Loading...
HomeMy WebLinkAbout2007-02-26 18-00_14-16_4_40pm_4_50pm_ FacilitiesFacilities Management - FY 08 Budget Summary Budget Highlights ƒ Monitor the new library through the warranty period and through the season changes so that any issues of concern can be identified and addressed. ƒ Complete the initial programming for the space needs at the old library and begin bidding and construction phase for the remodel of the building for a new City Hall. Oversee the project and monitor construction. ƒ Complete the preliminary design work and bid documents with a goal of spring construction for the Downtown Bozeman Intermodal Facility. Oversee the project and monitor construction. ƒ Re-bid and award the contract for custodial services for the major city owned buildings. ƒ Begin a building-by-building analysis for the purpose of creating a Facilities Condition Index which is an objective evaluation of each city building to determine a maintenance schedule that can then be included in the Capital Improvements Program budget. ƒ My budget request includes a new hire in Facilities. This person will provide needed assistance to the department as more of my time is dedicated to construction oversight. This person will also spend a portion of the day at the new library for mid-day cleaning and year-round grounds maintenance that will be needed once the landscaping work is completed. ƒ Utility costs have been adjusted based on both historic use and the cost projections provided by NorthWestern Energy for all buildings. Building Specific Details City Hall – Maintain the facility as we transition into a new building through reduced maintenance but not serious deferred maintenance. Money is budgeted to clear out years of accumulated files and to sort and move files into a new storage area. Increase refuse disposal by $1,200 Moving costs to relocate files $10,000 Boxing and shelving for file storage $10,000 Annex – Split off the boiler in anticipation of the sale of City Hall for improved energy efficiency and practical use. Split off boiler and convert to hot water from steam $40,000 Facilities Condition Index $12,000 15 Facilities Management - FY 08 Budget Summary Page 2 Shops – Re-roof the north wing of the complex. Re-roof north wing of the complex $20,000 Facilities Condition Index $8,000 Professional Building – On-going maintenance and general building improvements for multiple-department, long-term city occupancy. Air conditioning maintenance based on last oil sample $6,000 Facilities Condition Index $14,500 New Public Library – Budget has been adjusted down to reflect actual spending now that we have some building history to reference and to reflect building budget deficit. Costs will increase next year when we are out of the warranty period and after landscaping. Library Building – Utility and maintenance costs are brought back into the budget now that we are keeping and remodeling the building. Senior Center – Replace the de-laminating floor in the dining area and the entryway and coat closet. Install an air conditioning system for the areas of the building not currently served by AC. Replace dining room floor $33,000 Replace entrance and coat room floor $20,000 Add horn and strobes for fire alarm in basement areas of the building $10,000 Air conditioning installation in dining area $22,000 Facilities Condition Index $14,000 Station #2 – Building improvements to reflect the age and condition of the building. Wash and paint engine room to cover diesel exhaust and old paint $5,000 Replace de-laminated flooring in kitchen area $4,000 Replace deteriorating and inefficient irrigation system $4,000 Facilities Condition Index $6,000 Request for an additional employee – An additional person is needed for some mid-day cleaning at the new library based on the number of people that move through the building daily. The construction related workload will be very heavy this year requiring more help in overseeing contracted services such as building maintenance, snow removal and other grounds related activities. 16