Loading...
HomeMy WebLinkAboutNORTHSIDE planning zoning subdivision review  annexation  historic preservation  housing  grant administration  neighborhood coordination CITY OF BOZEMAN DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT Alfred M. Stiff Professional Building 20 East Olive Street P.O. Box 1230 Bozeman, Montana 59771-1230 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net January 9, 2006 Montana Avenue Partners, LLC Attn: Scott Dehlendorf & Barry Brown 1006 West Main Street Bozeman MT 59715 RE: Northside Preliminary PUD Plan Application #Z-05253 Northside Minor Subdivision Preliminary Plat Application #P-05057 Dear Scott & Barry: On December 19, 2005, the Bozeman City Commission conditionally approved the Planned Unit Development/Conditional Use Permit application to allow the adaptive reuse of the existing structures, the construction of a new building, and the development of common parking, sidewalks, landscaping, and open space on property located at 1237 North Rouse Avenue. On the same date, the City Commission approved the four lot minor subdivision with and one common area for access, parking, open space, landscaping, sidewalks, and stormwater detention. The City Commission’s decisions were based on the fact that, with conditions, the proposals comply with the requirements of the Unified Development Ordinance, will not be detrimental to the health, safety, or welfare of the community, and are in harmony with the purpose and intent of the Bozeman 2020 Community Plan. Regarding the Zoning PUD, seven copies of a Final PUD Plan which show how all conditions of approval and code provisions have been addressed must be submitted to the Planning & Community Development Department within six months, by June 19, 2006. This Final PUD must be submitted prior to additional work on the property. The submittal must be accompanied by a written narrative explaining how all of the conditions of approval and code provisions have been addressed. If the Final Site Plan cannot be submitted within the six month period as previously referenced, a six month extension may be granted by the Planning Director. Once you have Final Site Plan approval and the Certificate of Appropriateness, you may apply for Building Permits. If you request occupancy prior to all required improvements (such as landscaping), you must enter into an Improvements Agreement secured with a financial guarantee in the amount of 1.5 times the estimated cost of the remaining improvements. I have attached a copy of the Final Site Plan application as well as the conditions of a conditional use permit which must be recorded at the Clerk & Recorder’s Office. The conditions of approval and code provisions for the Zoning PUD are as follows: #Z-05253 Conditions of Approval: 1. All subsequent development on the site shall require, at a minimum, Sketch Plan and Certificate of Appropriateness review. Any substantial changes, as determined by the Planning Department, from the approved Final PUD may require additional site plan review and/or PUD modifications. City Page 2 applications will not be accepted without written approval from the Northside Architectural Review Committee. 2. The Declaration of Covenants and Design Guidelines must be included and recorded with the Final PUD. The document must include language that the City of Bozeman shall be party to any changes or modifications made to the restrictive covenants and Architectural Guidelines as they relate to any code provisions or conditions of approval. Prior to recording the document, a draft copy shall be submitted with the Final PUD application for approval by the Planning Office. 3. The Final PUD Plan shall not count the area to the north of Building 4b toward PUD Performance points for open space. This square footage may be added to the cash-in-lieu of open space calculation. 4. Prior to any approvals for the final building phase, Planning Staff will reevaluate the on-site parking situation. If Staff determines that that is a parking problem, the applicants shall enter into a shared parking agreement with an adjoining property or implement another parking solution subject to review and approval by the Planning Department. 5. The Final PUD Plan parking calculations shall include the pool as part of the overall square footage for the gymnastics facility. 6. Regarding the comprehensive signage plan: (a) The sign plan must include specific calculations for sign sizes per unit. (b) Any proposals for shared complex signs must be included in the sign plan. (c) The sign plan must clearly indicate that city sign permits (including both permanent and temporary sign permits) are required prior to sign installation. (d) The address signage section shall specify that building addresses shall be a minimum of six inches in size and shall be displayed on a consistent location to be determined by the Architectural Review Committee for each building. (e) The sign plan shall state that the tenant is responsible for sign removal upon vacating the unit. 7. The applicant/owner shall work with the Forestry Department prior to removal of the spruce trees along Rouse. 8. The Final PUD Plan shall depict benches, picnic tables, and/or other types of pedestrian furniture into each of the designated open space areas. 9. The Final Landscape Plan must indicate that all trees shall be installed with a minimum caliber of two (2) inches in diameter. 10. To improve the pedestrian circulation system, the Final PUD Plan shall depict a sidewalk connection near the utility shed and concrete pavers where the pedestrian circulation system is interrupted by the parking lot. 11. Regarding the Development Guidelines: (a) Additional clarification, in the form of a diagram, shall be provided for where the main building entrances should front; (b) Additional language shall be provided in the Development Guidelines specifically stating that all mechanical, electrical, HVAC, utility services, and landscape irrigation systems (i.e., Page 3 irrigation wells, pumps, etc.) will be properly screened with an architectural or landscape opaque screening device (c) A paragraph addressing roof types and materials shall be added to the Development Guidelines; (d) Page 85 shall be revised to eliminate the reference to chain-link fencing; (e) The sign plan must allocate a specific amount of square footage, based on the requirements of the Unified Development Ordinance for each tenant space or building and clarify that no internally illuminated signs will be permitted; (f) The role and structure of the “Northside Design Review Committee” must be clearly identified in the beginning of the Development Guidelines along with the statement that: “All subsequent development review applications must receive approval from the Committee prior to submitting the application to the City.” #Z-05253 Code Provisions: (a) Per Section 18.34.100.C.1, the right to a use and occupancy permit shall be contingent upon the fulfillment of all general and special conditions imposed by the conditional use permit procedure (b) Per Section 18.34.100.C.2, all of the special conditions shall constitute restrictions running with the land use, shall apply and be adhered to by the owner of the land, successors or assigns, shall be binding upon the owner of the land, his successors or assigns, shall be consented to in writing, and shall be recorded as such with the County Clerk and Recorder’s Office by the property owner prior to the issuance of any building permits, final site plan approval or commencement of the conditional use. (c) Section 18.36.060 requires that within one (1) year following the approval of a preliminary plan, the applicant shall file with the Planning Department a final plan. The applicant must undertake and complete the development of an approved final plan within two years from the time of final plan approval. For the purposes of this section, a development is substantially complete once all engineering improvements (water, sewer, streets, curbs, gutter, street lights, fire hydrants and storm drainage) are installed and completed in accordance with City rules and regulations. Extensions may be granted as stated in the UDO. The timing of all extensions of final plan approval shall be coordinated with the approval period established for any subdivision plat approval that is part of the PUD so that any expiration dates are consistent. The Final PUD Plan must be submitted and approved prior to additional site work. (d) Section 18.38.050.F requires all mechanical equipment to be screened. Rooftop equipment should be incorporated into the roof form and ground mounted equipment shall be screened with walls, fencing or plant materials. (e) Sections 18.42.150 requires a lighting plan for all on-site lighting including wall-mounted lights on the building must be included in the final site plan submittal. Lighting cut-sheets shall be provided with the Final PUD Plan. (f) Section 18.42.170 requires the trash receptacles to be appropriately sized and located for the specific as approved by the City Sanitation Department. Accommodations for recyclables must also be considered. All receptacles shall be located inside of an approved trash enclosure. A copy of the site plan, indicating the location of the trash enclosures, dimensions of the receptacles and enclosures and details of the materials used, shall be sent to and approved by the City Sanitation Division (phone: 586-3258) prior to final site plan approval. Page 35 shall be revised to specify who will be responsible for trash removal. Page 4 (g) Section 18.46.040.D states that disabled accessible spaces shall be located as near as practical to a primary entrance. Parking spaces and access aisles shall be level with slopes not exceeding 1:50 in all directions. Raised signs shall be located at a distance no greater than five feet from the front of each accessible space and shall state “Permit Required $100 Fine.” At least one (1) of the disabled accessible spaces shall also be signed “Van Accessible” and must be eight (8) feet wide with an eight (8) foot wide striped unloading aisle/ramp. (h) Section 18.46.040.E states that all developments shall provide adequate bicycle parking facilities to accommodate employees and customers. The location and details for the bike rack shall be provided in the final site plan. (i) Section 18.48.060 “Landscape Performance Standards” requires 23 landscape points for projects with “residential adjacency” as defined in Section 18.80.1730. The final landscape plan shall be signed and certified by a landscape professional as outlined in Section 18.78.100. (j) Cash-in-lieu of open space is subject to the provisions of Section 18.50.030. (k) Chapter 18.52 requires a comprehensive signage plan and the review and approval of all individual Sign Permit Applications prior to the sign construction and installation. Regarding the subdivision, the Findings of Fact and Order for the subdivision have been forwarded to legal staff. Once this document has been approved and signed, I will forward the original to you for your files. I have attached a Final Plat Application for your reference. The following conditions of approval and code provisions apply toward the subdivision: #P-05057 Conditions of Approval: 1. Approval of this preliminary plat is contingent upon City Commission approval of the requested subdivision variances. 2. This subdivision shall comply with all approved conditions of the Planned Unit Development (PUD) #Z-05253. No additional site work may occur until the Final PUD is submitted and approved by the Department of Planning & Community Development. 3. Prior to approval of plans and specifications, a cultural resource inventory completed by a qualified professional must be submitted and approved by the Bozeman Historic Preservation Office and the State Historic Preservation Office. 4. Prior to approval of plans and specifications, the applicants shall submit a detailed phasing plan that shows both the phasing of the infrastructure as well as the phasing of the buildings. 5. A reciprocal access and parking easement shall be provided on the Final Plat for all shared accesses and parking facilities. The easement shall state that the drive accesses and parking areas are permitted for reciprocal use by all of the lots of the subdivision. 6. The Final Plat shall not include buildings or parking layout. 7. The final plat shall comply with the standards identified and referenced in the Unified Development Ordinance. The applicant is advised that unmet code provisions, or code provisions that are not Page 5 specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 8. The Final Site Plan/Final Plat shall be adequately dimensioned. A complete legend of all line types used shall also be provided. 9. The developer shall make arrangements with the City Engineer’s office to provide addresses for all individual lots in the subdivision prior to filing of the Final Plat. 10. All existing utility and other easements must be shown on the Final Site Plan/Final Plat. 11. Adequate snow storage area must be designated outside the sight triangles, but on the subject property (unless a snow storage easement is obtained for a location off the property and filed with the County Clerk and Recorder's Office). 12. Applicant shall provide and file with the County Clerk and Recorder’s Office executed Waivers of Right to Protest Creation of Special Improvements Districts (SIDs) for the following: a) Street improvements to Oak Street including paving, curb/gutter, sidewalk, and storm drainage (unless currently filed with the property). 13. Project phasing shall be clearly defined on the infrastructure plans and specifications including installation of infrastructure. 14. A Stormwater Master Plan for the subdivision for a system designed to remove solids, silt, oils, grease, and other pollutants from the runoff from the private and public streets and all lots must be provided to and approved by the City Engineer. The master plan must depict the maximum sized retention/detention basin location, and locate and provide easements for adequate drainage ways within the subdivision to transport runoff to the stormwater receiving channel. The plan shall include sufficient site grading and elevation information (particularly for the basin sites, drainage ways, and lot finished grades), typical stormwater retention/detention basin and discharge structure details, basin sizing calculations, and a stormwater maintenance plan. Any stormwater ponds located within park or open space shall be designed and constructed so as to be conducive to the normal use and maintenance of the park or open space. Storm water ponds shall not be located on private lots. Detailed review of the final grading and drainage plan and approval by the City Engineer will be required as part of the infrastructure plan and specification review process. 15. The location of and distinction between existing and proposed sewer and water mains and all easements shall be clearly and accurately depicted, as well as all nearby fire hydrants and proposed fire hydrants. 16. The existing 10-inch water that runs through the center of this development must be replaced. An engineering report must be submitted to verify the future water main is sized so as to accommodate this proposed development. 17. All existing and proposed water and sanitary sewer infrastructure within the scope of the project must be clearly depicted and labeled on the Final Site, landscaping, paving, and drainage plan sheets. 18. Each proposed lot of the subdivision must have its own adequately sized sewer and water service. If any existing services or fire lines are proven to be too dilapidated to serve the lot and the buildings they must be replaced. Page 6 19. Easements needed for the water and sewer main extensions shall be a minimum of 30 feet in width, with the utility located in the center of the easement. In no case shall the utility be less than 10 feet from the edge of the easement. All necessary easements shall be provided prior to Final plat approval and shall be shown on the plat. 20. Plans and Specifications for any fire service line must be prepared in accordance with the City’s Fire Service Line Policy by a Professional Engineer (PE), and be provided to and approved by the City Engineer prior to initiation of construction of the fire service or fire protection system. The applicant shall also provide Professional Engineering services for construction inspection, post- construction certification, and preparation of mylar record drawings. 21. A water service easement will be necessary for the water service line that will serve building number one. This easement shall be a minimum of 20 feet wide. 22. Plans and Specifications for streets and storm drainage facilities, prepared and signed by a Professional Engineer (PE) registered in the State of Montana shall be provided to and approved by the City Engineer. The applicant shall also provide Professional Engineering services for Construction Inspection, Post-Construction Certification, and preparation of mylar Record Drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a preconstruction conference has been conducted. No building permits shall be issued prior to City acceptance of the required infrastructure improvements except as allowed under Section 18.74.030.D. 23. Documentation from the Montana Department of Transportation (MDT) must be provided stating that they are supportive of no improvements to Rouse Ave with this development, along with a schedule of when these improvements will happen. 24. Proposed street widths shall be indicated on the submittal. City Standard curb, gutter and sidewalk shall be provided along all streets in the subdivision. Streets within the subdivision will be City standard width. Detailed review of the street and intersection design and approval by the City Engineer will be required as part of the infrastructure plan and specification review process. Typical sections of the proposed Montana Avenue shall be submitted to the Engineering Division. 25. Montana Avenue shall be upgraded to meet all minimum City standards for a local street. At this time City Engineering does not support left turns out of Montana Ave. Full access will be allowed onto Rouse Ave, but do to the poor visibility onto Oak from Montana Ave. there will be only right turns out only. Full access from Oak onto Montana Ave. will be allowed. Adequate traffic control measures must be instituted at the intersection of Montana and Oak to restrict left turns out. At a minimum these traffic control measures shall be “no left turn” signs, and a “pork chop.” 26. The Engineering Division is requiring that the intersection of North Rouse Avenue and East Oak Street be signalized. Section 18.44.060.D of the Unified Development Ordinance states “Street and intersection level of service C shall be the design and operational objective, and under no conditions will less than level of service D be accepted.” The traffic study submitted shows this intersection at a level of service F. The developer shall work with Montana Department of Transportation (MDT) regarding the installation of the traffic signal and provide written documentation from MDT to the City of Bozeman. Page 7 27. The Montana Department of Fish, Wildlife and Parks, SCS, Montana Department of Environmental Quality and Army Corps of Engineer's shall be contacted regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) shall be obtained prior to Final Site Plan approval. #P-05057 Code Provisions: (a) The Final Plat must be in compliance with all requirements of Chapter 18.06 “Review Procedures for Subdivisions” including that the Final Plat must be submitted within one (1) year of City Commission approval. (b) Section 18.42.060.B requires all easements to be described, dimensioned and shown on the Final Plat in their true and correct location. The “No Build” easement needs to be shown on the plat map itself in addition to being in the notes section. (c) The Lighting Plan shall reflect the standards outlined in Section 18.42.150. A corrected plan including both existing and proposed street lights shall be submitted for review and approval prior to the contracting, creation of an SILD, and installation of any lights. All of the lights, including the bollard lights, shall conform to City’s requirements for cut-off shields. All subdivision lighting shall be operated and maintained through the creation of a new SILD (Special Improvements Lighting District), through the annexation to an existing SILD or through some other equivalent means approved by the City of Bozeman. Required street lights must be installed or financially guaranteed prior to building permit approval. Occupancy requests will not be approved prior to City Commission acknowledgement of the SILD. (d) All improvements are subject to Chapter 18.74 “Improvements and Guarantees.” If it is the developer’s intent to file the plat prior to the completion of all required improvements, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the preliminary plat submittal information and conditions of approval. If the final plat is filed prior to the installation of all improvements, the developer shall supply the City of Bozeman with an acceptable method of security equal to 150 percent of the cost of the remaining improvements. Concurrent Construction must meet the twelve criteria outlined in Section 18.74.030.D. (e) The Final Plat must be in compliance with all requirements of Section 18.78.070 “Final Plat,” including, but not limited to the following item: ii. Section 18.78.070.C states that a Memorandum of Understanding shall be entered into by the Weed Control District and the subdivider for the control of county declared noxious weeds and a copy provided to the Planning Department prior to Final Plat approval; iii. The final plat submittal shall include all required documents, including certification from the City Engineer that as-built drawings for public improvements were received, a platting certificate, and all required and corrected certificates. The final plat application shall include four (4) signed reproducible copies on a stable base polyester film (or equivalent); two (2) digital copies on a double-sided, high density 3½-inch floppy disk or compact disk; and five (5) paper prints. Page 8 We look forward to seeing this project move forward. Please don’t hesitate to contact me if you have any questions. Thank you. Sincerely, Susan Kozub Associate Planner CC: Comma-q Architecture, Inc., attn: Doug Minarik, 109 North Rouse Avenue #1, Bozeman MT 59715 HKM Engineering, Inc., attn: Clint Litle, PE, 601 Nikles Drive, Suite 2, Bozeman MT 59715