HomeMy WebLinkAbout04-14-14 MSUIC_TCC_Full Submittal
411 East Main Street • Suite 101 • Bozeman, Montana 59715 • 406. 556. 7100 • Fax: 406. 585. 3031
http://www.ctagroup.com E-mail: info@ctagroup.com
4-14-14
City of Bozeman – Engineering Department
Attn: Rick Hixson
20 E Olive
Bozeman, MT 59715
Dear Mr. Hixson,
Please accept the exhibits included with this letter as a submittal package to facilitate discussion and approval
with the Transportation Coordinating Committee (TCC), regarding a future 27th Avenue through the Montana
State University Innovation Campus (MSUIC). We have been advised to meet with the TCC regarding 27th
Avenue. This package is intended for use in the April 23rd, 2014 TCC meeting.
We are planning to provide a presentation of the MSUIC project at this meeting. Our hope is that the TCC will
make a decision on April 23rd as to; 1) the necessity of a 27th Avenue through the MSU Innovation Campus, 2)
revising the 2007 Transportation Plan to remove 27th Avenue through the MSU Innovation Campus, or 3) if the
TCC finds 27th Avenue necessary through the MSU Innovation Campus, then recommendation be provided to
the City Commission to approve the construction of 27th as shown on the exhibits included with this letter, thus
allowing MSUIC to finalize permitting and construction documents to begin installation of the roadways and
utilities this summer.
The original master plan for the MSU Innovation Campus was completed at the end of 2012 and was shown
and discussed in meetings with city staff and during two city commission meetings. CTA conducted various
discussions with members of the City of Bozeman public staff starting at the end of 2013. Through these
meetings CTA was instructed by the City engineering staff that the MSU Innovation Campus would need to
follow the Greater Bozeman Area Transportation Plan (2007) unless the TCC and ultimately the City
Commission approved of an amendment to the 2007 plan. This plan shows a “future collector” through the
MSUIC site connecting West College Street with West Garfield Street via a future 27th Avenue. The MSUIC
original master plan did not show this connection, because national standards of university-related research
parks are pedestrian friendly campus environments that reduce vehicular interruptions comparable to that of
the Montana State University main campus. Hearing the needs of the City of Bozeman engineering staff,
MSUIC has revisited the original plan to see what alternatives can be generated in order to accomplish the
development of a pedestrian research and development (R&D) campus while attempting to accommodate the
2007 Transportation Plan.
In order to work in partnership, variances through the City process will most likely be needed including block
length (along Garfield), and, if 27th from Technology to College is required in the future, drive access offsets
with 27th Avenue at College. Also, regarding water, sanitary sewer, and storm sewer facilities, we will need to
utilize the 27th Avenue right of way to connect to existing utilities within the College Street ROW. As you are
fully aware, MDT will be starting the College Street construction project later this summer and it will be vitally
important that we are allowed to utilize these existing utilities.
Not included with the provided exhibits is a Traffic Study for the project. A traffic study is currently being
conducted by a qualified Traffic Engineer and will be available no later than April 23rd.
Sincerely,
CTA ARCHITECTS ENGINEERS
Ron Isackson, PE
cc: CTA File
MONTANA STATE UNIVERSITY INNOVATION CAMPUS
April 23rd, 2014
Project Circulation Study
Exhibits for the Bozeman Transportation Coordinating Committee
Montana State UniversityInnovation CampusSite CirculationStudy03.14.142MSU aerial
campuscore60 ac
■ MSU has a contiguous campus core that is pedestrian focused. Vehicular circulation is kept to the perimeter to further emphasize the experience
■ The MSU Innovation Campus is a university related research park and an extension of MSU. The Innovation Campus seeks to create a pedestri-an experience that mirrors the MSU campus
Montana State UniversityInnovation CampusSite CirculationStudy03.14.143original master plan - 2012
Campus Goals:
■ Create a collaborative environment with a defined campus core - an 'ener-gy' center with a 'sense of place' and connectivity
■ Minimalize vehicular interruptions to provide a more pedestrian/campus experience. Reduce pedestrian conflicts by reducing through traffic from major roadways. Place parking on the 'perime-ter' while shielding from internal/external view
■ Provide a sense of security/safety to patrons while still allowing vehicular and pedestrian public access in and out of the project
■ Provide interface with the surrounding community and contribute to the overall neighborhood aesthetic
■ Produce a high-tech research and development campus that provides high paying jobs to the community
■ Protect and enhance sensitive natural environments. Allow for the ability to construct a natural trail adjacent to the wetlands for pedestrian connectivity
■ Incorporate innovative approaches to building construction, storm-water, and site development
■ Use building massings to enframe space, create pedestrian plazas and greenways, and provide form to streets by creating an attractive 'streetscape' both to internal and external roads
Montana State UniversityInnovation CampusSite CirculationStudy03.14.144revised campus core diagram
parking onperimeter
parking onperimeter
parking onperimeter
campus core
pedestrianconnections
pedestrianconnections
natural openspace
trailconnections
parking onperimeter
entryfeature
openspace
■ During project meetings with the City of Bozeman planning staff to discuss the original master plan concept, the plan-ning staff expressed concerns related to community interface. As a result, the plan was revisited to take into consid-eration greater community integration and increased trail connections through the site
communityinterface
communityinterface
Montana State UniversityInnovation CampusSite CirculationStudy03.14.145revised concept diagram
parking
parking
parking
parking
focalbuilding
park
wetlandarea
connector trail
stormwaterdetention
centralgreen
plaza
entryfeature
College
Garfield
campuscore
communityinterface
communityinterface
■ This page highlights a revised concept which was shared with various members of the City of Bozeman staff
■ The concept was generally well received. The major concern expressed was the City would request the ability to include a through street from College to Garfield
■ According to the Greater Bozeman 2007 Transportation Plan, this through street needs to be a collector with a 90' ROW
Montana State UniversityInnovation CampusSite CirculationStudy03.14.146
aligned with27th Avenue
27th collector diagram overlay
■ Various options were studied for a 27th Avenue collector that may accommodate the needs of the City and the goals of the campus
■ The layout depicted on this page is consi-sitent with the alignment shown on the 2007 Transportation Plan
■ This layout allows for larger contiguous parcels that are not divided by streets providing a safer pedestrian environment. This facilitates pedestrian connections and enhanced collaboration between building users. This option aligns more closely with university related research park goals com-pared with other studied options
■ Vehicular network is addressed without dominance
Montana State UniversityInnovation CampusSite CirculationStudy03.14.147current site diagram
Garfield
College
ParkingArea
PotentialBuildingPad (typ.)
27th Avenue
■ Vehicular circulation is accommo-dated north/south without dissecting the pedestrian campus
■ Parking areas are placed in interior courtyards, screening them from view
■ A strong streetscape environment is created
■ Greenspace areas are created along the west boundary to buffer uses
■ Ability will be provided for an outside entity to construct a natural trail in Zone 2 of the wetland buffer to traverse the site north/south
■ NOTE: Right of Way will be dedi-cated for 27th Avenue north of its in-tersection with Technology Boulevard. The actual roadway will be construct-ed in the future only as required when loading on 27th mandates installation as determined by a traffic study. Ini-tially, a trail will be constructed in this dedicated ROW that will join with the constructed portion of 27th Avenue to provide a pedestrian connection from College to Garfield
ParkingArea
ParkingArea
Technology Blvd.
StormwaterInfiltration (typ.)
GreenspaceBuffer
Park
WetlandArea
NaturalTrail
FutureStreetIf Required
PotentialBuildingPad (typ.)
EntryFeature
Montana State UniversityInnovation CampusSite CirculationStudy03.14.148roadway and wetland area calculations
Roadway & Wetland Acreages
Garfield
College
Roadway and Associated Setbacks - 7.3 acres
Wetland and Required Buffer5.5 acres
Total Site+-42 ac
Collector3.2 ac
Technology Blvd.4.3 ac
■ All areas listed above comprise +- 40% of the total site which represents a significant amount that is unavail-able for development. This creates a hardship on the property in order to achieve development goals. Vari-ances, as required, will be requested and leniency sought as a result of this hardship
Greenspace Buffer/Park3.8 acres
Park
GreenspaceBuffer
Montana State UniversityInnovation CampusSite CirculationStudy03.14.149city zoning
projectsite
BP - Business ParkPLI - Public Lands/Inst.B-2 - Community Busin.
Pages 9 - 16 show how traffic can be dispersed in and around the inno-vation campus in order to serve the community needs and the goals of the project
■ Zoning around the site includes PLI lands to the south of the project. This land is owned by the State (MSU)
Montana State UniversityInnovation CampusSite CirculationStudy03.14.1410MSU long-rangeframework plan
57Chapter 4: Elements and Principles of the Framework Plan
'SBNFXPSL1MBO%JTUSJDUT.BQ
projectsite
■ MSU plans to use this PLI land for agricultural use. Agricultural use by nature generates minimal traffic
■ According to the Framework Plan, this agricultural use should be insulat-ed from private use
Montana State UniversityInnovation CampusSite CirculationStudy03.14.1411MSU long-range
development plan
projectsite
Agricultural
■ The MSU Long Range Development Plan shows minimal use in and through their site reducing the need for 27th to connect with College in the near future
27th Avenue
Montana State UniversityInnovation CampusSite CirculationStudy03.14.1412existing circulation
Existing Paved Road
Existing Gravel Road
Legend
College
Garfield
Huffine
19thKagy
Lincoln
Stucky27th (Gravel)FolwerTechnology29thprojectsiteProfessional 23rd■ 27th Aveune is currently gravel and is not continuous to the southern communities
■ Existing road framework around the site allows traffic to disperse around the site. Users will not be inconve-nienced from current patterns without 27th through the site
■ Currently, those traveling south from the west commonly use Fowler to access Garfield to 19th. Those from the north use 23rd to College, and those from the east generally use 19th Avenue. Thus, the need for the community to traverse through the site is fairly minimal
Montana State UniversityInnovation CampusSite CirculationStudy03.14.14132007 transportation plan
future connections
Principal Arterial
S 19th AveJohnson
Kagy
Stucky
W Lincoln
Garfield
Patterson FowlerCollegeHuffine
projectsite
Goldenstein
Blackwood
27th Minor Arterial
Collector
27th Avenue Collector
LegendCollector as shown on the 2007 Plan
■ According to the 2007 Greater Boz-eman Area Transportation Plan, 27th Avenue is shown as a "future collector"
Montana State UniversityInnovation CampusSite CirculationStudy03.14.1414traffic dispersal patterns
Principal Arterial
S 19th AveJohnson
Kagy
Stucky
W Lincoln
Garfield
Patterson FowlerCollegeHuffine
projectsite
Goldenstein
Blackwood
27th Minor Arterial
Collector
27th Avenue Collector
Legend
see detailpage 10
local streets
traffic flowdiagram
■ Traffic is gathered from local streets to Collector Streets. Collectors funnel traffic to Arterials. Arterials are designed to conduct major traffic to destination points
Collectors serve to effi-ciently move traffic from local streets to arterials
Traffic is dispersed from 27th to 19th Avenue or-Fowler/Cottonwood
Montana State UniversityInnovation CampusSite CirculationStudy03.14.1415detail
traffic dispersal patterns
Principal Arterial
College
Minor Arterial
Collector
27th Avenue Collector
Legend
Garfield
Lincoln
Kagy
Stucky 19th27thHuffine
FowlerTechnologyprojectsite
to southerncommunities
funnel trafficto arterialsfunnel trafficto arterials
traffic to/fromwest traffic to/fromeastMSU agriculturalland - minimal traffic
funnel trafficto arterials andthrough commercial areas
Future Traffic Signal - MDT
Existing Traffic Signal
■ Most traffic traveling north on 27th Avenue should be dispersed from 27th at Kagy. North of Kagy, MSU agricultural lands will produce min-imal traffic. This will ease the traffic burden of 27th Avenue at Garfield Street and the project site
■ Vehicles from the west traveling south can use Fowler
■ Vehicles from the east traveling south use 19th
■ Vehicles from the north use 23rd to flow east on College
move traffic through commercial areas23rd
Montana State UniversityInnovation CampusSite CirculationStudy03.14.1416MSUIC proposed circulationExisting Local Street
Legend
to BozemanGateway
Existing Arterial Street
Proposed Bicycle Route in Roadway/Sidewalk in ROW
Existing Trail/Walk
23rd
College
Garfield ResearchTechnology19th29thto Folwer
Huffine
‘businessloop’
27thAvenue
Proposed Pathway
Future Sidewalk
Existing Collector Street
MSUIC Proposed Street
traffic from Huffinecan use 29th traffic at 23rd can use Technology/Research
traffic from Garfield to 23rd can use Research/Technology
most traffic east can be directed to 19th Avenuemost traffic west can be directed to Fowler
Bicycle/Pedestrian Route in27th Avenue ROW
ability will be provided for pedestrians to traverse site from College to Garfield in the wetland buffer
Future Street Connection (if required)
traffic from College/Garfield to/from 29th can use Tech-nology to traverse project
traffic from Garfield to College can use 29th
Montana State UniversityInnovation CampusSite CirculationStudy03.14.1417MSUIC phasing plan
Phasing Plan
Garfield
College
Phase One - Summer 2014 Constructionfuturephase
futurephasefuturephase
futurephase
Phase one will include access path and utilities within the ROW in this section. Roadway north of its intersection with Technology Boulevard will be part of a future phase - if required
Wetland rehabilitation