Loading...
HomeMy WebLinkAboutE3and4 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Brian Heaston, Project Engineer Chris Kukulski, City Manager SUBJECT: Easements for Resort Closings, Inc. MEETING DATE: May 15, 2006 BACKGROUND: Attached is a copy (original to Devin Harbour) of partially executed easement documents between Resort Closings, Inc. and the City for a Storm Drainage Easement and Trail Corridor Easement. The storm drainage easement is provided to correct a misaligned public storm drainage main that exists on the project site. The trail corridor easement will allow a public access trail to be constructed on and across the project site. Engineering staff has reviewed the easements and found them acceptable. RECOMMENDATION: Authorize City Manager to sign. FISCAL EFFECTS: N/A ALTERNATIVES: None recommended. Respectfully submitted, _________________________________ ____________________________ Brian Heaston, Project Engineer Chris A. Kukulski, City Manager Attachments: Storm Drainage Easement Trail Corridor Easement Report compiled on April 28, 2006 cc: Project File