Loading...
HomeMy WebLinkAboutAgenda Packet 12-04-06THE CITY COMMISSION MEETING OF BOZEMAN, MONTANA AGENDA Monday, December 4, 2006 A. Call to Order - 6:00 PM - Community Room, Gallatin County Courthouse, 311 West Main B. Pledge of Allegiance and Moment of Silence C. Public Service Announcement - Stormwater (Johnson) D. Minutes - November 6, November 13 and November 27, 2006 *Consider a motion to approve the Minutes of November 6, November 13 and November 27, 2006 as submitted. E. Consent 1. Authorize payment of claims (LaMeres) 2. Adopt Commission Resolution No. 3981, Change Order No. 2 Durston Road SID 684 Project (Stodola) 3. Authorize City Manager to Sign Temporary Drainage Easement – Blackleaf Group, LLC (Stodola) 4. Approve Meadow Creek Subdivision, Phase 1 Final Plat (Cooper) *Consider a motion to approve Consent items 1 – 4 as listed above. F. Public Comment - Please state name and address in an audible tone of voice for the record. This is the time for individuals to comment on matters falling within the purview of the Bozeman City Commission. There will also be an opportunity in conjunction with each agenda item for comments pertaining to that item. Please limit your comments to 3 minutes. G. Action Items 1. Presentation of the Contract Goal of the Bozeman Parking Garage (Fontenot) *Consider taking action if necessary. 2. Buffalo Wild Wings Conditional Use Permit/Certificate of Appropriateness, #Z-06209, continued from Nov. 6th - APPLICATION WITHDRAWN AT APPLICANT’S REQUEST (Kozub) *Consider a motion acknowledging receipt of the applicant’s request to withdraw their application for Buffalo Wild Wings Conditional Use Permit/Certificate of Appropriateness, #Z-06209. 3. Edgewood Townhomes Preliminary Planned Unit Development, #Z- 06149, continued from Nov. 6th - APPLICATION WITHDRAWN AT APPLICANT’S REQUEST (Skelton) *Consider a motion acknowledging receipt of the applicant’s request to withdraw their application for Edgewood Townhomes Preliminary Planned Unit Development, #Z- 06149. 4. Edgewood Townhomes Major Subdivision Preliminary Plat, #P-06041, continued from Nov. 6th - APPLICATION WITHDRAWN AT APPLICANT’S REQUEST (Skelton) *Consider a motion acknowledging receipt of the applicant’s request to withdraw their application for Edgewood Townhomes Major Subdivision Preliminary Plat, #P-06041. 5. Old Chicago Minor Subdivision Preliminary Plat Application #P-06054 – PUBLIC HEARING (Knight) *Consider a motion to conditionally approve the Old Chicago Minor Subdivision Preliminary Plat application, based on the Planning Board’s recommendation of conditional approval, with the conditions listed on Page 2 of Planning Board Resolution #P-06054. H. FYI/Discussion 1. Goals Discussion (Kukulski) 2. Affordable Housing Task Force Update (Brey) 3. South 19th Street Lights (Fontenot) I. Adjournment City Commission meetings are open to all members of the public. If you have a disability that requires assistance, please contact our ADA Coordinator, Ron Brey, at 582 2306 (TDD 582 2301). Please note that agenda submissions must be received by the City Manager the Wednesday before the Commission Meeting. For further information please see the City of Bozeman webpage at www.bozeman.net Commission meetings are televised live on cable channel twenty. Repeats are aired at 5 PM on Wednesday and Friday and 1 PM on Sundays. LINKED MINUTES OF THE MEETING OF THE CITY COMMISSION BOZEMAN, MONTANA November 6, 2006 ***************************** The Commission of the City of Bozeman met in the Community Room, Gallatin County Courthouse, 311 West Main, on Monday, November 6, 2006, at 6:00 p.m. Present were Mayor Jeff Krauss, Cr. Sean Becker, Cr. Steve Kirchhoff, Cr. Jeff Rupp, City Manager Chris Kukulski, Assistant City Manager Ron Brey, Public Works Director Debbie Arkell, Assistant Planning Director Chris Saunders, City Attorney Paul Luwe, and City Clerk Brit Fontenot. 0:10:07 [18:03:15] A. Call to Order - 6:00 p.m. - Community Room, Gallatin County Courthouse, 311 West Main 0:10:09 [18:03:17] B. Pledge of Allegiance and Moment of Silence 0:10:56 [18:04:04] Changes to the agenda Mayor Krauss asked City Manager Kukulski about any changes to the agenda. Mr. Kukulski responded that there has been a request to continue the public hearing, Edgewood Townhomes Preliminary Planned Unit Development, #Z-06149, to December 4, 2006. 0:11:42 [18:04:58] C. Public Service Announcement(s) - 911 Mil Levy (Cashell/Rosenberry) Anna Rosenberry, City of Bozeman Finance Director informed the public about the 911 ballot issue in the context of financial matters. Gallatin County Sheriff Jim Cashell stated the top 10 reasons for supporting the 911 Mil Levy. Public Works Director Debbie Arkell updated the public on the progress of the construction of Durston Road. 0:18:06 [22:54:26] D. Minutes - October 16, October 20 (Joint City-County Meeting), and October 30, 2006 0:18:09 [18:11:23] Motion and Vote to approve the minutes for October 16, October 20 (Joint City-County Meeting), and October 30, 2006 as submitted. It was moved by Cr. Becker, seconded by Cr. Rupp, to approve the minutes for October 16, October 20 (Joint City-County Meeting), and October 30, 2006 as submitted. 2 Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 0:18:22 [18:11:24] E. Consent 1. Authorize payment of claims (LaMeres) 2. Authorize City Manager to sign State Lands East Annexation Agreement (Cooper) 3. Approve Resolution 3974, Resolution of Annexation for State Lands East (Cooper) 4. Provisionally adopt Ordinance 1677, Initial Zoning of State Lands East (Cooper) 5. Adopt Resolution 3975 declaring Mandeville Farm blighted (Kukulski) 6. Approve Morgan Annexation (part 46), #A-06010 7. Adopt Resolution 3976 transferring ownership of parking lots from the Parking Commission to the City of Bozeman (Luwe) 8. Approve Durston Road SID Project - Amendment No.4 to the Professional Services Agreement (Stodola) 9. Approve Hyalite Transmission Main Project - Amendment No.3 to the Professional Services Agreement (Stodola) 10. Authorize Mayor to sign Findings of Fact and Order for Meadow Creek Subdivision (Cooper) 11. Award contract for fire suppression system for Bogert Pavilion to Spring Corporation (Goehrung) 12. Award bid for Side Loader to Rocky Mountain Truck Center (Johnson) 13. Finally Adopt Ordinance 1676 Legends Zone Map Amendment (Bernard) 14. Approve Baxter Meadows Phase 3A Final Plat (Cooper) 15. Approve Bozeman Gateway Subdivision Planned Unit Development, Phase 3, Final Plat (Cooper) 16. Authorize City Manager to sign Wilda Lane Annexation Agreement (Cooper) 17. Adopt Resolution 3978 Wilda Lane Annexation (Cooper) 18. Adopt Ordinance 1679 Wilda Lane Zone Map Amendment (Cooper) 19. Authorize payment of Buttrey's Solvent Site Cost Recovery (Luwe) 20. Approve Oak Springs Subdivision, Phase 3, Final Plat (Cooper) 21. Authorize Mayor to sign Findings of Fact and Order for LeClair Minor Subdivision (Cooper) 22. Authorize Mayor to sign Findings of Fact and Order for Wierda Minor Subdivision (Cooper) 0:18:25 [18:11:49] F. Public Comment Mayor Krauss called for public comment on Consent Items E1 - E22. 0:18:45 [18:12:11] Public Comment - Deb Stober 3 Deb Stober resides at 395 North Valley Drive. She voiced concern about the Durston Road SID amendment and the contract increase due to a proposed engineering change. 0:20:52 [18:12:13] Mr. Kukulski Mr. Kukulski provided clarification on the Professional Services Agreement (E8 Approve Durston Road SID Project - Amendment No.4 to the Professional Services Agreement. 0:27:06 [18:19:40] Motion and Vote to approve consent items E1 - E22 as listed. It was moved by Cr. Rupp, seconded by Cr. Kirchhoff, to approve consent items E1 - E22 as listed. Those voting Aye being Crs. Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 0:27:24 [18:20:40] F. Public Comment Mayor Krauss called for public comment. This was the time for individuals to comment on matters falling within the purview of the Bozeman City Commission. There was also an opportunity in conjunction with each agenda item for comments pertaining to that item. 0:27:45 [18:21:08] Public Comment - Marty Lambert Marty Lambert resides at 1611 Willow Way. He opposes the Lincoln Park Condo project and suggested limiting dense development and restricting the proposal to maintain the single family character of the neighborhood. 0:30:17 [18:21:09] Public Comment - Savannah Barns Savannah Barns resides at 1602 Maple Lane. She is angry about having to appear before the Commission for the fourth time to protect their neighborhood. She resents feeling like a victim and opposes the Lincoln park Condos project. 0:33:14 [18:23:55] Public Comment - Joanne Wilke Joanne Wilke resides at 1665 Alder Court and opposes the revised Lincoln Park development plan. 0:36:49 [18:26:46] Public Comment - Michael Ivy Michael Ivy resides at 1407 South Rouse and asks that the Commission not delay the issue [of Edgewood Townhomes] and requested that the Commission proceed with testimony and follow-up with a vote. 0:40:01 [18:33:08] Public Comment - Deb Stober Deb Stober resides at 395 North Valley Drive. She seeks a date certain for the opening of Durston and Annie streets. She questioned the possibility of enacting ordinance limiting road closures and proposed a waiting list for construction. She is seeking a Valley Drive street sign on Durston Road. She asked the Commission to seriously consider the 4 number of blight designations being adopted and is upset about compact fluorescent light bulbs in the City. 0:42:55 [18:33:47] Public Comment - David Smith David Smith, President and CEO of the Bozeman Area Chamber of Commerce, stated that the road construction this year is a colossal failure and noted that some businesses in the construction zones have revenues half of what they would normally have. He suggested an allowance in sign codes for larger signs in construction areas. 0:47:12 [18:40:43] G. Action Items 0:47:20 [22:53:38] 1. Special Improvement Lighting District No. 696, Laurel Glen Subdivision Phase II (Rosenberry) - PUBLIC HEARING, open and continue to November 20, 2006. 0:47:30 [18:40:46] Staff Report Director of Finance Anna Rosenberry requested an open and continuance on the Special Improvement Lighting District No. 696, Laurel Glen Subdivision Phase II. 0:47:55 [18:41:08] Public Comment Mayor Krauss called for public comment. No person commented. 0:48:10 [18:41:12] Motion and Vote to continue to Nov. 20, 2006, the Special Improvement Lighting District No. 696, Laurel Glen Subdivision Phase II It was moved by Cr. Kirchhoff, seconded by Cr. Jacobson, to continue to Nov. 20, 2006, the Special Improvement Lighting District No. 696, Laurel Glen Subdivision Phase II. Those voting Aye being Crs. Kirchhoff, Jacobson, Becker, Rupp and Mayor Krauss. Those voting no being The motion carried. 0:48:40 [18:41:25] 2. Fire Master Plan (Winn) - PUBLIC HEARING 0:49:25 [18:41:55] Staff Report Director of Public Safety - Fire Services Chuck Winn presented the staff report and Fire Master Plan. 1:11:59 [18:42:51] Public Comment Mayor Krauss called for public comment. No person commented. 5 1:34:48 [19:09:10] Motion to adopt the amended fire protection master plan and formally adopt a 6 minute response time. It was moved by Cr. Jacobson, seconded by Cr. Becker, to adopt the amended fire protection master plan as the guiding document for our [City of Bozeman] future planning and formally adopt a 6 minute response time goal for the Bozeman fire department. 1:41:23 [19:13:32] Vote to adopt the amended fire protection master plan and formally adopt a 6 minute response time. [It was moved by Cr. Jacobson, seconded by Cr. Becker, to adopt the amended fire protection master plan as the guiding document for our [City of Bozeman] future planning and formally adopt a 6 minute response time goal for the Bozeman fire department.] Those voting Aye being Crs. Jacobson, Becker, Rupp, Kirchhoff and Mayor Krauss. Those voting No being none. The motion carried. 1:41:46 [19:14:40] Break Mayor Krauss called for a break. 1:54:06 [19:15:20] 3. Edgewood Townhomes Major Subdivision Preliminary Plat, #P-06041 opened and continued from August 28, 2006 (Skelton) 1:54:56 [19:16:39] Staff Report Senior Planner Dave Skelton presented the staff report. 2:04:42 [19:19:45] Public Comment Mayor Krauss called for public comment. 2:04:51 [19:20:52] Public Comment - Brian Gallik Attorney Brian Gallik, 35 N. Grand Avenue, appeared on behalf of his clients Jimmy and Sherry Pepper who are opposed to the pending application, including recent changes. He suggested that the Commission make decision based on the original application submitted months ago. 2:07:37 [19:22:28] Public Comment - Frank Munshower Frank Munshower resides at 1407 South Bozeman Avenue and is Chairman of the Executive Committee of the Bozeman Creek Neighborhood Association and requested a firm answer on whether this issue would be tabled. He also requested more notice before the Planning Dept. meets with the developer. 2:21:45 [19:36:20] Public Comment 6 Mayor Krauss called for further public comment. No person commented. 2:21:57 [19:36:49] Motion to continue the Edgewood Townhomes Major Subdivision Preliminary Plat, #P-06041 hearing to December 4, 2006. It was moved by Cr. Becker, seconded by Cr. Rupp, to continue the public hearing on the initial Edgewood Townhomes Major Subdivision preliminary plat application to December 4, 2006. 2:23:23 [19:49:25] Vote to continue the Edgewood Townhomes Major Subdivision Preliminary Plat, #P-06041hearing to December 4, 2006 [It was moved by Cr. Becker, seconded by Cr. Rupp, to continue the public hearing on the initial Edgewood Townhomes Major Subdivision preliminary plat application to December 4, 2006.] Those voting Aye being Crs. Becker, Rupp, Jacobson and Mayor Krauss. Those voting No being Cr. Kirchhoff. The motion carried. 2:23:34 [19:49:44] 4. Edgewood Townhomes Preliminary Planned Unit Development, #Z-06149, opened and continued from August 28, 2006 (Skelton) 2:23:39 [19:50:11] Staff report Senior Planner Dave Skelton presented the staff report. 2:24:18 [19:52:26] Public Comment Mayor Krauss called for public comment. 2:24:23 [19:53:10] Public Comment - Frank Munshower Frank Munshower resides at 1407 South Bozeman Avenue and is Chairman of the Executive Committee of the Bozeman Creek Neighborhood Association and requested that the City Planning Department notify the BCNA when they are meeting with the developer. 2:27:45 [19:56:41] Public Comment - Chuck Paden Chuck Paden resides at 507 Ice Pond Road. He requested clarification on whether or not the public will have the opportunity to comment on both Edgewood applications. 2:28:42 [19:57:22] Motion and Vote to continue the Edgewood Townhomes Preliminary Planned Unit Development, #Z-06149 to December 4, 2006. It was moved by Cr. Rupp, seconded by Cr. Kirchhoff, to continue the Edgewood Townhomes Preliminary Planned Unit Development [the original application], #Z- 7 06149 to Dec. 4, 2006. Those voting Aye being Crs. Rupp, Jacobson, Becker and Mayor Krauss. Those voting No being Cr. Kirchhoff. The motion carried. 2:29:50 [19:59:09] 5. Buffalo Wild Wings Conditional Use Permit/Certificate of Appropriateness, #Z-06209, opened and continued from October 16, 2006 (Kozub) 2:30:11 [19:59:46] Staff report Planner Susan Kozub presented the staff report. 2:31:27 [20:00:20] Public Comment Mayor Krauss called for public comment. No person commented. 2:34:51 [20:11:09] Motion to continue the Buffalo Wild Wings Conditional Use Permit/Certificate of Appropriateness, #Z-06209 to Dec. 4, 2006. It was moved by Cr. Kirchhoff, seconded by Cr. Jacobson, to continue the Buffalo Wild Wings Conditional Use Permit/Certificate of Appropriateness, #Z-06209 to Dec. 4, 2006. 2:36:16 [20:12:29] Vote to continue the Buffalo Wild Wings Conditional Use Permit/Certificate of Appropriateness, #Z-06209 to Dec. 4, 2006. [It was moved by Cr. Kirchhoff, seconded by Cr. Jacobson, to continue the Buffalo Wild Wings Conditional Use Permit/Certificate of Appropriateness, #Z-06209 to Dec. 4, 2006.] Those voting Aye being Crs. Becker and Mayor Krauss. Those voting No being Crs. Kirchhoff, Jacobson and Rupp. The motion failed. 2:40:07 [20:19:07] Substitute motion to continue the Buffalo Wild Wings Conditional Use Permit/Certificate of Appropriateness, #Z-06209 to Dec. 4, 2006. It was moved by Cr. Kirchhoff, seconded by Cr. Jacobson, continue the Buffalo Wild Wings Conditional Use Permit/Certificate of Appropriateness, #Z-06209 to Dec. 4, 2006. 2:40:27 [20:19:14] Vote to continue the Buffalo Wild Wings Conditional Use Permit/Certificate of Appropriateness, #Z-06209 to Dec. 4, 2006. 8 [It was moved by Cr. Kirchhoff, seconded by Cr. Jacobson, continue the Buffalo Wild Wings Conditional Use Permit/Certificate of Appropriateness, #Z-06209 to Dec. 4, 2006.] Those voting Aye being Crs. Jacobson, Becker and Mayor Krauss. Those voting No being Crs. Kirchhoff and Rupp. The motion carried. 2:40:55 [20:19:40] Mayor Krauss Mayor Krauss requested from Mr. Luwe information about whether or not the Mayor can postpone hearings in the absence of the applicant. 2:41:57 [20:20:28] 6. Lincoln Park Condos Site Plan, #Z-06193 (Kozub) (Tabled from Oct. 16, 2006) 2:42:17 [20:21:27] Staff Report Planner Susan Kozub presented the staff report 2:47:06 [20:22:56] Commissioner Rupp Commissioner Rupp stated that he was absent on October 16, 2006 the meeting in which when this item was tabled. 2:50:46 [20:26:51] Applicant Catherine Konen of Gaston Engineering appeared on behalf of the applicant and Jeremy Shay, the applicant, appeared on his own behalf. 3:15:03 [20:43:08] Public Comment Mayor Krauss called for public comment. 3:15:33 [20:43:35] Public Comment - Marty Lambert Marty Lambert resides at 1611 Willow Way and suggests this is an illogical development in a college town when one takes into consideration the character of the neighborhood. The proposal does not providing a transition area between units and parking will be an issue. 3:19:07 [20:43:43] Public Comment - Joanne Wilke Joanne Wilke resides at 1665 Alder Court . She clarified that her earlier comments referred to the revised plan, she continues to oppose the development. 3:22:11 [20:43:55] Public Comment - Savannah Barnes Savannah Barnes resides at 1602 Maple Lane. She continues to oppose the Lincoln Park development. 3:23:52 [20:44:17] Public Comment - Mary Price Mary Price resides at 1615 Alder Court and while she appreciates the efforts by the developer to revise the plans but its still too dense. 9 3:24:29 [20:45:05] Public Comment - Brian Hamer Brian Hamer, no residence stated, states that if this area is too dense for R-1 zoning than the law should be changed. 3:27:08 [20:47:04] Applicant Response to public comment The applicant had no response. 3:46:24 [20:55:57] Motion and Vote to forward the Lincoln Park Condos Site Plan to DRC and return to the Commission on Nov. 20, 2006. It was moved by Cr. Becker, seconded by Cr. Jacobson, to forward the Lincoln Park Condos Site Plan, #Z-06193 revised application, to the Design Review Committee with the advice and comments provided by the Commission for DRC review and return to the Commission on Dec. 20, 2006. Those voting Aye being Crs. Becker, Jacobson, Kirchhoff and Mayor Krauss. Those voting No being Cr. Rupp. The motion carried. 3:48:20 [20:56:23] 7. Oak Meadows Condos Site Plan/Certificate of Appropriateness/Deviations (Krueger) [Tabled on October 23, 2006 with a motion on the floor and vote held in abeyance] 3:49:20 [20:57:18] Staff report Planner Brian Krueger presented the staff report. 3:51:21 [20:57:59] Applicant James Nicholson of Morrison-Maierle appeared for the applicant. 3:53:01 [20:59:02] Public Comment Mayor Krauss called for public comment. No person commented. 3:53:09 [21:00:04] Withdrawal of original motion by Commissioner Kirchhoff Commissioner Kirchhoff withdrew the original motion made on October 23, 2006: [It was moved by Cr. Kirchhoff, seconded by Cr. Becker, to conditionally approve Oak Street Meadows Condos Site Plan/Certificate of Appropriateness/Deviations as conditioned by Planning Staff including the most recent one (a corrected condition that was requested by City Engineering) referenced by (Planner) Brian (Krueger)] 3:53:13 [22:26:39] Withdrawal of second to the original motion by Commissioner Becker 10 Commissioner Becker withdrew his second to the original motion (see original motion above). 3:53:39 [21:09:51] New Motion to approve Oak Meadows Condominiums Site Plan/Certificate of Appropriateness with Deviations as conditioned by Planning Staff. It was moved by Cr. Kirchhoff, seconded by Cr. Becker, to approve Oak Meadows Condominiums Site Plan/Certificate of Appropriateness with Deviations as conditioned by Planning Staff in the November 6, 2006 staff report addendum and as shown on the October, 2006 site plan with one deviation to 18.16.050 "Yards" to allow a maximum encroachment of four feet into the required 20 foot rear yard setback on Lot 2, Block 5. RECOMMENDED CONDITIONS OF APPROVAL: Based on the previous analysis, the DRC, DRB and ADR staff find that the application, with conditions, is in general compliance with the adopted Growth Policy and the City of Bozeman Unified Development Ordinance. The following conditions of approval are recommended. Please note that these conditions are in addition to the required code provisions beginning on Pages 3 and 4 of the October 23, 2006 staff report. 1. A stronger urban building form shall be used along the Oak Street Corridor. An example of an appropriate build form is the Unit 5 model building. A strong corner presence shall be established at the corners of Oak Street and N. 14th Avenue and Lilac Avenue. The buildings along Oak Street shall have the primary entrance facing north and a pedestrian connection to the Oak Street trail. 2. A shared use Type IA trail constructed to City standards shall be provided in the setback area along Oak Street. The trail location should be coordinated with the City of Bozeman Parks Department. A preconstruction meeting is required with the City of Bozeman Parks Department prior to construction. 3. All proposed on-street parking shall be shown and designated on the final site plan with accurate hydrant locations, curb extensions, crosswalks, and site vision triangles depicted on that plan. 4. The landscape plan shall be revised to address the following: a) Accurate locations of the water and sewer, and utility lines shall be shown on the landscape plan. No tree may be closer than 10 feet to a utility line. Water and sewer lines shall be 11 routed to avoid the parking area landscape islands in order to protect the required tree canopy within the parking areas. b) Sidewalks shall be moved to one side of the parking area landscape island at the rear of unit #5’s in order to accommodate an additional tree in those areas. c) The proposed surface detention ponds shall be designed as amenities. The ponds shall be lined with native grasses, indigenous plants, and boulders to create a more natural site amenity. d) Additional seating areas shall be provided along the north/south trail corridor. e) Ground mounted mechanical equipment, including air exchange equipment, air conditioning condensers, and irrigation wells, are not permitted in the required yard setbacks or open space corridor and must be noted on the site plan and landscape plan, if proposed. 5. That the applicant provide on the site plan and exterior elevations the location of all roof-top and/or ground-mounted mechanical and utility equipment, including ground-mounted mechanical power and telephone boxes, irrigation wells, as well as a typical detail(s) illustrating the materials, color, and method of screening used to screen the equipment from adjacent properties and public streets, for review and approval by the planning staff prior to issuance of a C.O.A. and Final Site Plan approval. 6. The color palette for the building shall include material samples and color chips for review and approval by the Planning Office, prior to Final Site Plan approval. All final building elevations shall be keyed to the color palette to delineate where each individual building material and color is specified. 7. All building/site signage anticipated shall be shown in the correct scale, size, and color on all final building elevations and perspectives submitted for final site plan approval. 8. The alternate design of unit #7 on Oak Street is required, that variety and use of colors be incorporated into the design, and shrub foundation plantings be used on street sides and internal locations of the buildings. 9. That the entire perimeter and center parkland trail of the site (i.e., driveways, sidewalks, egress/ingress points, setback landscaping, boulevard trees, and trail improvements) shall be installed with the initial phase of the 12 project, if phased construction is proposed. 10. That the applicant provide an access easement for the sidewalk system that services the condominium units that front on Oak Street. 11. That the applicant upon submitting the Final Site Plan for approval by the Planning Director and prior to issuance of a building permit, will also submit a written narrative outlining how each of the conditions of approval and code provisions have been satisfied 12. The Final Site Plan shall be adequately dimensioned. A complete legend of all line types used shall also be provided. 13. A Storm Water Drainage/Treatment Grading Plan and Maintenance Plan for a system designed to remove solids, silt, oils, grease, and other pollutants must be provided to and approved by the City Engineer. The plan must demonstrate adequate site drainage (including sufficient spot elevations), flow direction arrows, storm water detention/retention basin details (including basin sizing and discharge calculations, and discharge structure details), storm water discharge destination, and a storm water maintenance plan. 14. Sewer and water services shall be shown on the FSP and approved by the Water/Sewer Superintendent. City of Bozeman applications for service shall be completed by the applicant. 15. Trees shall not be located within ten (10) feet of water and sewer service lines. 16. The location of existing water and sewer mains shall be properly depicted, as well as nearby fire hydrants. Proposed main extensions shall be labeled "proposed". 17. The drive approach shall be constructed in accordance with the City's standard approach (i.e., concrete apron, sidewalk section and drop-curb) and shown as such on the FSP. A City Curb Cut and Sidewalk Permit shall be obtained prior to FSP approval. 18. City standard sidewalk shall be installed and properly depicted at the standard location (i.e., 1 foot off property line) along the street(s) frontage. Any deviation to the standard alignment or location must be approved by the City Engineer. 19. All existing utility and other easements must be shown on the FSP. 13 20. Adequate snow storage area must be designated outside the sight triangles, but on the subject property (unless a snow storage easement is obtained for a location off the property and filed with the County Clerk and Recorder's office). 21. Drive approach and public street intersection sight triangles shall be free of plantings which at mature growth will obscure vision within the sight triangle. 22. The Montana Department of Fish, Wildlife & Parks, SCS, Montana Department of Environmental Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to FSP approval. 23. If construction activities related to the project result in the disturbance of more than 1 acre of natural ground, an erosion/sediment control plan may be required. The Montana Department of Environmental Quality may need to be contacted by the Applicant to determine if a Stormwater Discharge Permit is necessary. If a permit is required by the State, the Developer shall demonstrate to the City full permit compliance. 24. The applicant shall submit a construction route map dictating how materials and heavy equipment will travel to and from the site in accordance with section 18.74.020.A.1 of the Unified Development Ordinance. This shall be submitted as part of the final site plan for site developments, or with the infrastructure plans for subdivisions. It shall be the responsibility of the applicant to ensure that the construction traffic follows the approved routes. 25. All construction activities shall comply with section 18.74.020.A.2. of the Unified Development Ordinance. This shall include routine cleaning/sweeping of material that is dragged to adjacent streets. The City may require a guarantee as allowed for under this section at any time during the construction to ensure any damages or cleaning that are required are complete. The developer shall be responsible to reimburse the City for all costs associated with the work if it becomes necessary for the City to correct any problems that are identified. 26. Regarding Condition No. 11, indicate the impact of the development on the previously approved storm water plan for the Oakwood Meadows Subdivision. Any storm water runoff that exceeds what was previously designed for shall be retained on site. 27. At the 21’ wide alleys provide the City standard alley approach instead of the radii shown. 14 28. Wherever parking shall not be allowed on the private streets the curb shall be painted red with white lettering that is at least 3" in height and signs provided every 35 feet that state "FIRE LANE/TOW AWAY ZON". No parking shall be allowed on the private streets and alleys less than 27 ft wide and parking may be allowed on one side of the 27 29 ft wide private street. 29. Plans and Specifications for water and sewer main extensions prepared and signed by a Professional Engineer (PE) registered in the State of Montana shall be provided to and approved by the City Engineer. Water and sewer plans shall also be approved by the Montana Department of Environmental Quality. The applicant shall also provide Professional Engineering services for Construction Inspection, Post-Construction Certification, and preparation of mylar Record Drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a preconstruction conference has been conducted. No building permits shall be issued prior to City acceptance of the required infrastructure improvements unless approved for concurrent construction. 30. A 30 ft wide easement shall be provided for the water and sewer mains within the property prior to FSP approval. 31. Wherever sanitary sewer mains are not located under or accessed from improved streets, a 12 foot wide all weather access drive shall be constructed to provide necessary access. 32. A Public Access Easement shall be provided for the private streets thru the property prior to FSP approval Those voting Aye being Crs. Kirchhoff, Becker, Jacobson and Mayor Krauss. Those voting No being none. Those absent being Cr. Rupp. The motion carried. 3:54:40 [21:10:01] 8. Delaney/Indreland Fence, Phase II, Z-06239 - PUBLIC HEARING 3:55:11 [21:10:39] Staff report Director of Planning Andy Epple presented the staff report 3:58:35 [21:11:01] Applicant Ileana Inderland appeared on behalf of the applicant. 3:58:59 [21:11:16] Public Comment Mayor Krauss Called for public comment. No person commented. 15 4:02:53 [21:19:14] Motion and Vote to approve the Delaney/Indreland Fence, Phase II, Z-06239 It was moved by Cr. Jacobson, seconded by Cr. Becker, to approve the Delaney/Indreland Fence, Phase II, Z-06239 as conditioned by planning staff. Conditions: 1. All proposed fences shall avoid the required site vision triangle at the alley and East Story Street intersection. 2. Prior to the issuance of a building permit, the applicant shall submit a detail for the proposed gate of Fence Type C. 3. Prior to the issuance of a building permit, the applicant shall submit a modified fence site plan that depicts Fence Type B as beginning at the 15-foot corner side yard line along East Story Street. 4. The applicant shall provide a color and materials palette for final design review and approval by Administrative Design Review Staff (including color of the concrete and rod iron fencing material). 5. The applicant shall obtain a building permit and pay all required fees prior to construction, and within one year of Certificate of Appropriateness approval or this approval shall become null and void. 6. This project shall be constructed as approved and conditioned in the Certificate of Appropriateness with deviations application. Any modifications to the submitted and approved drawings shall invalidate the project's approval unless the applicant submits the proposed modifications for review and approval by the Department of Planning prior to undertaking said modifications, as required by Section 18.64.110 of the Bozeman Unified Development Ordinance. Those voting Aye being Crs. Jacobson, Becker, Rupp, Kirchhoff and Mayor Krauss. Those voting No being none. The motion carried. 4:03:36 [22:28:03] Suspension of the Rules of Procedure to allow the meeting to continue past 10 PM. Mayor Krauss suspended the Rules of Procedure to allow the meeting to continue past 10 PM. 4:04:53 [21:20:57] 9. Morgan Zone Map Amendment, #A-06197 - PUBLIC HEARING 16 4:04:56 [21:21:44] Staff report Planner Martin Knight presented the staff report. 4:06:33 [21:24:13] Applicant Chris Budeski of Madison Engineering appeared for the applicant. 4:07:32 [21:24:19] Questions for the applicant There were no questions for the applicant. 4:07:51 [21:24:41] Public Comment Mayor Pro Tem Jacobson called for public comment. No person commented. 4:08:12 [21:29:41] Motion and Vote to approve the Morgan Zone Map Amendment, #A-06197. It was moved by Cr. Rupp, seconded by Cr. Kirchhoff, to approve the Morgan Zone Map Amendment, #A-06197 with contingencies listed on page 2 of the Zoning Commission Resolution #Z-06197. Recommended Contingencies: 1. That the Ordinance of the Zone Map Amendment shall not be adopted until the Resolution of Annexation is signed by the applicant and formally approved by the City Commission. If the annexation is not approved, the application shall be null and void. 2. That the applicant submit a zone amendment map, titled "Morgan tract 2 Zone Map Amendment", on a 24" by 36" mylar, 8 ½" by 11", or 8 ½" by 14" paper exhibit, and a digital copy of the area to be zoned, acceptable to the Director of Public Service, which will be utilized in the preparation of the Ordinance to officially amend the City of Bozeman Zoning Map. Said map shall contain a metes and bounds legal description of the perimeter of the subject property and zoning districts, and total acreage of the property. 3. That the Ordinance for the Zone Map Amendment shall not be drafted until the applicant provides a metes and bounds legal description prepared by a licensed Montana surveyor and map of the area to be rezoned, which will be utilized in the preparation of the Ordinance to officially amend the zone map. 17 Those voting Aye being Crs. Rupp, Kirchhoff, Becker and Mayor Pro Tem Jacobson. Those voting No being none. Those absent being Mayor Krauss. The motion carried. 4:09:02 [21:32:08] 10. Genesis Business Park Annexation, #A-06003 - PUBLIC HEARING 4:09:09 [21:34:31] Staff report Senior Planner Dave Skelton presented the staff report. 4:15:00 [21:35:52] Applicant Chris Budeski and Gene Gianforte appeared for the applicant. 4:19:21 [21:40:22] Motion to approve the Genesis Business Park Annexation, #A- 06003 It was moved by Cr. Becker, seconded by Commissioner Kirchhoff, to approve the request for annexation [Genesis Business Park Annexation, #A-06003 based on the terms and contingencies outlined in the staff report and direct staff to prepare an annexation agreement for signature by the parties.] Staff Recommendation: 1. Applicant shall provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of S.I.D.'s for the following: a. Street improvements including paving, curb/gutter, sidewalk and storm drainage facilities for the following streets 1) South 19th Avenue, 2) Graf Street, 3) South 27th Avenue, 4) Stucky Road, 5) Fowler Avenue, 6) Blackwood Road, and 7) applicable signalization improvements at said street intersections. b. Truck Sewer and Water Mains to service the property. The documents filed shall specify that in the event an S.I.D. is not utilized for the completion of these improvements, the developer agrees to participate in an alternate financing method for the completion of said improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development or a combination thereof. 18 2. Public street and utility easements shall be provided for South 19th Avenue unless adequate right of way already exists. 3. That the applicant execute at the Gallatin County Clerk & Recorder's Office a waiver of right-to-protest creation of S.I.D.'s for a City-wide Park Maintenance District, which would provide a mechanism for the fair and equitable assessment of maintenance costs for City parks as part of the Annexation Agreement. 4. The property owner shall provide usable water rights, or cash in-lieu thereof, in the amount determined by the Director of Public Service at the time the property is annexed to the corporate limits to the City of Bozeman. 5. The property owner should be advised that prior to development of the property, the future developer(s) may be required to prepare, at their own expense, a comprehensive design report evaluating existing capacity of water and sewer utilities, storm water master plan and traffic impacts. 6. That at the time of any new development on the property, fire, street, water and wastewater impact fees will be assessed. 7. The Annexation Agreement should include notice that, prior to development, the developer will be responsible for installing any facilities required to provide full municipal services to the property in accordance with the City's infrastructure Master Plan and all city policies and guidelines that may be in effect at the time of development. 8. The Annexation Agreement shall contain a section that the Landowner acknowledges and agrees that that future development will comply with the goals and policies of the Bozeman 2020 Community Plan, and having recognized the City's concern for implementation of progressive urban design guidelines outlined in the Bozeman 2020 Community Plan for both community and neighborhood design, a Master Plan of the land use patterns and types for development of the property that addresses compatibility with, and sensitive to, the immediate environment of the site and the adjacent neighborhoods relative to architectural design, building mass and height, neighborhood identity, landscaping, historical character, orientation of buildings, and visual integration shall be provided. 9. An Annexation Map, titled "Genesis Business Park Annexation Map" with a legal description of the property and adjoining rights-of-way and/or street access easements (i.e., Griffin Drive and Manley Road) shall be submitted by the applicant for use with the Annexation Agreement. The map must be supplied on a mylar for City records (18" by 24"), a reduced 8 ½" x 11" or 8 ½" by 14" exhibit for filing with the Annexation Agreement at the County Clerk & Recorder, and a digital copy for the City Engineer's Office. This 19 map must be acceptable to the Director of Public Services and City Engineer's Office, and shall be submitted with the signed Annexation Agreement. 10. That the applicant execute an Annexation Agreement, which addresses all contingencies and terms placed on the annexation application by the City Commission, shall be signed, notarized and returned to the City of Bozeman Planning & Community Development Department within sixty (60) days of distribution of the annexation agreement, unless another time period is specifically identified by the City Commission. 4:19:43 [21:41:20] Motion to amend the previous motion. It was moved by Cr. Rupp to amend the previous motion to include the conditions outlined in the Ainsworth letter of November 2, 2006. The motion to amend fails for the lack of a second. 4:20:04 [22:28:13] Vote to approve the Genesis Business Park Annexation, #A- 06003. It was moved by Cr. Becker, seconded by Commissioner Kirchhoff, to approve the request for annexation [Genesis Business Park Annexation, #A-06003 based on the terms and contingencies outlined in the staff report and direct staff to prepare an annexation agreement for signature by the parties.] See conditions above. Those voting Aye being Crs. Becker, Kirchhoff, Jacobson, Rupp and Mayor Krauss. Those voting No being none. The motion carried. 4:20:17 [21:43:22] 11. Genesis Business Park Zone Map Amendment, #Z-06133 - PUBLIC HEARING 4:20:23 [21:43:39] Staff Report Senior Planner Dave Skelton presented the staff report. 4:22:06 [21:44:35] Applicant The applicant did not have a presentation. 4:22:14 [21:45:31] Public Comment Mayor Krauss called for public comment. No person commented. 4:22:27 [21:45:43] Motion and Vote to approve the Genesis Business Park Zone Map Amendment, #Z-06133. 20 It was moved by Cr. Kirchhoff, seconded by Cr. Jacobson, to approve the Genesis Business Park Zone Map Amendment, #Z-06133 for an initial municipal "BP" zoning designation based on the recommendations outlined in the staff report and Zoning Commission Resolution #Z-06133. Staff Recommendations: 1. That the Ordinance of the Zone Map Amendment shall not be adopted until the Resolution of Annexation is signed by the applicant and formally approved by the City Commission. If the annexation is not approved, the application shall be null and void. 2. That the Ordinance for the Zone Map Amendment shall not be adopted until the growth policy amendment to amend the Land Use Plan Element of the Bozeman 2020 Community Plan from "Residential" to "Business Park" is formally adopted by the City Commission. 3. That the applicant submit a zone amendment map, titled "Genesis Business Park Zone Map Amendment", on a 24" by 36" mylar, 8 ½" by 11" or 8 ½" by 14" paper exhibit, and two (2) digital copies of the area to be zoned, acceptable to the Director of Public Service, which will be utilized in the preparation of the Ordinance to officially amend the City of Bozeman Zoning Map. Said map shall containing a metes and bounds legal description of the perimeter of the subject property, total acreage of the property and adjoining rights-of-way and/or street access easements. 4. That the Ordinance for the Zone Map Amendment shall not be drafted until the applicant provides a metes and bounds legal description and map of the area to be rezoned, which will be utilized in the preparation of the Ordinance to officially amend the zone map. Those voting Aye being Crs. Kirchhoff, Jacobson, Becker, Rupp and Mayor Krauss. Those voting No being none. The motion carried. 4:22:56 [21:45:52] Motion to suspend the Rules of Procedure in order to continue the meeting. It was moved by Cr. Becker, seconded by Jacobson, to continue to suspend the rules to continue the meeting. Those voting Aye being Crs. Becker, Jacobson and Rupp. Those voting No being Cr. Kirchhoff and Mayor Krauss. The motion carried. 21 4:23:57 [21:48:55] H. Non-Action Items 4:23:58 [21:46:05] 1. Lower Yards - removal/replacement costs and location suggestions (Arkell) 4:24:25 [21:46:30] Staff Report Debbie Arkell presented the staff report. 4:31:15 [21:57:02] 2. City Lands Inventory Report (Goehrung) This report was delayed to the following week. 4:31:22 [21:58:52] I. FYI/Discussion 4:31:24 [21:58:11] 1. Draft letter from the Commission supporting Streamline bustle back style busses. 4:36:16 [22:33:09] Mayor Krauss Mayor Krauss received the support of at least two additional Commissioners to endorse the letter from the Commission supporting Streamline bustle back style busses. 4:36:21 [22:04:17] 2. Willson/College Traffic Signal Installation 4:39:25 [22:07:17] Mayor Krauss Mayor Krauss questioned whether or not there was majority agreement on proceeding with the stoplight. He received the support of at least two additional Commissioners to place the issue of the Willson/College Traffic Signal Installation on a future agenda. 4:48:39 [22:20:35] 3. Commission Policy Meeting Schedule 4:57:06 [22:25:04] J. Adjournment Mayor Krauss adjourned the meeting at 10:57 PM. ______________________________ Jeffrey K. Krauss, Mayor ATTEST: ____________________________ Brit Fontenot, City Clerk 22 PREPARED BY: ______________________________________ Brit Fontenot, City Clerk Approved on ____________________. LINKED MINUTES OF THE MEETING OF THE CITY COMMISSION BOZEMAN, MONTANA November 13, 2006 ***************************** The Commission of the City of Bozeman met in the Community Room, Gallatin County Courthouse, 311 West Main Street, on Monday, November 13, 2006, at 6:00 p.m. Present were Mayor Jeff Krauss, Cr. Sean Becker, Cr. Jeff Rupp, Cr. Kaaren Jacobson, Cr. Steve Kirchhoff, City Manager Chris Kukulski, Assistant City Manager Ron Brey, Director of Public Services Debbie Arkell, Planning Director Andy Epple, City Attorney Paul Luwe, and Deputy City Clerk Stuart John Bernard. 0:24:19 [17:36:07] A. Call to Order - 6:00 PM - Community Room, Gallatin County Courthouse, 311 West Main Mayor Krauss called the meeting to order at 6:06 PM. 0:24:21 [17:36:09] B. Pledge of Allegiance and Moment of Silence 0:25:10 [17:36:24] Changes to Agenda The location had to be changed due to an asbestos issue at the County Building 0:25:54 [17:36:43] C. Public Service Announcement 0:26:29 [17:42:05] 2006 Beautification Awards Associate Planner Susan Kozub presented the 2006 Beautification Awards. 0:31:35 [17:42:49] D. Consent 1. Authorize payment of claims (LaMeres) 2. Approve professional services agreement with HDR for update to the Fire Impact Fee (Saunders) 3. Authorize amendment to contract with HDR to revise indemnification language (Saunders) 4. Approve Mengel Annexation #A-06009 (Skelton) 5. Ratify City Manager's Signature on Montana Department of Commerce - Big Sky Economic Development Trust Fund, Management Plan, with Gallatin Development Corporation (Rosenberry) 6. Authorize Mayor to sign a letter supporting the Streamline "bussel back" style busses (Fontenot) 7. Authorize City Manager to sign Public Access Easement for Baxter Springs Condos (Johnson) 8. Provisionally Adopt Ordinance 1683 amending the City Acquisition Rules (Kukulski) 9. Provisionally Adopt Ordinance 1682 Revising Building Fees (Poulsen) 10. Adopt Resolution 3980 Clarifying the ownership of a right-of-way (Bernard) 0:32:17 [17:43:40] Motion - It was moved by Cr. Becker, seconded by Cr. Rupp, to approve Consent items 1 - 10 as listed. 0:33:25 [17:44:33] Questions for Staff - Rupp 0:34:26 [17:47:37] Vote - to approve Consent items 1 - 10 as listed. Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 0:34:41 [18:04:51] E. Public Comment Mayor Krauss called for Public Comment. This was the time for individuals to comment on matters falling within the purview of the Bozeman City Commission. 0:35:13 [18:04:52] Public Comment - Brianne Barber Brianne Barber of 308 S 5th Ave. a student, talked about global warming, and proposed a project from Burlington, VT to reduce energy by 10%. 10percentchallenge.org 0:38:27 [18:05:58] Discussion - Becker 0:39:51 [18:06:27] Public Comment - Debbie Pendland Debbie Pendland of 429 E. Story spoke in favor of the parking lot at Burke Park and spoke in favor of sidewalk. 0:42:51 [18:13:00] F. Action Items 0:42:54 [18:14:10] 1. Mengel Zone Map Amendment #Z-06192 (Skelton) 0:43:18 [18:15:05] Staff Report Senior Planner Dave Skelton presented the Staff Report 0:54:20 [18:15:24] Applicant Dab Dabney spoke for the Applicant. 0:54:50 [18:15:59] Public Comment - Janet Swenson Janet Swenson of 4959 Swenson Rd spoke against the zoning designation of the Mengel Zone Map Amendment. 1:02:00 [18:19:58] Public Comment - Bob Swenson Bob Swenson of 4959 Durston Rd understands expansion in the city happens, but feels that the annexations will make some unhappy. 1:12:06 [18:23:46] Applicant Dan Derby spoke of the future plans for the parcel. 1:13:42 [18:24:11] Motion - It was moved by Cr. Rupp, seconded by Cr. Jacobson, to approve the Mengel Zone Map Amendment application for an initial municipal R-1 zoning designation based on the recommendations outlined in the staff report and Zoning Commission Resolution #Z-06192. 1:15:35 [18:43:13] Vote - to approve the Mengel Zone Map Amendment application for an initial municipal R-1 zoning designation based on the recommendations outlined in the staff report and Zoning Commission Resolution #Z-06192. Those voting Aye being Crs. Rupp, Jacobson. Those voting No being Crs. Becker, Kirchhoff, and Mayor Krauss. The motion failed. 1:16:18 [18:46:07] Motion and Vote - It was moved by Cr. Rupp, seconded by Cr. Kirchhoff, to approve the Mengel Zone Map Amendment application for an initial municipal R-2 zoning designation based on the recommendations outlined in the staff report and Zoning Commission Resolution #Z-06192. Those voting Aye being Crs. Becker, Kirchhoff, and Mayor Krauss. Those voting No being Crs. Rupp, Jacobson. The motion carried. 1:18:56 [18:48:11] 2. Senior Citizens Advisory Board Appointments (Bernard) 1:19:54 [18:49:53] Motion - It was moved by Cr. Jacobson to appoint Ken Tiahrt, Robert Seltzer, and Sheila Velazquez to the Senior Citizens Advisory Board. 1:22:02 [21:38:34] Second - It was seconded by Cr. Rupp, to appoint Ken Tiahrt, Robert Seltzer, and Sheila Velazquez to the Senior Citizens Advisory Board. 1:23:18 [21:42:06] Vote - to appoint Ken Tiahrt, Robert Seltzer, and Sheila Velazquez to the Senior Citizens Advisory Board. Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 1:23:39 [18:55:16] 3. Mandeville Farm Tax Increment Financing Industrial District - PUBLIC HEARING (Kukulski) 1:23:46 [18:55:47] Staff Report City Manager Chris Kukulski presented the staff report. 1:29:49 [18:56:07] Public Comment There was no public comment 1:30:09 [18:57:09] Questions for Staff - Becker 1:31:26 [18:57:53] Craig Campbell Manager Bozeman Unit DNRC 1:33:27 [19:00:08] Discussion - Krauss 1:37:57 [21:42:22] Staff - Deputy City Clerk Stuart John Bernard 1:38:21 [19:00:42] Motion and Vote - It was moved by Cr. Becker, seconded by Cr. Rupp, to approve the Mandeville Farm Tax Increment Financing Industrial District. Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 1:38:37 [19:01:36] Motion and Vote - It was moved by Cr. Becker, seconded by Cr. Rupp, to provisionally adopt Ordinance 1684 Creating the Mandeville Farm Tax Increment Financing Industrial District (TIFID) as amended to change a date in the resolution. Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 1:39:19 [19:03:05] 4. North 7th Urban Renewal Plan - PUBLIC HEARING (Brey) 1:39:32 [19:04:44] Staff Report Assistant City Manager Ron Brey presented the staff report 1:58:17 [19:05:22] Public Comment - Bernie Jones Bernie Jones of Darigold spoke for the North 7th Urban Renewal District, but mentioned disinterest in one of the proposed roads that would go thru their building. 1:59:32 [19:05:25] Public Comment - Mike Hope Mike Hope of 2215 Arrowleaf Hills Drive supports the plan and thanked Ron Brey for all his work. 2:00:22 [19:11:40] Public Comment - Ben Ben (last name unintelligible) of 621 N Bozeman spoke in favor of alternative forms of transportation in the plan. 2:20:15 [19:41:58] Motion and Vote - It was moved by Cr. Rupp, seconded by Cr. Kirchoff, to approve the North 7th Urban Renewal Plan. Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 2:20:31 [19:42:51] Motion and Vote - It was moved by Cr. Rupp, seconded by Cr. Kirchhoff, to provisionally adopt Ordinance 1685 Adopting an Urban Renewal Plan for the North Seventh Avenue corridor and adjacent properties. Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 2:20:58 [19:43:51] Break 2:41:48 [19:47:21] 5. 3303 Sora Way Conditional Use Permit for Accessory Dwelling Unit, #Z-06242 - PUBLIC HEARING (Knight) 2:42:06 [19:49:35] Staff Report Assistant Planner Martin Knight presented the staff report for 3303, 3332, and 3366 Sora Way 2:52:32 [20:03:53] Motion - It was moved by Cr. Kirchhoff, seconded by Cr. Jacobson, to approve Application No. Z-06242 with the conditions of approval as outlined in the Staff Report. 2:54:01 [20:25:23] Vote - to approve Application No. Z-06242 with the conditions of approval as outlined in the Staff Report. Those voting Aye being Crs. Becker, Kirchhoff, and Jacobson Those voting No being Crs. Rupp and Mayor Krauss The motion carried. Conditions of Approval: Planning: 1. Parking shall be provided for all uses in accordance with UDO Section 18.46 “Parking`.” Parking for accessory dwelling units may not provided on-street. A 26- foot setback is required for a garage with stacked parking off an alley. 2. Accessory structures greater than 600 square feet shall not be located in any required front, rear, or side yard. 3. Accessory structures may not occupy more than 20 percent of the area of the lot located to the rear of the principal building. Lot coverage calculations shall be included on the site plan for Final Site Plan submittal. 4. Evidence that the proposed development (s) have been reviewed and approved by the Cattail Creek Design Review Authority shall be submitted prior to Final Site Plan submittal. 5. Landscaping standards, per UDO Section 18.48 “Landscaping,” shall be provided. 6. Any utility lines and easements shall be accurately depicted on the Final Site Plan and Landscape plan. Proposed extensions and additions shall be labeled “proposed.” 7. The proposed project shall be completed as approved and conditioned in the Conditional Use Permit and Variance applications. Any modifications to the submitted and approved application materials shall invalidate the project's legitimacy, unless the applicant submits the proposed modifications for review and approval by the Department of Planning prior to undertaking said modifications. 8. The applicant shall comply with all applicable Building/Electrical/Plumbing codes, and permits shall be obtained as required by the Building Division prior to commencement of any tenant improvements. Engineering: 1. A dedicated sewer service shall be provided for the accessory dwelling unit. 2. Sidewalk shall be depicted and installed in the standard location across the lot frontage (i.e. 1’ off property) and shall not be installed in the street boulevard. 2:54:15 [20:25:28] 6. 3332 Sora Way Conditional Use Permit for Accessory Dwelling Unit, #Z-06243 - PUBLIC HEARING (Knight) 2:54:20 [20:29:04] Motion and Vote - It was moved by Cr. Jacobson, seconded by Cr. Becker, to approve Application No. Z-06243 with the conditions of approval as outlined in the attached Staff Report. Those voting Aye being Crs. Becker, Kirchhoff, and Jacobson Those voting No being Crs. Rupp and Mayor Krauss The motion carried. Conditions of Approval: Planning: 1. Parking shall be provided for all uses in accordance with UDO Section 18.46 “Parking`.” Parking for accessory dwelling units may not provided on-street. A 26- foot setback is required for a garage with stacked parking off an alley. 2. Accessory structures greater than 600 square feet shall not be located in any required front, rear, or side yard. 3. Accessory structures may not occupy more than 20 percent of the area of the lot located to the rear of the principal building. Lot coverage calculations shall be included on the site plan for Final Site Plan submittal. 4. Evidence that the proposed development (s) have been reviewed and approved by the Cattail Creek Design Review Authority shall be submitted prior to Final Site Plan submittal. 5. Landscaping standards, per UDO Section 18.48 “Landscaping,” shall be provided. 6. Any utility lines and easements shall be accurately depicted on the Final Site Plan and Landscape plan. Proposed extensions and additions shall be labeled “proposed.” 7. The proposed project shall be completed as approved and conditioned in the Conditional Use Permit and Variance applications. Any modifications to the submitted and approved application materials shall invalidate the project's legitimacy, unless the applicant submits the proposed modifications for review and approval by the Department of Planning prior to undertaking said modifications. 8. The applicant shall comply with all applicable Building/Electrical/Plumbing codes, and permits shall be obtained as required by the Building Division prior to commencement of any tenant improvements. Engineering: 1. A dedicated sewer service shall be provided for the accessory dwelling unit. 2. Sidewalk shall be depicted and installed in the standard location across the lot frontage (i.e. 1’ off property) and shall not be installed in the street boulevard. 2:54:44 [20:29:34] 7. 3366 Sora Way Conditional Use Permit for Accessory Dwelling Unit, #Z-06244 - PUBLIC HEARING (Knight) 2:54:56 [20:30:24] Motion and Vote - It was moved by Cr. Becker, seconded by Cr. Rupp, to approve Application No. Z-06244 with the conditions of approval as outlined in the attached Staff Report. Those voting Aye being Crs. Becker, Kirchhoff, and Jacobson Those voting No being Crs. Rupp and Mayor Krauss The motion carried. Conditions of Approval: Planning: 1. Parking shall be provided for all uses in accordance with UDO Section 18.46 “Parking`.” Parking for accessory dwelling units may not provided on-street. A 26- foot setback is required for a garage with stacked parking off an alley. 2. Accessory structures greater than 600 square feet shall not be located in any required front, rear, or side yard. 3. Accessory structures may not occupy more than 20 percent of the area of the lot located to the rear of the principal building. Lot coverage calculations shall be included on the site plan for Final Site Plan submittal. 4. Evidence that the proposed development (s) have been reviewed and approved by the Cattail Creek Design Review Authority shall be submitted prior to Final Site Plan submittal. 5. Landscaping standards, per UDO Section 18.48 “Landscaping,” shall be provided. 6. Any utility lines and easements shall be accurately depicted on the Final Site Plan and Landscape plan. Proposed extensions and additions shall be labeled “proposed.” 7. The proposed project shall be completed as approved and conditioned in the Conditional Use Permit and Variance applications. Any modifications to the submitted and approved application materials shall invalidate the project's legitimacy, unless the applicant submits the proposed modifications for review and approval by the Department of Planning prior to undertaking said modifications. 8. The applicant shall comply with all applicable Building/Electrical/Plumbing codes, and permits shall be obtained as required by the Building Division prior to commencement of any tenant improvements. Engineering: 1. A dedicated sewer service shall be provided for the accessory dwelling unit. 2. Sidewalk shall be depicted and installed in the standard location across the lot frontage (i.e. 1’ off property) and shall not be installed in the street boulevard. 2:55:31 [20:31:32] 8. Walton Homestead Planned Unit Development/Conditional Use Permit Modifications II (Lot 11), #Z-06237 - PUBLIC HEARING (Kozub) 2:58:52 [21:42:45] Staff Report Andy Epple presented the staff report 3:03:39 [20:33:16] Motion and Vote - It was moved by Cr. Rupp, seconded by Cr. Kirchhoff, to approve the Conditional Use Permit allowing a modification to the Walton Homestead Planned Unit Development for Lot 11, #Z-06237 as conditioned by staff. Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. Conditions of Approval: 1. The approval for the 3,555 square foot lot shall only apply to Lot 11, Block 5, Walton Homestead Planned Unit Development. 3:04:47 [20:34:09] G. Non-Action Items 3:05:59 [20:35:07] 1. City Lands Inventory Report (Goehrung) 3:21:17 [20:49:50] H. FYI/Discussion 3:21:28 [21:24:06] 1. Board of Adjustments Application Status (Bernard) 3:27:36 [20:58:50] FYI - Kukulski - Durston Update 3:39:52 [21:17:00] FYI - Kukulski Structure Report on Lamme Street Library 3:44:14 [21:18:06] FYI - Kukulski South 19th Lightining 3:45:59 [21:18:32] FYI - Epple - Susan Kozub leaving the Planning Department 3:47:29 [21:19:16] FYI - Epple - Deconness land swap meeting 3:51:27 [21:20:10] FYI - Jacobson map readablity 3:53:40 [21:21:50] FYI - Rupp Letter response 3:55:35 [21:23:53] I. Adjournment Mayor Krauss adjourned the meeting at 10:01 PM. ______________________________ Jeffrey K. Krauss, Mayor ATTEST: ______________________________________ Brit Fontenot, City Clerk PREPARED BY: ______________________________________ Stuart John Bernard, Deputy City Clerk Approved on ____________________. LINKED MINUTES OF THE MEETING OF THE CITY COMMISSION BOZEMAN, MONTANA November 27, 2006 ***************************** The Commission of the City of Bozeman met in the Community Room, Gallatin County Courthouse, 311 West Main Street, on Monday, November 27, 2006, at 6:00 p.m. Present were Mayor Jeff Krauss, Cr. Sean Becker, Cr. Jeff Rupp, Cr. Kaaren Jacobson, Cr. Steve Kirchhoff, City Manager Chris Kukulski, Director of Public Services Debbie Arkell, Planning Director Andy Epple, City Attorney Paul Luwe, and Deputy City Clerk Stuart John Bernard. 0:09:45 [18:04:35] A. Call to Order - 6:00 PM - Community Room, Gallatin County Courthouse, 311 West Main Mayor Krauss called the meeting to order at 6:04 pm 0:09:48 [18:04:36] B. Pledge of Allegiance and Moment of Silence 0:10:35 [18:05:26] Changes to the Agenda 0:11:33 [18:05:30] C. Public Service Announcement – Announce winners of the Bozeman Beautification Awards (Quatraro) 0:12:31 [18:06:21] Terry Quatraro - Chair of the Beautification Board Terry Quatraro presented the 2006 Bozeman Beautification Awards 0:21:27 [18:06:34] PSA - Krauss Thanks to the MSU Fighting Bobcats 0:22:03 [18:07:20] D. Minutes - November 9, 2006 (Policy Meeting) 0:22:11 [18:16:33] Motion and Vote - It was moved by Cr. Becker, and seconded by Cr. Rupp to approve the minutes November 9, 2006 as submitted. Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 0:22:30 [18:17:05] E. Consent 1. Claims (LaMeres) 2. Finally Adopt Ordinance 1677, State Lands Zone Map Amendment (Bernard) 3. Finally Adopt Ordinance 1682, Revising Building Fees (Bernard) 4. Finally Adopt Ordinance 1683, amending the City Acquisition Rules (Bernard) 5. Finally Adopt Ordinance 1684, Creating Mandeville Farm Tax Increment Financing Industrial District (Bernard) 6. Finally Adopt Ordinance 1685, Adopting an Urban Renewal Plan for the North Seventh Avenue corridor and adjacent properties (Bernard) 7. Approve Simmental Way Speed Zone Study (Kerr) 8. Authorize City Manager to Sign Public Access & Drainage Easements - Bozeman Peaks Condos (Heaston) 9. Authorize City Manager to sign Pebble Brook Condominiums Irrevocable Offer of Dedication (Murray) 10. Authorize City Manager to Sign Rosa Johnson Apartments - Public Street and Utility Easement and Sanitary Sewer Easement (Johnson) 11. Approve the appointment of Commissioners Kirchhoff and Jacobson to review the depository bonds and pledged securities as of September 30, 2006 (Clark) 12. Purchase of property at 214 East Lamme (Goehrung) 0:22:39 [18:17:14] Public Comment No public comment was received. 0:22:56 [18:17:33] Staff - Chris Kukulski City Manager Chris spoke to clarify consent item E12 Purchase of property at 214 East Lamme. 0:26:30 [18:17:41] Motion and Vote - It was moved by Cr. Rupp, and seconded by Cr. Kirchhoff to approve Consent items 1 - 12 as listed above. Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 0:26:50 [18:17:58] G. Public Comment This is the time for individuals to comment on matters falling within the purview of the Bozeman City Commission. There will also be an opportunity in conjunction with each agenda item for comments pertaining to that item. 0:27:27 [18:21:37] Public Comment - Jim Good Jim Good of 908 S Grand spoke about returning the Ten Commandments to the park. 0:30:34 [18:22:01] Public Comment - Laura Hain Laura Hain of 1115 S Wilson spoke in favor of action at of the Willson/College Traffic Signal Installation 0:32:14 [18:22:34] Public Comment - Richard Bennett Richard Bennett of 1612 W Olive spoke of the removal of the Ten Commandments from the Park, and asked that the monument be returned. 0:35:04 [18:25:45] H. Swearing in of Bozeman Firefighter Joe Capri 0:38:20 [18:27:27] I. Special Presentation 0:40:22 [18:30:27] Carbon Reduction Presentation Jeff Penderson presented the Carbon 0:52:52 [18:33:41] Carbon Sequestration Susan Capalbo presented the presentation 1:08:21 [18:35:46] Mayors' Climate Protection Agreement Karen Krieger of 1105 S Grand spoke of the history of the Mayors' Climate Protection Agreement 1:10:31 [18:48:31] Local Governments for Sustainability 1:11:40 [19:04:19] Climate Action Handbook 1:12:30 [19:06:39] Joan Diamond Joan Diamond of 424 N Wilson asked the Commission to sign the Mayors' Climate Protection Agreement. She continued to ask the Commission add Global Warming to the Commissioner's Goal List for 2007 and the future. Third she ask the Commission to create a Task Force. Fourth consider creation a business advisory panel. Fifth she asked that appropriate boards review environmental impact within their specialties. 1:18:10 [19:07:46] Public Comment - Gretchen Rupp Gretchen Rupp of 221 Lindsey Place listed several options for economic environmentally responsible options. 1:22:13 [19:08:38] Public Comment - David Bogman David Bogman 3701 Tracker Trail spoke of the environmental impact of bicycles and bicycle facilities. 1:24:43 [19:14:20] Public Comment - Mark Johnston Mark Johnston of 107 Western Ave spoke of integrating various endeavors including the Mayors' Climate Protection Agreement, and Task Force. 1:27:06 [19:18:28] Public Comment - Valerie Harms Valerie Harms spoke of leadership too guide environmental policies. 1:28:39 [19:21:08] Public Comment - Stan Jones Stan Jones believes that man has had no impact on global warming. 1:33:46 [19:23:28] Public Comment - Sandy Bellingham Sandy Bellingham of 605 S 6th spoke of teamwork and Bozeman Environmental Action Plan. 1:36:14 [19:25:02] Public Comment - Randy Carpenter Randy Carpenter of 1108 S Black spoke of working with the county. 1:38:04 [19:30:16] Public Comment - Jenny Birdsalt Jenny Birdsalt of 205 S 7th requested adoption of Mayors' Climate Protection Agreement. 1:39:01 [19:32:51] Public Comment - Radon Dilstrom Radon Dilstrom referenced a Disney movie with lemmings, to make a point about more investigation and less emotion. 1:40:54 [19:34:46] Public Comment - Rich Vought Rich Vought of 712 N Montana spoke on behalf of the Christian Education Association asked the Commissioners to review Anti-Global Warming Petition. 1:45:35 [19:34:50] Public Comment - Greg Pederson Greg Peterson of 2750 Marlin Court spoke in rebuttal to Rich Vought. 1:47:15 [19:35:37] Public Comment - Pete Martins Pete Martins would like to keep Montana cool. He spoke of the relation of solar activity to climate change. 1:50:11 [19:37:24] Public Comment - Amy Kelly Amy Kelly of 702 East Peach asked the Commission to adopt the Mayors' Climate Protection Agreement and appoint an environmental task force. 1:51:28 [19:42:19] Public Comment - Chris Werner Chris Werner of 9201 Big Gultch presented Mike Phillips' letter. 1:52:04 [19:44:15] Public Comment - Louise Forest Louise Forest spoke in support of various environmental initiatives 1:52:49 [19:47:01] Public Comment - Collette Brooks-Hops Collette Brooks-Hops of 371 Old West Trail told a story about an Eskimo elder named Uncle and how our actions affect the climate in Greenland. 1:56:48 [19:48:24] Public Comment - Jennifer Roundtree Jennifer Roundtree 514 N Black read a quote from Out of Balance a movie about Exxon. 1:59:09 [19:49:05] Public Comment - Bob Applebee Bob Applebee of 102 Trails End Road asked the Commissioners to take on the CO2 issue. 2:01:34 [19:49:45] J. Action Items 2:12:27 [20:04:06] Motion and Vote - It was moved by Cr. Kirchhoff, and seconded by Cr. Jacobson to adopt Mayors’ Climate Protection Agreement Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 2:21:50 [20:16:51] Motion and Vote - It was moved by Mayor Krauss, and seconded by Cr. Becker to encourage other local government bodies including the School District, MSU, and Gallatin County also adopt the Mayors’ Climate Protection Agreement Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Krauss and Mayor Pro-Tem Jacobson. Those voting No being none. The motion carried. [Mayor Pro Tem Jacobson initially voted no, she subsequently changed her vote to Aye] 2:29:42 [20:24:07] Motion and Vote - It was moved by Cr. Rupp, and seconded by Cr. Kirchhoff to Direct staff to review and develop the Draft Bozeman Environmental Action Plan and return to the Commission with suggestions for adoption including the Task Force. Those voting Aye being Crs. Becker, Rupp, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being none. The motion carried. 2:30:12 [20:24:19] Break 2:45:29 [20:24:35] Commissioner Jacobson Commissioner Jacobson would like to change her vote on Mayor Krauss's Motion to Aye, and have that change reflected in the minutes. 2:46:05 [20:24:48] 2. Commissioner Becker’s vote on Commissioner Kirchhoff’s motion to approve the Lincoln Park Condos Site Plan, #Z-06193, from November 20, 2006 (Fontenot) 2:46:30 [20:27:27] Vote - Commissioner Becker's vote on Commissioner Kirchhoff’s November 20, 2006 motion to approve the Lincoln Park Condos Site Plan, #Z-06193, as conditioned by staff. Those voting Aye being Cr. Becker The motion carried. [Motion to approve application No. Z-06193, Lincoln Park Condos Site Plan, with the REVISED site plan and with the revised conditions and code provisions outlined in the staff memo. It was moved by Cr. Kirchhoff to approve [application No. Z-06193], Lincoln Park Condos Site Plan, with the REVISED site plan and with the revised conditions and code provisions outlined in the staff memo. Conditions of Approval: 1. The Annexation and Zone Map Amendment must be finalized prior to Final Site Plan approval. 2. Stormwater detention facilities shall not have a slope steeper than 25 percent and shall not make up more than one-third of the required front yard. 3. Regarding pedestrian circulation (Section 18.34.090.6): a. The pedestrian connection shall be constructed of concrete (minimum 6 feet in width) or asphalt (minimum of 10 feet in width), subject to review and approval by the Parks Department. b. The trail must either: 1) connect to both Maple Lane and to Alder Court or 2) connect directly to the sidewalk to be installed along Lincoln Road. c. The applicants/owners shall work with the condominium association to the south to coordinate the location (specifically the southern terminus) of the trail. 4. Regarding the relationship of site plan elements to conditions on and off the property (Section 18.34.090): a. The relocated house shall be on its own lot and not be part of the condominium association. b. The north elevations of the units along Lincoln Street shall include additional architectural features (including front porches with sidewalk connections to the sidewalk on Lincoln Road) to avoid presenting a “back” side to the streetscape. c. The covenants shall specify that no individual unit fences are allowed. 5. Regarding the impact of the project on parking and traffic conditions (Section 18.34.090.5): a. Garage doors must be setback at least 20 feet from the public access easement for Maple Lane and from the right-of-way line for Alder Court. Where driveways along the interior private drive are less than 20 feet, no parking signage shall be installed and shown on the Final Site Plan. No driveways will be permitted to be between 10 and 20 feet in length to avoid parked cars blocking the pedestrian facilities and the private drive aisle. b. The covenants must also specify these parking restrictions and the method of enforcement for parking problems. Revised parking calculations must be included with the Final Site Plan. 6. An 8 inch sanitary sewer main shall be extended down Alder Court Lane to the southern property line. 7. Provide a fire hydrant at the southwest corner of the Lincoln Street/Alder Court Lane intersection instead of the north side of Lincoln Street. Provide a City standard blow-off at the dead end of the Lincoln Street water main. 8. The 6” water main in Alder Court Lane does not meet City standard. The water main shall be 8” and extend to the southern property line. The water main extension is in excess of 500 ft and shall be looped. 9. Any unused water services to the property shall be properly abandoned at the main. 10. The private drive into the property shall connect to Maple Lane with a City standard approach not with curb radii as shown on the site plan. Both sides of the private drive shall have the curb painted red with white lettering that is at least 3” in height and signs every 35 feet that state “FIRE LANE/TOW AWAY ZONE”. The cul-de-sac shall meet Fire Department code requirements. 11. The minimum width of Maple Lane, from Lincoln Street to the southern property line, shall be 29 feet back of curb to back of curb. Curb and gutter, shall be provided on both sides of the street. Sidewalk shall be provided on the east side of the street. Also, the curb on the east side of the street shall be painted red with white lettering that is at least 3” in height and signs provided every 35 feet that state “FIRE LANE/TOW AWAY Report compiled on November 15, 2006 ZONE”. This is to allow parking on the west side of the street and provide a 20 foot minimum width for emergency vehicles. 12. Either a City standard sidewalk or extension of the linear park trail shall be provided on Lincoln Street. 13. City standard curb and gutter, boulevard, and sidewalk shall be provided on the west side of Alder Court Lane from Lincoln St to the southern property line. 14. Plans and Specifications for water and sewer main extensions, and streets and storm drainage facilities, prepared and signed by a Professional Engineer (PE) registered in the State of Montana shall be provided to and approved by the City Engineer. Water and sewer plans shall also be approved by the Montana Department of Environmental Quality. The applicant shall also provide Professional Engineering services for Construction Inspection, Post-Construction Certification, and preparation of mylar Record Drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a preconstruction conference has been conducted. No building permits shall be issued prior to City acceptance of the required infrastructure improvements. 15. A Public Access Easement shall be provided for the private drive within the property prior to FSP approval. 16. Prior to issuance of building permits for any new buildings in the development and upon availability of service, any existing residence/business on the property must be connected to City water and sewer utilities. The existing on-site treatment systems must be properly abandoned and certification provided the abandonment occurred. Any wells presently used for domestic purpose can be retained for irrigation only with no physical connection to domestic water piping. UDO Code Provisions: a) Section 18.16.040 requires 5,000 square feet per single household residence. Section 18.80.1980 defines net residential density as the number of residences per buildable unit of land which would exclude the easement for Maple Lane, any easements for Lincoln Avenue, and the required parkland equivalent of 0.03 acres per dwelling unit (for the new units only). Exact density calculations must be submitted with the Final Site Plan. b) A subdivision exemption to aggregate and relocate lot lines must be approved prior to Final Site Plan approval in order to meet to meet Section 18.10.040 of the Unified Development Ordinance. c) Section 18.34.130 requires the applicant to submit seven (7) sets (bound together) of a Final Site Plan within six (6) months of preliminary approval containing all of the conditions, corrections and modifications to be reviewed and approved by the Planning Office. d) Section 18.34.140 states that a Building Permit must be obtained prior to the work, and must be obtained within one year of Final Site Plan approval. Building Permits will not be issued until the Final Site Plan is approved. e) Section 18.38.050.F requires all mechanical equipment to be screened. Rooftop equipment should be incorporated into the roof form and ground or wall-mounted equipment shall be screened with walls, fencing, or dense evergreen plant materials. The location of all mechanical equipment and the method of screening shall be shown on the Final Site Plan. f) Sections 18.42.150 requires a lighting plan for all on-site lighting including wall-mounted lights on the building must be included in the Final Site Plan submittal. All lights must be full cutoff. Lighting cut-sheets shall be provided with the Final Site Plan. g) All street and driveway vision triangles must be shown on the Final Site Plan in accordance with Section 18.44.100. On-street parking does not count within a street vision triangle. h) Section 18.46.020 specifies the required length and width of parking spaces. i) Section 18.46.040.E states that all developments shall provide adequate bicycle parking facilities to accommodate residents and guests. The location and details for the bike rack shall be provided in the Final Site Plan. j) The Final Site Submittal must indicate how the required 23 landscape points are being met in accordance with Chapter 18.48 without double counting. Note that any drought tolerant species proposed for points must be specifically denoted in the Landscape Schedule. The final landscape plan must be signed and certified by a landscape professional as outlined in Section 18.78.100. k) Section 18.48.050.E requires one large canopy tree for each 50 feet of total street frontage (including Lincoln Road and Alder Court). Street tree permits must be obtained from the Forestry Division prior to installation. l) Section 18.50.110.F requires a 25-foot wide public access easement for the entire length of the north-south trail, which should be centered on the easement. m) Per Chapter 18.52, all signage, including any project identification signage, shall require a sign permit subject to review and approval by the Department of Planning & Community Development. Only one free-standing sign is permitted per lot. n) The Final Site Plan shall be adequately dimensioned. A complete legend of all line types used shall also be provided. o) A Storm Water Drainage/Treatment Grading Plan and Maintenance Plan for a system designed to remove solids, silt, oils, grease, and other pollutants must be provided to and approved by the City Engineer. The plan must demonstrate adequate site drainage (including sufficient spot elevations), flow direction arrows, storm water detention/retention basin details (including basin sizing and discharge calculations, and discharge structure details), storm water discharge destination, and a storm water maintenance plan. p) Sewer and water services shall be shown on the FSP and approved by the Water/Sewer Superintendent. City of Bozeman applications for service shall be completed by the applicant. q) Trees shall not be located within ten (10) feet of water and sewer service lines. r) The location of existing water and sewer mains shall be properly depicted, as well as nearby fire hydrants. Proposed main extensions shall be labeled "proposed". s) The drive approach shall be constructed in accordance with the City's standard approach (i.e., concrete apron, sidewalk section and drop-curb) and shown as such on the FSP. A City Curb Cut and Sidewalk Permit shall be obtained prior to FSP approval. t) City standard sidewalk shall be installed and properly depicted at the standard location (i.e., 1 foot off property line) along the street(s) frontage. Any deviation to the standard alignment or location must be approved by the City Engineer. u) All existing utility and other easements must be shown on the FSP. v) Adequate snow storage area must be designated outside the sight triangles, but on the subject property (unless a snow storage easement is obtained for a location off the property and filed with the County Clerk and Recorder's office). w) Drive approach and public street intersection sight triangles shall be free of plantings which at mature growth will obscure vision within the sight triangle. x) The Montana Department of Fish, Wildlife & Parks, SCS, Montana Department of Environmental Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to FSP approval. y) If construction activities related to the project result in the disturbance of more than 1 acre of natural ground, an erosion/sediment control plan may be required. The Montana Department of Environmental Quality may need to be contacted by the Applicant to determine if a Stormwater Discharge Permit is necessary. If a permit is required by the State, the Developer shall demonstrate to the City full permit compliance. z) The applicant shall submit a construction route map dictating how materials and heavy equipment will travel to and from the site in accordance with section 18.74.020.A.1 of the Unified Development Ordinance. This shall be submitted as part of the final site plan for site developments, or with the infrastructure plans for subdivisions. It shall be the responsibility of the applicant to ensure that the construction traffic follows the approved routes. Report compiled on November 15, 2006. aa) All construction activities shall comply with section 18.74.020.A.2. of the Unified Development Ordinance. This shall include routine cleaning/sweeping of material that is dragged to adjacent streets. The City may require a guarantee as allowed for under this section at any time during the construction to ensure any damages or cleaning that are required are complete. The developer shall be responsible to reimburse the City for all costs associated with the work if it becomes necessary for the City to correct any problems that are identified.] 2:47:07 [20:27:55] 3. Landfill Convenience Center Conditional Use Permit, #Z-06245, continued from November 20, 2006 (Knight) 2:47:41 [20:43:19] Staff Report Assistant Planner Martin Knight presented the staff report. 2:51:51 [20:43:25] Applicant Project Engineer Dustin Johnston appeared for the Applicant 2:52:54 [20:44:00] Public Comment - Peter Rugheimer Peter Rugheimer of 1404 Story Mill Road spoke of chemical mishandling in relation to the Landfill. 2:58:52 [20:44:36] Public Comment - Paul Rugheimer Paul Bruchimer of 506 Oxford Dr. spoke in favor of household hazardous containment, but against this location. 3:00:34 [20:45:05] Public Comment - Charles Bowen Charles Bowen of 3070 Mackelhatten wanted to hear a landfill update and mentioned that a sidewalk would be appropiate. 3:27:05 [21:12:32] Motion - It was moved by Cr. Jacobson, and seconded by Cr. Becker to approve application No. Z-06245, Landfill Convenience Center Conditional Use Permit, with the conditions of approval outlined in the staff report. 3:32:08 [21:24:25] Vote - to approve application No. Z-06245, Landfill Convenience Center Conditional Use Permit, with the conditions of approval outlined in the staff report. Those voting Aye being Crs. Becker, Rupp, Kirchhoff, and Jacobson. Those voting No being Mayor Krauss. The motion carried. 3:32:15 [21:24:56] 4. Willson/College Traffic Signal Installation (Arkell) 3:32:38 [21:25:58] Staff Report - Debbie Arkell Director of Public Services 3:35:34 [21:26:12] Public Comment - Tom Johnston Tom Johnston asked that the pedestrian balls be removed and a right turn lane added. 3:36:49 [21:27:56] Public Comment - Ted Lang Ted Lang of 2807 Westridge Dr. spoke in favor of a roundabout at Willson/College. Suggested contacting Wallwork to design a roundabout at the intersection. 3:40:15 [21:29:37] Public Comment - Cathy Costakis Cathy Costakis of 408 Bonner Lane spoke in favor of the roundabout. 3:44:30 [21:30:34] Public Comment - Patricia Ann Simpson Patricia Ann Simpson of 320 S Willson mentioned some issues with the MDT report. 3:46:40 [21:31:06] Public Comment - Jane Klockman Jane Klockman of 713 S Willson spoke against a light at the Willson/College intersection. 3:50:29 [21:31:14] Public Comment - Randy Walthall Randy Walthall of 516 S Tracy is the principal of Longfellow school and asked the Commission to consider extra traffic on Tracy as a result of a signal at Willson and College. 3:52:15 [21:31:29] Public Comment - Jack Devant 802 S Tracy spoke against the signalization of Willson/College and the fallout to Tracy Ave. 3:53:21 [21:34:15] Public Comment - Wade Pannell Wade Pannell of 725 S Willson spoke against a light at the intersection. 3:57:16 [21:34:36] Public Comment - Rachel Wallace Rachel Wallace of 401 S Willson brought up issues with a light and asked for a holistic solution. 3:59:32 [21:35:57] Public Comment - Jim Devit Jim Devit of 1060 Westgate lived on Willson for 20 years and feels that Willson works as is. 4:03:00 [21:39:25] Public Comment - Mike Miles Mike Miles spoke of flaws in the MDT report and didn't examine the whole area. 4:06:04 [21:43:48] Mayor Krauss suspended the rules to extend the meeting past 10:00 pm 4:06:11 [21:45:56] Public Comment - Joanne Jenson Joanne Jenson represents the residents of 804 S Willson and spoke against the proposed light at College/Willson and asked to save the on street parking. 4:07:10 [21:49:50] Public Comment - Rob Zimmer Rob Zimmer is the chair of the Bozeman Pedestrian and Traffic Safety spoke in favor of the signal. He is blind and finds crossing the street a challenge. 4:14:12 [21:59:04] Rob Lustridge from Montana Department of Transportation 4:38:56 [22:33:45] Motion and Vote - It was moved by Cr. Becker, and seconded by Cr. Kirchhoff to Direct staff to work with MDT to facilitate an alternative roundabout design and historic impact mitigation to install a roundabout at College and Willson that is still eligible to capture MDT federal hazard safety elimination funding and to authorize the use of up to three thousand dollars to acquire professional services to inform this process Those voting Aye being Crs. Becker, Kirchhoff, Jacobson and Mayor Krauss. Those voting No being Cr. Rupp. The motion carried. 4:41:02 [22:34:54] Motion and Vote - It was moved by Cr. Becker, and seconded by Cr. Jacobson to extend the meeting Those voting Aye being Crs. Becker, Kirchhoff, and Jacobson Those voting No being Cr. Rupp and Mayor Krauss. The motion carried. 4:41:33 [22:35:27] 5. Churn Creek Annexation Extension Request (Epple) 4:42:33 [22:37:55] Staff Report Andy Epple presented the staff report 4:48:24 [22:38:10] Questions for Staff - Becker 4:48:45 [22:38:21] Applicant Troy appeared for Churn Creek Partners 4:50:23 [22:38:43] Public Comment - Pat Martin Pat Martin of 2771 Deercreek Dr. mentioned a lack of contact with the land owners. 4:52:08 [22:39:06] Public Comment - Peter Rugheimer Peter Rugheimer of 1404 Story Mill Road likes the plans and has enjoyed working with Churn Creek Partners 4:54:15 [22:39:22] Public Comment - Paul Rugheimer Paul Rugheimer of 506 Oxford Dr. has enjoyed working with the Churn Creek team. 4:55:40 [22:41:59] Public Comment - Steve Zigler Steve Zigler of 2531 Whitetail Rd. spoke of TDRs and future expansion issues. 4:58:21 [22:43:07] Public Comment - Brian Damon Brian Damon of 8645 Look Far Way spoke of traffic concerns relating to this project. 4:59:19 [22:43:10] Motion - It was moved by Cr. Rupp, and seconded by Cr. Kirchhoff to deny the request for extension of Preliminary Annexation Approval 5:05:25 [22:50:58] Vote - to deny the request for extension of Preliminary Annexation Approval Those voting Aye being Crs. Rupp, Kirchhoff, and Jacobson Those voting No being Cr. Becker and Mayor Krauss. The motion carried. 5:05:50 [22:52:46] L. Adjournment Mayor Krauss adjourned the meeting at 11:10 pm ______________________________ Jeffrey K. Krauss, Mayor ATTEST: ______________________________________ Brit Fontenot, City Clerk PREPARED BY: ______________________________________ Stuart John Bernard, Deputy City Clerk Approved on ____________________. Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brian LaMeres, City Controller and Chris Kukulski, City Manager SUBJECT: Accounts Payable Claims Review and Approval MEETING DATE: December 4, 2006 BACKGROUND: Section 7-6-4301 MCA states that claims should not be paid by the City until they have been first presented to the City Commission. However, under Section 7-1-4124 MCA a municipality has the power to ratify any action of the municipality or its officers or employees that could have been approved in advance. Because the Commission held a work session last week and not a formal meeting, no claims were approved. The Commission is therefore being presented with two lists of claims this week. The claims on one list being reviewed for approval have already been paid, while the claims on the other list have not yet been paid. The Commission is being asked to approve the claims presented on the Expenditure Approval Lists, a portion of which have already been paid. RECOMMENDATION: The City Commission approve payment of the claims. FISCAL EFFECTS: The total amounts of the claims paid and the claims to be paid are presented at the bottom of the Expenditure Approval Lists. ALTERNATIVES: As suggested by the City Commission. Respectfully submitted, Brian LaMeres, City Controller Approved by: Chris A. Kukulski, City Manager Attachments: Expenditure Approval Lists Report compiled on November 29, 2006 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Sue Stodola, Project Engineer Chris Kukulski, City Manager SUBJECT: Commission Resolution No. 3981 Change Order No. 2 Durston Road SID 684 Project MEETING DATE: December 4, 2006 BACKGROUND: On February 27, 2006 the City Commission authorized award of the bid for the Durston Road project to Johnson-Wilson Constructors, Inc. The City Commission approved Change Order No. 1 on October 2, 2006. Six (6) original signature copies of the partially executed Change Order No. 2 to the Construction contract for the above referenced project have been provided to the City Clerk, Brit Fontenot. This change order covers the additional North 19th Avenue intersection signal work and road improvements to the east leg of the intersection as summarized in the attached Change Order No. 2 Cost Summary. The change order increases the contract amount from $4,279,715.84 by $94,857.48 to a total of $4,374,573.32. In addition, this change order includes an increase in the contract time of 7 days for substantial completion and final completion. RECOMMENDATION: The Commission make a motion to adopt Commission Resolution No. 3981 to authorize the City Manager to sign Change Order No. 2 of the construction contract for the Durston Road project. FISCAL EFFECTS: The project will be funded through SID 684, Street Impact Fees, Water Impact Fees, and Sewer Impact Fees. Change order No. 2 is still within the project contingency thus, overall, the project remains within budget. Commission Memorandum Commission Resolution No. 3981 Change Order No. 2 Durston Road SID 684 Project December 4, 2006 Page 2 of 2 ALTERNATIVES: As may be suggested by the City Commission. Respectfully submitted, _________________________________ ____________________________ Susan M. Stodola, Project Engineer Chris A. Kukulski, City Manager Attachments: Change Order No. 2 and Commission Resolution No. 3981 Report compiled on 11/29/06 cc: Brit Fontenot w/orig. enclosures Project File COMMISSION RESOLUTION NO. 3981 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH JOHNSON-WILSON CONSTRUCTORS, INC., HELENA, MONTANA. WHEREAS, the City Commission did, on the 27th day of February 2006, authorize award of the bid for the Durston Road project to Johnson-Wilson Constructors, Inc., Helena, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Johnson-Wilson Constructors, Inc., as contained in Change Order No. 2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 4th day of December 2006. __________________________________________ JEFFREY K. KRAUSS, Mayor ATTEST: ________________________________________ BRIT FONTENOT City Clerk APPROVED AS TO FORM: _____________________________________ PAUL J. LUWE City Attorney Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Sue Stodola, Project Engineer Chris Kukulski, City Manager SUBJECT: Temporary Drainage Easement (Blackleaf Group, LLC) MEETING DATE: December 4, 2006, Consent Agenda BACKGROUND: The original partially executed Temporary Drainage Easement for the above referenced property has been provided to the City Clerk. The temporary drainage easement is for storm drainage from Durston Road along the property which will permanently be detained on the property once it is fully developed. Engineering staff has reviewed the Temporary Drainage Easement and found it to be acceptable. RECOMMENDATION: The City Commission make a motion to authorize City Manager to sign the Temporary Drainage Easement. FISCAL EFFECTS: N/A ALTERNATIVES: None Respectfully submitted, _________________________________ ____________________________ Susan M. Stodola, Project Engineer Chris A. Kukulski, City Manager Attachments: Temporary Drainage Easement Report compiled on 11/28/06 cc: Project File REPORT TO: Honorable Mayor and City Commission FROM: Tim Cooper, Assistant City Attorney Chris Kukulski, City Manager SUBJECT: Meadow Creek Subdivision, Phase 1 Final Plat MEETING DATE: December 4, 2006 BACKGROUND: This is a request for approval of a Subdivision Final Plat to subdivide approximately 118 acres to create a traditional residential neighborhood development of mixed density housing on property located south of Stuckey Road, west of South 19th Avenue, and north of Blackwood Road. At the November 7, 2005 public hearing, the City Commission voted to approve the Meadow Creek Subdivision Preliminary Plat with twenty-nine (29) subdivision conditions and subject to all applicable subdivision code provisions. The applicant has applied for final plat approval for Phase 1 and staff has concluded all terms and conditions of preliminary plat approval have been met. State law provides that the governing body shall approve the plat only if: a) The plat conforms to the conditions of approval set forth on the preliminary plat and to the terms of the state subdivision law and regulations and the regulations adopted by the Bozeman City Commission; and b) The County Treasurer has certified that all real property taxes and special assessments assessed and levied on the land to subdivide have been paid. The County Treasurer has certified that the taxes and special assessments have been paid. Attached is a memorandum from Dave Skelton, Senior Planner, delineating how the conditions of preliminary plat approval have been satisfied. RECOMMENDATION: Upon the Director of Public Service’s review and concurrence, the City Commission approves the Final Plat of Meadow Creek Subdivision, Phase 1, and authorizes the Director of Public Service to execute the same on behalf of the City of Bozeman. FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased property tax revenues from new development, along with increased costs to deliver municipal services to the property. ALTERNATIVES: As suggested by the City Commission Respectfully submitted, _________________________________ ____________________________ Tim Cooper, Assistant City Attorney Chris Kukulski, City Manager Attachments: Review Memo to Tim Cooper, dated October 27, 2006. Commission Memorandum planning · zoning · subdivision review · annexation · historic preservation · housing · grant administration · neighborhood coordination CITY OF BOZEMAN DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building 20 East Olive Street P.O. Box 1230 Bozeman, Montana 59771-1230 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net MEMORANDUM -------------------------------------------------------------------------------------------------------------------------------------- TO: TIM COOPER, CITY ATTORNEY’S OFFICE FROM: DAVE SKELTON, SENIOR PLANNER RE: FINAL PLAT REVIEW AND APPROVAL MEADOW CREEK SUBDIVISION, PHASE ONE PLANNING FILE NO. P-06058 DATE: OCTOBER 27, 2006 (Updated November 22, 2006) -------------------------------------------------------------------------------------------------------------------------------------- Engineering, Inc., on behalf of Meadow Creek Partners, LLC, has made application to the Planning Office for Final Plat review and approval for Meadow Creek Subdivision, Phase One, being the first phase of a residential major subdivision to subdivide 202.4± acres and create 341 mixed-use residential lots located south of Stucky Road, west of South 19th Avenue, and north of Blackwood Road. Phase One would subdivide 118.4 acres and create 155 residential lots. On Monday, November 7, 2005, the City Commission granted preliminary plat approval to subdivide 202.41± acres and create Meadow Creek Subdivision subject to twenty-nine (29) conditions (Planning Application No.P-05053). The Commission is scheduled to tentatively approve the Findings of Fact and Order on November 6, 2006, and a draft of the Findings of Fact and Order is attached to this memorandum for your review. The developer has applied for final plat review and approval of Phase One, electing to financially guarantee the following subdivision improvements for said phase: a) portions of the internal subdivision street for Enterprise Boulevard and Parkway Avenue, b) City standard boulevard sidewalks, c) boulevard landscape and irrigation, d) open space landscape, irrigation and trail improvements, and e) parkland improvements. The applicant will provide Staff with the applicable financial guarantee for the remaining subdivision improvements prior to scheduling this matter before the City Commission. A “No Build” Restriction is necessary at this time with this final plat application. All street and municipal infrastructure improvements are scheduled to be completed, inspected and accepted by the City of Bozeman with the filing of the final plat for Phase One, with exception to sections along Enterprise Boulevard and Parkway Avenue. Based on the summary review provided below, the City Engineer’s Office and Planning Department have reviewed the final plat application against the conditions of preliminary plat approval; and as a result, find that final plat approval should be granted. Page 2 Enclosed, please find four (4) original mylars of the Final Plat, original Platting Certificate, copy of Improvements Agreement and financial guarantee, copy of Declaration of Covenants and Restrictions for the Property Owner’s Association, and deed to transfer site for the Fire Department’s substation. The Planning Staff respectfully requests that you prepare a City Attorney's Certificate using the attached original Platting Certificate; approve the Certificates of Director of Public Service, Release of Sanitary Restrictions, and Certificate of Completion "as to form". If you find this submittal acceptable and complete, the applicant respectfully requests that the Final Plat application be scheduled before the Bozeman City Commission at the earliest time possible. An application for final plat review and approval was submitted on Wednesday, October 9, 2006 and deemed substantially complete. The 45-day (i.e., working days) review period would be Wednesday, December 19, 2006. However, a review against the conditions of preliminary plat approval indicated that the following conditions were not yet met upon submitting the application: condition #1 – BMC code provisions need to be met, 2) condition #2 and #3 confirmed by City Engineer’s Office, 3) condition #10 – 100-year flood elevations, 4) condition #15 – modify covenants with language to maintain existing vegetation in right-of-way, 5) condition #25 – modify covenants, 6) condition #27 – identify all parks as “public”, 7) condition #28 – modify covenants to provide landscape and placement details for storm water facilities, and 8) condition #29 – modify covenants to include Seifert language. A revised final plat and platting certificate, containing a new Certificate of Consent of Mortgage on the face of the plat, was prepared and submitted to the Planning Office on November 6, 2006. Therefore, the 45-day (i.e., working days) review period for this final plat now expires on Tuesday, January 9, 2007. Once the Commission has acted on the Final Plat application, please forward all of the original mylar plats, documents, and supplemental information to Debbie Arkell, have her sign the appropriate certificates on the final plat, and then return all of the documents to the Planning Office. The conditions of preliminary plat approval, which are pertinent to this phase, and how they have been met, follow: Planning Application No. P-06058: 1. The applicant must comply with all provisions of the Bozeman Municipal Code, which are applicable to this project. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. a. Item “e” of staff report - Section 18.42.180.C - Requires 10% of the net building acreage to be dedicated to Restricted Size Lots, or a minimum of 453,301 square feet for this subdivision. The Final Plat must identify the RSL lots. Both the certificate page(sheet 1 of 3) and subdivision page (sheet 2 of 3) of the final plat need to provide a “notation that identifies the RSL lots for Phase One to demonstrate how the requirement for RSL lots will be met. The final plat for Phase One has been updated to address said provision. b. Item “m” of staff report - Section 18.78.060.G - A professional cultural resource inventory of the site to be conducted by a qualified archeologist is necessary. The results Page 3 of said survey must be provided to the Planning Office and the State Historic Preservation Office prior to the disturbance of any of the subdivision grounds. The final plat application now provides a copy of the professional cultural resource inventory. c. Item “v” of staff report - The final plat shall provide public utility easements along side and rear lots lines as required by the subdivision regulations. However, in the event front yard easements are used, side and rear yard easements must still be provided on the plat unless written confirmation is submitted to the Planning Office from all utility companies indicating that front yard easements are adequate to service said subdivision lots. The easement notation required in Section 16.14.050.B.4 of the Bozeman Subdivision regulations shall also be provided on the final plat. Because the final plat does not provide utility easements along all required yards, it is necessary to provide the final plat application approval by all utility companies that said easements being provided are acceptable. Said letters from all applicable utility companies has been provided with an updated version of the final plat. 2. The traffic impact analysis submitted for the project shall be approved by City Engineering and the Montana Department of Transportation. All improvements needed to provide adequate level of service for the analyzed intersections must be installed with the project. Said improvements are being installed and are scheduled be completed prior to the filing of the final plat. However, a “No Build” restriction is necessary with the filing of the plat based on the outcome of said required improvements, as well as other outstanding subdivision improvements identified by the City Engineer’s Office. 3. Access Permits for the intersections, and Occupancy Permits for water and sewer mains and services within the State's right-of-way must be obtained from the Montana Department of Transportation. The City Engineer’s Office has determined that said condition has been met. 4. The west half of South 19th Avenue shall be improved to the 120’ right of way, 5 Lane Principal Arterial standard as shown in the Greater Bozeman Area Transportation Plan, 2001 Update, along the entire frontage of the subdivision including tapers back to existing asphalt on the north and south end meeting AASHTO standards. All of the improvements to South 19th Avenue shall be complete with Phase I of the subdivision. Said improvements are being completed prior to the filing of the final plat. 5. The sidewalks adjacent to South 19th shall be 6 feet wide, and shall be installed at the time the street improvements are done. Said improvements are scheduled to be completed prior to the filing of the final plat or financially guaranteed. 6. The north half of Blackwood Road along with the required utility extensions shall be improved to the 62-feet back-of-curb to back-of-curb Collector standard as shown in the Greater Bozeman Area Page 4 Transportation Plan, 2001 Update, along the entire frontage of the subdivision. This shall include the curb for the future median. Said improvements for Phase One are scheduled to be completed with the filing of the final plat. 7. The full width of Graf Street along with the required utility extensions shall be improved to the 48 feet back-of-curb to back-of-curb Collector standard as shown in the Greater Bozeman Area Transportation Plan, 2001 Update, from South 27th Avenue to the western boundary of the property. Said improvements will be completed with the filing of the final plat. 8. The full width of South 27th Avenue from Blackwood Drive to Alder Creek Drive, and the east half from Alder Creek Drive to Graf Street, along with the required utility extensions shall be improved to the 62-feet back-of-curb to back-of-curb Collector standard as shown in the Greater Bozeman Area Transportation Plan, 2001 Update. This shall include the curb for the future median where only a half street is constructed. Said improvements will be completed with the filing of the final plat. 9. The proposed variances identified in the preliminary plat submittal are not variances, but rather deviations from the City Design Standards. Calculations must be submitted to justify the deviations, or the intersections realigned to meet the standards. The City Engineer’s Office has approved said variances. 10. 100-year flood elevations shall be computed for the watercourses that are within the subdivision boundary. All locations where flooding limits encroach onto proposed lots shall be noted on the final plat along with minimum floor elevation for the structures to be constructed on the effected lots. Said information is provided on the final plat. 11. The sewer master plan for the area requires that a 10-foot main be installed through this subdivision or the majority of it to provide service for the properties to the south. The preliminary plat submittal states that all interior mains will be 8 inches. The mains must be adequately sized to serve the area to the south. Said 12-inch main as required by the City Engineer’s Office has been installed to the south property line. 12. A 1-foot No Access Strip shall be shown on the plat along the entire frontage of South 19th Avenue, Blackwood Drive, Graf Street, and South 27th Avenue with the exception of along Lots 11 & 12 of Block 5, and Lots 13, 14, and 15 of Block 9. These lots shall utilize a shared access as shown on the preliminary plat submittal. The 1-foot No Access strip and shared access points are noted accordingly on the final plat for Phase One. 13. All weather access roads shall be installed to provide access to all sewer mains that are not located within an existing street. Page 5 The City Engineer’s Office has approved all weather access roads for this phase. 14. Pursuant to Section 18.42.070.3 of the UDO, sewer and water mains shall be stubbed out to the boundary of the subdivision to provide future service to adjoining undeveloped land. The applicant indicates that water and sewer mains have been extended to the boundaries of the subdivision for future extension of infrastructure to the west and south, which the City Engineer’s Office has confirmed.. 15. Section 18.44.020.2.b of the UDO requires that the subdivision be a PUD unless the rights of way are 60 feet wide. Two 40-foot rights of way separated by 60 feet of open space is being proposed for South 29th Avenue. Either the subdivision will need to be submitted as a PUD, or the rights of way increased to 60 feet. Alternatively, the entire 140 feet may be dedicated. The plat and covenants shall require that the median in this street be maintained by the homeowners association. This shall include any maintenance or removal of the trees along the ditch. The City Engineer’s Office has accepted the entire 140 feet, and the protective covenants require the homeowner’s association to maintain the mature vegetation within the median. 16. That the subject property shall be formally annexed to the corporate limits of the City of Bozeman with the appropriate municipal zoning designations adopted by the City Commission prior to the applicant submitting for final plat approval for any phase of the major subdivision. Resolution of Annexation No. 3909 was adopted by the City of Bozeman on April 17, 2006 to annex the entire said lands. 17. That the phasing of the major subdivision will not have sub-phasing within each phase and that each phase shall be in the proper sequential format, regardless of the timing for each phase to be filed at the Clerk and Recorder’s Office. No sub-phasing is proposed. 18. That the subdivision exemption for relocation of a common boundary between the adjoining landowners (i.e., Marshall Bennett and Jane Schaaf and Don Miller) be filed at the Gallatin County Clerk & Recorder’s Office prior to submitting for final plat review and approval. Said common boundary realignment has been filed. 19. That water rights, or cash in-lieu thereof, shall be provided and paid for prior to final plat review and approval for each phase. If the final plat of the subdivision is filed in phases, water rights, or cash in-lieu thereof will only be required for each phase of the subdivision that is being filed. The applicant shall provide payment of the calculated cash in-lieu of water rights based on an amount determined by the Director of Public Service. Payment of cash in-lieu of water rights in the amount of $54,903.31 for Phase One was paid on October 10, 2006. Page 6 20. That the final plat contain the following language that is readily visible with lettering, at a minimum height of 3/16-inch, placing future landowners of individual lots on notice of the presence of high groundwater in the area of the subdivision for review and approval by the Planning Office: “Due to the potential of high ground water tables in the areas of the subdivision, no partial or full basements will be permitted in areas designated as having groundwater within five (5) of the surface during peak irrigation. The finish floor of all residential structures shall be not less than two (2) feet above the established elevation from the top of curb of the adjoining street. Furthermore, it is not recommended that residential dwellings or commercial structures with full or partial basements be constructed without first consulting a professional engineer licensed in the State of Montana and qualified in the certification of residential and commercial construction.” Said notation is provided on the final plat. 21. Dedication of the public parkland will occur with the first phase of the major subdivision. Two of the four public parks proposed with the subdivision will be dedicated with Phase One of the major subdivision. Each park noted on the final plat must identify said acres to be dedicated, exclusive of any common areas and/or storm water facilities. The Recreation and Parks Advisory Board and Planning Office endorsed the parkland with Phase One with the exception to note the actual acres for each park and that Ainsworth Park is a Public Park. 22. That the applicant dedicates with the first phase of the major subdivision up to a 2-acre parcel of land, reviewed and approved by the City of Bozeman Fire Department, for the purposes of a fire department substation situated along Graf Street. This matter was not addressed with the original final plat application, whereby said parcel of land for the purposes of a fire department substation along Graf Street was deeded to the City. The creation and documentation to transfer said parcel to the City of Bozeman was executed on November 16, 2006 (see attached copy of warranty deed). 23. Public pathway easements shall be at least 25-30-feet wide, including said easement located in Block 23 of Phase 2b, and noted accordingly on the final plat. Said public pathway easements are provided. However, the alignment of the easement on Lot 14 and 15, Block 9 does not allow proper placement of the 30-foot wide shared access easement service both lots. Therefore, said alignment will need to be adjusted. 24. That the final design and specifications of the trail system within the major subdivision be reviewed and approved by the Superintendent of Parks and Recreation. 25. That the applicant modify the protective covenants of the homeowner’s association as outlined in the staff report and that the applicant submit a revised draft of the protective covenants for review and approval by the Planning Office at least thirty (30) days prior to submitting for final plat approval of the initial phase of the major subdivision. Page 7 Said protective covenants need to be modified to address items identified by staff. 26. All areas for the purposes of open space, storm water runoff facilities, and other common areas owned and maintained by the homeowner’s association shall be identified on final plat as “common area” and/or “common open space”, and noted accordingly in the protective covenants of the homeowner’s association documents. 27. All parks that are dedicated parkland shall be noted on the final plat as “Public Park”. Ainsworth Parks has been identified as a public park on the final plat. 28. That the applicant provide in the protective covenants of the homeowners association for review and approval by the Planning Office, written language and landscape details providing the necessary provisions for the proper landscaping of all storm water facilities and related structures, and that all facilities will be a distance not less than 30 feet from the water courses. The protective covenants will be amended to provide adequate provisions for the placement and landscaping of the storm water facilities and related structures. 29. That the applicant provide in the protective covenants of the homeowners association for review and approval by the Planning Office, the recommended language provided by Mr. Donald Selfert regarding agricultural and farming practices, damage due to livestock, pets, and trespassing on private agricultural lands. The revised protective covenants contain the recommended language provided by Mr. Seifert. DS/dps Attachments Applicants Response to Conditions of Preliminary Plat Approval Four (4) original mylars and original Platting Certificate Copy of Improvements Agreement Copy of Warranty Deed and Realty Transfer Certificate for City of Bozeman Fire Station Site cc: Meadow Creek Partners, LLC., 924 Stoneridge Drive, Suite 1, Bozeman, MT 59718 Madison Engineering, 924 Stoneridge Drive, Suite 1, Bozeman, MT 59718 Engineering Inc., 705 Oysterman Drive, Suite F, Bozeman, MT 59715 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brit Fontenot, City Clerk Chris Kukulski, City Manager SUBJECT: Contract Goal of the Bozeman Parking Garage MEETING DATE: December 4, 2006 BACKGROUND: The purpose of the presentation by Cassie Riggin of Morrison-Maierle Engineering is to outline the City of Bozeman’s approach to establishing the Disadvantaged Business Enterprise (DBE) goal for the Bozeman Parking Garage project. The City of Bozeman will submit to the Federal Transit Authority (FTA) for a DBE program contract goal for the Bozeman Parking Garage project from 2007 to 2009. Prior to this submittal, a public information presentation should be scheduled at a regular Bozeman City Commission meeting. This presentation will also provide a venue for questions and make comments to the DBE goal and methodology, and also inform the engineering firm on ways to increase DBE participation on this project via Race Neutral Means. RECOMMENDATION: FISCAL EFFECTS: N/A ALTERNATIVES: None recommended. Respectfully submitted, _________________________________ ____________________________ Brit Fontenot, City Clerk Chris A. Kukulski, City Manager December 4, 2006 Bozeman Parking Garage – DBE Goal Public Meeting Info Today’s meeting is intended to outline the City of Bozeman’s approach to establishing the DBE goal for the Bozeman Parking Garage project. After this informational meeting, the project DBE Goal will be published in the Bozeman Chronicle, in the Montana Department of Transportation’s Civil Rights Bureau DBE Newsletter, and in the Montana Contractors’ Association monthly newsletter. The public is encouraged to review the goal methodology and comment to the City of Bozeman for 45 days from this meeting. All public comments will be considered for inclusion in the DBE program goal setting. The public can contact James Goehrung or Cassie Riggin with any comments or questions at the following location. James Goehrung Cassie Riggin PO Box 1230 #1 Engineering Place Bozeman Mt, 59711 Helena Mt, 59604 jgoehrung@bozeman.net criggin@m-m.net (406) 582-3232 (406) 495-3503 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brian Krueger, Associate Planner SUBJECT: Buffalo Wildwings CUP/COA, #Z-06209 MEETING DATE: Originally scheduled for October 16, 2006, but opened and continued to November 6, 2006, 6pm and opened and continued to Monday, December 4, 2006. BACKGROUND: The application for a Conditional Use Permit (CUP) would allow the construction of a new 5,995 square foot restaurant with on-premise alcohol consumption and related site improvements on property located at 1783 North 19th Avenue (Home Depot Pad Lot #2). The property is designated as “Business Park” in the Bozeman 2020 Community Plan and is zoned M-1 (Light Manufacturing District). The original public hearing was scheduled for October 16, 2006; however, after a recommendation of denial from the Design Review Board, the applicants decided to make changes to the project. The DRB re-reviewed minor modifications to the site plan and elevations on November 8th; however, the DRB again recommended denial of the project citing that while the revisions were certainly an improvement from the initial application, they did not go far enough to adequately address all the initial concerns. At this time, the applicants have withdrawn the project to allow time for more substantial revisions. When resubmitted, the revised project will have to be completely re-noticed in the newspaper and to all property owners within 200 feet. The DRB and possibly the DRC will also have to review the revised project. UNRESOLVED ISSUES: None. RECOMMENDATION: That the City Commission acknowledge the applicants request to withdraw the application. FISCAL EFFECTS: Fiscal impacts are undetermined at this time. ALTERNATIVES: As suggested by the City Commission. CONTACT: Please feel free to email Brian Krueger at bkrueger@bozeman.net if you have any questions prior to the public hearing. APPROVED BY: Andrew Epple, Planning Director Chris Kukulski, City Manager Report compiled on November 29, 2006 Bruce M. Carlson, AIA Patrick G. Blees, AIA Applicants Withdraw Ltr.doc C.M. Architecture, P.A. C.M. Architecture, P.A. 200 Bailey Avenue, Suite 310 219 North Second Street, Suite 301 Fort Worth, Texas 76107-1210 Minneapolis, Minnesota 55401-1454 Office (817) 877-0044 Office (612) 338-6677 Fax (817) 877-0418 Fax (612) 338-2995 DATE: 29 November 2006 RE: Buffalo Wild Wings Home Depot Minor Subdivision 1783 N. 19th Avenue, Lot 2 Bozeman, MT 59718 CMA Project No. 06127-01 SUBJECT: Temporarily Withdraw On behalf of Brad Anderson [Buffalo Wild Wings Franchise], C.M. Architecture, P.A. would like to temporarily withdraw the project from the December 04 Commission meeting in order to go before the Design Review Board one additional time to verify compliance with their wishes. Any further questions or comments may be directed to Mitch K. Booth @ 612-547-1312. Report compiled on November 27, 2006 Commission Memorandum REPORT TO: Honorable Mayor & City Commission FROM: Andrew Epple, Planning Director Chris Kukulski, City Manager SUBJECT: Old Chicago Minor Subdivision Preliminary Plat Application #P-06054 MEETING DATE: Monday, December 4, 2006 BACKGROUND: Garden Inn Center, LLC, represented by Hyalite Engineers, LLC, have made application for a Second or Subsequent Minor Subdivision from a Tract of Record to subdivide 3.4 acres into two commercial lots at 1940 South 19th Avenue. The subject property is currently occupied by the Old Chicago and Montana Furniture Gallery buildings. The subject parcel is part of the Stoneridge P.U.D. Minor Subdivision #2, and was created in 2003. At their November 21st, 2006 public hearing the City of Bozeman Planning Board voted 7 in favor and 0 against to forward a recommendation of conditional approval subject to 5 conditions. UNRESOLVED ISSUES: There are no unresolved issues at this time. RECOMMENDATION: The City Commission conditionally approves this application, based on the Planning Board’s recommendation of conditional approval, with the conditions listed on Page 2 of Planning Board Resolution #P-06054. FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased property tax revenues, along with increased costs to deliver municipal services to the property, when the property is developed. ALTERNATIVES: As suggested by the City Commission. CONTACT: Please feel free to email Martin Knight at mknight@bozeman.net if you have any questions prior to the public hearing. Attachments: Planning Board Resolution #P-06054 Minutes of the Planning Board’s November 21st, 2006 public hearing Staff report Applicant’s submittal materials Proposed amended plat APPROVED BY: Andrew Epple, Planning Director Chris Kukulski, City Manager Report compiled on November 27, 2006 Commission Memorandum PLANNING BOARD AND CITY COMMISSION STAFF REPORT OLD CHICAGO MINOR SUBDIVISION FILE NO. #P-06054 #P-06054 Old Chicago Minor Subdivision Staff Report 1 Item: Subdivision Preliminary Plat Application #P-06054, a Second or Subsequent Minor Subdivision from a Tract of Record to divide 3.4 acres into two commercial lots at 1940 North 19th Avenue. The subject property is legally described as Lot 55, Stoneridge P.U.D. Minor Subdivision #2, situated in the northeast one-quarter of Section 2, T2S, R5E, PMM, City of Bozeman, Gallatin County, Montana. Owner/Applicant: Garden Center Inn 2020 Charlotte Street Bozeman, MT 59718 Representative: Hyalite Engineers 2066 Stadium Drive, Suite 203 Bozeman, MT 59715 Date/Time: Before the Bozeman Planning Board on Tuesday, November 21st, 2006 at 7:00 p.m. in the Community Room, Gallatin County Courthouse, 311 West Main Street, Bozeman, Montana. Before the Bozeman City Commission on Monday, December 4th, 2006 at 6:00 p.m. in the Community Room, Gallatin County Courthouse, 311 West Main Street, Bozeman, Montana. Report By: Martin Knight, Assistant Planner Recommendation: Conditional Approval ____________________________________________________________________________________ PROJECT LOCATION The subject property is legally described Lot 55, Stoneridge P.U.D. Minor Subdivision #2, situated in the northeast one-quarter of Section 2, T2S, R5E, PMM, City of Bozeman, Gallatin County, Montana, is addressed at 1940 North 19th Avenue, and is generally located between Commerce Way and Tschache Lane. The property is zoned B-2 (Community Business District). Please refer to the vicinity map provided on Page 2. #P-06054 Old Chicago Minor Subdivision Staff Report 2 PROPOSAL Don Cape & Garden Center Inn, LLC, represented by Hyalite Engineers, have made application for a Second or Subsequent Minor Subdivision from a Tract of Record to subdivide 3.4 acres into two commercial lots at 1940 North 19th Avenue. The subject property currently has two buildings, occupied by Old Chicago and Montana Furniture Galleries. This subdivision would create individual parcels for each of these buildings. Lot 55A-1 would be approximately 1.97 acres, and occupied by Old Chicago. Lot 55A-2 would be approximately 1.43 acres, and occupied by Montana Furniture Galleries. The subject parcel is part of the Stoneridge P.U.D. Subdivision, and was created in 2003. ZONING DESIGNATION & LAND USES Again, the subject property is currently occupied by Old Chicago and Montana Furniture Galleries and is zoned B-2 (Community Business District). The intent of the B-2 district is to provide for a broad range of mutually supportive retail and service functions located in clustered areas bordered on one or more sides by limited access arterial streets. The following land uses and zoning are adjacent to the subject property: North: Hilton Garden Center Inn, zoned B-2 (Community Business District); South: Bridger Peaks Town Center, zoned B-2 (Community Business District); East: Lowe’s, zoned B-2 (Community Business District); West: Home Depot, zoned B-2(Community Business District). #P-06054 Old Chicago Minor Subdivision Staff Report 3 ADOPTED GROWTH POLICY DESIGNATION The subject property, as well as all adjacent property, is designated as Regional Commercial and Services in the Bozeman 2020 Community Plan. This category designates places where the retail, education, health services, public administration, and tourist services with a regional impact should be provided. Because of the draw from outside consumers of these services, it is necessary that these types of facilities be located in proximity to significant transportation routes. PRELIMINARY PLAT SUPPLEMENTS During the preapplication review the applicants submitted a letter requesting waivers for all of the materials required by Section 18.78.060 “Additional Subdivision Preliminary Plat Supplements” of the UDO. During the preapplication review, the development review committee (DRC) voted to grant all of the requested waivers. STAFF FINDINGS/REVIEW CRITERIA The basis for the City Commission’s decision to approve, conditionally approve or deny the subdivision shall be whether the preliminary plat, Planning Board advise and recommendation, and additional information demonstrates that development of the subdivision complies with the Unified Development Ordinance, the City’s growth policy, the Montana Subdivision and Platting Act and other adopted state and local ordinances. The Montana Subdivision and Platting Act established six primary review criteria, which the governing body must also consider when evaluating subdivisions. Planning staff, the DRC, and other reviewing agencies have made comments in relation to those and other criteria as described below, and have recommended conditions as outlined in this staff report. A. Primary Review Criteria 1. Effects on Agriculture The property has planned, zoned and developed for commercial uses. The area has been platted and developed for many years, and does not support agricultural uses. There are no adjacent agricultural uses. 2. Effects on Agricultural Water User Facilities No effects on agricultural water user facilities were identified. 3. Effects on Local Services Water/Sewer. Water and Sewer services are currently obtained from Commerce Way and a 35-foot utility easement along the eastern property boundary. No modifications to these services are proposed. Existing water and sewer service lines must be accurately depicted on the final plat. This has been included as a condition for Final Plat approval. Police/Fire. The property is well within the City’s Police and Fire emergency response area. The subdivider must obtain an address for the new lot from the City Engineering Division prior to filing of the final plat to facilitate fire and police response to the site. Streets. No modification to the access and street configuration is proposed. A perpetual reciprocal easement for access, driveways, parking, snow storage, drainage, etc. must be #P-06054 Old Chicago Minor Subdivision Staff Report 4 executed prior to final plat approval. This has been included as a condition for Final Plat approval. All existing and proposed easements, including adjacent right-of-ways, shall be depicted upon the preliminary plat. This has also been included as a condition for Final Plat approval. Stormwater. Stormwater facilities have been provided with the development of Stoneridge P.U.D. Subdivision. Parks. Parkland dedication was provided with the Stoneridge P.U.D. Parkland dedication cannot be required with minor subdivisions. Utilities. There are existing power, cable and phone utilities that were installed with initial development of the subject property. This includes a 35-foot utility easement along the eastern property boundary. No modifications are proposed. 4. Effects on the Natural Environment The existing weed plan, as approved through the original subdivision, is found to be acceptable. 5. Effects on Wildlife and Wildlife Habitat There should be no impact on wildlife and wildlife habitat. The subject property has been developed for commercial uses for some time. 6. Effects on Public Health and Safety The intent of the regulations in the Unified Development Ordinance is to protect the public health, safety and general welfare. The subdivision has been reviewed and determined to be in general compliance with the title. Any other conditions deemed necessary to ensure compliance have been noted throughout this staff report. B. Compliance with the survey requirements provided for in Part 4 of the Montana Subdivision and Platting Act. The property in question has been surveyed and platted in conformance with the Montana Subdivision and Platting Act and filed as a preliminary plat in accordance with the state statute and the Bozeman Municipal Code. C. Compliance with the Bozeman Unified Development Ordinance. The following requirements are standards of the Unified Development Ordinance and shall be addressed with the final plat submittal: 1. In accordance with UDO Section 18.42.060, all easements, existing and proposed, shall be accurately depicted on the final plat. 2. A final copy of the covenants, restrictions, and articles of incorporation, with language that indicates that these lots are included in the homeowner’s association, shall be submitted #P-06054 Old Chicago Minor Subdivision Staff Report 5 with the final plat application for review and approval by the Planning Department and shall contain, but not be limited to, provisions for assessment, maintenance, repair and upkeep of common open space areas, public parkland/open space corridors, stormwater facilities, public trails, snow removal, and other areas common to the association pursuant to Chapter 18.72 of the Bozeman Unified Development Ordinance. 3. The final plat shall conform to all requirements of the Bozeman Unified Development Ordinance and the Uniform Standards for Final Subdivision Plats and shall be accompanied by all required documents, including certification from the City Engineer that as-built drawings for public improvements were received, a platting certificate, and all required and correct certificates. The final plat application shall include four (4) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent); two (2) digital copies on a double-sided, high density 3-1/2" floppy disk; and five (5) paper prints. 4. Pursuant to Section 18.06.040.D.6, conditional approval of the preliminary plat shall be in force for not more than one calendar year. Prior to that expiration date, the developer may submit a letter of request for the extension of the period to the Planning Director for the City Commission’s consideration. The City Commission may, at the written request of the developer, extend its approval for no more than one calendar year, except that the City Commission may extend its approval for a period of more than one year if that approval period is included as a specific condition of a written subdivision improvements agreement between the City Commission and the developer, provided for in §18.74.060, BMC. 5. Pursuant to Section 18.74.030.B, if it is the developer’s intent to file the plat prior to installation, certification, and acceptance of all required improvements by the City of Bozeman, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the Preliminary Plat submittal information and conditions of approval. If the final plat is filed prior to the installation of all improvements, the developer shall supply the City of Bozeman with an acceptable method of security equal to 150 percent of the cost of the remaining improvements. 6. Pursuant to Section 18.06.060, the applicant shall submit with the application for final plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval has been satisfactorily addressed, and specifically (tab, page, paragraph, etc.) where this information can be found. D. Compliance with the required subdivision review process. A subdivision preapplication was submitted on August 7, 2006. The preapplication was reviewed by the DRC on August 16th, 23rd, and 30th, 2006, and the final preapplication letter was mailed on August 30th, 2006. The applicant had until August 30th, 2007 to submit a preliminary plat application. A preliminary plat application was submitted on October 3rd, 2006 and the required completeness letter was sent on October 6th, 2006. The preliminary plat was reviewed by the DRC on October 25th, November 1st, and 8th, 2006, and the required adequacy letter was mailed on November 8th, 2006. On the third and final week of DRC review, a favorable recommendation was forwarded for consideration by the Planning Board and City Commission. #P-06054 Old Chicago Minor Subdivision Staff Report 6 Public notice for this application was placed in the Bozeman Daily Chronicle on Sunday, November 5th, 2006. The site was posted with a public notice on November 3rd, 2006. Finally, notice was sent to adjacent property owners via certified mail, and to all other property owners of record within 200 feet of the subject property via first class mail, on November 3rd, 2006. On November 9th, 2006 the subdivision staff report was drafted and forwarded with a recommendation of conditional approval to the Planning Board for consideration at its November 21st, 2006 public hearing. The City Commission will make a final decision at a December 4th, 2006 public hearing. Final decision for a Second or Subsequent Minor Subdivision from a Tract of Record Preliminary Plat must be made within 60 working days of the date it was deemed complete or in this case by December 6th, 2006. If the application is approved on December 4th, 2006 then it will have taken 58 working days. E. Provision of easements for the location and installation of any planned utilities. No modifications are proposed. F. Provision of legal and physical access to each parcel. Both lots gain access from Commerce Way. A perpetual reciprocal easement for access, driveways, parking, snow storage, drainage, etc. will be required. This must be executed prior to Final Plat approval. This has been included as a condition for Final Plat approval. RECOMMENDED CONDITIONS OF APPROVAL The recommended conditions of approval do not include code requirements identified in the Staff Findings. Mandatory compliance with the explicit terms of the Unified Development Ordinance does not constitute conditions of approval. The conditions of approval may require compliance with more than the minimum standards in order to conform to the physical and economic development of the City, and to the safety and general welfare of the future lot owners and of the community at large. The applicant must comply with all provisions of the Bozeman Municipal Code, which are applicable to this project. Planning Staff and the Development Review Committee (DRC) find that the application, with conditions, is in general compliance with the adopted Growth Policy, the Montana Subdivision and Platting Act and the Unified Development Ordinance. The Planning Board may provide advice and comments on the following recommended conditions of approval: 1. When two lots are created, each lot will be expected to provide adequate landscaping to comply with the landscape performance standards contained in Section 18.48.060 of the UDO. A revised landscaping plan illustrating how the performance standards will be satisfied must be submitted with the final plat application. Any additional landscaping that is required shall be installed or financially guaranteed prior to final plat approval. 2. The perpetual reciprocal easement for access, driveways, parking, snow storage, drainage, etc. must be executed prior to final plat approval. 3. All existing and proposed easements (including adjacent right-of-way) shall be depicted upon the final plat. 4. Existing water and sewer service lines shall be accurately depicted upon the final plat. #P-06054 Old Chicago Minor Subdivision Staff Report 7 5. The final plat shall comply with the standards identified and referenced in the Unified Development Ordinance. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. CONCLUSION/RECOMMENDATION Pursuant to Section 18.06.040.D of the Unified Development Ordinance, the Planning Board shall review the preliminary plat and supplementary information to determine if the proposed plat is in compliance or noncompliance with the adopted growth policy. The Planning Board shall act to recommend approval, conditional approval or denial of the preliminary plat application. The Board shall then provide advice and comments to the Bozeman City Commission for its consideration at its Monday, December 4th, 2006, public hearing which begins at 6:00 p.m. The Planning Board Resolution #P-06054 and minutes from the Planning Board’s November 21st, 2006 public hearing will be forwarded to the City Commission and made a part of the Commission’s record. THE BOZEMAN PLANNING BOARD WILL MAKE A RECOMMENDATION TO THE BOZEMAN CITY COMMISSION. THE CITY COMMISSION SHALL MAKE THE FINAL DECISION ON THIS APPLICATION. THE DECISION OF THE CITY COMMISSION MAY BE APPEALED BY AN AGGRIEVED PERSON AS SET FORTH IN SECTION 18.66 OF THE UNIFIED DEVELOPMENT ORDINANCE. PUBLIC COMMENTS No public comments have been received as of this date. Any public comments received after the date of this report will be distributed at the public hearing. ATTACHMENTS Applicant’s preliminary plat submittal materials REPORT SENT TO Done Cape, Garden Center Inn, 2020 Charlotte Street, Bozeman, MT 59718 Daniel Summerfield, Hyalite Engineers, 2066 Stadium Drive, Suite 203, Bozeman, MT 59715 Old Chicago Minor Subdivision 1 RESOLUTION #P-06054 RESOLUTION OF THE CITY OF BOZEMAN PLANNING BOARD REGARDING A MINOR SUBDIVISION PRELIMINARY PLAT APPLICATION FOR THE SUBDIVISION OF 3.4 ACRES INTO TWO COMMERCIAL LOTS AT 1940 NORTH 19TH AVENUE. THE PROPERTY IS ZONED B-2 (COMMUNITY BUSINESS DISTRICT) AND IS LEGALLY DESCRIBED AS LOT 55, STONERIDGE P.U.D. MINOR SUBDIVISION #2, SITUATED IN THE NORTHEAST ONE-QUARTER OF SECTION 2, T2S, R5E, PMM, CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA, GENERALLY LOCATED AT THE INTERSECTION OF NORTH 19TH AVENUE AND COMMERCE WAY. WHEREAS, the City of Bozeman has adopted a growth policy pursuant to Section 76-1-601, M.C.A.; and WHEREAS, the City of Bozeman Planning Board has been created by Resolution of the Bozeman City Commission as provided for in Title 76-1-101, M.C.A.; and WHEREAS, the property owners and applicants, Garden Inn Center, LLC, submitted a Second or Subsequent Minor Subdivision from a Tract of Record Preliminary Plat Application to divide 3.4 acres into two commercial lots at 1940 North 19th Avenue on land described as Lot 55, Stoneridge P.U.D. Minor Subdivision #2, situated in the northeast one-quarter of Section 2, T2S, R5E, PMM, City of Bozeman, Gallatin County, Montana; and WHEREAS, the proposed Second or Subsequent Minor Subdivision from a Tract of Record Preliminary Plat Application has been properly submitted, reviewed, and advertised in accordance with the procedures of Section 18.04 of the Bozeman Unified Development Ordinance; and WHEREAS, the City of Bozeman Planning Board held a public hearing on Tuesday, November 21, 2006, to review the application and any written public testimony on the request for said Second or Subsequent Minor Subdivision from a Tract of Record Preliminary Plat Application; and WHEREAS, no members of the public spoke at the public hearing; and WHEREAS, the City of Bozeman Planning Board reviewed the application against the requirements of the Montana Subdivision and Platting Act, and found that with conditions the Second or Subsequent Minor Subdivision from a Tract of Record Preliminary Plat Application would comply with those requirements; and NOW, THEREFORE, BE IT RESOLVED, that the City of Bozeman Planning Board, upon a vote of 7-0, recommends to the Bozeman City Commission that the application to divide 3.4 acres into two commercial lots at 1940 North 19th Avenue, on land described as Lot 55, Stoneridge P.U.D. Minor Subdivision #2, situated in the northeast one-quarter of Section 2, T2S, R5E, PMM, City of Bozeman, Gallatin County, Montana, be conditionally approved subject to the following conditions: Old Chicago Minor Subdivision 2 1. When two lots are created, each lot will be expected to provide adequate landscaping to comply with the landscape performance standards contained in Section 18.48.060 of the UDO. A revised landscaping plan illustrating how the performance standards will be satisfied must be submitted with the final plat application. Any additional landscaping that is required shall be installed or financially guaranteed prior to final plat approval. 2. The perpetual reciprocal easement for access, driveways, parking, snow storage, drainage, etc. must be executed prior to final plat approval. 3. All existing and proposed easements (including adjacent right-of-way) shall be depicted upon the final plat. 4. Existing water and sewer service lines shall be accurately depicted upon the final plat. 5. The final plat shall comply with the standards identified and referenced in the Unified Development Ordinance. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. DATED THIS DAY OF , 2006 Resolution #P-06054 _____________________________ ____________________________ Andrew C. Epple, Planning Director JP Pomnichowski, President Department of Planning & Community Development City of Bozeman Planning Board 1 ** MINUTES ** JOINT MEETING OF THE CITY OF BOZEMAN PLANNING BOARD AND ZONING COMMISSION NOVEMBER 21st, 2006 CITY HALL, COMMISSION MEETING ROOM 7:00PM 0:08:50 [17:19:38] ITEM 1. CALL TO ORDER AND ATTENDANCE Chair JP Pomnichowski called this joint meeting of the Bozeman Zoning Commission and Planning Board to order at 7:04PM and directed the secretary to record the attendance. Zoning Commission Members Present: Zoning Commission Members Absent: JP Pomnichowski, Chair Nicholas Lieb Peter Harned Warren Vaughan Nathan Minnick Sean Becker, Commission Liaison Planning Board Members Present: JP Pomnichowski, President and Chair Brian Caldwell Randy Carpenter Dave Jarrett Caren Roberty Edward Sypinski Erik Henyon Steve Kirchhoff, Comission Liaison Staff Present: Andy Epple, Director of Planning and Community Development Chris Saunders, Assistant Director of Planning and Community Development Martin Knight, Assistant Planner Lanette Windemaker, Contract Planner Kimberly Kenney-Lyden, Recording Secretary Guests Present: Jami Morris, Land Use Planning Consultant Joby Sabol Keith Belden, Morrison-Maierele Inc. Shelly Engler Marcia Kavenez Chaucer Silverson Rex Friesenhahn Paul VanOrden Cory Ravnass, Hyalite Eng. Daniel Sommerville, Hyalite Eng. Katryn Mitchell, Hyalite Eng. Craig Mendenhall Glen Monigheth Jerry Perkins, PT Land Trust 2 2:27:41 [22:27:31] ITEM 2. PUBLIC COMMENT (0-15 MINUTES) Seeing there was none, President JP Pomnichowski closed this portion of the meeting. 2:28:03 [22:42:59] ITEM 3. MINUTES OF NOVEMBER 7TH, 2006. On page 4, 4th paragraph, please change Mr. Jarrett to Mr. Dabney. Seeing there were no other corrections, Chair Pomnichowski moved to approve the minutes as amended, seconded by Mr. Sypinski and Mr. Jarrett. All in favor, motion passed 7-0. 2:27:17 [21:55:27] ITEM 4: PLANNING BOARD PROJECT REVIEW 2:27:24 [19:15:47] 1. Preliminary Plat Application #P-06054 (Old Chicago Minor Subdivision): Subdivision preliminary plat application requested by the owner and applicant, Garden Center Inn, and representative Hyalite Engineers to allow a second or subsequent Minor Subdivision from a Tract of Record to divide 3.4 acres intotwo commercial lots at 1940 North 19th Avenue. The subject property is legally described as Lot 55, Stoneridge PUD Minor Subdivision #2, situated in the northeast one-quarter of Section 2, T2S, R5E, PMM, City of Bozeman, Gallatin County, Montana. (Knight) 2:29:32 [21:47:48] Staff Report Planner Knight presented his staff report. He noted there were no modifications to this site, but this plan will propose individual lots for the individual buildings. All zoning ordinances and requirements are being met and the only issue is the condition for revised landscape requirements for each lot. Mr. Knight closed by stating the planning staff is recommending conditional approval per page six of the staff report. 2:31:05 [ ] Questions for Staff Erik Henyon asked Planner Knight if the parking meets the City's requirements for number of stalls. Mr. Knight responded this plan does meet the parking requirements. Dave Jarret asked if there were any waiver of rights to protest prior to this that have not been met and Mr. Knight stated this was handled prior to this, during the Stoneridge minor subdivision process. JP Pomnichowski asked if each lot would have the required number of stalls and Mr. Knight stated they would and each lot will have a shared access agreement for the entire parking area. 2:32:23 [20:14:52] Applicant Presentation Daniel Sommerfield with Hyalite Engineers representing the owners of this project. He noted he did not have much to add, and basically the client, Montana Furniture Gallery is simply proposing to draw a line down this lot because their desire is to purchase the portion their shop is on instead of leasing it. 3 2:33:46 [20:28:09] Discussion Brian Caldwell stated he appreciates the clarification of the reasoning behind this minor lot split as a lot of people are not familiar with commercial issues. He closed by noting he would like move forward with a recommendation. 2:34:31 [21:13:57] Motion and Vote Mr. Caldwell moved to recommend approval of #P-06054 as conditioned by staff. Seconded by Erik Henyon. Those in favor being Brian Caldwell, Erik Henyon, JP Pomnichwoski, Dave Jarrett, Caren Roberty, Ed Sypinski, and Randy Carpenter. All in Favor. Motion passed, 7-0. Draft 2007 Goals List 1 Draft 2007 Goals List November 30, 2006 City Commission HIGH 1) Continue to enhance the affordable housing program 2) Implement Charter provisions 3) Utilize citizen panels as an additional method for gaining public input into critical decisions 4) Adopt updated impact and utility rate fees 5) Implement principles outlined in the Mayor’s Climate Protection Agreement – adopted November 27, 2006 6) Educate the public on the necessity for and passage of a Public Safety mill levy 7) Sign Inter-Local Planning Agreement with Gallatin County MEDIUM 8) Appoint the Board of Adjustments 9) Coordinate 2020 Plan update with Bozeman school district 10) Schedule a working trip to Fort Collins in order to learn what has gone well or failed since Fort Collins grew from our current size to over twice our size (include staff, Chamber & MSU) 11) Consider a ban on cellular telephone use while driving within the City City Manager HIGH 1) Provide leadership on our workforce housing challenge (Housing Task Force) (NCS – Below Norm) 2) Complete an analysis of the police department for staffing levels and facilities 3) Present the City Commission with a plan for the review and approval of a Public Safety mill levy 4) Be actively engaged in the 2007 legislative session focused on expanding the ability for local elected officials and citizens to make decisions regarding: · Local option resort taxes and/or a general sales tax · Local option accommodations tax · Increasing the ½ inflation adjustment to be equal to inflation · Protect use of TIF Districts 5) Present a timeline for major facility construction and funding sources for each project (i.e. wastewater plant, fire stations, police station, City Hall and water plant) Draft 2007 Goals List 2 MEDIUM 6) Complete the redevelopment of Story Mansion 7) Wallace Street/Library lands redevelopment (library debt) 8) Expand our working relationship with MSU focused on: · Planning campus expansion with community interface · Street design – S-19th, 11th, 8th, etc. · Student impact on neighborhoods 9) Establish an economic development strategy, beginning with the development of an Industrial Park on the Mandeville Farm site (cooperation between City, MSU and Chamber) 10) Develop public information strategy (public information, media, Bresnan) 11) Assist Downtown redevelopment projects - develop a strategy to maintain Downtown vitality 12) Complete Disc Golf Course 13) Create a Parks Maintenance District Public Safety Director – Police 1) Complete an analysis of the police department for staffing levels and facilities 2) Present the City Manager with a plan for the review and approval of a Public Safety mill levy 3) Improve recruitment and retention of employees 4) Work effectively with Gallatin County to implement the Criminal Justice Plan 5) Create and implement a Traffic Enforcement Plan (NCS – Below Norm) 6) Improve traffic and pedestrian safety - be actively involved in street design with safety, speed and patrol in mind Public Safety Director – Fire 1) Implement the 2006 Facility and Staffing Plan - Adopted November 6, 2006 2) Present the City Manager with a plan for the review and approval of a Public Safety mill levy 3) Open fire station 3 in 2008 4) Open fire station 4 in 2010 5) Review fire works policy 6) Improve fire prevention and safety (NCS – Below Norm) Draft 2007 Goals List 3 Public Services Director HIGH 1) Implement the 2006 Waste Water Facilities Plan – Adopted May 22, 2006 · Phase I of BNR plant to open in 2008 - $27,000,000 · $750,000 in collection system improvements every other year 2) Negotiate the terms and conditions for joining the Solid Waste District 3) Implement the 2002 water conservation recommendations 4) Implement the 2006 Water Facilities Plan – Adopted October 9, 2006 · $750,000 in distribution system improvements every other year · Phase I of the water plant expansion to open in approximately 2011 5) Complete the Transportation Plan Update in 2008 · Road Design Workshop – Walkable Communities Best Practices discussion led by engineering and planning · Transit issues · Downtown Couplets (eliminate one ways? Add diagonal parking?) MEDIUM 6) Continue close working relationship with the Gallatin NFS on a Watershed Management Plan that deals with the long range and overall health of Bozeman’s watershed 7) Implement the Storm Water District Plan 8) Improve snow removal – on-street parking issue (NCS – Below Norm) 9) Improve street repair, cleaning, lighting (NCS – Below Norm) 10) Pursue EPA grants for utility infrastructure and rehabilitation 11) Determine new Shops complex location 12) Improve recycling opportunities (NCS – Below Norm) Finance Director 1) Complete utility rates and impact fee analysis for wastewater, water, storm water, streets, fire, police and recreation facilities 2) Update the Capital Improvement Plan 3) Investigate and propose an arterial and collector street assessment 4) Improve website to maximize convenient public access to city information and services 5) Identify funding sources to pay for added demand for services 6) Conduct an activity-based costing audit of our planning and development fees 7) Install a pilot city wireless project Draft 2007 Goals List 4 Planning and Community Development Director HIGH 1) Complete update of the Impact Fee studies 2) Commence five year review of the 2020 Growth Policy 3) Complete the Parks & Recreation Facilities Plan (PROST) 4) Negotiate and present an Inter-Local Planning Agreement with Gallatin County 5) Complete UDO Revisions MEDIUM 6) Amend Gambling Ordinance to limit gaming machines to five or less if outside gaming district 7) Conduct a neighborhood design workshop to discuss accessory dwelling units and density issues; are there areas where densities are too low and/or too high? 8) Improve interface between MSU students and neighbors in neighborhoods (enforcement of residency restrictions) Library 1) Retire Library debt by working with the City Commission on Library lands redevelopment (3) 2) Hire additional maintenance staff to adequately maintain the new Library (1) 3) Complete landscaping of the plaza, trail system, and Peets Hill parking lot (4) 4) Purchase a second self-check system in order to adequately serve the public (2) 5) Purchase RFID (Radio Frequency Identification) system for best customer service/staff usage (5) 6) Hire additional library staff to adequately meet public demand at the new Library (1) 7) Purchase additional equipment and materials in order to adequately stock Library (6) Legal HIGH 1) Implementation of the adopted Charter 2) Anticipate needs and provide necessary legal support for the high priority goals of the Commission and other departments 3) Approve language for the Public Safety mill levy 4) Increase level of prosecution by maximizing efficiency and reducing case load per attorney 5) Complete implementation of criminal case management software Draft 2007 Goals List 5 MEDIUM 6) Complete decriminalization of parking violations 7) Complete sidewalk café ordinance 8) Draft ordinance for surcharges on criminal offenses for software management and other criminal related costs 9) Complete implementation of electronic discovery guidelines; monitor emerging case law and evidentiary rules and revise, if necessary, guidelines 10) Manage litigation case load by maximizing in-house efficiency and contracting out future in- house cases 11) Research and draft cell ban ordinance (depending on Commission direction) 12) Prepare list of potential offenses that consideration should be given to converting to municipal infractions 13) Develop department MOUs for legal services Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brit Fontenot, City Clerk Chris Kukulski, City Manager SUBJECT: South 19th Street Lights MEETING DATE: December 4, 2006 BACKGROUND: Mayor Krauss requested that the issue of the newly erected street lights on South 19th Avenue be placed on the December 4, 2006 Commission meeting agenda as an FYI/Discussion item. The attached documents include an e-mail dated November 15, 2006, from Director of Planning and Community Development Andy Epple to City Manger Chris Kukulski outlining the lighting standards and correspondence from design engineer Bob Marvin to City Planner Dave Skelton. Mr. Marvin’s letter, dated November 14, 2006, explains why his lighting design exceeds City standards. RECOMMENDATION: Discuss FISCAL EFFECTS: N/A ALTERNATIVES: None Respectfully submitted, _________________________________ ____________________________ Brit Fontenot, City Clerk Chris A. Kukulski, City Manager Attachments: E-mail from A. Epple to C. Kukulski dated Nov. 15 2006 Letter from Bob Marvin to Dave Skelton dated Nov. 14, 2006 From: Andy Epple Sent: Wednesday, November 29, 2006 4:30 PM To: Brit Fontenot Subject: FW: South 19th Lighting -------------------------------------------------------------------------------- From: Andy Epple Sent: Wednesday, November 15, 2006 11:50 AM To: Chris Kukulski Cc: Dave Skelton; Bob Murray; Jody Sanford; Richard Hixson Subject: South 19th Lighting Dave has his hands full with DRC this morning so I volunteered to write this memo to you. Any of the others who are cc’d are welcome to chime in and correct any misstatements I might make or offer additional thoughts, but here’s my attempt to shed some light (sorry) on the subject. Planning and Engineering staff have reviewed the approved plans and specs for the roadway design for South 19th adjacent to Meadow Creek, which included the lighting plan. We have also reviewed additional technical information we have received from Bob Marvin, the project design engineer. We have compared all this information to our UDO and find that the lights as installed do not create a conflict with the lighting standards contained therein. The opening paragraph of our Street Improvement Standards states: “All street improvements [including lighting] shall be designed by and constructed under the supervision of a professional civil engineer, registered in the State of Montana, and shall meet or exceed the right-of-way and construction standards adopted by the City…and required for the type of street to be constructed.” (Section 18.44.060 BMC, emphasis added) The second paragraph goes on to state that: “Plans and specifications for all public or private streets (including but not limited to curb, gutter, storm drainage, street lighting and sidewalks), shall be provided to and approved by the City Engineer.” (NOTE: Although South 19th is a State route, MDT deferred to the City Engineer in terms of approving plans and specs for this project because it is in the City limits and in an urbanizing area.) Design engineer Bob Marvin, in a letter to us dated November 14, 2006 (attached), explains why his lighting design exceeds our standards. He references compliance with safety design standards set forth by the American Association of State Highway and Transportation Officials (AASHTO) and the Illuminating Engineering Society (IES) of North America. Mr. Marvin’s conclusion is that the approved lighting is necessary to adequately protect the public’s health and safety, given the design speed of the roadway (high, 60 mph) and the urban design standard of the roadway (with curb and sidewalk). Staff also feels that the number of intersecting streets, and changes in lane configurations (from two to three and back to two, with attendant striping and signage) justify the lighting levels in this area where a high speed arterial street enters an urbanizing area. It is important that the motoring public be able to see and recognize lane striping and to read directional signs in such an environment, especially at night and during periods of inclement weather. As this area continues to urbanize, staff anticipates reduced speed limits on South 19th, probably down to 45 mph at some time in the not-too-distant future. As speed limits are reduced, the level of lighting could be reduced as well. Meadow Creek engineers advise us that they would be willing to remove an appropriate number of the subject light standards and make them available to other developers in the corridor, so that a continuous pattern of lower level lighting could eventually be achieved. Staff will discuss this option with developers in the corridor as opportunities to do so arise. In other words, the current lighting pattern may be viewed as an interim condition in this part of the South 19th corridor. Let us know if you have any questions or need any additional information. Andrew Epple, AICP Director of Planning and Community Development City of Bozeman P.O. Box 1230 Bozeman, MT 59771-1230 phone 406.586.2260 fax 406.582.2263 aepple@bozeman.net www.bozeman.net MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 Mailing Address: P.O. Box 80785 Billings, MT 59108-0785 Phone: 406-655-4550 FAX: 406-655-4991 Email: bobm@marvinassociates.com Dave Skelton City Planner City of Bozeman 20 East Olive Street P.O. Box 1230 Bozeman, MT 59771 November 14, 2006 Re: Meadow Creek S 19th Lighting Dear Mr. Skelton: Kurt Thomson of Engineering Inc. informed me that the City of Bozeman wanted me to provide design justification for the lighting system that has recently been installed on S. 19th Avenue, but has not yet been energized. This question has arisen due to comments from individuals who feel that there are an excessive number of lights between Graf Road and Blackwood Road. First, I would offer my opinion that the reason that it is felt that there are an excessive number of lights is the fact that this section of roadway is located in the middle of an rural environment with open highway speeds on a flat tangent section. From a driver’s perspective in a vehicle traveling at 60 mph, the lights would indeed resemble a picket fence. The fact that this section of roadway is currently in a rural environment with open highway speeds is actually a justifying factor in providing street lighting which conforms to current guidelines and acceptable standards. Despite our earlier contentions that curb& gutter should not be constructed on roadways where the 85th% speed is greater than 45 mph, which is in accordance with the American Association of State Highway and Transportation Officials’ (AASHTO) “Policy on Geometric Design of Highways and Streets” guidelines, the curb was required as a conditions of development by the City of Bozeman. The curb section on this high speed facility could be considered a roadside obstruction and has the potential to cause serious damage if struck by a vehicle traveling at 60 mph. Since the potential for striking this curb would be greater during hours of darkness, adequate street lighting is required and our street lighting design was based on the most current standards and in accordance with national street and roadway lighting criteria. Illuminance levels for various classes of roadways are found in the American Association of State Highway and Transportation Officials’ (AASHTO) An Informational Guide for Roadway Lighting, which references the American National Standard Practice for Roadway Lighting by the Illuminating Engineering Society (IES) of North America. The highest illuminance level for major roadways in commercial areas is 1.6 horizontal foot candles (HFC) and an average to minimum uniformity ratio no greater than 3:1 and a maximum to average ratio no greater than 6:1. In this case, S 19th Avenue is an arterial street and the adjacent roadside environment will be primarily residential. Therefore MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 Mailing Address: P.O. Box 80785 Billings, MT 59108-0785 Phone: 406-655-4550 FAX: 406-655-4991 Email: bobm@marvinassociates.com the illuminance levels could be as low as 0.8 HFC. However, future development on the east side of the roadway could feasibly have some commercial and the combination could then be considered intermediate, which would require 1.2 HFC. Not being entirely sure of what future development could evolve, the level of illuminance of 1.0 HFC was selected as a compromise. Even if both sides of the street would be totally residential, we would still be dealing with a high speed rural roadway for an unknown period of time. In addition, the adjacent walkways require an illuminance level of 2.0 HFC and in order to achieve that level, the roadway lighting level would also need to be higher. Thus, it was felt that the 1.0 HFC design criteria was a good compromise to ensure both interim and future lighting needs. The Bozeman Unified Ordinance standards on lighting do not specifically state the level of illuminance to be achieved on street surfaces, but requires 2.0 HFC on pathways with mixed pedestrians and vehicles (Table 42-4). Also in Table 42- 2, of the Bozeman codes, it indicates that on arterial streets with high pedestrian conflicts the poles should be spaced at a maximum distance of 225’ and with low pedestrian conflicts they should be at a maximum of 300’. Table 42-3 indicates that the luminaire mounting height for the 33000-22500 lumen lights, which are required for arterial streets (Table 42-2), should be 38’. Thirty eight foot mounting height poles are not readily available in the Montana market area and would be rather costly from a design and supply standpoint. From what we could determine, the City codes provide a good ballpark estimate of the type of fixtures and poles that could be required, but does not address curb overhang, variations in pole positioning, number of traffic lanes, medians, or other factors which have a critical influence in achieving adequate illumination on critical areas of the street. Also, uniformity criterion is missing, which is actually more important than the HFC levels. Since the human eye is not very responsive to extreme lighting changes, dark areas between illuminated areas can be more dangerous than no lights at all. To check the City of Bozeman spacing criteria based on the existing roadway geometry, curb overhang, and available hardware, we ran the illuminance calculations using the General Electric program “Aladan” to determine illuminance levels and uniformity. The attached calculation summaries indicate that the interim half-street arterial with 225’ spacing would have an average HFC of 0.73, which is less than the recommended HFC for purely residential streets. More importantly, the average/minimum ratio would be 3.38:1 and the maximum/minimum ratio would be 7.84:1, both of which could be considered substandard. Using the 300’ spacing on the half-street section, average HFC would be 0.55, which is well below local neighborhood street standards. The uniformity calculations resulted in an average/minimum ratio of 10.1:1 and the maximum/minimum ratio of 17.2:1. With this spacing, roadway safety would be better if there were no lights at all. When the future full arterial street section illuminance was calculated using the 225’ and 300’ spacing the 225’ spacing would have an average HFC of 0..53, which is less than the 300’ spacing on the MARVIN & ASSOCIATES 1300 N. Transtech Way Billings, MT 59102 Mailing Address: P.O. Box 80785 Billings, MT 59108-0785 Phone: 406-655-4550 FAX: 406-655-4991 Email: bobm@marvinassociates.com half street and the average/minimum ratio would be 5.43:1, with the maximum/minimum ratio being 17.2:1. The 300’ spacing resulted in a HFC of 0.40, which is the recommended illumination for alleys. The uniformity would be horrendous, with an average/minimum ratio of 10.07:1 and the maximum/minimum ratio being 46.82:1. Many areas of the street would be better lit by moonlight. Hopefully you can see that our design, which provided an initial HFC of 1.02 for interim half-street lighting and 0.90 for future full-width conditions is appropriate for the conditions described and the assumptions made. Also, the average/minimum uniformity ratios, which are below 2:1 and maximum/minimum ratios less than 5:1, would provide for ideal uniform illumination, which is critical for safety. In the past 23 years, Marvin & Associates has completed street lighting designs on a minimum of 50 different projects encompassing every type of street and parking facility imaginable. In total, our designs have incorporated the installation and/or upgrade of approximately 9,500 individual lights. Thus, we are thoroughly familiar with the design process and individual attention required for each facility’s design. When the lights are turned-on, you may want to see if anyone would like to remove a few of the lights or install smaller bulbs. I would caution however, that the new lights will be significantly brighter than the 1.0 HFC average because they are new and clean. Within a year, when they are dirty and less efficient, the 1.0 HFC will be realized. Since continuous lighting was only required on the one-half mile section between Graf and Blackwood, the dark areas in-between intersection will be darker than is currently experienced by drivers and the potential for nighttime accidents will increase to some degree in these unlit areas. This is one of the other reasons why we didn’t think that the curb and gutter section between Graf and Blackwood was a good idea. When lighting is installed on a facility, it should be continuous. If I can provide any additional information is this regard, feel free to contact me. Respectfully Submitted, Robert R. Marvin, P.E., P.T.O.E.