Loading...
HomeMy WebLinkAboutG7 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Andrew Kerr, Engineering Assistant Chris Kukulski, City Manager SUBJECT: 2006 Street Improvements – Contract Award MEETING DATE: June 19, 2006 BACKGROUND: Bids were opened June 2, 2006, for the 2006 Street Improvements Project. The project consists of asphalt concrete overlays on S. Church Avenue from Story Street to Kagy Boulevard and on N. Wallace/L Street from Tamarack Street to Oak Street, and chip seal improvements in New Hyalite View Subdivision, Grafs 1st and 2nd Subdivision, and on Ellis Street from Highland Boulevard to Haggerty Lane. Two bids were received, with the low bidder being Big Sky Asphalt, Inc. of Bozeman in the amount of $312,376.00. The bid appears to be competitive with the low bid being approximately 3% below the construction estimate ($322,485.50). A copy of the Certified Bid Tabulation is attached. RECOMMENDATION: Authorize the City Manager to sign the Notice of Award to award the contract for the 2006 Street Improvements to Big Sky Asphalt, Inc. in the amount of $312,376.00. FISCAL EFFECTS: Funding source for the proposed work is the gas tax fund. The Street Superintendent has authorized using gas tax funds for this project. ALTERNATIVES: As suggested by the City Commission. Respectfully submitted, _________________________________ ____________________________ Andrew Kerr, Engineering Assistant Chris A. Kukulski, City Manager Attachments: Bid Tabulation Notice of Award (3) Report compiled on June 12, 2006 Cc: Debbie Arkell, Dir. of Public Service John VanDelinder, Street Superintendent Rick Hixson, City Engineer NOTICE OF AWARD Dated: __________________________ TO: Big Sky Asphalt, Inc. ADDRESS: P.O. Box 835, Bozeman, MT 59771 PROJECT: City of Bozeman 2006 Street Improvements CONTRACT FOR: Seal Coat Improvements and Hot Mix Asphalt Overlays You are notified that your Bid dated June 2, 2006, for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for Seal Coat Improvements and Hot Mix Asphalt Overlays. The Contract Price of your Contract is: three hundred twelve thousand three hundred seventy six and 00/100 Dollars ($ 312,376.00). Three copies of the proposed Contract Documents accompany this Notice of Award. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by . 1. You must deliver to the OWNER 3 fully executed counterparts of the Agreement including all the Contract Documents and Drawings. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instruction to Bidders (page 8), General Conditions (paragraph 5.01) and Supplementary Conditions (paragraph SC-5.02). 3. List other conditions precedent: You must deliver with the executed Agreement the Certificates of Insurance as specified in the General Conditions (paragraph 5.03). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited. Within ten (10) days after you comply with these conditions, OWNER will return to you one fully signed counterpart of the Agreement with the Contract Documents attached. CITY OF BOZEMAN, MONTANA ATTEST: BY: __________________________________ BY: ____________________________ (CITY MANAGER) (CITY CLERK ) DATE: _______________________________