Loading...
HomeMy WebLinkAbout14- Morrison Maierle Wastewater Collection System Facility Plan Update Professional Services Agreement PROFESSIONAL SERVICES AGREEMENT THIS IS AN AGREEMENT made as of - MkdA M MI , between THE CITY OF BOZEMAN, a Municipal Corporation,Bozeman,Montana,59715(OWNER)and Morrison Maierle, Inc.. P.O. Box 1113 Bozeman ,Montana 59771,(ENGINEER). Whereas the accomplishment of the work and services described in this Agreement is essential to the OWNER'S public works improvement program. Whereas the OWNER intends to and has selected the ENGINEER to provide necessary and professional engineering services for the project. Whereas the ENGINEER represents that it is willing and qualified to perforin the professional engineering services for this project described in this Agreement. Therefore, in consideration of the foregoing recitals and the mutual covenants and conditions contained herein, the parties agree as follows: The conditions and provisions set forth in the attached EXHIBIT A - Scope of Services, and EXHIBIT B-Fee Estimate,are hereby incorporated in and made part of this Agreement. ARTICLE I -ENGINEERING SERVICES 1.1. The detailed description of the specific project components is described as follows: Prepare a Wastewater Collection System Facility Plan Update. 1.2. The scope of services under this contract is set forth in this agreement and the attached EXHIBITS. ARTICLE 2-ENGINEER'S RESPONSIBILITIES 2.1. ENGINEER shall perform for OWNER professional engineering services in all phases of the Project to which this Agreement applies as hereinafter provided. These services will include, but not be limited to, serving as OWNER's professional engineering representative for the Project, providing professional engineering consultation and advice and furnishing customary civil and structural engineering services incidental thereto. 2.2. The ENGINEER shall furnish all labor,materials,equipment,supplies,and incidentals necessary to conduct and complete the ENGINEER'S portions of the Project and to prepare and deliver to the OWNER all data, reports, plans, specifications,and recommendations as designated herein. 2.3. The ENGINEER shall ascertain such information as may have a bearing on the work from local units of government, public, and private organizations and shall be authorized to procure information from other authorities as to the extent of these contacts and the results thereof. 2.4. The ENGINEER'S work shall be in accordance with the standards of sound engineering practices. 2.5. The ENGINEER shall name a Principal-In-Charge for the duration of the project. The Principal-]n-Charge shall be Jack Schunke,P.E. 2.6. The ENGINEER shall name a Project Manager who shall be the liaison between the ENGINEER and the OWNER. The Project Manager shall be James Nickelson, P.E. The OWNER may name a Task Director who would be the liaison between the ENGINEER and the OWNER during the design segment of the Project. 1 2.7. The ENGINEER shall submit an estimated progress schedule at the beginning of the work,and monthly progress reports thereafter until the project is completed. ARTICLE 3-OWNER'S RESPONSIBILITIES 3.1 The OWNER shall name a Task Director who shall be the liaison between the ENGINEER and the OWNER during DESIGN segment of the Project. The Task Director designated shall be Robert J.Murray,Jr.,P.E. 3.2 The OWNER shall have the right of review and examination of the ENGINEER'S work at all times. 3.3 The OWNER shall make available all records(record drawings,construction records,etc.)indicating the existing configuration of the city utilities. 3.4 The 03ANER will be respetisible fiaFAdveW4ng44d-Openings-. q_9 The 0AAMR. shall --ittend the pre-b ARTICLE 4-BASIC ENGINEERING SERVICES The ENGINEER shall render professional Engineering Services as follows: 4.1 PRE-DESIGN INVESTIGATION PHASE After written authorization to proceed,ENGINEER shall: 4.1.1 Consult with OWNER to clarify and define OWNER's requirements for the Project and review available data. 4.1.2 Advise OWNER as to the necessity of OWNER's providing or obtaining from others,data or services and assist OWNER in obtaining such data or services. 4.1.3 Identify and analyze requirements of governmental authorities having jurisdiction to approve the design of the Project and participate in consultations with such authorities. 4.1.4. Provide analyses of OWNER's needs, planning surveys, site evaluations and comparative studies of prospective sites and solutions. 4.1.5. Provide a general economic analysis of OWNER's requirements applicable to various alternatives. ..........by i'-uPP^cnvzc 4.1.7. Prepare a Report containing schematic layouts, sketches and conceptual design criteria with appropriate exhibits to indicate clearly the considerations involved (including applicable requirements of governmental authorities having jurisdiction as aforesaid) and the alternative solutions available to OWNER and setting forth ENGINEER's findings and recommendations. This Report will be accompanied by ENGINEER's opinion of probable costs for the Project, including the following which will be separately itemized: Construction Cost, allowance for engineering costs and contingencies, and (on the basis of information furnished by OWNER) allowances for such other items as charges of all other professionals and consultants, for the cost of land and rights-of-way, for compensation for or damages to properties, for interest and financing charges and for other services to be provided by others for Owner. The total of all such costs,allowance,etc.are hereinafter called "Total Project Costs". 2 4.1.8. Furnish 5 copies and an electronic copy of the Study and Report documents and review them in person with OWNER. The Pre-design Investigation Phase will be completed and submitted within 220 calendar days following written authorization from OWNER to ENGINEER to proceed with that phase of services. 4.2 PRELIMINARY DESIGN PHASE—NOT USED 4.3 FINAL DESIGN PHASE—NOT USED 4.4 BIDDING OR NEGOTIATING PHASE—NOT USED 4.5 CONSTRUCTION PHASE—NOT USED 4.6. PROJECT DOCUMENTATION—NOT USED 4.7. CONSTRUCTION TESTING—NOT USED ARTICLE 5-ADDITIONAL SERVICES 5.1. If OWNER wishes ENGINEER to perform any of the following Additional Services, OWNER shall so instruct ENGINEER in writing, and ENGINEER shall perform or obtain from others such services and will be paid therefor as provided in the Agreement: 5.1.1. Legal land surveys performed to obtain data for preparing easements and rights-of-way descriptions. 5.1.2. Preparation of applications and supporting documents for governmental agencies in addition to those required under Basic Services; preparation or review of environmental studies and related services; and assistance in obtaining environmental approvals. 5.1.3. Services resulting from significant changes in the general scope, extent or character of the Project or major changes in documentation previously accepted by OWNER where changes are due to causes beyond ENGINEER's control. 5.1.4. Providing renderings or models. 5.1.5. Preparing documents for alternate bids requested by OWNER for work not executed or for out-of- sequence work. 5.1.6. Providing other services not otherwise provided for in the Agreement, including services normally furnished by the OWNER as elsewhere herein described. 5.1.7. Furnishing the services of independent professional associates or consultants for other than Basic Services. 3 5.2. When required by the Contract Documents in circumstances beyond ENGINEER's control, ENGINEER shall perform or obtain from others any of the following Additional Services as circumstances require during construction and without waiting for specific instructions from OWNER, and ENGINEER will be paid therefor as provided in this Agreement: 5.2.1. Services in connection with work directive changes and change orders to reflect the changes requested by OWNER if the resulting change in compensation for Basic Services is not commensurate with the additional services rendered. 5.2.2. Services in making revisions to Drawings and Specifications occasioned by the OWNER'S acceptance of substitutions proposed by Contractor(s); services after the award of each contract in evaluating and determining the acceptability of an unreasonable or excessive number of substitutions proposed by Contractor; and evaluating an unreasonable or extensive number of claims submitted by Contractor(s)or others in connection with the work. 5.2.3. Services resulting from significant delays, changes or price increases occurring as a direct result of materials,equipment or energy shortages. 5.2.4. Additional or extended services during construction made necessary by (1) work damage by fire or other causes during construction, (2) a significant amount of defective or neglected work of any Contractor, (3) acceleration of the progress schedule involving services beyond normal working hours, (4) default by any Contractor. ARTICLE 6-COMPENSATION FOR ENGINEERING SERVICE 6.1 LUMP SUM AGREEMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER 6.1.1 Payment. The OWNER shall for design phase services performed as Basic Engineering Services under sections 4.1 through 4.3 of this agreement pay a total sum in the amount of $149,546 for such services. 6.1.2 Payment Schedule. Total cumulative payments for the design phase engineering services(sections 4.1 through 4.4)shall not exceed the following ceilings: $ 142.069 (95% of design fee) until the Final Report has been submitted to the OWNER and review authorities. 6.1.3 General. Engineer shall submit monthly statements for services rendered. The statements shall be based upon Engineer's estimate of the proportion of the total services actually completed at the time of billing, subject to any limitations on Payments based on completion of tasks or specific retainage requirements pursuant to the payment provisions of the Agreement. 6.1.4 Reimbursable Expenses. Only those expenses specifically identified for payment under section 6.2 of this Agreement are reimbursable. All other design related expenses are included in the Lump Sum Payment for the Basic services (4.1 through 4.4) and are not separately reimbursable. Additional Services specifically identified under the scope of design services for payment under 6.1 are not separately reimbursable. 6.2 DIRECT LABOR COST PAYMENT FOR BASIC SERVICES AND EXPENSES OF ENGINEER, Constfuefien Testing,shall be compensated in aeeordaneewith the fellawiw. 6.2.1 The OWNER shall pay fOF GORSIMWE)n Phase and Projeet Deetianentation SepAees an afneurit fist to e3eeeed a eeeppt ss-previded under€�-I_2 and 4.2.4. 1 6.2.1.1 `51- Compensation for these qPp4ppq glaili be based an the ENGINEER' D:-eet t abof"....:...e ., F....,,. „F fef sen,iees-rPfldeF d hi " Er-B ' Dofeet t 1....n..,._heed ,. nene. t n, n d 6.2.1.2 Notifleatien. At any Additignal sompeasalien, OWNER said ENGINEER may iiegetiatl,-Ienn&-as-pfevided-Hnder-- The amount and tems of any additi abr...d un nFiiirrg-pvrl[*urtiis 9.1¢ 7 inelude any allowance far PFOfit. . AypFlu-so costs, but shall not 6.2,2, ne:...1......1.1e n. Ader in ieetien 7-A-of this �u<v identified in Exhibit" 11. 6_1_3Failed Te...�the ENGRIEER shall d t OnOg AggAgiateg vdth failing quality eornfal tests PeFfOffned fef the OWNER dmifig the Peurse of tit 6.2.4 The OWNER shall pay an amount for Additional Services rendered by the ENGINEER and approved in writing by the OWNER on the basis of the ENGINEER'S Direct Labor Costs times a factor of 3.15 ,or an amount otherwise negotiated at the time such services are requested and approved by the OWNER. ARTICLE 7-MEANING OF TERMS 7.1 AGREEMENT As used herein the term "this Agreement" refers to the contents of this document and its Exhibits attached hereto and referred to as if they were part of one and the same document. 7.2 CONSTRUCTION COSTS The construction cost of the entire Project (herein referred to as "Construction Cost")means the total cost to OWNER of those portions of the entire Project designed and specified by ENGINEER, but it will not include ENGINEER's compensation and expenses, the cost of land, rights-of-way, or compensation for or damages to, properties unless this Agreement so specifies, nor will it include OWNER's legal, accounting, insurance counseling or auditing services, or interest and financing charges incurred in connection with the Project or the cost of other services to be provided by others to OWNER. 2 7.3 DIRECT LABOR COSTS Direct Labor Costs used as a basis for payment mean the actual salaries and wages paid to all ENGINEER's personnel engaged directly on the Project, including, but not limited to, engineers, architects, surveyors, designers, drafters, specification writers,estimators, other technical and business personnel;but does not include indirect payroll related costs or fringe benefits. For the purposes of this Agreement the principals and employees of the ENGINEER maximum billable Direct Labor Costs are: Principals $_10 /hour Senior QA $ 85 /hour Senior Technical Advisor $ 68 /68 /hour Project Manager $ 56 /hour Senior Engineer $-A7_/hour Project Engineer $ 33 /33 /hour Staff Engineer $ 30 /hour Field Engineer $ 36 /hour Admin $ 26 /hour 7.4 REIMBURSABLE EXPENSES Reimbursable Expenses mean the actual expenses incurred by ENGINEER or ENGINEER's independent professional associates or consultants directly in connection with the Project, such as expenses for: transportation and subsistence incidental thereto; obtaining bids or proposals from Contractor(s); subsistence and transportation of Resident Project Representatives and their assistants;toll telephone calls and telegrams; reproduction of reports,Drawings, Specifications, Bidding Documents and similar Project-related items; and if authorized in advance by OWNER, overtime work requiring higher than regular rates. In addition,when compensation for Basic Services is on the basis of Direct Labor Costs method of payment; Reimbursable Expenses will also include the amount billed to ENGINEER by special consultants employed by ENGINEER and authorized by OWNER (other than as an authorized Additional Services) and will also include expenses incurred for computer time and other specialized equipment, including an appropriate charge for previously established programs and expenses of photographic production techniques. ARTICLE 8-PAYMENT PROVISIONS 8.1 TIMES OF PAYMENTS. ENGINEER may submit monthly statements for Basic Services and approved Additional Services rendered and for Reimbursable Expenses incurred; however, payments shall not exceed the ceilings provided in 6.1 and 6.2. Final payment shall be made only after acceptance of the project by the OWNER. If OWNER disputes the amount of the billing, OWNER will notify the ENGINEER in writing within ten (10) calendar days of the receipt of bill of the dispute. 8.2 REQUESTS FOR PAYMENT. Each request for payment shall include a documentation summary of the period incremental man hours incurred,direct labor rates and billed rates,detail of reimbursable costs,total period billing, and total cumulative billing. When requested by OWNER services for distinct project segments shall be accounted and billed separately. 8.3 PAYMENT UNDER TERMINATION. In the event of termination by the OWNER upon the completion of any phase of the Basic Services,progress payments due ENGINEER for services rendered through such phase shall constitute total payment for such services. In the event of such termination by OWNER during any phase of the Basic Services, ENGINEER also will be reimbursed for the charges of pre-approved independent professional associates and consultants employed by ENGINEER to render Basic Services, and paid for services rendered during that phase on the basis of the 3 payment provisions of the Agreement. In the event of any such termination, ENGINEER will be paid for unpaid pre. approved Additional Services and unpaid Reimbursable Expenses which are authorized under this agreement. ARTICLE 9-GENERAL CONSIDERATIONS 9.1 TERMINATION OF AGREEMENT 9.1.1 The sole right is hereby reserved to the OWNER to terminate this Engineering Agreement for any and all causes or for its convenience at any time upon fifteen(15)days written notice to the ENGINEER. 9.1.2 If termination for default is effected by the OWNER, an equitable adjustment in the price provided for in this Agreement shall be made, but (1) no amount shall be allowed for anticipatedprofit on unperformed services or other work,and(2)any payment due to the ENGINEER at the time of termination may be adjusted to cover any additional costs to the OWNER because of the ENGINEER's default. If termination for convenience is effected by the OWNER,the equitable adjustment shall include a reasonable profit, as determined by owner, for services or other work performed. The equitable adjustment for any termination shall provide for payment to the ENGINEER for services rendered and expenses incurred prior to the termination, in addition to termination settlement costs reasonably incurred by the ENGINEER relating to commitments which had become firm prior to the termination. 9.13 Upon receipt of a termination action under paragraph 9.1.2, the ENGINEER shall (1) promptly discontinue all affected work(unless the notice directs otherwise),and(2)deliver or otherwise make available to the OWNER within ten (10) days copies of all data, design drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by the ENGINEER in performing this Agreement,whether completed or in process. 9.1.4 In the event this Contract is terminated prior to completion, the original copies of the ENGINEER'S data, recommendations,plans, specifications, analysis and other related documents prepared by the ENGINEER prior to said termination shall be delivered to and become the property of the OWNER. 9.1.5 Upon termination,the OWNER may take over the work and may award another party an Agreement to complete the work under this Agreement. 9.1.6 OWNER'S right to terminate is in addition to any other remedies OWNER may have under the law. 9.2 INSPECTION AND AUDIT All books, papers, records, payrolls, vouchers and invoices relating to costs and expenditures incurred as to the performance of the services by the ENGINEER hereunder shall be made available to the OWNER, or their authorized representatives for audit and review, at the ENGINEER'S respective offices at all reasonable times during the contract period and for three years from the date of final payment. 9.3 EMPLOYMENT The ENGINEER warrants that he has not employed or retained any company or persons,other than a bona fide employee, working solely for the ENGINEER, to solicit to secure this contract, and that he has not paid or agreed to pay any company or person,other than bona fide employees working solely for the ENGINEER,any fee,commission,percentage, brokerage fee,gifts or any other considerations contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty;the OWNER shall have the right to annul the Contract without liability or in its discretion to deduct from the price or consideration or otherwise recover the full amount of such fee, commission, percentage,brokerage fee,gift or contingent fee. All employees of the ENGINEER or other persons while engaged in the performance of work or services required by the ENGINEER shall be considered employees of the ENGINEER only and not of the OWNER. 4 9.4 NONDISCRIMINATION The ENGINEER will have a policy to provide equal employment opportunity in accordance with all applicable state and federal anti-discrimination laws,regulations,and contracts. The ENGINEER will not refuse employment to a person,bar a person from employment,or discriminate against a person in compensation or in a term,condition,or privilege of employment because of race,color, religion,creed,political ideas, sex, age, marital status, national origin, actual or perceived sexual orientation, gender identity, physical or mental disability,except when the reasonable demands of the position require an age,physical or mental disability, marital status or sex distinction. The ENGINEER shall be subject to and comply with Title VI of the Civil Rights Act of 1964;Section 140,Title 2, United States Code,and all regulations promulgated thereunder. The ENGINEER shall require these nondiscrimination terms of its sub-consultants providing services under this agreement. 9.5 SUBLETTING OR ASSIGNING OF WORK The ENGINEER shall not sublet or assign any of the work covered herein without prior written approval of the OWNER. 9.6 STANDARD OF CARE in providing services under this agreement, the ENGINEER will perform in a manner consistent with the degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances. If any service should be found to be not in conformance with this standard, the ENGINEER shall, at the OWNER's request, re- perform the service at its own expense. Engineer shall also, at its own expense, make such changes, modifications or additions to the project which are made necessary as a result of the initial non-performance or the re-performance of services. The OWNER's rights herein are in addition to any other remedies the OWNER may have under the law. 9.7 LEGAL RELATIONS: 9.7.1 The ENGINEER shall, consistent with the standard care, comply with those Federal, State, and Local laws and ordinances applicable to the work to be done. 9.7.2 The ENGINEER agrees to defend, indemnify and hold harmless the OWNER, its officers, directors, agents and employees from and against any suit,cause of action,claim,cost,expenses,obligation and liability of any character, including attorney's fees, which is brought or asserted for any bodily injury, death, or physical damage to property received or sustained by any person, persons, property, business or any other entity, arising out of or resulting from,or in connection with the ENGINEER'S negligent performance of the work specified in this agreement. 9.7.3. The ENGINEER agrees to defend, indemnify and hold harmless the OWNER, its officers, directors, agents and employees, should OWNER, its officers, directors, agents or employees be named as a defendant in any action where the OWNER'S alleged liability arises from the negligent performance of the ENGINEER'S work herein described. The obligations of the ENGINEER to defend,indemnify and hold harmless the OWNER will apply to any suit,cause of action,claim,cost or obligation including,without limitation,those alleged under the common law or pursuant to a federal or state statute or regulation including those arising in tort, trespass, nuisance,and strict liability. 9.7.4 In the event the OWNER is found proportionately responsible for any damages ultimately awarded to a plaintiff or plaintiffs in any lawsuit, the ENGINEER will be responsible for only those damages, costs, or 5 liabilities as are attributable to the ENGINEER'S percent of fault as compared with 100%of the fault giving rise to the damages. Should the OWNER be found responsible for negligence by its own officers,directors,agents or employees,then in that event the OWNER agrees to reimburse the ENGINEER for the reasonable attorney's fees and costs incurred in any defense of the OWNER in an amount proportional to the fault attributed to the OWNER. The indemnity required herein shall notbe limited by reason of the specification of any particular insurance coverage in this Agreement. 9.7.5 Should either OWNER or ENGINEER be held responsible, for any damages, costs or liabilities resulting from intentional misconduct by any officer, director, agent or employee in connection with the work specified in this Agreement, then in that event,that party shall defend, indemnify and hold harmless the other as to any damages, costs or liabilities that result from or arise out of that intentional misconduct, including reasonable attorney's fees and costs which shall include costs and salary of the city attorney or other in-house counsel. Further, notwithstanding the obligations set forth in paragraphs 9.7.2 and 9.7.3 above, the ENGINEER agrees to defend OWNER where the OWNER'S alleged liability arises from intentional misconduct by the ENGINEER. Should the OWNER be found responsible for intentional misconduct by its own officer, director, agent or employee,then OWNER agrees to reimburse ENGINEER for the reasonable attorney's fees and costs incurred in any defense of the OWNER. 9.7.6 The ENGINEER shall perform this agreement as an independent contractor,and as such,is responsible to the OWNER only as to the results to be obtained in the work herein specified, and to the extent that the work shall be done in accordance with the terms, plans and specifications. The ENGINEER shall have and maintain complete control over all of its employees, subcontractors, agents and operations, being responsible for any required payroll deductions and providing required benefits,such as, but not limited to worker's compensation with statutory limits,and unemployment insurance. 9.8 INSURANCE The ENGINEER shall secure and furnish to the OWNER certificate of insurance, therein, naming the OWNER as an additional insured,to include thirty(30)days notice of cancellation or non-renewal. Without limiting any of ENGINEER's obligations hereunder, ENGINEER shall secure and maintain, until the work is completed and accepted by the OWNER, insurance coverage naming the OWNER as additional insured with minimum insurance coverage as follows: 6 Type of Coverage Limits Employers'Liability: 100 000.per accident General Liability: Bodily Injury&Property Damage Single and combined $ 1.000,000,per accident General Aggregate: $2.000,000. Excess Liability Coverage(umbrella) $1.000.000.each occurrence Automobile: Bodily Iniury covering all $ 1,000,000 each person automobiles,trucks, tractors,trailers,or $ 1,000.000 each occurrence other automotive equip- ment whether owned or rented by Engineer or owned by employees of Engineer. Property Damage covering $ 100.000 each occurrence all automobiles,trucks, tractors,trailers or other automotive equipment whether owned or rented by Engineer or owned by employees of Engineer OR Bodily Iniury&Property $1,000,000 each occurrence Damage Single and combined In addition to the above insurance coverage, the ENGINEER shall secure and maintain, until the work is completed and accepted by the OWNER, and without naming OWNER as an additional insured, professional errors and omissions coverage as follows: Professional Errors&Omissions: $ 1,000,000 per claim and aggregate each occurrence 9.9 ENDORSEMENT The ENGINEER shall place his endorsement on all drawings and other data furnished by him. 7 9.10 OWNERSHIP OF DOCUMENTS The parties admit and agree the documents produced under this agreement are not intended or represented to be suitable for reuse by OWNER or any other individual on any other project. Any reuse without written verification or adaptation by ENGINEER will be at OWNER's sole risk and without liability or legal exposure to ENGINEER, or to ENGINEER's independent professional associates or consultants. Files in electronic media format of text, data, graphics, or of other types that are furnished by ENGINEER to OWNER are only for convenience of owner. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. 9.11 PUBLIC INFORMATION The ENGINEER shall not issue any statements, releases or information for public dissemination without prior approval of the OWNER. 9.12 PROPRIETARY RIGHTS If patentable discoveries or inventions should result from work required herein, all rights accruing from such discoveries or inventions shall be joint property of the ENGINEER and the OWNER. Provided that the OWNER, state agencies or political subdivisions and the United States Government shall have the irrevocable, nonexclusive, nontransferable and royalty-free license to use each invention in the manufacture, use and disposition, according to law, of any article or material,and in the use of any method that may be developed as part of the work described and contemplated herein. 9.13 RECORDS The ENGINEER shall maintain accounting records and other evidence pertaining to the cost incurred and to make the records available at all reasonable times during the Contract term and for one (1) year from the date of final payment. Such accounting records and other evidence pertaining to the cost incurred will be made available for inspections by OWNER. 9.14 SUCCESSORS IN INTEREST The covenants, agreements and all statements in this Contract apply to and shall be binding on the heirs, personal representatives,successors and assigns of the respective parties. 8 9.15 ATTORNEY'S FEES AND COSTS That in the event it becomes necessary for either Party of this Contract to retain an attorney to enforce any of the terms or conditions of this Contract or to give any notice required herein,then the prevailing Party or the Party giving notice shall be entitled to reasonable attorney's fees and costs, including fees, salary, and costs of in-house counsel to include City Attorney. 9.16 MODIFICATIONS AND AMENDMENTS That any amendment or modification of this Contract or any provisions herein shall be made in writing or executed in the same manner as this original document and shall after execution become a part of this Contract. In witness Whereof,the Parties hereto do make and execute this Agreement. CITY OF BOZEMAN,MONTANA ENGINEER BY:C_�Ia_ B (`City Manager) / (Vice President) DATE: J ` l DATE:_ OO F 130 ATTEST: BY: 9 Exhibit A Scope of Services 100 Project Management 200 Basis of Planning Memorandum 300 Existing System Inventory 400 Existing Collection System Evaluation 500 Future Collection System Recommendations 600 Reports 700 Public Presentations TASK 100. PROJECT MANAGEMENT Objectives: Plan and execute the facility plan development in accordance with an established schedule and budget while exceeding quality expectations. MMUHDR Subtasks: 101 Project Updates. James Nickelson of MMI will serve as Project Manager for MMI/HDR. Bob Murray will serve as City Project Manager. Overall project related meetings will be held with Bob Murray as needed. All meetings will be limited to key personnel. Arrangements will be made to conduct the meetings at the MMI Bozeman office or City office; at the discretion of the City. To the extent possible, these will be coordinated with other meetings and workshops to minimize impact on City staff. 102 Monitoring. Monitor project progress including work completed, work remaining, budget expended, schedule and estimated cost of work remaining, and estimated cost at completion. Manage activities within task budgets. 103 Quality Control. Review all work activities and project deliverables for conformance with quality control requirements and project standards. Monitor project activities for potential changes, anticipate changes whenever possible, and with the City's approval, modify project tasks and approach to keep the overall project within budget and on schedule. Deliverables: • Memoranda and meeting notes as required. City Involvement: • Participate in telephone conference calls and meetings. • Review and approve modifications to approach, schedule and deliverables as appropriate. • Report to City Manager and Commission as appropriate. TASK 200. BASIS OF PLANNING MEMORANDUM Objectives: The Basis of Planning Memorandum will provide population and flow projections for a 20-year planning period. The Memorandum will establish the planning constraints and clarify the issues that will impact planning decisions and provide a clear foundation for the development of alternatives for the wastewater facilities plan. The current service area boundary will be utilized. The Basis of Planning Memorandum will be developed through the following subtasks and activities: MMI/HDR Subtasks: 201 Population and Land Use Baseline (Existing Conditions). In conjunction with City staff develop a strong understanding of existing conditions. Land use data will be gathered for the Bozeman area and developed into current population characteristics. 202 Population and Land Use Baseline (Future Conditions). The goal of this subtask is to project population data characteristics out to the 20-year planning period. MMI/HDR will rely primarily on information available from the Bozeman 2020 Plan, the Bozeman Area Transportation Plan, the 2007 Wastewater Facility Plan, the Integrated Water Resource Plan and State of Montana projections to provide recommendations. 203 Population Distribution. The baseline data will be integrated into a summary of the Bozeman area GIS database. A review of the impact that Montana State University has on population will be analyzed as it impacts demands on the existing and future wastewater system. This task will include identification of future areas of expansion based upon past and projected patterns of community growth and development. The City will provide input and approve these projections. Population distribution for future projections will only be completed on anticipated full build out scenario. 204 Basis of Planning Meeting. A single meeting will be organized and facilitated to review the conclusions and information presented in the draft Basis of Planning Memorandum. The meeting will review land use information, ongoing trends and other relevant information used to develop the baseline and future population projections. Particular focus will be placed on how the information in the text of the planning report will impact the development and evaluation of facility improvement alternatives. Final decisions on the use of this information will be made at this meeting. 205 Finalize Basis of Planning Memorandum. The Draft Basis of Planning Memorandum developed as part of Subtasks 201 through 205 will be finalized after review and comment by the City. Deliverables: • Service area boundary map. • Population projections. • Draft and final Basis of Planning Memoranda. City Involvement: • Participate in meetings. • Review and approve Draft and Final Basis of Planning Memoranda. TASK 300.EXISTING SYSTEM INVENTORY Objectives: Gather accurate existing system information. The information gathered in this task will be the foundation for recommendations in the facility plan. MMUHDR Subtasks: 301 Collect and Inventory Existing System Information. MMUHDR will review existing reports, records, logs, system maps, GIS information, digital ortho maps and as-built drawings relating to the sewer collection and treatment facilities gathered by the City. The focus of this task is to compile available physical system information, incorporate system information into the existing City mapping system (i.e. sewer inverts and pipe sizing and material) and evaluate existing system conditions to determine deficiencies. Existing water meter data from 2012 and 2013 with corresponding GIS water meter points are requested for base flow loading the model. Where inconsistencies exist in the sources of information, MMUHDR will request the City provide additional information to verify system conditions. 302 Flow Measurement. Develop program for measuring flows in the collection system for the purpose of calibrating the model developed in Task 400. MMI/HDR in conjunction with City staff will measure flow at 4 key locations in the collection system for a period of two months at each location. MMUHDR will provide three flow meters and the City will provide one flow meter for the two month duration. MMUHDR will provide the technical support to calibrate and collect data from the meters and the city will provide for installation and assistance in data collection. Weekly or bi-weekly visits will be made to the sites during the monitoring period. Two rainfall data collection meters will be installed at select locations for infiltration/inflow evaluation during the flow monitoring period. 303 System Database. The existing database of the sewer collection system attributes will be updated to include the new components to the system. The collection system database will include information such as pipe and manhole locations, diameters, materials, elevations, inverts, depths and other additional physical information describing the system components. This database will be based on existing GIS information from the City, record drawings from the City and if needed field collected GPS data by the City. A data gap analysis will be completed to determine missing information required for input from record drawing and field data collection. Data gaps after data collection will be assumed based on constant slope /diameter interpolation or similar methods and will be tracked as such in the database. 304 Existing System Inventory Summary Memorandum. A summary memorandum will be prepared presenting a summary of the existing systems. Deliverables: • Collection System database. • Summary memorandum of system inventory. City Involvement: • Collect existing reports, records, logs, systems maps, GIS, digital ortho maps and record drawings relating to the sewer collection system and treatment facilities. • Assist MMI/HDR in field verification of model by providing existing system flow monitoring operation and maintenance data. • Supply existing system records inclusive of existing database. • Provide existing SewerCAD Model files and supporting documentation. • Participate in brief and organized staff interviews. • Review system inventory database. • Assist in flow measurement study. • Collect GPS data for missing information from the City existing database. TASK 400.EXISTING COLLECTION SYSTEM EVALUATION Objective: With the modeling and planning efforts for the wastewater collection system, MMUHDR will collaborate directly with City of Bozeman staff. MMI/HDR will document each major step of model development and validation via a technical memorandum and associated appendices. MMI/HDR will evaluate the existing sewer collection facilities. The capacity limited sections will be identified and recommendations will be made for necessary improvements and equipment replacement. MMI/HDR will provide a computer model for the entire existing collection system in a format compatible with the City's GIS system. The model will be constructed using HDR-owned software and delivered for the City's use. The City must purchase a software license to update and maintain the model if desired. The collector and interceptor collection system will be modeled in Innovyze InfoSWMM and evaluated using existing dry-and wet-weather flows.The model will be created by converting and updating the city's existing SewerCAD collection system model. Allocation of existing dry-weather flows can be completed with the water meters and billing data with an allowance for base infiltration based on flow monitoring data. Wet-weather loading will be based on historic infiltration and inflow rates recorded at the wastewater treatment plant and any captured wet-weather events during the flow monitoring period. Validation will be completed using available flow monitoring data and treatment plant influent data. Capacity analysis will be completed utilizing the validated model with existing dry-and wet-weather flows. Lift stations will be examined under existing loads for capacity and operational needs. MMLIMR Subtasks: 401 Model Conversion. Convert the existing City of Bozeman wastewater model from SewerCAD to InfoSWMM. All scenarios will be converted and the model results will be compared to the existing model results to verify the conversion. 402 Flow Monitming/Raintall Analysis. Analyze flow monitoring and rainfall data and separate dry weather flow periods from wet-weather events to determine diurnal patterns and infiltration rates. 403 Model Update and Validation. The converted model will update with the system inventory developed in Task 300. The database will be used to add new areas to the model that have been added to the collection system since the last master plan as well as update changes to reflect more recent information. Model validation will be completed using wastewater treatment plant flow data and other flow monitoring data from the collection system. Average day dry-weather and peak day wet-weather model scenarios will be included for existing conditions. Validation within 10% of flow volume and 10% of peak flows will be attempted at the treatment plant and each flow monitor location. 404 Existing List Station Analysis • Determine whether the existing wastewater lift stations require enlargement and/or modifications. • The hydraulic model will be utilized for determining hydraulic needs for the pumped areas. • If deficiencies are found,they will be noted and addressed in the future system analysis. 405 Existing System Review/Recommendations. Results from the existing condition model run along with information gathered from City staff will be used to identify existing system problem areas. Potential deficiency areas that may be identified in the modeling process include surcharged pipe locations, storm water cross-connections and low and high pipeline velocities. Improvement recommendations and cost estimates associated with remedying deficiency areas in the existing system will be prepared. 406 Inflow and Infiltration ("Reduction. Past and current efforts to reduce UI and will be evaluated with recommended additional actions. This scope item is not intended to be a full-scale I/I study but only a review of existing data and limited recommendations in regards to the apparent magnitude of the problem. 407 Existing Wastewater Collection System Summary Memorandum.A summary memorandum will be prepared presenting the existing problems identified. Included in the summary memorandum will be conceptual level estimates of capital costs for the alternatives developed. The goal of this memorandum is to provide City staff with a draft of the system alternatives and proposed improvements for their review prior to the development of future system recommendations. Deliverables: • Existing collection system, lift station and force main hydraulic evaluation. • Existing wastewater collection system summary memorandum. • Existing 1nfoSWMM model used for analysis. Client Involvement: • Provide data from previous flow monitoring studies and any additional field studies, i.e. smoke testing, UI analysis,etc. • Review Existing Wastewater Collection System Summary Memorandum. TASK 500. FUTURE COLLECTION SYSTEM RECOMMENDATIONS Objective: The population data assembled will develop the future sewage flow projections. This information in conjunction with the study area boundary will be utilized to delineate new drainage areas for the 20-year planning period. MMI/HDR will develop and evaluate alternatives to expand sewer collection facilities to meet the needs of the expanded service area and additional capacity requirements in the existing service area. The collector and interceptor collection system will be modeled in Innovyze InfoSWMM and evaluated using future dry-and wet-weather flows. Future flow allocation will be completed using unit flows and land use and parcel information with an allowance for base infiltration based on flow monitoring data and design standards. Wet-weather loading will be based on historic 1/I rates recorded at the wastewater treatment plant, any captured wet-weather events during the flow monitoring period, and design standards considering which would result in the greatest allowance. Capacity analysis will be completed utilizing the validated model with future near-term and long-term dry-and wet-weather flows. Lift stations will be examined under future loads for location, capacity and operational needs. A conceptual level analysis will be provided that assesses the long term costs associated with construction and operation/maintenance of a multiple lift station scenario compared to a regional lift station scenario. One drainage basin will be selected by MMI/HDR,with input from city staff, for this analysis. The results of this assessment will be utilized as a tool for selection of drainage basin alternatives. MMI/HDR Subtasks: 501 Future System Analysis and Deficiency Identification. Using the population projections developed, a future condition hydraulic model will be developed that will project future sewer flows. This model will aid in the determination of collection system requirements to serve future development and alleviate existing system deficiencies. Future system requirements will be developed for the 20-year (near-term) for lift stations and saturation growth (long-term ultimate buildout) conditions for the remaining collection system components. Expanded existing and additional future drainage basins will be developed in the buildout service area to determine service to future growth areas. Average day dry-weather and peak day wet-weather model scenarios will be included for each of the near-term and long-term future conditions. 502 Drainage Basin Alternative Analysis. The alternative analysis task will investigate traditional collection solutions to serving the expanded service area. Initial alternatives will be developed for each drainage basin in sketch format with a maximum of two alternatives being further refined into a conceptual level including planning level costs and relative benefits for comparison purposes. The conceptual level alternatives will be analyzed utilizing the model developed in Task 400 with the addition of the 20-year and building loading projections. Recommended future sewer lines will be established based on the alternative with the best cost-benefit. 503 Alternative Evaluation Workshop. The focus of this workshop will be to jointly evaluate, rank and select the recommended alternatives for the collection systems. 504 Future Lift Station Analysis • Evaluate the need for 20-year(near-term) and saturation growth (long-term ultimate buildout) conditions future wastewater lift stations locations and capacities based on results of the drainage basin alternative analyses. • The future lift stations and service areas will be evaluated under future conditions for any necessary capital and operational improvements. • The hydraulic model will be utilized for determining hydraulic needs for the pumped areas. • Pumping capacities, cost estimates, and prioritization of improvements will be provided. 505 Future System Review/Recommendations. Results from the future condition model runs along with information gathered from City staff will be used to identify future system improvement requirements. Improvement recommendations and cost estimates associated with expanding the existing system to support future growth will be prepared. MMVHDR will summarize all recommended improvements with phasing, sizing, basic constructability issues, improvement flow triggers, and planning level cost estimates for improvements. As part of this task, tools will be developed to allow for city staff to easily assess and track impacts from future developments. 506 Future Wastewater Collection System Summary Memorandum. MMI/HDR will prepare a summary memorandum presenting the future problems identified and a summary of solutions. Included in the summary memorandum will be conceptual level estimates of capital costs for the alternatives developed and exhibits to aid City staff in review. The goal of this memorandum is to provide City staff with a draft of the system alternatives and proposed improvements for their review prior to the development of system recommendations. A map showing sewer service areas and interceptor and lift station/forcemain improvements will be prepared. MMI/HDR will work with the city to develop appropriate maps/graphics that describe the future recommendations in an easy to use format. Deliverables: • Future collection system, lift station and force main evaluation. • Future system alternative evaluations. • Future wastewater collection system summary memorandum. • Future InfoSWMM model used for analysis. Client Involvement: • Assist MMI/HDR in exploring alternatives for the future collection system locations based on information regarding potential future development projects. • Review alternatives and future wastewater collection system summary memorandum. • Participate in alternative evaluation workshop. City Involvement: 0 Review rating criteria. TASK 600. REPORTS Objective: The final technical memorandums will be assembled into one document that will form the Facilities Plan. This document will be structured similar to the outline of tasks in this scope document. MMI/HDR Subtasks: 601 Draft Report Development. MMI/HDR will provide a draft of the facility plan document for City staff. 602 Prepare and Deliver Final Facility Plan to City of Bozeman. Based on review comments received, revisions to the draft report will be made by MMI/HDR and the final report will be assembled and 5 copies delivered to the City. Deliverables: • Draft reports. • Final reports. City Involvement: • Review of draft report. TASK 700. PUBLIC PRESENTATIONS The estimated level of effort includes two public presentations of the findings and recommendations of the wastewater facility plans. These presentations are planned for the City Commission work sessions or meetings. Prior to the presentations a preparation conference call will be held with the MMI/HDR team and City staff to discuss the format and information to be provided to the Commission. Exhibit B Engineering Services Budget Cost Summary City of Bozeman, Montana 2013 Wastewater Facility Plan Update Task Task Description Task Labor Cost Task 100 Project Management $ 14,396.00 Task 200 Basis of Planning Memorandum $ 8,272.00 Task 300 Existing System Inventory $ 25,970.00 Task 400 Existing Collection System Evaluation $ 26,459.00 Task 500 Future Collection System Evaluation $ 40,296.00 Task 600 Reports $ 13,514.00 Task 700 Public Presentation $ 3,608.00 Total Labor Cost $ 132,515.00 Expense Description Expense Cost Misc Expenses $ 9,219.00 Travel Expenses $ 1,900.00 Printing and Photocopying $ 525.00 Technology Charge $ 5,387.30 Total Direct Expenses $ 17,031.30 Total Cost Per Task(Labor+ Expenses) Task 100 Project Management $ 15,565.60 Task 200 Basis of Planning Memorandum $ 9,014.20 Task 300 Existing System Inventory $ 35,595.00 Task 400 Existing Collection System Evaluation $ 27,535.30 Task 500 Future Collection System Evaluation $ 42,417.80 Task 600 Reports $ 14,641.80 Task 700 Public Presentation $ 4,776.60 Total Project Cost $ 149 546.30 Page 1 City of Bozeman 2013 Wastewater Facility Plan Update Task 100 Project Management Total Staff 101 1 102 1 103 Hours Rate Total Senior Technical Advisor/QA 01 0 24 24 $ 167.00 $ 4,008.00 Project Manager 4 8 4 16 $ 167.00 $ 2,672.00 Senior Engineer 0 0 0 0 $ 124.00 $ - Field Engineer 0 0 0 0 $ 95.00 $ Staff Engineer 0 0 0 0 $ 82.00 $ - Admin 0 12 0 12 $ 62.00 $ 744.00 Senior Technical Advisor 0 0 12 12 $ 198.00 $ 2,376.00 Local Coordination Project Engineer 4 12 01 16 $ 95.00 $ 1,520.00 Lead Modeling Engineer 01 0 0 0 $ 145.00 $ - Senior Project Engineer 0 0 0 0 $ 138.00 $ Project Engineer Modeler 0 0 0 0 $ 115.00 $ Staff Engineer Modeler 0 0 0 0 $ 88.00 $ - QA/QC 0 0 8 8 $ 263.00 $ 2,104.00 Accounting Admin 0 12 0 12 $ 81.00 $ 972.00 Totals 100 $ 14,396.00 Total Labor $ 14,396.00 Direct Expenses: 101 Project Updates Miscellaneous $ 156.00 102 Monitoring Travel Expenses $ 500.00 103 Quality Cotrol Mapping/Photos/Surveys $ - Printing and Photocopying $ 50.00 Technology Charge $ 463.60 Total Direct Expenses $ 1,169.60 TOTAL TASK BUDGET $ 15,565.60 City of Bozeman 2013 Wastewater Facility Plan Update Task 200 Basis of Planning MemorandumSubtasks Total Staff 201 202 203 204 205 Hours Rate Total Senior Technical Advisor/QA 0 0 0 0 0 0 $ 167.00 $ Project Manager 2 2 2 4 6 16 $ 167.00 $ 2,672.00 Senior Engineer 6 6 4 4 8 28 $ 124.00 $ 3,472.00 Field Engineer 0 0 0 0 0 0 $ 95.00 $ - Staff Engineer 0 0 0 0 0 0 $ 82.00 $ - Admin 0 0 0 0 4 4 $ 62.00 $ 248.00 Senior Technical Advisor 0 0 0 0 0 0 $ 198.00 $ - Local Coordination Project Engineer 0 0 0 4 0 4 $ 95.00 $ 380.00 Lead Modeling Engineer 2 2 0 0 0 4 $ 145.00 $ 580.00 Senior Project Engineer 0 0 0 0 0 0 $ 138.00 $ - Project Engineer Modeler 4 4 0 0 0 8 $ 115.00 $ 920.00 Staff Engineer Modeler 0 0 0 0 0 0 $ 88.00 $ - QA/QC 0 0 0 0 0 0 $ 263.00 $ Accounting Admin 0 0 0 0 0 0 $ 81.00 $ - Totals 64 $ 8,272.00 Total Labor $ 8,272.00 Direct Expenses: 201 Population and Land Use Baseline(Existing Condition) Miscellaneous $ 144.00 202 Population and Land Use Baseline(Future Condition) Travel Expenses $ 250.00 203 Population Distribution Mapping/Photos/Surveys $ - 204 Basis of Planning Meeting Printing and Photocopying $ 25.00 205 Finalize Basis of Planning Memorandum Technology Charge $ 323.20 Total Direct Expenses $ 742.20 $ 9,014.20 City of Bozeman 2013 Wastewater Facility Plan Update Task 300 Existing System Inventory ISubtasks Total Staff 301 302 303 304 Hours Rate Total Senior Technical Advisor/QA 0 0 0 0 0 $ 167.00 $ Project Manager 4 4 0 4 12 $ 167.00 $ 2,004.00 Senior Engineer 16 8 24 8 56 $ 124.00 $ 6,944.00 Field Engineer 0 72 0 0 72 $ 95.00 $ 6,840.00 Staff Engineer 0 0 72 8 80 $ 82.00 $ 6,560.00 Admin 0 0 0 4 4 $ 62.00 $ 248.00 Senior Technical Advisor 0 0 0 0 0 $ 198.00 $ - Local Coordination Project Engineer 0 0 oil 2 2 $ 95.00 $ 190.00 Lead Modeling Engineer 2 2 2 0 6 $ 145.00 $ 870.00 Senior Project Engineer 0 0 0 0 0 $ 138.00 $ - Project Engineer Modeler 4 4 4 2 14 $ 115.00 $ 1,610.00 Staff Engineer Modeler 8 0 0 0 8 $ 88.00 $ 704.00 QA/QC 0 0 0 0 0 $ 263.00 $ - Accounting Admin 0 010 0 0 $ 81.00 $ Totals 254 $ 25,970.00 301 Collect and Inventory Existing System Information Total Labor $ 25,970.00 302 Flow Measurement 303 System Database Direct Expenses: 304 Existing System Inventory Summary Memorandum Miscellaneous $ 8,232.00 Travel Expenses $ - Mapping/Photos/Surveys $ - Printing and Photocopying $ 50.00 Technology Charge $ 1,343.00 Total Direct Expenses $ 9,625.00 TOTAL TASK BUDGET $ 35,595.00 City of Bozeman 2013 Wastewater Facility Plan Update Task 400 Existing Collection System Evaluation Subtasks Total Staff 401 1 402 1 403 1 404 1 405 1 406 1 407 1Hours Rate Total Senior Technical Advisor/QA 0 0 0 0 0 0 0 0 S 167.00 $ Project Manager 0 1 0 1 1 1 1 5 $ 167.00 $ 835.00 Senior Engineer 0 0 0 4 0 0 0 4 $ 124.00 $ 496.00 Field Engineer 0 4 0 0 0 0 0 4 $ 95.00 $ 380.00 Staff Engineer 0 0 0 0 0 0 0 0 $ 82.00 $ Admin 0 0 0 0 0 0 0 0 $ 62.00 $ Senior Technical Advisor 0 0 0 0 0 0 0 0 $ 198.00 $ Local Coordination Project Engineer 0 0 0 0 0 0 4 4 $ 95.00 $ 380.00 Lead Modeling Engineer 2 4 4 2 4 2 8 26 $ 145.00 $ 3,770.00 Senior Project Engineer of 01 01 Of 41 41 21 10 $ 138.00 1 $ 1,380.00 Project Engineer Modeler 8 8 16 4 16 4 24 80 $ 115.00 $ 9,200.00 Staff Engineer Modeler 0 16 32 128 8 36 112 $ 88.00 $ 9,856.00 QA/QC 0 0 0 0 0 0 0 0 $ 263.00 $ Accounting Admin 0 0 0 0 0 0 2 2 $ 81.00 $ 162.00 Totals 247 $ 26,459.00 Total Labor $ 26,459.00 Direct Expenses: 401 Model Conversion Miscellaneous $ 39.00 402 Flow Monitoring/Rainfall Analysis Travel Expenses $ - 403 Model Update and Validation Mapping/Photos/Surveys $ - 404 Existing Lift Station Analysis Printing and Photocopying $ 100.00 405 Existing System Review/Recommendations Technology Charge $ 937.30 406 Inflow and Infiltration(1/1)Reduction 407 Existing Wastewater Collection System Summary Memorandum Total Direct Expenses $ 1,076.30 TOTAL TASK BUDGET $ 27,535.30 City of Bozeman 2013 Wastewater Facility Plan Update Task 500 Future Collection System Evaluation Total Staff 501 502 503 504 505 1 506 Hours Rate Total Senior Technical Advisor/QA 0 0 0 0 0 0 0 $ 167.00 $ Project Manager 0 12 4 4 8 4 32 $ 167.00 $ 5,344.00 Senior Engineer 0 16 4 4 8 8 40 $ 124.00 $ 4,960.00 Field Engineer 0 0 0 0 0 0 0 $ 95.00 $ - Staff Engineer 0 40 0 8 0 12 60 $ 82.00 $ 4,920.00 Admin 0 0 0 0 0 4 4 $ 62.00 $ 248.00 Senior Technical Advisor 0 0 0 0 0 0 0 $ 198.00 $ Local Coordination Project Engineer 0 21 8 0 0 4 14 $ 95.00 $ 1,330.00 Lead Modeling Engineer 4 8 2 2 4 8 28 $ 145.00 $ 4,060.00 Senior Project Engineer 0 4 0 0 4 2 10 $ 138.00 $ 1,380.00 Project Engineer Modeler 16 12 4 8 12 24 76 $ 115.00 $ 8,740.00 Staff Engineer Modeler 16 16 4 16 16 36 104 $ 88.00 $ 9,152.00 QA/QC 0 0 0 0 0 0 0 $ 263.00 $ Accounting Admin 0 0 0 0 0 2 2 $ 81.00 $ 162.00 Totals 370 $ 40,296.00 Total Labor $ 40,296.00 501 Future System Analysis and Deficiency Identificati Direct Expenses: 502 Alternative Analysis Miscellaneous $ 408.00 503 Alternative Evaluation Workshop Travel Expenses $ 504 Future Lift Station Analysis Mapping/Photos/Surveys $ - 505 Future System Review.Recommendations Printing and Photocopying $ 100.00 506 Future Wastewater Collection System Summary N Technology Charge $ 1,613.80 Total Direct Expenses $ 2,121.80 TOTAL TASK BUDGET $ 42,417.80 City of Bozeman 2013 Wastewater Facility Plan Update Task 400 Existing Collection System Evaluation Subtasks Total Staff 401 1 402 1 403 1 404 1 405 1 406 1 407 1Hours Rate Total Senior Technical Advisor/QA 0 0 0 0 0 0 0 0 S 167.00 $ Project Manager 0 1 0 1 1 1 1 5 $ 167.00 $ 835.00 Senior Engineer 0 0 0 4 0 0 0 4 $ 124.00 $ 496.00 Field Engineer 0 4 0 0 0 0 0 4 $ 95.00 $ 380.00 Staff Engineer 0 0 0 0 0 0 0 0 $ 82.00 $ Admin 0 0 0 0 0 0 0 0 $ 62.00 $ Senior Technical Advisor 0 0 0 0 0 0 0 0 $ 198.00 $ Local Coordination Project Engineer 0 0 0 0 0 0 4 4 $ 95.00 $ 380.00 Lead Modeling Engineer 2 4 4 2 4 2 8 26 $ 145.00 $ 3,770.00 Senior Project Engineer of 01 01 Of 41 41 21 10 $ 138.00 1 $ 1,380.00 Project Engineer Modeler 8 8 16 4 16 4 24 80 $ 115.00 $ 9,200.00 Staff Engineer Modeler 0 16 32 128 8 36 112 $ 88.00 $ 9,856.00 QA/QC 0 0 0 0 0 0 0 0 $ 263.00 $ Accounting Admin 0 0 0 0 0 0 2 2 $ 81.00 $ 162.00 Totals 247 $ 26,459.00 Total Labor $ 26,459.00 Direct Expenses: 401 Model Conversion Miscellaneous $ 39.00 402 Flow Monitoring/Rainfall Analysis Travel Expenses $ - 403 Model Update and Validation Mapping/Photos/Surveys $ - 404 Existing Lift Station Analysis Printing and Photocopying $ 100.00 405 Existing System Review/Recommendations Technology Charge $ 937.30 406 Inflow and Infiltration(1/1)Reduction 407 Existing Wastewater Collection System Summary Memorandum Total Direct Expenses $ 1,076.30 TOTAL TASK BUDGET $ 27,535.30 City of Bozeman 2013 Wastewater Facility Plan Update Task 500 Future Collection System Evaluation Total Staff 501 502 503 504 505 1 506 Hours Rate Total Senior Technical Advisor/QA 0 0 0 0 0 0 0 $ 167.00 $ Project Manager 0 12 4 4 8 4 32 $ 167.00 $ 5,344.00 Senior Engineer 0 16 4 4 8 8 40 $ 124.00 $ 4,960.00 Field Engineer 0 0 0 0 0 0 0 $ 95.00 $ - Staff Engineer 0 40 0 8 0 12 60 $ 82.00 $ 4,920.00 Admin 0 0 0 0 0 4 4 $ 62.00 $ 248.00 Senior Technical Advisor 0 0 0 0 0 0 0 $ 198.00 $ Local Coordination Project Engineer 0 21 8 0 0 4 14 $ 95.00 $ 1,330.00 Lead Modeling Engineer 4 8 2 2 4 8 28 $ 145.00 $ 4,060.00 Senior Project Engineer 0 4 0 0 4 2 10 $ 138.00 $ 1,380.00 Project Engineer Modeler 16 12 4 8 12 24 76 $ 115.00 $ 8,740.00 Staff Engineer Modeler 16 16 4 16 16 36 104 $ 88.00 $ 9,152.00 QA/QC 0 0 0 0 0 0 0 $ 263.00 $ Accounting Admin 0 0 0 0 0 2 2 $ 81.00 $ 162.00 Totals 370 $ 40,296.00 Total Labor $ 40,296.00 501 Future System Analysis and Deficiency Identificati Direct Expenses: 502 Alternative Analysis Miscellaneous $ 408.00 503 Alternative Evaluation Workshop Travel Expenses $ 504 Future Lift Station Analysis Mapping/Photos/Surveys $ - 505 Future System Review.Recommendations Printing and Photocopying $ 100.00 506 Future Wastewater Collection System Summary N Technology Charge $ 1,613.80 Total Direct Expenses $ 2,121.80 TOTAL TASK BUDGET $ 42,417.80 City of Bozeman 2013 Wastewater Facility Plan Update Task 600 Reports Total Staff 6-01T-6-0—2 d Hours Rate Total Senior Technical Advisor/QA 0 0 0 $ 167.00 $ Project Manager 12 4 16 $ 167.00 $ 2,672.00 Senior Engineer 16 10 26 $ 124.00 $ 3,224.00 Field Engineer 0 0 0 $ 95.00 $ - Staff Engineer 8 6 14 $ 82.00 $ 1,148.00 Admin 8 4 12 $ 62.00 $ 744.00 Senior Technical Advisor 0 0 0 $ 198.00 $ - Local Coordination Project Engineer 41 2 6 $ 95.00 $ 570.00 Lead Modeling Engineer 41 2 6 $ 145.00 $ 870.00 Senior Project Engineer 4 0 4 $ 138.00 $ 552.00 Project Engineer Modeler 12 4 16 $ 115.00 $ 1,840.00 Staff Engineer Modeler 12 4 16 $ 88.00 $ 1,408.00 QA/QC 0 0 0 $ 263.00 $ - Accounting Admin 4 2 6 $ 81.00 $ 486.00 Totals 122 $ 13,514.00 Total Labor Total Labor $ 13,514.00 Direct Expenses: Miscellaneous $ 204.00 601 Draft Report Development Travel Expenses $ 250.00 602 Prepare and Deliver Final Facility Plan to City of Bozeman Mapping/Photos/Surveys $ - Printing and Photocopying $ 100.00 Technology Charge $ 573.80 Total Direct Expenses $ 1,127.80 TOTAL TASK BUDGET $ 14,641.80 City of Bozeman 2013 Wastewater Facility Plan Update Task 700 Public Presentation Subtasks Staff 701 Hours Rate Total Senior Technical Advisor/QA 0 0 $ 167.00 $ - Project Manager 6 6 $ 167.00 $ 1,002.00 Senior Engineer 6 6 $ 124.00 $ 744.00 Field Engineer 0 0 $ 95.00 $ - Staff Engineer 0 0 $ 82.00 $ - Admin 0 0 $ 62.00 $ - Senior Technical Advisor 0 0 $ 198.00 $ - Local Coordination Project Engineer 8 8 $ 95.00 $ 760.00 Lead Modeling Engineer 2 2 $ 145.00 $ 290.00 Senior Project Engineer 0 0 $ 138.00 $ - Project Engineer Modeler 4 4 $ 115.00 $ 460.00 Staff Engineer Modeler 4 4 $ 88.00 $ 352.00 QA/QC 0 0 $ 263.00 $ Accounting Admin 0 0 $ 81.00 $ Totals 30 $ 3,608.00 Total Labor $ 3,608.00 Direct Expenses: 701 Public Presentation Miscellaneous $ 36.00 Travel Expenses $ 900.00 Mapping/Photos/Surveys $ Printing and Photocopying $ 100.00 Technology Charge $ 132.60 Total Direct Expenses $ 1,168.60 TOTAL TASK BUDGET $ 4,776.60 Exhibit B-City of Bozeman,Montana 2013 Wastewater Facility Plan Update Engineering Staff Hour Estimate MMI HDR error ec mca enror ec nroa owcoordination ea mg error rot role Engineer a ngmeer Accounting Personnel Advisor/CA Project Manager Senior Engineer Field Engineer Staft Erginear Admin Advisor Pmject Engineer Engineer Engineer Modeler Modeler QAJQC Admin HDR Tota MMI Total Total Cormier Nickelson Hickman/Blanksma Wain' hOEIIer Neilson Madden Harmon Revis Wood Whitfield Hegedus Fleckenstein Tomic Ward Hours Hours Hours Task 100 Project Management 101 Project Updates q 4 4 102 Monitoring 8 12 12 12 24 103 Quality Cotrol 24 4 12 8 1 20 Hours subtotal 24 16 0 0 0 12 12 16 0 0 0 0 8 12 48 52 100 Task 200 Basis of Planning Memorandum 207 Po ulation and Land Use Baseline(Existin Condition 2 6 2 4 6 202 Population and Land Use Baseline Future Condition 2 6 2 4 6 203 Population Distribution 2 4 0 204 Basis of PlanningMeetingq 4 4 4 205 Finalize Basis of Plannin Memorandum 6 8 4 0 Hours sub-total 0 16 28 0 0 4 0 4 4 0 8 0 0 0 16 48 64 Task 300 ExistingSystem Inventory 301 Collect and InventoryExistingSystem Information 4 16 2 4 8 14 302 Flow Measurement 4 8 72 2 4 8 303 System Database 24 72 2 4 6 304 ExistingSystem InventorySumma Memorandum 4 8 8 4 2 2 4 Hours subtotal 0 12 56 72 80 4 0 2 6 0 14 8 0 0 30 224 254 Task 400 ExistingCollection System Evaluation 401 Model Conversion 2 8 10 402 Flow Mondodn (Rainfall Analysis 1 4 4 8 16 28 403 Model Update and Validation 4 16 32 52 404 Existin Lift Station Analysis 1 4 2 4 12 18 405 ExistingSystem Review/Recommendations 1 4 4 16 8 32 406 Inflow and lnfttration I/I Reduction 1 2 4 4 8 18 407 ExistingWastewater Collection System Summa Memorandum 1 4 8 2 24 36 2 76 Hours subtotal 0 5 4 4 0 0 0 4 26 10 80 112 0 2 234 13 247 Task 500 Future Collections tem Evaluation 501 Future System Analysis and Deficient Identification 4 16 16 36 502 Alternative Analysis 12 16 40 2 8 4 12 16 42 503 Alternative Evaluation Workshop4 4 8 2 4 4 18 504 Future Lift Station Analysis 4 4 8 2 8 16 26 505 Future System Review.Recommendations a 8 4 4 12 16 36 506 Future Wastewater Collection System Summary Memorandum 4 8 12 4 4 a 2 24 36 2 76 Hours subtotal 0 32 40 0 60 4 0 14 28 10 76 104 0 2 234 136 370 Task 600 Reports 601 Draft Report Development 12 16 8 8 4 4 4 12 12 4 40 602 Prepare and Deliver Final Facility Plan to C' of Bozeman 4 10 6 4 2 2 4 4 2 14 Hours sub-total 0 16 26 0 14 12 0 6 6 4 16 16 0 6 54 68 122 Task700 Public Presentation 701 Public Presentation 6 6 a 2 4 4 18 Hours subtotal 0 6 6 0 0 0 0 8 2 0 4 4 0 0 18 12 30 Total Staff Hours 24 103 160 76 154 36 12 64 72 24 198 244 8 22 1634 553 1187