Loading...
HomeMy WebLinkAboutH4 Peets Hill Parking Lot Commission Memorandum TO: Honorable Mayor and City Commission FROM: Susan Kozub, AICP, Associate Planner SUBJECT: Peet’s Hill Parking Lot/COA #Z-04112-A MEETING DATE: November 20, 2006, 6pm BACKGROUND: On June 14, 2004, the City Commission reviewed a Sketch Plan/Certificate of Appropriateness (COA) Application to allow the demolition of wooden coal storage bins and the construction of a new 30-space parking lot and related site improvements at the base of Peet’s Hill along South Church Avenue. Prior to that hearing, both the Recreation and Parks Advisory Board (4/8/04) and the Development Review Committee (6/1/04) had recommended conditional approval of the application. At the June hearing, the City Commission made a formal action to permit the demolition of the coal bins but delayed action on the parking lot in order to explore additional options for the property which essentially put the parking lot portion of the project on hold. In August 2005, an appropriation of $1.125 million from the federal transportation bill was awarded for parking facilities, bicycle and pedestrian enhancements and landscaping on the new Public Library site. MT Dept of Transportation is administering the award through the Community Transportation Enhancement Program (CTEP). The Peet’s Hill parking lot design was incorporated into the library site enhancement and Milwaukee RD Rail Trail CTEP project. While Final Site Plan review for the Library has long been complete, the addition of the Peet’s Hill parking lot design was only recently approved by the Library Board in June 2006. The original design that was presented in 2004 has been revised to meet the conditions of approval and code provisions. This item is coming before the Commission again as a continuation and final step from the process that began over two years ago. To ensure fair public process and participation, and as required in the Unified Development Ordinance, Staff sent standard notices to property owners within 200 feet of the proposed parking lot and posted the notice on site to announce the November 20th hearing date. One written public comment has been received thus far. This packet also includes public comment from the original application of 2004. Any items received after November 15, 2006 will be distributed to the Commission at the hearing. UNRESOLVED ISSUES: The Department of Planning is not aware of any unresolved issues for the proposed development at this time. RECOMMENDATION: That the City Commission approve the Sketch Plan and Certificate of Appropriateness application (#Z-04112-A). FISCAL EFFECTS: The Department of Planning is not aware of any fiscal effects for the proposed development at this time. ALTERNATIVES: As suggested by the City Commission. Report compiled on November 15, 2006 CONTACT: Please email Andrew Epple at aepple@bozeman.net if you have any questions prior to the public hearing. APPROVED BY: Andrew Epple, Planning Director Chris Kukulski, City Manager CITY COMMISSION STAFF REPORT PEET’S HILL PARKING LOT COA FILE #Z-04112 Item: Zoning Application #Z-04112, a Certificate of Appropriateness Application to allow the demolition of two wooden structures and the construction of a new parking lot and related site improvements at the base of Peet’s Hill on property zoned R-4 (Residential High Density District) within the Neighborhood Conservation Overlay District. Owner/Applicant: City of Bozeman P.O. Box 1230 Bozeman, Montana, 59771-1230 Date & Time: City Commission Hearing: Monday, June 14, 2004, 7 pm, in the City Commission Meeting Room, City Hall, 411 East Main Street, Bozeman, MT 59715. Report By: Susan Kozub, Planner I Recommendation: Conditional Approval PROJECT LOCATION The subject property is located at the base of Peet’s Hill on the southern part of the library property. The property is legally described as a Portion of Block C, Rouse’s Addition, Portions of Block B, C, E & F, Rouse’s Second Addition, Portions of East Babcock Street, East Olive Street, East Story Street, and East Curtiss Street all lying between the East line of Wallace Avenue and Ida Avenue, and Portions of Ida Avenue lying between the South line of Main Street and the South line of Curtiss Street, City of Bozeman, Montana. The specific site proposed for the parking lot is zoned R-4 (Residential High Density District) and falls within the Neighborhood Conservation Overlay District. Please refer to the vicinity map on the following page. #Z-04112 Peet’s Hill Parking Lot COA City Commission Staff Report 1 #Z-04112 Peet’s Hill Parking Lot COA City Commission Staff Report 2 PROPOSAL & BACKGROUND This is a Certificate of Appropriateness to allow the demolition of two wooden coal bins (built in the early to mid-twentieth century) and the construction of a new parking lot with related site improvements. The new parking lot would have access onto South Church Avenue, directly across from Story Street. The lot would mainly serve users of Burke Park and the Gallagator Trail. The plan includes several amenities such as trail connections, landscaping, picnic tables, and benches. Pedestrians may access the site via a sidewalk extension along Church Avenue and several trail connections. In terms of landscaping, the plan includes vegetative screening and berming to minimize impact on the neighborhood. The benches and picnic table are shown toward the northeast portion of the site. The comfort station and the picnic shelter are part of a future phase. No lighting is proposed at this time. Any future lighting must conform to the Unified Development Ordinance (UDO) and direct light down and away from adjoining properties and roadways. On April 8, 2004, the Recreation and Parks Advisory Board recommended approval of the proposed parking lot. On June 1, 2004, the Development Review Committee (DRC) recommended conditional approval of the proposal. ZONING DESIGNATION & LAND USES The subject property is zoned R-4 (Residential High Density District). As stated in the Bozeman Unified Development Ordinance, the intent of the R-4 residential district is to provide for high- density residential development through a variety of housing types within the City with associated service functions. The following land uses and zoning are adjacent to the subject property: North: Single-Household Residence, zoned R-2 (Residential Two-Household, Medium Density District); South: Single-Household Residence, zoned R-4 (Residential High Density District); East: Burke Park; West: Single-Household Residences, zoned R-2 (Residential Two-Household, Medium Density District) #Z-04112 Peet’s Hill Parking Lot COA City Commission Staff Report 3 GROWTH POLICY DESIGNATION The development proposal is in conformance with the Bozeman 2020 Community Plan including the “Residential” land use designation. This category designates places where the primary activity is urban density living quarters. Other uses which complement residences are also acceptable such as parks, low intensity home based occupations, fire stations, churches, and schools. REVIEW CRITERIA & FINDINGS Section 18.28.050 “Standards for Certificates of Appropriateness” Section 18.42.060, “Standards for Certificates of Appropriateness” outlines architectural appearance design guidelines used to consider the appropriateness and compatibility of the alterations with original design features of subject structures or properties and with neighboring structures and properties including height, proportions of doors and windows, relationship of building masses and spaces, roof shape, scale, directional expression, architectural details, concealment of non-period appurtenances, and materials and color scheme. Staff finds that these review criteria are non-applicable to a new parking lot for a park. Any future structures (such as the Comfort Station) would be subject to these review criteria. Section 18.28.080 “Demolition or Movement of Structures or Sites within the Conservation District” The review procedures and criteria for the demolition or movement of any structure or site within the conservation district are as follows: A. Applications for the demolition or movement of structures within the conservation district will not be accepted without a complete submittal for the subsequent development or treatment of the site after the demolition or movement has occurred. The subsequent development or treatment must be approved before a demolition or moving permit may be issued. The proposed parking lot and related site improvements, including extensive landscaping, would replace the decrepit wood coal bins that currently occupy the site. B. The demolition or movement of conservation district principal and accessory structures or sites, which are designated as intrusive or neutral elements by the Montana Historical and Architectural Inventory, and are not within recognized historic districts or in other ways listed on the National Register of Historic Places, shall be subject to approval by the Planning Director after review and recommendation of administrative design review staff or Design Review Board as per Chapters 18.34 and 18.62, BMC, and the standards outlined in '18.28.050, BMC. The Montana Historical and Architectural Inventory Form shall be reviewed and, if necessary, updated by the Historic Preservation Planner to reflect current conditions on the site, prior to the review of the demolition or movement proposal. The final approval authority for the demolition or movement of structures or sites described within this section shall rest with the City Commission when proposed in conjunction with a deviation, variance, conditional use permit or planned unit development application. #Z-04112 Peet’s Hill Parking Lot COA City Commission Staff Report 4 According to the sandborn maps, the northernmost coal bin was built between 1912 and 1927. The second structure was built between 1927 and 1943. Both coal bins are non- contributing elements and there are no Historical and Architectural Inventory Forms for this property. Because this is a City project, however, the City Commission is the final review authority. Overall, the structures are a threat to public health and safety and do not have any viable economic or useful life remaining. Conditions 1 and 2 will ensure that the history of the site is preserved despite demolition of the structures. C. The demolition or movement of conservation district principal and accessory structures or sites, which are designated as contributing elements by the Montana Historical and Architectural Inventory, and all properties within historic districts and all landmarks, shall be subject to approval by the City Commission, through a public hearing. The coal bins are not listed as contributing elements. D. If an application for demolition or moving is denied, issuance of a demolition or moving permit shall be stayed for a period of two years from the date of the final decision in order to allow the applicant and City to explore alternatives to the demolition or move, including but not limited to, the use of tax credits or adaptive reuse. The two year stay may be terminated at any point in time if an alternate proposal is approved or if sufficient additional evidence is presented to otherwise satisfy the requirements of subsection B or C of this section. Non-applicable at this time. The applicant is advised of this section. E. All structures or sites approved for demolition or moving shall be fully documented in a manner acceptable to the Historic Preservation Planner and administrative design review staff prior to the issuance of demolition or moving permits. According to Condition No. 1, the City will have to provide detailed written and photographic documentation regarding the wooden storage buildings. An interpretive sign (see Condition 2) will make the raise public awareness of the site’s history. F. In addition to the remedies in Chapter 18.64, BMC, the owner of any structure or site that is demolished or moved contrary to the provisions of this section, and any contractor performing such work, may be required to reconstruct such structure or site in a design and manner identical to its condition prior to such illegal demolition or move, and in conformance with all applicable codes and regulations. Non-applicable. PUBLIC COMMENT On November 12, 2003, a public meeting was held to discuss potential parking lot designs. Attendees of this meeting included: James Goehrung, Superintendent of Lands and Facilities; Tracy Oulman, Neighborhood Coordinator; and fourteen citizens. During the meeting, attendees were provided seven drawings and asked to select a preferred design for the parking lot. The group identified two preferred designs and expressed concerns including: use of the parking lot, the number of provided parking spaces, lighting, and the preservation of existing vegetation. See materials from Tracy Oulman dated November 13, 2004 for additional details. After the meeting, a new design was created by Gary Vodenhal, Gallatin Valley Land Trust (GVLT) that attempted to #Z-04112 Peet’s Hill Parking Lot COA City Commission Staff Report 5 incorporate resident concerns and suggestions while also addressing the challenges and limitations of the site. The Recreation and Parks Advisory Board considered all of the designs and voted to recommend to the City Commission the design submitted by GVLT. Please note again that this design was not among the original seven designs presented to the meeting attendees. On May 28, 2004, public notices and a copy of the proposed plan were sent to property owners within 200 feet of the subject property and to all those who attended the neighborhood meeting. A notice was also posted on site on the same date and printed in the Chronicle on May 30, 2004. The Department of Planning & Community Development has received one letter in reference to this project. Any comments received after the date of this Staff Report will be distributed at the City Commission hearing. RECOMMENDED CONDITIONS OF APPROVAL Staff has reviewed the application for a Certificate of Appropriateness, against the criteria set forth in the Bozeman Unified Development Ordinance. Based on the evaluation of the criteria and findings by Administrative Design Review, Staff recommends conditional approval of the Certificate of Appropriateness application with the following conditions of approval: Conditions of Approval 1. Prior to demolition, the City shall provide written and photographic documentation regarding the wooden storage buildings. 2. The City shall install an interpretive sign explaining the history of the site, specifically the use of the Coal Bins. 3. Vegetative screening must be planted along the west portion of the parking lot. 4. Any future buildings (including the comfort station) shall require additional Certificate of Appropriateness (COA) review. 5. This project shall be constructed as approved and conditioned in the Certificate of Appropriateness with deviations application. Any modifications to the submitted and approved drawings shall invalidate the project's approval unless the applicant submits the proposed modifications for review and approval by the Department of Planning prior to undertaking said modifications, as required by Section 18.64.110 of the Bozeman Unified Development Ordinance. 6. The Final Site Plan shall be adequately dimensioned. 7. A Storm Water Drainage/Treatment Grading Plan and Maintenance Plan for a system designed to remove solids, silt, oils, grease, and other pollutants must be provided to and approved by the City Engineer. The plan must demonstrate adequate site drainage (including sufficient spot elevations), storm water detention/retention basin details (including basin sizing and discharge calculations, and discharge structure details), storm water discharge destination, and a storm water maintenance plan. 8. A storm water easement must be established on the adjacent property and filed with the County Clerk and Recorder's Office for the retention pond and discharge course if located off the subject property. #Z-04112 Peet’s Hill Parking Lot COA City Commission Staff Report 6 9. The drive approach shall be constructed in accordance with the City's standard approach (i.e., concrete apron, sidewalk section and drop-curb) and shown as such on the Final Site Plan. A City Curb Cut and Sidewalk Permit shall be obtained prior to Final Site Plan approval. 10. City standard sidewalk shall be installed and properly depicted at the standard location (i.e., 1 foot off property line) along the street(s) frontage. Any deviation to the standard alignment or location must be approved by the City Engineer. 11. Typical curb details (i.e., raised and/or drop curbs) and typical asphalt paving section detail shall be provided to and approved by the City Engineer. Concrete curbing shall be provided around the entire new parking lot perimeter and adequately identified on the Final Site Plan. 12. Flood plain: a. A Flood Plain Development Permit must be obtained from the City Engineer prior to Final Site Plan approval if any work is to occur within the delineated 100 year flood plain. b. The 100 year flood plain boundary and flood elevations must be depicted on the Final Site Plan. c. Culvert sizing design calculations shall be provided for the stream crossing. d. All buildings must be flood-proofed to at least 2' above the 100 year flood elevation. Elevation Certificates must be provided for each building following completions of construction. 13. The Montana Fish, Wildlife & Parks, Soil Conservation Services (SCS), Montana Department of Environmental Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to Final Site Plan approval. 14. All existing utility and other easements must be shown on the Final Site Plan. 15. Adequate snow storage area must be designated outside the sight triangles, but on the subject property (unless a snow storage easement is obtained for a location off the property and filed with the County Clerk and Recorder's office). 16. Drive approach and public street intersection sight triangles shall be free of plantings which at mature growth will obscure vision within the sight triangle. 17. If construction activities related to the project result in the disturbance of more that 1 acre of natural ground, an erosion/sediment control plan may be required. The Montana Department of Environmental Quality, Water Quality Bureau (WQB), shall be contacted by the Applicant to determine if a Storm Water Discharge Permit is necessary. If required by the WQB, an erosion/sediment control plan shall be prepared for disturbed areas of 1 acre or less if the point of discharge is less than 100' from State Waters. 18. The cul-de-sac as shown is the absolute minimum required radius to accommodate a passenger car turning movement. This shall be increased in size minimum of 10’ to provide for an easier movement, and must be signed no parking and the curbs painted yellow. #Z-04112 Peet’s Hill Parking Lot COA City Commission Staff Report 7 19. If crosswalks are proposed at the two crossings shown on Church, they must be signed to meet the requirements of the Manuel of Uniform Traffic Control Devices (MUTCD). 20. The remediation project must be completed and accepted by the Department of Environmental Quality (DEQ) prior to initiation of any construction activities on the site. 21. Sewer and water services shall be shown on the Final Site Plan and approved by the Water/Sewer Superintendent. City of Bozeman applications for service shall be completed by the applicant. Code Provisions ◦ Per Section 18.42.150, “Lighting,” all new lighting must conform to code requirements. ◦ Per Section 18.46.020.F, “Surfacing,” all areas intended to be utilized for permanent parking spaces and driveways shall be paved with concrete or asphaltic concrete, or approved pavers, to control dust and drainage. ◦ Per Section 18.48.050.E, “Street Frontage Landscaping Required,” all street rights- of-way within the proposed development site not used for street pavement, curbs, gutters, sidewalks or driveways shall be landscaped, and shall include one large canopy tree for each 50 feet of total street frontage. CONCLUSION Staff conditionally supports the Certificate of Appropriateness application as requested by the applicant. The applicant must comply with all provisions of the Bozeman Municipal Code that are applicable to this project. The applicants are advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, do not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. BECAUSE THIS APPLICATION IS FOR A CERTIFICATE OF APPROPRIATENESS ON CITY OWNED PROPERTY, THE BOZEMAN CITY COMMISSION SHALL MAKE THE FINAL DECISION ON THIS APPLICATION. THE DECISION OF THE CITY COMMISSION MAY BE APPEALED BY AN AGGRIEVED PERSON AS SET FORTH IN CHAPTER 18.66 OF THE BOZEMAN UNIFIED DEVELOPMENT ORDINANCE. Attachments: Site Plan Photographs of the coal bins dated June 2, 2004 Copy of the 1943 Sandborn Map Letter from Ken Sinay dated November 17, 2004 Letter from Gary Vodehnal dated February 9, 2004 Minutes from the Recreation & Parks Advisory Board dated April 8, 2004 Information from Neighborhood Coordinator Tracy Oulman Report Sent To: James Goehrung, City of Bozeman, P.O. Box 1230, Bozeman, MT, 59771-1230