Loading...
HomeMy WebLinkAboutPacket 2007-02-20_9-14_4_30pm - 4_45pm_ Public Services Admin_EngineeringEngineering Division Of the Department of Public Works Primary Functions • Assure that the City’s long term infrastructure master plans and the Capital Improvement Plans for Water, Wastewater, Stormwater, Solid Waste and Transportation Facilities are maintained and implemented in a cost effective manner; • Assure that all City infrastructure improvements are properly installed to serve the communities immediate and long-term needs. Major Areas of Responsibility Infrastructure – Master Planning, CIP, Design & Construction Oversight, Standards Development • Streets/Signals/Sidewalks • Water – Treatment & Distribution • Sanitary Sewer - Collection & Treatment • Solid Waste/Landfill • Storm Water - Collection & Treatment Records & Mapping • Infrastructure Record Drawings • Aerial Photos • Property Plats, Easements, Vacations, etc • SID, Lighting & Payback Districts • Property Ownership Records • Street Names & Addressing • Annexation, Zoning & Reference Maps • Sewer & Water Service Records Subdivision & Zone Code Reviews Other • Sanitary Sewer Pretreatment Program • Floodplain Program • Snow Removal & Weed Enforcement • Traffic Counts & Studies • Public R/W Management • SID’s & Payback Districts Street & Alley Vacations & Closures • Sidewalk Programs Encroachment & Occupancy Permits Ordered Installations & Repairs • Traffic Calming Program 9 Major Public Projects in the Division Water Treatment & Distribution • Lyman Creek Collection Improvements • Hilltop Tank Re-Painting • Water Main Replacements, Main Street • Implement Water Conservation Program Wastewater Collection & Treatment • WWTP Modifications • Pretreatment Program Transportation • South 19th, Babcock to Kagy (Now MDT) • Finish Durston Road • Coordinate Main Street Overlay Project Signal Replacement Project with MDT and Business • Implement Phase II Stormwater Program Owners • Road Design Workshop – Walkable Communities • Coordinate 2006 Transportation Plan Update Best Practices Solid Waste • Facilitate Construction of Convenience Station • On-going support to Solid Waste Division Representative Major Private Projects • Baxter Meadows • Laurel Glen • Cattail Creek • Gallatin Center • Bridger Peaks • Valley West • Gateway Development • Stoneridge • Creekwood Subdivision • The Legends Subdivision • Meadow Creek Subdivision • West Winds Subdivision Division Staffing City Engineer Rick Hixson Engineering Assistant Andy Kerr Engineer II Bob Murray Engineering Inspector Tom Hudson Engineer II Sue Stodola Drafting/GIS Bill Stetzner Engineer I Dustin Johnson Administrative Assistant Helene Greninger Engineer I Brian Heaston Seasonal (Snow Removal) Mary Armstrong Personnel Budget (FY 2007): $368,164.00 (Includes all benefits and seasonal employees – averaging 2.5% per year increase since 2004) Operating Budget (FY 2007): $134,020.00 10 Page 3 PUBLIC STREET AND STORM SEWER PROJECTS 1/1/06 TO 12/31/06 STREETS (LF)STORM SEWER $VALUE 1 1 Durston Road, 7th to 19th 3900 1,810,000 2 N. 19th/Valley Center Signal SID 677 n/a n/a 168,291 3 Babcock Street SID 683 4960 3260 3,118,477 4 Valley Center SID 676 3834 1,820,034 5 N. 19th SID 675 4560 1,913,925 6 N. 19th/Cattail Signal SID 678 n/a n/a 165,291 7 Durston Road, 19th to Fowler 5435 3610 4,374,573 TOTAL 22689 6870 13,370,591 1 Unless actual costs are known, projects are valued at $40/LF for water, $30/LF for sewer, $75/LF for streets, and $50/LF for storm sewer * Plan review only - project not under construction Work Description Final Cost 2006 Street Improvements $318,724 Paving N. Wallace/L Street, overlay of S. Church Ave., chip seal of New Hyalite View, Grafs Sub., Ellis Street 2006 Thermoplastic Pavement Markings $25,000 1 2006 Curbing and Sidewalk Improvements $124,328 Fairgrounds Sidewalk Curb replacement unit block W. Curtiss 2 Misc. Curb replacements/ped. ramps/alley approach replacements: $1,190 3 Misc. Curbcut/Sidewalk Permits Issued: 27 4 2006 Weed/Sidewalk Obstruction Enforcement: 20 lots mowed for non-compliance 5 Traffic Calming Investigations: N. 25th Ave. N. Wallace Ave. Graf Street S. Tracy Ave. 6 Cemetery Expansion Re-grading Project Re-grading of approx. 4.7 acres to facilitate future cemetery use. Design and staking by Engineering Dept., work completed by Street Dept. PROJECT ENGINEER FEE EST. COMP. 1 Water Renovations Surveying MM $103,562 2007 2 Hyalite Trans. Main MM $837,434 2006 3 Wastewater Facility Plan MM $187,996 2007 4 Water Facility Plan Allied $182,395 2006 COST SUBTOTAL $1,311,387 ***************STREET/TRANSPORTATION/MISC.************ 5 W. Babcock Improve. (Design/Con)MM $542,617 2006 6 Durston Road - 7th to 19th HKM $420,618 2007 7 Valley Center/N. 19th SID TD&H $827,994 2006 8 Durston R/W Acq.Various $218,835 2006 9 Durston Road SID (Design/Con)MM $667,216 2007 10 Stormwater Facility Plan HDR $194,600 2007 COST SUBTOTAL $2,871,880 ********************LANDFILL*************************** 11 Gas/Groundwater Monitoring,Tetratech $33,608 On going Well Abandoment, Gas Control 12 Transfer Station Design SCS/Allied $385,000 2006 13 Transfer Station Design Springer Grp.$182,800 2006 14 Misc. Landfill Consulting Great West $23,228 On going COST SUBTOTAL $624,636 *********************Misc****************************** 15 Mandeville Masterplan Thinktank $39,722 2006 SIDEWALKS / CURBCUTS / WEEDS / MISC. II SERVICE CONTRACTS OVERSIGHT *******************WATER & SEWER**************** CITY OF BOZEMAN STREET IMPROVEMENTS/MAINTENANCE 11 2006 TOTAL SERVICE CONTRACTS $4,847,295 2005 Total Service Contracts $5,387,231 12 Page 4 III. PLANNING REVIEWS SUMMARY Calendar Year 2001 2002 2003 2004 Reviews Lots Reviews Lots Reviews Lots Reviews Lots Zoning Cond. Use Permits 14 12 16 Concept Plan Reviews 4 9 5 PUDs 4 6 6 Minor Site Plans 23 19 20 Major Site Plans 17 21 19 Annexations 10 9 8 Subdivision Subdivision Preapplications 10 787 15 369 15 489 Major Sub. Prelim. Plats - Approved 9 660 8 40 7 596 Minor Sub. Prelim. Plats - Approved 6 11 9 946 7 26 Final Plats 12 405 16 339 19 495 TOTALS 109 1863 121 1694 114 1606 13