Loading...
HomeMy WebLinkAboutAmendment to Prof. Services Agreement with Tetra Tech for Soil Gas Investigation at SM Landfill_4 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Rick Hixson, City Engineer Craig Woolard, Public Works Director Dustin Johnson, Project Engineer SUBJECT: Amendment to Professional Services Agreement with Tetra Tech Inc. for ongoing post-closure soil gas investigation at the Story Mill Landfill. MEETING DATE: May 19, 2014 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize City Manager to sign. BACKGROUND: Since the City of Bozeman has been required by the Montana Department of Environmental Quality (DEQ) to monitor the environmental impacts of the Story Mill Landfill Tetra Tech (previously Maxim Technologies) has been contracted with the City to serve as a consultant. The nature of the contract has been to provide consulting services to the City of Bozeman in the form of sampling, drafting technical reports to the DEQ, and keeping the landfill in compliance with State and Federal regulations. In a previous task orders regarding the soil gas investigation Tetra Tech’s research found volatile organic compounds (VOCs) in the soil in the residential area south of the landfill. Based on these results city staff and Tetra Tech determined it was necessary to conduct indoor air sampling on residences in the area of concern. From this indoor air sampling it was determined that sub-slab sampling would be necessary to better understand the migration of soil gas from the landfill. The results of all of these samples were used to decide to install soil gas mitigation systems for those who requested them in the homes of Bridger Creek Phase III at no cost to the homeowner. The attached task order continues the field investigation, monitoring of gas mitigation systems within the homes of Bridger Creek Phase III Subdivision, public outreach, reporting, and project management. The proposed cost for this task order is $159,320.40. 13 FISCAL EFFECTS: The entire project will be funded through the Solid Waste Landfill Closure/Post-Closure Fund. ALTERNATIVES: As suggested by the City Commission. Attachments: Task Order and estimated budget from Tetra Tech Inc. Report compiled on: 5/8/14 14 Task Order Task Order for 2014 Activities on Vapor Intrusion Project Bozeman Landfill Bozeman, Montana April 4, 2014 CLIENT: CONSULTANT: The City of Bozeman Tetra Tech, Inc. P.O. Box 1230 851 Bridger Drive, Ste 6 Bozeman, Montana 59711-1230 Bozeman, MT 59715 Attention: Mr. Rick Hixson, PE Attention: Mr. Kirk A. Miller INTRODUCTION This Task Order outlines activities anticipated to be conducted during 2014 to continue the vapor intrusion investigation and mitigation work at the Story Mill Landfill site. The scope of some tasks initiated in 2013 have also expanded or are projected to exceed our initial estimates hence, additional budgets are requested. The Project Management, Community Relations and Database Management tasks are projected to require work well into 2014, hence, additional funds are needed to support our work going forward. Background Volatile organic compounds (VOCs) were discovered in soil gas at the south boundary of the Bozeman Landfill in 2012. Follow-up investigations have included a soil gas investigation in the Phase 3 Subdivision and air sampling of indoor, subslab, or crawlspace or outdoor locations. These samples have also been collected in four residential structures in the Bridger Creek Phase 2 Subdivision. Mitigation systems have been installed and are operating in 26 homes in the Bridger Creek Phase 3 Subdivision. SCOPE OF WORK This Modification is for the following work, which is in excess of our initial Task Order. Air Monitoring for Phase 3 Mitigation Tetra Tech has collected more air samples than originally expected during the pre-mitigation and post mitigation sampling efforts, due to the addition of two new homes constructed in the neighborhood and more oversight labor hours per home than we initially projected. In addition, costs for the reporting phase (i.e., individual homeowner letters) have been greater than we originally anticipated. Mitigation System Installation and Oversight of Contractor The original Task Order anticipated 26 homes would require mitigation systems, however, two new homes have been constructed in the neighborhood, increasing the scope of work. In addition, we have had numerous requests by homeowners to modify the traditional mitigation system. This has included moving piping and fans to less obtrusive locations in the home, adding sheetrock covers over piping runs, adding boxed in covers over vent piping, carrying piping to the highest roof line in the home, using custom colored piping or downspouts to match exterior colors and other home specific modifications. These additional items have been 15 Task Order – April 2014 Modification Bozeman Landfill, Bozeman, Montana April 4, 2014 Page 2 of 2 provided in order to maintain a satisfied homeowner that will continue to cooperate with the City, however, these additions have been requested after systems are installed. The process of getting City electrical inspectors into each home to inspect and approve the switches and power supply to the mitigation system fans has been conducted as a separate activity since it was difficult to coordinate inspector schedules with the homeowners and radon contractor during system installation. The result is longer installation times, which in turn increases Tetra Tech’s observation hours. Additional thermal imaging contractor inspections have been required due to their being more radiant heat systems than anticipated and we also had several return visits when a second extraction point or additional vacuum monitoring points were determined to be necessary. Project Management, Database Management, Data Validation and Reporting The previous project management budgets have been expended as a result of project meetings, preparation for the recent public meetings and responding to homeowner questions and concerns. Additional funds are proposed to continue to provide these services through summer 2014. The additional sampling work outlined above also requires data validation and entry of the analytical data into the project database (Microsoft Access). This will in turn support generation of data tables, maps and GIS analysis as needed throughout this work plan and other phases of the project. Community Relations While this task is expected to include another public meeting sometime during spring/summer 2014, it also will include assisting the City in their dealings with bankers, realtors, appraisers and homeowners. This part of the task will entail developing graphics and materials to provide clear, simple presentations of the affects the mitigation systems have had on in-home air quality to help them move forward with lending on homes in the Bridger Creek subdivision. Compensation Estimated costs to complete the foregoing scope of services are not to exceed $159,320. A breakdown of these proposed expenditures is contained in the attached cost estimate. The services will be conducted on a time and materials basis. Special Conditions Execution of this Task Order constitutes acceptance of all terms and conditions contained in Tetra Tech’s Professional Services Agreement with the City of Bozeman, dated January 3, 1994 and Amendment Nos. 1, 2, 3, and 4 of the Professional Services Agreement dated July 31, 1995; January 1, 1996; March 17, 1997; and December 10, 2001, respectively. CLIENT: CONSULTANT: City of Bozeman Tetra Tech By: By: Its: Its: Sr. Project Manager Date: Date: April 4, 2014 16 ESTIMATED BUDGET MODIFICATION TO CONTRACT FOR SITE INVESTIGATION, MITIGATION BOZEMAN LANDFILL BOZEMAN, MONTANA Date Submitted: 4/4/2014 Air Monitoring For Phase 3 Mitigation Field Work Units Rate Cost Project Manager/Senior Hydrogeologist, per hour 64 $150.00 $9,600.00 Assistant Project Manager/Hydrogeologist, per hour 60 $95.00 $5,700.00 Environmental Scientist, per hour 120 $95.00 $11,400.00 Field Technician, per hour 120 $65.00 $7,800.00 Clerical 24 $55.00 $1,320.00 Subtotal $35,820.00 DIRECT COSTS Tetra Tech Vehicle Mileage, per mile 500 $0.56 $280.00 Per Diem and Lodging, per person per day 10 $140.00 $1,400.00 Sampling Media and Analytical Costs 6L SUMMA Canister, certification & rental, each 40 $55.00 $2,200.00 24-hr Flow Controller, certification & rental, each 22 $20.00 $440.00 1/2-hr Flow Controller, certification & rental, each 18 $15.00 $270.00 TO-15 Analysis, each 40 $140.00 $5,600.00 Client Specific EDD, each 2 $5.00 $10.00 Duplicate Sampling T, certification & rental, each 3 $8.00 $24.00 Sampling Disposables - Miscellaneous, each 12 $10.00 $120.00 Helium Meter, per week 2 $375.00 $750.00 Helium, estimate 1 $300.00 $300.00 Miscellaneous Shipping, estimate 2 $100.00 $200.00 Lab Sample Shipping (overnight to lab), estimate 1 $750.00 $750.00 TetraTech Subcontractor Markup (10%)$1,066.40 Subtotal $13,410.40 TOTAL $49,230.40 Mitigation System Installation and Oversight of Contractor Project Manager/Senior Hydrogeologist, per hour 80 $150.00 $12,000.00 Assistant Project Manager/Hydrogeologist, per hour 200 $95.00 $19,000.00 Field Technician, per hour 80 $65.00 $5,200.00 Administrative Personnel, per hour 4 $55.00 $220.00 Subtotal $36,420.00 Field Equipment Vacuum meter, per day 12 $25.00 $300.00 Vehicle, mileage 2,000 $0.60 $1,200.00 Per Diem and Lodging, per person per day 16 $140.00 $2,240.00 Infrared USA Thermal Imaging contractor (per house)8 $250.00 $2,000.00 TetraTech Subcontractor Markup (10%)$150.00 Subtotal $5,890.00 TOTAL $42,310.00 Project Management, Database Management and Data Validation Project Manager/Senior Hydrogeologist, per hour 120 $150.00 $18,000.00 Principal Engineer, per hour 40 $262.00 $10,480.00 Assistant Project Manager/Hydrogeologist, per hour 16 $95.00 $1,520.00 Environmental Chemist, per hour 40 $110.00 $4,400.00 Database/GIS Analyst, per hour 40 $95.00 $3,800.00 Administrative Personnel, per hour 16 $55.00 $880.00 Subtotal $39,080.00 DIRECT COSTS Vehicle, mileage 2,000 $0.60 $1,200.00 AND PROJECT MANAGEMENT Tetra Tech17 Per Diem and Lodging, per person per day 6 $140.00 $840.00 Subtotal $2,040.00 TOTAL $41,120.00 Community Relations Project Manager/Senior Hydrogeologist, per hour 60 $150.00 $9,000.00 Assistant Project Manager/Hydrogeologist, per hour 40 $95.00 $3,800.00 Environmental Scientist, per hour 60 $110.00 $6,600.00 Database/GIS Analyst, per hour 60 $95.00 $5,700.00 Field Technician, per hour $65.00 $0.00 Administrative Personnel, per hour 24 $55.00 $1,320.00 Subtotal $26,420.00 DIRECT COSTS Photocopies, estimate 400 $0.10 $40.00 Reprographics, estimate 4 $50.00 $200.00 Subtotal $240.00 TOTAL $26,660.00 TOTAL OF ALL TASKS $159,320.40 Tetra Tech18 Task 1: Pilot Testing of Regenesis Hydrogen Release Compound Test Design Units Senior Engineer or Hydrogeologist, per hour 12 Hydrogeologist, per hour 16 CAD Operator, per hour 8 Clerical, per hour 3 Miscellaneous design materials, estimate 1 Subtotal Contracted Drilling Services Drill/complete three 4-inch diameter wells and one 2-inch diameter well Askin Estimate #2057 for well completions 1 Tetra Tech subcontractor markup (10%) Subtotal Field Work Units Senior Hydrogeologist, per hour 2 Hydrogeologist, per hour 82 Mileage, per mile 1,100 Per diem, per person per day 8 Clerical, per hour 1 Subtotal Equipment, Materials, and Analytical Instrumentation, rental estimate 1 Regenesis product (includes shipping), estimate 1 Regenesis product shipping, estimate 1 Water truck, per hour 4 Water pump rental, per day 1 September 9, 2011 ATTACHMENT A COST ESTIMATE WORK PLAN FOR PRELIMINARY TESTING OF REMEDIAL ALTERNATIVES Richland County Landfill – License #102 Richland County, Montana 19 Analytical - inorganics, metals (Table 1), and VOCs (Method 8260), per sample 2 Miscellaneous materials, estimate 1 Tetra Tech subcontractor markup (10%) Subtotal Follow-up Monitoring Assumed to be responsibility of Richland County Units Analytical - Inorganics, metals (Table 1), and VOCs (Method 8260), per sample 8 Project Management and Reporting Senior Engineer or Hydrogeologist, per hour 15 Hydrogeologist, per hour 40 CAD Operator, per hour 12 Clerical, per hour 2 Miscellaneous reporting materials, estimate 1 Subtotal Task 1 Total Task 2: Preliminary Active Landfill Gas Extraction Study Task 2A Installation of LFG extraction wells Preparation Units Senior Engineer or Hydrogeologist, per hour 1 Hydrogeologist, per hour 16 CAD Operator, per hour 0 Clerical, per hour 1 Subtotal Contracted Drilling Services Drill/complete eight LFG extraction wells. Four wells to 40 feet TD and four wells to 20 feet TD Askin Estimate #2057 for well completions 1 Tetra Tech subcontractor markup (10%) Subtotal Field Work Units Senior Hydrogeologist, per hour 2 Hydrogeologist, per hour 62 Mileage, per mile 880 20 Per diem, per person per day 6 Clerical, per hour 1 Subtotal Equipment, Materials, and Analytical Units Landfill gas meter, per day 5 Analytical - inorganics, metals (Table 1), and VOCs (Method 8260), per sample 4 (Possible leachate samples collected from LFG wells) Subtotal Report Preparation Senior Engineer or Hydrogeologist, per hour 1 Hydrogeologist, per hour 8 CAD Operator, per hour 6 Clerical, per hour 1 Subtotal Task 2A Total Task 2B Deep Cells LFG Evaluation Field Work Units Senior Engineer, per hour 4 Hydrogeologist, per hour 70 Mileage, per mile 1,540 Per diem, per person per day 4 Clerical, per hour 1 Subtotal Equipment, Materials, and Analytical Regenerative Blower and Generator, 1 week rental estimate 2 Instrumentation, rental estimate 1 Landfill gas meter, per day 5 SUMMA® canister rental, each 6 Gas sample analysis (TO-15 SIM), per sample 6 Gas Samples shipping Lab to Sidney 6 Gas Samples shipping Sidney to Lab 6 Miscellaneous materials/equipment, estimate 1 Tetra Tech subcontractor markup (10%) Subtotal Report Preparation Units 21 Senior Engineer or Hydrogeologist, per hour 8 Hydrogeologist, per hour 36 CAD Operator, per hour 4 Clerical, per hour 1 Subtotal Task 2B Total Task 2C Design active LFG extraction system, permit application Design Senior (BAS) Engineer, per hour 40 Project (BAS) Engineer, per hour 120 CAD (BAS) Operator, per hour 60 Administrative Assistant (BAS), per hour 8 Permit fee, estimate 1 Subtotal Task 2C Total Task 2D Construct active LFG extraction system Gas extraction Installation, estimate per acre 6 Flare or GAC treatment system, estimate 1 Ancillary materials, estimate 1 Power installation, estimate 1 Subtotal Construction Field Oversight Units Senior Engineer, per hour 8 Hydrogeologist, per hour 180 Construction Materials Technician, per hour 300 Mileage, per mile 10,820 Per diem, per person per day 48 Clerical, per hour 4 Subtotal Prepare As-Built Report Senior (BAS) Engineer, per hour 4 Project (BAS) Engineer, per hour 50 Hydrogeologist, per hour 50 CAD (BAS) Operator, per hour 24 22 Administrative Assistant (BAS), per hour 2 Subtotal Task 2D Total Task 2E Operation and Maintenance of Active LFG Extraction System Assume O&M for a period of two years. Power costs not included. Field Work Units Senior Engineer, per hour 8 Hydrogeologist, per hour 120 Staff Scientist, per hour 112 Mileage, per mile 2,200 Per diem, per person per day 4 Clerical, per hour 4 Subtotal Equipment, Materials, and Analytical Landfill Gas Meter, per day 16 Tedlar bag, each 16 Gas sample analysis (TO-15 SIM), per sample 16 Gas Samples shipping Sidney to Lab 4 Miscellaneous materials/equipment, estimate 4 Plumber, estimate per hour 4 Electrician, estimate per hour 4 Tetra Tech subcontractor markup (10%) Subtotal Operation and Maintenance Reporting Senior Engineer or Hydrogeologist, per hour 4 Hydrogeologist, per hour 32 Clerical, per hour 4 Subtotal Task 2E Total Task 2 Total Task 3: Preliminary Groundwater Withdrawal Assessment Field Work Units Senior Hydrogeologist, per hour 20 23 Hydrogeologist, per hour 76 Staff Scientist, per hour 60 Mileage, per mile 550 Per diem, per person per day 6 Clerical, per hour 1 Subtotal Equipment and Materials Submersible pump (ProActive Mega-Monsoon® pump), each 1 Power booster/controller 1 Generator 4 Pressure transducers and laptop computer 1 Miscellaneous materials/equipment, estimate 1 Tetra Tech subcontractor markup (10%) Subtotal Report Preparation Senior Engineer or Hydrogeologist, per hour 16 Hydrogeologist, per hour 40 CAD Operator, per hour 4 Clerical, per hour 1 Subtotal Task 3 Total TOTAL OF ALL TASKS Tetra personnel labor cost to client 24 Notes: Rate Cost $150.00 $1,800.00 $95.00 $1,520.00 $65.00 $520.00 $55.00 $165.00 $100.00 $100.00 Estimate $4,105.00 $0.00 $0.00 Used Worksheet Task 1 Askin Drilling $0.00 $0.00 Rate Cost Assume 3 days drilling and well completion, 1 day for aquifer (slug) testing in new wells, and 2 days for product application for total of 6 10-hour days $150.00 $300.00 Include 12 hours driving and 10 hours prep Tt personnel mob from Billings office and stay in Glendive $95.00 $7,790.00 $0.56 $616.00 Billings to Sydney round trip 550miles $140.00 $1,120.00 Added miles for Accomodation in Glendive 110miles $55.00 $55.00 $9,881.00 $200.00 $200.00 Aquifer (slug) test equipment $3,356.00 $3,356.00 Regenesis has recommended the type and volume of product to be used for pilot test $300.00 $300.00 Regenesis Proposal #BRG40692 $75.00 $300.00 Water truck or water tank rental for injection $75.00 $75.00 WORK PLAN FOR PRELIMINARY TESTING OF REMEDIAL ALTERNATIVES 25 $350.00 $700.00 Pre-test monitoring, two wells. Tt will pay for these. $200.00 $200.00 $493.10 $5,624.10 Rate Cost $350.00 $2,800.00 Four monitoring events conducted quarterly for one year to include metals, inorganics, and VOCs. One monitoring well upgradient of the test site and the observation well would be sampled. Richland Co will pay for these. $150.00 $2,250.00 $95.00 $3,800.00 $65.00 $780.00 $55.00 $110.00 $100.00 $100.00 $7,040.00 $26,650.10 Pilot test will be run for two years Rate Cost $150.00 $150.00 $95.00 $1,520.00 $65.00 $0.00 $55.00 $55.00 $1,725.00 $18,941.00 $18,941.00 Used Worksheet Task 1 Askin Drilling $1,894.10 $20,835.10 Rate Cost $150.00 $300.00 $95.00 $5,890.00 Assume 4 days drilling and well completion for total of 4 10-hour days $0.56 $492.80 Include 12 hours driving and 10 hours prep Tt personnel mob from Billings office and stay in Glendive 26 $140.00 $840.00 $55.00 $55.00 Billings to Sydney round trip 550miles Added miles for Accomodation in Glendive 110miles $7,577.80 Rate Cost $50.00 $250.00 $350.00 $1,400.00 Possible leachate samples collected from LFG wells $1,650.00 $150.00 $150.00 $95.00 $760.00 $65.00 $390.00 $55.00 $55.00 $1,355.00 $35,392.90 Rate Cost $150.00 $600.00 Assume 3 days field work per well for total of 6 8-hour days $95.00 $6,650.00 Include 12 hours driving and 10 hours prep Tt personnel mob from Billings office and stay in Glendive $0.56 $862.40 $140.00 $560.00 Billings to Sydney round trip 550miles $55.00 $55.00 Added miles for Accomodation in Glendive 110miles $8,727.40 $600.00 $1,200.00 Connect to 4" diam well for assessment of landfill gas. Assume two 3-day tests. $200.00 $200.00 $50.00 $250.00 $55.00 $330.00 Atmaa quote 818-223-3277 $350.00 $2,100.00 May 2011 quote for Bozeman Landfill from Atmaa Laboratory, no markup $103.00 $618.00 2 boxes, 20# each sent by FedEx - Std Overnight $103.00 $618.00 2 boxes, 20# each sent by FedEx - Std Overnight $200.00 $200.00 Estimate $551.60 $6,067.60 Rate Cost 27 $150.00 $1,200.00 $95.00 $3,420.00 $65.00 $260.00 $55.00 $55.00 $4,935.00 $19,730.00 $198.00 $7,920.00 - This is also a rate for a BAS division engineer $156.00 $18,720.00 Brian A. Stirrat & Assoc. (BAS) Rates $90.00 $5,400.00 Telecom with Greg Acosta, Division Engineer $80.00 $640.00 Not used:BAS Staff Engineer $1,000.00 $1,000.00 $33,680.00 $33,680.00 $35,000.00 $210,000.00 Tt (BAS) estimate for typical active gas extraction system installation. Includes wellhead valving, piping, and condensate collection $101,430.00 $101,430.00 $40,000.00 $40,000.00 $20,000.00 $20,000.00 $371,430.00 Rate Cost $150.00 $1,200.00 Assume 30 working days for construction of system (6 weeks) $95.00 $17,100.00 $75.00 $22,500.00 Assume 30 days CMT labor at 10 hours per day and four trips between Billings and Sydney $0.56 $6,059.20 Billings to Sydney round trip 550miles Added miles for Accomodation in Glendive 110miles $140.00 $6,720.00 $55.00 $220.00 Assume 18 days Field Project Manager labor at 10 hours per day and six trips between Bozeman and Sydney Billings to Sydney round trip 850miles $53,799.20 Added miles for Accomodation in Glendive 110miles $198.00 $792.00 - This is also a rate for a BAS division engineer $156.00 $7,800.00 Brian A. Stirrat & Assoc. (BAS) Rates $95.00 $4,750.00 $90.00 $2,160.00 Telecom with Greg Acosta, Division Engineer 28 $80.00 $160.00 Not used:BAS Staff Engineer $15,662.00 $440,891.20 Rate Cost $150.00 $1,200.00 Assume one Tt hydrogeologist to conduct four site visits to adjust system and sample gas. 2 days per site visit. $95.00 $11,400.00 Include 12 hours driving, 10 hours prep, 8 hours field work for total of 30 per site visit $75.00 $8,400.00 $0.56 $1,232.00 Billings to Sydney round trip 550miles $140.00 $560.00 Added miles for Accomodation in Glendive 110miles $55.00 $220.00 $23,012.00 $50.00 $800.00 - Semi-annual gas sampling and analysis $25.00 $400.00 Atmaa quote 818-223-3277 $350.00 $5,600.00 May 2011 quote for Bozeman Landfill from Atmaa Laboratory, no markup $30.00 $120.00 $100.00 $400.00 $75.00 $300.00 $85.00 $340.00 $796.00 $8,756.00 $150.00 $600.00 Prepare four reports during the 2 year time duration $95.00 $3,040.00 8 hours per report $55.00 $220.00 $3,860.00 $35,628.00 $565,322.10 Rate Cost $150.00 $3,000.00 Assume 2 Tt personnel, 4 days field work for total of 4 12-hour days 29 $95.00 $7,220.00 Include 12 hours driving and 16 hours prep Tt personnel mob from Billings office and stay in Glendive $75.00 $4,500.00 $0.56 $308.00 Billings to Sydney round trip 550miles $140.00 $840.00 Added miles for Accomodation in Glendive 110miles $55.00 $55.00 $15,923.00 $599.00 $599.00 No Tt mark-uphttp://www.proactivepumps.com/Products/High%20Performance/Product_Detail_MegaMonsoon.html $360.00 $360.00 No Tt mark-uphttp://www.proactivepumps.com/Products/Controller%20and%20Power%20Boosters%20for%20PP/PowerBooster2Controller.html $50.00 $200.00 Estimate - Have assumed 24 hours per well site for 4-day field time duration $100.00 $100.00 $200.00 $200.00 $115.90 $1,574.90 $150.00 $2,400.00 $95.00 $3,800.00 $65.00 $260.00 $55.00 $55.00 $6,515.00 $24,012.90 $615,985.10 $176,167.00 30 Assume 3 days drilling and well completion, 1 day for aquifer (slug) testing in new wells, and 2 days for product application for total of 6 10-hour days Tt personnel mob from Billings office and stay in Glendive 1trips =550total miles 5trips =550total miles 1100miles Regenesis has recommended the type and volume of product to be used for pilot test 31 Four monitoring events conducted quarterly for one year to include metals, inorganics, and VOCs. One monitoring well upgradient of the test site and the observation well would be sampled. Tt personnel mob from Billings office and stay in Glendive 32 1trips =550total miles 3trips =330total miles 880miles Tt personnel mob from Billings office and stay in Glendive 2trips =1100total miles 4trips =440total miles 1540miles Connect to 4" diam well for assessment of landfill gas. Assume two 3-day tests. May 2011 quote for Bozeman Landfill from Atmaa Laboratory, no markup 33 BAS Staff Engineer $110.00 Tt (BAS) estimate for typical active gas extraction system installation. Includes wellhead valving, piping, and condensate collection Assume 30 days CMT labor at 10 hours per day and four trips between Billings and Sydney 4trips =2200total miles 30trips =3300total miles 5500miles Assume 18 days Field Project Manager labor at 10 hours per day and six trips between Bozeman and Sydney 6trips =5100total miles 2trips =220total miles 5320miles 34 BAS Staff Engineer $110.00 Assume one Tt hydrogeologist to conduct four site visits to adjust system and sample gas. 2 days per site visit. Include 12 hours driving, 10 hours prep, 8 hours field work for total of 30 per site visit Tt personnel mob from Billings office and stay in Glendive 4trips =2200total miles 0trips =0total miles 2200miles May 2011 quote for Bozeman Landfill from Atmaa Laboratory, no markup 35 Tt personnel mob from Billings office and stay in Glendive 1trips =550total miles 2trips =220total miles 770miles http://www.proactivepumps.com/Products/High%20Performance/Product_Detail_MegaMonsoon.html http://www.proactivepumps.com/Products/Controller%20and%20Power%20Boosters%20for%20PP/PowerBooster2Controller.html Estimate - Have assumed 24 hours per well site for 4-day field time duration 36