Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Brit Fontenot; City Clerk and Chris A. Kukulski, City Manager
SUBJECT: Commissioner Sean Becker’s vote on Commissioner Steve Kirchhoff’s
motion from November 20, 2006
MEETING DATE: November 27, 2006
BACKGROUND: On November 20, 2006 it was moved by Commissioner Steve Kirchhoff
to approve application No. Z-06193, Lincoln Park Condos Site Plan, with the REVISED site
plan and with the revised conditions and code provisions outlined in the staff memo (see attached
excerpt of minutes). Commissioner Sean Becker was absent and therefore did not cast a vote at
the November 20, 2006 meeting. The motion and vote are transcribed below:
[It was moved by Cr. Kirchhoff, seconded by Mayor Krauss, to approve application No. Z-
06193, Lincoln Park Condos Site Plan, with the REVISED site plan and with the revised
conditions and code provisions outlined in the staff memo.]
Those voting Aye being Cr. Kirchhoff and Mayor Krauss.
Those voting No being Crs. Jacobson and Rupp.
The vote ties and will be broken by the vote of Commissioner Becker on November 27,
2006 based upon a review of the meeting minutes of November 20, 2006.
The vote resulted in a 2 – 2 tie.
RECOMMENDATION: After reviewing the audio and written record and stating such,
Commissioner Sean Becker should cast a vote on the motion as it was recorded by the City Clerk
on November 20, 2006.
ALTERNATIVES: As suggested by the City Commission.
Respectfully submitted,
____________________________ ____________________________
Brit Fontenot, City Clerk Chris A. Kukulski, City Manager
Attachment: Excerpted Minutes from November 20, 2006
2
EXCERPTED MINUTES OF THE MEETING OF THE CITY COMMISSION
BOZEMAN, MONTANA
November 20, 2006
*****************************
The Commission of the City of Bozeman met in the Community Room, Gallatin County
Courthouse, 311 West Main Street, on Monday, November 20, 2006, at 6:00 p.m. Present were
Mayor Jeff Krauss, Cr. Steve Kirchhoff, Cr. Jeff Rupp, City Manager Chris Kukulski, Finance
Director Anna Rosenberry, Public Works Director Debbie Arkell, Planning Director Andy
Epple, Assistant City Attorney Tim Cooper, and City Clerk Brit Fontenot.
0:22:51 [18:15:29] 2. Lincoln Park Condos Site Plan, #Z-06193, continued from Nov. 6, 2006
(Epple for Kozub)
0:23:22 [18:15:18] Staff Report
Planning Director Andy Epple presented the Staff report.
0:29:08 [18:15:37] Applicant
Catherine Konen of Gaston Engineering appeared on behalf of the applicant.
0:29:24 [18:17:48] Public Comment
Mayor Krauss called for public comment.
0:29:38 [18:19:59] Public Comment - Joanne Wilke
Joanne Wilke resides at 1665 Alder Court and opposes the Lincoln Park Condominium
development as proposed.
0:33:23 [18:20:08] Public Comment - Stacy Jackson
Stacy Jackson resides at 1523 Alder Court and is concerned about the character of the
neighborhood changing if the current proposal is approved.
0:34:40 [18:21:40] Public Comment - Jay Rutherford
Jay Rutherford resides at 1721 West Kagy and appeared representing the Hawks Ridge
Homeowners Association which supports the development of the Lincoln Park Condos as
proposed and also speaking as MSU student and is concerned about he high cost of home
ownership.
0:44:50 [18:30:35] Motion to approve application No. Z-06193, Lincoln Park Condos Site
Plan, with the REVISED site plan and with the revised conditions and code provisions
outlined in the staff memo.
It was moved by Cr. Kirchhoff to approve [application No. Z-06193], Lincoln Park Condos
Site Plan, with the REVISED site plan and with the revised conditions and code provisions
outlined in the staff memo.
Conditions of Approval:
3
1. The Annexation and Zone Map Amendment must be finalized prior to Final Site Plan
approval.
2. Stormwater detention facilities shall not have a slope steeper than 25 percent and shall
not make up more than one-third of the required front yard.
3. Regarding pedestrian circulation (Section 18.34.090.6):
a. The pedestrian connection shall be constructed of concrete (minimum 6 feet in
width) or asphalt (minimum of 10 feet in width), subject to review and approval by
the Parks Department.
b. The trail must either: 1) connect to both Maple Lane and to Alder Court or 2)
connect directly to the sidewalk to be installed along Lincoln Road.
c. The applicants/owners shall work with the condominium association to the south
to coordinate the location (specifically the southern terminus) of the trail.
4. Regarding the relationship of site plan elements to conditions on and off the property
(Section 18.34.090):
a. The relocated house shall be on its own lot and not be part of the
condominium association.
b. The north elevations of the units along Lincoln Street shall include
additional architectural features (including front porches with sidewalk
connections to the sidewalk on Lincoln Road) to avoid presenting a “back”
side to the streetscape.
c. The covenants shall specify that no individual unit fences are allowed.
5. Regarding the impact of the project on parking and traffic conditions (Section
18.34.090.5):
a. Garage doors must be setback at least 20 feet from the public access
easement for Maple Lane and from the right-of-way line for Alder Court.
Where driveways along the interior private drive are less than 20 feet, no
parking signage shall be installed and shown on the Final Site Plan. No
driveways will be permitted to be between 10 and 20 feet in length to avoid
parked cars blocking the pedestrian facilities and the private drive aisle.
b. The covenants must also specify these parking restrictions and the method
of enforcement for parking problems. Revised parking calculations must be
included with the Final Site Plan.
6. An 8 inch sanitary sewer main shall be extended down Alder Court Lane to the southern
property line.
4
7. Provide a fire hydrant at the southwest corner of the Lincoln Street/Alder Court Lane
intersection instead of the north side of Lincoln Street. Provide a City standard blow-off at
the dead end of the Lincoln Street water main.
8. The 6” water main in Alder Court Lane does not meet City standard. The water main
shall be 8” and extend to the southern property line. The water main extension is in excess
of 500 ft and shall be looped.
9. Any unused water services to the property shall be properly abandoned at the main.
10. The private drive into the property shall connect to Maple Lane with a City standard
approach not with curb radii as shown on the site plan. Both sides of the private drive shall
have the curb painted red with white lettering that is at least 3” in height and signs every
35 feet that state “FIRE LANE/TOW AWAY ZONE”. The cul-de-sac shall meet Fire
Department code requirements.
11. The minimum width of Maple Lane, from Lincoln Street to the southern property line,
shall be 29 feet back of curb to back of curb. Curb and gutter, shall be provided on both
sides of the street. Sidewalk shall be provided on the east side of the street. Also, the curb
on the east side of the street shall be painted red with white lettering that is at least 3” in
height and signs provided every 35 feet that state “FIRE LANE/TOW AWAY Report
compiled on November 15, 2006
ZONE”. This is to allow parking on the west side of the street and provide a 20 foot
minimum width for emergency vehicles.
12. Either a City standard sidewalk or extension of the linear park trail shall be provided
on Lincoln Street.
13. City standard curb and gutter, boulevard, and sidewalk shall be provided on the west
side of Alder Court Lane from Lincoln St to the southern property line.
14. Plans and Specifications for water and sewer main extensions, and streets and storm
drainage facilities, prepared and signed by a Professional Engineer (PE) registered in the
State of Montana shall be provided to and approved by the City Engineer. Water and
sewer plans shall also be approved by the Montana Department of Environmental Quality.
The applicant shall also provide Professional Engineering services for Construction
Inspection, Post-Construction Certification, and preparation of mylar Record Drawings.
Construction shall not be initiated on the public infrastructure improvements until the
plans and specifications have been approved and a preconstruction conference has been
conducted. No building permits shall be issued prior to City acceptance of the required
infrastructure improvements.
15. A Public Access Easement shall be provided for the private drive within the property
prior to FSP approval.
16. Prior to issuance of building permits for any new buildings in the development and
upon availability of service, any existing residence/business on the property must be
connected to City water and sewer utilities. The existing on-site treatment systems must be
properly abandoned and certification provided the abandonment occurred. Any wells
5
presently used for domestic purpose can be retained for irrigation only with no physical
connection to domestic water piping.
UDO Code Provisions:
a) Section 18.16.040 requires 5,000 square feet per single household residence. Section
18.80.1980 defines net residential density as the number of residences per buildable unit of
land which would exclude the easement for Maple Lane, any easements for Lincoln
Avenue, and the required parkland equivalent of 0.03 acres per dwelling unit (for the new
units only). Exact density calculations must be submitted with the Final Site Plan.
b) A subdivision exemption to aggregate and relocate lot lines must be approved prior to
Final Site Plan approval in order to meet to meet Section 18.10.040 of the Unified
Development Ordinance.
c) Section 18.34.130 requires the applicant to submit seven (7) sets (bound together) of a
Final Site Plan within six (6) months of preliminary approval containing all of the
conditions, corrections and modifications to be reviewed and approved by the Planning
Office.
d) Section 18.34.140 states that a Building Permit must be obtained prior to the work, and
must be obtained within one year of Final Site Plan approval. Building Permits will not be
issued until the Final Site Plan is approved.
e) Section 18.38.050.F requires all mechanical equipment to be screened. Rooftop
equipment should be incorporated into the roof form and ground or wall-mounted
equipment shall be screened with walls, fencing, or dense evergreen plant materials. The
location of all mechanical equipment and the method of screening shall be shown on the
Final Site Plan.
f) Sections 18.42.150 requires a lighting plan for all on-site lighting including wall-mounted
lights on the building must be included in the Final Site Plan submittal. All lights must be
full cutoff. Lighting cut-sheets shall be provided with the Final Site Plan.
g) All street and driveway vision triangles must be shown on the Final Site Plan in
accordance with Section 18.44.100. On-street parking does not count within a street
vision triangle.
h) Section 18.46.020 specifies the required length and width of parking spaces.
i) Section 18.46.040.E states that all developments shall provide adequate bicycle parking
facilities to accommodate residents and guests. The location and details for the bike rack
shall be provided in the Final Site Plan.
j) The Final Site Submittal must indicate how the required 23 landscape points are being
met in accordance with Chapter 18.48 without double counting. Note that any drought
tolerant species proposed for points must be specifically denoted in the Landscape
Schedule. The final landscape plan must be signed and certified by a landscape
professional as outlined in Section 18.78.100.
6
k) Section 18.48.050.E requires one large canopy tree for each 50 feet of total street
frontage (including Lincoln Road and Alder Court). Street tree permits must be obtained
from the Forestry Division prior to installation.
l) Section 18.50.110.F requires a 25-foot wide public access easement for the entire length of
the north-south trail, which should be centered on the easement.
m) Per Chapter 18.52, all signage, including any project identification signage, shall
require a sign permit subject to review and approval by the Department of Planning &
Community Development. Only one free-standing sign is permitted per lot.
n) The Final Site Plan shall be adequately dimensioned. A complete legend of all line types
used shall also be provided.
o) A Storm Water Drainage/Treatment Grading Plan and Maintenance Plan for a system
designed to remove solids, silt, oils, grease, and other pollutants must be provided to and
approved by the City Engineer. The plan must demonstrate adequate site drainage
(including sufficient spot elevations), flow direction arrows, storm water
detention/retention basin details (including basin sizing and discharge calculations, and
discharge structure details), storm water discharge destination, and a storm water
maintenance plan.
p) Sewer and water services shall be shown on the FSP and approved by the Water/Sewer
Superintendent. City of Bozeman applications for service shall be completed by the
applicant.
q) Trees shall not be located within ten (10) feet of water and sewer service lines.
r) The location of existing water and sewer mains shall be properly depicted, as well as
nearby fire hydrants. Proposed main extensions shall be labeled "proposed".
s) The drive approach shall be constructed in accordance with the City's standard
approach (i.e., concrete apron, sidewalk section and drop-curb) and shown as such on the
FSP. A City Curb Cut and Sidewalk Permit shall be obtained prior to FSP approval.
t) City standard sidewalk shall be installed and properly depicted at the standard location
(i.e., 1 foot off property line) along the street(s) frontage. Any deviation to the standard
alignment or location must be approved by the City Engineer.
u) All existing utility and other easements must be shown on the FSP.
v) Adequate snow storage area must be designated outside the sight triangles, but on the
subject property (unless a snow storage easement is obtained for a location off the property
and filed with the County Clerk and Recorder's office).
w) Drive approach and public street intersection sight triangles shall be free of plantings
which at mature growth will obscure vision within the sight triangle.
7
x) The Montana Department of Fish, Wildlife & Parks, SCS, Montana Department of
Environmental Quality and Army Corps of Engineer's shall be contacted regarding the
proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall
be obtained prior to FSP approval.
y) If construction activities related to the project result in the disturbance of more than 1
acre of natural ground, an erosion/sediment control plan may be required. The Montana
Department of Environmental Quality may need to be contacted by the Applicant to
determine if a Stormwater Discharge Permit is necessary. If a permit is required by the
State, the Developer shall demonstrate to the City full permit compliance.
z) The applicant shall submit a construction route map dictating how materials and heavy
equipment will travel to and from the site in accordance with section 18.74.020.A.1 of the
Unified Development Ordinance. This shall be submitted as part of the final site plan for
site developments, or with the infrastructure plans for subdivisions. It shall be the
responsibility of the applicant to ensure that the construction traffic follows the approved
routes. Report compiled on November 15, 2006.
aa) All construction activities shall comply with section 18.74.020.A.2. of the Unified
Development Ordinance. This shall include routine cleaning/sweeping of material that is
dragged to adjacent streets. The City may require a guarantee as allowed for under this
section at any time during the construction to ensure any damages or cleaning that are
required are complete. The developer shall be responsible to reimburse the City for all
costs associated with the work if it becomes necessary for the City to correct any problems
that are identified.
0:46:02 [18:31:35] Second, by Mayor Krauss, to Cr. Kirchhoff's motion to approve
application No. Z-06193, Lincoln Park Condos Site Plan, with the REVISED site plan and
with the revised conditions and code provisions outlined in the staff memo (see conditions
and provisions above). Mayor Krauss handed the gavel to Commissioner Jacobson in
order to second Commissioner Kirchhoff's motion to approve application No. Z-06193,
Lincoln Park Condos Site Plan, with the REVISED site plan and with the revised
conditions and code provisions outlined in the staff memo (see conditions and provisions
above).
0:55:00 [18:39:05] Vote to approve application No. Z-06193, Lincoln Park Condos Site
Plan, with the REVISED site plan and with the revised conditions and code provisions
outlined in the staff memo (see conditions and provisions above).
[It was moved by Cr. Kirchhoff, seconded by Mayor Krauss, to approve application No. Z-
06193, Lincoln Park Condos Site Plan, with the REVISED site plan and with the revised
conditions and code provisions outlined in the staff memo (see conditions and provisions
above).]
Those voting Aye being Cr. Kirchhoff and Mayor Krauss.
Those voting No being Crs. Jacobson and Rupp.
The vote ties and will be broken by the vote of Commissioner Becker on November 27,
2006 based on a review of the meeting minutes of November 20, 2006.