Loading...
HomeMy WebLinkAboutJ3 Landfill Conv Center CUP Report compiled on November 15, 2006 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Martin Knight, Assistant Planner SUBJECT: Bozeman Landfill Convenience Center CUP, #Z-06245 MEETING DATE: Monday, November 27th, 2006 BACKGROUND: This is an application for a Conditional Use Permit to allow the construction of a household hazardous waste (HHW) facility on property located at 2143 Story Mill Road. The property in question is legally described as Section 30, T1S, R6E, City of Bozeman, Gallatin County, Montana. No deviations are requested. Public Agency Exemptions are requested from the following chapters of the Unified Development Ordinance; Chapter 18.44 “Transportation,” to forgo the installation of street improvements and sidewalks along Story Mill Road; and Chapter 18.46 “Parking,” to forgo the installation and striping of designated parking. UNRESOLVED ISSUES: The Department of Planning is not aware of any unresolved issues for the proposed development at this time. RECOMMENDATION: That the City Commission approve Application No. Z-06245 with the conditions of approval as outlined in the attached Staff Report. ALTERNATIVES: As suggested by the City Commission. CONTACT: Please feel free to email Martin Knight at mknight@bozeman.net if you have any questions. APPROVED BY: Andrew Epple, Planning Director Chris Kukulski, City Manager CITY COMMISSION STAFF REPORT BOZEMAN LANDFILL CONVENIENCE CENTER CUP #Z-06245 #Z-06245, Bozeman Landfill Convenience Center CUP 1 Item: Zoning Application #Z-06245, a Conditional Use Permit application to allow the construction of a household hazardous waste (HHW) facility near the scale house at the City of Bozeman Landfill on property located at 2143 Story Mill Road, which is zoned “PLI,” Public Lands and Institutions District. Property Owner: City of Bozeman PO Box 1230 Bozeman, MT 59771 Applicant/Representative: City of Bozeman Attn: Dustin Johnson, Project Engineer PO Box 1230 Bozeman, MT 59771 Date: City Commission Hearing: Monday, November 20th, 2006, 6:00 p.m., in the Community Room, Gallatin County Courthouse, 311 West Main Street, Bozeman, MT 59715. Report By: Martin Knight, Assistant Planner Recommendation: Conditional Approval ____________________________________________________________________________________ PROJECT LOCATION The subject property is located at 2143 Story Mill Road and legally described as Section 30, T1S, R6E, City of Bozeman, Gallatin County, Montana. The total lot area of the landfill is approximately 200 acres (8,712,000 square feet). The proposed convenience center would occupy approximately 1.37 acres (43,560 square feet). Said property is zoned “PLI,” Public Land and Institutions District. Please refer to the following vicinity map. PROPOSAL This is a Conditional Use Permit Application to allow the construction of a household hazardous waste (HHW) facility near the scale house at the City of Bozeman Landfill. The subject property is zoned “PLI,” Public Lands and Institutions District. Public Agency Exemptions are requested from the following chapters of the Unified Development Ordinance; Chapter 18.44 “Transportation,” to forgo the installation of street improvements and sidewalks along Story Mill Road; and Chapter 18.46 “Parking,” to forgo the installation and striping of designated parking. To fulfill the landscaping requirements, the applicant has submitted a request, in accordance with UDO Section 18.48.030, for the designation of an artificial lot. This artificial lot will include the area immediately surrounding the proposed convenience center. The proposed artificial lot is found to be in compliance with the requirements set forth in UDO Section 18.48.030. Landscaping that fulfills the zoning ordinance requirements will be required within the boundaries of the proposed artificial lot. The proposed landscape plan will be evaluated for needed points with the Final Site Plan. This application is CUP because solid waste landfill and transfer facilities are Conditional Uses in the PLI zoning district, per section 18.16 of the Unified Development Ordinance. No public comment has been received. ZONING DESIGNATION & LAND USES As previously noted, the subject property is zoned “PLI,” (Public Lands and Institutions District). The intent of the “PLI” District is to provide for major public and quasi-public uses outside of other districts. Not all public and quasi-public uses need to be classified PLI. Some may fit within another district; however larger areas will be designated PLI. The following land uses and zoning are adjacent to the subject property: #Z-06245, Bozeman Landfill Convenience Center CUP 2 #Z-06245, Bozeman Landfill Convenience Center CUP 3 North: Landfill property/vacant land; zoned “PLI,” Public Lands and Institutions District. South: Single-Household Residences; zoned “R-3,” Residential Medium Density District. East: Vacant/agricultural land; Gallatin County West: Landfill property/Vacant; zoned “PLI,” Public Lands and Institutions District. ADOPTED GROWTH POLICY DESIGNATION The property is designated as “Public Institutions” in the Bozeman 2020 Community Plan. A variety of activities are undertaken in this land use classification. Schools are a dominant use including Montana State University. Other typical uses are libraries, fire stations and publicly owned utilities. A significant portion of Bozeman’s employment occurs within this category. REVIEW CRITERIA & FINDINGS The City of Bozeman Planning Office has reviewed the application for a Conditional Use Permit against relevant chapters of the Unified Development Ordinance (UDO), and as a result offers the following summary review comments. The findings outlined in this report include comments and recommended conditions provided by the Development Review Committee (DRC). This project does not meet the thresholds established by Chapter 18.62 to warrant evaluation by the Design Review Board. Section 18.34.090 “Site Plan Review Criteria” In considering applications for site plan approval under this title, the City Commission, the DRC, and when appropriate, the ADR Staff shall consider the following: 1. Conformance to and consistency with the City’s adopted growth policy The development proposal is in conformance with the Bozeman 2020 Community Plan land use designation of “Community Commercial.” 2. Conformance to this title, including the cessation of any current violations The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. The following code provisions must be addressed prior to Final Site Plan approval: a) Section 18.34.130 states that the applicant upon submitting the Final Site Plan for approval by the Planning Director, and prior to the issuance of a building permit, will also submit a written narrative outlining how each of the above conditions of approval and code provisions have been satisfied or met. b) Section 18.38.050.F requires all mechanical equipment to be screened. Rooftop equipment should be incorporated into the roof form and ground mounted equipment shall be screened with walls, fencing or plant materials. c) Section 18.54.040.B.1.b states that all installations shall be as visually unobtrusive as is #Z-06245, Bozeman Landfill Convenience Center CUP 4 feasible. Facilities and equipment mounted on existing structures shall be visually incorporated into the structure or background by the use of architectural elements, color, screening, or other methods. d) Section 18.54.040.B.1.c states that no lighted signage is permitted. e) Section 18.54.040.B.1.e states that screening of ground-mounted equipment shall provide an opaque screen within eighteen months of establishment and be a minimum of 4 feet in height. f) Section 18.64.100 states that a building permit shall be obtained within one year of approval, or said approval shall become null and void. Prior to the lapse of one year, the applicant may seek an extension of one additional year from the Planning Director. g) Section 18.64.110 states that no permit or license shall be issued unless the use, arrangement and construction has been set forth in such approved plans and applications. Engineering Provisions a. The FSP shall be adequately dimensioned and labeled with a legend of linetypes and symbols used provided. b. A Stormwater Drainage/Treatment Grading Plan and Maintenance Plan for a system designed to remove solids, silt, oils, grease, and other pollutants must be provided to and approved by the City Engineer. The plan must demonstrate adequate site drainage (including sufficient spot elevations), stormwater detention/retention basin details (including basin sizing and discharge calculations, discharge structure details and basin cross-section), stormwater discharge destination, and a stormwater maintenance plan. c. Asphalt paving and/or gravel section detail shall be provided to and approved by the City Engineer. d. The applicant shall submit a construction route map dictating how materials and heavy equipment will travel to and from the site in accordance with section 18.74.020.A.1 of the Unified Development Ordinance. This shall be submitted as part of the final site plan for site developments, or with infrastructure plans for subdivisions. It shall be the responsibility of the applicant to ensure that the construction traffic follows the approved routes. e. All construction activities shall comply with section 18.74.020.A.2 of the Unified Development Ordinance. This shall include routine cleaning/sweeping of material that is dragged to adjacent streets. The City may require a guarantee as allowed for under this section at any time during the construction to ensure any damages or cleaning that are required are complete. The developer shall be responsible to reimburse the City for all costs associated with the work if it becomes necessary for the City to correct any problems that are identified. #Z-06245, Bozeman Landfill Convenience Center CUP 5 f. If construction activities related to the project result in the disturbance of more than 1 acre of natural ground, an erosion/sediment control plan may be required. The Montana Department of Environmental Quality, Water Quality Bureau, shall be contacted by the applicant to determine if a Storm Water Discharge Permit is necessary. If required by the WQB, an erosion/sediment control plan shall be prepared for disturbed areas of 1 acre or less if the point of discharge is less than 100’ from State Waters. 3. Conformance with all other applicable laws, ordinances, and regulations The proposal conforms to all other applicable laws, ordinances, and regulations. All conditions for a Site Plan and Conditional Use Permit must be met prior to final site plan approval. The plans will be further evaluated against the requirements of the International Building Code if an application is made for a Building Permit. 4. Relationship of site plan elements to conditions both on and off the property Currently, the subject area is vacant. The primary entrance to the landfill, including the scale house, is located immediately adjacent to the proposed convenience center. To the south lie single household residences; property to the north, east, and west is currently vacant. Landscaping that fulfills the Zoning Ordinance requirements will provide adequate screening from adjacent residences. Furthermore, a grade change of approximately 15 feet, from the proposed convenience center to the property line, will further aid in screening. The proposed convenience center will not prohibit development of adjacent properties. No lighting or signage has been proposed. 5. The impact of the proposal on the existing and anticipated traffic and parking conditions Currently, the primary entrance to the landfill, which includes the scale house, sees large volumes of traffic during operating hours. The proposed development is not expected to significantly increase this traffic. Currently, parking facilities are not provided at the scale house. During hours of operation, the attendant of the scale house parks directly next to the scale house. The applicant has requested a Public Agency Exemption from Unified Development Ordinance Chapter 18.46 “Parking.” This exemption would permit the UDO requirement for “providing parking for all uses” to be waived. The proposed convenience station will offer areas for the public to pull in and dispose of their waste/recyclables. This area will only be utilized for unloading; Parking will not be permitted. The scale house attendant will continue to park directly next to the scale house. 6. Pedestrian and vehicular ingress and egress The convenience center will utilize the existing access off Story Mill Road. The proposed development is not expected to significantly increase the traffic volume. #Z-06245, Bozeman Landfill Convenience Center CUP 6 7. Landscaping, including the enhancement of buildings, the appearance of vehicular use, open space, and pedestrian areas, and the preservation or replacement of natural vegetation To fulfill the landscaping requirements, the applicant has submitted a request, in accordance with UDO Section 18.48.030, for the designation of an artificial lot. This artificial lot will include the area immediately surrounding the proposed convenience center. The proposed artificial lot is found to be in compliance with the requirements set forth in UDO Section 18.48.030. Landscaping that fulfills the Zoning Ordinance requirements will provide adequate screening from adjacent residences. Furthermore, a grade change of approximately 15 feet, from the proposed convenience center to the property line, will further aid in screening. The proposed landscape plan will be evaluated for needed points with the Final Site Plan. Landscaping standards, per UDO Section 18.48 “Landscaping,” will be met. 8. Open space The Zoning Ordinance requirements are being met. 9. Building location and height The proposed convenience center is exclusive of the required setbacks. The proposed building height of approximately 16 feet is within the permitted height requirements. Thus, building location and height are acceptable. 10. Setbacks The PLI zoning district does not have yard requirements. When a PLI zoned lot is adjacent to another district, the yard requirements for that adjacent district are required. The subject property is adjacent to property zoned R-3. A 15-foot front, 20-foot rear, and 5-foot side yard setback is required. All setbacks requirements are being met. 11. Lighting No exterior lighting has been proposed. Any exterior lighting will require a lighting plan and must be reviewed, and approved, by the Planning Department prior to installation. 12. Provisions for utilities, including efficient public services and facilities No water, sewer, or utility services are proposed. The proposed development will not affect any existing utility services. 13. Site surface drainage Stormwater runoff calculations have not been provided. This will be evaluated as part of the Final Site Plan and any needed grading for Stormwater must be provided. There is little impervious surface and it is expected that stormwater will naturally infiltrate. #Z-06245, Bozeman Landfill Convenience Center CUP 7 14. Loading and unloading areas The proposed facility will provide areas for the public to pull in and dispose of their waste/recyclables. This area will be used for unloading; no parking will be permitted. The proposed unloading area is found to be acceptable. 15. Grading A grade change of approximately 15 feet does exist on the subject area. This grade change will be found from the proposed concrete pad to the southern property line. Minimal grading will be required to install the proposed convenience center; however, some grading may be necessary prior to the installation of landscaping features adjacent to the convenience center. Any necessary grading will be reviewed with the grading and drainage plan required for Final Site Plan submittal. However, if needed, grading will be required to route the water to the appropriate stormwater facilities. 16. Signage No signage is proposed. Any new signage requires a sign permit that must be reviewed, and approved by the Planning Department prior to installation. 17. Screening No screening has been proposed. All mechanical equipment shall be screened in accordance with UDO section 18.38.050. This shall include, but not be limited too, air conditioners and electric panels. All mechanical equipment and screening shall be depicted on the site plan and landscaping plan for Final Site Plan submittal. This has been included as a code provision for Final Site Plan approval. 18. Overlay district provisions Non-applicable 19. Other related matters, including relevant comment from affected parties No public comment has been received. Any comments received after the date of this Staff Report will be distributed to the Commission at the public hearing. 20. If the development includes multiple lots that are interdependent for circulation or other means of addressing requirement of this title, whether the lots are either: a. Configured so that the sale of individual lots will not alter the approved configuration or use of the property or cause the development to become nonconforming; #Z-06245, Bozeman Landfill Convenience Center CUP 8 b. The subject of reciprocal and perpetual easements or other agreements to which the City is a party so that the sale of individual lots will not cause one or more elements of the development to become nonconforming. Non-applicable Section 18.34.100 “City Commission Consideration and Findings for Conditional Use Permits” In addition to the review criteria outlined above, the City Commission shall, in approving a conditional use permit, find favorably as follows: 1. That the site for the proposed use is adequate in size and topography to accommodate such use, and all yards, spaces, walls and fences, parking, loading and landscaping are adequate to properly relate such use with the land and uses in the vicinity. Again, the convenience center will utilize the existing access off Story Mill Road. This facility is not expected to significantly increase the traffic volume. Landscaping that fulfills the Zoning Ordinance requirements will provide adequate screening from adjacent residences. The proposed layout will not prohibit development of adjacent properties. 2. That the proposed use will have no material adverse effect upon the abutting property. Persons objecting to the recommendations of review bodies carry the burden of proof. Again, the proposed facility will be adequately screened from adjacent properties. Minimal traffic will be generated and the proposed layout will not prohibit development of adjacent properties. No public comment has been received. Any comments received after the date of this Staff Report will be distributed to the Commission at the public hearing. 3. That any additional conditions stated in the approval are deemed necessary to protect the public health, safety and general welfare. Such conditions may include, but are not limited to: regulation of use; special yards, spaces and buffers; special fences, solid fences and walls; surfacing of parking areas; requiring street, service road or alley dedications and improvements or appropriate bonds; regulation of points of vehicular ingress and egress; regulation of signs; requiring maintenance of the grounds; regulation of noise, vibrations and odors; regulation of hours for certain activities; time period within which the proposed use shall be developed; duration of use; requiring the dedication of access rights; other such conditions as will make possible the development of the City in an orderly and efficient manner. a. Regulation of use: no special recommendations. b. Special yards, spaces and buffers: As discussed above in item 2, the site provides adequate size and topography to accommodate the proposed convenience center. c. Special fences, solid fences and walls: No special conditions recommendations. d. Surfacing of parking areas: No special conditions recommended. #Z-06245, Bozeman Landfill Convenience Center CUP 9 e. Requiring street, service road or alley dedications and improvements: No special recommendations. f. Regulation of points of vehicular ingress and egress: No special recommendations. g. Regulation of signs: All signage must be approved by Vicki Hasler, Code Enforcement Officer for the City of Bozeman. h. Requiring maintenance of the grounds: No special conditions. i. Regulation of noise, vibrations and odors: The issuance of the CUP will not add noise, vibrations or odors. j. Regulation of hours for certain activities: No regulations are recommended. k. Time period within which the proposed use shall be developed: No special conditions recommended. l. Duration of use: The use may continue for the life of the structure. m. The dedication of access rights: None. n. Other such conditions as will make possible the development of the City in an orderly and efficient manner: No additional recommended conditions. Staff has not identified any additional conditions, other than those listed below, to protect the public health, safety, and general welfare. RECOMMENDED CONDITIONS OF APPROVAL Based on the previous analysis, the DRC finds that the application, with conditions, is in general compliance with the adopted Growth Policy and the City of Bozeman Unified Development Ordinance. The following four conditions of approval are recommended: Planning: 1. Landscaping standards, per UDO Section 18.48 “Landscaping,” shall be provided. For the purpose of fulfilling landscaping requirements, the applicant may designate an artificial lot. An application must be submitted to the Planning Director prior to the City Commission Hearing of this Conditional Use Permit. 2. Parking shall be provided for all uses in accordance with UDO Section 18.46 “Parking.” 3. Any utility lines and easements shall be accurately depicted on the Final Site Plan and Landscape plan. Proposed extensions and additions shall be labeled “proposed.” 4. The proposed project shall be completed as approved and conditioned in the Conditional Use Permit and Variance applications. Any modifications to the submitted and approved application materials shall invalidate the project's legitimacy, unless the applicant submits the proposed modifications for review and approval by the Department of Planning prior to undertaking said modifications. 5. The applicant shall comply with all applicable Building/Electrical/Plumbing codes, and permits shall be obtained as required by the Building Division prior to commencement of any tenant improvements. #Z-06245, Bozeman Landfill Convenience Center CUP 10 CONCLUSION/RECOMMENDATION The DRC has reviewed the Conditional Use Permit Application to allow the construction of a household hazardous waste (HHW) facility near the scale house at the City of Bozeman Landfill on property located at 2143 Story Mill Road and as a result recommend to the City Commission approval of said application with the conditions and code provisions outlined in this Staff Report. Planning Staff has identified various code provisions that are currently not met by this application. Some or all of these items are listed in the findings of this Staff Report. The applicant must comply with all provisions of the Bozeman Unified Development Ordinance, which are applicable to this project, prior to receiving Final Site Plan approval. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. Attachments: Applicant’s Submittal Materials Report Sent To: City of Bozeman, Attn: Debbie Arkell, PO Box 1230, Bozeman, MT 59771 City of Bozeman, Attn: Dustin Johnson, PO Box 1230, Bozeman, MT 59771 November 15, 2006 To: Martin Knight, Planner From: Dustin Johnson, Project Engineer Re: Request for artificial lot for the development of the Convenience Station at the Story Mill Landfill The City of Bozeman would like to formally request that an artificial lot be established for the purpose of developing a landscape plan for the convenience station located at the Story Mill Landfill. cc: ERF Project File October 26, 2006 To: Martin Knight, Planner From: Dustin Johnson, Landfill Engineer Re: Story Mill Landfill Convenience Station Exemption Requests The City of Bozeman would like to make the following exemption requests for the proposed Convenience Station that will be located at the existing Story Mill Landfill: Installation of street improvements and sidewalks along Story Mill (UDO section 18.44.080 and 18.44.050) – Currently the section of Story Mill Road that fronts the landfill does not have curb, gutter, or sidewalk. The adjoining properties to the north and south of the landfill do not have curb, gutter, or sidewalk. If curb, gutter, and sidewalk were required for the section of Story Mill Road that fronts the landfill, it would not connect to any other section along Story Mill Road that has curb, gutter, or sidewalk. It should be noted that there currently exists a trail that ends at the landfill access gate. This trail connects to the Bridger Creek Subdivision system of trails and eventually to the series of trails that run along the East Gallatin. Further, our application is for further development of the site, which entails improving the existing customer convenience site and only adding the HHW facility. Installation and striping of designated Parking (UDO section 18.46) – There is no parking at or near the scale building for the public, and no changes will be made in this area. The improved convenience station will offer areas for the public to pull in and dispose of their waste/recyclables. This area will only be used for unloading, and no parking will be permitted. During hours of operation the attendant of the scale parks directly next to the scale house. The scale area sees large volumes of traffic and designated parking could create undo congestion. Landscaping (UDO section 18.48) – The City of Bozeman intends to provide a berm and a series of trees to screen views of the convenience station from the south. The plans provided show the berm and several trees screening the view. However, a full landscape plan has not been submitted at this time. Staff would like to propose to work with in-house staff in the Forestry Department and the Planning Department to design a landscape plan that would meet all necessary requirements and adequately screen the views of the convenience station, rather than spend taxpayer money to hire an outside consultant for this work. This plan will be implemented as early as next spring. cc: ERF Project File