Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
14- Amendment 3 to the Professional Services Agreement with Morrison-Maierle for the North Seventh Lighting Design & Construction Administration
AMENDMENT NO. 3 TO PROFESSIONAL SERVICES AGREEMENT FOR NORTH 7TH LIGHTING DESIGN AND CONSTRUCTION ADMINISTRATION MMI.No.417.063 THIS IS AN AGREEMENT made as of 0.t4 S .20 1-.+,between THE CITY OF BOZEMAN,a Municipal Corporation,P.O.Box 1230, man,Montana,59771-1230(OWNER)and Morrison- Maierle,Inc.,P.O.Box 1113,Bozeman,Montana,59771.1113(ENGINEER). WHEREAS de parties previously entered into a Professional Services Agreement dated July 11,2011.herein referred to as the Original Agreement. for professional engineering services for the North 7" Lighting Design and Construction Administration project;and WHEREAS. the scope of the Original Agreement included preliminary design. final design, bidding and negotiating services,construction services and miscellaneous services: and WHEREAS, the scope of Amendment No.1 to the Original Agreement included additional miseellaneous services:and WIIFREAS, the scope of Anendmem No.2 to the Original Agreement included a pre-design investigation services phase;and WHEREAS,the parties desire to amend provisions of the Original Agreement to include additional preliminary design, limit design,bidding and negotiating services.construction services and miscellaneous services for the project. NOW,THEREFORE,IN CONSIDERATION OF THE MUTUAL COVENANTS CONTAINED HEREIN,the parties agree as follows: The conditions and provisions set forth in the attached EXHIBIT C-3 —SCOPE OF SERVICES FOR NORTH 7°1 LIGHTING DESIGN AND CONSTRUCTION ADMINISTRATION and EXHIBIT D-3 — ENGINEERING FEE ESTIMATE are hereby incorporated in and trade part of this agreement. The Scope of Services and Engineering Fees are increased per these exhibits. AR'T'ICLE 1 -ENGINEERING SF,RVICFS Article 1.1 of the original agreement is modified ur include the following: 1.1. 'the detailed description of the specific project components is described as follows: Perform preliminary and final design level engineering services for improvements to North T"Avenue,between West Juniper Street and West Main Street. Perform bidding and negotiating services and construction engineering services for improvements to North 7tb Avenue,between West Juniper Street and West Main Street. Perform miscellaneous services m requested by the City of Bozeman for improvements to North 7"'Avenue,between West Juniper Street and West Main Street. 1 ARTICLE 6-COMPENSATION FOR ENGINEERING SERVICE Article 6.1 of the original agreement is modified as follows: 6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.1.1 Payment. The OWNER shall for design phase services performed as Basic Engineering-Services under sections 4.1 through 4.3 of this agreement pay a total sunt in the amount of 5114.696.56 for suchservices. 6.1.2 Payment Schedule. Total cumulative payments for the design phase engineering services(sections 4.1 through 4.3)shall not exceed the following-ceilings: $24.339.56(-20''4 of design fee)until.the Pre-Design Investigation Phase report and exhibits have teen submitted to the OWNER. $72.099.(X1(-6OSP of design fee)until the Preliminary Plans and Specifications have been submitted to the OWNER and review authorities. $23.2500)(-20%of design fee)until the Final Plats and Specifications have been submitted to the OWNER and review authorities. 6.1.3 General. Engineer shall submit monthly statements for services rendered. The statements shall he based upon Engineer's estimate of the proportion of the total services actually completed at the time of billing.subject to any limitations on Payments based on completion of tasks or speci f is retainage rquirements pursuant to the payment provisions of the Agreement. 6.1.4 Reimbursable Expenses. Only those expenses specifically identified for payment under section 6z2 of this Agreement are reimbursable. All other design related expenses arc included in the Lump Sum Payment for the Basic services(4.1 through4.3)anti are not separately reimbursable. Additional Services specifically identified under the scope of design services for paynent under 6.1 are not separately reimbursable. 0.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINF,F,R. Article 6.2 of the original agreement is modified as follows: Construction and project documentation services performed as Basic Engineering Services under sections 4.4 through 4.7 including General Administration of Construction Contract,Resident Project Representation, Project Iheumentation,and Construction Testing shall be compensated in accordance with the following: 6.2 1 The OWNER shall pay for Construction Phase and Project Documentation Services an amnat not to exceed S92,8190) except as provided under 6.2.1.2 and 62.4. 6.2.L I Costs Compensation. Compensation for these services shall he based on the ENGINEER's Direct Labor Cost times a factor of 3.15 for services rendered which shall cover Direct Labor,Direct Labor Overhead.General&Administrative Overhead and Profit. 6.2.1.2 Notification. Al any titne during tile construction that it becornes apparent that the Construction Phase and Project Documentation Services rendered under this Agreement will exceed the negotiated compensation for these services, and prior to performing services in excess of the contract ceiling-,the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER,prior to any additional costs being incurred under paragraph 6.2.1.3. If it is determined that due to a change in project scope under paragraph 52.1. the ENGINEER is entitled to additional compensation.OWNER and ENGINEER may negotiate teens as provided under 6.2.1.1. The amount and 2 terms of any additional compensation under 6.2.1.1 or 6.2.1.3 shall be negotiated and agreed in writing pumuanl to 9.16. 6.2.1.3 Cost+Exceeding Estimated Comnensation. Except as allowed under 5.2.1,when the total cost of the original scope Construction phase and Project Documentation Services exceeds the negotiated compensation for these services,the OWNER shall pay only for the direct costs incurred in excess of he estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct Labor Cost times it factor of 2.74 for services rendered which shall include Direct Labor,the lcdcrlly audited payroll Direct Labor Overhead,and General&Administrative Overhead costs,but shall not include any allowance for profit. 6.2.2. Reimbursable Expense,as defined in section 7.4 of this Agreentent,for Basic Services and Approved Additional Services shall be paid to the ENGINEER by the OWNER in the actual amount of the costs incurred up to an aunount not to exceed$7.360.(0 which includes$ Wit) for consultants employed by the Engineer and S 7.360.(X) for all other mimbursable expenses. ..... ---. _J._r_h,h •• .• 6.2.3. railed Test Exnenxe.s. The ENGINEER shall maimain and provide to the OWNER,a record of the costs associated with failing quality control tests performed for the OWNER during the course of the construction of the project and recommend an amount the OWNER deduct from the contractans)payments. 6.2.4 The OWNER shall pay an amount for Additional Services tendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.15,or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. 6.3 DIRECT LABOR COST PAYMENT FOR MISCELLANEOUS SERVICES AND EXPENSES OF ENGINEER. Article 6.3 of the original agreement is nullified as follows: Task 701,702 and 703 shall be compensated in accordance with the following: 6.3.1 The OWNER shall pay for Miscellaneous Servicesanamount not touxcecd$44.894.80e.xceptnc provided under 6.3.1.2 and 6.3.3. 6.3.1.1 Costs Compensation. Compensation for these services shall he based on the ENGINEER'S Direct Labor Cost times a factor of 3.15 for services rendered which shall cover Direct Labor,Direct Labor Overhead,General&Administrative Overhead and Profit. 6.3.L2 Notification. Al any time during the project that it becomes apparent that the Miscellaneous Services rendered under this Agmement will exceed the negotiated compensation for these services,and prior to performinp services in excess of the contract ceiling,the ENGINEER shall give OWNER written notice thereof. Promptly thereafter OWNER and ENGINEER shall review the scope and progress of the project work. ENGINEER shall obtain written authorization from OWNER.prior to any additional costs being incurred under paragraph 6.3.1.3. If it is determined that due to a change in project scope under paragraph 5.2.1,the ENGINEER is entitled to additional compensation,OWNER mrd ENGINEER may negotiate terms as provided under 6.3.1.1. The amount and terns of any additional compensation under 6.3.1.1 or 6.3.1.3 shall be negotiated and agreed in writing pursuant to 9.16. 6.3.1.3 Costs Exceeding r'xtimated Compensation. Except as allowed under 5.2.1,when the total cost of the original scope Constriction phase and Project Documentation Services exceeds the negotiated compensation for these services,the OWNER shall pay only for the direct costs incurred in excess of the estimated compensation. These costs consist of an amount equal to the ENGINEER'S Direct Labor Cost times a factor of 2.74 for services tendered which shall include Direct l.ahor,the federally audited payroll Direct Labor Overhead,and General&.Administrative Overhead costs,but shall not include any allowance for profit. 3 6.3.3. Reimbursable Expenses, as defined in section 7.4 of this Agreement, for Basic Services and Approved Additional Services shall lx paid to the ENGINEER by file OWNER iu the actual mnount o1'the costs incurred up to an amount not to exceed$ 1.144.80 which includes$ 0.00 for consultants employed by the Engineer and S 1.144.80 for all other reimbursable expenses. .« v ff6�. "-e:,i-t e•,ttrridrftfified in 6,01ilik 6.3.3 The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.15,or an amount otherwise negotiated of the time such services are requested and approved by the OWNER, 7.3 DIRECT LABOR COSTS Article 7.3 of the original agreement is nuditicd as follows: Direct tabor Costs used as a basis for payment mean the actual salaries and wages paid to all ENGINEER's personnel engaged directly on the Project,including,but not limited m,engineers,architects.surveyors.designers,drafters,specification writers. estimators,other technical and business personnel;but does not include indirect payroll related costs orfrhtgebenefits. Forthe purlxtseN of this Agreement the principals and employees of the ENGINEER maximum billable Direct Labor Costs are: Principals $59.00/hour Supervising Engineer III S53.00/hour Supervising Engineer 11 S50.00/hour Supervising Engineer 1 S46.00/hour Senior Engineer II S43.001hour Senior Engineer 1 $40.00/hour Design Engineer lI 536.00/hour Design Engineer 1 $33.00/hour Staff Engineer $29.00/hour Engineer Intern S26.00/hour Survey Manager S46.00/hour Limit Su vevor If $31.00mour Land Surveyor 1 S28.00/hotir Survey Technician S24.00/hour Engineer Technician 11 $32.00/hour EngincerTechnicianI $28.00/hour Technician II $23.00/hour CARD Drafter $22.M/hour Two Person Survey Crew S49.00/hour Clerical S22.00/hour *Non professional classified employees subject to time and one-half over time rates. Except as specifically amended herein,the Original Agreement shall remain in full force and effect and the parties shall be bound by all terms and conditions therein. 4 In witness whereol'. the Parties hereto do make and execute this Agreement. CI'T'Y OF BOZEMAN, MONTANA MORRISON-MAIERLE, INC. BY, � �?u(� BY: (City Manager) (Vice-/President) DATE: �' s�1 y DATE: 4�r, ATl� °?E•' yL tk lerk 3 5 ti:HNINIG}\Cunv:mts-('licnt\('nmmfl Amcnd k3V)rall PSA Amendment O.Aw 6 AM MOFMSON Aid MMEM,ISC. Exhibit C-3 - Scope of Services for N.7 I Lighting Design and Construction Administration West.luniper Street to Durston Road April 7, 2014 Preliminary Design Phase The preliminary design phase will proceed following written authorization to proceed from the owner. The additional topographic survey and preliminary engineering design shall occur during this phase. The following sections describe each task as well as identifying the deliverable for each task. Task 101 Topographic Survey Task Description —The topographic survey will he completed following written authorization to proceed from the owner. All surface features, as well as subsurface features, will be mapped on project coordinates for areas that have been modified since the last survey completed (Verizon, U-Haul, etc.). Key features; including intersections, anticipated utility crossing points, and potential easement areas will be surveyed as well. City of Bozeman horizontal and vertical control networks will be used for the survey. Task deliverable—Updated topographic mapping illustrating survey findings. Task 102 Site Evaluation Task Description —Previously completed. Task deliverable—N/A Task 103 Lighting Layout Task Descriotion — Updating the preliminary lighting layout for Phase 2. Task deliverable— Preliminary Lighting Layout. 1 �J MORRISON AA MAIERLE,ixc. M fmPtYW GM+N(u+yunY Task 104 Lighting Calculations and Modeling Task Description — Updates to lighting modeling and calculations per City of Bozeman. MDT, and IESNA standards. Task deliverable— N/A Task 105 R.O.W. Exhibits (3) Task Description —Previously completed. Task deliverable— N/A Task 106 SILD Exhibits/Lcgal/Packet Task Description — Previously completed. "Task deliverable— N/A Task 107 Coordination - City, MDT,Utilities, Suppliers Task Description — On-going coordination with regulatory agencies, utilities and product suppliers as it relates to the North 7`h Lighting Design and Construction Administration project. Task deliverable—N/A Task 108 Traffic Control Plan Task Description — Completion of traffic control plan to be included in the construction documents. Task deliverable— Inclusion in construction documents. fi MORRISON AMAIERIE,isc. �. < �.,. Task 109 Preliminary Plans and Specifications Tusk Description — This task includes effort associated with preparation of a preliminary set of construction drawings and specifications. Plans and specifications to be completed in accordance with City of Bozeman standards. Task deliverable— Preliminary Plans and Specifications. Task 110 Preliminary Engineer's Estimate Task Description — Preparation of an Engineer's estimate of probable cost based on the preliminary planN and specifications. Task deliverable— Preliminary Engineer's estimate. Task 111 NSURB Meetings Task Description — Attendance at up to six (G) NSURB meetings or other applicable meetings to present project status and project findings. Task deliverable— Attendance and presentations at NSURB meetings. Task 112 Quality Assurance/Quality Control Task Description — This task includes effort associated with project coordination and quality assurance review. Task deliverable— N/A 3 AJ MORRISON !td MAIERLE,m. AfmP+l v.(:w,[J[rrV+unv Final Design Phase The final design phase will proceed following written authorization to proceed from the owner. Following review and comments by reviewing authorities, we will incorporate required changes into the final design plan set and specifications. The following sections describe each task as well as identifying the deliverable for each task. Task 201 Final Plan Set Preparation Task Description — A final set of constriction plans based on continents and changes requested from the governing reviews. Phan set will be a"construction ready" set. Task deliverable—Final plan set. Task 202 Final Specifications/Ridding Documents Task Description — A final set of construction specifications. Specifications will provide the bidding documents for the construction project. Specifications and contract documents will be per City of Bozeman standards and will be "bid ready". Task deliverable — Final specifications and bidding documents. Task 203 Final Review/Permitting Coordination Task Description — Final coordination for review and permitting items associated with the project. Task deliverable—Technical memorandum with findings, as necessary. Task 204 Quality Assurance/Quality Control Task Description — This task includes effort associated with project coordination and quality assurance review. "Task deliverable— N/A 4 � MORRISON A-r MAIERLE,m. Bidding or Negotiating Phase The bidding or negotiating phase will proceed following written authorization to proceed from the owner. The following sections describe each task as well as identifying the deliverable for each task. 'task 301 Prepare Advertisement,Bid Document Reproduction, Bidders List, Process Deposits Task Description — Prepare project advertisement and complete all coordination required to distribute construction documents to bidders. Task deliverable — Bidders List. Task 302 Conduct Pre-Bid Conference and Respond to Contractor Requests Task Description — Conduct pre-bid conference and respond to all Contractor RFI's prior to bidding. Task deliverable— N/A Task 303 Prepare and Issue Addendum Task Description — This task provides allowance for issuance of one (I) addendum to the plans and specifications. Task deliverable—Addendum No. 1. Task 304 Attend Bid Opening, Prepare/Evaluate Bid Tab, Award Recommendation Task QLscription — Attend bid opening and subsequently process bid tab and make award recommendation. Task deliverable— Bid tab and award recommendation. 5 MORRISON A-M MAIERLE,i.w. Task 305 Award Contract and Contract Documents Task Description - Facilitate contract award and execute contract documents. Task deliverable - Two (2) signed originals of all contract documents to City of Bozeman and one (1) signed original of all contract documents to Contractor. Construction Phase The construction phase includes the general administration of the construction contract. The following sections describe each task as well as identifying the deliverable for each task. Task 401 Conduct Pre-Construction Conference and Notice to Proceed Task Description -Coordinate pre-construction conference and prepare Notice to Proceed. Task deliverable - Notice to Proceed. Task 402 Shop Drawing/Traffic Control/Permit Review and Approval Task Description -Review and approval of applicable Contractor submittals. Task deliverable - Approved Contractor submittals. Task 403 Construction Layout/Control Task Description - Provide construction staking services and control points as requested by Contractor and per project specifications. Task deliverable- N/A 6 As MORRISON 49 MAIERLE,iu. Task 404 Resident Project Representative(1/4 Time,3 Months) Task Description — Complete duties and responsibilities of the Resident Project Representative (RPR). Estimate effort is based on a three (3) month construction window with the RPR on-site approximately 25% of the time. Task deliverable— N/A Task 405 Construction Management - Coordination,Schedule Progress, Pay Requests Task Description — Provide construction management services, schedule review and updates, and preparation/review of Contractor pay requests. Task deliverable—Weekly progress reports and pay requests. Task 406 Final.and Two Year Warranty Inspection Task Description — Coordinate final and two-year warranty walk through. Prepare punch list items and notify City of Bozeman when items are complete. Task deliverable—Punch lists and completion notifications. Project Documentation Project documentation includes preparation of a construction notebook documenting the construction events that occurred throughout the project. The following sections describe each task as well as identifying the deliverable for each task. Task 501 Progress Reports (Monthly) Task Description — Preparation and assembly of monthly progress reports based on weekly progress reports throughout the project. Task deliverable — Monthly progress reports. 7 Ad MORRISON #� MAIERLE,Ic Task 502 Record Drawings and Project Notebook Task Description — Preparation and assembly of record drawings and project construction notebook. "Task deliverable —Project construction notebook and Mylar record drawings. Construction Testing Construction testing shall include material testing and verification of contract compliance. The following sections describe each task as well as identifying the deliverable for each task. Task 601 Concrete Strength,Air, Temp, Slump (Flatwork) Task Description — Completion of concrete testing of pole bases and flatwork per City of Bozeman standards Task deliverable—Testing reports. Task 602 Subgrade and Base Densities Task Description — Testing of Subgrade and base material densities for impervious surface improvements. Task includes one (1) soil proctor to determine maximum densities for on-site backfill material. Task deliverable—Testing reports. K MORRISON ,A1 MAIERLEj.%c. Miscellaneous Services Miscellaneous services as described below. The following sections describe each task as well as identifying the deliverable for each task. Task 701 Miscellaneous Services -Easements Task Description — Task 701 provides for additional effort as necessary to prepare easement documents for areas within Phase 2 or other unidentified requested services as directed by Owner. Currently there are seven (7) known properties requiring easements. Task deliverable—Easement documents. Task 702 Miscellaneous Services -LED Analysis Task Description — Task 702 provides for additional effort as requested for an analysis of LED lighting. This includes analysis of available retrofit kits for existing HPS lights recently installed along N. 7`h Avenue, LED calculations/modeling, available rebates, cost estimating and payback estimates. Task deliverable — Report/Technical Memorandum with findings. Task 703 Miscellaneous Services -Additional Requested Task Description —Task 702 provides for additional effort as requested by the City of Bozeman. Task deliverable— Easement documents. 9 Exhibit D-3 - Engineering Fee Estimate "aso4 City of Bozeman,W-North 7th Lighting Design and Construction Administration >.y�SLNF.i1LF:. West JuniWStreet to Durston Road Prepared For:Dustin Johnsen,P.E. Engineering Services Staff Labor Labor Total Task or Division Assigned Hours Rate Labor�st 100•Pranm4rP Ghee Two P W lot.TOPoora1R9r Surrry-PMNaW 9U cvakon, 5mgr neer) Lou SIMM 120.00 u4waMotlartliroim�%-rapt w ) Iaftl So tl 2.00 X0.00 $196.00 E lora, T nklen AO $79Z W 102.SRe Evaluumn Oe0 n 1 0.00 swoop Sow _R70.m _.W. 103.DoB'layaR stwor jamm Senior need y.00 $110.00 S120w 109.IIP"Okvktlws and MaklmOOrsi nE (neerI 16.0) 100.00 t600AD Senn 'neer I IAO120.00 E 105.R.O.W. Wtas(3) Design E ixtt t 0,00 w sow Sena EV.1 O.m ]20.00 saw IN,MLD wwbrovutgav w D n FW.1 0.00 m 5enar Mss] O.mDason 107.fioorElt vlon-�JIy,MDT,"A"M SOMUer, I 6.00 600Ao ___. . ._...._ Sema_Esglr.I . ... .._. 36.00_..._._ j120.00 _ §4�320.m IN.Traffic COnbd Pkn nest - 9.00 00.00 - S400.00 Senor I 2.00 tIAm .m 309.PreWnary Pisa and SpsHkatlan Drop Erspnoerl 32.00 sulow .W Senor ',earl 12.00 $11440,00 110.Fa9mnary EiSprlafs Estirtiete n IneR I 9,00 100.00 W Smkr E 'nett 1 e.m 120.00 M tII.NSURB s 6 Senior E I 21.00 $Dom SZWW 132. Asda - Can d aver In 1. 1165.co 200•Find Phpa 201.Aral Pkn Set Preparabon Desiw Erqpnes1 3200 100,00 2m.m Santa nest0.m .W 202.RM specifrcHipro/Wd v Docs Desi n E.O.I 19400 I`IW.00 Sent EnuirrerI IBM S 160.0) 203.FlneIRMen CairtneWn Senior 'earl 20.0) 5120.00 2900.0) 209.QoaaY Aeurvou, Control 'n E In 2.0) 165.00 30.0) 300-Oiddl ar Ph. 301.Prepare AdvMisemmt,Eid OPnmuR _._brlwiWeOve Sperkliatn_.. .__. B.W_.. A'.Wuctkn,Otlders tis,Roars DFosits Senior esl &W 00 S nor, 0b410 EMi.til I'm .m m. Ro- Cm asxa to nE nesl 9.W 140040 W ('mlracta Reds+ Senior Epg(nes] BM IUMVP IF900AO 3D3.ftP .; W Issue Mhsgrxn Datum nes t s E neem 2.0) 130,00 90.0) 309.Attsd Od Opanug,Pr anvi use ERT , Dep n Fro,1 100 AO 100.00 Award Reova Uon Senor Engineer 1 6.00 720_W 305.A.,cl Contract MW Contract Do rre= Senior nmI 12.00 3440.00 Su in l.m 165.00 slow 900•Lmdna©en PhaY 1. Npbae n E lies I9.00 .m .m to imumd Smv 'a'sl B.m5560.00 902. Renew a Oesla�E(ginee I___ B.W lm.m0_W B.m W 903. Two Psson Su Craw 32.0) $4,9600D 90rtiarl deo Pyge¢Rapassttabva(1/l irme,I Epbker l,dem 90.00 812.00 66,560.00 905.CQYmKR011 MamOttrent Veon bats 1 16.00 1600.00 Sdedula ress Pay ReauvAn Eaoia,Ewl.d 00.00 Moo $7,2W.m 106.FM and Two Year Warranty inspe n Em.l 9.00 W .m �narEnoloserl 9.00 m m 500• oauinaeMOtiPn -0 irm Sol.ProOass RePoos(MaRNy) Defrn treed 9.00 100.00 .m 9 ,ar rMst 12.00 .m 302.Rccem Orawnp and Prost tlseo** E lHI 9.00 .00 S2.400w arE nest 16.00 log1920,00 60D•DanNssiWPnT ml.CncMA$paaptlr,Au,Temp,Skms(fleW.ork) E.W.Intern 1600 382.00 53,31240 0)2. adeard Base l]emNes En icer tsern 7a0•Ef14nMIOWa6YYl0[ mi.NonAaaous Se .EAunkrR OPamenb Nab Pse k �m0A0 ----. 002. sir NabEa(ttd RMe Sdkduk 5920.00 5seem 700.Moabanea05eivP.'ea-AddpaW Nab cant Rak Sdkd k 5000.00 _ zp, W E a T and r'anmunicMiors �659.0) x.60 3608.00 VetYde mi y0m 00 50)Pr 1e St 1 ConOek MT Set oto 6 11300 .00 78.00 Rerad Set .00 slavev liaieous 1.0% 85 300.00 IA% p day 3 SEaO.m x bMIfNlWmanblMn4vNa!/uln�J ily�I.blDf ki•yYm�gi+e MFnh,i. n111I1V1'r