HomeMy WebLinkAbout14- Modification No. 1 Montana Department of Environmental Quality DEQ for Protecting Bozeman WatersDEQ Contract 213031
CONTRACTOR'S COPS' Modification 1
MODIFICATION 1 TO 213031
City of Bozeman (Contractor) and the Montana Department of Environmental Quality (DEQ)
mutually agree to modify DEQ Contract #213031. The purpose of 213031 is Protecting
Bozeman Waters.
Contractor and DEQ mutually agree to modify 213031 by replacing Attachment A with
Attachments A-1 respectively and extending the completion date for the project.
Subsection 1.1 of Section 1 entitled "EFFECTIVE DATE, DURATION, AND RENEWAL" is
modified as follows:
1.1. "Contract Term. The Contract's initial term is from the date of Contract execution,
with the effective date being the latter of the two signatures, through dune 30014
June 30, 2015, unless terminated earlier as provided in this Contract. In no event is
this Contract binding on DEQ unless the DEQ's authorized representative has signed
it. DEQ's authorized signatory for this Contract is the Contracts Officer for the
Department of Environmental Quality."
2. Section 2 entitled "SERVICES" is modified as follows:
"Contractor shall conduct and administer the services, as described in "Attachment
AAA=1" entitled "Protecting Bozeman's Waters," attached hereto and incorporated
herein by reference."
3. Subsection 4.1 of Section 4 entitled "CONSIDERATION" is modified as follows:
4.1 "In consideration of services rendered pursuant to this Contract, DEQ agrees to
reimburse Contractor up to a maximum of $10,000 for the actual, reasonable, and
necessary expenditures allowed in paragraph (2) below, according to the budget
amounts identified in "Attachment A A-1."
4. Section 20 entitled "LIAISONS" is modified as follows:
All project management and coordination on DEQ's behalf must be through a single point of
contact designated as DEQ's liaison. Contractor shall designate a liaison who will provide
the single point of contact for management and coordination of Contractor's work. All work
performed under this Contract must be coordinated between DEQ's liaison and Contractor's
liaison.
Ann McCauley, or successor, will be the liaison for DEQ.
1520 E. 6 1 Ave
Helena, MT 59601
Telephone:406.444.9897
Fax: 406.444.6836
E-mail: amccauley@mt.gov
Page 1 of 2
DEQ Contract 213031
Modification 1
Di mt+n de#asen Brian Heaston, or successor, will be the liaison for the Contractor.
121 N. Rouse Ave.
Bozeman, MT 59771
Telephone: 406.582.2288 2280
E-mail: bheaston(a)bozeman.net
All other terms and conditions remain as previously stated or modified.
IN WITNESS THEREOF, Contractor and DEQ have executed this Modification 1 of 213031 on
the dates set out below.
CITY OF BOZEMAN
y-z-Iy �` 9.XIAL
DATE Chris Kukulski, City Manager
121 N. Rouse Ave.
Bozeman, MT 59771
Federal Employer's ID No. 81-6001238
MONTANA DEPARTMENT OF ENVIRONMENTAL
QUALITY
DATE VICKI J. WOWDRCW_ARMZ��
Approved for legal content by:
DEdltttorney
Contracts and Procurement
Financial Services
Metcalf Building, Room 003
1520 E. Sixth Avenue
Helena, MT 59620-0901
Page 2 of 2
DEQ Contract No. 213031
Attachment A-1
ATTACHMENT A-1
DEQ Contract No. 213031
Protecting Bozeman's Waters
Contractor: City of Bozeman
Chris Kukulski
121 N. Rouse Ave; P.O. Box 1230
Bozeman, MT 59771
DEQ Project Manager:
Ann McCauley, (406) 444-9897, amccauley@mt.gov
Contractor Contact
Dusts. jehRsen, (nnn 582 2298 c Brian
Heaston. (406)582-2280. bheastonCwbozeman.net
Contract End Date:
c"^.�46 30 2015
319 Funds:
$ 10,000
Non -Federal Matching Funds:
$14,000
Total Project Cost:
$ 24,000
PURPOSE: The purpose of this project is to develop an education and outreach program to
promote understanding of lawn care and riparian area Best Management Practices (BMPs) in the
Bozeman area. The program shall be targeted to specific property owners and land managers that have
the potential to substantially reduce nonpoint source pollution through BMP implementation.
TASK 1—PROJECT PLANNING AND COORDINATION
Task 1 Description: Contractor shall research and identify land management uses in the greater
Bozeman area that have the potential to substantially reduce nonpoint source pollution through BMP
implementation. Targeted land uses may include golf courses, sod farms, the City of Bozeman's public
parks, Montana State University property, local school property, and other commercial and residential
properties.
From the list of identified land uses, Contractor shall contact a minimum of ten property owners and
land managers about current land management practices to guide the development of the education
and outreach program described in Task 2, and to solicit participation in the education and outreach
program.
Task 1 Funding: 319 Funds $ 2,000
Non -Federal Match $ 2,000
Task 1 Timeline: Upon contract execution through !2 'gin 05/31/2014
Task 1 Deliverables: Contractor shall submit to DEQ the following deliverables:
A list of specific individuals, organizations, schools and universities, municipalities, and other
entities that were identified and contacted for participation in the education and outreach
project.
Summary of meeting notes with each contacted property owner and/or land manager.
Page 1 of 4
DEQ Contract No. 213031
Attachment A-1
TASK 2—EDUCATION AND OUTREACH PROGRAM
Task 2 Description: Contractor shall develop an education and outreach program targeted to
property owners and land managers identified in Task 1. Contractor shall coordinate with local water
quality protection groups, including the Greater Gallatin Watershed Council, the Gallatin Local Water
Quality District, and Montana State University Extension Water Quality, and other stakeholders in
developing the education and outreach program. Contractor shall obtain DEQ's approval in writing for
any contracted services related to the development of the education and outreach program.
Contractor shall ensure that participants receive background information on NPS pollution in the
Bozeman area, proposed solutions, and BMPs for proper lawn care and riparian restoration through
presentations and printed handouts. Additional outreach may include direct mailings, on-site visits,
web -based presentations, or other media -outlet presentations. Contractor shall provide resources for
participants interested in pursuing BMP implementation.
Task 2 Funding: 319 Funds $ 7,000
Non -Federal Match $ 7,000
Task 2 Timeline: Upon contract execution through 6/'^�4-12/31/2014
Task 2 Deliverables: Contractor shall submit to DEQ the following deliverables:
• A list of individuals, organizations, agencies, and other entities participating in the education and
outreach program.
• A draft copy of each educational material produced to be reviewed by DEQ Project Manager.
• A final version of each educational material produced in electronic and hard copy format.
• Presentation agendas, photos, and attendee sign -in sheets.
TASK 3 — PROJECT EFFECTIVENESS EVALUATION
Task 3 Description: Contractor shall monitor the effectiveness of education and outreach activities
through follow-up surveys with project participants. Contractor shall work with the DEQ Project
Manager and partner groups to prepare a survey that captures the level of participation, subject
awareness, and the likeliness of BMP implementation.
Task 3 Funding: 319 Funds $ 1,000
Non -Federal Match $ 2,000
Task 3 Timeline: Upon contract execution through 6/'^406/30/2015
Task 3 Deliverables: Contractor shall submit to DEQ the following deliverables:
• A draft copy of the survey for review by DEQ Project Manager.
• A final copy of the survey.
• Survey results and summary of project effectiveness to be included in Final Report prepared for
Task 4, Contract Administration.
Page 2 of 4
DEQ Contract No. 213031
Attachment A-1
TASK 4 — PROJECT ADMINISTRATION
Task 4 Description: Contractor shall oversee and be accountable for the completion of all tasks.
Contractor shall prepare and submit attachment B -billing statements, status reports, annual reports,
and a final report (details are listed below). Contractor shall maintain regular contact as defined by the
DEQ project manager.
Status Report and Billing Statement (Attachment B)
• Whether there is activity or not, the contractor shall submit a status report quarterly. Reports
must be received by DEQ within 15 days following the end of each calendar quarter.
0 1" Quarter (January - March): April 15
0 2nd Quarter (April -June): July 15
0 3`d Quarter (July -September): October 15
o Annual Reports shall supersede the fourth quarter (October through December) report
(i.e., a separate status report shall not be required for the fourth quarter). Annual
Reports (including the 4`h quarter attachment B -billing statement) are due January 15
following the calendar year upon which the report is based.
• Contractor shall bill DEQ no more frequently than monthly, and no less frequently than
quarterly. Every attachment B -billing statement must include a status report. Contractor shall
submit status reports to DEQ using the most current guidance and template available at
http://deg.mt.gov/wqinfo/nonpointl319Grants.mcpx.
Annual Reports
Contractor shall submit an annual report for each calendar year in which the contract is active,
except in the final year, when the final report shall replace the annual report.
Contractor shall submit annual reports to DEQ using the most current guidance and template
available at http://deq.mt.gov/wginfo/nonpoint/319Grants.mcpx
Contractor shall ensure annual reports are received by DEQ by January 15 following the calendar
year upon which the report is based.
Final Reports
• Contractor shall submit a complete draft to DEQ for review and comment.
• Contractor shall submit the final report, addressing DEQ comments.
• The final report must be received by DEQ within 45 days after eitherthe project is completed or
the contract expires whichever is first.
• Contractor shall attach electronic and hard copies of all of the deliverables from all tasks,
regardless of whether or not copies of the deliverables were submitted previously.
• The final report must be a stand-alone report that documents the contract from beginning to
end.
Contractor shall complete the final report using the most current final report guidance available at
http:lZdeg.mt.gov/wqinfo/nonpoint/319Grants.mcpx
Task 4 Funding: 319 Funds $ 0,000
Non -Federal Match $ 3,000
Page 3 of 4
DEQ Contract No. 213031
Attachment A-1
Task 4 Timeline: Upon contract execution through 6/'^406/30/2015
Task 4 Deliverables: Contractor shall submit to DEQ the following deliverables as described in the
Task 4. Description: Status Reports, Annual Reports, Attachment B -Billing Statement and a Final Report.
Contractor shall ensure that all reports are written clearly, and require only a minimal amount of editing
by the DEQ project manager.
Contractor shall do the following with respect to all deliverables associated with all tasks in this contract
(not just Task 4).
• Contractor shall adhere to document formatting guidance provided by the DEQ project
manager.
• Contractor shall submit all draft documents in electronic format.
• Contractor shall submit all final documents in both electronic (e.g., PDF and Word formats) and
hard copy formats.
• Contractor shall submit all electronic documents using the file format prescribed by the DEQ
project manager.
• Contractor shall submit all electronic deliverables and reports to the DEQ project manager
using email or if files are greater than 2.5 megabytes in size using the State of Montana File
Transfer Service (www.transfer.mt.gov) or as directed to by the DEQ project manager.
• Contractor shall submit all hard copy documents, attachment B —billing statements and other
deliverables to Robyn Boyle (rboyle@mt.gov), Grant Contract Coordinator, at PO Box 200901,
Helena MT 59620-0901.
Page 4 of 4