"-� lbel.
traffic Traffic Impact Study
services Boulder Creek/Westbrook
ResidenfleA Development
Bozeman, Montana
Prepared For:
Four Corners Construction, LLC.
125 Central Avenue
Bozeman, MT 59718
November, 2013
130 South Howie Street
Helena, Montana 59601
406.459.1443
Boulder Creek/Westbrook Traffic Impact Study Bozeman, Motilaua
Table of Contents
A. Executive Summary......................................................................................I
B. Project Description.....................................................................................—I
C. Existing Conditions........................................................................................I
AdjacentRoadways ..............................................................................2
TrafficCounts........................................................................................3
Levelof Service.....................................................................................3
D. Proposed Development................................., ...........................................4
E. Trip Generation and Assignment.................
F. Trip Distribution ..........................................................................................7
G. Traffic Impacts Outside of the Development...............................................7
H. Impact Summary & Recommendations......................................................8
List of Figures
Figure 1 — Proposed Development Site...................................................................2
Figure 2— Proposed Boulder Creek Development..................................................5
Figure 3— Proposed Westbrook Development........................................................6
Figure 4 — Trip Distribution......................................................................................7
List of Tables
Table 9 — 2013 Level of Service Summary..............................................................3
Table 2— Trip Generation Rates.............................................................................7
Table 3— Level of Service Summary With Development........................................8
i
Boulder Creek/Westbrook Traffic Impact Study Bozeman, Montana
Boulder Creek/Westbrook Residential
Development Traffic Impact Study
Bozeman, Montana
A. EXECUTIVE SUMMARY
As proposed, the Boulder Creels and Westbrook developments will not create any new roadway
capacity problems along Durston Road. The intersection of Durston Road and Cottonwood Road
is currently operating at a poor LOS in the PM peak-hour and the traffic from these
developments will add to this problem. It is recommended that a left-turn be installed at this
intersection for westbound traffic and that the intersection be converted to four-way STOP
control. Alternatively this intersection could be improved by the installation of a modern
roundabout. All other nearby intersections will continue to function at acceptable levels of
service and no other additional improvements will be required along Durston Road to serve the
proposed developments.
B. PROJECT DESCRIPTION
This document studies the possible effect on the surrounding road system from two proposed
residential developments located north of Durston Road between Laurel Parkway and Rosa Way
in Bozeman, Montana. The document also identifies any traffic mitigation efforts that the
development may require. The site is located north of Durston Road '/4 mile west of Cottonwood
Road. The property would be developed to include up to 233 new residential units. Based on
the City of Bozeman Subdivision Regulations, the developers must study all effected
intersections within %s mile of the proposed development which includes the intersections of
Durston Road with Laurel Parkway, Rosa Way, Cottonwood Road, and Flanders Mill Road.
Although this development will include the construction of a portion of Oak Street,the section of
road will not connect to the existing sections of Oak Street to east and will not provide access to
the development site until additional properties in this area are developed to the east.
A traffic impact study was prepared for this project in 2007 which was then called Laurel Glen
Phases 3 & 4. The 2007 traffic study, which anticipated the construction of 270 residential units
on the property, recommended the construction of a designated left-turn lane along Durston Road
at Cottonwood Road, and that four-way STOP controls be installed at the intersections of
Durston Road with Ferguson Road (completed) and Cottonwood Road.
C. EXISTING CONDITIONS
The proposed development property currently consists of a 70-acre parcel of undeveloped land
located north of Durston Road between Laurel Parkway and Rosa Way. The site is located
AbeIin Traffic Services 1 November 2013
Boulder Creek/Westbrook Traffic Impact Study Bozeman,Montana
between the Laurel Glen Phase 2 Subdivision and the Traditions Subdivision. The topography in
this area is flat. See Figure 1 for a location map of the proposed development.
Figure 1- Proposed Development Site
i
f
Adjacent Roadways
Durston Road is a two-way east/west minor arterial route that provides access to the
residential areas to the west of Bozeman. In recent year much of the road has been
reconstructed to accommodate development in this area. Currently the road has a three-lane
cross-section with a paved width of 46-feet east of Cottonwood Road and two-lanes paved at
31 feet west of Cottonwood Road. Durston Road also has designated bike lanes. All cross-
street between Laurel Parkway and Flanders Mill Road are controlled by STOP signs. The
roadway has a posted speed limit of 35 MPH and currently carries 8,600 Vehicles Per Day
(VPD).
Laurel Parkway is a north/road that was constructed to serve the different phases of the
Laurel Glen development. This roadway was constructed with a wide median, turn lanes,
and roundabouts at some intersection to provide capacity for future development and future
road connections. The roadway has a posted speed limit of 25 MPH and currently carries
2,800 Vehicles Per Day(VPD).
Cottonwood Road is a principal arterial north/south route that provides access to the
residential developments to the north and Huffine lane to the south. The road has a two-lane
cross-section with a paved width of 28-feet near Durston Road. The road has a posted speed
limit of 25 MPH north of Durston Road and 40 MPH south of Durston Road. Cottonwood
Road currently carries 550 VPD north of Durston Road. .
Abelin Traffic Services 2 November 2013
Boulder Creek/Westbrook'Traffic Impact Study Bozeman,Montana
Flanders Mill Road in a north/south two-lane road which provides access north to Baxter
Lane. The road currently has a paved width of 27 feet and a posted speed limit of 40 MPH.
Flanders Mill Road currently carries 2,500 VPD north of Durston Road.
Traffic Counts
In July 2013 Abelin Traffic Services (ATS) collected turning movement count data at
intersections along Durston Road as requested by the City of Bozeman. These counts
included the intersections of Durston Road with Laurel Parkway, Rose Way, Cottonwood
Road, and Flanders Mill Road. ATS also collected 24-hour ADT data on Laurel
Parkway, Flanders Mill, and Durston Road. The raw traffic data is included in Appendix
A of this report.
Level of Service
Using the data collected for this project, ATS conducted a Level of Service (LOS)
analysis at area intersections. This evaluation was conducted in accordance with the
procedures outlined in the Transportation Research Board's Highway Capacity Manual
(HCM) - Special. Report 209 and the Highway Capacity Software (HCS) version 5.3.
Intersections are graded from A to F representing the average delay that a vehicle
entering an intersection can expect. Typically, a LOS of C or better is considered
acceptable for peak-hour conditions.
Table 1 — 2013 level of Service Summa
AM Peak Hour PM Peak Hour
Intersection Delay Sec. LOS Delay Sec. LOS
Durston Road & Laurel 14.4 B 13.3 B
Parkewa
Durston Road & Rosa 12.6 B 13.8 B
Way
Durston Road &
Cottonwood Road* 11.9/15.3 B/C 56.2/23.4 F!C
Durston Road & 11.3 B 16.8 C
Flanders Mill Road
'NorthboundlSouthbound LOS and Delay
Table 1 shows the existing 2013 LOS for the AM and PM peak hours without the traffic
from the proposed developments. The LOS calculations are included in Appendix C.
Table 1 shows that most of the existing intersections along Durston Road are currently
operating within acceptable limits. However, the intersection of Cottonwood Road and
Durston Road is currently experiencing excessive evening peak-hour delay. This issue
Abelin Traffic Services 3 November 2013
Boulder Creek/Westbrook Traffic Impact Study Bozeman,Montana
will need to be addressed regardless of any additional development within this area. If
this intersection were converted to a four-way STOP controlled intersection it would
function at LOS C with 16.8 seconds of delay in the PM peak-hour. If an additional left-
turn lane were added to this intersection for westbound traffic, the overall intersection
delay would drop to 14.0 seconds.
D. PROPOSED DEVELOPMENT
The development currently under consideration for this site includes 70 acres of land located
north of Durston Road which would be developed into two residential subdivisions. The
Westbrook Subdivision would be located just north of Durston Road and the Boulder Creels
Subdivision would be located just north of Annie Street. The Westbrook Subdivision would
include 118 single-family residential units. A total of 115 single-family residential units are
proposed in the Boulder Creek Subdivision for a total of 233 new residential units. It should be
noted that this is a significant decrease for the 270 residential units previously proposed for this
property. The developments would each have designated parks and sidewalks throughout the
properties. Access to the development sites would be provided through a variety of new
connections onto Laurel Parkway, Rosa way,and North Cottonwood Road. Presently these three
streets would be the only access points from the developments to Durston Road and the City of
Bozeman. As this area continues to develop in the future it is likely that additional road
connections will be provided to the north and east. The Westbrook and Boulder Creek
development are shown in Figures 2 & 3.
E. TRIP GENERATION AND ASSIGNMENT
ATS performed a trip generation analysis to determine the anticipated fixture traffic volumes
from the proposed development using the trip generation rates contained in Trip Generation
(Institute of Transportation Engineers, Seventh Edition). These rates are the national standard
and are based oil the most current information available to planners. A vehicle "trip" is defined
as any trip that either begins or ends at the development site. ATS determined that the critical
traffic impacts on the intersections and roadways would occur during the weekday morning and
evening peak hours. According to the 1TE trip generation rates, at full build-out the
developments would produce 175 AM peak hour trips, 235 PM peak hour trips, and 2,230 daily
trips. See Table 2 for detailed trip generation information.
Abelin Traffic Services 4 November 2013
Boulder Creek/Westbrook Traffic Impact Studio Bozeman,Montana
Figure 2 - Proposed Boulder Creek Development
i
'_ ._._..�....__�.• �►�o�.�rnrc�tir�� st�ctlylUvrt.t =�:��la��f_',
`Z .,�,�r'"" - i ;y; i)ii �i h� S'�•e; si a; �i i I
f ; I RUN
I as I e� ' I J '4ti si �i •�ii lei >,i si �i ei� �=`' .
cob
60
all
LU
CL
i ' y �nlct,�ta�tns raa! r�svr 11I opts! r ris K
o7,pq1epp4pp
Y979
R
i te�lipjllSg3f�� @fi4i@ 13b+ �ii;iP
ld 2 i.Q� ���6�94� � i ��a
Abelin Traffic Services 5 November 2013
Boulder CreeklWestbrook Traffic Impact Study Bozeman,Montana
Figure 3 — Proposed Westbrook Development
1_T.;. I_:1 i CT1 I_i, i� -a` Tf�ilq,�t ��_.•
t'-��
�V/�JVv//J/
r N ,t
J ~ "� ���fj i s , R.. I ;;s-ij tilt
lrJl f lei r w� ,!1.in i e at n t`e4 : toi: rl 1
IL
pig
Ali'
VIM: I
z LAM"
4i
r � { ..v:, '=�';,+Y �-r.i•r.:^.:� �� i�w"C i�a 7r�1 ':'Lt: f.f �
:.•mow.�w
::ram' . i a t,,.: i! ti..�`1'•• '�~ f..ti.��. :;^.''" ..� _
-t� ' r
NUISIN ills NO JJ '!;[T1111"I
/� •� �' '. t !' !: Y }I II IC •A tct F �:61 iI'
88kti e
fig �ilia`;
Y 4{ si�ii i �i I {•i �4ga isliii
P. 1 s
�' Abelin Traffic Services 6 November 2013
Bouddej•Creek/Westbrook Traffic Impact Study Bozeman,Montana
Table 2 - Trip Generation Rates
AM Peak Total AM PM Peak Total PM
Hour Trip Peak Hour Trip Peak Weekday Total
Ends per Hour Trip Ends per Hour Trip Trip Ends Weekday
Land Use Units Unit Ends Unit Ends per Unit Trip Ends
Boulder Creek
Single-Family 115 0.75 86 1.01 116 9.57 1,101
Westbrook
Single-Family 118 0.75 89 1.01 119 9.57 1,129
Total 233 175 1 235 2,230
F. TRIP DISTRIBUTION
The traffic distribution and assignment for the proposed subdivisions was based upon the
existing ADT volumes along the adjacent roadways and the peak-hour turning volumes. Based
on field observations, half of the traffic from the development site will use Durston Road to
reach areas to the east in Bozeman. The rest of the traffic will use Cottonwood Road, Flanders
Mill Road, and Durston Road to reach other destinations. Traffic is expected to distribute onto
the surrounding road network as shown on Figure 4.
Figure 4—Trip Distribution
5% MO
Proposed
Development
Site w
a�
v
c
5% LL
Durston Road v 50%
m
0
v
0
0
3
c
0
c 40%
CO)
G. TRAFFIC IMPACTS OUTSIDE OF THE DEVELOPMENT
Using the trip generation and trip distribution numbers, ATS determined the future Level of
Service for the area intersections. The anticipated intersection LOS with the Westbrook and
Boulder Creek Subdivisions is shown in Table 3. These calculations are based on the projected
model volumes included in Appendix B of this report.
Abelin Traffic Services 7 November 2013
Boulder CreeklWestbrook Traffic Impact Study Bozeman,Montana
Table 3 indicates that the construction of the Boulder Creek and Westbrook Subdivisions will
not cause any additional roadway capacity problems at locations along Durston Road. The
intersection of Cottonwood Road and Durston Road is currently operating at a poor LOS and the
Bounder Creek/Westbrook developments will contribute to the need for improvements at this
location.
There are several options for improving the capacity and LOS at the intersection of Durston
Road and Cottonwood Road. If the intersection were modified to a four-way STOP controlled
intersection with its current lane configuration the LOS would improve to D with 29.3 seconds of
peak-hour delay. If an additional left-turn lane were added for westbound traffic with the four-
way STOP control, the overall intersection delay would improve to 19.3 seconds (LOS C) and
the intersection would have considerable reserve capacity. With the current road layouts in this
intersection, a left-turn lane could be created by widening only the west leg of Durston Road and
re-striping the intersection.
Alternatively, the capacity related issues at this intersection could be addressed by constructing a
modern roundabout at this location. There is sufficiently area to construct a roundabout in this
intersection and this type of traffic control is becoming common in this part of Bozeman. if
constructed, a roundabout would operate at LOS B with 11.5 seconds of delay and would
provide sufficient capacity for this intersection well into the future.
Table 3-Level of Service Summary
With the Boulder Creek/Westbrook Developments
AM Peak Hour PM Peak Hour
Intersection Delay Sec. LOS Delay Sec. LOS
Durston Road & Laurel 15.1 B 14.1 B
Parkewa
Durston Road & Rosa 14.0 B 15.2 C
Way
Durston Road & 14.6/25.6 BID 204.8/45.9 FIE
Cottonwood Road*
Durston Road & 12.0 B 19.6 C
Flanders Mill Road
"Northbound/Souhbound LOS and Delay
H. IMPACT SUMMARY & RECOMMENDATIONS
As proposed, the Boulder Creek and Westbrook developments will not create any new roadway
capacity problems along Durston Road. The intersection of Durston Road and Cottonwood Road
is currently operating at a poor LOS in the PM peak-hour and the traffic from these
developments will add to this problem. It is recommended that a left-turn be installed at this
intersection for westbound traffic and that the intersection be converted to four-way STOP
Abelin Traffic Services 8 November 2013
Boulder Creek/Westbrook Traffic Impact Study Bozeman,Montana
control. Alternatively this intersection could be improved by the installation of a modern
roundabout. All other nearby intersections will continue to function at acceptable levels of
service and no other additional improvements will be required along Durston Road to serve the
proposed developments.
Abelin Traffic Services 9 November 2013
�,'��_''�.' ?Gil ��[l��. l
¢�tlU'�'u�u o� L��1'i�:
Abelin Traffic Services
130 S. Howie Street
Helena, MT 59601
Abelin Traffic Services File Name : durstandcottonwood
130 S. Howie Street Site Code : 00000000
Helena, MT 59601 Start Date : 7/23/2013
Page No : 1
Batik 2
FLANDERS DURSTON FLANDERS DURS'I'ON
South o d Woqfturd NorthboundEastbound
atrt Time Right Thru Left Peds Right Tim Lell Peds Right Thru I Left Pods Right Thru Lett Peds Int.Total
07:30 AM 13 0 8 0 5 36 0 0 0 0 0 0 0 52 9 0 123
07A5 AM 18 0 9 0 4 25 0 0 0 0 0 0 0 103 8 0 167
Total 31 0 17 0 9 61 0 0 0 0 0 0 0 155 17 0 290
08:00 AM 8 0 6 0 4 28 0 0 0 0 0 0 0 64 10 0 120
08:15 AM 11 0 10 0 4 35 0 0 0 0 0 0 0 50 8 0 118
08:30 AM 8 0 6 0 4 28 0 0 0 0 0 0 0 53 3 0 102
8:45 AM 1 0 7 0 0 0 0 0 0 51 11 0 117
Total 34 0 29 0 22 122 0 0 0 0 0 0 0 218 32 0 457
BREAK•'*
04:15 PM lit 0 6 0 14 62 0 0 0 0 0 0 0 40 12 0 148
04:30 PM 10 0 6 0 7 49 0 0 0 0 0 0 0 58 12 0 142
04:45 PM 12 0 5 0 6 53 0 0 0 0 0 0Q��7 15 0 140
Total 36 0 17 0 29 164 0 0 0 0 0 0 0 145 39 0 430
05:00 PM 19 0 10 0 11 80 0 0 0 0 0 0 0 67 13 0 200
05:15 PM 18 0 12 0 16 102 0 0 0 0 0 0 0 36 12 0 196
05:30 PM 17 0 14 0 II 90 0 0 0 0 0 0 0 51 14 0 197
Grand Total 155 0 99 0 98 619 0 0 0 0 0 0 0 672 127 0 1770
Apprch% 61 0 39 0 137 86.3 0 0 0 0 0 0 0 84.1 15.9 0
Total% 8.8 0 5.6 0 5.5 35 0 0 0 0 0 0 0 38 7-2 0
Abelin Traffic Services
130 S. Howie Street
Helena, MT 59601
Abelin Traffic Services File Name : durstandcottonwood
130 S. Howie Street Site Code : 00000000
Helena, MT 59601 Start Date : 7/23/2013
Page No : 1
Grou s Printed-Unshiftcd
COTTONWOOD DU RSTON COTTON WOOD DURSTON
Sou hbound Westbound Northbound Eastbound
Start Time Right I Thru I Loft Peds Right Thru I Lcft Pcds Right I Thru Lcft Peds Right I Thru I Left Pcds Int.'folal
07:30 AM 4 3 6 0 0 28 14 0 13 1 9 0 11 49 t 1 140
0 :45 AM 2 0 3 0 1 26 26 0 14 1 1 0 30 81 0 0 185
Total 6 3 9 0 1 54 40 0 27 2 10 0 41 130 1 1 325
08:00 AM 1 2 4 0 0 28 22 0 18 0 3 0 1 15 48 1 0 142
08:15 AM 0 1 3 0 2 32 19 0 23 2 7 0 14 44 0 0 147
08:30 AM 1 3 1 0 0 29 17 0 12 1 2 0 7 49 0 0 l22
08:45 AM 0 1 3 0 2 38 I8 0 19 0 3 0 16 46 2 0 148
Total 2 7 11 0 4 127 76 0 72 3 IS 0 52 187 3 0 559
`••BREAK•••
04:15 PM I I 1 0 2 64 15 0 28 2 11 0 15 37 0 0 177
04:30 PM 2 1 3 0 1 54 12 0 29 6 10 0 10 59 1 0 188
4:45 PM 0 2 2 0 2 51 14 0 37 2 10 6 56 0 0 187
Total 3 4 6 0 5 169 46 0 94 10 31 0 31 152 1 0 552
05:00 PM 0 2 3 0 2 76 27 0 34 4 15 0 19 59 2 0 243
05:15 PM 0 0 1 0 9 98 32 0 31 3 20 0 8 38 2 0 242
0530 PM 0 0 6 0 6 78 32 0 43 5 23 0 13 52 0 0 258
Grand Total II 16 36 0 27 602 253 0 301 27 114 0 164 618 9 1 2179
Apprch% 17.5 25.4 57.1 0 3.1 68.3 28.7 0 68.1 6.1 25.8 0 20.7 78 1.1 0.1
Total% 0.5 0.7 13 0 1.2 27.6 11.6 0 13.8 1.2 5.2 0 7.5 28.4 0.4 0
Abelin Traffic Services
130 S. Howie Street
Helena, MT 59601
Abelin Traffic Services File Name : durstandrosa
130 S. Howie Street Site Code : 00000000
Helena, MT 59601 Start Date : 7/22/2013
Page No : 1
_ Oroupg Printed- nshift d
ROSA DURSTON ROSA DURSTON
South bound N Bns oun
Right Thru Loll Pods Right Thni Left Peds Right Thru Loft Pcds Rigltt 'Thru Left Peds Int.7'otal
07:30 AM 1 0 2 0 0 28 0 0 0 0 0 0 0 56 0 0 87
AM 2 0_ 4 0 1 59 0 0 0 0 0 0 0 109 0 5,
Total 3 0 6 0 1 87 0 0 0 0 0 0 0 165 0 0 262
WOO AM 1 0 2 0 0 28 0 0 0 0 0 0 0 69 1 0 101
08:15 AM 1 0 3 0 0 26 0 0 0 0 0 0 0 69 1 0 100
08:30 AM 1 0 2 0 0 37 0 0 0 0 0 0 0 52 0 0 92
08:45 A 1_ __0 2 0 2 0 04 0 0 64 0 9
Total 4 0 9 0 0 114 0 0 0 0 0 0 0 254 2 0 383
" BREAK•46
04:45 PM I 0 0 2 0 I 1 70 0 0 I 0 0 0 0 I 0 51 0 0 I 124
Total 0 0 3 0 2 133 0 0 0 0 0 0 0 98 3 0 239
05:00 PM 0 0 I 0 2 56 0 0 0 0 0 0 0 50 0 0L5�7
05:15I'M 0 0 0 0 I 85 0 0 0 0 0 0 0 52 0 0
05-30I'M 1 0 4 0 4 106 0 0 0 0 0 0 0 71 1 0
_ _05:45 PM 0 0 1 0_ I 74 0 0 0 0 0 0 62 0
Total t 0 6 0 8 321 0 0 0 0 0 0 0 235 1 0
Grand Total I 8 0 24 0 I 11 655 0 0 I 0 0 0 0 I 0 752 6 0 I 1456
Apprch% 25 0 75 0 1.7 98.3 0 0 0 0 0 0 0 99.2 0.8 0
Total% 0.5 0 1.6 0 0.8 45 0 0 0 0 0 0 0 51.6 0.4 0
Abelin Traffic Services
130 S. Howie Street
Helena, MT 59601
Abelin Traffic Services File Name : durstandrosa
130 S. Howie Street Site Code : 00000000
Helena, MT 59601 Start Date : 7/22/2013
Page No : 1
Groups Printed-Bank
LAUREL DURSTON LAUREL DURSTON
Southbound es t N 1 and Eastboun
Start Time Right Thru Loll Pcds Right Thru Left I Pods Right Thru I Left Pods Ri ht ThruI Lett Peds int.Total
07:30 AM 0 0 10 0 2 27 0 0 0 0 0 0 0 55 1 0 95
07:45 AM 5 0 43 0 8 53 0 0 0 0 0 0 0 190 0 0 299
TO 5 0 53 0 t0 80 0 0 0 0 0 0 0 245 1 0 394
09:00 AM 3 0 24 0 6 23 0 0 0 0 0 0 0 69 1 0 126
08:15 AM 1 0 21 0 7 20 0 0 0 0 0 0 0 70 0 0 119
08:30 AM 1 0 13 0 3 35 0 0 0 0 0 0 0 51 1 0 104
08:4S AM 1 0 16 0 0 24 09. 0 0 0 0 0 64 0 0 los
Total 6 0 74 0 16 102 0 0 0 0 0 0 0 754 2 0 454
•••BREAK•*•
04:30 PM 2 0 13 0 14 49 0 0 0 0 0 0 0 48 2 0 128
4:45 P 1 0 20 50 0 0 0 0 0 0 _0 48 3 0 140
Total 3 0 31 0 34 99 0 0 0 0 0 0 0 96 5 0 268
05:00 PM 2 0 6 0 11 45 0 0 0 0 0 0 0 47 3 0 114
05.15 PM 0 0 12 0 is 70 0 0 0 0 0 0 0 47 5 0 149
0530 PM 4 0 11 0 20 87 0 0 0 0 0 0 0 69 3 0 194
05:4 I'M 1 0 _12__ _ 0 2§ 48 0 0 0 0 0 0 0 59 4 0 149
f Total 7 0 41 0 �72 250 0 0 0 0 0 0 0 221 15 0 606
Grand Total 21 0 199 0 I 132 531 0 0 I 0 0 0 O I 0 816 23 0 I 1722
Apprch% 9.5 0 90.5 0 19.9 80.1 0 0 0 0 0 0 0 97.3 2.7 0
Total% 1.2 0 11.6 0 7.7 30.8 0 0 0 0 0 0 0 47A 1.3 0
Basic VolumeI
Station ID : DURST Last Connected Device Type : Unic-L
Info Line 1 : ATS Version Number: 1.41
Info Line 2 : UNICORN#1 Serial Number:
GPS Lat/Lon : Number of Lanes 1
DB File : DURST.DB Posted Speed Limit
Lane#1 Configuration J
# Dlr. Information Volume Mode Volume Sensors Divide By 2 Comment
1. ALL Normal Axle Yes
Lane#1 Basic Volume Data From: 11:00-08/06/2013 To:08:69-08/09/2013 1
Dates DIN 0000 0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 Total
080613 T 544 667 597 543 570 708 885 621 399 360 257 124 88 6363
0807*13 W 34 11 18 7 15 72 227 554 595 509 485 502 613 542 549 595 649 881 618 390 317 269 157 80 8689
080813 T 38 11 7 7 18 84 232 515 598 529 536 511 631 635 607 552 694 905 606 423 298 212 153 90 8892
080913 F 50 27 20 14 25 65 205 464 870
Month Total 122 49 45 28 56 221 664 1533 1193 1038 1021 1557 1911 1774 1699 1717 2051 2671 1846 1212 975 738 434 258 24814
Perconl• 0'%6 01. 0% 0% 0% 1% 3% 81/6 5% 4% 4% 81/. 8% 7% 7".16 746 8% 11% 7% 5% 4% 3% 2% 1%
ADT: 41 16 15 9 19 74 221 511 597 519 511 519 637 591 566 672 684 890 615 404 325 246 145 86 8813
Sun Mon Tue Wed Thu Fri Sat Total Percent
DW Totals: 0 0 6363 8689 8892 870 0 Weekday(Mon-Fri): 24814 100%
#Days: 0.0 OA 0.5 1.0 1.0 0.3 0.0 ADT: 8631
ADT: 0 0 11747 8689 8892 2610 0 Weekend(Sat-Sun): 0 0%
Percent 0% 0% 26% 35% 36% 4% 0% ADT: 0
Conlunon Basic Volumo Report Ynnfed 0812l'113 Fop 7
Basic VolumeI 1
Station ID : CTNWD N Last Connected Device Type : Unic-L
Info Line 1 : ATS Version Number : 1.41
Info Line 2 : UNICORN #3 Serial Number: 91888
GPS Lat/Lon : Number of Lanes : 1
DB File : CTNWD N.DB Posted Speed Limit :
Lane #1 Configuration
# Dir. Information Volume Mode Volume Sensors Divide By 2 Comment
1. ALL Normal Axle Yes
Lane#1 Basic Volume Data From: 10_00-08/06/2013 To_0869 -08/09/2013
Date DW 0000 0100 0200 0300 0400 0500 0600 0700 0800 0900 1000 1100 1200 1300 1,100 1500 1600 1700 1800 1900 2000 2100 2200 2300 Total
080613 T 29 34 38 44 40 32 52 66 36 33 24 17 15 5 455
080713 W 3 2. 0 0 3 6 9 26 14 23 24 42 43 29 28 37 32 52 55 19 28 8 19 5 507
080813 T 2. 6 0 0 4 12 12 25 23 21 26 30 33 37 43 42 38 44 49 32 24 16 7 2 528
080913 F 5 6 2 1 7 6 8 23 58
Month Total 10 14 2 1 14 24 29 74 37 44 79 106 114 110 111 111 122 152 140 84 76 41 41 12 1548
Portent-, 1% 1% 0% 0% 1% 2% 2% 51/6 2% 31/,, 5% 7% 746 79,16 7% 7%, 8% 10% 9% 5% 54% 3% 3% 1%
ADT: 3 5 1 0 5 8 10 25 19 22 26 35 38 37 37 37 41 51 47 28 25 14 14 4 532
Stln Mon Tue Wed Thu Fri Sat Total Percent
DW Totals: 0 0 455 507 528 58 0 Weekday(Mon-Fri): 1548 100%
#Days: 0.0 0.0 0.6 1.0 1.0 0.3 0.0 ADT: 531
ADT: 0 0 780 507 528 174 0 Weekend(Sat-Sun): 0 0%
Percent. 0% 0% 29% 33% 34% 4% 0% ADT: 0
Cenlunon Basic Volume Repot Printed 08121113 Pago 1
APPENDIX B
Traffic Model
Boulder Creek/Westbrook Traffic Model
Bozeman,MT
Existing 2013
AM Peak Hour laurel Parkway Rosa Way cuttonwoA Flanders MITI
Peak 15•1,41n x 4
B 4) L 4
7o J L 3z 6 fD L 4 o 1 4" 104 72 4) L 16
172 4 4— 212 16 4 <-" 236 12 1# f" 104 36 4 4- 140
Ourston 4 -1 0 J 4 .1 4 32 J
264 436 -11' 324 4 392 -1
120 'f /� 56
PM Peak Hour Laurci t.,rl,v:ay Rosa W.'y Cottonwood Flanders Mill
Peak 15•Min x 4
0 L 24
16 x.1 L a0 4 L 16 0 1 4- 312 68 L 44
•14 M 348 16 4 4- 424 24 b 128 56 4 `" 408
Ourston 12 -1 4 8 .1 172 56
zoo —s 284 -► 208 20 324 �1
S2 '� r 92
Boulder Creek/Westbrook Traffic Model
Bozeman,MT
MODEL
AM Peak Hour Laurel Parkway Rosa Way Cottonwood Plunders MITI
IN 44
OUT 132 60%
2016 2U
79 26
269 26 9 411 It. 13
5 t. 7 3 e1 8 40 8 4— 11 2 4) Pa
21 14 4- 3 24 ti 7 is 40 G4_ Q' 24 a- 22
Durston 2 J 1 .1 45 .9 4 73 7 .4
1 "0 21 34 Q 13 66 �►
11 -4 Ir
PM Peak Hoer Laurel Parkway Rosa Way Cottonwood Plandefs Mill
IN 150
OUT 85 6014
7m. 2(111
51 90
17 30 17 30 t. 45
3 4) IL 24 2 4J t. 27 26 i 4"' 38 8 49 L
14 1" 2 15 p' 24 51 26 1. d' 83 Ib15
Dunton 6 .9 3 I9 .J 13 47 5 .�
1 -4 14 22 "4 Q 45 42 -4
7
Boulder creek/Westbrook Traffic Model
Bozeman,MT
With Development
AM Peak Hour Laurel Parkway Rosa Way Cottonwood Flanders Mill
is 41 L 17
25 41 L 39 11 4j L 12 40 a *' 115 74 4) L 16
193 04 4- 215 40 4 4" 243 52 0 104 36 4 4-- 162
Ourston 6 J 1 J 4 9 8 39 J
265 "4 457 -4 358 1j 17 458
131 "$ 56
PM Peak Hour 'Laurel Pxh.mv Rosa Way cotwnwood
0 <1 L 69
i° j IL 101 6 41 L 43 26 A 4- 350 76 4) L 44
k' 350 31 04 4- 449 50 b r 228 56 {#
Durston Is .9 7 J 8 j 185 61 .!
290 230 -4 t 65 366 14
59 'f N 92
APPEN DA C
LOS calculations
T`WO-Way Stop Control 1'1(,c I of I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nal st RLA Intersection Durston&Lourol
Agency/Co. Abefin Traffic Jurisdiction
Date Performed 611212013 Analysis Year 2013
Analysis Time Period AM Peak Hour
Project Description Boulder/Westbrook
East/West Street: Durston Road North/South Street: Laurel Parkway
Intersection Orientation: Cast-West IStUdy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume veh/h) 4 264 212 32
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 4 264 0 0 212 32
vehlh
Percent Heavy Vehicles 0 1 0 — -
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 172 20
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 0 0 0 172 0 20
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 1 0 1
Configuratio2_________j L R
Delay,Queue Length and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT L R
v (veh/h) 4 172 20
C (m) (veh/h) 1334 532 816
V/C 0.00 0.32 1 0.02
95%queue length 0.01 1.39 0.08
Control Delay(s/veh) 7.7 15.0 9.5
LOS A B A
Approach Delay (s/veh) -- - 14A
Approach LOS B
Copyright 0 2010 University of Florida,All Rights Reserved HCS+7M Version 5.6 Generated: 11/1212013 8:58 AM
I ile:///C:/tJsei-s/Bob%2OAbel in/Al)pl)ata/l,ocal/'I'eml)/Li2i:4450.tmp 1 1/12/2013
Two-Way Stop Control llagc 1 41
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection IDurston &Laurel
Agency/Co. lAbelin Traffic Airisdiction
Date Performed 811212013 Analysis Year 12013
Analysis Time Period IPM Peak Hour
Project Description Bouider/Westbrook
EastANest Street: Durston Road North/South Street: Laurel Parkway
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
olume (veh h 12 240 348 80
Peak-Flour Factor, PI IF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 12 240 0 0 348 80
veh/h
Percent Heavy Vehicles 0 -- 0
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Northbound S011lhbeUnd
Movement 7 8 9 10 11 12
L T R I- T R
Volume veh/h 44 16
Peak-Flour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 0 0 0 44 0 16
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 1 0 1
Configuration L R
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT L R
(veh/h) 12 44 16
C (m) (veh/h) 1142 431 665
Ic 0.01 0.10 1 0.02
95% queue length 0.03 0.34 0.07
Control Delay (s/veh) 8.2 14.3 10.5
LOS A B B
Approach Delay (s/veh) — 13.3
pproach LOS - B
Copyright V 2010 University of Florida,All Rights Reserved HCS+TM Version 5.6 Generated: 11/12/2013 6:58 AM
f i le:///C:/Users/Boh%2OAbeiiii/Api)Data/Local/Temp/u2l(13f.21).tmp 1 1/12/2013
'I'wo-Way Stop Control Page I of I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection Durston &Rosa Wa
Agency/Co. lAbelin Traffi Jurisdiction
Date Performed 1811212013 Analysis Year 2013
Analysis Time Period M Peak Hour
Project Description BoulderlWestbrook
East/West Street: Durston Road North/South Street: Rosa Way
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume veh/h 2 436 236 4
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 2 436 0 0 236 4
veh/h
Percent Heavy Vehicles 0 -- -- 0 —
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
U stream Si nal 0 0
Minor Street Northbound Sellthbeltnd
Movement 7 8 9 10 11 12
L T R L T R
Volume vehlh 16 8
Peak--I-lour Factor, PHF 1.00 1,00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 0 0 0 16 0 8
veh/h)
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length, and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
v(veh/h) 2 24
C (m) (veh/h) 1339 500
v/c 0.00 0,05
95%queue length 0.00 0.15
Control Delay (s/veh) T 7 12.6
LOS A B
pproach Delay (s/veh) - 126
pproach LOS - -- B
Copyright 0 2010 University of Florida,All Rights Reserved HCS+TM Version 5.6 Generated: 11/1212013 8:58 AM
file:///C:/Users/Bob%20Abclin/AppData/Local/'I'einp/u2kI 1 D2.tnp 11/12/2013
Two-Way Stop Control Page 1 of 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst RLA Intersection Durston &Rosa Way
Agency/Co. Abefin Traffic Airisdiction
Date Performed 811212013 Analysis Year 2013
Analysis Time Period PM Peak Hour
Project Description Boulder/Westbrook
EastM/est Street: Durston Road tdorth/South Street: Rosa Way
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L 'r R L T R
Volume veh/h 4 284 424 16
Peak-Hour Factor, PHF 1.00 1.00 1 00 1.00 1.00 1.00
Hourly Flow Rate, HFR 4 284 0 0 424 16
veh/Il
Percent Heavy Vehicles 0 1 0 — -
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
COnf gUration LT TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 1 l 12
L T R L T R
olume veh/h 16 4
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 0 0 0 16 0 4
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay, Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
v(veil/h) 4 20
C (m) (veh/h) 1131 427
v/c 0.00 0.05
95%queue length 0.01 0.15
Control Delay (s/veh) 8.2 13.8
LOS A B
pproach Delay(s/veh) - 13.8
pproach LOS - -- B
Copyright©2010 University or Florida,All Rights Reserved HCS JNI Version 5.6 Generated: 11/12/2013 8:59 AM
f i lc:///C:/Users/Bob%2OAbel in/AppData/Local/'I'cmp/u2k6C43.tmp 1 1/12/2013
Txvo-Wary Stop Control I'agc I of I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection IDurston &Cottonwood
Agency/Go. belin Traffic urisdiction
Date Performed 1811212013 Analysis Year 12013
Analysis Time Period IPM Peak Hour
Project Description Boulder/Westbrook
EasttWest Street: Durston Road North/South Street: Cottonwood Road
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
olume veh/h 6 208 52 128 312 24
Peak-Hour Factor, PI-IF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, lIFR 8 208 52 128 312 24
veh/h
Percent Heavy Vehicles 0 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Si nal 0 0
Minor Street Northbound SOLIthbOUnd
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 172 20 92 24 4 4
Peak-Hour Factor, PFIF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 172 20 92 24 4 4
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length, and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
(veh/h) 8 128 284 32
C (m) (veh/h) 1235 1316 331 228
lc 0.01 0,10 0.86 1 0.14
95%queue length 0.02 0.32 7.79 0.48
Control Delay(s/veh) T9 8.0 56.2 23.4
LOS A A F C
Approach Delay (s/veh) — -- 56.2 1 23.4
Approach LOS -- - F C
Copyright 02010 University of Florida,All Rights Reserved HCS+1M Version 5,6 Generated: 11/12/2013 8:56 AM
file:///C:/Users/Bob%20AbeI iii/AppData/Local/'I'cmp/Li2k I0L,8.tmp 1 1/12/2013
'kvo-way Stop UonU•ol Page I of I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection Durston & Cottonwood
Agency/Co. Abefrn Traffi Jurisdiction
Date Performed 1811212013 Analysis Year 2013
Analysis Time Period JAM Peak Hour-
Project Description Boulder/Westbrook
East/West Street: Durston Road North/South Street: Cottonwood Road
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume veh/h 4 324 120 104 104 4
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 4 324 120 104 104 t
veh/h
Percent Heavy Vehicles 0 -- — 0 -
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 1 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L 1- R
olurne (vet/h 4 4 56 12 4 8
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 4 4 56 12 4 8
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration I LTR LTR
Delay,Queue Length, and Level of Service
Approach Fastboufnd Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
(veh/h) 4 104 64 24
C (m) (veh/h) 1495 1127 566 374
v/c 0.00 0.09 0.11 0.06
95% queue length 0.01 0.30 0.36 0.20
Control Delay(s/veh) 7.4 8.5 11.9 15.3
LOS A A B C
Approach Delay(s/veh) - 11.3 15.3
Approach LOS - B C
Copyright 0 2010 University of Florida,All Rights Reserved HCS-ITr1 Version 5.6 Generated 11112/2013 8:53 AM
fi le:///C:/Users/Bob%,20Abelin/AppData/Local/Temp/ti2k77EI'.tmp 11/12/2013
'kvo-way Slob Control
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection IDurston &Flanders
Agency/Co. IAbefin Traffic Jurisdiction
Date Performed 1811212013 Analysis Year 2013
Analysis Time Period JAM Peak Hour
Project Description Boulder/Westbrook
East/West Street: Durston Road North/South Street: Flanders Mill
Intersection Orientation: East-West IStUdy Period hrs : 0.25
Vehicle Volumes and Adjustments
Ma-or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume veh/h 32 392 140 16
Peak-Flour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 32 392 0 0 140 16
vehlh
Percent Heavy Vehicles 0 - 0 —
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration f_ T TR
Upstream Si nal D 1 0
Minor Street Northbound Southbound
Movement 7 8 9 1U 11 12
L T R L T R
Volume veh/h 36 72
Peak-Hour Factor, PFIF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 0 0 0 36 0 72
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
(veh/h) 32 108
C (m) (veh/h) 1436 680
/c 0.02 0.16
95% queue length 0,07 0.56
Control Delay(slveh) 7.6 11.3
LOS A B
Approach Delay(s/veh) 11.3
Approach LOS -- B
Copyright Q 2010 University of Florida,All Rights Reserved HCS+TM Version 5.6 Generated: 1111212013 8:5/AM
file:///C:/Users/13ob°/r20A belie/ApI)Data/Local/Temp/Li21<6D4D.tmp 1 1/12/2013
Two-Way Stop ('olltrol Paf-c I of I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nal st RLA Intersection Durston&Flanders
Agency/Co. Abefin Traffic Jurisdiction
Date Performed 811212013 Analysis Year 2013
Analysis Time Period PM Peak Hour
Project Description BouldedWestbrook
East/West Street: Durston Road North/South Street: Flanders Mill
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume veh/h 56 324 408 44
Peak-flour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 56 324 0 0 408 44
vehlh
Percent Heavy Vehicles 0 - -- 0 -
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T Th
Upstream Signal 0 0
Minor Street Northbound SOUthbound
Movement 7 8 9 10 11 12
L T I: L T R
Volume veh/h 56 68
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 0 0 0 56 0 68
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay, Queue Length,and Level of Service
Approach Eastbound Westbound Northbound SOtlthbOttnd
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
(veh/h) 56 124
C (m) (veh/h) 1119 429
v/C 0.05 0.29
95%queue length 0.16 1.18
Control Delay (s/veh) 8A 16.6
LOS A C
pproach Delay (s/veh) — -- 16.8
pproach LOS — - C
Copyright®2010 University of Florida.All Rights Reserved Version 5.6 Generated: 11112/2013 8 57 AM
file:///C:/Users/Bob%20Abelin/AppData/Local/Temp/u2l(D297.tmp 1 1/12/2013
Two-Way Stop Control I'agc I of I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection Durston& Laurel
Agency/Co. IAbefin Traffi Jurisdiction
Date Performed 1811212013 Analysis Year With Development
Analysis Time Period M Peak Hour
Project Description 13ouldedWestbrook
EastM/est Street: Durston Road North/South Street: Laurel Parkway
Intersection Orientation: East-West IStUdy Period hrs : 0.25
Vehicle Volumes and Adjustments
Ma-or Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume veh/h 6 265 215 39
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 6 265 0 0 215 39
veh/h
Percent Heavy Vehicles 0 1 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration !_I TR
U stream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 193 25
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 0 0 0 193 0 25
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 D 0 1 0 1
Confi uration L R
Delay, Queue Length, and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT L R
v(veh/h) 6 193 25
C (m) (veh/h) 1323 524 810
v/C 0.00 0.37 0.03
95%queue length 0.01 1.68 0.10
Control Delay (s/veh) 7.7 15.8 9.6
LOS A C A
Approach Delay (s/veh) - 15.1
Approach LOS C
Copyright©2010 University of Florida,All Rights Reserved I ICS 0 M Vof,ion 5& Generated: 11112/2013 9:17 AM
file:///C:/Users/Bob%2OAbeiiii/AppData/l,ocai/Tetnl)/u2kA30C.tinp 1 1/12/2013
Iwo-Way Slop Control Page I of I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection Durston &Laurel
Agency/Co. befin Traffi Jurisdiction
Date Performed 1811212013 Analysis Year With Development
Analysis Time Period JPM Peak I-lour
Project Description Boulder/Westbrook
East/West Street: Durston Road Nortli/South Street: Laurel Parkway
Intersection Orientation: East-West IStUdy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume veh/h 18 243 350 104
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 18 243 0 0 350 104
veil/h
Percent Heavy Vehicles 0 1 0 -- -
Median Type Undivided
RT Channelized 0 0
Lanes 1 0 1 0 0 1 0
Configuration L 7 TR
U stream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L I' R L T R
Volume veh/h 58 19
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate,HFR 0 0 0 58 0 19
veh/h
Percent Fleavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 1 0 1
,Configuration L R
Delay,Queue Length, and Level of Service
Approach Eastbound Westbound Northbound SOUthbOUnd
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT L R
v (veh/h) 18 56 19
C(m) (veh/h) 1117 412 653
lC 0.02 0.14 1 0.03
95% queue length 0.05 0.49 0.09
Control Delay(s/veh) 8.3 15.2 10.7
LOS A C B
Approach Delay(s/veh) -- 14.1
Approach LOS -- B
Copyright 0 2010 University of Florida,All Rights Reserved HCS+Tm Version 5.6 Generated: 11/1212013 9:17 AM
file:///C:/Users/Bob%20Abeliii/AppData/Local/Temp/Li2kEE8F.tmp 11/12/2013
Two-Way Stop Control Page 1 of ]
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
nal st RLA Intersection Durston &Rosa Way
Agency/Co. Abefin Traffic Airisdiction
Date Performed 611212013 Analysis Year With Development
Analysis Time Period AM Peak Hour
Project Description Boulder/Westbrook
East/West Street: Durston Road North/South Street: Rosa Way
Intersection Orientation: East-West IStUdy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 G
L T R L T R
Volume veh/h 2 457 243 12
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 2 457 0 0 243 12
veh/11
Percent Fleavy Vehicles 0 — -- 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Sig7a-11 0 0
Minor Street Northbound SOLIthbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 40 11
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 0 0 0 40 0 11
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay, Queue Length, and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
v (veh/h) 2 51
C (m) (veh/h) 1322 450
vlc 0.00 0.11
95%queue length 0.00 0.38
Control Delay(s/veh) 7.7 140
LOS A B
Approach Delay (s/veh) -- -- 14.0
Approach LOS I — - B
Copyright Q 2010 University of Florida,All Rights Reserved HCS+TM Version 5.6 Generated: 1111212013 0:17 AM
file:///C:/Users/Bob%2OAbolin/AppData/Local/Temp/ti2k49DI3.tmp 1 1/12/2013
Two-Way Stop Control Page I of I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection Durston & Rosa Way
Agency/Co. belin Traffi Jurisdiction
Date Performed 1811212013 Analysis Year With Development
Analysis Time Period IPM Peak Hour
Project Description Boulder/Westbrook
East/West Street: Durston Road North/South Street: Rosa Way
Intersection Orientation: Fast-West IStUdy Period (firs): 0,25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume veh/h 7 298 448 43
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 7 298 0 0 448 43
veh/h
Percent Heavy Vehicles 0 1 0 — --
Median Type Uf7divided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LT TR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume vehlh 31 6
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 0 0 0 31 0 6
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay,Queue Length, and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
(veh/h) 7 37
C (m) (veh/h) 1083 389
Ic 0.01 0.10
95%queue length 0.02 0.31
Control Delay(slveh) 8.3 15.2
LOS A C
Approach Delay (s/veh) - - 15.2
Approach LOS - - C
Copyright 0 2010 University of Florida,All Rights Reserved HCS+TtA Version 5.6 Generated. 11112/2013 9:18 AM
file:///C:/Users/Bob%2OAbeliii/AppData/Local/Temp/u2l(A279.tmp 1 1/12/2013
Two-Way Slop Control I'agc 1 01 1
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection Durston & Cottonwood
Agency/Co. belin Traffic Airiscliction
Date Performed 1811212013 Analysis Year With Development
Analysis Time Period M Peak Hour
Project Description Boulder/Westbrook
East/West Street: Durston Road North/South Street: Cottonwood Road
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume veh/h 4 358 131 104 115 17
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 4 358 131 104 115 17
veh/h
Percent Heavy Vehicles 0 1 0 —
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration I.TR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 8 17 56 52 40 8
Peak-Hour Factor, PHF 1.00 1.00 1.00 100 1.00 1.00
Hourly Flow Rate, HFR 8 17 56 52 40 8
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length,and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
v(veh/h) 4 104 81 100
C (rn) (veh/h) 1466 1085 457 273
lc 0.00 0.10 0.18 1 0-37
95%queue length 0.01 0.32 0.64 1.61
Control Delay(s/veh) 7.5 8.7 14.6 25.6
LOS A I A B D
Approach Delay(s/veh) -- 14.6 25.6
Approach LOS -- 8 D
Copyright 0 2010 University of Florida,All Rights Reserved HCSF1M Version 5 6 Generated: 11112/2013 9:15 AM
file:///C:/Users/Bob%2OAbcl in/AppData/Local/Temp/u21c 1938.tmp 1 1/12/2013
rl'wo-Way Stop Control Page 1 of* I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection Durston & Gottonwoad
Agency/Co. belie Traffic Jurisdiction
EJ
Date Performed 1811212013 Analysis Year With Development
Analysis Time Period IPM Peak Hour
Project Description Boulder/Westbrook
East/West Street: Durston Road North/South Street: Cottonwood Road
Intersection Orientation: East-West IStudy Period hrs : 0.25
Vehicle VOILImeS and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume veh/h 8 230 59 128 350 69
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 100 1.00
Hourly Flow Rate, HFR 8 230 59 128 350 69
veh/h
Percent Heavy Vehicles 0 - -- 0 -
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
U stream Signal 0 0
Minor Street Northbound Sauthbound
Movement 7 8 9 10 11 12
L T R L T R
olurne veh/11 185 65 92 50 26 1
Peak-Hour Factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 185 65 92 50 26 1
veh/t1
Percent Heavy Vehicles 0 0 0 0 0 U
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay,Queue Length, and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LTR LTR LTR LTR
(veh/h) 8 128 342 77
C (m) (veh/h) 1151 1284 260 162
v/c 0.01 0.10 1.32 0.48
95%queue length 0.02 0.33 17.56 2.24
Control Delay(s/veh) 8.1 8.1 204.8 45.9
LOS A A F E
Approach Delay(s/veh) - 204.8 45.9
Approach LOS — - F E
Copyright Q 2010 University of Florida,All Rights Reserved HCS+TM Version 5.6 Generated: 11/12/2013 9:15 AM
file:///C:/Users/Bob`/o2OAbcliii/AppData/Local/'I'cmp/Li2k6A37.tmp 1 1/12/2013
Two-Way Stop Control 11age 1 of I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection Durston & Flanders
Agency/Co. 14belin Traffi Jurisdiction
Date Performed 1811212013 Analysis Year With Develo meat
Analysis Time Period M Peak Hour
Project Description Bouldor/Westbrook
East/West Street: Durston Road North/South Street: Flanders Mill
Intersection Orientation: East-West IStUdy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
olume veh/h 39 458 162 16
Peak-Hour Factor, PHF 1.00 1.00 1.00 1 00 1 00 1.00
Hourly Flow Rate, HFR 39 458 0 0 162 16
veh/h
Percent Heavy Vehicles 0 - - 0
Median-r e Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T TR
1 stream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
L I' R L T R
olume vehlh 36 74
Peak-Flour Factor, PFIF 1.00 1.00 1-00 1.00 1.00 1.00
Hourly Flow Rate, FIFR 0 0 0 36 0 74
veh/h
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade(%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration I LR
Delay,Queue Length, and Level of Service
Approach Eastbound Westbound Northbound SOuthbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
v (veh/h) 39 110
C (m) (veh/h) 1410 627
Vic 0.03 0,18
95%queue length 0.09 0.63
Control Delay(s/veh) 7.6 12.0
LOS A 8
Approach Delay(s/veh) 12.0
pproach LOS 8
Copyright©2010 University of Florida,All Rights Reserved HCS+7M Version 5.6 Generated: 11/1212013 9:16 AM
File:///C:/Users/Bob%2OAbeiiii/Appl)ata/l.,ocal/Temp/Li2l(C88F.tmp 11/12/2013
Two-Way Stop Control Page I of I
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst IRLA Intersection Durston & Flanders
Agency/Go. kbelin Traffic .Jurisdiction
Date Performed 1811212013 Analysis Year With Development
Analysis Time Period M Peak Hour
Project Description Boulder/Westbrook
East/West Street: Durston Road North/South Street: Flanders Mill
Intersection Orientation; Fast-West IStUdy Period hrs : 0.25
Vehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
Volume veh/h 61 366 483 44
Peak-I-lour Factor, PFIF 1.00 1.00 1.00 1.00 1.00 1.00
Hourly Flow Rate, l-IFR 61 366 0 0 483 44
veh/h
Percent Heavy Vehicles 0 1 0 --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T TR
U stream Signal 0 0
Minor Street Northbound SOuthbolmd
Movement 7 8 9 10 11 12
L T R L T R
Volume veh/h 56 76
Peak-Hour Factor, PhIF 1.00 1.00 I.00 1.00 1.00 1.00
Hourly Flow Rate, HFR 0 0 0 56 0 76
vehlh
Percent Heavy Vehicles 0 0 0 0 0 0
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay, Queue Length, and Level of Service
Approach Eastbound Westbound Northbound Southbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
(veh/h) 61 132
C (m) (vehlh) 1050 377
Ic 0,06 0.35
95% queue length 0.18 1.54
Control Delay (s/veh) 8.6 19.6
LOS A C
Approach Delay(s/veh) 19.6
pproach LOS C
Copyright 0 2010 University of Florida,All Rights Reserved IiCS+TM version 5.6 Generated: 11/1212013 9:16 AM
file:///C:/Users/Bob%20Abelin/AppData/Local/'1'einp/u21<3F 18.tmp 1 1/12/2013
All-way Stop Control l'age 1 of I
ALL-WAY STOP CONTROL ANALYSIS
General Information Site Information
Analyst RLA Intersection IColtonwod&Durston
Agency/Co. befin Traffic Jurisdiction
Date Performed 611212013 nal Is Year With Development
Analysis Time Period PM Peak Hour
Project ID BoulderlWestbrook
East/West Street: Durston Road North/South Street: Coflonwood Road l
Volurne Adjustments and Site Characteristics
Approach Eastbound Westbound
Movement L T R L T R
Volume(vehlh) 8 230 59 128 350 69
%Thrus Left Lane
Approach Northbound Southbound
Movement L I R L T R
Volume(vehlh) 185 65 92 50 26 4
/oThrus Left Lane j:_ -1
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration LTR L TR LTR LTR
PHF 1.00 1.00 1.00 1.00 1.00
Flow Rate(veh)h) 297 128 419 342 80
%Heavy Vehicles 0 0 0 0 0
No.Lanes 1 2 1 1
Geometry Group 4a 5 2 2
Duration,l 0.25
Saturation Headway Adjustment Worlcsheet
Prop Left-Turns 0.0 1.0 0.0 0.5 0.6
Prop.Right-Turns 0.2 0.0 0.2 0.3 0.1
Prop.Heavy Vehicle 0.0 0.0 0.0 0.0 0.0
hLT-adj 0.2 0.2 0.5 0.5 0.2 0.2 0.2 0.2
hRT-adj 1 -0.6 1 -0.6 1 -0.7 -0.7 1 -0.6 1 -0.6 1 -0.6 1 -0.6
It HV-adj 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1,7
hadj,computed -0.1 0.5 -0.1 -0.1 0.1
De arture Headway and Service Time
lid,initial value(s) 3.20 3.20 3.20 3.20 3.20
Inlllal 0.26 0.11 0.37 0.30 0.07
hd,final value(s) 6.34 7.04 6.41 6.41 7.38
final value 0.52 0.25 0.75 0.61 0.16
Move-up time,m(s) 2.0 2.3 2.0 2.0
Service Time,is(s) 4.3 4.7 4.1 4.4 5.4
Capacity and Level of Service 1
Eastbound Westbound Northbound Southbound
L1 1_2 1.1 12 L1 1_2 L1 L2
Capacity(vehlh) 534 378 549 531 330
Delay(slveh) 16.10 12.07 25.59 18.86 11.83
LOS C B D C a
Approach:Delay(slveh) 16.10 22.42 16.86 11.83
LOS C C I C B
Intersection Delay(slveh) 19.31
Intersection LOS C
Copyright©2010 University of Florida,All Rights Reserved 1-ICS+TM Version 5.G Generated: 11/1212013 9:18 AM
tile:///C:/Users/Bob%20Abeiiii/AppData/Local/Temp/Li2k997.tmp 11/12/2013
Formatted Report Page l of l
ROUNDABOUT REPORT
General Information Site Information
Analyst RLA Intersection Durston&Cottonwood
Agency or Co. Abelin Traffic ENV Street Name Durston Road
Date Performed 811212013 NLS Street Name
Time Period PM Peak Hour Analysis Year With Development
Peak Hour Factor 1.00 Project ID Boulder/Westbrook
Project Description:
Volume Adjustment and Site Characteristics
EB WB NB SB
L I T I R U L T R U L T R U L T R U
Number of Lanes(N) 0 1 0 0 1 0 0 1 0 0 1 0
Lane Assignment LTR LTR LTR L.TR
Right-Turn Bypass None None None None
Conflicting Lanes 1 1 1 1
Volume(V),veh/h 8 230 59 0 128 350 69 0 185 65 92 0 50 26 4 0
Heavy Veh.Adj.(fHv),% 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Pedestrians Crossing 0 0 0 0
Critical and Follow-Up Headway Adjustment
EB WB NB SB
Left Right I Bypass Left Right Bypass Left Right Bypass Left Right Bypass
Critical Headway(sec) 5.1929 5 1929 5.1929 5.1929 5,1929 5.1929 5.1929 5.1929 5.1929 5.1929 5,1929 5.1929
Follow-Up Headway(sec) 3.1858 3.1858 13.1856 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858 3.1858
Flow Computations
EB WB NB SB
Left Right Bypass Left I Right Bypass Left I Right Bypass Left Right Bypass
Circulating Flow(V,),pc/h 211 266 297 663
Exiting Flow(Vex),pc/h 383 555 146 219
Entry Flow(Ve),pclh 306 563 352 82
Entry Volume veh/h 297 547 342 80
Capacity and v/c Ratios
EB WB NB SB
Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass
Capacity(cpCE),pc/h 916 866 840 571
Capacity(c),veh/h 889 841 815 554
/c Ratio(X) 0.33 0.65 0.42 0.14
Delay and Level of Service
EB WB NB SB
Left Right Bypass Left Right Bypass Left Right Bypass Left Right Bypass
Lane Control Delay(d),s/veh 7.7 15.1 9.7 8.3
Lane LOS A C A A
Lane 95%Queue 1.5 4.9 2.1 0.5
Approach Delay,s/veh 7.7.1 15.11 9.67 6.30
Approach LOS,s/veh A C A A
Intersection Delay,s/veh 11.46
Intersection LOS 8
Copyright 02013 University of Florida,All Rights Reserved HCS 20107M 6.50 Roundabouts Generated: 11/1212013 9:19 AM
file:///C:/Users/Bob`/`20Abel in/nppData/L,ocal/Temp/u2k8F33.tmp 1 l/12/2013