HomeMy WebLinkAboutH4 Commission Memorandum C:4 REPORT TO: Honorable Mayor and City Commission FROM: Andrew Epple, Planning Director Chris Kukulski, City Manager SUBJECT: Baxter Meadows Phase 6 PUD Major Subdivision, #P-06015 MEETING DATE: Monday, May 15, 2006 BACKGROUND: An application to subdivide — 11 acres into —49 single household lots, 3 multi- household lots, roads, alleys, park and open space areas on property legally described as a portion of Tract 2A in COS 2202A, located in the SE '/4 of Section 34, T1S, R5E, PMM, City of Bozeman, Gallatin County, Montana. The property is zoned is R-3 (Residential Medium Density District) and B-2 (Community Business District). UNRESOLVED ISSUES: Compliance with 2020 Plan—The continuing expansion of residential uses within the Community Commercial area with limited commercial uses calls into question the compliance with the Bozeman 2020 Community Plan. The residential component described in the Bozeman 2020 Community Plan is intended to be located on second or subsequent floors above the commercial components. Staff required the following condition on the PUD Plan approval: P. The final PUD plan shall ensure that a majority of the Community Commercial designated area is developed in compliance with the dominant commercial uses described in the Bozeman 2020 Community Plan. Possible alternatives to comply with this condition include establishment of a required commercial land use FAR that is 2 or 3 times greater than the typical FAR of .25 or .3:1 (i.e. 1:1) on equal square footage east of Vacquero Parkway in exchange for the ability to develop Block 14 in ground floor residential uses, or amend the Bozeman 2020 Community Plan with a corresponding zone map amendment. Commercial land uses means those uses indicated as "Principal Uses" within the B-2 zone. RECOMMENDATION: The City Commission approves application #P-06015 with relaxations #1 through#5, and#7 through#11, and with the conditions of approval outlined in the staff report. ALTERNATIVES: As suggested by the City Commission. Respectfully submitted, Andrew Epple, Planning Director Chris Kukulski, City Manager Attachments: Planning Board Staff Report. Planning Board Resolution. Planning Board Minutes. Applicant's Submittal Materials. Report Compiled on May 9,2006 COMMISSION STAFF REPORT BAXTER MEADOWS PHASE 6 PUD PRELIMINARY PLAT FILE NO. P-06015 Item: Subdivision Preliminary Plat Application 9P-06015, to subdivide — 11 acres into 49 single household lots,3 multi-household lots,roads,alleys, park land and open space on property legally described as a portion of Tract 2A in COS 2202A, located in the SE '/4 of Section 34, T1S, R5E, PMM, City of Bozeman, Gallatin County, Montana. Owner: Baxter Meadows Development,LP,P.O.Box 81487,Billings,MT 59108. Applicant: PC Development, 3985 Valley Commons Drive, Bozeman, MT 59718. Date/Time: Before the Planning Board on Tuesday,April 18,2006 at 7:00 p.m.in the Commission Meeting Room at City Hall, 411 East Main Street, Bozeman, Montana, and before the City Commission on Monday,May 15, 2006 at 6:00 p.m., in the Community Room, Gallatin County Courthouse, 311 West Main Street, Bozeman, Montana. Report by: Lanette Windemaker, AICP: Contract Planner. Recommendation: Conditional Approval. PROJECT LOCATION The subject property is described as — 11 acres of land located northeast of the intersection of Ferguson Avenue and Galloway Street,is legally described as a portion of Tract 2A in COS 2202A, located in the SE '/4 of Section 34, TIS, R5E, PMM, City of Bozeman, Gallatin County, Montana. The property is zoned is R-3 (Residential Medium Density District)and B-2(Community Business District). Please refer to the vicinity map on the following page. 7Stubject -p F R-3 -nn-"Ar8 7, _11M LI I PROPOSAL The applicant is requesting a Major Subdivision Preliminary Plat approval to subdivide— 11 acres into—49 single household lots,3 multi-household lots,roads,alleys,park land and open space. The subdivision would have access from Ferguson Avenue, Galloway Street and internal streets. The necessary Preliminary Plat Supplements were submitted or waived by the Development Review Committee (DRC). The applicant has requested the following relaxations: 1.) Section 18.16.030,Lot Coverage;to allow a maximum lot coverage of not more than 52%of the lot area for Bungalow Lots, and not more than 55% of the lot area for Village Lots. This relaxation was approved in the previous two phases to the south and the following condition is recommended.- The Final Site Plan shall include a table listing specific setbacks, maximum lot coverage, minimum lot area,and minimum lot width for each lot. 2.) Section 18.16.030.C,Lot Coverage and Floor Area(RSLs);to allow affordable housing units to exceed the floor area ratio 1:3.3 and to allow a maximum square footage of 1,575 square feet. CAHAB recommends the following condition. • RSLs for single household detached dwellings shall be smaller than 5,000 square feet, and shall not be larger than 3,384 square feet. • Affordable housing units may exceed the floor area ratio 1:3.3 and single-household detached houses shall not exceed a maximum square footage of 1,575 square feet of living space or 900 if they are attached. 3.) Section 18.16.040, Lot Area; to allow Bungalow Lots to have a minimum lot area of 2,432 square feet and Village Lots to have a minimum lot area of 4,800 square feet. This relaxation # P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 2 was approved in the previous two phases to the south and the following condition is recommended: • The Final Site Plan shall include a table listing specific setbacks, maximum lot coverage, minimum lot area, and minimum lot width for each lot. 4.) Section 18.16.040,Lot Width;to allow lots for single-household dwellings to have a minimum lot width of 40 feet. This relaxation was approved in the previous two phases to the south and the following condition is recommended: • The Final Site Plan shall include a table listing specific setbacks, maximum lot coverage, minimum lot area, and minimum lot width for each lot. 5.) Section 18.16.050, Yards; to allow a minimum front yard of 10', and to allow a minimum rear yard of 5' or 2'. This relaxation was approved in the previous two phases to the south and the following condition is recommended: • The Final Site Plan shall include a table listing specific setbacks, maximum lot coverage, minimum lot area, and minimum lot width for each lot. 6.) Section 18.42.040.D.1,Rights-of-Way for Pedestrians;to allow the yards adjacent to pedestrian walks to be treated as side yards. Planning Staff recommends the following conditions: • The pedestrian rights-of-way in Block 15 shall be widened to 30 feet. • Lots adjacent to the 30-foot pedestrian rights-of-way in Block 15 shall have 5 foot side yard setbacks adjacent to the walkways. • The Final Site Plan shall include a table listing specific setbacks, maximum lot coverage, minimum lot area, and minimum lot width for each lot. 7.) Section 18.42.060.B.2.b,Rear Yard Utility Easements;to allow the rear yard utility easements to be 5' or 0' when adjacent to a public alley. This relaxation was approved in the previous two phases to the south and the following condition is recommended: • The Final Plat shall include a table listing specific easements on each lot. 8.) Section 18.42.120,Mail Delivery; to allow the provision of an off-street area for mail delivery outside of the subdivision but within the Baxter Meadows PUD. This relaxation was approved in the previous two phases to the south, and there is currently a mailbox center located within the Trakker Building. 9.) Section 18.42.180.C, Number of Restricted Size Lots Required; to allow the provision of a minimum of 7.5 percent of the buildable net acreage dedicated to Restricted Size Lots (RSLs) and to allow a RSL to be smaller than 5,000 square feet for single household detached dwellings. CAHAB recommends the following condition: • RSLs for single household detached dwellings shall be smaller than 5,000 square feet, and shall not be larger than 3,384 square feet. • Affordable housing units may exceed the floor area ratio 1:3.3 and single-household detached houses shall not exceed a maximum square footage of 1,575 square feet of living space or 900 if they are attached. 10.) Section 18.42.180.D,Restrictions on Building Size;to allow dwellings constructed on RSLa 9 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 3 to not be subject to the size restrictions of Section 18.16.030.B.L CAHAB recommends the following conditions: • RSLs for single household detached dwellings shall be smaller than 5,000 square feet, and shall not be larger than 3,384 square feet. • Affordable housing units may exceed the floor area ratio 1:3.3 and single-household detached houses shall not exceed a maximum square footage of 1,575 square feet of living space or 900 if they are attached. 11.) Section 18.50.060, Frontage; to allow park land to have frontage along 33 percent of the perimeter and to not provide the additional land area in the park to accommodate the off-street parking which would have been provided by the additional length of perimeter streets.Planning Staff recommends the following condition: • Additional park land shall be provided in the amount calculated at 5,768 square feet (lot frontage (—412 feet)x 14 feet(parking on both sides of road) =— 5,768 square feet, if the frontage of the park changes, this number will be recalculated). It is preferable to see the difference made up by expanding the East West PPW between Ferguson and Milkhouse to a 30' wide dedicated trail corridor. • Additional park land, cash in lieu or additional improvements shall be provided to compensate for the cost of construction of the parking. ZONING DESIGNATION&LAND USES The subject property is zoned R-3 (Residential Medium Density District) and B-2 (Community Business District). The intent of the R-3,Residential Medium Density,district is to provide for the development of one-to five-household residential structures near service facilities within the City.It should provide for a variety of housing types to serve the varied needs of households of different size,age and character,while reducing the adverse effect of nonresidential uses. The intent of the B- 2, Community Business District, is to provide for a broad range of mutually supportive retail and service functions located in clustered areas bordered on one or more sides by limited access arterial streets. The following land uses and zoning are adjacent to the subject property: North: R-3 (Residential Medium Density District)and B-2(Community Business District)—Baxter Meadows;unsubdivided. East: B-2 (Community Business District)—Baxter Meadows Phase 213; Vida Urbana. South: R-3(Residential Medium Density District)and B-2(Community Business District)—Baxter Meadows Phases 21); dwelling units. West: R-3 (Residential Medium Density District)—Baxter Meadows Phases 2C; dwelling units. ADOPTED GROWTH POLICY DESIGNATION The property is currently designated as"Residential"and"Community Commercial"in the Bozeman 2020 Community Plan. Residential. This category designates places where the primary activity is urban density living quarters. Other uses which complement residences are also acceptable such as parks,low intensity home based occupations, fire stations, churches, and schools. The residential designation also #P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 4 indicates that it is expected that development will occur within municipal boundaries which may require annexation prior to development. The dwelling unit density expected within this classification varies.It is expected that areas of higher density housing would be likely to be located in proximity to commercial centers to facilitate the broadest range of feasible transportation options for the greatest number of individuals and support businesses within commercial centers. Low density areas should have an average minimum density of six units per net acre. Medium density areas should have an average minimum density of twelve units per net acre. High density areas should have an average minimum density of eighteen units per net acre. A variety of housing types should be blended to achieve the desired density with large areas of single type housing being discouraged. In limited instances the strong presence of constraints and natural features such as floodplains may cause an area to be designated for development at a lower density than normally expected within this classification. All residential housing should be arranged with consideration given to the existing character of adjacent development,any natural constraints such as steep slopes,and in a fashion which advances the overall goals of the Bozeman 2020 Community Plan. The residential designation is intended to provide the principal locations for additional housing within the Planning Area. Community Commercial. Activities within this land use category are the basic employment and services necessary for a vibrant community. Establishments located within these categories draw from the community as a whole for their employee and customer base and are sized accordingly.A broad range of functions including retail, education, professional and personal services, offices, residences, and general service activities typify this designation. The R-3 (Residential Medium Density District) zoning designation is consistent with the "Residential"land use designation of the property.The B-2(Community Business District)zoning designation is consistent with the"Community Commercial"land use designation of the property. However,the continuing expansion of residential uses within the Community Commercial area with limited commercial uses calls into question the compliance with the Bozeman 2020 Community Plan. The residential component described in the Bozeman 2020 Community Plan is intended to be located on second or subsequent floors above the commercial components. The appropriate method of addressing compliance of the land use with the Bozeman 2020 Community Plan is through the final PUD plan. At that time, the final PUD plan will be required to ensure that a majority of the Community Commercial designated area is developed in compliance with the dominant commercial uses described in the Bozeman 2020 Community Plan. PRELIMINARY PLAT SUPPLEMENTS A pre-application was reviewed in January of 2006. The applicant chose not to take the pre- application to Planning Board and City Commission. The Development Review Committee discussed utilities in the park, access to Ferguson Avenue, required relaxations, compliance with park frontage requirements. Provided below is a summary review of the Preliminary Plat Supplements submitted with the Preliminary Plat application. A. Surface Water: The Spring Ditch borders the subdivision on the east side. This watercourse has associated wetlands #P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 5 and floodplain. As a result, any activity within the identified watercourse, wetlands area and/or floodplain (i.e., road construction) will require applicable Section 310 and 404 Permits and/or Floodplain Development Permits. B. Floodplains: The floodplain of the Spring Ditch is located within the linear park/open space area,and is required to be noted on the plat. C. Groundwater: High groundwater depths have been found in the area. Therefore,staff finds it necessary to note on the final plat that there is the potential for seasonal high ground water tables within the area of the subdivision.In addition,buildings proposed for construction with crawl spaces or basements shall be required to submit with each Building Permit an Engineer Certification regarding depth of ground water and soil conditions and proposed mitigation methods. Installation of municipal water and sanitary sewer services will greatly reduce any concerns regarding the potential of groundwater degradation. D. Geology-Soils-Slopes: There are no known geologic hazards associated with this site,with exception to the Seismic Zone 3 for earthquakes, which is common for the Bozeman area. No significant physical features or topographical conditions have been identified,and no slopes in excess of fifteen percent(15%)grade are evident. Applicant shall provide a soils report, along with building plans, to the Building Division, recommending types of foundations. E. Vegetation: In the area that has historically been in agricultural use there are no significant levels of mature vegetation(trees and large bushes). The bulk of the vegetation on site consists of native grasses and weeds.No critical plant communities are found within or adjacent to the proposed development. A memorandum of understanding for control of county declared noxious weeds has been executed. F. Wildlife: Due to the agricultural history of the property,any potential impacts to wildlife and wildlife habitat are limited to white-tailed deer,small mammals and birds. No known endangered species or critical game ranges have been identified in the area.There are active wetlands on this property,which may provide limited habitat for wildlife. The wetlands included in this phase of the development are riverine-type wetlands which will be protected by the 50-foot watercourse setback. G. Historical Features: Due to the agricultural use of the property for many years, there is low likelihood of impact on cultural properties. A cultural resource survey of the property was completed by Larry Lahren on June 3, 2002. H. Agriculture: Historically, the subject property has been used for agricultural purposes with the majority of the #P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 6 parcel in cultivated crops or pastureland. L Agaricultural Water User Facilities: No agricultural water use will be affected by this subdivision. J. Water and Sewer: An extension of municipal water mains in the area will provide water for domestic and fire protection services. An extension of municipal sewage lines will provide for sewage collection and disposal. Final approval of the water distribution system and sewage collection and disposal system for this subdivision proposal will be obtained through the normal approval procedures of preliminary and final plat review by the City Engineer's Office, Superintendent of Water/Sewer, and Montana Department of Environmental Quality. K. Stormwater Management: The applicant's submittal information includes general storm drainage and grading concept. However,the stormwater management plan will be subject to further engineering review as part of the infrastructure plan and specification review process. L. Streets,Roads, and Alleys: Access to the subdivision will be from Ferguson Avenue,Galloway Street,and the proposed internal streets. Ferguson Avenue is designated a Collector. Access: Since Ferguson Avenue is a Collector is may be prudent limit driveway access. All lots in this subdivision have alley access. Therefore no driveway access will be allowed Ferguson Avenue. Ca aci : Due to potential capacity issues based on the applicant's traffic study, the Engineering Department has required all improvements identified as necessary in the Phase III traffic impact analysis shall also be required for this phase. Traffic Generation: The Traffic Impact Study is included in the applicant's submittal. Based on the study this subdivision will generate as many as 883 average weekday trips. Bicycle and Pedestrian Pathways,Lanes and Routes: According to the Bike Route Network of the Greater Bozeman Area Transportation Plan(Figures 6-3 and 6-4),a bike lane is proposed along Ferguson Avenue. Trails: According to the Bozeman Area Trail Network of the Greater Bozeman Area Transportation Plan (Figure 6-5), there is a future trail corridor extending from the southeast side to the northwest side of the Baxter Meadows project. One link in that trail corridor is located adjacent to the east side of this subdivision. As the Baxter Meadows development borders both the regional park and school district property, and the Public Pedestrian Walkway(PPW)provides the only East-West off road pedestrian connection between the Greenway Open Space and Ferguson Ave., its design should receive special attention. The following conditions are recommended: #P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 7 • The offsets that occur in the PPW at Gallatin Green Blvd. and at the 20' alley should be eliminated to provide improved continuity. • The mid-block crossing at Ferguson Avenue shall have a painted pedestrian crossing with crossing and advanced crossing signs at either end. • Curb cuts shall be provided at all street/trail connections. • A 30'trail easement for the East-West PPW would create a much safer,more attractive,and user-friendly pedestrian passage. • The pedestrian rights-of-way in Block 15 shall be widened to 30 feet. M. Utilities: No concerns were mentioned from any of the private agencies regarding the provision of service to the proposed subdivision. All utilities servicing the subdivision will be provided by underground services. The applicant has requested a relaxation from Section 18.42.060.B.2.b,Rear Yard Utility Easements; to allow the rear yard utility easements to be 5' or 0' when adjacent to a public alley. This relaxation was approved in the previous two phases to the south and the following condition is recommended: • The Final Plat shall include a table listing specific easements on each lot. N. Educational Facilities: Bozeman School District#7 has indicated that the current bus system can accommodate the students. O. Land Use: Baxter Meadows Phase 6 includes 49 lots for single-household residential use and 3 lots designated for multi-family use. For affordable housing, the applicant has designated 9 RSLs. Per Section 18.42.180 of the Bozeman Unified Development Ordinance and the adopted growth policy, lands subdivided shall have not less than a minimum net density of six dwelling units per acre. This R-3 portion of this subdivision has a net density of— 10.7 dwelling units per acre. Relaxations: The applicant has requested the following land use related relaxations: • Section 18.16.030,Lot Coverage;to allow a maximum lot coverage of not more than 52%of the lot area for Bungalow Lots, and not more than 55%of the lot area for Village Lots. • Section 18.16.040, Lot Area; to allow Bungalow Lots to have a minimum lot area of 2,432 square feet and Village Lots to have a minimum lot area of 4,800 square feet. • Section 18.16.040,Lot Width;to allow lots for single-household dwellings to have a minimum lot width of 40 feet. • Section 18.16.050, Yards;to allow a minimum front yard of 10', and to allow a minimum rear yard of 5' or 2'. These relaxations were approved in the previous two phases to the south and the following condition is recommended: The Final Site Plan shall include a table listing specific setbacks, maximum lot coverage, minimum lot area, and minimum lot width for each lot. • Section 18.42.040.D.1,Rights-of-Way for Pedestrians;to allow the yards adjacent to pedestrian walks to be treated as side yards. Planning Staff recommends the following conditions: • The pedestrian rights-of-way in Block 15 shall be widened to 30 feet. • Lots adjacent to the 30-foot pedestrian rights-of-way in Block 15 shall have 5 foot side yard setbacks adjacent to the walkways. 4 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 8 • The Final Site Plan shall include a table listing specific setbacks, maximum lot coverage, minimum lot area, and minimum lot width for each lot. • Section 18.42.120, Mail Delivery;to allow the provision of an off-street area for mail delivery outside of the subdivision but within the Baxter Meadows PUD. This relaxation was approved in the previous two phases to the south, and there is currently a mailbox center located within the Trakker Building. Affordable Housing Relaxations: The following relaxations have been requested: • Section 18.16.030.C,Lot Coverage and Floor Area(RSLs);to allow affordable housing units to exceed the floor area ratio 1:3.3 and to allow a maximum square footage of 1,575 square feet. • Section 18.42.180.C, Number of Restricted Size Lots Required; to allow the provision of a minimum of 7.5 percent of the buildable net acreage dedicated to Restricted Size Lots(RSLs) and to allow a RSL to be smaller than 5,000 square feet for single household detached dwellings. • Section 18.42.180.D,Restrictions on Building Size;to allow dwellings constructed on RSLa to not be subject to the size restrictions of Section 18.16.030.B.1. CAHAB recommends the following conditions: • RSLs for single household detached dwellings shall be smaller than 5,000 square feet, and shall not be larger than 3,384 square feet. • Affordable housing units may exceed the floor area ratio 1:3.3 and single-household detached houses shall not exceed a maximum square footage of 1,575 square feet of living space or 900 if they are attached. P. Parks and Recreation Facilities: Dedication: For 49 single-household lots, 1.47 acres of park land is required to be dedicated to the City of Bozeman. For the B-2 lots, if the subdivider indicates that the net residential density of development is unknown,then the equivalent to an area dedication for six dwellings per net acre shall be provided as cash-in-lieu,and the number of dwelling units per lot for which cash-in-lieu has been paid shall be designated on the plat.The Home Owners Association must maintain the park area until such time a City-wide Parks Maintenance District is established. Frontage: The applicant is requesting a relaxation of Section 18.50.060,Frontage;to allow park land to have frontage along 33 percent of the perimeter and to not provide the additional land area in the park to accommodate the off-street parking which would have been provided by the additional length of perimeter streets. There are several UDO code provisions that the applicant must comply with when there are streets along less than 100 percent of the perimeter of the park: • Per Section 18.50.060, the trail system around the perimeter of the park land shall be constructed by the subdivider to provide direct pedestrian access to the perimeters without street frontage. • Per Section 18.50.060, additional park land shall be provided in the amount calculated at 5,768 square feet (lot frontage (— 412 feet) x 14 feet (parking on both sides of road) _ 5,768 square feet,if the frontage of the park changes,this number will be recalculated). It is preferable to see the difference made up by expanding the East West PPW between Ferguson and Milkhouse to a 30' wide dedicated trail corridor. • Per Section 18.50.060,the subdivider shall either develop the parking area or in lieu of the constructed parking area,an equivalent dollar value of non-parking improvements within the 4 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 9 park are provided according to the individual park plan. The Recreation&Parks Advisory Board Subdivision Review Committee is has suggested that this could also be additional park land. Waivers: The applicant is requesting a waiver of park dedication requirements pursuant to Section 18.50.100.A of the Bozeman Unified Development Ordinance to allow natural resources/critical wildlife habitat (stream and wetlands) to meet the requirements for this subdivision. Staff believes that it is appropriate for the natural resource area(stream and wetlands)to be used to reduce the total parkland requirement. PUD Open Space: Since all of the open space in this proposed subdivision is publicly accessible with recreation pathways, only 16% of the non-dedicated portion of the project must be PUD open space. — 8 acres of the project is non-dedicated land, requiring — 1.3 acres of publicly accessible open space. The open space shall be landscaped by the applicant in a manner that shall meet or exceed the standards of Chapter 18.48. Park and Open Space Plan:The Preliminary Park Plan depicts a relatively passive park with benches and sidewalks. The Unified Development Ordinance does not require the subdivider to install any of the additional park amenities noted in the Preliminary Park Plan. However, due to the PUD design and relaxation,the applicant shall be required to fully development the park. The Master Park Plan must identify all improvements to be borne by the subdivider prior to installation of improvements or final plat, whichever comes first. The Recreation and Park Advisory Board Subdivision Review Commission and the Park and Recreation Superintendent has reviewed the park plan and suggested that the following recommendations, conditions, changes or additions be made to the Park Plan prior to submittal for review and approval by the City Commission,with a recommendation from the Recreation and Parks Advisory Board: • Sewer service is to be removed from the Park and the concrete"road"for servicing the sewer is to be removed from the plan. • The Park should be fully developed, including a playground, due the demographics of the area and the lack of play structures available. • Any barriers,such as fences,hedges,etc.,on private property adjacent to the park boundary shall have a minimum setback of 6 feet from the edge of the park sidewalk to provide a maintainable area. • Curb cuts shall be provided at all street/trail connections. • All sidewalks adjacent to park land shall be constructed to a 6 foot width. • Compensation needs to be determined for lack of adequate street frontage on park. The Public Park enjoys only 33% street frontage and compensation for the loss of parking and accessibility is required. The amount has been calculated at 5,768 square feet(lot frontage(- 412 feet)x 14 feet(parking on both sides of road)_—5,768 square feet,if the frontage of the park changes,this number will be recalculated)plus the cost of construction. It is preferable to see the difference made up by expanding the East West PPW between Ferguson and Milkhouse to a 30' wide dedicated trail corridor. • Additional park land, cash in lieu or additional improvements shall be provided to compensate for the cost of construction of the parking. • A master plan,including a maintenance plan, shall be completed and submitted to the City Parks Division for review and approval. # P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 10 • The developer shall be responsible for the development the park and trails, to include at a minimum for park development, grading, 10 inches of amended soil,irrigation system with water source, seeding and landscaping. • Preconstruction meetings shall be held prior to all work to be done on park or trails. • All materials and construction shall meet standards set by the City Parks Division. • Cash in lieu shall be based on requirements in Section 18.50.030. • Trails — As the Baxter Meadows development borders both the regional park and school district property,and the Public Pedestrian Walkway(PPW)provides the only East-West off road pedestrian connection between the Greenway Open Space and Ferguson Ave.,its design should receive special attention. o The offsets that occur in the PPW at Gallatin Green Blvd.and at the 20' alley should be eliminated to provide improved continuity. o The mid-block crossing at Ferguson Avenue shall have a painted pedestrian crossing with crossing and advanced crossing signs at either end. o A 30' trail easement for the East-West PPW would create a much safer, more attractive, and user-friendly pedestrian passage. • The subdivider should address maintenance of the public pedestrian walkways in Block 16 which show 6' sidewalks in a 10 or 12' easement with 2 or 3' lawn buffers on either side. At this width, the buffers cannot be easily maintained. Either a larger buffer(6')minimum is recommended,or covenants requiring a 6' setback from the sidewalk for any barriers,such as fences, hedges. O. Neighborhood Center Plan: The neighborhood center for the Baxter Meadows PUD project will be located in the community commercial area, and consists of a plaza. R. Lighting Plan. A Special Improvement Lighting District will be formed for the subdivision street lighting,subject to the following conditions: Subdivision lighting SILD information shall be submitted to the Clerk of Commission directly after Preliminary Plat approval in hard copy and digital form. The final plat will not be deemed complete until the resolution to create the SILD has been approved by the City Commission. S. Miscellaneous: This subdivision will have direct impact on the future Bozeman School District#7 middle school site. Signage and bulb-outs will be used to help ensure pedestrian safety at the Ferguson Avenue and Galloway Street intersection. On or near the subdivision, there is no known health, safety hazards or other nuisances, such as unpleasant odors, unusual noise, dust or smoke, with exception to the typical risks identified with seismic activity. 4 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report ll STAFF FINDINGS/REVIEW CRITERIA The basis for the City Commission's decision to approve,conditionally approve,or disapprove the subdivision shall be whether the preliminary plat,public hearing if required,Planning Board advice and recommendation,and additional information demonstrates that development of the subdivision complies with this title, the City's growth policy, the Montana Subdivision and Platting Act, and other adopted state and local ordinances, including, but not limited to, applicable zoning requirements. The Montana Subdivision and Platting Act, Section 76-3-608, establishes the following primary review criteria for the governing body to consider when evaluating subdivisions. Planning Staff, the DRC, the WRB, the R&PAB Subdivision Review Committee and other reviewing agencies have made comments in relation to those and other criteria as described below, and have recommended conditions as outlined at the end of this Staff Report. A. Effects on agriculture, agricultural water user facilities, local services, the natural environment,wildlife and the wildlife habitat, and public health and safety. 1. Effects on Agriculture. Historically,the subject property has been used for agricultural purposes with the majority of the parcel in cultivated crops or pastureland. 2. Effects on Agricultural Water User Facilities. No agricultural water use will be affected by this subdivision. 3. Effects on Local Services. Water/Sewer: Water/Sewer services can be provided by extension and connection to the municipal water and sewer systems. Streets: Access to the subdivision will be from Ferguson Avenue, Galloway Street and the proposed internal streets. 4. Effects on the Natural Environment. The applicant's submittal information includes general storm drainage and grading concept. The stormwater management plan will be subject to further engineering review as part of the infrastructure plan and specification review process. Applicant has entered into an agreement for a Noxious Weed Management and Revegetation Plan with the Gallatin County Weed Board. 5. Effects on Wildlife and Wildlife Habitat. Due to the agricultural history of the property,any potential impacts to wildlife and wildlife habitat are limited to white-tailed deer, small mammals and birds. No known endangered species or critical game ranges have been identified in the area.There are active wetlands on this property,which may provide limited habitat for wildlife. The wetlands included in this phase of the development are riverine-type wetlands which will be protected by the 50-foot watercourse setback. 6. Effects on Public Health and Safety. 4 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 12 Because municipal sewer will service development in the subdivision, the threat of groundwater degradation from onsite sewage disposal will be eliminated. There are no known, unmitigated natural or man-made hazards on this property. B. Compliance with the following: 1. The survey requirements provided for in Part 4 of the Montana Subdivision and Platting Act. The subdivision complies or will comply with survey requirements of the Act. 2. The local subdivision regulations provided for in Part 5 of the Montana Subdivision and Platting Act. The final plat shall comply with the standards identified and referenced in the Unified Development Ordinance. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. The following requirements are standards of the Unified Development Ordinance and shall be addressed on the final plat: a. A qualified landscape professional shall either document that the current watercourse setback planting plan meets the requirements of Section 18.42.100 or a watercourse setback planting plan shall be prepared by a qualified landscape professional and shall be reviewed and approved by the Planning Department prior to the commencement of development or site preparation. The plan shall include a schedule for planting and landscaping as outlined for Zone 1 and Zone 2 outlined in Section 18.42.100. Since the watercourse setback in located adjacent to the park boundaries,this shall be included in the Park Plan. b. Section 18.42.180, the RSL designation shall be recorded on the individual lots in a manner that will appear on a title search and include reference to the sunset provisions of Section 18.42.180. c. Documentation of satisfaction of park dedication requirements in accordance with Section 18.50.020 shall be provided. For the B-2 lots,if the subdivider indicates that the net residential density of development is unknown, then the equivalent to an area dedication for six dwellings per net acre shall be provided as cash-in-lieu, and the number of dwelling units per lot for which cash-in-lieu has been paid shall be designated on the plat. d. Per Section 18.50.090, executed waivers of right to protest creation of special improvement districts(SIDs)for a park maintenance district shall be filed and of record with the Gallatin County Clerk and Recorder prior to final plat approval. A copy of the filed documents shall be submitted with the final plan. e. Covenants,restrictions, and articles of incorporation for the creation of a homeowners' association shall be submitted with the final plat application for review and approval by 4 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 13 the Planning Office and shall contain, but not be limited to,provisions for assessment, maintenance, repair and upkeep of common open space areas, public parkland/open space corridors, stormwater facilities, public trails, snow removal, and other areas common to the association pursuant to Chapter 18.72 of the Bozeman Unified Development Ordinance. f. Prior to final plan approval,a common area and facility maintenance plan and guarantee shall be provided for the permanent care and maintenance of open spaces, recreational areas, stormwater facilities and parking lots in accordance with Chapter 18.72 or the Bozeman Unified Development Ordinance. The same shall be submitted to the city attorney and shall not be accepted by the city until approved as to legal form and effect. A draft of these documents must be submitted for review and approval by the Planning Department at least 30 days prior to filing and recordation with the Gallatin County Clerk and Recorder. g. A table showing the computed park areas shall be included on the final plat pursuant to Section 18.78.030.D. This table shall include but is not limited to detention/retention areas, watercourse, wetlands, watercourse setbacks, park land, parking area and total area. h. Section 18.78.070.D requires a Final Park Plan to be approved by the City Commission, with a recommendation from the Bozeman Recreation and Parks Advisory Board,prior to Final Plat approval. Four bound copies of the plan shall be submitted to the Planning Office for review prior to installation of any improvements or prior to Final Plat submission, whichever comes first. The Park Plan shall address all of the criteria outlined in Section 18.78.060.P. • The Wetlands Asset evaluation indicates that over time, the wetlands areas will require shrub and tree replacement,and bi-to tri-yearly weed control measure. This needs to be addressed in the Final Park Plan. i. The Final Plat shall conform to all requirements of the Bozeman Unified Development Ordinance and the Uniform Standards for Final Subdivision Plats and shall be accompanied by all required documents, including certification from the City Engineer that as-built drawings for public improvements were received,a platting certificate,and all required and corrected certificates. The Final Plat application shall include four(4) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent);two(2)digital copies on a double-sided,high density 3-1/2"floppy disk;and five (5)paper prints. j. Pursuant to Section 18.06.040.D.6,conditional approval of the Preliminary Plat shall be in force for not more than one calendar year for minor subdivisions,two years for single- phased major subdivisions and three years for multi-phased major subdivisions. Prior to that expiration date,the developer may submit a letter of request for the extension of the period to the Planning Director for the City Commission's consideration. The City Commission may,at the written request of the developer,extend its approval for no more than one calendar year, except that the City Commission may extend its approval for a 4 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 14 period of more than one year if that approval period is included as a specific condition of a written subdivision improvements agreement between the City Commission and the developer,provided for in §18.74.060, BMC. k. If it is the developer's intent to file the plat prior to installation, certification, and acceptance of all required improvements by the City of Bozeman, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the Preliminary Plat submittal information and conditions of approval. If the Final Plat is filed prior to the installation of all improvements, the developer shall supply the City of Bozeman with an acceptable method of security equal to 150%of the cost of the remaining improvements. 1. The applicant shall submit with the application for Final Plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval has been satisfactorily addressed. 3. The local subdivision review procedure provided for in Part 6 of the Montana Subdivision and Platting Act. The hearings before the Planning Board and the City Commission have been properly noticed, as required in the Bozeman Unified Development Ordinance. The notice was mailed to all adjoining property owners by certified mail on April 3, 2006. The proposed project was noticed in the Bozeman Daily Chronicle on April 2, 2006 and April 9, 2006. C. The provision of easements for the location and installation of any planned utilities. All utilities and necessary utility easements will be provided and depicted on the final plat. D. The provision of legal and physical access to each parcel within the subdivision and the required notation of that access on the applicable plat and any instrument of transfer concerning the parcel. All lots within the subdivision will have direct access to the dedicated public streets,or direct access to a dedicated public alley right-of-way and a public pedestrian walkway corridor. PUBLIC COMMENT No public comments have been received to date.Any public comments received after the date of this report will be distributed at the public hearing. RECOMMENDED CONDITIONS OF APPROVAL 1. The CAHAB advises the City Commission to allow the developer to provide only 7.5%of the net buildable area in RSL's subject to the following conditions. If these conditions are not acceptable the CAHAB recommends that the City Commission deny the developer's requests. • RSLs for single household detached dwellings shall be smaller than 5,000 square feet, and shall not be larger than 3,384 square feet. • Affordable housing units may exceed the floor area ratio 1:3.3 and single-household 4 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 15 detached houses shall not exceed a maximum square footage of 1,575 square feet of living space or 900 if they are attached. 2. The pedestrian rights-of-way in Block 15 shall be widened to 30 feet. 3. Lots adjacent to the 30-foot pedestrian rights-of-way in Block 15 shall have 5 foot side yard setbacks adjacent to the walkways. 4. The Final Site Plan shall include a table listing specific setbacks, maximum lot coverage, minimum lot area, and minimum lot width for each lot. 5. Additional park land shall be provided in the amount calculated at 5,768 square feet(lot frontage (—412 feet)x 14 feet(parking on both sides of road)_—5,768 square feet,if the frontage of the park changes,this number will be recalculated).It is preferable to see the difference made up by expanding the East West PPW between Ferguson and Milkhouse to a 30' wide dedicated trail corridor. 6. Additional park land,cash in lieu or additional on-site park improvements shall be provided to compensate for the cost of construction of the parking. 7. A street and traffic control signage plan for the subdivision shall be prepared and implemented upon review and approval by the City Engineer, this shall include no parking signage in the alleys and notification of mid-block pedestrian crossing. 8. Sewer and water services shall be shown on the landscaping plan and park plan,and approved by the Water/Sewer Superintendent. 9. Trees shall not be located within 10 feet of sewer and water services. The park plans need to remove the trees being planted within 10 feet of water and sewer services. 10. Covenants shall address the requirements that a planting permit for street trees must be submitted to the COB and utility locates obtained before any excavation begins in the COB right of way. 11. A concurrent construction plan that addresses all aspects of Section 18.74.030.D may be submitted for review,evaluation and consideration by DRC. No occupancy shall be permitted until required infrastructure improvements have been completed,and inspected and accepted by the City, and all other conditions have been met. 12. The street vision triangle diagram shall be corrected to show all street vision triangles. 13. Water rights,or cash-in-lieu thereof,as calculated by the Director of Public Service,is due with the final plat. 14. The following items shall be addressed in the Final Park Plan: a. Sewer service is to be removed from the Park and the concrete"road"for servicing the sewer is to be removed from the plan. 4 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 16 b. The Park shall be fully developed. c. Any barriers, such as fences, hedges, etc., on private property adjacent to the park boundary shall have a minimum setback of 6 feet from the edge of the park sidewalk to provide a maintainable area. d. All sidewalks adjacent to park land shall be constructed to a 6 foot width. e. Compensation needs to be determined for lack of adequate street frontage on park. The Public Park enjoys only 33%street frontage and compensation for the loss of parking and accessibility is required. The amount has been calculated at 5,768 square feet (lot frontage(—412 feet)x 14 feet(parking on both sides of road)_—5,768 square feet,if the frontage of the park changes, this number will be recalculated) plus the cost of construction. It is preferable to see the difference made up by expanding the East West PPW between Ferguson and Milkhouse to a 30' wide dedicated trail corridor. f. Additional park land, cash in lieu or additional improvements shall be provided to compensate for the cost of construction of the parking. g. A master plan, including a maintenance plan, shall be completed and submitted to the City Parks Division for review and approval. h. The developer shall be responsible for the development the park and trails,to include at a minimum for park development, grading, 10 inches of amended soil, irrigation system with water source, seeding and landscaping. i. Preconstruction meetings shall be held prior to all work to be done on park or trails. j. All materials and construction shall meet standards set by the City Parks Division. k. Cash in lieu shall be based on requirements in Section 18.50.030. 1. Trails—As the Baxter Meadows development borders both the regional park and school district property,and the Public Pedestrian Walkway(PPW)provides the only East-West off road pedestrian connection between the Greenway Open Space and Ferguson Ave.,its design should receive special attention. • The offsets that occur in the PPW at Gallatin Green Blvd.and at the 20' alley should be eliminated to provide improved continuity. • The mid-block crossing at Ferguson Avenue shall have a painted pedestrian crossing with crossing and advanced crossing signs at either end. • Curb cuts shall be provided at all street/trail connections. • A 30' trail easement for the East-West PPW would create a much safer, more attractive, and user-friendly pedestrian passage. m. The subdivider should address maintenance of the public pedestrian walkways in Block 16 which show 6' sidewalks in a 10 or 12' easement with 2 or 3' lawn buffers on either side. At this width,the buffers cannot be easily maintained. Either a larger buffer(6') minimum is recommended,or covenants requiring a 6' setback from the sidewalk for any barriers, such as fences,hedges. 15. The park shall be titled "Public Park". The open space shall be titled "Open Space, Public Access". Notes shall be included on the plat describing ownership and maintenance responsibility for both the park and open space, e.g.: public park, dedicated to the city and maintained by the homeowners association; and open space, public access, owned by the landowners, maintained by the homeowners association, etc. 9 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 17 16. Subdivision lighting SILD information shall be submitted to the Clerk of Commission directly after Preliminary Plat approval in hard copy and digital form. The final plat will not be deemed complete until the resolution to create the SILD has been approved by the City Commission. 17. The owner shall executed and submit the following documents prior to final plan approval: a. A certification of completion and compliance stating that they understand any conditions of approval and the submitted final site plans or master site plan have complied with any conditions of approval or corrections to comply with code provisions per Section 18.34.130.B. b. A statement of intent to construct according to the final site plan. Such statement shall acknowledge that construction not in compliance with the approved final site plan may result in delays of occupancy or costs to correct noncompliance per Section 18.34.130.C. c. A certification that it is their intent to comply with the requirements of the Bozeman Municipal Code and any conditions considered necessary by the approval body. 18. Buildings proposed for construction with crawl spaces or basements shall include Engineer Certification regarding depth of ground water and soil conditions and proposed mitigation methods to be submitted with each Building Permit. The Final Plat shall include a notation that due to high ground water conditions full or partial basements are not recommended. 19. Applicant shall provide a soils report, along with building plans, to the Building Division, recommending types of foundations. If development shall occur in phases,the soils report may address those lots within the proposed phase. 20. The owner shall executed and submit the following documents prior to final plan approval: a. A certification of completion and compliance stating that they understand any conditions of approval and the submitted final site plans or master site plan have complied with any conditions of approval or corrections to comply with code provisions per Section 18.34.130.B. b. A statement of intent to construct according to the final site plan. Such statement shall acknowledge that construction not in compliance with the approved final site plan may result in delays of occupancy or costs to correct noncompliance per Section 18.34.130.C. c. A certification that it is their intent to comply with the requirements of the Bozeman Municipal Code and any conditions considered necessary by the approval body. 21. The final plat shall comply with the standards identified and referenced in the Unified Development Ordinance.The applicant is advised that unmet code provisions,or code provisions that are not specifically listed as conditions of approval,does not,in any way,create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 22. Stormwater Master Plan: A Stormwater Master Plan for the subdivision for a system designed to remove solids,silt,oils, grease and other pollutants from the runoff from the private and public streets and all lots must be provided to and approved by the City Engineer. 4 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 18 The master plan must depict the maximum sized retention basin location,show location of and provide easements for adequate drainage ways within the subdivision to transport runoff to the stormwater receiving channel. The plan shall include sufficient site grading and elevation information (particularly for the basin site, drainage ways and finished lot grades), typical stormwater detention/retention basin and discharge structure details,basin sizing calculations and a stormwater maintenance plan. Any stormwater ponds located within a park or open space shall be designed and constructed to be conducive to the normal use and maintenance of the open space. Stormwater ponds for runoff generated by the subdivision (e.g., general lot runoff, public or private streets, common open space, parks, etc.) shall not be located on easements within privately owned lots. While the runoff from the individual lots will be dependent on the intensity of use on each lot, the maximum sizing of the storm retention facilities for each lot will be established based on maximum site development. Final facility sizing may be reviewed and reduced during design review of the FSP for each lot. 23. Plans and specifications and a detailed design report for water and sewer main extensions,storm sewer and the public street, prepared by a Professional Engineer, shall be provided to and approved by the City Engineer and the Montana Department of Environmental Quality. The Applicant shall also provide Professional Engineering services for construction inspection,post- construction certification,and preparation of mylar record drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a pre-construction conference has been conducted. No building permits shall be issued prior to substantial completion and City acceptance of the required infrastructure improvements unless all of the requirements of section 18.74.030.1)are met to allow for concurrent construction. 24. All infrastructure improvements including 1) water and sewer main extensions, and 2) public streets, curb/gutter, sidewalks fronting parks, open space, rear yard frontages or other non-lot frontages,and related storm drainage infrastructure improvements shall be financially guaranteed or constructed prior to Final Plat approval. City standard residential sidewalks shall be constructed on all public street frontages of a property prior to occupancy of any structure on the property. Upon the third anniversary of the plat recordation of any phase of the subdivision, any lot owner who has not constructed said sidewalk shall, without further notice, construct within 30 days said sidewalk for their lot(s), regardless of whether other improvements have been made upon the lot. This condition shall be included on the final plat for the subdivision. 25. The location of existing water and sewer mains shall be properly depicted. Proposed main extensions shall be noted as proposed. 26. Flood plain: a) The 100-year floodplain shall be delineated for the watercourse on the eastern boundary of #P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 19 the subdivision. If flooding limits encroach onto proposed lots,it shall be noted on the final plat along with a minimum floor elevation for the structures to be constructed on the lots. b) The 100 year flood plain boundary and flood elevations must be depicted on the Final Plat. 27. The Montana Fish,Wildlife and Parks,SCS,Montana Department of Environmental Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any required permits(i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to FSP approval. 28. Easements for the water and sewer main extensions shall be a minimum of 30 feet in width,with the utility located in the center of the easement. In no case shall the utility be less than 10 feet from the edge of easement. 29. Project phasing shall be clearly defined including installation of infrastructure. 30. The developer shall make arrangements with the City Engineer's office to provide addresses for all individual lots in the subdivision prior to filing of the final plat. 31. The applicant shall submit a construction route map dictating how materials and heavy equipment will travel to and from the site in accordance with section 18.74.020.A.1 of the Unified Development Ordinance. This shall be submitted as part of the final site plan for site developments,or with the infrastructure plans for subdivisions. It shall be the responsibility of the applicant to ensure that the construction traffic follows the approved routes. 32. All construction activities shall comply with section 18.74.020.A.2.ofthe Unified Development Ordinance. This shall include routine cleaning/sweeping of material that is dragged to adjacent streets. The City may require a guarantee as allowed for under this section at any time during the construction to ensure any damages or cleaning that are required are complete. The developer shall be responsible to reimburse the City for all costs associated with the work if it becomes necessary for the City to correct any problems that are identified. 33. This property is in the Baxter Lane Signal payback district. The payback shall be made prior to filing of the final plat. 34. All improvements identified as necessary in the phase III traffic impact analysis shall also be required for this phase. All improvements must be installed or financially guaranteed prior to filing of the plat for this phase. No building permits will be issued until all improvements required for the phase are installed and accepted unless approved for concurrent construction. If concurrent construction is utilized, no occupancy will be allowed until the improvements are installed and accepted. 35. The sewer main to serve block 16 should be installed in the alley rather than the pocket park. All other utilities shall be prohibited from being installed within the alley right of way if the sewer is located there. 36. Easements shall be provided across lots 20,21,26,&28,of block 16 for the future maintenance of the water services to lots 21 & 27, block 16. The easements in conjunction with the public 4 P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 20 pedestrian walkway corridor shall provide for a total width of 20'. 37. A 1' No Access Strip shall be shown on the plat along the entire frontage of Ferguson Avenue. 38. The COB design standards require a minimum of 6" crushed base course. The sections in the geotechnical report only call for 5". Revise accordingly. CONCLUSION/RECOMMENDATION Pursuant to Section 18.06.040.1) of the Unified Development Ordinance,the Planning Board shall review the preliminary plat and supplementary information to determine if the proposed plat is in compliance or noncompliance with the adopted Growth Policy. The Planning Board shall act to recommend approval,conditional approval or denial of the preliminary plat application. The Board shall then provide advice and comments to the Bozeman City Commission for its consideration at its Monday, May 15, 2006, hearing which begins at 6:00 p.m. The Planning Board Resolution #P- 06015 and minutes from the Planning Board's April 18,2006,meeting will be forwarded to the City Commission and made a part of the Commission's record. BECAUSE THIS APPLICATION IS FOR A MAJOR SUBDIVISION, THE BOZEMAN PLANNING BOARD WILL MAKE A RECOMMENDATION TO THE BOZEMAN CITY COMMISSION. THE CITY COMMISSION SHALL MAKE THE FINAL DECISION ON THIS APPLICATION. THE DECISION OF THE CITY COMMISSION MAY BE APPEALED BY AN AGGRIEVED PERSON AS SET FORTH IN SECTION 18.66 OF THE UNIFIED DEVELOPMENT ORDINANCE. Attachments: Preliminary Plat submittal dated March 7, 2006. Planning Board Resolution#P-06015. Planning Board Minutes dated April 18, 2006. CAHAB Minutes dated April 19, 2006. Cc: PC Development, 3985 Valley Commons Drive, Bozeman, MT 59718 Baxter Meadows Development, LP, P.O. Box 81487, Billings, MT 59108 #P-06015 Baxter Meadows Phase 6 PUD Preliminary Plat: Commission Staff Report 21 CAHAB Minutes from Meeting of 4-19-2006 In attendance were Board Members Brian LaMeres, Susie Gallaher,Verne Klingensmith, and Mary Martin, and Mary Jo Nehasil Also in attendance were Lanette Windemaker, City Planner; Caren Roberty and Tracy Blain, HRDC Staff Mike McCormick builder in Baxter Meadows, and Harley Huestis, Project Manager for PC Development The CAHAB listened to a presentation by Harley Huestis and subsequently voted to allow the relaxations as requested by the developer. Specifically the CAHAB recommended that Baxter Meadows 6 be allowed to exceed the 1:3.3 lot to floor size ratio up to 1575 feet. The CAHAB changed the decision,they had made on 4-12-2006 regarding the RSL's in Baxter Meadows 6, due to additional information from the developer's representative. 1. Baxter Meadows 6 was a subsequent phase of a PUD authorized in 2000 and that had been designed and built with a consistent theme that enhanced the development. When the sub-division was designed RSR/RSU's were not required and the sub-division lay out and building plans were not compatible with size restricted units. The property averaged 10 units per acre and at that density level, for detached dwellings,the layout of the sub- division through subsequent phases left little or no room for changes to the building footprints or positioning. 2. Although the single family detached RSUs were not affordable to the target income groups identified in the City's housing policies,the RSV's were selling for between $244,000 and $255,000 which was a lower price than most, new, single family detached homes and therefore affordable to a population that was struggling to buy a new, single family detached home in the current housing market. 3. Limiting the size of the RSL and/or RSU has not always resulted in homes being constructed that are affordable to persons' whose income is below the area median income. The CAHAB then reviewed the pre-application for Baxter Meadows 4. The Developer was not asking any relaxations for Phase 4. The CAHAB voted,to recommend to the City Commission,that Baxter Meadows 4 met the City's affordable housing requirements as outlined in the UDO. w�A,a f � RESOLUTION #P-05065 RESOLUTION OF THE CITY OF BOZEMAN PLANNING BOARD RECOMMENDING CONDITIONAL APPROVAL OF A MAJOR SUBDIVISION PRELIMINARY PLAT APPLICATION ON — 11 ACRES TO BE SUBDIVIDED INTO—49 RESIDENTIAL SINGLE- HOUSEHOLD LOTS,3 MULTI-HOUSEHOLD LOTS AND SITE RELATED IMPROVEMENTS. THE PROPERTY IS ZONED R-3 (RESIDENTIAL MEDIUM DENSITY DISTRICT)AND B-2 (COMMUNITY BUSINESS DISTRICT), AND IS GENERALLY LOCATED NORTHEAST OF THE INTERSECTION OF FERGUSON AVENUE AND GALLOWAY STREET. THE PROPERTY IS LEGALLY DESCRIBED AS A PORTION OF TRACT 2A IN COS 2202A, LOCATED IN THE SE'/4 OF SECTION 34,T1 S,RSE,PMM,CITY OF BOZEMAN, GALLATIN COUNTY, MONTANA. WHEREAS, the City of Bozeman has adopted a Growth Policy pursuant to 76-1-601, M.C.A.; and WHEREAS, the City of Bozeman Planning Board has been created by Resolution of the Bozeman City Commission as provided for in Title 76-1-101, M.C.A.; and WHEREAS, the applicant, Baxter Meadows West, LLC, 3985 Valley Commons Dr., Bozeman, MT 59718; the owners, Baxter Meadows Development, LP, P.O. Box 81487, Billings, MT 59108; and represented by PC Development, 3985 Valley Commons Drive, Bozeman, MT 59718, submitted a Major Subdivision Preliminary Plat Application on— 11 acres to be subdivided into—49 single household residential lots, 3 multi-household lots and site related improvements on property legally described as a portion of Tract 2A in COS 2202A.The property is situated in the SE 1/4 of Section 34, Tl S,RSE,PMM, City of Bozeman, Gallatin County, Montana; and WHEREAS, the applicant is requesting the following eleven PUD relaxations; and 1. Section 18.16.030,Lot Coverage;to allow a maximum lot coverage of not more than 52%of the lot area for Bungalow Lots, and not more than 55% of the lot area for Village Lots. 2. Section 18.16.030.C,Lot Coverage and Floor Area(RSLs);to allow affordable housing units to exceed the floor area ratio 1:3.3 and to allow a maximum square footage of 1,575 square feet. 3. Section 18.16.040,Lot Area; to allow Bungalow Lots to have a minimum lot area of 2,432 square feet and Village Lots to have a minimum lot area of 4,800 square feet. 4. Section 18.16.040, Lot Width; to allow lots for single-household dwellings to have a minimum lot width of 40 feet. 5. Section 18.16.050, Yards; to allow a minimum front yard of 10', and to allow a minimum rear yard of 5' or 2'. 6. Section 18.42.040.D.1, Rights-of-Way for Pedestrians; to allow the yards adjacent to pedestrian walks to be treated as side yards. 7. Section 18.42.060.B.2.b, Rear Yard Utility Easements; to allow the rear yard utility easements to be 5' or 0' when adjacent to a public alley. 8. Section 18.42.120, Mail Delivery; to allow the provision of an off-street area for mail delivery outside of the subdivision but within the Baxter Meadows PUD. 1 DaXLer ivleauuws ru"ruabe u iviajui....ouumviniun ri ummaal y riaE ff,F gam 9. Section 18.42.180.C,Number of Restricted Size Lots Required;to allow the provision of a minimum of 7.5 percent of the buildable net acreage dedicated to Restricted Size Lots (RSLs) and to allow a RSL to be smaller than 5,000 square feet for single household detached dwellings. 10. Section 18.42.180.D,Restrictions on Building Size;to allow dwellings constructed on RSLs to not be subject to the size restrictions of Section 18.16.030.B.1. 11. Section 18.50.060, Frontage; to allow park land to have frontage along 33 percent of the perimeter and to not provide the additional land area in the park to accommodate the off- street parking which would have been provided by the additional length of perimeter streets. WHEREAS,the applicant is requesting a waiver of park dedication requirements pursuant to Section 18.50.100.A of the Bozeman Unified Development Ordinance to allow natural resources/critical wildlife habitat (stream and wetlands) to meet the requirements for this subdivision; and WHEREAS,the proposed Major Subdivision Preliminary Plat Application has been properly submitted, reviewed, and advertised in accordance with the procedures of Section 18.76 of the Bozeman Unified Development Ordinance; and WHEREAS,the City of Bozeman Planning Board held a public meeting on Tuesday,April 18, 2006, to receive and review all written and oral testimony on the request for said Major Subdivision Preliminary Plat Application; and WHEREAS,the City of Bozeman Planning Staff presented the staff report on the request for said Major Subdivision Preliminary Plat Application; and WHEREAS,due to the intent and design of this PUD as a neo-traditional development and the history of project,with PUD relaxations#1, 3,4, and 5 approved in the previous two phases to the south,the following condition is recommended; and • The Final Site Plan shall include a table listing specific setbacks, maximum lot coverage, minimum lot area, and minimum lot width for each lot. WHEREAS, the Community Affordable Housing Advisory Board recommended the following on the PUD relaxations #2, 9, and 10; and The CAHAB advises the City Commission to allow the developer to provide only 7.5% of the net buildable area in RSL's subject to the following conditions.If these conditions are not acceptable the CAHAB recommends that the City Commission deny the developer's requests. • RSLs for single household detached dwellings shall be smaller than 5,000 square feet, and shall not be larger than 3,000 square feet. • Affordable housing units may exceed the floor area ratio 1:3.3 and single-household detached houses shall not exceed a maximum square footage of 1,200 square feet of living space or 900 if they are attached. WHEREAS, staff did not support the request for PUD relaxation #6 to allow the yards adjacent to pedestrian walks to be treated as side yards,and recommended the following conditions; and • The pedestrian rights-of-way in Block 15 shall be widened to 30 feet. 2 P • Lots adjacent to the 30-foot pedestrian rights-of-way in Block 15 shall have 5 foot side yard setbacks adjacent to the walkways. • The Final Site Plan shall include a table listing specific setbacks, maximum lot coverage, minimum lot area, and minimum lot width for each lot. WHEREAS, staff supported the request for PUD relaxation#7 to allow the rear yard utility easements to be 5' or 0' when adjacent to a public alley,and recommended the following condition; and • The Final Plat shall include a table listing specific easements on each lot. WHEREAS, staff supported the request for PUD relaxation#8 to allow the provision of an off-street area for mail delivery outside of the subdivision but within the Baxter Meadows PUD,and recommended no applicable conditions; and WHEREAS, due to the intent and design of this PUD as a neo-traditional development and the history of project,staff recommended the following conditions in relation to the request for PUD relaxation 11 to allow park land to have frontage along 33 percent of the perimeter and to not provide the additional land area in the park to accommodate the off-street parking which would have been provided by the additional length of perimeter streets; and • Additional park land shall be provided in the amount calculated at 5,516 square feet (lot frontage (— 394 feet) x 14 feet (parking on both sides of road) = 5,516 square feet, if the frontage of the park changes, this number will be recalculated). It is preferable to see the difference made up by expanding the East West PPW between Ferguson Avenue and Milkhouse Street to a 30' wide dedicated trail corridor. • Additional park land, cash in lieu or additional improvements shall be provided to compensate for the cost of construction of the parking. WHEREAS, staff supported the request for a waiver of park dedication requirements pursuant to Section 18.50.100.A of the Bozeman Unified Development Ordinance to allow natural resources/critical wildlife habitat (stream and wetlands) to meet the requirements for this subdivision; and WHEREAS, the applicant described the application, expressed concerns with three recommended conditions of approval forwarded by various reviewing agencies and the Development Review Committee, and code provisions in the staff report; and WHEREAS,the applicant expressed concern with recommended condition of approval#14b, explaining that there will be three playgrounds in the six pocket parks, and asks that the words "including a playground"be stricken; and WHEREAS, the applicant expressed concern with recommended condition of approval #141(first bullet), explaining that engineering does not allow them to align the pedestrian walkways, but that they would stripe and sign the walkways; and WHEREAS,the applicant expressed concern with recommended condition of approval#1, explaining that the bungalows are all built on the same foundation,therefore they have a cost savings that keeps the bungalows at the lowest price point in the City,and that the additional square footage 3 naxter;V1Uauvw5 rU"rnase o MaJur 3UDU1Via1011 rreiiuiruarY riai rr r—VUU1 PRELIMwoa,Ry in the dwelling is the cheapest, and asks that condition#1 be changed to read as follows; and The CAHAB advises the City Commission to allow the developer to provide only 7.5% of the net buildable area in RSL's subject to the following conditions.If these conditions are not acceptable the CAHAB recommends that the City Commission deny the developer's requests. • RSLs for single household detached dwellings shall be smaller than 5,000 square feet, and shall not be larger than 1,40 3,384 square feet. • Affordable housing units may exceed the floor area ratio 1:3.3 and single-household detached houses shall not exceed a maximum square footage of 440 1,575 square feet of living space or 900 if they are attached. WHEREAS, no members of the public were present speaking in favor of or opposition to said Major Subdivision Preliminary Plat; and WHEREAS,members of the City of Bozeman Planning Board discussed the appropriateness of supporting a project due to the historical approval of the design, and the problems with long build-outs in PUD projects due to changing regulations and policies; and WHEREAS, members of the City of Bozeman Planning Board discussed the safety issues potentially created by the proximity of the houses to each other, the width of the alley, and the proximity of the garages; and WHEREAS,members of the City of Bozeman Planning Board discussed the affordability of the units in this project; and WHEREAS, members of the City of Bozeman Planning Board discussed the need for a playground in the pocket park in this phase; and WHEREAS, members of the City of Bozeman Planning Board discussed the need for the uses developed in the B-2 area to be in compliance with the Bozeman 2020 Community Plan; and WHEREAS,no members of the City of Bozeman Planning Board expressed opposition to the staff conditions regarding the requests for PUD relaxations#1, 3, 4, 5, 6, 7, 8, and 11; and WHEREAS, members of the City of Bozeman Planning Board discussed the CAHAB recommended conditions regarding the requests for PUD relaxations #2, 9 and 10; and WHEREAS,no members of the City of Bozeman Planning Board expressed opposition to the staff support for the waiver of park dedication requirements for the natural resources(stream and wetlands); and WHEREAS, the City of Bozeman Planning Board reviewed the application against the requirements of the Montana Subdivision and Platting Act, and found that the Major Subdivision Preliminary Plat Application would comply with those requirements with the recommended conditions of approval; and WHEREAS, City of Bozeman Planning Board, on a vote of 7 to 0, recommends to the Bozeman City Commission that Condition#14b be stricken from the list of conditions; and 4 WHEREAS, City of Bozeman Planning Board, on a vote of 6 to 1, recommends to the Bozeman City Commission that Condition #1 be amended to read as follows; and The CAHAB advises the City Commission to allow the developer to provide only 7.51/0 of the net buildable area in RSL's subject to the following conditions.If these conditions are not acceptable the CAHAB recommends that the City Commission deny the developer's requests. • RSLs for single household detached dwellings shall be smaller than 5,000 square feet, and shall not be larger than 3,4N 3,384 square feet. • Affordable housing units may exceed the floor area ratio 1:3.3 and single-household detached houses shall not exceed a maximum square footage of 4�3A9 1,575 square feet of living space or 900 if they are attached. NOW,THEREFORE,BE IT RESOLVED, that the City of Bozeman Planning Board,on a vote of 6 to 1,recommends to the Bozeman City Commission that the— 1,1 acres to be subdivided into — 49 lots for single household residential use, 3 lots for multi-household use and site related improvements on property zoned R-3 (Residential Medium Density District) and B-2 (Community Business District),which is generally located northeast of the intersection of Ferguson Avenue and Galloway Street,on property legally described as a portion of Tract 2A in COS 2202A, and situated in the SE 1/4 of Section 34, T1S, R5E, PMM, City of Bozeman, Gallatin County, Montana, be approved with the 38 conditions which follow; and 1. The CAHAB advises the City Commission to allow the developer to provide only 7.5% of the net buildable area in RSL's subject to the following conditions. If these conditions are not acceptable the CAHAB recommends that the City Commission deny the developer's requests. • RSLs for single household detached dwellings shall be smaller than 5,000 square feet, and shall not be larger than 1,4N 3,384 square feet. (As amended by Planning Board) • Affordable housing units may exceed the floor area ratio 1:3.3 and single-household detached houses shall not exceed a maximum square footage of 44, N 1,575 square feet of living space or 900 if they are attached. (As amended by Planning Board) 2. The pedestrian rights-of-way in Block 15 shall be widened to 30 feet. 3. Lots adjacent to the 30-foot pedestrian rights-of-way in Block 15 shall have 5 foot side yard setbacks adjacent to the walkways. 4. The Final Site Plan shall include a table listing specific setbacks, maximum lot coverage, minimum lot area, and minimum lot width for each lot. 5. Additional park land shall be provided in the amount calculated at 5,516 square feet(lot frontage (—394 feet)x 14 feet(parking on both sides of road)=—5,516 square feet,if the frontage of the park changes,this number will be recalculated).It is preferable to see the difference made up by expanding the East West PPW between Ferguson Avenue and Milkhouse Street to a 30' wide dedicated trail corridor. 6. Additional park land,cash in lieu or additional on-site park improvements shall be provided to compensate for the cost of construction of the parking. 5 Baxter'.Meadows PUD Phase 6 Major Subdivision Preliminary Plat #P-06015 5 3 y 4j 7. A street and traffic control signage plan for the subdivision shall be prepared and implemented upon review and approval by the City Engineer, this shall include no parking signage in the alleys and notification of mid-block pedestrian crossing. 8. Sewer and water services shall be shown on the landscaping plan and park plan,and approved by the Water/Sewer Superintendent. 9. Trees shall not be located within 10 feet of sewer and water services. The park plans need to remove the trees being planted within 10 feet of water and sewer services. 10. Covenants shall address the requirements that a planting permit for street trees must be submitted to the COB and utility locates obtained before any excavation begins in the COB right of way. 11. A concurrent construction plan that addresses all aspects of Section 18.74.030.D may be submitted for review,evaluation and consideration by DRC. No occupancy shall be permitted until required infrastructure improvements have been completed,and inspected and accepted by the City, and all other conditions have been met. 12. The street vision triangle diagram shall be corrected to show all street vision triangles. 13.Water rights,or cash-in-lieu thereof,as calculated by the Director of Public Service,is due with the final plat. 14. The following items shall be addressed in the Final Park Plan: a. Sewer service is to be removed from the Park and the concrete"road"for servicing the sewer is to be removed from the plan. • The Park should be fully developed, b the area and the laek of„lay st..,,,.tUFeS aVailnhli. (Stricken by Planning Board) c. Any barriers,such as fences,hedges,etc.,on private property adjacent to the park boundary shall have a minimum setback of 6 feet from the edge of the park sidewalk to provide a maintainable area. d. All sidewalks adjacent to park land shall be constructed to a 6 foot width. e. Compensation needs to be determined for lack of adequate street frontage on park. The Public Park enjoys only 33% street frontage and compensation for the loss of parking and accessibility is required. The amount has been calculated at 5,516 square feet (lot frontage (---394 feet)x 14 feet(parking on both sides of road)=—5,516 square feet,if the frontage of the park changes, this number will be recalculated) plus the cost of construction. It is preferable to see the difference made up by expanding the East West PPW between Ferguson Avenue and Milkhouse Street to a 30' wide dedicated trail corridor. f. Additional park land, cash in lieu or additional improvements shall be provided to compensate for the cost of construction of the parking. g. A master plan, including a maintenance plan, shall be completed and submitted to the City Parks Division for review and approval. h. The developer shall be responsible for the development the park and trails, to include at a minimum for park development,grading, 10 inches of amended soil, irrigation system with water source, seeding and landscaping. 6 fkA I NARY i. Preconstruction meetings shall be held prior to all work to be done on park or trails. j. All materials and construction shall meet standards set by the City Parks Division. k. Cash in lieu shall be based on requirements in Section 18.50.030. 1. Trails— As the Baxter Meadows development borders both the regional park and school district property,and the Public Pedestrian Walkway(PPW)provides the only East-West off road pedestrian connection between the Greenway Open Space and Ferguson Ave., its design should receive special attention. • The offsets that occur in the PPW at Gallatin Green Blvd. and at the 20' alley should be eliminated to provide improved continuity. • The mid-block crossing at Ferguson Avenue shall have a painted pedestrian crossing with crossing and advanced crossing signs at either end. • Curb cuts shall be provided at all street/trail connections. • A 30' trail easement for the East-West PPW would create a much safer,more attractive, and user-friendly pedestrian passage. in. The subdivider should address maintenance of the public pedestrian walkways in Block 16 which show 6' sidewalks in a 10 or 12' easement with 2 or 3' lawn buffers on either side. At this width, the buffers cannot be easily maintained. Either a larger buffer(6') minimum is recommended, or covenants requiring a 6' setback from the sidewalk for any barriers,such as fences, hedges. 15. The park shall be titled "Public Park". The open space shall be titled "Open Space, Public Access". Notes shall be included on the plat describing ownership and maintenance responsibility for both the park-and open space, e.g.: public park, dedicated to the city and maintained by the homeowners association; and open space, public access, owned by the landowners, maintained by the homeowners association, etc. 16. Subdivision lighting SILD information shall be submitted to the Clerk of Commission directly after Preliminary Plat approval in hard copy and digital form. The final plat will not be deemed complete until the resolution to create the SILD has been approved by the City Commission. 17. The owner shall executiand submit the following documents prior to final plan approval: a. A certification.of completion and compliance stating that they understand any conditions of approval and the submitted final site plans or master site plan have complied with any conditions of approval or corrections to comply with code provisions per Section 18.34.130.B. b. A statement of intent to construct accordin<(, to the final site plan. Such statement shall. acknowledge that construction not in compliance with the approved final site plan may result in delays of occupancy or costs to correct noncompliance per Section 18.34.130.C. c. A certification that it is their intent to comply with the requirements of the Bozeman Municipal Code and any conditions considered necessary by the approval body. 18. Buildings proposed for construction with crawl spaces or basements shall include Engineer Certification regarding depth of ground water and soil conditions and proposed mitigation methods to be submitted with each Building Permit. The Final Plat shall include a notation that due to high ground water conditions full or partial basements are not recommended. 7 Baxter'.Meadows PUD Phase 6 Major Subdivision Preliminary Plat #P-06015 - RA NNl A 19. Applicant shall provide a soils report, along with building plans, to the Building Division, recommending types of foundations. If development shall occur in phases,the soils report may address those lots within the proposed phase. 20. The owner shall executed and submit the following documents prior to final plan approval: a. A certification.of completion and compliance stating that they understand any conditions of approval and the submitted final site plans or master site plan have complied with any conditions of approval or corrections to comply with code provisions per Section I8.34.130.B. b. A statement of intent to construct. according to the final site plan. Such statement shall acknowledge that construction not in compliance with the approved final site plan may result in delays of occupancy or costs to correct noncompliance per Section 1.8.34.130.C. c. A ceiti.f cation that it is their intent to comply with the requirements of the Bozeman Muni.ci.pal Code and any conditions considered necessary by the approval body. 21. The final plat shall comply with the standards identified and referenced in the Unified Development Ordinance. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval,does not,in any way,create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 22. Stormwater Master Plan: A Stormwater Master Plan for the subdivision for a system designed to remove solids,silt,oils, grease and other pollutants from the runoff from the private and public streets and all lots must be provided to and approved by the City Engineer. The master plan must depict the maximum sized retention basin location, show location of and provide easements for adequate drainage ways within the subdivision to transport runoff to the stormwater receiving channel. The plan shall include sufficient site grading and elevation information (particularly for the basin site, drainage ways and finished lot grades), typical stormwater detention/retention basin and discharge structure details, basin sizing calculations and a stormwater maintenance plan. Any stormwater ponds located within a park or open space shall be designed and constructed to be conducive to the normal use and maintenance of the open space. Stormwater ponds for runoff generated by the subdivision (e.g., general lot runoff, public or private streets, common open space, parks, etc.) shall not be located on easements within privately owned lots. While the runoff from the individual lots will be dependent on the intensity of use on each lot, the maximum sizing of the storm retention facilities for each lot will be established based on maximum site development. Final facility sizing may be reviewed and reduced during design review of the FSP for each lot. 23. Plans and specifications and a detailed design report for water and sewer main extensions,storm sewer and the public street, prepared by a Professional Engineer, shall be provided to and approved by the City Engineer and the Montana Department of Environmental Quality. The 8 -;Wi= 1@ i s lU R S�ajor,�)uoaivision rrenminary riai ft X-wv c_ MLLIMINARY Applicant shall also provide Professional Engineering services for construction inspection,post- construction certification,and preparation of mylar record drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a pre-construction conference has been conducted. No building permits shall.be issued prior to substantial completion and City acceptance of the required infrastructure improvements unless all of the requirements of section 18.74.030.D are met to allow for concurrent construction. 24. All infrastructure improvements including 1) water and sewer main extensions, and 2) public streets, curb/gutter, sidewalks fronting parks, open space, rear yard frontages or other non-lot frontages, and related storm drainage infrastructure improvements shall be financially guaranteed or constructed prior to Final Plat approval. City standard residential sidewalks shall be constructed on all public street frontages of a property prior to occupancy of any structure on the property. Upon the third anniversary of the plat recordation of any phase of the subdivision, any lot owner who has not constructed said sidewalk shall, without further notice, construct within 30 days said sidewalk for their lot(s), regardless of whether other improvements have been made upon the lot. This condition shall be included on the final plat for the subdivision. 25. The location of existing water and sewer mains shall be properly depicted. Proposed main extensions shall be noted as proposed. 26.Flood plain: a) The 100-year floodplain shall be delineated for the watercourse on the eastern boundary of the subdivision. If flooding limits encroach onto proposed lots,it shall be noted on the final plat along with a minimum floor elevation for the structures to be constructed on the lots. b) The 100 year flood plain boundary and flood elevations must be depicted on the Final Plat. 27. The Montana Fish,Wildlife and Parks,SCS,Montana Department of Environmental Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any required permits (Le., 310, 404, Turbidity exemption, etc.) shall be obtained prior to FSP approval. 28. Easements for the water and sewer main extensions shall be a minimum of 30 feet in width,with the utility located in the center of the easement. In no case shall the utility be less than 10 feet from the edge of easement. 29.Project phasing shall be clearly defined including installation of infrastructure. 30. The developer shall make arrangements with the City Engineer's office to provide addresses for all individual lots in the subdivision prior to filing of the final plat. 9 $ter Meauows 1rLJ1J rnase b 1vlajor lupa iston'rreuminarV inat ft r-U"UI � ,A I 31. The applicant shall submit a construction route map dictating how materials and heavy equipment will travel to and from the site in accordance with section 18.74.020.A.1 of the Unified Development Ordinance. This shall be submitted as part of the final site plan for site developments, or with the infrastructure plans for subdivisions. It shall be the responsibility of the applicant to ensure that the construction traffic follows the approved routes. 32. All construction activities shall comply with section 18.74.020.A.2.of the Unified Development Ordinance. This shall include routine cleaning/sweeping of material that is dragged to adjacent streets. The City may require a guarantee as allowed for under this section at any time during the construction to ensure any damages or cleaning that are required are complete. The developer shall be responsible to reimburse the City for all costs associated with the work if it becomes necessary for the City to correct any problems that are identified. 33. This property is in the Baxter Lane Signal payback district. The payback shall be made prior to filing of the final plat. 34. All improvements identified as necessary in the phase III traffic impact analysis shall also be required for this phase. All improvements must be installed or financially guaranteed prior to filing of the plat for this phase. No building permits will be issued until all improvements required for the phase are installed and accepted unless approved for concurrent construction. If concurrent construction is utilized, no occupancy will be allowed until the improvements are installed and accepted. 35. The sewer main to serve block 16 should be installed in the alley rather than the pocket park. All other utilities shall be prohibited from being installed within the alley right of way if the sewer is located there. 36. Easements shall be provided across lots 20,21,26,&28,of block 16 for the future maintenance of the water services to lots 21 &27, block 16. The easements in conjunction with the public pedestrian walkway corridor shall provide for a total width of 20'. 37. A 1' No Access Strip shall be shown on the plat along the entire frontage of Ferguson Avenue. 38. The COB design standards require a minimum of 6" crushed base course. The sections in the geotechnical report only call for 5". Revise accordingly. DATED THIS 18"DAY OF APRIL, 2006 Resolution#P-06015 f t Andrew C. Epple, Planning Director JP Pomnipfi+ski, President Planning & Community Development Dept. City of BLeman Planning Board 10 ITEM 5. PROJECT REVIEW A. Major Subdivision Prel. Plat Application#P-06015 - (Baxter Meadows Phase 6). A Major Subdivision Preliminary Plat Application requested by the property owners, Baxter Meadows Development,represented by PC Development, to allow the subdivision of — 11 acres into —49 lots for single-household residential lots, 3 multi-household residential lots, roads, alleys,park and open space areas. The property is legally described as a portion of Tract 2A in COS 2202A, located in the SE 1/4 of Section 24, TIS, RSE, PMM, City of Bozeman, Gallatin County, Montana. (Windemaker) Contract Planner Lanette Windemaker presented the Staff Report. She explained the 11 requested relaxations. Planner Windemaker discussed condition#1, CAHAB's requested relaxations on the RSL lots, which advises the City Commission to allow a 7% reduction- subject to conditions. However, if the conditions are not met, CAHAB would most likely deny the relaxation as RSL lots would be smaller than 5,000 sq. ft. Planner Windemaker discussed condition#14b, a condition which the applicant has requested to be eliminated with the reasoning that there are 3 existing tot lots in Baxter Meadows. Harley Heustis, applicant,reported that phase 6 is a continuation of the last two phases. He noted they are not looking to do anything new, only continue what has already been done. He stated most of the relaxations have been approved in the past with the previous phases. Mr. Heustis noted conditions#14 and 435 required the sewer main to be moved from the pocket park to the alley,which he plans to do. He noted the applicant concurs with conditions #2, #3, and#10. He stated conditions#5, #6, and#14 are in regard to parking and are contradictory to what they have been doing, but they will attempt to provide the extra parking. Mr. Heustis stated three items he would like removed from the conditions. The first item is condition#14B, which requires play equipment. He would rather leave the park passive and well landscaped. Mr. Heustis stated the second item the applicant would like removed is #I4L(first bullet),which says offsets in the pedestrian walkways "should"be eliminated. The design of the lots and dwellings does not allow elimination of the offsets, and he has discussed striping and signage with Ron Dingman. Mr. Heustis stated the final item the applicant would like altered is condition 91, the RSL lots. He noted there is a four part reasoning for altering the condition: 1) it has been approved in the past. Mr. Heustis feels that he is meeting and exceeding what other subdivisions are doing by providing the most inexpensive housing in Bozeman. 2) Changing the plan would be a hardship on the applicant, contractors, and potential home buyers. The layout worked well in phase one as each home compliments the other surrounding homes. 3) Changing this plan would incur a delay in building and the market ends up not liking the houses as well. The proposed structures would be about the same price as a 1,575 sq. ft. house, but with less livable space and less equity for the buyer. 4)Mr. Heustis requested that condition #1 be stricken or modified to 3384 sq. ft. maximum lot size with a maximum 1575 sq. ft. house size. City of Bozeman Planning Board Minutes—April 18,2006 3 President Pomnichowski OPENED THE MEETING FOR PUBLIC COMMENT, and hearing none, she CLOSED THE PUBLIC COMMENT PORTION OF THE MEETING. Mr. Caldwell asked the applicant to clarify the square footage of the RSL lots. He asked Mr. Heustis if he was requesting a modification to condition#1 to a lot size of 3274 sq. feet. Mr. Heustis replied he was requesting 3384 sq. ft. Mr. Jarrett asked Planner Windemaker for code requirements on RSL lots as far as how many sq. ft. can be built. She responded that a RSL detached lot should be no more than 5000 sq. ft., as the builder is restricted to a 1:3.3 ratio, which comes out to be 1515 sq. ft. Mr. Jarrett then asked if the lot is smaller, does one get a smaller house. Planner Windemaker responded that one would. She added that if one has a 2500 sq. ft. lot, one would be restricted to a 758 sq. ft. house. Mr. Jarrett noted having a smaller house is where CAHAB has a problem, as they want to bring that ratio down. He noted that if a fire started in a house in phase one, with a wind, the whole block would burn. He stated the reduced setbacks and the 20 ft. alley are problematic, and he is not in favor of them. He added that he supported larger lots and larger houses. Mr. Sypinski asked for the proposed uses in the B-2 area of the phase. Planner Windemaker noted the applicant specified multi-family,but they would address the commercial aspect at a later date. She stated a decision has not been made. She noted one option is a multi-use, another option is placing a deed restriction on land that would require two-story structures. Mr. Caldwell asked Planner Windemaker what effect prior decisions have on current approvals. He noted it seems to be a moving target, as the UDO is always changing. Planner Windemaker stated the applicant does not receive approval for a concept plan. She noted there are no guarantees to an applicant that any future phase will be approved as preceding ones were approved. Mr. Caldwell asked whether or not long range PUD's should go beyond the two year period. Planner Windemaker stated it is a tough question because things are changing all the time, and ultimately the City Commission will answer it. President Pomnichowski asked about the groundwater and asked the applicant if he would have a problem with prohibiting basements. Mr. Heustis answered that he would have a problem with that, as he did not want to restrict basements. Planner Windemaker noted that the requirements for approval on a basement are stronger than before, as a licensed professional engineer has to verify the feasibility of adding a basement. President Pomnichowski inquired if the fire department had any issues with the 2 ft rear yards. Planner Windemaker responded they did not. President Pomnichowski asked if the applicant had considered a request for a variance in B-2 zoning. Planner Windemaker noted they would have to apply for a conditional use permit rather than a variance. President Pomnichowski asked the applicant if he had considered applying for a zone amendment. Mr. Heustis stated it has been discussed,but he intended to provide live/work buildings and was, therefore, advised by the City Planning Office to request B-2 zoning. Mr. Kirchhoff asked the applicant about GVLT's concern for providing a safe route to the middle school. Planner Windemaker responded that the trail system will most likely be utilized, though it is still in draft form and has not been finalized. Mr. Kirchhoff asked if the applicant is willing to make that commitment. Mr. Heustis noted they would consider it and they are designing plans for a safe route. City of Bozeman Planning Board Minutes—April 18,2006 4 Mr. Jarrett asked what would happen if a builder bought 2 or 3 of the RSL lots and construct a larger house. Planner Windemaker stated that he would have to aggregate the lots into one lot; however, an RSL lot is a deed restricted and buying more than one lot to build a bigger home is simply not an option. The applicant noted the deed restriction applies to the house size as well. MOTION: Mr. Henyon moved,Mr. Jarrett seconded, to strike condition#14B. Mr. Caldwell stated he had an issue with a long term, multifaceted PUD and whether the planning board should contemplate them. Mr. Sypinski noted the board should not base their decisions on historic decisions, even within the same subdivision,because codes change. Mr. Kirchhoff noted changes have come from both the applicant and the City. He used the example of the 100 acre park —which was not originally planned. Mr. Jarrett noted developers progress through a PUD process and then, when they start doing phases, the planning board, etc. will get to review them. He stated as times change, it's not only the policies,but also the PUD that changes. The motion carried 7-0. MOTION: Mr. Caldwell moved, Mr. Kirchhoff seconded, to recommend the RSL lots to be no larger than 3384 sq. ft. with a maximum structure size of 1575 sq. ft. Ms. Roberty stated when CAHAB originally proposed smaller houses on smaller lots, it was to create more affordable homes in Bozeman. She noted in some cases, it worked, in others it didn't. She noted CAHAB is waiting to change their requirements until there are changes in the UDO to bring affordability to Bozeman. She continued Baxter Meadows Phase 6 will bring affordable housing to Bozeman. She stated CAHAB has worked with a number of developers who want to supply more affordable housing. Mr. Jarrett concurred with Mr. Kirchhoff, if the applicant decides that the market will produce the same profit margin for a smaller home, it will be built that way. He stated he favored the motion. The motion carried 6-1,with Ms. Roberty voting in opposition. President Pomnichowski called for a motion regarding the entire application. MOTION: Mr. Kirchhoff moved,Mr. Jarrett seconded, to recommend approval of application, #P-06015, subject to the staff conditions as amended by the planning board. The motion carried 6-1,with Ms. Roberty voting in opposition. B. Minor Subdivision Pre-Application#P-06013 - (Commerce Business Park). A Minor Subdivision Pre-Application requested by the applicant,JWT Capital, LLC, representing the property owners, State of Montana School Trust, to allow the subdivision of 45.11 acres into 5 parcels. The property is in the process of being annexed into the City of Bozeman and re-zoned M-1 (industrial use). The property is located north of the 7t" Street/Interstate 90 Interchange within the City of Bozeman. (Saunders) City of Bozeman Planning Board Minutes-April 18,2006 5