Loading...
HomeMy WebLinkAboutE14 Baxter Meadows PUD Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Tim Cooper, Staff Attorney Chris Kukulski, City Manager SUBJECT: Baxter Meadows PUD Phase 3A Subdivision Final Plat (#P-05065) MEETING DATE: November 6, 2006 BACKGROUND: This is a request for approval of a Subdivision Final Plat to subdivide ~ 52 acres into 75 lots for single-household, residential conditional, park and open space uses. The property is generally located northeast of the intersection of Baxter Lane and Harper Puckett Road. At its February 6, 2006, public hearing, the Bozeman City Commission voted to conditionally approve the Baxter Meadows PUD Phase 3A Subdivision Preliminary Plat. The applicant applied for final plat approval on October 3, 2006, and staff has concluded all terms and conditions of preliminary plat approval have been met. State law provides that the governing body shall approve the plat only if: a) The plat conforms to the conditions of approval set forth on the preliminary plat and to the terms of the state subdivision law and regulations and the regulations adopted by the Bozeman City Commission; and b) The County Treasurer has certified that all real property taxes and special assessments assessed and levied on the land to subdivide have been paid. The County Treasurer has certified that the taxes and special assessments have been paid. Attached is a memorandum from Lanette Windemaker, Contract Planner, delineating how the conditions of preliminary plat approval have been satisfied. RECOMMENDATION: Upon the Director of Public Service’s review and concurrence, the City Commission approves the Final Plat of Baxter Meadows PUD Phase 3A Subdivision, and authorizes the Director of Public Service to execute the same on behalf of the City of Bozeman. FISCAL EFFECTS: Fiscal impacts are undetermined at this time, but will include increased property tax revenues from new development, along with increased costs to deliver municipal services to the property. ALTERNATIVES: As suggested by the City Commission Respectfully submitted, _________________________________ ____________________________ Tim Cooper, Staff Attorney Chris Kukulski, City Manager Attachments: Review Memo to Tim Cooper, dated October 23, 2006. MEMORANDUM To: Tim Cooper, Staff Attorney From: Lanette Windemaker, AICP; Contract Planner Date: October 23, 2006 RE: Baxter Meadows PUD Phase 3A Subdivision (#P-05065) Attached please find the final plat submittal for the Baxter Meadows PUD Phase 3A Subdivision. Attached you will find the Original Platting Certificate, four (4) signed mylars, and the full final plat submittal information with one paper copy. Bob Murray has reviewed the plat and Andy Kerr checked the plat for closure. Please review, and advise me of your findings. Planning is still working on the Final PUD Plan due to issues with the landscaping plans (see code provision b), but we will have it approved prior to final plat approval and recordation. Some public improvements have been financially guaranteed and therefore, a notice of building permit restriction will be recorded with the final plat. Please prepare a City Attorney’s Certificate using the attached ORIGINAL copy of the Platting Certificate and approve the Certificates of Director of Public Service and Certificate of Exclusion from MDEQ Review “as to form”. If you find this submittal acceptable, please place it as an item on the next available City Commission Agenda. The final plat was submitted on October 3, 2006. In accordance with 18.06.060, the final plat must be approved by the City Commission no later than December 8, 2006. Baxter Meadows PUD Phase 3A Subdivision is generally located northeast of Baxter Lane and Harper Puckett Road. The Baxter Meadows PUD Phase 3A Subdivision was approved subject to the following conditions. Subdivision Conditions: 1. The subdivider shall ensure that a minimum of 10 percent of the net buildable acreage is dedicated to Restricted Size Lots (RSLs). For RSLs provided off-site in Baxter Meadows Phases 1 and 2C, the subdivider may provide for those smaller lot RSLs at a minimum ratio of 5,000 square feet required to 3,750 square feet provided achieving a minimum of 7.5 percent of the net buildable acreage. Complied with. 2. The total floor area of the dwelling unit built on a lot in Phases 1 and 2C subject to the provisions of Section 18.42.180, Provision of Affordable Housing, (excluding area used for a garage) shall not exceed 1,575 square feet. Complied with. 3. Restricted Size Lots (RSLs) in Phase 3 may have a minimum lot with of 45 feet. Not applicable, all RSLs required for Phase 3A were provided off-site in Baxter Meadows Phases 1 and 2C. 4. The watercourse setback along the relocated (eastern) portion of the Baxter-Border Ditch shall not be used to satisfy park land dedication requirements. (As amended by City Commission.) Complied with. 5. The stream corridor and associated wetlands along the relocated (eastern) portion of the Baxter-Border Ditch within the dedicated parkland may be considered critical wildlife habitat or natural resources and used to satisfy park land dedication requirements. Complied with. 6. Block 16 may have a block length of less than 300 feet due to impractibility and a block width of less than 200 feet to overcome specific disadvantages of orientation. Complied with. 7. The number of lots in this subdivision may increase from 129 lots up to 150 lots to meet the requirement for Restricted Size Lots (RSLs) pursuant to Section 18.42.180. Not applicable, all RSLs required for Phase 3A were provided off-site in Baxter Meadows Phases 1 and 2C. 8. Street trees in the boulevards adjacent to the mid-block trail crossings shall be eliminated. Complied with. 9. The five lots along the south side of Equestrian Lane and the west side of Riata Road shall be eliminated to provide additional park frontage. Complied with. 10. The Final Park Plan shall: a) Be to a scale of 1-inch equals 20 feet but not less than 1-inch equals 100 feet. b) Ensure that bridges have a minimum width of 36 inches. c) Provide a trail system map/signage at the parking lot. d) Contain the appropriate sections from the “Design Guidelines for City of Bozeman Parks”. Complied with. 11. Sidewalks along park land shall be constructed to a six foot width to accommodate snow removal equipment. Complied with. 12. The park shall be titled “Public Park”. The open space shall be titled “Open Space, Public Access”. Notes shall be included on the plat describing ownership and maintenance responsibility for both the park and open space, e.g.: public park, dedicated to the city and maintained by the homeowners association; and open space, public access, owned by the landowners, maintained by the homeowners association, etc. Complied with. 13. Subdivision lighting SILD information shall be submitted to the Clerk of Commission directly after Preliminary Plat approval in hard copy and digital form. The final plat will not be deemed complete until the resolution to create the SILD has been approved by the City Commission. Complied with. 14. Water rights, or cash-in-lieu thereof, as calculated by the Director of Public Service, is due with the final plat. Complied with. 2 15. The Final Plat shall contain the following language on the plat, placing future landowners of individual lots on notice of the presence of high groundwater in the area of the subdivision “Due to relatively high ground water table within the areas of the subdivision, it is not recommended that residential dwellings with full basements be constructed without first consulting a professional engineer. If daylight basements are incorporated in the construction of residential dwellings, they should not have a depth greater than three (3) feet below the top of the curb or crown of the street from which it is served.” Complied with. 16. The final plat shall comply with the standards identified and referenced in the Unified Development Ordinance. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. Complied with. 17. Stormwater Master Plan: A Stormwater Master Plan for the subdivision for a system designed to remove solids, silt, oils, grease and other pollutants from the runoff from the private and public streets and all lots must be provided to and approved by the City Engineer. The master plan must depict the maximum sized retention basin location, show location of and provide easements for adequate drainage ways within the subdivision to transport runoff to the stormwater receiving channel. The plan shall include sufficient site grading and elevation information (particularly for the basin site, drainage ways and finished lot grades), typical stormwater detention/retention basin and discharge structure details, basin sizing calculations and a stormwater maintenance plan. Any stormwater ponds located within a park or open space shall be designed and constructed to be conducive to the normal use and maintenance of the open space. Stormwater ponds for runoff generated by the subdivision (e.g., general lot runoff, public or private streets, common open space, parks, etc.) shall not be located on easements within privately owned lots. While the runoff from the individual lots will be dependent on the intensity of use on each lot, the maximum sizing of the storm retention facilities for each lot will be established based on maximum site development. Final facility sizing may be reviewed and reduced during design review of the FSP for each lot. Complied with and financially guaranteed. 18. Plans and specifications and a detailed design report for water and sewer main extensions, storm sewer and the public street, prepared by a Professional Engineer, shall be provided to and approved by the City Engineer and the Montana Department of Environmental Quality. The Applicant shall also provide Professional Engineering services for construction inspection, post-construction certification, and preparation of mylar record drawings. Construction shall not be initiated on the public infrastructure improvements until the plans 3 and specifications have been approved and a pre-construction conference has been conducted. Complied with and financially guaranteed. No building permits shall be issued prior to substantial completion and City acceptance of the required infrastructure improvements unless all of the requirements of section 18.74.030.D are met to allow for concurrent construction. A notice of building permit restriction will be filed with this final plat. 19. All infrastructure improvements including 1) water and sewer main extensions, and 2) public streets, curb/gutter, sidewalks fronting parks, open space, rear yard frontages or other non-lot frontages, and related storm drainage infrastructure improvements shall be financially guaranteed or constructed prior to Final Plat approval. Complied with and financially guaranteed. 20. The location of existing water and sewer mains shall be properly depicted. Proposed main extensions shall be noted as proposed. Complied with. City standard residential sidewalks shall be constructed on all public street frontages of a property prior to occupancy of any structure on the property. Upon the third anniversary of the plat recordation of any phase of the subdivision, any lot owner who has not constructed said sidewalk shall, without further notice, construct within 30 days said sidewalk for their lot(s), regardless of whether other improvements have been made upon the lot. This condition shall be included on the plat and in the covenants for the subdivision. Complied with. 21. The Montana Fish, Wildlife and Parks, SCS, Montana Department of Environmental Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to Final Plat approval. Complied with. 22. Ditch relocation: a) The Montana Fish, Wildlife and Parks shall be contacted by the Applicant regarding the proposed relocation and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to Final Plat approval. b) The Applicant shall comply with all parts of section 18.42.060.D for any ditch relocation. c) An easement shall be granted on the plat for the relocated irrigation ditch, and the existing easements vacated. Complied with. 23. Easements for the water and sewer main extensions shall be a minimum of 30 feet in width, with the utility located in the center of the easement. In no case shall the utility be less than 10 feet from the edge of easement. Complied with. 24. Project phasing shall be clearly defined including installation of infrastructure. Complied with. 4 25. The developer shall make arrangements with the City Engineer's office to provide addresses for all individual lots in the subdivision prior to filing of the final plat. Complied with. 26. The applicant shall submit a construction route map dictating how materials and heavy equipment will travel to and from the site in accordance with section 18.74.020.A.1 of the Unified Development Ordinance. This shall be submitted as part of the final site plan for site developments, or with the infrastructure plans for subdivisions. It shall be the responsibility of the applicant to ensure that the construction traffic follows the approved routes. Complied with. 27. All construction activities shall comply with section 18.74.020.A.2. of the Unified Development Ordinance. This shall include routine cleaning/sweeping of material that is dragged to adjacent streets. The City may require a guarantee as allowed for under this section at any time during the construction to ensure any damages or cleaning that are required are complete. The developer shall be responsible to reimburse the City for all costs associated with the work if it becomes necessary for the City to correct any problems that are identified. Complied with. 28. Flanders Mill Road shall be paved to a 24’ wide county road section from the end of the existing asphalt north of Durston Road to Baxter Lane provided the 24’ of asphalt can be centered in the existing right of way without necessitating relocation of the ditch. If it cannot be done, the same limits of road shall be overlaid with 4” of asphalt millings, treated with Reclamite, and chip sealed. Complied with. 29. All improvements needed to provide adequate level of service for the analyzed intersections must be installed with the project. This will require approval from the Montana Department of Transportation for the required geometric improvements to the intersection of 19th and Oak. Complied with and financially guaranteed. 30. The east half of Harper Puckett Road shall be improved to the 5-Lane Principal Arterial standard as shown in the Transportation Plan along the entire frontage of the subdivision. The required right of way dedication for Harper Puckett is 60’. Deferred until Phase 3B in accordance with letter from Andy Epple, dated July 24, 2006 (Tab 15). 31. The north half of Baxter Lane shall be improved to the 2-Lane Minor Arterial standard along the entire frontage of the subdivision. The required right of way dedication for Baxter is 50’. Complied with and financially guaranteed. 32. The west half of Davis/Fowler shall be improved to the 5-Lane, 71’ back of curb to back of curb Minor Arterial standard from Baxter to Oak. The required easement for Fowler/Davis is 50’. Complied with. 33. The sidewalks adjacent to Harper Pucket, Baxter, and Davis/Fowler shall be 6’wide, and shall be installed at the time the street improvements are done. Complied with and financially guaranteed. 5 34. A 1’ No Access Strip shall be shown on the plat along the entire frontage of Harper Pucket Road and Baxter Lane. Complied with. 35. The water mains in Equestrian and Kimberwicke shall be extended to the center median in Harper Pucket Road for future looping purposes. Complied with. 36. The COB design standards require a minimum of 6” crushed base course. One of the alternative sections in the geotech report only calls for 5”. Revise accordingly. Complied with. Subdivision Code Provisions a. Pursuant to 18.42.060, a minimum easement width of 10 feet shall be provided on each side of irrigation pipelines and ditches. Complied with. b. Per Section 18.42.060.D.1.c, the planting of vegetation other than grass within the irrigation facility easement is prohibited without the written permission of the facility owner. Landscaping plans (to be approved as part of the Final PUD Plan) will need to be corrected to comply with this. c. A watercourse setback planting plan shall be prepared by a qualified landscape professional and shall be reviewed and approved by the Planning Department prior to the commencement of development or site preparation. The plan shall include a schedule for planting and landscaping as outlined for Zone 1 and Zone 2 outlined in Section 18.42.100. Since the watercourse setback in located inside the park boundaries, this shall be included in the Park Plan. Complied with. d. Section 18.42.150.C, Subdivision lighting includes street lighting and pathway intersection lighting. Complied with. e. Per Section 18.42.180 of the Bozeman Unified Development Ordinance and the adopted growth policy, lands subdivided shall have not less than a minimum net density of six dwelling units per acre. With 129 dwelling units, this subdivision has a net density of ~ 3.4 du/ac, and at 150 dwelling units, this subdivision has a net density of ~ 4 du/ac. However, staff interprets the minimum net density of six dwelling units per acre as averaged over the entire Baxter Meadows PUD. Complied with. f. Section 18.42.180, the RSL designation shall be recorded on the individual lots in a manner that will appear on a title search and include reference to the sunset provisions of Section 18.42.180. Complied with. g. Per Section 18.44.040, all street names shall be reviewed and approved by Gallatin County and City Engineer’s Office prior to final plat approval. Complied with. 6 h. Per Section 18.50.060, the trail system around the perimeter of the park land shall be constructed by the subdivider to provide direct pedestrian access to the perimeters without street frontage. Financially guaranteed. i. Per Section 18.50.060, the subdivider shall provide the additional land for a parking area based on lot frontage (~ 922 feet) x 14 feet for ~ 12,908 square feet. The additional land for the parking area may not be counted towards the final park land dedication. If the frontage of the park changes, this number will be recalculated. Complied with. j. Per Section 18.50.060, the subdivider shall either develop the parking area or in lieu of the constructed parking area, an equivalent dollar value of non-parking improvements within the park are provided according to the individual park plan. Financially guaranteed. k. Section 18.50.080.D states that storm water retention or detention facilities may be located within a park but cannot count towards the final parkland dedication. Complied with. l. Section 18.50.080 states that the subdivider must decide on the improvements to be completed by the subdivider prior Final Park Plan approval. At a minimum these improvements included; leveling any park area(s), amending the soil, seeding disturbed areas to allow mowing with turf type mowers, installing an underground irrigation system with well, boundary posts and sidewalks. In addition, these improvements include the parking area or improvements in lieu, the trail system to provide direct pedestrian access to the perimeter, and watercourse landscaping. Financially guaranteed. m. Per Section 18.50.090, executed waivers of right to protest creation of special improvement districts (SIDs) for a park maintenance district shall be filed and of record with the Gallatin County Clerk and Recorder prior to final plat approval. A copy of the filed documents shall be submitted with the final plan. Complied with. n. Covenants, restrictions, and articles of incorporation for the creation of a homeowners’ association shall be submitted with the final plat application for review and approval by the Planning Office and shall contain, but not be limited to, provisions for assessment, maintenance, repair and upkeep of common open space areas, public parkland/open space corridors, stormwater facilities, public trails, snow removal, and other areas common to the association pursuant to Chapter 18.72 of the Bozeman Unified Development Ordinance. Complied with. o. Prior to final plan approval, a common area and facility maintenance plan and guarantee shall be provided for the permanent care and maintenance of open spaces, recreational areas, stormwater facilities and parking lots in accordance with Chapter 18.72 or the Bozeman Unified Development Ordinance. The same shall be submitted to the city attorney and shall not be accepted by the city until approved as to legal form and effect. A draft of these documents must be submitted for review and approval by the Planning Department at least 30 days prior to filing and recordation with the Gallatin County Clerk and Recorder. Complied with. 7 p. A table showing the computed park areas shall be included on the final plat pursuant to Section 18.78.030.D. This table shall include but is not limited to detention/retention areas, watercourse, wetlands, watercourse setbacks, park land, parking area and total area. Complied with. q. Section 18.78.070.D requires a Final Park Plan to be approved by the City Commission, with a recommendation from the Bozeman Recreation and Parks Advisory Board, prior to Final Plat approval. Four bound copies of the plan shall be submitted to the Planning Office for review prior to installation of any improvements or prior to Final Plat submission, whichever comes first. The Park Plan shall address all of the criteria outlined in Section 18.78.060.P. Approved by the City Commission on September 18, 2006. r. The Final Plat shall conform to all requirements of the Bozeman Unified Development Ordinance and the Uniform Standards for Final Subdivision Plats and shall be accompanied by all required documents, including certification from the City Engineer that as-built drawings for public improvements were received, a platting certificate, and all required and corrected certificates. The Final Plat application shall include four (4) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent); two (2) digital copies on a double-sided, high density 3-1/2" floppy disk; and five (5) paper prints. Complied with. s. Pursuant to Section 18.06.040.D.6, conditional approval of the Preliminary Plat shall be in force for not more than one calendar year for minor subdivisions, two years for single-phased major subdivisions and three years for multi-phased major subdivisions. Prior to that expiration date, the developer may submit a letter of request for the extension of the period to the Planning Director for the City Commission’s consideration. The City Commission may, at the written request of the developer, extend its approval for no more than one calendar year, except that the City Commission may extend its approval for a period of more than one year if that approval period is included as a specific condition of a written subdivision improvements agreement between the City Commission and the developer, provided for in §18.74.060, BMC. Complied with. t. If it is the developer’s intent to file the plat prior to installation, certification, and acceptance of all required improvements by the City of Bozeman, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the Preliminary Plat submittal information and conditions of approval. If the Final Plat is filed prior to the installation of all improvements, the developer shall supply the City of Bozeman with an acceptable method of security equal to 150% of the cost of the remaining improvements. Complied with. u. The applicant shall submit with the application for Final Plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval has been satisfactorily addressed. Complied with. Attachments: Four (4) signed Mylars of Final Plat Original Platting Certificate 8 Full Final Plat Submittal One paper Copy of Final Plat) cc: Debbie Arkell, Director of Public Service; with copy of plat and memo. Brit Fontenot, Clerk of Commission; with copy of plat and memo. Baxter Meadows West, LLC, 3985 Valley Commons Dr., Bozeman, MT 59718 Geske Properties, LLC, 155 Bison Trail, Bozeman, MT 59718 T.D.&H, Inc., 215 West Mendenhall, Ste C-1, Bozeman, MT 59715 9