HomeMy WebLinkAboutF3 Notice of Award t Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Kerr, Engineering Assistant Chris Kukulski, City Manager SUBJECT: 2006 Curbing and Sidewalk Improvements—Contract Award MEETING DATE: July 24,2006 BACKGROUND: Bids were opened July 14, 2006, for the 2006 Curbing and Sidewalk Improvements Project. The project consists of the installation of a sidewalk along Tamarack Street adjacent to the Gallatin County Fairgrounds. This sidewalk was ordered to be constructed by the City Commission in 2003. The Commission later extended the deadline for the Fairgrounds to construct the sidewalk utilizing their own contractor to October I, 2005. They elected not to construct the sidewalk using their own contractor. The project also consists of the replacement of curbing on Curtiss Street between Willson Ave. and Tracy Ave., and the replacement of a driveway approach at the Senior Center. Three bids were received, with the low bidder being J'fl, Group, Inc. of Belgrade in the amount of$120,670.00. The bid appears to be competitive with the low bid being approximately 4% above the construction estimate ($1 15,825.00). A copy of the Certified Bid Tabulation is attached. RECOMMENDATION: Authorize the City Manager to sign the Notice of Award to award the contract for the 2006 Curbing and Sidewalk Improvements to .1TI, Group, Inc. in the amount of $120,670.00. FISCAL EFFECTS: The cost of the Fairgrounds sidewalk is estimated to be $51,000. Funding for new sidewalks is typically obtained by selling warrants or through an intercap loan. The Fairgrounds would then be assessed for the work over a five year period. Funding for the curbing replacement will be from the gas tax fund, and has been budgeted for by the Street Superintendent. Funding for the approach replacement at the Senior Center has been budgeted for by the Superintendent of Facilities in the Senior Center Building Maintenance Fund. ALTERNATIVES: As suggested by the City Commission. Respectfully submitted, Andrew Kerr, Engineering Assistant Chris A. Kukulski, City Manager Attachments: Bid Tabulation Notice ol'Award(3) Report compiled on July 17, 2006 Cc: Debbie Arkell, Dir. of Public Service John VanDelinder, Street Superintendent Rick Hixson, City Engineer I as u p • v �� N r a o w a Q a 4 `'y W U 10 n w E-i A y TA` A 00 U ° cl �o 0 3 lV 'd n N O� Sri 'O In N W NOTICE OF AWARD Dated: TO: JTL Group, Inc. ADDRESS: P.O. Box 9 Belgrade, MT 59714 PROJECT, City of Bozeman 2006 Curbing and Sidewalk Improvements CONTRACT FOR: Installation of new concrete sidewalks, and replacement of concrete curbing and drive approaches. You are notified that your Bid dated July 14, 2006, for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for installation of new concrete sidewalks,and replacement of concrete curbing and drive approaches The Contract Price of your Contract is one hundred twenty thousand six hundred seventy and no/100 Dollars ($ 120,670.00) Three copies of the proposed Contract Documents accompany this Notice of Award You must comply with the following conditions precedent within fifteen (15)days of the date of this Notice of Award, that is, by 1 You must deliver to the OWNER 3 fully executed counterparts of the Agreement including all the Contract Documents and Drawings 2 You must deliver with the executed Agreement the Contract Security(Bonds)as specified in the Instruction to Bidders(page 8), General Conditions(paragraph 5.01)and Supplementary Conditions (paragraph SC-5 02). 3 List other conditions precedent: You must deliver with the executed Agreement the Certificates of Insurance as specified in the General Conditions (paragraph 5 03). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited. Within ten (10) days after you comply with these conditions, OWNER will return to you one fully signed counterpart of the Agreement with the Contract Documents attached CITY OF BOZEMAN, MONTANA ATTEST BY. BY- (CITY MANAGER) (CITY CLERK) DATE: