HomeMy WebLinkAboutAuthorize Notice of Award for 2014 Water Renovations Project_5 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: 2014 Water Renovations Project Notice of Award MEETING DATE: May 5, 2014 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager to sign the Notice of Award to Williams Civil Construction for the Total Base Bid in the amount of $526,812.00. BACKGROUND: Attached is a copy of the Notice of Award for the above referenced project. The project generally involves replacement of existing mains, valves, fittings and appurtenances on Montana Avenue from Beall Street to Aspen Street and on Peach Street from Rouse Avenue to Montana Avenue. In addition to the main replacements, the project also includes replacement of existing services on Rouse Avenue from Bond Street to Griffin Drive in anticipation of the road reconstruction, and the replacement of a leaking valve at 19th and Main. The contract is to be completed within 75 days of the issuance of the notice to proceed. Bids for the above-referenced project were opened on April 15, 2014 with 3 bids being submitted. The low bid was submitted by Williams Civil Construction in the amount of $526,812.00. The Bid Tabulation for the project is attached. The project is funded in the water fund in the current fiscal year. UNRESOLVED ISSUES: None ALTERNATIVES: Disapprove FISCAL EFFECTS: The project is fully funded in the water fund for this fiscal year. Attachments: Notice of Award, Bid Tabulation Report compiled on: 4/17/14 31 Schedule 1 Item Description Unit Est. Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 101 Taxes, Bonds, Insurance L.S. 1 20,000.00$ 20,000.00$ 8,150.00$ 8,150.00$ 30,000.00$ 30,000.00$ 19,000.00$ 19,000.00$ 102 Mobilization L.S. 1 30,000.00$ 30,000.00$ 35,100.00$ 35,100.00$ 40,000.00$ 40,000.00$ 18,200.00$ 18,200.00$ 103 Connection to Existing Main Each 5 1 200 00$6 000 00$2 320 00$11 600 00$1 000 00$5 000 00$600 00$3 000 00$ 2014 WATER RENOVATIONS PROJECT Engineer's Estimate Williams Civil Division Omdahl Excavation Dick Anderson Construction 103 Connection to Existing Main Each 5 1,200.00$ 6,000.00$ 2,320.00$ 11,600.00$ 1,000.00$ 5,000.00$ 600.00$ 3,000.00$ 104 4" MJ Gate Valve w/V.B. Each 3 1,400.00$ 4,200.00$ 920.00$ 2,760.00$ 1,400.00$ 4,200.00$ 1,300.00$ 3,900.00$ 105 8" MJ Gate Valve w/V.B. Each 10 1,800.00$ 18,000.00$ 1,460.00$ 14,600.00$ 1,800.00$ 18,000.00$ 1,820.00$ 18,200.00$ 106 10" MJ Gate Valve w/V.B. Each 2 2,500.00$ 5,000.00$ 2,020.00$ 4,040.00$ 2,600.00$ 5,200.00$ 2,600.00$ 5,200.00$ 107 8" x 4" MJ Reducer Each 1 350.00$ 350.00$ 270.00$ 270.00$ 300.00$ 300.00$ 550.00$ 550.00$ 108 10" x 8" MJ Tee Each 3 775.00$ 2,325.00$ 640.00$ 1,920.00$ 700.00$ 2,100.00$ 920.00$ 2,760.00$ 109 8" x 6" MJ Tee Each 5 700.00$ 3,500.00$ 480.00$ 2,400.00$ 650.00$ 3,250.00$ 640.00$ 3,200.00$ 110 8" x 4" MJ Tee Each 1 625.00$ 625.00$ 410.00$ 410.00$ 600.00$ 600.00$ 670.00$ 670.00$ 110 8 x 4 MJ Tee Each 1 625.00$ 625.00$ 410.00$ 410.00$ 600.00$ 600.00$ 670.00$ 670.00$ 111 4" x 4" SST Tapping Fee Each 1 700.00$ 700.00$ 870.00$ 870.00$ 1,400.00$ 1,400.00$ 950.00$ 950.00$ 112 10" 22 1/2 deg MJ Bend Each 2 750.00$ 1,500.00$ 480.00$ 960.00$ 700.00$ 1,400.00$ 690.00$ 1,380.00$ 113 8" 22 1/2 deg MJ Bend Each 4 550.00$ 2,200.00$ 360.00$ 1,440.00$ 525.00$ 2,100.00$ 640.00$ 2,560.00$ 114 8" 90 deg MJ Bend Each 1 550.00$ 550.00$ 380.00$ 380.00$ 525.00$ 525.00$ 640.00$ 640.00$ 115 4" CL 51 D.I.P. L.F. 3 55.00$ 165.00$ 90.00$ 270.00$ 70.00$ 210.00$ 160.00$ 480.00$ 116 6" CL 51 D.I.P.L.F.71 60.00$ 4,260.00$ -$ -$ -$ 117 8" CL 51 D.I.P.L.F. 2,425 69.00$ 167,325.00$ 53.00$ 128,525.00$ 50.00$ 121,250.00$ 68.60$ 166,355.00$ ,$,$$,$$,$$,$ 118 10" CL 51 D.I.P.L.F. 366 90.00$ 32,940.00$ 63.00$ 23,058.00$ 60.00$ 21,960.00$ 77.50$ 28,365.00$ 119 Service reconnection w/in trench limits 2" diameter and smaller Each 62 $ 550.00 34,100.00$ 380.00$ 23,560.00$ $ 750.00 46,500.00$ $ 510.00 31,620.00$ 120 Service reconnection outside trench limits 2" diameter and smaller L.F.280 $ 50.00 14,000.00$ 77.00$ 21,560.00$ $ 50.00 14,000.00$ $ 145.00 40,600.00$ 121 Service reconnection inside trench limits 4" diameter and larger Each 1 $ 1,800.00 1,800.00$ 800.00$ 800.00$ $ 1,800.00 1,800.00$ $ 1,120.00 1,120.00$ 122 Service reconnection outside trench limits 4" diameter and larger L.F.3 $ 105.00 315.00$ 120.00$ 360.00$ $ 68.00 204.00$ $ 700.00 2,100.00$ 123 Install Expansion Tank and Backflow Preventer Each 1 $ 800.00 800.00$ 820.00$ 820.00$ $ 850.00 850.00$ $ 800.00 800.00$ 124 Fire Hydrant 6.5' bury Each 2 5,500.00$ 11,000.00$ 4,480.00$ 8,960.00$ 6,250.00$ 12,500.00$ 8,800.00$ 17,600.00$ 125 Fire Hydrant 7.5' bury Each 1 5,600.00$ 5,600.00$ 4,530.00$ 4,530.00$ 6,350.00$ 6,350.00$ 8,850.00$ 8,850.00$ 126 Remove Existing Fire Hydrant Each 1 1,000.00$ 1,000.00$ 190.00$ 190.00$ 1,000.00$ 1,000.00$ 2,700.00$ 2,700.00$ 127 R I tllEiti Fi Hd t Eh 1 3 500 00$3 500 00$1 410 00$1 410 00$1 700 00$1 700 00$5 500 00$5 500 00$127 Re-Install Existing Fire Hydrant Each 1 3,500.00$ 3,500.00$ 1,410.00$ 1,410.00$ 1,700.00$ 1,700.00$ 5,500.00$ 5,500.00$ 128 Insulation L.F. 1,718 16.00$ 27,488.00$ 10.00$ 17,180.00$ 20.00$ 34,360.00$ 11.00$ 18,898.00$ 129 Traffic Control L.S. 1 14,000.00$ 14,000.00$ 11,200.00$ 11,200.00$ 19,500.00$ 19,500.00$ 10,100.00$ 10,100.00$ 130 Temporary Water System L.S. 1 50,000.00$ 50,000.00$ 20,400.00$ 20,400.00$ 78,000.00$ 78,000.00$ 71,400.00$ 71,400.00$ 131 Asphalt Restoration L.F. 2,845 30.00$ 85,350.00$ 34.00$ 96,730.00$ 26.00$ 73,970.00$ 56.00$ 159,320.00$ 132 Type 2 Pipe Bedding C.Y. 15 40.00$ 600.00$ 38.00$ 570.00$ 100.00$ 1,500.00$ 56.00$ 840.00$ 133 Imported Backfill Material C.Y. 100 30.00$ 3,000.00$ 42.00$ 4,200.00$ 25.00$ 2,500.00$ 30.00$ 3,000.00$ 134 Valve Box Removal Outside Trench Each 3 300 00$900 00$190 00$570 00$250 00$750 00$410 00$1 230 00$134 Valve Box Removal Outside Trench Each 3 300.00$ 900.00$ 190.00$ 570.00$ 250.00$ 750.00$ 410.00$ 1,230.00$ 135 Locate & Repair Sewer Service Each 5 500.00$ 2,500.00$ 520.00$ 2,600.00$ 600.00$ 3,000.00$ 1,180.00$ 5,900.00$ 136 Miscellaneous Work Each 20,000 1.00$ 20,000.00$ 1.00$ 20,000.00$ 1.00$ 20,000.00$ 1.00$ 20,000.00$ TOTAL SCHEDULE 1 575,593.00$ 472,393.00$ 575,979.00$ 676,988.00$ Omdahl Excavation Dick Anderson Construction Schedule2-N19th Avenue Work Engineer's Estimate Williams Civil Division Item Description Unit Est. Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 137 8" Gate Valve Replacement L.S. 1 8,900.00$ 8,900.00$ 10,000.00$ 10,000.00$ 9,100.00$ 9,100.00$ 18,100.00$ 18,100.00$ 138 Traffic Control L.S. 1 2,000.00$ 2,000.00$ 7,290.00$ 7,290.00$ 5,000.00$ 5,000.00$ 6,200.00$ 6,200.00$ TOTAL SCHEDULE 2 10,900.00$ 17,290.00$ 14,100.00$ 24,300.00$ Schedule 2 - N 19th Avenue Work Item Description Unit Est. Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 139 Abandon & Plug Existing Main Each 2 $1,050.00 $2,100.00 1,740.00$ 3,480.00$ 1,500.00$ 3,000.00$ 870.00$ 1,740.00$ 140 Service reconnection w/in trench limits 2" diameter and smaller Each 9 $3,000.00 $27,000.00 500.00$ 4,500.00$ $ 950.00 8,550.00$ $ 1,340.00 12,060.00$ Service reconnection outside trench limits Williams Civil Division Dick Anderson ConstructionEngineer's Estimate Schedule 3 - N Rouse Avenue Work Omdahl Excavation 141 Service reconnection outside trench limits 2" diameter and smaller L.F.347 $52.00 $18,044.00 27.00$ 9,369.00$ $ 75.00 26,025.00$ $ 138.00 47,886.00$ 142 Service reconnection w/in trench limits 4" diameter and larger Each 1 $4,000.00 $4,000.00 1,990.00$ 1,990.00$ 2,000.00$ 2,000.00$ 3,000.00$ 3,000.00$ 143 Service reconnection outside trench limits 4" diameter and larger Each 18 $100.00 $1,800.00 87.00$ 1,566.00$ 95.00$ 1,710.00$ 205.00$ 3,690.00$ 144 Asphalt Restoration L.F. 186 $35.00 $6,510.00 39.00$ 7,254.00$ 40.00$ 7,440.00$ 42.00$ 7,812.00$ 145 Traffic Control L.S. 1 $4,000.00 $4,000.00 8,970.00$ 8,970.00$ 5,000.00$ 5,000.00$ 4,200.00$ 4,200.00$ 145 Traffic Control L.S.1 $4,000.00 $4,000.00 8,970.00$ 8,970.00$ 5,000.00$ 5,000.00$ 4,200.00$ 4,200.00$ TOTAL SCHEDULE 3 $63,454.00 37,129.00$ 53,725.00$ 80,388.00$ TOTAL BASE BID $649,947.00 526,812.00$ 643,804.00$ 781,676.00$ Williams Civil Division Dick Anderson ConstructionEngineer's EstimateAdditive Alternate #1 Omdahl Excavation Item Description Unit Est. Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 201 Fiber Optic Cable L.F. 3126 2.25$ $7,033.50 2.00$ 6,252.00$ 1.95$ 6,095.70$ 1.50$ 4,689.00$ 202 Directional Drilling & Inter-Duct Conduit L.F. 2796 30.00$ $83,880.00 53.00$ 148,188.00$ 54.00$ 150,984.00$ 31.25$ 87,375.00$ 203 Type 1 Concrete Pull Box EA 4 2,500.00$ $10,000.00 3,000.00$ 12,000.00$ 3,000.00$ 12,000.00$ 1,490.00$ 5,960.00$ 204 Type 2 Concrete Pull Box EA 1 4,000.00$ $4,000.00 4,030.00$ 4,030.00$ 4,000.00$ 4,000.00$ 1,480.00$ 1,480.00$ Alternate Total $104,913.50 170,470.00$173,079.70$99,504.00$ Williams Civil Division Dick Anderson ConstructionEngineer s Estimate Additive Alternate #1 Omdahl Excavation Alternate Total $104,913.50 170,470.00$ 173,079.70$ 99,504.00$ 32 NOTICE OF AWARD Dated: __________________ TO: Williams Civil Construction ADDRESS: 2131 Industrial Drive Bozeman, MT 59715 PROJECT: 2014 Water Renovations CONTRACT FOR: Total Base Bid You are notified that your Bid opened on April 15, 2014, for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for the: 2014 Water Renovations Project. The Contract Price of your Contract is: Five Hundred Twenty Six Thousand Eight Hundred Twelve Dollars ($ 526,812.00). Five (5) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by _______________. 1. You must deliver to the OWNER Five (5) fully executed counterparts of the Agreement including all the Contract Documents and Drawings. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instruction to Bidders (Article 20), and the General Conditions (paragraph 5.01). 3. List other conditions precedent: You must deliver with the executed Agreement the Certificates of Insurance as specified in the General Conditions (Article 5) and Supplementary Conditions (paragraphs SC-5.04 and SC-5.06). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited. Within ten (10) days after you comply with these conditions, OWNER will return to you two fully signed counterpart of the Agreement with the Contract Documents attached. CITY OF BOZEMAN, MONTANA ATTEST: BY: __________________________________ BY: ____________________________ (CITY MANAGER) (CITY CLERK) DATE: _______________________________ 33