Loading...
HomeMy WebLinkAboutAgenda Packet 12-04-06_Meadow Creek Phase One Summary_11 planning · zoning · subdivision review · annexation · historic preservation · housing · grant administration · neighborhood coordination CITY OF BOZEMAN DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building 20 East Olive Street P.O. Box 1230 Bozeman, Montana 59771-1230 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net MEMORANDUM -------------------------------------------------------------------------------------------------------------------------------------- TO: TIM COOPER, CITY ATTORNEY’S OFFICE FROM: DAVE SKELTON, SENIOR PLANNER RE: FINAL PLAT REVIEW AND APPROVAL MEADOW CREEK SUBDIVISION, PHASE ONE PLANNING FILE NO. P-06058 DATE: OCTOBER 27, 2006 (Updated November 22, 2006) -------------------------------------------------------------------------------------------------------------------------------------- Engineering, Inc., on behalf of Meadow Creek Partners, LLC, has made application to the Planning Office for Final Plat review and approval for Meadow Creek Subdivision, Phase One, being the first phase of a residential major subdivision to subdivide 202.4± acres and create 341 mixed-use residential lots located south of Stucky Road, west of South 19th Avenue, and north of Blackwood Road. Phase One would subdivide 118.4 acres and create 155 residential lots. On Monday, November 7, 2005, the City Commission granted preliminary plat approval to subdivide 202.41± acres and create Meadow Creek Subdivision subject to twenty-nine (29) conditions (Planning Application No.P-05053). The Commission is scheduled to tentatively approve the Findings of Fact and Order on November 6, 2006, and a draft of the Findings of Fact and Order is attached to this memorandum for your review. The developer has applied for final plat review and approval of Phase One, electing to financially guarantee the following subdivision improvements for said phase: a) portions of the internal subdivision street for Enterprise Boulevard and Parkway Avenue, b) City standard boulevard sidewalks, c) boulevard landscape and irrigation, d) open space landscape, irrigation and trail improvements, and e) parkland improvements. The applicant will provide Staff with the applicable financial guarantee for the remaining subdivision improvements prior to scheduling this matter before the City Commission. A “No Build” Restriction is necessary at this time with this final plat application. All street and municipal infrastructure improvements are scheduled to be completed, inspected and accepted by the City of Bozeman with the filing of the final plat for Phase One, with exception to sections along Enterprise Boulevard and Parkway Avenue. Based on the summary review provided below, the City Engineer’s Office and Planning Department have reviewed the final plat application against the conditions of preliminary plat approval; and as a result, find that final plat approval should be granted. Page 2 Enclosed, please find four (4) original mylars of the Final Plat, original Platting Certificate, copy of Improvements Agreement and financial guarantee, copy of Declaration of Covenants and Restrictions for the Property Owner’s Association, and deed to transfer site for the Fire Department’s substation. The Planning Staff respectfully requests that you prepare a City Attorney's Certificate using the attached original Platting Certificate; approve the Certificates of Director of Public Service, Release of Sanitary Restrictions, and Certificate of Completion "as to form". If you find this submittal acceptable and complete, the applicant respectfully requests that the Final Plat application be scheduled before the Bozeman City Commission at the earliest time possible. An application for final plat review and approval was submitted on Wednesday, October 9, 2006 and deemed substantially complete. The 45-day (i.e., working days) review period would be Wednesday, December 19, 2006. However, a review against the conditions of preliminary plat approval indicated that the following conditions were not yet met upon submitting the application: condition #1 – BMC code provisions need to be met, 2) condition #2 and #3 confirmed by City Engineer’s Office, 3) condition #10 – 100-year flood elevations, 4) condition #15 – modify covenants with language to maintain existing vegetation in right-of-way, 5) condition #25 – modify covenants, 6) condition #27 – identify all parks as “public”, 7) condition #28 – modify covenants to provide landscape and placement details for storm water facilities, and 8) condition #29 – modify covenants to include Seifert language. A revised final plat and platting certificate, containing a new Certificate of Consent of Mortgage on the face of the plat, was prepared and submitted to the Planning Office on November 6, 2006. Therefore, the 45-day (i.e., working days) review period for this final plat now expires on Tuesday, January 9, 2007. Once the Commission has acted on the Final Plat application, please forward all of the original mylar plats, documents, and supplemental information to Debbie Arkell, have her sign the appropriate certificates on the final plat, and then return all of the documents to the Planning Office. The conditions of preliminary plat approval, which are pertinent to this phase, and how they have been met, follow: Planning Application No. P-06058: 1. The applicant must comply with all provisions of the Bozeman Municipal Code, which are applicable to this project. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. a. Item “e” of staff report - Section 18.42.180.C - Requires 10% of the net building acreage to be dedicated to Restricted Size Lots, or a minimum of 453,301 square feet for this subdivision. The Final Plat must identify the RSL lots. Both the certificate page(sheet 1 of 3) and subdivision page (sheet 2 of 3) of the final plat need to provide a “notation that identifies the RSL lots for Phase One to demonstrate how the requirement for RSL lots will be met. The final plat for Phase One has been updated to address said provision. b. Item “m” of staff report - Section 18.78.060.G - A professional cultural resource inventory of the site to be conducted by a qualified archeologist is necessary. The results Page 3 of said survey must be provided to the Planning Office and the State Historic Preservation Office prior to the disturbance of any of the subdivision grounds. The final plat application now provides a copy of the professional cultural resource inventory. c. Item “v” of staff report - The final plat shall provide public utility easements along side and rear lots lines as required by the subdivision regulations. However, in the event front yard easements are used, side and rear yard easements must still be provided on the plat unless written confirmation is submitted to the Planning Office from all utility companies indicating that front yard easements are adequate to service said subdivision lots. The easement notation required in Section 16.14.050.B.4 of the Bozeman Subdivision regulations shall also be provided on the final plat. Because the final plat does not provide utility easements along all required yards, it is necessary to provide the final plat application approval by all utility companies that said easements being provided are acceptable. Said letters from all applicable utility companies has been provided with an updated version of the final plat. 2. The traffic impact analysis submitted for the project shall be approved by City Engineering and the Montana Department of Transportation. All improvements needed to provide adequate level of service for the analyzed intersections must be installed with the project. Said improvements are being installed and are scheduled be completed prior to the filing of the final plat. However, a “No Build” restriction is necessary with the filing of the plat based on the outcome of said required improvements, as well as other outstanding subdivision improvements identified by the City Engineer’s Office. 3. Access Permits for the intersections, and Occupancy Permits for water and sewer mains and services within the State's right-of-way must be obtained from the Montana Department of Transportation. The City Engineer’s Office has determined that said condition has been met. 4. The west half of South 19th Avenue shall be improved to the 120’ right of way, 5 Lane Principal Arterial standard as shown in the Greater Bozeman Area Transportation Plan, 2001 Update, along the entire frontage of the subdivision including tapers back to existing asphalt on the north and south end meeting AASHTO standards. All of the improvements to South 19th Avenue shall be complete with Phase I of the subdivision. Said improvements are being completed prior to the filing of the final plat. 5. The sidewalks adjacent to South 19th shall be 6 feet wide, and shall be installed at the time the street improvements are done. Said improvements are scheduled to be completed prior to the filing of the final plat or financially guaranteed. 6. The north half of Blackwood Road along with the required utility extensions shall be improved to the 62-feet back-of-curb to back-of-curb Collector standard as shown in the Greater Bozeman Area Page 4 Transportation Plan, 2001 Update, along the entire frontage of the subdivision. This shall include the curb for the future median. Said improvements for Phase One are scheduled to be completed with the filing of the final plat. 7. The full width of Graf Street along with the required utility extensions shall be improved to the 48 feet back-of-curb to back-of-curb Collector standard as shown in the Greater Bozeman Area Transportation Plan, 2001 Update, from South 27th Avenue to the western boundary of the property. Said improvements will be completed with the filing of the final plat. 8. The full width of South 27th Avenue from Blackwood Drive to Alder Creek Drive, and the east half from Alder Creek Drive to Graf Street, along with the required utility extensions shall be improved to the 62-feet back-of-curb to back-of-curb Collector standard as shown in the Greater Bozeman Area Transportation Plan, 2001 Update. This shall include the curb for the future median where only a half street is constructed. Said improvements will be completed with the filing of the final plat. 9. The proposed variances identified in the preliminary plat submittal are not variances, but rather deviations from the City Design Standards. Calculations must be submitted to justify the deviations, or the intersections realigned to meet the standards. The City Engineer’s Office has approved said variances. 10. 100-year flood elevations shall be computed for the watercourses that are within the subdivision boundary. All locations where flooding limits encroach onto proposed lots shall be noted on the final plat along with minimum floor elevation for the structures to be constructed on the effected lots. Said information is provided on the final plat. 11. The sewer master plan for the area requires that a 10-foot main be installed through this subdivision or the majority of it to provide service for the properties to the south. The preliminary plat submittal states that all interior mains will be 8 inches. The mains must be adequately sized to serve the area to the south. Said 12-inch main as required by the City Engineer’s Office has been installed to the south property line. 12. A 1-foot No Access Strip shall be shown on the plat along the entire frontage of South 19th Avenue, Blackwood Drive, Graf Street, and South 27th Avenue with the exception of along Lots 11 & 12 of Block 5, and Lots 13, 14, and 15 of Block 9. These lots shall utilize a shared access as shown on the preliminary plat submittal. The 1-foot No Access strip and shared access points are noted accordingly on the final plat for Phase One. 13. All weather access roads shall be installed to provide access to all sewer mains that are not located within an existing street. Page 5 The City Engineer’s Office has approved all weather access roads for this phase. 14. Pursuant to Section 18.42.070.3 of the UDO, sewer and water mains shall be stubbed out to the boundary of the subdivision to provide future service to adjoining undeveloped land. The applicant indicates that water and sewer mains have been extended to the boundaries of the subdivision for future extension of infrastructure to the west and south, which the City Engineer’s Office has confirmed.. 15. Section 18.44.020.2.b of the UDO requires that the subdivision be a PUD unless the rights of way are 60 feet wide. Two 40-foot rights of way separated by 60 feet of open space is being proposed for South 29th Avenue. Either the subdivision will need to be submitted as a PUD, or the rights of way increased to 60 feet. Alternatively, the entire 140 feet may be dedicated. The plat and covenants shall require that the median in this street be maintained by the homeowners association. This shall include any maintenance or removal of the trees along the ditch. The City Engineer’s Office has accepted the entire 140 feet, and the protective covenants require the homeowner’s association to maintain the mature vegetation within the median. 16. That the subject property shall be formally annexed to the corporate limits of the City of Bozeman with the appropriate municipal zoning designations adopted by the City Commission prior to the applicant submitting for final plat approval for any phase of the major subdivision. Resolution of Annexation No. 3909 was adopted by the City of Bozeman on April 17, 2006 to annex the entire said lands. 17. That the phasing of the major subdivision will not have sub-phasing within each phase and that each phase shall be in the proper sequential format, regardless of the timing for each phase to be filed at the Clerk and Recorder’s Office. No sub-phasing is proposed. 18. That the subdivision exemption for relocation of a common boundary between the adjoining landowners (i.e., Marshall Bennett and Jane Schaaf and Don Miller) be filed at the Gallatin County Clerk & Recorder’s Office prior to submitting for final plat review and approval. Said common boundary realignment has been filed. 19. That water rights, or cash in-lieu thereof, shall be provided and paid for prior to final plat review and approval for each phase. If the final plat of the subdivision is filed in phases, water rights, or cash in-lieu thereof will only be required for each phase of the subdivision that is being filed. The applicant shall provide payment of the calculated cash in-lieu of water rights based on an amount determined by the Director of Public Service. Payment of cash in-lieu of water rights in the amount of $54,903.31 for Phase One was paid on October 10, 2006. Page 6 20. That the final plat contain the following language that is readily visible with lettering, at a minimum height of 3/16-inch, placing future landowners of individual lots on notice of the presence of high groundwater in the area of the subdivision for review and approval by the Planning Office: “Due to the potential of high ground water tables in the areas of the subdivision, no partial or full basements will be permitted in areas designated as having groundwater within five (5) of the surface during peak irrigation. The finish floor of all residential structures shall be not less than two (2) feet above the established elevation from the top of curb of the adjoining street. Furthermore, it is not recommended that residential dwellings or commercial structures with full or partial basements be constructed without first consulting a professional engineer licensed in the State of Montana and qualified in the certification of residential and commercial construction.” Said notation is provided on the final plat. 21. Dedication of the public parkland will occur with the first phase of the major subdivision. Two of the four public parks proposed with the subdivision will be dedicated with Phase One of the major subdivision. Each park noted on the final plat must identify said acres to be dedicated, exclusive of any common areas and/or storm water facilities. The Recreation and Parks Advisory Board and Planning Office endorsed the parkland with Phase One with the exception to note the actual acres for each park and that Ainsworth Park is a Public Park. 22. That the applicant dedicates with the first phase of the major subdivision up to a 2-acre parcel of land, reviewed and approved by the City of Bozeman Fire Department, for the purposes of a fire department substation situated along Graf Street. This matter was not addressed with the original final plat application, whereby said parcel of land for the purposes of a fire department substation along Graf Street was deeded to the City. The creation and documentation to transfer said parcel to the City of Bozeman was executed on November 16, 2006 (see attached copy of warranty deed). 23. Public pathway easements shall be at least 25-30-feet wide, including said easement located in Block 23 of Phase 2b, and noted accordingly on the final plat. Said public pathway easements are provided. However, the alignment of the easement on Lot 14 and 15, Block 9 does not allow proper placement of the 30-foot wide shared access easement service both lots. Therefore, said alignment will need to be adjusted. 24. That the final design and specifications of the trail system within the major subdivision be reviewed and approved by the Superintendent of Parks and Recreation. 25. That the applicant modify the protective covenants of the homeowner’s association as outlined in the staff report and that the applicant submit a revised draft of the protective covenants for review and approval by the Planning Office at least thirty (30) days prior to submitting for final plat approval of the initial phase of the major subdivision. Page 7 Said protective covenants need to be modified to address items identified by staff. 26. All areas for the purposes of open space, storm water runoff facilities, and other common areas owned and maintained by the homeowner’s association shall be identified on final plat as “common area” and/or “common open space”, and noted accordingly in the protective covenants of the homeowner’s association documents. 27. All parks that are dedicated parkland shall be noted on the final plat as “Public Park”. Ainsworth Parks has been identified as a public park on the final plat. 28. That the applicant provide in the protective covenants of the homeowners association for review and approval by the Planning Office, written language and landscape details providing the necessary provisions for the proper landscaping of all storm water facilities and related structures, and that all facilities will be a distance not less than 30 feet from the water courses. The protective covenants will be amended to provide adequate provisions for the placement and landscaping of the storm water facilities and related structures. 29. That the applicant provide in the protective covenants of the homeowners association for review and approval by the Planning Office, the recommended language provided by Mr. Donald Selfert regarding agricultural and farming practices, damage due to livestock, pets, and trespassing on private agricultural lands. The revised protective covenants contain the recommended language provided by Mr. Seifert. DS/dps Attachments Applicants Response to Conditions of Preliminary Plat Approval Four (4) original mylars and original Platting Certificate Copy of Improvements Agreement Copy of Warranty Deed and Realty Transfer Certificate for City of Bozeman Fire Station Site cc: Meadow Creek Partners, LLC., 924 Stoneridge Drive, Suite 1, Bozeman, MT 59718 Madison Engineering, 924 Stoneridge Drive, Suite 1, Bozeman, MT 59718 Engineering Inc., 705 Oysterman Drive, Suite F, Bozeman, MT 59715