Loading...
HomeMy WebLinkAbout13 - 05-07-2007_Authorize City Manager to sign Amendment No_ 2 to _13 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Chris Kukulski, City Manager SUBJECT: Water Renovations Field Survey MEETING DATE: 5/7/07 BACKGROUND: Attached is a copy of the partially executed Amendment No. 2 with Morrison Maierle, Inc. for Professional Surveying Services for water main renovation projects. The document is in the City’s standard format. The amendment is to add two sections of Lamme to the survey project that were not part of the original scope of services. City staff will use the information to design the water main replacement projects. These sections have been added because we have experienced a large number of breaks and feel it is important to get it replaced. The proposed fee of $16,192 appears to be commensurate with the project complexity and anticipated total project cost. RECOMMENDATION: Authorize City Manager to sign. FISCAL EFFECTS: This project will be paid for from the Water Fund. ALTERNATIVES: As suggested by the City Commission. Respectfully submitted, _________________________________ ____________________________ Robert J. Murray Jr., Project Engineer Chris A. Kukulski, City Manager Attachments: Amendment No. 2 Report compiled on 4/24/2007 100 101 102 103