Loading...
HomeMy WebLinkAboutBOZEMAN GATEWAY The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 1 THE BOZEMAN GATEWAY SUBDIVISION ZONING FILE NO. Z-05217 P.U.D. PRELIMINARY PLAN REVIEW DESIGN REVIEW BOARD STAFF REPORT ITEM: ZONING APPLICATION NO. Z-05217 -- AN APPLICATION FOR PRELIMINARY P.U.D. PLAN REVIEW FOR A MIXED-USE COMMERCIAL/PROFESSIONAL OFFICE/RETAIL PLANNED UNIT DEVELOPMENT ON APPROXIMATELY 72.2± ACRES OF LAND LOCATED SOUTH OF HUFFINE LANE/US HIGHWAY 191, ZONED “B-2”, COMMUNITY COMMERCIAL DISTRICT, AND “BP”, BUSINESS PARK DISTRICT. APPLICANT: MITCHELL DEVELOPMENT GROUP, I.L.C. % TED MITCHELL P.O. BOX 738, GREAT FALLS, MT 59403 OWNER: MITCHELL DEVELOPMENT GROUP, I.L.C. % TED MITCHELL P.O. BOX 738, GREAT FALLS, MT 59403 DATE/TIME: TUESDAY, OCTOBER 26, 2005, AT 3:30 P.M., IN THE CONFERENCE ROOM, ALFRED M. STIFF PROFESSIONAL BUILDING, 20 EAST OLIVE STREET, BOZEMAN, MONTANA REPORT BY: DAVE SKELTON SENIOR PLANNER --------------------------------------------------------------------------------------------------------------------------- Project Description: The subject property is legally described as being Tract 2A of the Amended Plat of West College Minor Subdivision No. 195A located in the NW ¼ of Section 15, T2S, R5E, P.M.M., City of Bozeman, Gallatin County, Montana, and is further identified as property situated south of Huffine Lane/US Highway 191 and Gallatin Valley Mall, and west of the Bozeman Daily Chronicle facility. The site is approximately 72.2 acres in size and fronts Huffine Lane/US Highway 191 along the north boundary, extension of Fowler Avenue on the west and extension of Garfield Street on the south boundary. Please refer to the vicinity map and exhibits provided in the applicant’s submittal. Proposal: The applicant, Mitchell Development Group, L.L.C., has made application for Preliminary P.U.D. Plan Review of a mixed-use commercial, professional office, and retail planned unit development consisting of The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 2 61 commercial/business park lots zoned “B-2” and “BP”. The proposal is also undergoing a concurrent preliminary plat review of the 72+ acre site as a major subdivision. The six-phased mixed-use planned unit development is located in the West Main Street entryway corridor overlay district along its north boundary and is bound on the north by the major arterial street, Huffine Lane/US Highway 191 and Gallatin Valley Mall. The Advanced Technology Park and Bozeman Daily Chronicle are to the east and partially developed lands under Gallatin County jurisdiction are to the west. The placement of mixed land uses within the development focuses on a mix of professional offices, retail services and hotel/conference facility on the east one-third and a mixed of retail service and commercial uses on the west two-thirds. The Development Manual contains architectural and landscape guidelines that illustrate the concept of a “lifestyle” center and methods by which the developer will implement the image of the planned unit development. The Bozeman Gateway consists of several different building types that are discussed in the Manual: 1) Lifestyle Center along the interior main street for the development, 2) Convenience Center and Outparcels along Fowler Avenue and West Main Street, and 3) Office Professional area along the east adjacent to the Advanced Technology Center and the extreme west at the southwest corner of Huffine Lane and Fowler Avenue. Chapter 18.36 – Planned Unit Development The intent of the planned unit development concept is to promote maximum flexibility and innovation in the development of land and the design of development projects within the city. As a result, the developer has requested multiple relaxations to the Unified Development Ordinance with this application for P.U.D. review. With regard to the improvement and protection of the public health, safety and welfare, it shall be the intent of the Ordinance to promote the city’s pursuit of community objectives as outlined in Chapter 18.36 of the Unified Development Ordinance. The Development Review Committee, Design Review Board, Planning Board and City Commission participated in the Concept P.U.D. Plan Review process in January and February of 2005. Please refer to the attached copies of the meeting of the D.R.B. in January of 2005. The purpose of these meetings was for discussion of the applicant’s proposal with the designated review committees in order to identify any requirements and applicable standards and policies, as well as offering the applicant the opportunity to identify major problems that may exist and identify solutions prior to making formal application. Relaxations to the Unified Development Ordinance: The following relaxations to the Unified Development Ordinance have been identified with the application for subdivision preliminary plat review and P.U.D. preliminary plan review: Requested Relaxations:  Section 18.20.030.B “Lot Coverage and Floor Area” to eliminate the 60 percent restriction on impervious surfaces and development the entire site, exclusive of the required yard setbacks.  Section 18.36.060.B “Duration of Final Plan Approval” to undertake and complete the development in ten years.  Section 18.42.040.B “Block Length” to allow the block lengths to exceed 400 feet.  Section 18.42.040.C “Block Width” to allow the block widths to be more than 400 feet. The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 3  Section 18.42.100.B.3.c – “Setbacks” to encroach into the 50-foot minimum setback required along watercourses.  Section 18.42.100.B.4.b – “Watercourse Setback” to allow the required watercourse setback to not include adjacent wetlands.  Section 18.44.030.A.1 “Intersections” to allow streets to intersect at angles less than 90 degrees.  Section 18.44.090.D.3 “Spacing Standards for Drive Access” to allow the average spacing of intersections on Fowler Avenue to be reduced from 660 feet to 420 feet.  Section 18.42.150.D.1 “Parking Lot Lighting” to allow horizontal illuminnace to be less than 0.1 foot-candles as required by the U.D.O.  Section 18.42.150.F “Lighting Specifications” to allow light fixtures and standards that do not comply the U.D.O. (i.e., distract light and glare down and aware from adjoining streets and properties.  Section 18.44.030.A.1 “Intersections” to relax the streets to intersection at angles less than 90 degrees (City Engineer decision).  Section 18.44.080 “Sidewalks” to allow soft trials in place of concrete boulevard sidewalks along streets fronting open space/pedestrian corridors.  Section 18.44.090 “Access” to relax the average spacing requirements for public streets (City Engineer decision).  Section 18.44.090.B.2 “Drive Access from Public Streets” to exclude the requirement of all subdivision lots having 25 feet of frontage on all improved public or private street, or improved alley.  Section !8.46.020.D “Backing into Public Rights-of-Way” to allow diagonal parking along Technology Boulevard and Chronicle Lane. Identified Relaxations not Requested:  Section 18.18.020 “Building Height” to increase the allowable building height in the “B-2 district from 44 feet to 146 feet.  Section 18.18.050 “Yards” to encroach into the yard setbacks with off-street parking in the B’2” District.  Section 18.20.060” “Building Height” to increase the allowable building height in the “BP” district from 44 feet to 146 feet.  Section 18.20.050 “Yards” to encroach into the yard setbacks with off-street parking in the “BP” District.  Section 18.42.030.I “Frontage” to not have access for all subdivision lots from an improved pubic street, approved private street or alley. ZONING DESIGNATION & LAND USES The subject property is zoned “B-2”, Community Business District and “BP,” Business Park District. The “B-2”, Community Business District, allows for a broad range of mutually supportive retail and service functions located in clustered areas bordered on one of more sides by limited access arterial streets. Principal permitted uses range from banks and hospitals to offices and hotels/motels. Conditional uses permitted in the district range from automobile fuel sales to technical or vocational schools to light goods repair and light manufacturing. The “BP”, Business Park District, provides for high quality settings and The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 4 facilities for the development of a wide range of compatible employment opportunities. These areas should be developed so as to recognize the impact on surrounding or adjacent development and contribute to the overall image of the community. Compatibility with adjacent land uses and zoning is required. Permitted uses range from hospitals and professional offices to research laboratories and public buildings. Conditional uses that may be considered in the “BP” district range from banks and day care centers to type II essential services. The following land uses and zoning are adjacent to the subject property: North: US Highway 101/Huffine Lane/West Main Street and Gallatin Valley Mall zoned “B-2”, Community Business District. South: Undeveloped agricultural land under Gallatin County jurisdiction and owned by the State of Montana Endowment and Research Foundation. East: Advanced Technology Park and Bozeman Daily Chronicle zoned “BP”, Business Park District. West: Partially developed agricultural lands under Gallatin County jurisdiction. ADOPTED GROWTH POLICY DESIGNATION The development proposal is in general conformance with the Bozeman 2020 Community Plan including the “Community Commercial” and “Business Park” land use designations with the recommendations to be considered by the Planning Board and City Commission. The “Community Commercial” classification provides areas for basic employment and services necessary for a vibrant community. Establishments located within this category draw from a community as a whole for their employee and customer base and are sized accordingly. A broad range of functions include retail, education, professional and personal services, offices, residences and general service activities typify this designation. The “Business Park” classification provides for areas typified by office uses and technology-oriented light industrial uses, although retail, services, or industrial uses may also be included in an accessory or local service role. Additional uses may be approved as part of a planned unit development if they are found to be compatible with and subordinate to the uses described above, and are consistent with the intent of the underlying Business Park land use classification. REVIEW CRITERIA The Design Review Board is established to evaluate aesthetic considerations of larger and more complex proposals which are likely to produce significant community impact and to provide recommendations regarding such proposals to the City Commission. The Board is empowered to recommend approval or conditional approval of the project with support of some or all of the requested relaxations or to forward a recommendation of denial. The Design Review Board provided the following comments with the Concept Plan:  The DRB recommended a reduction in parking from the minimum required (as a relaxation through the PUD). The proposal for shared, reduced off-street parking spaces was supportive but concern was also expressed with the demand with maximum parking with retail establishments.  D.R.B. recommended that consideration should be given to residential development as part of the mixed-use planned unit development. The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 5  Expressed concern with the potential for storm water runoff impacting the landscape features and ponds along the entryway corridor.  Questioned the level of retail uses allowed in the “BP” component of the P.U.D.  Fewer off-street parking provided with additional landscape features incorporated into the mixed – use development that people could mingle in.  Stated that the location of the grocery store on the corner of the entryway corridor was problematic and suggested relocating the grocery store to the central core of the development, or provide extensive screening.  Expressed concern with the presentation of drive-thru facilities along the entryway corridor and the potential conflict with making the project pedestrian and bicycle friendly .  Would like to see the use of natural materials throughout the development.  Supported the preservation of the watercourses and associated wetlands to enhance the area.  Recommended a conscious effort of keeping and enhancing the character of Bozeman.  Expressed concern with crossings and connections between vehicular movement with pedestrian and bicycle circulation. Need for adequate connections to Babcock Street and components of the Farmer’s Canal trail to the east. Suggested placement of nodes and a place where cars cannot go to avoid conflict with bicycles.  Protect as many of the large trees and mature vegetation preserved.  Carry out materials and architectural elements on all sides of the buildings. Do not present a “backside” of a building, especially on the unloading side and refuse areas.  There should be more building frontage onto the Entryway instead of parking. This may be accomplished by including additional pad site in front of the larger buildings and/or more landscape features. Design Objectives Plan 1. Neighborhood Design (pages 9-14): A. Green Space- Provisions for achieving the minimum open space requirements have been met with the overall master plan for the PUD. This includes the preservation of the existing watercourses and associated vegetation and wetlands. Those areas designated as open space must be identified accordingly on the final subdivision plat and final PUD plan. The preliminary plan identifies six key areas of green space for both visually and functionally open space; 1) entryway corridor along US 191/West Main Street, 2) west most watercourse along Fowler Avenue, 3) watercourse along Harmon Stream Boulevard, 4) watercourse along the eastern half of the PUD, 5) public plaza along Technology Boulevard, and 6) two watercourses in the The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 6 north parking lot . All of theses areas contain existing physical features that are being preserved and should be further complimented with landscape features that will embrace the importance of urban open space. The applicant requests a relaxation to Section 18.20.030.B “Lot Coverage and Floor Area” to eliminate the 60 percent restriction on impervious surfaces and development for the entire site, exclusive of the required yard setbacks for lots in the “BP” District. Staff is recommending denial finding that the request does not encourage the campus like setting of open space that is sought in the BP District and importance of urban open space and green spaces throughout the BP District. B. Auto Connections- Construction of Fowler Avenue and West Garfield Street by the developer, as well as the installation of the interior local streets and signalization improvements at the intersection of Fowler Avenue and US 191/West Main Street will provide direct automobile access to the development, abutting property, and surrounding areas. C. Pedestrian & Bicycle Connections- The application illustrates a pedestrian and bicycle trail system for the development that stems from recommendations by City Staff, Planning Office, Recreation and Parks Advisory Board, and G.V.L.T. The proposal calls for a Type I asphalt trail along the frontage of US 191/West Main Street that continues linkage with the called for Farmer’s Canal trail and a series of interior Type II trails throughout the site. Trails constructed in the watercourse setback shall be constructed in Zone 2 of the setback. Staff is further recommending that all pedestrian/bicycle crossings with streets should be given greater emphasis by using similar pavers that reflect the surface treatment of public plazas and areas of outdoor social activities. Connections of between streets, off-street parking lots, public areas should also be given attention in terms of raised walkways, pavers, pedestrian lighting and landscape features. D. Street Character- A landscaped streetscape along all public and private streets that contain a compliment of formal boulevard trees with placement of informal landscape features is necessary to provide continuity and sense of place at a pedestrian scale. Informal landscape features should provide a mix of type, texture and seasonal color throughout and are important in coordinating landscape design along that establishes a unified identity for the area.. A regular spacing of boulevard trees along all streets in concert with landscape features and screening of off-street parking lots is necessary; primarily, areas along West Garfield Street and US Highway 191/West Main Street. Street character along the West Main Street entryway corridor should call for architectural features that suggest a presence of store fronts, plazas, fenestration treatment and architectural details that reflect the “lifestyle center” concept. Commercial and retail drive-thrus and associated apprentices (speaker phones, signage, ATM, canopies, etc.) shall not front onto the entryway corridor and will not impact the building façade of the satellite structures along the streetscape. 2. Site Design (pages 15-36): A. Natural Features- The described watercourses with associated vegetation and wetlands will be maintained as public open space with exception to the necessary street crossings. The 50-foot The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 7 wide watercourses will need to be landscaped to emphasize effective landscape features as discussed previously. B. Views- View sheds of the mountains to the northeast and south should not be significantly obscured, unless the applicant elects to move forward with a request to relax the building heights in the “B-2” and “BP” of up to 146 feet. A relaxation to exceed the maximum building height of 44 feet in the “B-2” and “BP” would be inconsistent with surrounding land uses. However, the “BP” district allows the maximum building height to be increased by 30 percent when the additional height is specifically identified as being the purpose of the review (example: downtown business district). C. Cultural Resources- There are no existing structures on the site. A cultural resource inventory study is required with the preliminary plat for review by the State Historic Preservation Office. Any cultural resources uncovered during construction and earthwork will need to be inventoried by the Planning Office and State Historic Preservation Office. D. Topography- The site slopes from south to north with an approximate change in grade of 18± feet. The amount of cut and fill required with the project during construction activity will influence the existing amenities of the existing topography. As a result, encroachments into the watercourse setbacks and areas of mature vegetation should be limited. Any change in grade that will encroach into these areas should be limited to a 1:4 or 25% slope to minimize the visual impact of cut and fill on the site. E. Site Drainage- The storm drainage master plan for the development will direct storm water runoff generally to the north and will be treated with underground facilities designated throughout the site. The applicant’s consultants note that the surface water ponds along the entryway corridor and along Technology Boulevard are not part of the storm water runoff facilities. However, the master plan identifies at least fourth drainage basins that are either located in the open space corridors for have outlets draining into the corridor. These facilities must be properly landscaped and prevent any impact on the landscape features along these corridors. Specific landscape details will be required with the final landscape plan to demonstrate proper landscape of the facilities. F. Building Placement- The mixed-use development focuses on a “lifestyle center” concrete that centers on an interior street (i.e.., Technology Boulevard), which faces the primary building entrances to a common interior route that features pedestrian friendly open-air squares and plazas. Thus, producing active outdoor public spaces. In addition, there are at least three of the five street intersections that are considered major intersections and should give consideration to a strong building presence (i.e., intersection of US 191/West Main Street with Fowler Avenue, Harmon Stream Boulevard with US 191/West Main Street, West Garfield with Fowler Avenue, and Chronicle Drive with West College Street). These intersections should be enhanced with a pedestrian-friendly entrance plaza or human scaled design features., such as benches and landscape planters. Building entrances near the sidewalk edge that contain an entry plaza should also be considered at the intersections of local streets with Technology Boulevard and should be considered not only in the commercial area, but also along the business park/professional office corridors. G. Outdoor Public Spaces- The plan notes a number of outdoor public spaces for the enjoyment of pedestrians. Two plazas along Technology Boulevard serve as focal points shared by adjoining The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 8 buildings and visually connect at least one of the watercourse/open space corridors. The plan also suggests the opportunity for a number of smaller public spaces along the watercourses that preserve the natural amenities of the site. Both public plazas along Technology Boulevard will contain decorative surface materials, landscape features, and plaza furniture. These areas should illustrate the heart of the development and be carried throughout the entire regions of the project. Detail to these areas is critical and should be specifically addressed in the master landscape plan. The principle public plaza extends north through the “life style’ center, continues to the off-street parking lot, ending at the West Main Street entryway corridor. Detail for this section is limited and must be described in the landscape plan. Those pedestrian/bicycle pathway sections through the parking lot must be carefully considered and offer at least one public space along each watercourse corridor within the parking lot. This would involve the conversation of at least two off-street parking spaces (i.e., 18’ by 18’) that abut the corridor being converted to a green space with a bench, pavers and landscape features. Public spaces along the identified watercourses should also be given attention with smaller pads that reflect similar pavers, benches, lighting and landscape features as the larger plazas. H. Pedestrian & Bicycle Circulation Systems- The Master Plan provides connections for pedestrians and bicyclists throughout the development while also implementing the Farmer’s Canal trail system called for in the Bozeman 2020 Community Plan. This includes connections from parking lots, into buildings, as well as a network of pedestrian/bicycle trails throughout the project. Emphasis should be given to transitions between parking lots, driveways, street crossings and connections with pubic boulevard sidewalks that include the typical “life style” center landscape theme. Transitions through the parking lots, primarily the larger north most parking lot, must be given specific attention to providing an adequate width through the parking lot. Principle and secondary entries (i.e.., US 191/West Main Street, Fowler Avenue, Garfield Street and West College Street) , should be given the same attention with developments landscape theme. I. Internal Automobile Circulation Systems- The Bozeman Gateway Subdivision PUD contains a transportation network that includes implementation of the greater Bozeman Transportation Plan with construction of Fowler Avenue and West Garfield Street. A network of interior local streets completes the transportation network for the development. Diagonal parking along Technology Boulevard is proposed to compliment the “lifestyle” center and reduce conflicts between pedestrian and vehicular movement. A higher degree of landscape materials along major circulation routes is sought by the Bozeman Design Objectives Plan. In particular, the US 191/West Main Street entryway corridor should convey a higher degree of urban open space and importance intensive pedestrian/bicycle use. This should include decorative elements and furnishing that provide interest and a sense of human scale. This would also apply to both sides of Fowler Avenue and north side of West Garfield Street. J. Parking Lots- The application includes a parking plan that minimizes the number of off-street parking spaces as allowed under the Unified Development Ordinance by using the reduction table in 18.46.040. This is implemented with a combination of privately owned or common parking areas throughout the development. A parking analysis by the developer calculates the required off- street parking at 2,907 spaces. With the allowable reduction the parking plan may be adjusted to 2,556 spaces. The applicant is proposing 2,557 off-street parking spaces. The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 9 K. Site Lighting- The Preliminary Light Plan identifies three architectural light fixtures proposed throughout the development and off-street parking lots. Only of one the three fixtures (i.e.., Domus Series) complies with the U.D.O. and would prevent off-site glare and distraction to vehicular movement along adjoining pubic streets. It is recommended that the Domus Series fixture be allowed throughout the development and the other two fixtures be allowed with a retrofitted “louvered cover” along Technology Boulevard with a transition to the compliant fixture along private streets prior to intersecting with adjoining public streets. Street lights will be required along Fowler Avenue and West Garfield Street and must comply with the U.D.O. Neon and L.E.D. lighting will not be permitted unless used as a backlight architectural feature that is not directly visible from the public streetscape, sidewalks or streets. L. Utilities & Service Areas- The application is not clear on the placement, treatment and screening of waste disposal areas, unloading/loading and access to utilities. Because the development does not propose alleys and or backs to the buildings, provisions for utility and service areas is not clearly addressed in the application. The Development Manual discusses guidelines that suggests solutions to the issue (i.e., page 31) but does not demonstrate a desired solution that is consistent with architectural theme of the project. This is more of an issue when store fronts and public access will occur at the rear of the buildings, creating obtrusive noise, offensive sounds and odors, as well as conflict with servicing vehicles and the general vehicular circulation system.. As a result, the Development Manual must clearly demonstrate graphically how the conflict between utility service areas and the general public will be resolved. M. Landscape Design- Existing physical features, wetlands and mature vegetation are protected with the preservation of existing watercourses on the site. These areas should be incorporated into new development site design with public trails and pubic spaces as illustrated on the preliminary plan. Drought-tolerate plant species, native to the area, have been introduced and included in the plant palette. High maintenance, or highly decorative landscape is reserved for the public plazas and public spaces along the watercourse corridors. The landscape plan will need to identify the landscape palette to be implemented throughout the property and should include lighting structures, paving material, plantings and outdoor furniture. The plan should also include typical illustrations of a consistent plant palette throughout the property. The landscape guidelines of the Development Manual include illustrations for the two principle north/south watercourse corridors. The same illustrations are necessary for the West Main Street entryway corridor and Fowler Avenue corridor, as well as the pubic spaces identified along all of the watercourses. The landscape plan for the Final PUD Plan will need to include the final details for each area, landscape species and quantity to be installed and reviewed by the Planning Office and Design Review Board prior to submitting for final subdivision plat approval. It is further recommended based on the number of relaxations being requested with this application that all trees will be installed with a minimum caliber of 2 inches in diameter. The application suggests that a significant amount of the West Main Street entryway corridor will feature a series of ponds as landscape features for the development. The landscape guidelines have not specially addressed the landscape elements along the corridor with respect to landscape features and landscape furniture, nor an emphasis on trail connections leading into the development. As a result, these details will need to be addressed and will require review of the Final Plan and Landscape Plan by the Planning Office and Design Review Board. The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 10 N. Buffers- Landscape buffers should be provided adjacent to the off-street parking lots, between incompatible uses and for ground mounted mechanical equipment and service/storage areas. Special attention must be given to landscape buffers along the West Main Street entryway corridor and West Garfield Street based on the expansive imperious parking lots 3. Building Design (pages 37-48): A. Building & Topography- The site does not contain significant outcroppings or topographical features and has a gradual drop in grade of approximately 18 feet from south to north. Provisions to avoid the potential of exposed building foundations resulting from significant changes in grade should not be an issue. B. Building Character- Standardized “franchise” style architecture is strongly discouraged. If the developer chooses to use franchise style architecture it is necessary to establish a reasonable argument of how the franchise style is an innovative design that draws upon regional design traditions. The application does not specifically address. As a result, it is assumed that the development will not accept structures that suggest standardized “franchise” style architecture and so note it in the Development Manual. The architectural guidelines for the development suggest that the Convenience Center, Outparcels and Office-Professional areas will incorporate the architectural vocabulary of the lifestyle center. However, modifications will be required due to the significant variation in building type and scale. The Development Manual goes on to state that an exact determination of which entities will be responsible for which elements of design and construction will be determined by individual lease or sales agreements. In-lieu of this, the Development Manual should give specific attention to each of these areas of the mixed-use development and identify what must be achieved in each of these areas to maintain the architectural integrity of the overall development theme. C. Primary Building Entrance- The majority of the buildings orientate their entrance onto the “lifestyle” center main street, Technology Boulevard. The Development Manual discusses the treatment of the main entrance, but does not address a primary objective of the Bozeman Design Objectives Plan to orient the primary entrances of a building to face a street, plaza or pedestrian way for those structures that do not front onto Technology Boulevard. In particular, those structures that will back onto the West Main entryway corridor, Fowler Avenue and West Garfield Street. This needs to be addressed in the Development Manual. The Manual should go on to state a need for sheltering elements such as a canopy, awning, arcade or portico to signify the primary entrance to a building, as well as the secondary entrance if it serves an entrance along another façade. D. Street Level Interest- All sides of a building should include interesting details and materials to avoid presenting a “back side” to neighboring properties, public streets and the West Main Street entryway corridor. The treatment of materials and architectural detail will be consistent along all sides of the buildings and storefronts or display cases should be incorporated over at least one third of the façade area. Darker anodized window fronts should also be recommended in-lieu of brushed aluminum store fronts. E. Building Mass & Scale- The Bozeman Design Objectives Plan state that the following elements must be achieved in order to reduce the perceived mass of a building: a change in color or change The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 11 in material shall be used in each building module; a 20% change in vertical height between each module; change roof form; change in articulation. The architectural guidelines should discuss components that help to establish a human scale along the façade, store fronts, primary entrances (i.e., one-story elements). Expression of the each floor in the external skin and use of materials should also be noted. The Development Manual must contain these provisions and any illustrations proposed in the application that does not reflect the guidelines should be modified accordingly. F. Roof Form- The principle roof form for the mixed-use development is a flat roof with parapet walls, pediments, and articulate hip or shed roofs. Gable roof details either as a principle or secondary feature, or at the primary entrance points should be included to reduce the perceived scale of the building. This should be a primary architectural feature throughout the development but primarily on structures fronting onto the entryway corridor and public streets. G. Building Materials- The architectural guidelines discuss building materials that vary and create visual interest, while exhibiting an overall coordination of color materials and are generally consistent with the Bozeman Design Objectives Plan. However, the guidelines state 65% of all facades exclusive of the front façade may be covered with stucco or EIFS synthetic surfaces, which is consistent with the design objectives plan. Because this proposal stands on a ‘lifestyle’ center concept and a high quality setting that does not have the rear or back to a building, not more than 25% of any building façade will be covered by synthetic surfaces. H. Building Complex- The architectural guidelines reinforce the desire to create a development that exhibits a unity in design while providing a variety in the architectural vocabulary. I. Service Canopies- these criteria is not applicable as it is specific to gas stations and convenience store canopy design. J. Color- The architectural guidelines shall include language that specifically states that muted colors and earth tones will be used, including roof materials. A minimum of 75% of the exterior walls seen from the public way shall have muted colors. K. Utilities & Mechanical Equipment- The Development Manual will need to include language stating that all mechanical, electrical, HVAC, and utility services will be properly screened with an opaque screening device, which may include landscape screening features. The guidelines must go on to state that all utility equipment associated with storm water facilities or landscape irrigation system (i.e., irrigation wells, pumps, etc.) shall be located outside of the common open space areas and properly screened. 4. Sign Design (pages 49-56): A. Sign Context & Position- The design guidelines call for a common signage theme that generally focuses on building signage, not freestanding signs. Illustrations in the Development Manual suggest placement of monument signs at principle and secondary access points into the development, which are generally consistent with the quality and character of the project. The illustrations are intended to demonstrate the character of the signage and no so much compliance with the sign ordinance. However, two of the illustrations would not comply with the sign The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 12 ordinance. As a result, the common signage plan submitted with the Final PUD Plan will need to comply with the sign ordinance, unless deviations to the ordinance are requested by the applicant. The signage plan focuses on project identification signs as key entrance into the project, but does not identify freestanding type (i.e., pylon or monument). Only one pylon-style sign is permitted per street frontage with the remainder freestanding However, the Final PUD Plan will need to contain a common signage plan that illustrates the actual design standards for the project identification signs. The Development Manual will need to include a graphic component of the master sign plan for the entire property. This includes discussion on the position of signs as part of the overall building composition; avoid obscuring architectural details, materials, and use of color and relief, three-dimensional signage. B. Sign Type- The signage guidelines for buildings contain a mix of halo type reverse channel letters, internally illuminated cabinet signs, blade signs, and window graphics. Cabinet type “box” signage will not be permitted unless a three-dimensional component creates a sense of architectural relief with no plastic, translucent face allowed. These standards will need to be included in the Development Manual. C. Sign Materials- The signs discussed in the Development Manual contain a broad range of signs that exhibit high standards and quality of style, permanence and compatibility with the natural and building environment. Changeable copy reader boards are discouraged and should be noted in the guidelines D. Sign Lighting- The guidelines indicate that the majority of the illuminated signs will be internally illuminated. Light color backgrounds on internally illuminated signs are discouraged and a white background is inappropriate. The guidelines will need to address these restrictions E. Sign Content- The guidelines establish parameters for the letter styles and sizes that are compatible with the building design. F. Wall Murals- Not applicable. 5. Corridor Specific Guidelines: C. North 19th Avenue & Oak Street Corridor (pages 69-79)- 1. Existing agricultural site features and/or resources should be integrated into a newer development when feasible. Not applicable. 2. A building should fit within existing topography when feasible. The topography from south to north is generally gradual enough whereby a stepped foundations area necessary. The proposal does not give consideration parking underneath the structures. Double-fronted buildings are proposed to avoid the presence of the back of buildings onto the public streets and West Main Street entryway corridor. This was discussed in detail previously in the staff report. 3. Provide an infill building adjacent to the sidewalk in new and established developments. The application discusses the presence of satellite commercial pads along the The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 13 West Main Street entryway corridor. With exception to the corridor, no building fronts are proposed to be built adjacent to the public right-of-way along Fowler Avenue or West Garfield Street. 4. A pedestrian and bicycle boulevard trail shall be provided on the furthest reaches of West Main Street. This has been addressed as part of a trail network that includes an asphalt pedestrian/bicycle trail along the entire entryway corridor frontage. 5. The applicable streetscape elements appropriate in the corridor must be addressed. The application has addressed the treatment of street trees, landscape accents, furnishings, and bicycle facilities. The applicant should consider a shelter map and map display along what will serve as a regional boulevard trail connection that fronts along West Main Street. Provisions for a transit stop should also be considered. CONSIDERATIONS 1. That all pedestrian/bicycle crossings with streets be given greater emphasis by using similar pavers that reflect the surface treatment of public plazas and areas of outdoor social activities. Connections of between streets, off-street parking lots, public areas should also be given attention in terms of raised walkways, pavers, pedestrian lighting and landscape features. The Final PUD Plan will contain a detail whereby the development provides a public shelter and map display along what will serve as a regional boulevard trail connection that fronts along West Main Street. 2. Provisions for a transit stop within the interior of the PUD should be incorporated into site plan for review and approval with the Final PUD Plan. 3. The public streetscape shall contain a regular spacing of boulevard trees along all streets, both public and private, in concert with landscape features and screening of off-street parking lots; primarily, areas along West Garfield Street and US Highway 191/West Main Street. All trees to be installed in the boulevards, off-street parking lots, common open space areas, and individual subdivision lots will be installed at 2-inch caliber in diameter. Street character along the West Main Street entryway corridor Fowler Avenue and Garfield Street shall call for architectural features that suggest a presence of store fronts, plazas, fenestration treatment and architectural details that reflect the “lifestyle center” concept. The Development Manual shall contain said language to insure implementation of said streetscape features. 4. Commercial and retail drive-thrus and associated apprentices (speaker phones, signage, ATM, canopies, etc.) shall not front onto the entryway corridor or corner-side of the building and will not impact the building façade of the satellite structures along the streetscape. The Development Manual will provide a typical illustration that speaks to this provision prior to Final PUD Plan approval. 5. The Final PUD Plan and Development Manual will need to discus the treatment of street intersections that will be enhanced with a pedestrian-friendly entrance plaza or human scaled design features such as benches and landscape planters. Building entrances near the sidewalk edge that contain an entry plaza should also be considered at the intersections of local streets with Technology Boulevard and should be considered not only in the commercial area, but also along the business park/professional office corridors. This would also apply at the corner of Fowler Avenue and West Garfield Street. If it is the decision to locate the grocery store at the southeast corner of West Main Street and Fowler Avenue, a The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 14 building entrance and plaza must occur along the entryway corridor, preferably at the northwest corner of the building. 6. The Development Manual and Landscape Plan shall address the treatment of drainage basins in the open space corridors with regard to placement of said facilities and outlet structures. These facilities must be properly landscaped and prevent any impact on the landscape features along these corridors. Specific landscape details will be required with the final landscape plan to demonstrate proper landscape of the facilities. The landscape guidelines shall state that drainage basins will not eliminate the installation of landscape and landscape features as depicted on the Preliminary PUD Plan; and if so, will be replaced outside of the open space corridors. A landscape architect shall certify on the Landscape Plan that landscape features installed over or around areas that contain a drainage basin in the open space corridor will not be impacted. 7. That the landscape guidelines of the Development Manual state that the surface ponds along West Main Street are not part of the storm water facilities and will be maintained as landscape feature along the entryway corridor. Provisions will be discussed in the protective covenants and Development Manual that will limit the fluctuation of said ponds to ensure that they remain a landscape feature along the entryway corridor. Said improvements will be financially guarantee for a minimum of twenty-four mouths, or to construction seasons, to ensure that said improvements are an effective element of the entryway corridor. 8. The final Landscape Plan shall specifically address landscape details for the three corridors, two public trails within the off-street parking lot, West Main Street entryway corridor. Detailed landscape plans shall also be included for the two public plazas within in the interior of lifestyle center and the small public spaces along the north/south water courses. 9. The Bozeman Design Objectives Plan states that the following elements must be achieved in order to reduce the perceived mass of a building: a change in color or change in material shall be used in each building module; a 20% change in vertical height between each module; change roof form; change in articulation. The architectural guidelines should discuss components that help to establish a human scale along the façade, store fronts, primary entrances (i.e., one-story elements). Expression of the each floor in the external skin and use of materials should also be noted. The Development Manual will need to provide illustrations for each of these guidelines as discussed and revise any illustrations proposed in the application that do not reflect said criteria. 10. The architectural guidelines for the development suggest that the Convenience Center, Outparcels and Office-Professional areas will incorporate the architectural vocabulary of the lifestyle center. However, modifications will be required due to the significant variation in building type and scale. The Development Manual goes on to state that an exact determination of which entities will be responsible for which elements of design and construction will be determined by individual lease or sales agreements. In-lieu of this, the Development Manual should give specific attention to each of these areas of the mixed-use development and identify what must be achieved in each of these areas to maintain the architectural integrity of the overall development theme. The Development Manual shall graphically address the presentation of building facades that face onto the pubic streets (i.e., West Main Street entryway corridor, Fowler Avenue and West Garfield Street) and through the use of illustrations illustrate the architectural theme sought with the “lifestyle center of the Bozeman Gateway Subdivision. This also applies as well to the professional office, business park The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 15 and convenience components of the development, as well as the rear facades of both sides of the “lifestyle” center situated along Technology Boulevard. 11. The architectural guidelines of the Development Manual will be modified to state that not more than 25% of any of the building facades shall be covered with a synthetic surface. 12. The Development Manual will discuss presentation onto a street regardless if it’s the main street for the lifestyle center, private street or a public street with respect to a formal entrance, store fronts, covered entrances, and public spaces. 13. Detailed elevations, floor plan, landscape plan, site plan and a color palette and materials sample board shall be submitted for each building prior to Final PUD Plan or Final Site Plan approval and issuance of a building permit. 14. No franchise style architecture shall be permitted in the Bozeman Gateway Subdivision and noted accordingly in the protective covenants and restrictions and Development Manual. 15. The general materials theme shall be continued throughout the development but there needs to be more variety in design. 16. All of the buildings on the perimeter of the development shall have a second front (double fronted design) oriented towards the streetscape and include a colonnade and a sidewalk connection to the perimeter sidewalk/trail system and all corner buildings shall include some type of design feature oriented towards the corner (a concave area or a bump-out constructed of transparent materials). 17. The backside of the buildings shall be addressed by the continuation of materials on all sides and the addition of awnings over the doors on the rear elevations. 18. The development guidelines shall indicate that all store fronts shall be dark bronze anodized, or similar, versus the brushed stainless finish. 19. Sconce lights and goose neck lights (down lights only) shall be added to the larger retail buildings (over 15,000 square feet). 20. No translucent awnings. Building awnings shall be fabric or metal only. 21. Those areas to be finished in a synthetic finish shall place a strong emphasis on joint detail, relief and architectural detail, and noted accordingly in the Development Manual. 22. All crossings within the Planned Unit Development shall be constructed with scored concrete or pavers similar to the surface materials installed throughout the public outdoor public areas. The crossings shall be noted as such on the Final PUD Plan and details for the pattern shall be provided in the final development guidelines. 23. Larger seating areas with planters shall be installed throughout the plazas and public areas and a typical detail of the planters included in the Development Manual. The Bozeman Gateway Subdivision P.U.D. – Concept Plan Review 16 24. Shelter areas with a transit stop shall be added to the circle intersection and waiting zones shall be installed at the Tschache/19th and Oak/19th intersections. 25. The development guidelines shall indicate that no backlit cabinet signs will be permitted in the phase. A comprehensive sign plan shall be submitted to the Planning Office prior to Final PUD approval that depicts a sign package that exhibits qualities of style, relief and compatibility. 26. The development guidelines shall indicate that exposed neon is prohibited and can only be used as a subtle lighting element under the soffits, behind the fascia or in the sign package (i.e., backlit feature). 27. A common signage plan depicting the location, dimensions, height, illumination and use of materials for all freestanding stings shall be submitted for review and approval prior to Final PUD Plan approval. Both the pylon sign and monument signs shall be constructed of materials compatible with the overall building design theme for the complex, and illustrated accordingly in the Development Manual. 28. The north off-street parking lot shall exclude two off-street parking spaces along each of the two watercourse corridors for the placement of an 18’ x 18’ public space with benches, pavers and landscape features, and illustrated accordingly in the landscape guidelines and landscape plan. The watercourse corridors shall have a minimum width of not less than thirty feet, exclusive of the public space. 29. The storm water ponds shall be designed as open, landscaped features that are organic in shape and lined with native grasses and indigenous plants. Code Requirements: 30. All building mounted and pole mounted lights shall meet the cut off shield requirements outlined in the UDO. unless a relaxation is granted by the City Commission. CONCLUSION/RECOMMENDATION The applicant must comply with all other provisions of the Bozeman Unified Development Ordinance, which are applicable to this project prior to receiving Final PUD Plan, Final Plat or Building Permit approval. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. NOTE: The Design Review Board and Development Review Committee will forward a formal recommendation to the City Commission on this matter who will in turn consider an action on this application tentatively scheduled for Monday, December 5, 2005. Attachments: Applicant’s Submittal Materials Mailed To: Mitchell Development Group, L.L.C., 1315 8th Avenue N., Great Falls, MT 59401 Carter & Burgess Consultants, Inc., 1420 W. Mockingbird Lane, Suite 800, Dallas, TX 75247 Morrison-Maierle, Inc., P.O. Box 1113, Bozeman, MT 59771