Loading...
HomeMy WebLinkAboutFY 2015 Budget Work Session General Fund and Community Development_Part2 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Anna Rosenberry, Administrative Services Director Chris Kukulski, City Manager SUBJECT: Fiscal Year 2015 (FY15) Budget Work Session General Fund & Community Development (Planning) Fund MEETING DATE: June 9, 2014 AGENDA ITEM TYPE: Action – Budget Work Session RECOMMENDATION: Listen to staff presentations, ask questions, give direction, as you see fit. BACKGROUND: Attached are a Budget Information Sheet and other materials regarding the General Fund & Community Development Fund. This information has been prepared to assist us in developing the City’s Final Budget, and is based on what is contained in the City Manager’s Recommended Budget, available at http://www.bozeman.net/Departments-(1)/Finance/Budgets-and-Financials.aspx. Based on feedback during this work session, and the other work sessions held this spring, we intend to prepare the Final Budget resolution. The hearing for adoption of the Final Budget is scheduled for June 23, 2014. ENERGY AUDIT PROJECTS: We would like to start the Work Session with an introduction to the results of our recent Facility Energy Audit done by McKinstry company. The work of McKinstry was delivered after the City Manager’s Recommended Budget was developed and could affect the FY15 budgets of numerous funds. See Memo attached, from Natalie Meyer. GENERAL FUND: Included are reports detailing: • General Fund FY15 Budget Worksheet, • FY 15 Budget Preparation reports with charts for Personnel, Overtime, Capital, Gasoline & Oil, and Travel & Training budgets. • City Manager Recommended Budget Cuts to General Fund We need to correct the Recreation Department Financial Information, page 195, from the Budget document, as there is a data entry error in the department expenditures by division. That corrected page is attached to this memo. 5 COMMUNITY DEVELOPMENT FUND: While the Community Development Fund is a Special Revenue fund, it has been heavily reliant on the General Fund for support in the past. As such, its budget information is presented on the same night as the General Fund. This year, given the significant constraints on the General Fund including the final MMIA Settlement, lack of carryover, and payment on the Landfill Loan, we are recommending that the Community Development Fund utilize its accumulated reserves and not receive a transfer of support from the General Fund. Fiscal Year 14’s budgeted transfer was $184,000. For FY 11- 13, the transfer exceeded $300,000 each year. Included are reports detailing: • Community Development Fund FY15 Budget Worksheet, The City Manager’s Recommended Cuts to the Community Development Budget included: 1. ($60,620) – Moved portion of Community Development Director salary/benefits to Fund 111 (Building Inspection) 2. ($50,000) – Moved Workforce Housing Study/Update to Fund 120 – Community Housing 3. ($21,131) – Reduced Historic Preservation Officer to 24 hrs/week (salary & benefit reduction FISCAL EFFECTS: Although the Final Budget adoption has far-reaching fiscal effects, there are no immediate fiscal effects as a result of this work session. The General Fund and Community Development Fund budgets primarily affect the Property Tax amount below. As presented, the City Manager’s Recommended Budget is projected to have the following effects on the typical City resident: Typical Resident: Assessment/Charge CM Rec Budget Street Assessments $18.24 Forestry Assessments $ 0.35 Property Taxes $69.00 Water Services $0.00 Sewer Services $16.44 Storm Water Services $31.98 Annual Increase $136.01 Monthly Increase $11.33 Attachments: General Fund FY15 Budget Worksheet. FY 15 Budget Preparation reports with charts for Personnel, Overtime, Capital, 6 Gasoline & Oil, and Travel & Training budgets. City Manager Recommended Budget Cuts to General Fund. Community Development Fund FY15 Budget Worksheet. Corrected Budget Document Page 195: Recreation. Report compiled on: June 1, 2014 7 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Natalie Meyer, Sustainability Program Manager Chuck Winn, Assistant City Manager SUBJECT: Budget Work Session Regarding: Energy Saving Projects. McKinstry Investment Grade Audit FY15 report and project recommendations. MEETING DATE: June 9, 2014 AGENDA ITEM TYPE: Action RECOMMENDATION: Listen to staff presentation, ask questions, give direction, as you see fit. A number of these projects could be incorporated into the FY15 Final Budget. BACKGROUND: Because of the potential budget implications for the General Fund and other funds, and because the energy audit report was only available very recently, we are presenting this information for discussion during a budget work session, for potential inclusion in the FY15 Final Budget. The 2011-2012 Climate Action Plan Report and Emissions Inventory suggests that the leading source of municipal greenhouse gas emissions is from buildings (29%), followed by water and wastewater treatment operations (27%). Maximizing efficiency and identifying viable forms of renewable energy within these buildings and facilities makes good management sense and will be the most effective way to reduce our greenhouse gas emissions and satisfy our obligations under the Mayors’ Climate Protection Agreement. As part of our ongoing effort to conserve energy and water within municipal buildings and facilities, the City accepted proposals from three energy performance contractors and selected McKinstry to complete an investment grade audit of 30 City of Bozeman buildings and facilities. The goal was to create a detailed list of potential energy and water conservation, efficiency, and renewable energy projects with cost estimates, electricity and gas savings, and return on investment (ROI) data for each project. McKinstry is an Energy Service Company (ESCO) that offers Investment Grade Audits and Energy Performance Contracts. They provide turnkey service, sometimes compared to design/build construction contracting which equips customers with a comprehensive set of energy efficiency, renewable energy and these recommendations are accompanied with guarantees that the savings produced by a project will be sufficient to finance the full cost of the project. A typical Energy Performance Contract consists of the following elements: 8 • Turnkey Service: McKinstry provides all of the services required to design and implement a comprehensive project at the customer’s facility, from the initial energy audit through long-term monitoring and verification of project savings. • Comprehensive Measures: McKinstry tailors a comprehensive set of measures to fit the needs of a particular facility, and can include energy efficiency, renewable, distributed generation, water conservation and sustainable materials and operations. • Project Financing: McKinstry can help arrange for long-term project financing that is provided by a third-party financing company. • Project Savings Guarantee: McKinstry provides a guarantee that the savings produced by the project will be sufficient to cover the cost of project financing for the life of the project. In our Investment Grade Audit contract with McKinstry, their task was to identify and evaluate energy-saving and renewable energy opportunities and match the most appropriate technologies to our needs; developed preliminary engineering designs and specifications; price; calculate the savings; assist with financing and identify available rebates; and offer a performance guarantee for their design, construction costs, and operational savings. Energy Audit Results The Investment Grade Audit contract was approved by the Commission in December 2013. Beginning in January, McKinstry performed their audit by reviewing building plans, utility data, service invoices, met with staff to review operations in each department and toured buildings and parks. Since March, we have been working through the details of numerous projects with McKinstry. It should be noted that McKinstry did not limit their review to energy saving projects alone. They also incorporated several projects that would address safety, code requirements, or deferred maintenance. They incorporated some existing Capital Improvement Projects into their assessment to demonstrate that some energy saving projects could help offset the costs of other needed capital investments. We eliminated several projects based on excessively long payback periods. Typically, McKinstry would then take this revised list and generate a single report complete with preliminary engineering and design, a guaranteed maximum price for the work, as well as guaranteed utility and operational savings. However, we asked McKinstry to accelerate the process and provide a set of projects that could be reviewed by the City Commission prior to Fiscal Year 2015 budget adoption. McKinstry then focused on preparing a subset of projects and delivered this report to us on May 6, 2014. Fiscal Year 2015 Energy Audit Report: The Fiscal Year 2015 report includes recommendations such as LED lighting, building envelope improvements, retrocommissioning, furnace tunings, water conservation, window replacements, and computer power management. We requested several project scope modifications, which were finalized on May 20, 2014. The final FY15 Energy Audit summary is included as Exhibit 2. We expect a second Fiscal Year 2016 Report by October 2014 that will include additional projects related to irrigation, Fire Station #1, the Water Treatment Plant, and the Water Reclamation Facility. In addition to identifying energy saving opportunities, McKinstry uncovered recent design or installation errors at Fire Station #3, the Swim Center, and the Professional Building and is helping us resolve these issues. The resulting energy savings will likely be notable. 9 The FY15 Energy Audit Report includes projects totalling $2.1 Million with $107,400 in annual utility and operational savings with a 25 year payback period. Of these projects, several can readily be eliminated from the list as unfavorable energy projects, based on their payback. Among the remaining projects, we have identified several projects that can be completed in-house with existing personal and budgets, including the proposed FY15 budget These projects are outlined in Exhibit 3. Definitions: GMAX Pricing: The Guaranteed Maximum Price is a Not to Exceed Price based on quotes McKinstry has received from their pre-qualified sub-contractors. The price is considered turnkey with engineering, design, project administration, construction management, permit fees, equipment, labor, disposal expenses, and measurement and verification. Annual Utility Savings: These are guaranteed for three years during the measurement and verification period. Should the project fail to realize the stated savings, McKinstry would compensate the City of Bozeman for the shortfall. Annual Operational Savings: Operational savings are estimated for a period of five years, but generally continue after this period. Savings include service calls and maintenance contracts only, not staff time. There are currently 18 projects from the FY15 Energy Audit Report that we recommend to be completed by McKinstry in FY15 through a Performance Contract (Exhibit 4). These projects total $416,600 and include $40,300 in utility savings, and $11,700 in operational savings. After NorthWestern Energy rebates, the simple payback period is 8.8 years. Environmental Impact The outlined projects will reduce natural gas and electricity consumption within city facilities by 2.5 percent and 5.7 percent, respectfully. Among the projects that we will complete in-house in FY15, we anticipate a savings of approximately 31 metric tons of CO2 equivalents each year. The18 recommended McKinstry Performance Contract projects will reduce our greenhouse gas emissions by approximately 203 metric tons of CO2 equivalent each year. In total, this is nearly one percent of our municipal greenhouse gas emissions and is roughly equivalent to taking 45 cars off the road each year. McKinstry has provided an Environmental Impact Calculator report for both sets of projects (Exhibit 5). Project Funding Below is a summary of the proposed project costs by funding source: Fund GMAX Annual Utility Savings Annual Operational Savings Net Customer Cost with Incentives Simple Payback with Incentives General Fund $63,731 $11,359 $1,184 $60,827 4.7 Street Maintenance $226,642 $15,412 $6,372 $226,642 12.6 10 Fund Library Depreciation Reserve $6,604 $1,860 $1,000 $6,604 0.9 Parking Fund (Downtown TIF) $100,514 $6,949 $2,868 $100,514 12.4 Vehicle Maintenance Fund $630 $125 $0 $630 5.0 Wastewater Fund $18,480 $5,199 $282 $17,501 3.1 TOTAL $416,601 $40,904 $11,706 $412,718 8.8 General Fund Projects: We admittedly don’t have a funding solution for all of these items. For some, a modification of existing City Manager’s (CM) Recommended Budget could work. For instance: OM 401.01 Custom Systems Training: Current CM Recommended budget includes $6,800 for Facility Maintenance Training. This money could be re-prioritized and combined with other department savings to fund the $7,800 training that’s recommended. BOG 01.01 Commissioning Bogert Boilers: One year of savings will cover the cost of commissioning. Use current Bogert Pool utility budget to fund this project in FY15. CTY 09.02 City Hall Lighting Controls: Relatively small item; Use current Facility repair budget. Other items are more difficult to identify room in the existing budget, for instance the OM 26.01 Green IT project and the SEN various Senior Center improvements. These projects have good pay-back through energy savings, but will cost capital up-front to complete. Street Maintenance Fund Projects: The LED Street Light project entails replacement of 191 city- owned and metered fixtures and a few pole upgrades. Based on our success with the LED streetlight project on Durston St., we are confident that this is a wise long-term investment that will save money and offers the greatest opportunity to reduce greenhouse gas emissions. The Streets Department does not have the staff available to complete a project of this scale in one year. With the backlog of necessary street maintenance projects, we do not recommend paying for this project from the Street Maintenance Fund cash. Instead, we would seek financing opportunities through the Montana Board of Investments’ (MBOI), Intercap Program or other sources. If such financing is feasible, we would return with the terms of financing to be approved by the Commission. The plan would be to seek total financing that would be able to be repaid with the annual energy & operating savings, eliminating the need to increase annual assessments to repay the loan. Library Depreciation Fund Projects: Two minor projects related to lighting operations and low- flow urinals at the Library could be paid through the Library Depreciation Fund. We would pursue this with approval of the Library Board of Trustees. 11 Parking Fund (Downtown TIF) Projects: Discussions are in progress on an agreement between the Parking Commission and the Downtown TIF to fund a LED lighting retrofit for the basement and 1st floor of the parking garage. We are meeting with the TIF Board on June 17th to seek their approval. We could have an indication of support by June 23rd, for Final Budget adoption. Vehicle Maintenance Fund Projects: A minor boiler project could be absorbed through the Vehicle Maintenance Fund’s existing budget for general repairs. Wastewater Fund Projects: A lighting project in the old portion of the Water Reclamation Facility could be funded through repair budgets the Wastewater Fund. UNRESOLVED ISSUES: 1. The Downtown TIF has not yet agreed to help fund the Parking Garage LED retrofit, but we will formally present the project to the TIF Board on June 17th. 2. We have not fully identified where funding for the General Fund projects would come from. 3. We have not yet identified a lender for the Street LED project. ALTERNATIVES: As suggested by the Commission. FISCAL EFFECTS: 1. The in-house projects we have or expect to complete are anticipated to result in Utility and Operational savings of approximately $6,700/year. These items were funded with existing budgets and staff work. 2. The McKinstry projects, if undertaken, would cost up to a maximum of $416,601 with guaranteed utility and operational savings of $52,011/year. Project costs would be paid from the sources described above, with savings accruing back to the operating budget that supports the facility. If money is borrowed to construct the project, savings could be appropriated to make debt service payments. These current McKinstry projects ARE NOT included in the FY15 City Manager’s Recommended budget, due to the timing of receiving the report. Some could be funded by: borrowing, using existing cash, and/or be absorbed by re-prioritizing current recommended line-items. Attachments: List of Audited Building & Facilities FY15 Energy Audit Summary FY15 Recommended Internal Projects FY15Recommended McKinstry Performance Contract Projects Environmental Impact Calculator Report compiled on: June 2, 2014 12 Exhibit 1 Exhibit 1 List of Buildings and Facilities McKinstry Investment Grade Audit Building and Facility Descriptions 1) Beall Park 2) Bogert Pavilion & Bandstand 3) Cemetery & Vietnam Memorial 4) City Hall 5) East Gallatin Recreation Area 6) Fire Station 1 7) Fire Station 2 8) Fire Station 3 9) Landfill Building (only) 10) Library 11) Lindley Center 12) Parking Garage 13) Professional Building 14) Senior Center 15) Shop Complex Operations 16) Shops Complex-723344-Green Storage Building 17) Southside Community Service Bldg 18) Street Lighting 19) Swim Center 20) Vehicle Maintenance Building 21) Water Reclamation Facility 22) Bozeman Ponds 23) Bronken Soccer Complex 24) Christie Fields 25) Haggerty Softball Complex 26) Kirk Park 27) Laurel Glenn 28) Pear St. Water Booster 29) Water Distribution System 30) WTP Lyman Creek 13 Table 4.2 - Facility Improvement Measure (FIM) Summary Project City of Bozeman Scenario GMAX Express Date 5/20/2014 REV1 Facility Improvement Measures FIM Description Facility GMAX * Annual Utility Savings Annual Operational Savings ** Net Customer Cost (with Incentives) Simple Payback (SPB) (with Incentives) X BEA 04.01 Modify Thermostat Schedules There are two programmable thermostats that each control a furnace. The thermostats are programmable but currently are not properly scheduled and appear to be frequently overridden to hold 68/71°F. Implement scheduled setpoints to match normal weekly usage. Includes a posted placard with operating instructions and override instructions for evening and weekend events. Beall Park $483 $75 $0 $483 6.5 X BEA 09.01 Exterior Lighting Replace existing (1) 400W metal halide pole-mounted flood lights and (1) 150W high pressure sodium wall pack and (1) 50W high pressure sodium wall pack and (1) 400W metal halide wall pack with LED fixtures. Beall Park $5,662 $414 $92 $5,408 11.9 X BEA 13.01 Envelope Improvements Improve basement window surrounding insulation, provide new weatherstripping and seals at six (6) exterior doors, provide lockable door at basement crawlspace access hole, and seal first floor warming room area. Beall Park $3,515 $199 $0 $3,515 17.7 X BOG 01.01 Boiler Commission new boilers.Bogert Pool $2,047 $2,110 $1,000 $2,047 -1.4 X CTY 01.01 Boiler Stacks Raise boiler stacks above the plane of the condensing unit to prevent freeze-up during winter, inefficient condenser operation during the shoulder seasons when the boilers and the condensing unit are running simultaneously, and to prevent corrosion on the condensing unit. Bozeman City Hall $783 $122 $0 $783 6.4 X CTY 09.01 Lighting Controls Install daylight sensors to control linear fluorescent lighting at the central staircase skylight. Also includes wall packs at exterior walls and pole lighting at parking lot, walking path. Bozeman City Hall $5,041 $589 $154 $5,008 7.2 X CTY 09.02 Lighting Controls Install daylight sensors to control linear fluorescent lighting at the central staircase skylight. Bozeman City Hall $1,015 $219 $0 $1,015 4.6 X CTY 25.01 Retrocommissioning The building is heated by perimeter fintube with ventilation with additional conditioning provided by a central VAV air handling system. These two are separately controlled and they fight each other in some locations where control comes from a central thermostat rather than each room - implement individual room level control or space temperature voting. Reduce the bandwidth of user adjustability at the zone thermostats to reduce heating system demand variability. Implement dual minimum flow rates for heating and cooling at the VAV boxes. High AHU static and erratic fan ramping indicates poor control. Test duct static sensor and ensure that AHU VFDs are ramping correctly. Sequence building heating such that unoccupied heating is performed only by fintube until X°F off from setpoint, then enable AHU heating. Schedule AHU off during unoccupied hours. Heating hot water pumps have VFDs installed but operate at 100% constantly - investigate VFD control method and repair/install pressure differential sensors to modulate pump VFDs. Evaluate ventilation requirements for the building and adjust outdoor air damper minimum and sequence accordingly. Includes allowance for controls contractor to reprogram ($5,000). No allowance for "fixing" systems included. Bozeman City Hall $45,990 $2,376 $0 $45,990 19.4 X FR1 13.03 Envelope Improvements Two overhead doors to be sealed on four sides. Exterior door at entry to be weatherstripped and sealed. Bozeman Fire Station $5,789 $421 $0 $5,789 13.8 X FR2 03.01 Infrared Gas Heat Existing gas unit heater has failed. Change system type to radiant heat for snow melting on the fire trucks and improved at- floor heating. Bozeman Fire Station #2 $26,768 $543 $0 $26,768 49.3 X KRK 09.01 Lighting Upgrade Replace (3) 150W high pressure sodium wall packs with LED fixtures.Kirk Park $1,588 $192 $92 $1,488 5.4 X LIB 09.01 Lighting Modifications Commission existing lighting controls to account for added lights at stacks and to verify existing schedules and control strategies. Includes thirty (30) parking lot lights, nine (9) exterior soffit lights, and nine (9) exterior banner lights Bozeman Public Library $47,876 $1,411 $924 $47,876 30.7 X LIB 09.02 Lighting Modifications Commission existing lighting controls to account for added lights at stacks and to verify existing schedules and control strategies. Bozeman Public Library $2,144 $1,018 $0 $2,144 2.1 X LIB 13.01 Roof Envelope and Ext Door Seals Insulate ends of the standing seam metal roof with one part foam. Four (4) exterior doors to be weather stripped and sealed. Bozeman Public Library $6,930 $809 $0 $6,930 8.6 X LIB 18.01 Water Conservation Recommission flow control devices at sinks, flushometer toilets, shower heads, kitchen sprayers, and tank toilets to ensure that design flow is being delivered to each fixture as supply pressure has changed over time. In this location, specifically remove four (4) waterless urinals and replace with four (4) low-flow pint urinals to address ongoing maintenance impacts. Provide flow restrictors at nineteen (19) sink locations. Bozeman Public Library $4,460 $842 $1,000 $4,460 -0.6 X LIB 25.01 Retrocommissioning The current sequence of operation and ventilation rates results in simultaneous heating and cooling and potentially overventilation of the building. Modify sequence of operation to control DAT reset for both hot and cold deck AHUs and reduce minimum cooling airflow at VAV boxes to meet minimum ventilation requirements of their associated zones. Identify and re- commission VAV boxes that are operating incorrectly. Re- commission and, if necessary, modify sequence of operation of relief air fan to improve control of building pressurization. Bozeman Public Library $68,600 $5,844 $0 $68,600 14.6 X LIB 28.01 Auto Blinds Operational Reinstall light sensing control to effectively operate automatic window blinds to increase occupant comfort and reduce solar load. Provide lock box for controller on wall, to be opened by maintenance staff only. System reset required by vendor. Bozeman Public Library $870 $180 $0 $870 4.8 X LIN 13.02 Window Improvements Existing windows are double pane but non-operable. Install ~180 SF (quantity 9) operable windows to promote air flow for passive cooling during the summer months. Pricing based upon Marlin 3500 sliding windows, dark bronze anodized finish with Solarban 60 glazing. Lindley Center $21,135 $75 $0 $21,135 283.0 X OM 04.01 Custom Systems Training Provide a comprehensive systems training course to building operators. Overall Measures $7,840 $0 $0 $7,840 0.0 X OM 18.01 Water Conservation City-wide water fixture valve modifications at restrooms, breakrooms, sinks. Does not include irrigation. Overall Measures $54,741 $3,737 $0 $54,741 14.6 X OM 26.01 Green IT: PC Power Mgmt Implement computer power management at ~425 machines to reduce power consumption. Overall Measures $12,230 $4,553 $0 $9,680 2.1 X OM 26.02 Green IT: Printing Provide and install print management software, print behavior software, and consider eliminating 19 print devices. Overall Measures $34,123 $518 $3,899 $34,123 28.2 X PKG 09.01 Lighting Upgrades Change all light fixtures to LED lamps. Bozeman $198,394 $10,510 $5,671 $198,394 16.2 X PKG 09.02 Basement & 1st Floor LEDs Replace existing metal halide fixtures with individually controlled LED fixtures at basement and first floor only. Bozeman Parking $100,514 $6,949 $2,868 $100,514 12.4 X PND 09.01 Lighting Upgrade Replace (4) 50W metal halide wall packs and (1) 75W metal halide flood with LED fixtures.Bozeman Ponds $3,383 $97 $83 $3,321 29.8 X PRO 01.02 Boiler Burner Tuning Combustion analysis showed these boilers were not operating at peak efficiency. Perform a boiler burner tune to increase combustion efficiency and reduce natural gas consumption. Professional Building $2,800 $127 $0 $2,600 20.5 X PRO 03.02 IT Server Room Unit The existing CRAC unit was sized for the original IT load in the space it serves but now short-cycles due to reduced IT load. The City reports that the unit’s coolant pump was replaced 18 months ago and now has bad bearings and may fail at any time. There is not a redundant unit to serve as backup. This project is to replace the existing CRAC unit with a commercial grade split system heat pump air conditioner. This is not a specialized CRAC unit and does not include humidity control, but would be provided as 2-50% capacity units to provide for some redundancy. This is a more cost effective solution for this application. Professional Building $43,169 $1,856 $0 $43,169 23.3 X PRO 03.03 IT Server Room Unit - ALT The existing CRAC unit was sized for the original IT load in the space it serves but now short-cycles due to reduced IT load. The City reports that the unit’s coolant pump was replaced 18 months ago and now has bad bearings and may fail at any time. There is not a redundant unit to serve as backup. This project is to replace the existing unit with a new high quality, specialized computer room AC unit with complete redundancy, 25% turndown capability and humidification capability. This new unit could be relocated once these servers are relocated as the city has planned. Professional Building $114,728 $0 $0 $114,728 0.0 14 Facility Improvement Measures FIM Description Facility GMAX * Annual Utility Savings Annual Operational Savings ** Net Customer Cost (with Incentives) Simple Payback (SPB) (with Incentives) X PRO 09.01 Lighting Improvements Remove and replace eight (8) entrance canopy lights with LED.Professional Building $2,263 $342 $140 $2,113 4.1 X PRO 13.01 Envelope Improvements Weatherstrip and seal exterior vestibules on north and south sides. Professional Building $1,480 $101 $0 $1,480 14.7 X PRO 25.02 Controls Sequence Engineering Assist Facilities in managing controls contractor solutions. Evaluate controls contractor-provided sequence of operations and suggest improvements. Quantify improvements to sequence and recommend additional points as necessary. 40 engineering hours Professional Building $7,552 $0 $0 $7,552 0.0 X SCC 09.01 Lighting Improvements Retrofit (8) 8' linear fluorescent strip fixtures with (4) 28W T8 lamps and electronic ballasts. Southside Community $24,547 $2,195 $107 $23,584 10.5 X SEN 01.01 Boiler Replacement One of the two existing boilers has trouble firing and is not reliable. Replace the boiler with a new modulating condensing boiler of equivalent capacity in a manner consistent with the scope that the City has currently budgeted for the project. Due to system design, a boiler is required to run in the summer months for VAV reheat and domestic water heating. Modify the sequence so that the new boiler operates during periods of low load to take advantage of the additional condensing efficiency from producing lower temperature heating water. Bozeman Senior Center $38,076 $419 $1,000 $37,394 77.3 X SEN 01.02 Boiler Plant One of the two existing boilers has trouble firing and is not reliable. The remaining boiler is not a condensing type boiler. Due to system design, a boiler is required to run in the summer months for VAV reheat and domestic water heating. The boilers are not appropriately sized for this small load. Replace both boilers with three smaller condensing boilers, including one with domestic water heating priority control. Keep the newer boiler in owner stock, with the intention of relocating to an appropriate application in another building. Bozeman Senior Center $100,959 $419 $1,000 $98,912 224.1 X SEN 03.01 Kitchen Economizer The existing dedicated kitchen unit provides no make-up air for the exhaust hood and has no economizer so it operates in mechanical cooling mode nearly year round. Penetrate the exterior wall and install an outside air duct to the existing unit. Interlock the outside air and return air damper with the exhaust hood to provide make-up air when the exhaust hood is operating. Sequence the cooling operation of the unit to economize on a call for cooling when the outside air conditions are appropriate. Add a washable return air filter of suitable size to allow for proper maintenance. Bozeman Senior Center $13,251 $1,917 $0 $13,251 6.9 X SEN 03.06 Bathroom Exhaust Revise bathroom exhaust to include stacked men’s and women’s bathrooms on the basement and first floor of the Senior Center Bozeman Senior Center $11,095 $0 $0 $11,095 0.0 X SEN 12.01 Hot Water System Improvements Rewire the DHW heating circulator pump to shutoff when desired tank temperature has been reached. Install a DHW recirculation pump timer. Program heating hot water temperature reset to vary boiler supply water temperature based on outside air temperature. Bozeman Senior Center $7,486 $999 $0 $7,486 7.5 X SEN 13.01 Exterior Door Seals Replace seals and sweeps at entry doors. Bozeman $1,062 $84 $0 $1,062 12.6 X SEN 13.02 Window Replacement Replace all existing single pane, operable wood framed windows with new insulated pane commercial units. Pricing based upon Desco 2500 windows, clear anodized finish with Solarban 60 low- e glazing. Install new insulated commercial door at daycare. Bozeman Senior Center $134,897 $283 $0 $134,897 476.5 X SHP 09.01 Lighting Improvements Replace various fixtures throughout with T8s. Replace exterior lighting with LEDs. Install occupancy sensors in the Water Department shop and the Traffic & Sign shop and office spaces. Shops Complex $4,405 $356 $0 $3,987 11.2 X SHP 13.01 Window Replacement Remove and replace existing single pane windows with low-e insulated windows to reduce solar gain and air infiltration/heat loss. Replace storefront and sidelites, as well as triangular sections above, with thermal aluminum storefront. Solarban 60 low-e glass, tempered where required by code. Windows are inoperable. Shops Complex $31,581 $1,158 $0 $31,581 27.3 SHP 18.01 Water Conservation Recommission flow control devices at sinks, flushometer toilets, shower heads, kitchen sprayers, and tank toilets to ensure that design flow is being delivered to each fixture as supply pressure has changed over time. In this location, specifically recommission three (3) urinals and provide flow restrictors at eight (8) sinks. Shops Complex $1,731 $416 $0 $1,731 4.2 X SOC 09.01 Lighting Upgrade Replace (9) existing 65W PAR lamps with 26W CFL canopy fixtures. Bronken Soccer Complex $1,045 $134 $88 $1,027 4.4 X STR 09.01 LED Street Lights Replace existing (191) City-owned and directly metered metal halide and high pressure sodium street lights with LED street lights. Street Lighting $226,642 $15,412 $6,372 $226,642 12.6 X SWM 10.01 Solar Hot Water Install a solar hot water heating system to heat pool water and reduce natural gas consumption. Approximate array size is 1,440 SF and is isolated to the flat roof above the locker room area. Swim Center $330,780 $4,324 $0 $330,780 76.5 X SWM 12.01 DHW Pipe Insulate domestic hot water piping in front mechanical room.Swim Center $696 $11 $0 $696 66.1 X SWM 12.02 Domestic Water Pipe Insulation Insulate the domestic cold water piping to reduce condensation that is causing a sanitary issue and corrosion of the building structural components. This pipe is located in the mechanical room as well as above acoustical ceiling tile at natatorium space. Swim Center $6,556 $0 $0 $6,556 0.0 X SWM 13.01 Envelope Improvements Address the cracking and air infiltration at the NE, NW and SW corners of the natatorium by removing the existing low flexibility sealant and install new flexible joint material similar to what is used for large expansion joints in concrete structures. Replace weatherstripping and seals at five exterior doors, paying particular attention to the ones in the natatorium on the west facing wall. Swim Center $2,835 $188 $0 $2,835 15.1 X SWM 13.02 Vestibule Relocate southern-most wall of vestibule further south to address uninsulated corner of office, continued icing up of exit doors, and code required clearances. Install new clear anodized thermal aluminum storefront using Solarban 60 low-e tempered glass. Exterior outswing doors to be clear anodized with continuous gear hinges, alarm lock keypad, closer, low energy ADA operator. Swim Center $29,344 $104 $0 $29,344 281.0 X SWM 17.01 Filtration System Replacement Replace existing cellulose FiberBlend filtration system with new Neptune Defender automatic system to reduce water and maintenance costs, address worker safety issues, and extend life of other mechanical room equipment. Requires modification to existing concrete structure, process piping, and addition of new double door at exterior egress. Includes one year’s supply of filter media, operations and maintenance training, and as-builts of existing system process. Swim Center $334,013 $1,672 $1,000 $334,013 196.8 X VEH 01.01 Boiler Temperature Reset Existing waste oil boiler produces 180°F heating hot water to supply in-floor radiant loop regardless of loop temperature setpoint. Decrease waste oil boiler setpoint to 160°F and maximum setpoint of Lochinvar condensing boiler to 140°F. Vehicle Maintenance Building $630 $125 $0 $630 5.0 X WRF 09.01 Lighting Improvements Perform a comprehensive lighting retrofit project by changing out incandescent lamps to CFLs, linear fluorescent lighting from T12 to T8, HID exterior lighting to LED, and adding lighting controls where appropriate. Water Reclamation Facility $18,480 $5,199 $282 $17,501 3.1 Totals $2,152,295 $81,226 $25,773 $2,143,838 24.8 * Since design cost, audit cost, etc. are distributed among the FIMs, the total project cost will not go up or down by exactly the amounts shown here if a FIM or FIMs are dropped. ** For non recurring operational savings, the values are averaged over the 30 year length of this analysis. *** Incentives are contingent on final approval and are not guaranteed. Funds are shown for reference only. Confidential and Proprietary 15 Exhibit 3. FY15 Recommended Internal Projects FIM Description Facility GMAX * Annual Utility Savings Annual Operational Savings ** Net Customer Cost (with Incentives) Simple Payback (SPB) (with Incentives) Project Status CTY 01.01 Boiler Stacks Raise boiler stacks above the plane of the condensing unit to prevent freeze-up during winter, inefficient condenser operation during the shoulder seasons when the boilers and the condensing unit are running simultaneously, and to prevent corrosion on the condensing unit. Bozeman City Hall $783 $122 $0 $0 6.4 Complete CTY 09.01 Lighting Controls Replace wall packs at exterior walls and pole lighting at parking lot, walking path. Bozeman City Hall $4,026 $370 $154 $3,993 8.8 In progress FR2 03.01 Infrared Gas Heat Existing gas unit heater has failed. Change system type to radiant heat for snow melting on the fire trucks and improved at-floor heating. Bozeman Fire Station #2 $26,768 $543 $0 $26,768 49.3 To be completed in FY15 & FY16 PRO 01.02 Boiler Burner Tuning Combustion analysis showed these boilers were not operating at peak efficiency. Perform a boiler burner tune to increase combustion efficiency and reduce natural gas consumption. Professional Building $2,800 $127 $0 $2,600 20.5 Tune up completed anually PRO 03.02 IT Server Room Unit The existing CRAC unit was sized for the original IT load in the space it serves but now short-cycles due to reduced IT load. The City reports that the unit’s coolant pump was replaced 18 months ago and now has bad bearings and may fail at any time. There is not a redundant unit to serve as backup. This project is to replace the existing CRAC unit with a commercial grade split system heat pump air conditioner. This is not a specialized CRAC unit and does not include humidity control, but would be provided as 2-50% capacity units to provide for some redundancy. This is a more cost effective solution for this application. Professional Building $43,169 $1,856 $0 $43,169 23.3 To be completed in FY15 with modi- fications PRO 09.01 Lighting Improvements Remove and replace eight (8) entrance canopy lights with LED. Professional Building $2,263 $342 $140 $0 4.1 Complete 16 PRO 13.01 Envelope Improvements Weatherstrip and seal exterior vestibules on north and south sides. Professional Building $1,480 $101 $0 $1,480 14.7 To be completed in FY15 SEN 01.01 Boiler Replacement One of the two existing boilers has trouble firing and is not reliable. Replace the boiler with a new modulating condensing boiler of equivalent capacity in a manner consistent with the scope that the City has currently budgeted for the project. Due to system design, a boiler is required to run in the summer months for VAV reheat and domestic water heating. Modify the sequence so that the new boiler operates during periods of low load to take advantage of the additional condensing efficiency from producing lower temperature heating water. Bozeman Senior Center $38,076 $419 $1,000 $37,394 77.3 To be completed in FY15 SEN 03.06 Bathroom Exhaust Revise bathroom exhaust to include stacked men’s and women’s bathrooms on the basement and first floor of the Senior Center Bozeman Senior Center $11,095 $0 $0 $11,095 0.0 To be completed in FY15 SHP 09.01 Lighting Improvements Replace various fixtures throughout with T8s. Replace exterior lighting with LEDs. Install occupancy sensors in the Water Department shop and the Traffic & Sign shop and office spaces. Shops Complex $4,405 $356 $0 $3,987 11.2 To be completed in FY15 with mod- ifications SOC 09.01 Lighting Upgrade Replace (9) existing 65W PAR lamps with 26W CFL canopy fixtures. Bronken Soccer Complex $1,045 $134 $88 $0 4.4 To be completed in FY15 with mod- ifications LIB 13.01 Roof Envelope and Ext Door Seals Insulate ends of the standing seam metal roof with one part foam. Four (4) exterior doors to be weather stripped and sealed. Bozeman Public Library $6,930 $809 $0 $0 8.6 In progress LIB 28.01 Auto Blinds Operational Reinstall light sensing control to effectively operate automatic window blinds to increase occupant comfort and reduce solar load. Provide lock box for controller on wall, to be opened by maintenance staff only. System reset required by vendor. Bozeman Public Library $870 $180 $0 $870 4.8 To be completed in FY15 $143,710 $5,358 $1,382 131,356$ 23.2 * Since design cost, audit cost, etc. are distributed among the FIMs, the total project cost will not go up or down by exactly the amounts shown here if a FIM or FIMs are dropped. ** For non recurring operational savings, the values are averaged over the 30 year length of this analysis. *** Incentives are contingent on final approval and are not guaranteed. Funds are shown for reference only. 17 Exhibit 4. FY15 Recommended McKinstry Projects Facility Improvement Measures FIM Description Facility GMAX * Annual Utility Savings Annual Operational Savings ** Net Customer Cost (with Incentives) Simple Payback (SPB) (with Incentives) BEA 04.01 Modify Thermostat Schedules There are two programmable thermostats that each control a furnace. The thermostats are programmable but currently are not properly scheduled and appear to be frequently overridden to hold 68/71°F. Implement scheduled setpoints to match normal weekly usage. Includes a posted placard with operating instructions and override instructions for evening and weekend events. Beall Park $483 $75 $0 $483 6.5 BEA 09.01 Exterior Lighting Replace existing (1) 400W metal halide pole- mounted flood lights and (1) 150W high pressure sodium wall pack and (1) 50W high pressure sodium wall pack and (1) 400W metal halide wall pack with LED fixtures. Beall Park $5,662 $414 $92 $5,408 11.9 BEA 13.01 Envelope Improvements Improve basement window surrounding insulation, provide new weatherstripping and seals at six (6) exterior doors, provide lockable door at basement crawlspace access hole, and seal first floor warming room area. Beall Park $3,515 $199 $0 $3,515 17.7 BOG 01.01 Boiler Commissioning Commission new boilers.Bogert Pool $2,047 $2,110 $1,000 $2,047 -1.4 CTY 09.02 Lighting Controls Install daylight sensors to control linear fluorescent lighting at the central staircase skylight. Bozeman City Hall $1,015 $219 $0 $1,015 4.6 KRK 09.01 Lighting Upgrade Replace (3) 150W high pressure sodium wall packs with LED fixtures.Kirk Park $1,588 $192 $92 $1,488 5.4 LIB 09.02 Lighting Modifications Commission existing lighting controls to account for added lights at stacks and to verify existing schedules and control strategies. Bozeman Public Library $2,144 $1,018 $0 $2,144 2.1 18 LIB 18.01 Water Conservation Recommission flow control devices at sinks, flushometer toilets, shower heads, kitchen sprayers, and tank toilets to ensure that design flow is being delivered to each fixture as supply pressure has changed over time. In this location, specifically remove four (4) waterless urinals and replace with four (4) low-flow pint urinals to address ongoing maintenance impacts. Provide flow restrictors at nineteen (19) sink locations. Bozeman Public Library $4,460 $842 $1,000 $4,460 -0.6 OM 04.01 Custom Systems Training Provide a comprehensive systems training course to building operators. Overall Measures $7,840 $0 $0 $7,840 0.0 OM 26.01 Green IT: PC Power Mgmt Implement computer power management at ~425 machines to reduce power consumption. Overall Measures $12,230 $4,553 $0 $9,680 2.1 PKG 09.02 Basement & 1st Floor LEDs Replace existing metal halide fixtures with individually controlled LED fixtures at basement and first floor only. Bozeman Parking Garage $100,514 $6,949 $2,868 $100,514 12.4 PRO 25.02 Controls Sequence Engineering Assist Facilities in managing controls contractor solutions. Evaluate controls contractor-provided sequence of operations and suggest improvements. Quantify improvements to sequence and recommend additional points as necessary. 40 engineering hours. Professional Building $7,552 $0 $0 $7,552 0.0 SEN 03.01 Kitchen Economizer The existing dedicated kitchen unit provides no make-up air for the exhaust hood and has no economizer so it operates in mechanical cooling mode nearly year round. Penetrate the exterior wall and install an outside air duct to the existing unit. Interlock the outside air and return air damper with the exhaust hood to provide make-up air when the exhaust hood is operating. Sequence the cooling operation of the unit to economize on a call for cooling when the outside air conditions are appropriate. Add a washable return air filter of suitable size to allow for proper maintenance. Bozeman Senior Center $13,251 $1,917 $0 $13,251 6.9 SEN 12.01 Hot Water System Improvements Rewire the DHW heating circulator pump to shutoff when desired tank temperature has been reached. Install a DHW recirculation pump timer. Program heating hot water temperature reset to vary boiler supply water temperature based on outside air temperature. Bozeman Senior Center $7,486 $999 $0 $7,486 7.5 19 SEN 13.01 Exterior Door Seals Replace seals and sweeps at entry doors. Bozeman Senior Center $1,062 $84 $0 $1,062 12.6 STR 09.01 LED Street Lights Replace existing (191) City-owned and directly metered metal halide and high pressure sodium street lights with LED street lights. Street Lighting $226,642 $15,412 $6,372 $226,642 12.6 VEH 01.01 Boiler Temperature Reset Existing waste oil boiler produces 180°F heating hot water to supply in-floor radiant loop regardless of loop temperature setpoint. Decrease waste oil boiler setpoint to 160°F and maximum setpoint of Lochinvar condensing boiler to 140°F. Vehicle Maintenance Building $630 $125 $0 $630 5.0 WRF 09.01 Lighting Improvements Perform a comprehensive lighting retrofit project by changing out incandescent lamps to CFLs, linear fluorescent lighting from T12 to T8, HID exterior lighting to LED, and adding lighting controls where appropriate. Water Reclamation Facility $18,480 $5,199 $282 $17,501 3.1 $416,601 $40,305 $11,706 $412,718 8.8 * Since design cost, audit cost, etc. are distributed among the FIMs, the total project cost will not go up or down by exactly the amounts shown here if a FIM or FIMs are dropped. ** For non recurring operational savings, the values are averaged over the 30 year length of this analysis. *** Incentives are contingent on final approval and are not guaranteed. Funds are shown for reference only. 20 City of BozemanEnvironmental Impact CalculatorNWPPSelect eGRID Subregionlbs CO2e/kWh (eGRID Subregion Electricity Emissions Factor)Amount Each Utility Type Will Be Reduced Per YearElectricity53,720kWh=45,499lbs CO220.6Metric Tonnes CO2Natural Gas6Number of Vehicles Removed From Roads (Avg Size); or1,981Therms=23,192lbs CO210.5Metric Tonnes CO2116,425Number of Miles Not Driven Per Year (Avg Size); orSteam859Number of 75 Watt Light bulbs Not Energized; or0Mlbs=0lbs CO20.0Metric Tonnes CO23Number of Avg Sized Houses Removed From Power Grid; orFuel Oil9Acres of Trees Planted; or0Gallons=0lbs CO20.0Metric Tonnes CO232,099Pounds of Coal Not Burned Per YearPropane0Gallons=0lbs CO20.0Metric Tonnes CO2Total Reduction =68,691lbs CO231.2Metric Tonnes CO2Natural Gas: 11.707 lbs CO2 / ThermSteam: 195.3636 lbs CO2 / Mlbs (Seattle Steam)Fuel Oil: 22.384 lbs CO2 / galPropane: 12.5 lbs CO2 / galConversion: 2,204.623 lbs CO2 / Metric Tonnes CO2Car Emmissions: 11,470 lbs CO2 / car / yrTree Carbon Sequestation: 8,066 lbs CO2 / acre / yrVehicle Mileage Emmissions: 0.59 lbs CO2 / mile75 W Light Bulb Emmissions: 80 lbs CO2 / Light Bulb / yrTree Carbon Sequestation: 8,066 lbs CO2 / acre / yrCoal Emmisions: 2.14 lbs CO2 / pound CoalHouses Removed: 22,880 lbs CO2 / house* Energy Information Agency (EIA)* Environmental Protection Agency (EPA)* ENERGY STAR* eGRID 20100.84697This Annual Emissions Reduction Is Equivalent To The Following:Other Emissions FactorsEquivalents ConversionsSources:21 City of BozemanEnvironmental Impact CalculatorNWPPSelect eGRID Subregionlbs CO2e/kWh (eGRID Subregion Electricity Emissions Factor)Amount Each Utility Type Will Be Reduced Per YearElectricity472,412kWh=400,119lbs CO2181.5Metric Tonnes CO2Natural Gas39Number of Vehicles Removed From Roads (Avg Size); or4,072Therms=47,671lbs CO221.6Metric Tonnes CO2758,966Number of Miles Not Driven Per Year (Avg Size); orSteam5,597Number of 75 Watt Light bulbs Not Energized; or0Mlbs=0lbs CO20.0Metric Tonnes CO220Number of Avg Sized Houses Removed From Power Grid; orFuel Oil56Acres of Trees Planted; or0Gallons=0lbs CO20.0Metric Tonnes CO2209,248Pounds of Coal Not Burned Per YearPropane0Gallons=0lbs CO20.0Metric Tonnes CO2Total Reduction =447,790lbs CO2203.1Metric Tonnes CO2Natural Gas: 11.707 lbs CO2 / ThermSteam: 195.3636 lbs CO2 / Mlbs (Seattle Steam)Fuel Oil: 22.384 lbs CO2 / galPropane: 12.5 lbs CO2 / galConversion: 2,204.623 lbs CO2 / Metric Tonnes CO2Car Emmissions: 11,470 lbs CO2 / car / yrTree Carbon Sequestation: 8,066 lbs CO2 / acre / yrVehicle Mileage Emmissions: 0.59 lbs CO2 / mile75 W Light Bulb Emmissions: 80 lbs CO2 / Light Bulb / yrTree Carbon Sequestation: 8,066 lbs CO2 / acre / yrCoal Emmisions: 2.14 lbs CO2 / pound CoalHouses Removed: 22,880 lbs CO2 / house* Energy Information Agency (EIA)* Environmental Protection Agency (EPA)* ENERGY STAR* eGRID 20100.84697This Annual Emissions Reduction Is Equivalent To The Following:Other Emissions FactorsEquivalents ConversionsSources:22 General Fund Budget Work Sheet – June 9, 2014 Page 1 of 6 General Fund – FY15 Budget Worksheet In January and February of 2014, the City Manager, Assistant City Manager, and Administrative Services Director heard budget requests for the coming year. The City Manager’s (CM) Recommended Budget contains the following items: 1. Commission Budget - $199,930 a. Reduced recording fees, bond election costs & chamber dues - ($88,600) b. Study Commission funding - $33,560, pending the election results. 2. City Manager’s Office - $717,429 (Administration & City Clerk) a. Leadership Training Consultant & Risk Management Consultant - $10,000 b. Leadership Montana for Assistant City Manager - $2,000 c. Municipal Code Updates - $10,400 d. City-wide Records Review Consultant - $30,000 3. Municipal Courts - $678,475 a. County Law & Justice Center Court 1 & Clerk Space, lease amount. $51,000 b. County Law & Justice Center Court 2 Space, lease amount. $26,000 94,448 139,575 96,470 103,460 - 100,000 200,000 Personnel Operations City Commission FY14 FY15 544,516 98,315 595,519 121,910 - 200,000 400,000 600,000 800,000 Personnel Operations City Manager FY14 FY15 23 General Fund Budget Work Sheet – June 9, 2014 Page 2 of 6 4. City Attorney’s Office - $944,842 a. Westlaw internet accessible research and books - $17,250 b. Outside council for litigation/arbitration - $25,000 c. Increase Administrative Assistant to Legal Assistant I hours from 0.5 to 1.0 FTE - $21,000 estimate d. Note: There was a mid-year addition of a Civil Attorney to the Attorney’s office in FY14. 5. Administrative Services (Admin, Finance, Treasury, IT, Human Resources) - $2,244,535 a. Finance - Annual audit - $26,000 b. Finance - Software maintenance agreements - $67,422 c. Treasury – Billing Clerk III 1.0 FTE - $44,000 estimate d. IT – All General Fund internet and remote connections - $70,000 e. IT – CISCO annual contract - $65,000 f. IT – Help Desk: Public Safety 1.0 FTE - $56,500 estimate g. IT – GF062 – Personal computer replacement - $70,000 h. IT – GF079 & 080 – Replacement of switches and routers - $90,000 518,361 148,238 524,837 153,638 - 100,000 200,000 300,000 400,000 500,000 600,000 Personnel Operations Municipal Court FY14 FY15 663,022 135,825 65,000 846,717 98,125 - 200,000 400,000 600,000 800,000 1,000,000 Personnel Operations Capital City Attorney FY14 FY15 24 General Fund Budget Work Sheet – June 9, 2014 Page 3 of 6 6. Facilities Management - $1,372,968 a. Pooled Facility Condition Index items - $134,000 b. Electricity - $212,800 c. Janitorial Contracts - $436,200 d. CIP items – Site improvements at City Hall - $35,125 e. CIP items – Green vehicle storage roof refinish - $20,000 (shared cost) f. CIP items – ADA compliance improvements & IT AC rooftop unit - $43,500 g. CIP items – Senior Center upgrades: boiler, siding, fire sprinklers - $51,500 7. Police Department - $7,138,813 from General Fund (not including state share of retirement costs) a. Uniforms/Protective gear - $78,500 b. Gas & oil for all vehicles - $110,300 c. Ammunition, training supplies etc - $86,500 d. Repair & maintenance of equipment - $84,300 e. General contracted services (towing, background checks etc.) - $111,128 f. Animal shelter fees - $127,900 g. CIP items – replacement of vehicles & motorcycles - $237,000 1,336,881 598,143 40,000 1,507,233 631,558 105,744 - 500,000 1,000,000 1,500,000 2,000,000 Personnel Operations Capital Administrative Services FY14 FY15 258,493 909,860 27,000 263,175 959,668 150,125 - 200,000 400,000 600,000 800,000 1,000,000 1,200,000 Personnel Operations Capital Facilities Management FY14 FY15 25 General Fund Budget Work Sheet – June 9, 2014 Page 4 of 6 8. Fire Department - $4,623,326 from General Fund (not including state share of retirement costs) a. Clothing & Uniforms - $43,290 b. Water Service for flushing of hydrants - $111,300 c. CIP Item – GF162 Live fire training prop - $10,000 d. Note: Fire Department Capital primarily is funded through the Fire Department Capital & Equipment Replacement special revenue fund. 9. Parks/Cemetery - $12,018,202 a. Park land Street and Tree Maintenance Assessments - $112,000 b. Vehicle Maintenance fund allocation - $43,620 c. Water, electricity & gas - $140,600 d. CIP Items – GF010 Cemetery mower replacement - $16,000 e. CIP Items – GF115, GF100, GF207, GF194 Parks truck & tractor replacement, Cityworks hardware, Park signage continuation - $128,000 f. Cut funding to Park Improvement Grants this year. PIG = $0.00. Propose to finish existing projects and work on TOP projects that are already allocated. 5,621,699 846,617 1,319,933 5,976,198 925,615 237,000 - 2,000,000 4,000,000 6,000,000 8,000,000 Personnel Operations Capital Police FY14 FY15 4,090,978 448,358 2,000 4,122,911 490,415 10,000 - 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 Personnel Operations Capital Fire FY14 FY15 26 General Fund Budget Work Sheet – June 9, 2014 Page 5 of 6 10. Library - $1,742,365 a. Children’s Desk Assistant 12hrs/week - $7,600 estimate b. Books & reference materials - $175,000 c. Maintenance contracts - $69,921 d. Subscriptions - $32,000 11. Recreation - $1,727,687 a. Includes the budget for Swim Center, Bogert Pool, and Lindley & Beall Centers in the General Fund. b. Water/sewer/gas/electric - $151,580 c. Repair & maintenance - $81,700 d. CIP items – Pool design, part 2 - $225,000 (combined with $125,000 in FY14 budget) e. CIP Items – GF137 Swim Center filtration system - $135,000 1,021,673 602,828 37,000 75,000 1,112,930 661,272 244,000 - 500,000 1,000,000 1,500,000 Personnel Operations Capital Transfers Parks/Cemetery FY14 FY15 1,137,796 467,042 7,413 1,324,744 417,621 - - 500,000 1,000,000 1,500,000 Personnel Operations Capital Library FY14 FY15 27 General Fund Budget Work Sheet – June 9, 2014 Page 6 of 6 12. Community Services - $485,565 from General Fund (Includes Economic Development & Sustainability) a. Broadband Master Plan - $20,000 b. Green Fleet assessment - $8,000 13. Non-Departmental – $3,363,200 a. Liability & property insurance - $298,200 b. Fire/Police State share retirement (non cash) - $2,059,000 c. MMIA Settlement payment (last payment) - $675,000 14. Streamline Support - $89,062 772,806 313,690 450,000 893,796 473,891 360,000 - 200,000 400,000 600,000 800,000 1,000,000 Personnel Operations Capital Recreation FY14 FY15 249,698 313,690 288,255 197,310 - 100,000 200,000 300,000 400,000 Personnel Operations Community Services FY14 Budget FY15 Recommended 28 Date: 5/22/2014FY15 Budget Preparation GENERAL FUND - PERSONNEL BUDGETS Personnel with chart.imr Department Budget Level Amount ADMINISTRATIVE SERVICES $1,507,233.00 CEMETERY $304,430.00 CITY ATTORNEY $846,717.00 CITY COMMISSION $96,470.00 CITY MANAGER $595,519.00 COMMUNITY DEVELOPMENT $288,225.00 FACILITIES MANAGEMENT $263,175.00 FIRE $4,122,911.00 LIBRARY $1,324,744.00 MUNICIPAL COURT $524,837.00 PARKS $808,500.00 POLICE $5,976,198.00 RECREATION $893,796.00 $17,552,755.00 GENERAL FUND - PERSONNEL 29 Date: 5/22/2014FY15 Budget Preparation GENERAL FUND - OVERTIME overtime with chart.imr Department Budget Level Amount CEMETERY $4,461.00 CITY ATTORNEY $1,000.00 FACILITIES MANAGEMENT $944.00 FIRE $90,000.00 PARKS $5,539.00 POLICE $120,500.00 GENERAL FUND - OVERTIME $222,444.00 30 Date: 5/22/2014FY15 CM Recommended Budget GENERAL FUND - CAPITAL Capital with Chart.imr Department Budget Level Amount ADMINISTRATIVE SERVICES $105,744.00 CEMETERY $16,000.00 FACILITIES MANAGEMENT $150,125.00 FIRE $10,000.00 PARKS $128,000.00 POLICE $237,000.00 RECREATION $360,000.00 $1,006,869.00 GENERAL FUND - CAPITAL 31 Date: 5/22/2014FY15 Budget Preparation GENERAL FUND - FUEL BUDGETS Fuel with chart.imr Department Budget Level Amount ADMINISTRATIVE SERVICES $3,950.00 CEMETERY $10,000.00 CITY MANAGER $500.00 FACILITIES MANAGEMENT $5,850.00 FIRE $39,800.00 LIBRARY $350.00 MUNICIPAL COURT $150.00 PARKS $42,000.00 POLICE $110,300.00 RECREATION $1,800.00 $214,700.00 GENERAL FUND - FUEL 32 Date: 5/22/2014FY15 Budget Preparation GENERAL FUND - TRAINING/TRAVEL BUDGETS travel with chart.imr Department Budget Level Amount ADMINISTRATIVE SERVICES $25,100.00 CEMETERY $500.00 CITY ATTORNEY $11,000.00 CITY COMMISSION $3,400.00 CITY MANAGER $15,240.00 COMMUNITY DEVELOPMENT $13,400.00 FACILITIES MANAGEMENT $6,800.00 FIRE $37,830.00 LIBRARY $4,811.00 MUNICIPAL COURT $4,050.00 PARKS $8,200.00 POLICE $54,500.00 RECREATION $20,800.00 $205,631.00 GENERAL FUND - TRAINING/TRAVEL 33 Page 1 of 2 Cuts to General Fund Department Requests City Manager Recommended Budget Cuts to General Fund: These items represent some of the cuts and reductions the City Manager made to the DEPARTMENT REQUESTS for FY15. 1. General Fund: a. City Commission - $36,600 i. ($36,600) – Reduced Election costs per Charlotte Mills b. City Manager - $19,600 i. ($10,000) – Reduced budget for insurance consultant & removed risk management consultant ii. ($9,600) – Reduced Ordinance and Municipal Code updates based on experience c. City Attorney - $326,000 i. ($325,000) Moved outside counsel for defense to Landfill Post Closure Fund ii. ($1,000) – Reduced budget to bring witnesses from out of town d. Administrative Services - $29,519 i. ($1,000) – Reduced office supplies ii. ($519) – Reduced software maintenance contracts to match expected contract totals iii. ($11,000) – Removed add-on feature to Laserfiche iv. ($8,500) – Moved SID mailing costs to Funds 111 & 112 v. ($5,000) – Removed projector (completed in FY14) vi. ($1,500) – Removed cost of additional computer vii. ($2,000) – Reduced consulting services of employment law firm e. Facilities Management - $161,150 i. ($3,375) – Remove Cityworks annual maintenance – no longer needed ii. ($23,625) – Reduced CIP GIF139 Phase 3 site improvements – focus on pedestrian safety (sidewalk) iii. ($19,900) – CIP GIF189 – share cost with water/sewer - $20,000 remaining in General Fund iv. ($30,000) – CIP GF104 – Provided we move forward with McKinstry for the energy upgrades, this CIP item can be removed v. ($14,000) – CIP GF199 – Removed main floor carpet replacement at Professional building – not a trip hazard, so can be pushed back to a later year vi. ($26,250) – CIP GF187 – Reduced to amount necessary to replace the worst areas of siding at the Senior Center vii. ($38,500) – CIP GF203 – Reduced to amount necessary to repair the worst areas of the Senior Center envelope 34 Page 2 of 2 Cuts to General Fund Department Requests viii. ($5,500) – Removed addressing brick water scale at Library. Brick and mortar is not badly impacted at this time f. Police - $1,000 i. ($1,000) – Reduce vehicle supplies based on reduced need g. Fire - $40,010 i. ($4,000) – Removed Fire-Rescue International North West Leadership Conference training/travel ii. ($20,010) – Reduced overtime allocation iii. ($16,000) – Removed overtime for Succession Plan implementation h. Cemetery - $10,000 i. ($10,000) – Reduced water service. We will switch back to mill ditch water during the next 12 months – funds remaining for Summer 2014 only i. Parks - $5,875 i. ($3,375) – Removed Cityworks annual maintenance – no longer needed ii. ($2,500) – Reduced potential building and planning charges – PIG and TOP project fees should come from those funds, not the general fund j. Library - $25,500 i. ($25,500) – Reduced books & reference materials k. Recreation - $57,400 i. ($1,000) – Reduced office supplies ii. ($500) – Reduced postage based on increase in green practices iii. ($5,000) – Reduced chemicals – CO2 lowered overall chemical use iv. ($3,000) – Removed revenue development school training v. ($40,000) – CIP GF192 – Removed Swim Center ceiling tile replacement vi. ($4,000) – Reduced natural gas for Bogert pool for new boiler efficiency vii. ($2,500) – Reduced Beall Center TOPS Manager office design viii. ($400) – Reduced clothing & uniforms ix. ($1,000) – Reduced contracted instructor payout l. Community Development - $113,500 i. ($1,500) – Removed surface tablet ii. ($70,000) – Reduced Broadband master plan consulting fees iii. ($10,000) – Reduced legal counsel iv. ($15,000) – Removed Economic Development Plan update form Prospera v. ($4,500) – Reduced in-state travel/training vi. ($2,500) – Reduced social sector development vii. ($2,500) – Reduced Outdoor sector growth viii. ($7,500) – Reduced paid intern position by half 35 Community Development Fund – FY15 Budget Worksheet The Community Development Department information begins on page 114 of the City Manager’s Recommended Budget document. Last year, the “Planning Department” was re-named the “Community Development Department”. It still retains the same funding relationship to the city’s Planning Fund and General Fund. The most notable change is related to the Community Development Director’s salary and benefits now being partially supported by the Building Inspection Fund, which she supervises. Revenues: The Planning Fund is supported by a number of different revenue sources, including a substantial transfer from the General Fund. Over the past couple of years, Planning Fees have exceeded our budget estimates, and the department has spent less than budgeted, leaving a surplus in the Planning Fund that is estimated to total $422,000 at the end of FY14. In FY15 we recommend that a portion of this surplus be used to fund department operations to allow for the elimination of the General Fund transfer (subsidy) this year. The fund will continue to receive general property tax support and entitlement share to assist in operations. This budget anticipates that two of our Tax Increment Districts will continue to contribute money to fund the department, in support of the “Neighborhoods/Districts Specialist” position; N 7th District- $35,000 and Northeast District - $5,000. These transfers are included “other revenues” below. Planning Fund - Revenues FY11 Actual FY12 Actual FY13 Actual FY14 Budget FY15 Recommended Application Fees $153,000 $160,000 $317,580 $146,700 $383,600 General Fund Transfer 327,000 316,500 346,935 184,036 - Taxes 147,000 166,000 168,102 169,782 178,125 State/Grants 95,700 99,500 99,500 101,480 104,825 Other 33,000 30,000 20,720 31,000 55,000 Total $755,700 $772,000 $952,837 $632,998 $721,550 The CM Recommended Budget includes estimated Application Fee revenues of $383,600, or ~$32,000/month. The estimate for FY15 is based on the ACTUAL revenues for the most recent 12 months (April – June of FY13, and July – March of FY14.) As you can see from the graph that follows, average monthly application fees have risen markedly in the past four quarters. At budget development time last year (FY13, Q3 completed), we were seeing a promising increase in planning activity. 36 Expenditures: Excluding personnel costs, a total Community Development Fund operating budget of $170,788 is proposed. Attached on the next page, you will find a break-down of the separate areas of the operating budget and a chart representing the same. As you can see, the three largest areas of the operating budget are: • Consultants and Professional Services - $86,500 total, including o Planning Services - $30,000 o Historic Preservation Update - $45,000 o Application Fee Study - $10,000 • Computers and Servers - $16,000 for a new computer, replacement of old computers and software maintenance Budget Surplus or Deficit: Comm. Dev. Fund FY11 Actual FY12 Actual FY13 Actual FY14 Budget FY15 CM Rec Revenues $755,700 $772,000 $ 952,831 $632,998 $721,550 Expenditures 691,146 648,829 743,535 782,979 949,506 Surplus/(Deficit) $64,554 $123,171 $209,296 ($149,981) ($227,956) $- $5,000.00 $10,000.00 $15,000.00 $20,000.00 $25,000.00 $30,000.00 $35,000.00 $40,000.00 Q3 Q2 Q1 Q4 Q3 Q2 Q1 Q4 Q3 Q2 Q1 Q4 Q3 Q2 Q1 Q4 Q3 Q2 Q1 Q4 FY14 FY13 FY12 FY11 FY10 FY09 Average of Monthly Planning Fees 37 Department:RECREATION Activity:Public Welfare Department Expenditures by Category Department Expenditures by Division Department Expenditures by Fund FINANCIAL INFORMATION Category FY13 Actual FY14 Budget $ Change % ChangeFY15 Requested 15.66%$719,918 $772,806Salaries & Benefits $120,990$893,796 2.06%$495,101 $483,589Operating $9,975$493,564 -20.00%$15,065 $450,000Capital ($90,000)$360,000 100.00%$0 $0Debt Service $0$0 100.00%$0 $0Transfers $0$0 Totals $1,230,084 $1,706,395 $1,747,360 $ Change % ChangeFY13 Actual FY14 BudgetDivision FY15 Requested 8010 Recreation Operations ($72,312)-5.76%$825,348 $1,256,453 $1,184,141 8020 Swim Center $137,560 56.05%$245,302 $245,435 $382,995 8030 Bogert Pool ($27,900)-32.60%$58,256 $85,590 $57,690 8040 Facilities: Lindley, Beall, & Story ($2,500)-3.87%$60,234 $64,664 $62,164 8050 Recreation Programs $6,117 11.27%$40,941 $54,253 $60,370 Totals $1,230,081 $1,706,395 $1,747,360 % Change$ ChangeFundFY13 Actual FY14 Budget FY15 Requested 010 General Fund $37,839 2.24%$1,203,420 $1,689,848 $1,727,687 133 Recreation Special Revenue Fund $0 0.00%$10,170 $1,000 $1,000 189 Story Mansion Operating Fund $3,126 20.11%$16,491 $15,547 $18,673 Totals $1,230,081 $1,706,395 $1,747,360 City of Bozeman 195 - Revised FY15 Recommended Budget 38