Loading...
HomeMy WebLinkAbout14- Bottcher Access Agreement for sub-slab depressurization January 6 20J4 Jamie & Justine Bottcher 2010 Gilkerson Bozeman, MT 59715 Subject: Access Agreement for Installation, Operation and Maintenance of Sub-slab Depressurization System and Other,Mitigation Measures Dear Mr. & Ms. Bottcher Previously you granted the City of Bozeman and its consultants access to your house to conduct indoor and sub-slab testing as part of an ongoing vapor intrusion study conducted to evaluate the possible migration of constituents, including volatile organic compounds (VOCs), from the Bozeman Landfill into surrounding properties. The results of that testing have been evaluated and the City is now recommending and seeking permission to install a sub-slab depressurization system or other possible measures to mitigate against any vapor intrusion that may be occurring from underground sources. This voluntary agreement has been prepared for the purpose of granting the City, its consultants, and contractors access to your house and property as needed to complete the design and installation of a sub-slab depressurization system or other mitigation measures. Before executing this agreement you are asked to review the terms carefully with your own representatives. If you have any questions during this process please don't hesitate to contact Rick Hixson, City Engineer at 406-582-2280 or Kirk Miller of Tetra Tech at 406-461-0234. Sincerely, Rick Hixson, City Engineer ACCESS AGREEMENT MriMs Jamie Bottcher Mr/Ms Justine Bottcher as Owner(s) of property located at 696 St. Andrews Dr, , (Property) grant the City of Bozeman (City), and its authorized consultants, and contractors access to the Property, including the interior of the house, as reasonable and necessary to design, install, operate and maintain a sub-slab depressurization system (System) consistent with Exhibit A or other mitigation measures which may include, but are not limited to, sealing any cracks and penetrations in the slab or foundation of the home. If 1. Grant of Access. Owner(s) grant the City access reasonably necessary to design, install, monitor, and test the System and other mitigation measures (Permitted Activities). Thereafter the City shall have access to the Property at least twice per year, but not more than four times per year, to monitor and maintain the System, or as needed to repair or replace any System components. 2. Term of Agreement. This Agreement shall be in effect for ten (10) years from the date of execution. If the Parties agree it may be extended by any number of successive five (5) year terms. If the Agreement is not extended beyond its fixed term it shall continue year to year thereafter until terminated by either party. 3. Notice. The City shall contact Owner(s) to arrange for access to the Property as provided for here. Owners agree not to tamper with the System or to allow any person not approved by the City to tamper with or work on the System. In the event maintenance or repair is needed Owner(s) agree to notify the City as provided for here or as may be altered in writing: City Contact: Attn: City Engineer 20 East Olive Street PO Box 1230 Bozeman, MT 59771-1230 Owner. Jamie & Justine Bottcher 2010 Gilkerson Bozeman, MT 59715 4. Design. Prior to installation the City shall provide Owner(s) with final design plans and shall obtain Owner(s)' written approval to proceed, The System will be designed and installed to maximize effectiveness with minimal impact to the Property. 5. Insurance and Indemnification. Also prior to installation, City's contractor(s) will be required to provide City with evidence of adequate commercial general liability coverage naming the Owner(s) as additional insured(s) on a primary non-contributory basis. The City shall be responsible for any damage to the Property caused by the installation of the System or other mitigation measures and agrees to fully repair any such damage. & Installation Costs, The City shall ensure that no liens or encumbrances related to the System are placed on the Property and shall be responsible for all costs associated with the design and installation of the System or other mitigation measures. 2 7. System Ownership. The City shall own the System and shall be responsible for the cost of monitoring, operating and maintaining the System until otherwise agreed by the Parties or until this Agreement is terminated as provided herein, 8. Electrical Costs. Upon System installation the City shall pay Owner(s) a lump sum to cover projected cost of operating the System for the term of this Agreement based on the present value of the costs of operating the System for 10 years as shown in Exhibit B and should this Agreement be extended beyond the fixed term the City shall pay the Owner(s) an additional lump sum payment for the costs of operating the System for the term of any such extension until this Agreement is terminated. 9. Termination. At any time 60-days prior to the end of any Agreement term then in effect either party may, upon 60-days written notice to the other, terminate this Agreement. Upon termination, unless otherwise agreed to by the parties, the City of Bozeman agrees that it will, at the request of the Owner either convey the entire system to the owner or disconnect electrical service to the System and remove any components of the System requested by the Owner, and repair any damage to the Property that might have been caused in connection with any of the Permitted Activities, and to the extent reasonably possible return the Property to the condition it was in before Permitted Activities were conducted. 10. Binding on Successors. This Agreement is binding on the Parties and any person succeeding to the Parties' respective interests including agents, tenants, heirs, and assigns. Owner agrees to disclose this Agreement to any person or entity holding or accepting any interest in the Property. If the Property is rented, Owner(s) shall provide City with a copy of Exhibit C, "Tenant Acknowledgment" executed by any existing or future tenants, 11, No Admissions. Nothing in this Agreement may be construed as an admission of liability or as a waiver or release of any claim or defense that either Party may have related to vapor intrusion at the Property or otherwise. 1 /Le q I Date: Owner- Printed Name —no X76�- e Sign ur 7 1,� ��, ,/ k(lam. t L-, j 1 2:> Date, Owner-Printed Name :. V-5 v A S i g n aiit re Date: I e: i yyo�fBozeman Chris A. Kukulski, City Manager 3 ACCESS AGREEMENT mrimsJarnie Bottcher Mr/Ms Justine Bottcher as Owner(s) of property located at 696 St. Andrews Dr. , (Property) grant the City of Bozeman (City), and its authorized consultants, and contractors access to the Property, including the interior of the house, as reasonable and necessary to design, install, operate and maintain a sub-slab depressurization system (System) consistent with Exhibit A or other mitigation measures which may include, but are not limited to, sealing any cracks and penetrations in the slab or foundation of the home, 1. Grant of Access. Owner(s) grant the City access reasonably necessary to design, install, monitor, and test the System and other mitigation measures (Permitted Activities). Thereafter the City shall have access to the Property at least twice per year, but not more than four times per year, to monitor and maintain the System, or as needed to repair or replace any System components, 2. Term of Agreement. This Agreement shall be in effect for ten (10) years from the date of execution. If the Parties agree it may be extended by any number of successive five (5) year terms. If the Agreement is not extended beyond its fixed term it shall continue year to year thereafter until terminated by either party. 3. Notice. The City shall contact Owner(s) to arrange for access to the Property as provided for here. Owners agree not to tamper with the System or to allow any person not approved by the City to tamper with or work on the System. In the event maintenance or repair is needed Owner(s) agree to notify the City as provided for here or as may be altered in writing-. City Contact: Attn: City Engineer 20 East Olive Street PO Box 1230 Bozeman, IVIT 59771-1230 Owner: Jamie & Justine Bottcher 2010 Gilkerson Bozeman, IVIT 59715 4. Design. Prior to installation the City shall provide Owner(s) with final design plans and shall obtain Owner(s)' written approval to proceed. The System will be designed and installed to maximize effectiveness with minimal impact to the Property. 5. Insurance and Indemnification. Also prior to installation, City's contractor(s) will be required to provide City with evidence of adequate commercial general liability coverage naming the Owner(s) as additional insured(s) on a primary non-contributory basis. The City shall be responsible for any damage to the Property caused by the installation of the System or other mitigation measures and agrees to fully repair any such damage. 6. Installation Costs, The City shall ensure that no liens or encumbrances related to the System are placed on the Property and shall be responsible for all costs associated with the design and installation of the System or other mitigation measures, 2 7. System Ownership, The City shall own the System and shall be responsible for the cost of monitoring, operating and maintaining the System until otherwise agreed by the Parties or until this Agreement is terminated as provided herein. 8. Electrical Costs. Upon System installation the City shall pay Owner(s) a lump sum to cover projected cost of operating the System for the term of this Agreement based on the present value of the costs of operating the System for 10 years as shown in Exhibit B and should this Agreement be extended beyond the fixed term the City shall pay the Owner(s) an additional lump sum payment for the costs of operating the System for the term of any such extension until this Agreement is terminated. 9. Termination. At any time 60-days prior to the end of any Agreement term then in effect either party may, upon 60-days written notice to the other, terminate this Agreement. Upon termination, unless otherwise agreed to by the parties, the City of Bozeman agrees that it will, at the request of the Owner either convey the entire system to the owner or disconnect electrical service to the System and remove any components of the System requested by the Owner, and repair any damage to the Property that might have been caused in connection with any of the Permitted Activities, and to the extent reasonably possible return the Property to the condition it was in before Permitted Activities were conducted. 10. Binding on Successors. This Agreement is binding on the Parties and any person succeeding to the Parties' respective interests including agents, tenants, heirs, and assigns. Owner agrees to disclose this Agreement to any person or entity holding or accepting any interest in the Property. If the Property is rented, Owner(s) shall provide City with a copy of Exhibit C, "Tenant Acknowledgment" executed by any existing or future tenants. 11. No Admissions, Nothing in this Agreement maybe construed as an admission of liability or as a waiver or release of any claim or defense that either Party may have related to vapor intrusion at the Property or otherwise. Dat 2�2!4�Lxl—e e:– "Owner- Printed Name I/o Sign tdre Date: Owner- Printed Name ,V 3 Signature Date: City of Bozeman Chris A. Kukulski, City Manager 3 Exhibit C TENANT ACKNOWLEDGEMENT (Tenant's Name), agree to cooperate with and allow the City of Bozeman (City), its consultants and contractors to enter the property and dwelling I 14 lease from ............ 16 0 M:;YA� Owner(s)/Landiord, located 4N, at (address) in Bozeman MT to design, install, monitor, operate, and maintain a sub-slab depressurization system and other measures for the purpose mitigating subsurface vapor intrusion, I have been provided with a copy, of the Access Agreement entered in to between Owner and City for the same purpose and agree to comply with all applicable terms. re-i Gate:_I(/z,,(; X" Sc Owner- Printed Name ILI' SigriatVe V R NOTES 1. EXTRACTION POINT INSTALLED IN UTILITY ROOM. PIPE RUNS UP THROUGH FLOOR AND INTO COAT CLOSET ON MAIN FLOOR AND THEN THROUGH AND INTO ATTIC. HP 220 FAN INSTALLED AND THEN PIPE WAS RUN UP THROUGH ROOF. m. STORAGE/ SHOP 0 U) :D LIVING ROOM LAUNDRY CLOSET NY yY i BATH i BEDROOM CLOSET 2 _E BEDROOM BATH HOMEOWNER REVISED EXHIBIT-A ACKNOWLEDGEMENT INITIALS A rm In tg7ETRA7ECH Ta.d,,WN­Ata,�,d Ni�dompdu,,d%4t�,Athbpddrwddm,2wtofTETRA7ECIIIM =TEC TETRA TECH d�mt"pm, t M­d­A mv~­, Wffl�,1, m,�,O TETM TE.-k-1111=1 January 16,2014 VAPOR MONITORING BOTTCHER/LEEP RESIDENCE POINT LOCATED SUB-SLAB DEPRESSURIZATION SYSTEM EXTRACTION, PIPING 0 EXTRACTION POINT LOCATED AND VAPOR MONITORING POINTS EXHIBIT A a W a VJ a9 9 (D STORAGE/ SHOP Q a a C O LIVING ROOM 8 LALINDRY CLOSET R s BATH BEDROOM CLOSET BEDROOM BATH E O by TETRATECH."ntslonntnnH"y in the aAp4neNVt pmO MTETRATCH TECH. ademn�gcerutU be ai4rnd.raNaaf arrepndvwdwimau�th®peer xmmaauvneancd w ETATEC glpinal rlp rH IrwC � by TETRA "re+brd mps"tar puryaaes MtM'.p�act TETMTECH aoea ewt�pmn ct orwmnntahwa dawmarrta.ir�ananl7an er maamvwrien!a made vrethnw TETRA TECH.+.rvau++ap"o. DeCr @PPIbflP 19,2013 K VAPOR MONITORING BOTTCHER/LEEP RESIDENCE d' POINT LOCATED SUB-SLAB DEPRESSURIZATION SYSTEM EXTRACTION: PIPING 0 EXTRACTION POINT LOCATED AND VAPOR MONITORING POINTS EXHIBIT A (D U)(D t: o Z (D rn C: E cl) 0 M W U) C) CD 0 N " CL .5L"o m M a) a) to 0 75 .2 0 cu Q) 000 c cf) cq U) CD w M M CO r LO M r M r M V) GNU o T r co 0) r, cn ice; c N 0 1te CD ci c6 to c6 � © 6 6 -,-: QD a* co m m a CN m -gr in w Q 64 64 Qq-6-t Mu uj E W CL m 0 L) Mu m C3 4 E E a. LU uj Electricity cast for user submitted device Page 1 of 1 Home ft Ilnstal6 an Attic Fan I Jeep Pipes From Freezing I LED Light Bulb Savings Comparison I Electrical Products I About Us Commonly Used Devices 60'Watt Incandescent Light Bulb Computer System Drip Coffee Maker(warm) Oven at 350 degrees 100 Watt Incandescent Light Bulb Computer System(sleep mode) Electric Blanket Space Heater(portable) Compact Fluorescent Lamp Drip Coffee Maker(breve) Furnace Fan LCD HD TV-47 Inch Clothes Cwye r Oxygen Concentrator at 3.0 LPM Microwave Oven(Highest Setting) LCD Monitor-22 Inch. Device Marne: Depressurization Fan _ cost Per Hour: $0.00_.._..6859 Wattage of Device: 150 Cost Per Day: $0,236624 Kilowatt dour Cost: .065721 _ — ,Cost Per week: $1.656 Hours of use per day: 24 . cost Per month: $6.63 Calculate Cost cost Per "ear: $86.13 ........ .._...____.. _._._._ _.....__.. Copyright 2008-2093,Spectrum Research, Inc. http://www.electricity-usage.corn/Electricity-Usage-Calculator.aspx?Devic e=Depressurizati... 91612013 Electric Monthly Default Supply Rates Page I of I New Rate rifilocti've RIMP Silinkani 1,20113 8leottle Residential Electric Ughting Effective Date PricelkWh Change Effective Date PricplKVVh Chame October 01,20I 2 $0051193 $(0000019) Octal 20N2 S 0057438 $(0'000017) November 01,2012 $0 0616 33 $0000440 November 01 2012 S 0 057836 $0000398 Opcembor0l 2012 $0 062433 $0000800 December 01,,2,012 $0 058651 S 0 000825 January 01.2013 sl2 a5n56 $(0000077) JOndary 01,20113 $0 058579 S(0 0110082) February 01 2013 $lj 051857 $(0 000499) February 01 2013 R 0 058133 S(O 000446) March 01 2013 $0 062533 $0000676 March 01,2013 $0058744 $00100611 April 01 2013 $0 057481 $(0 C00052; April 01,2013 $0058697 $(0 000047) May all 2013 $0062388 $(0 000093) May 01,2013 il,C 058813 $(0 000084) June 111,2013 so l S 0 001261 June 0 1,2013 $0059868 S 0 001255 July 01,2013 $0065463 $0001804 July 01,2013 $0 061594 $0 0011726 August 01,2013 SO 065099 S(0:'000354) August 01,2013 $0061274 $(0000320) September 01 2013 S0065729 $0000630 Sciaternbarrol 2013 $Q08,8? 5 0 000508 General Service 1 Secondary Non Demand General Service I Secondary Demand Effective Date PricelkWh Change Lgrecl Data PrlcoJKWh Change October 01,2012 .5O 051438 S(OO00017) November 01,2012 $001,1622 $0000440 NcyennloerOl 2,012 $0 057836 $0000398 December 01,2012 $0062,434 SOCOO802 December 01,2012 SO 058681 $'0 000825 January 01 2013 $0;62357 $(O 000077) January 01,2013 $0058579 $(0000082) February 01,2013 $0061858 S(0 00040) February 01 2013 90056133 S(0 000446) March 01,20:13 $0 061858 S C 0000001 March 01,2013 S0058744 $000061-1 March 01,20,13 50062534 $01 000676 April 0'l,2013 $0056697 S(0 00004?], April 01.2013 $0062462 S(0000062) May 01,2013 $0 058613 15(0 000064) May 01.2013 S0062389 S(0000093) Juno 011 1013 $0 053858 5 0001255 June 01,2013 S 0 063650 S 0 00126°l Jul?01 2013 10 061594 5 0001726 July 01 2013 $0066464 $0001804 AwDUSt[01 2013 $0061274 $(0 OG0320) August 01,2013 $006-9100 S(O 000354) Sairlarnber 01 2013$0 061782 S0000508 SLplemlbar 01,2013 S 0 065730 S 0 000830 General Service 1 Primary Non Demand General Service I Primary Demand Effective Date PrIcWkWh Change Effective Date Pricellr(Wh Change October 0'i.2012 $0 059514 b(n 0000118) October 01.2012 S 0 0551 89 S(0 000017). Ncvernher01 2017 $0 059942 $0000423 Noverritter 01,2012 $0056580 5 0 000391 December 0 1,2012 $00607,72 5 0 000780 Demirribm 01,2012 $0 0573144 5 o aoulio 1 January 01,7013 $0060646 S(0 000078) Janunry 01 2013 $0 057301 S(o Congo) February 01 2013 $o 060'160 S(O 0004860 February 01,2013 $0 056863 $40 0001438) March 0 1,20T3 $0060817 S 0 000657 March 01.2013 $0 067463 $0000800 April 01,2013 SD 060'751 $(0000050) Apni01 2013 S0057417 $(0 000046) May 01,20'13 $0060677 S(O Ol May 01 2013 $0057395 S(O ccoov) June Cl,2013 $o 061903 $0001226 Juno 01,2013 $0 OW155 $o 001220 July 01,20113 so l S 0 0011755 July 01,2010, $0 060240 $0 O0'1685 ,august O'1,2013 SO 0633'14 S(0 X000344) Aul 01,2013 $0059925 S(O ow'3151 Supiturill 01,20113 SO 063927 $0000613 SepterrberOl 2013 $0060430 $0000505 "gation Non Demand Irrigation Demand 6tteefive Date PricelkWh Change Efrective Date PricelikWh Change October 01,2012 S0057438 &(0 000017) October 01 2012 $0057438 S(;0 0000'97], Noverriber0i 2012 $0 05'7'636 110 00039B Norernber 01,'2012 $0057836 S 0 OU396 December 01,2012 $0 0581361 $0000825 1)acentlopr 01.2012 $0 059661 $0000826 January 01,2013 SC 058579 S(0000082) January 01 2013 $0 0585 7'9 $(0 000082) February 011 2013 $0 0581 33 S(0000446) February 01.2013 $0 068133 $(o 000446], March 01.7'0'13 S0058-144 $00006111 MalchOl 201.5 $0058744 $0 000601 April 01,2013 S0058697 $10000047) April 01,2013 $0058697 5(O 000041) May 01 2013 $0058813 $(0 000084) May 0 1,201:5 $10 056613 $lo 000084) Jurie 01.2013 S0059868 $0001255 June 01,2013 $0 059868 $0 001255 July 01 2013 'SO 081594 $0001726 July 01,2013 $00611594 $0 001726 AugustOl 2013 $0051274 $(0000320) AUgll 0 1.2013 $006'u214 $(0000320) September 01L 2013$0061782 S 0 000508 Septernbar 01.2013 $0 061702 60000508 GS-2 Substation GS-2 7ransmissi on Effective Date PrIcill Chan2c Effective Date Pricaft(Wh Change October 01,21712 $0059003 $(0000018) October 01,2012 $0058,647 $(i7 000018) November 01 2012 $0059428 $0000425 Noverribtx 01,2012 S 0 050069 S 0 000422 Decerriber01 2012 $00602,01 $0000773 December 0 1,2012 8.0 059838 'S 0 000769 ,January 01.2013 $0060125 :x(0000076') January 01 2013 $005976,3 S(O 000075) Februaly01 M13 SO l 'S(000048'1) February 01.2013 S'0059284 S(O OOD4 791 March ol ✓013 $0060296 S 0 000652 Mardi 01,2013 $005993.2 $0000548 AprIO1 2013 $0060246 $(0 0000501 ApM 01,2013 S0059862 S(O Oaamo) May 01,2013 $0060158 $(0 0000190) May 01,2013 S 0 05W93 S(O 000089) June 101 2'013 $0061372 S0001216 June,01,2013, 3 0061001 $0001206 July 01,2013 $0063112 $0001740 July 01,2013 S 0 062732 $0001731 August 01,2013 S0062770 $(0000342) August Ol,2013 S 0 il $(O 0100339) Septemoer 01,2013$O 063377 S 0000607 Seplember 01 2013 '1 0 0629517 $C 000604 Eloctirtc supply fates ctrange wonlhly based m current projented 12 mcnth market pnre5 The ruwoue,5 xllmloj compared to actuaW costr,Incuned by NIAE are tined up On ari arliludt balli NVIF,puvvha.'ip1 WhOW010 n.1.,r0cily fioll producers and pwxs the cost dsrprtiy in custorrenswiftut markup http://custom.northwestemenergy.com/forrns/elecmonthly.asp 9/6/2013 USA Energy Inflation Forecast Page I of 6 About U8 RT 101 Forecasts,charts and analysis... FORECAST(HA Interest]late Forecast Stock Market Forecast Real Estate Forecast Exchange Rate Forecast Economic Forecast USA Energy Inflation Forecast USA Energy Inflation Rate Forecast Target Month Forecast L'D—TFA Forecast for the USA Energy Inflation Rate for the year August 2014 15,71% 12.800A ending in the target month indicated based on the Consumer Price Index for All Urban Consumers: Updated Monday,August 26,2013 Energy,not seasonally adjusted. Inflation Rate for All Urban Consumers:Energy-6 Year History 30% 20% 0% -10% -20% -30% 1108 1/2009 112010 112011 1/2012 1/2013 112014 1115 Annual US Inflation Rate for Energy is plotted monthly In gray(Consumer Price Index forAJI Urban Consumers:Energy),The forecast for the target month is shown in green.ether links related to this economic indicator are below. inflation Rate,Forecast:Energy 10 Year Chart-CPI-r=nnrqy US Inflation Rate Forecast inflation,Food'., Housing,Medlcal etc. Current Analysis&Forecast,US Energy Inflation Rate Commentary 6092 a ENERGY INFLATION RATE July,2013 Data: The forecast for the US Energy Inflation Rate is in the table at the top of this page.Forecast-Chart.com is forecasting that Energy Inflation Rates will be roughly 15.71%over the next year.The table shows a HDTFA of 12.80%which suggests that the Inflation rate for energy prices in the US for the 12 months ending August,2014 could easily fall between 28.51%and 2,91%.Links to Forecasts for many other economic indicators may be found at the top of this page.The energy price index used in this article is the Consumer Price Index for All Urban Consumers:Energy,hereinafter referred as the energy price index. Annual US Energy Inflation Rate Last Month -2.6% Last Year................ ...4.7% Last 5 Years 2.4% Last 10 Years.... 72% Last 20 Years 4,9% Annual Energy Inflation Rate:Highs&Lows High(Last 12 Months) 4.7% (July,2013) Low(Last 12 Months) -8.9% (August,2012) High(Since January,1958) 47,1% (April,1980) Low(Since January,1958) -28.1% (August,2009) The annual Energy Inflation Rate for the 12 months ended in July,2013 was 4.75%.That's 1.57%percent higher than the 12 months ended In June,2013 which inflated at a rate of 3.1 SW It is 10.34%percent higher than the 12 months ended in July,2012 which inflated at a rate of-5,590/x. The rise in inflation rates from June to July indicates that the short term Inflation trend in energy prices has been up.If that trend continues,we should see an inflation rate for the 12 months ended in August,2013 that is dose to 6.32% The USA Energy Inflation Rate one year ago was-5.59%.Over the last year, http://forecast-chart.com/inflation-usa-energy.html 9/6/2013 USA Energy Inflation Forecast Page 2 of 6 mnauon in vie energy price inaex was 4.tow. i no average race over me 1a*T I U years was 7.20%, Lower inflation over the last 12 months compared to the average inflation over the last 10 years serves as an indicator that the long term trend in the Energy Inflation Rate is down.Inflation expectations should be adjusted accordingly. Forecast-Chart com's historical research covers Energy Inflation Rate data back W January,1958.The average annual inflation rate in energy prices during that period of history was 4.92%.The highest rate was 47,13%.The lowest rate was-28.09%. The high was attained in the 12 months ended in April of 1980.The low was achieved in the 12 months ended in August of 2009. Recent rates experienced in the 12 months ended in July of 201 3 are similar to the historical 4.92%average. This page provides a five year chart and a forecast for the US Energy Inflation Rate.For links to longer term charts,look at the links under the five year chart (above).One link opens a ten year chart.Another opens cur longest term graph on the Energy Inflation Rate.Just one glance at Forecast-Chart.com's long term charts can provide tremendous insight into the historical trends of the financial markets. The US Governments Inflation economics policy attempts to control inflation. High inflation and negative inflation(deflation)can have damaging effects an the economy. Commentary 6092 e ENERGY INFLATION RATE June,2013 Data: The forecast for the US Energy Inflation Rate is in the table at the top of this page.Forecast-Chart.com is forecasting that Energy Inflation Rates will be roughly 15,48%over the next year.The table shows a HDTFA of 12.87%which suggests that the inflation rate for energy prices in the US for the 12 months ending July,2014 could easily fall between 28.34%and 2.61%.Links to Forecasts for many other economic indicators may be found at the top of this page.The energy price index used in this article is the Consumer Price Index for All Urban Consumers:Energy,hereinafter referred as the energy price Index. Annual US Energy Inflation Rate Last Month 19,9% Last Year....................3.2% Last 5 Years 2.7% Last 10 Years.... ... ...7.2% Last 20 Years 4.9% http://forecast-chart.com/inflation-usa-energy.html 9/6/2013 Exhibit C TENANT ACKNOWLEDGEMENT r ,` (Tenant's Name), agree to cooperate with and allow the City of Bozeman (City), its consultants and contractors to enter the property and dwelling I pease from Owner(s)/Landlord, located at (address) in Bozeman MT to design„ install, monitor, operate, and maintain a sub-slab depressurization system and other measures for the purpose mitigating subsurface vapor intrusion. I have been provided with a copy, of the Access Agreement entered in to between Owner and City for the same purpose and agree to comply with all applicable terms. Owner- Printed Name sigrWufe 4 ACC> CERTIFICATE OF LIABILITY INSURANCE DA7(MMIDDNYYYp 1011$12013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT CADE RASMUSSEN INSURANCE UNLIMITED PHONE zk,406-586-1818 c,N.).406 703 W MENDENI ALL ADDRESS, CADS MTINSURANCEUNLIMITED.COM _.._.. ...._....__...�......... _.. BOZEMAN, MT 59715 __INSURER(S)AFFORDING COVERAGE ___ NAIL? INSURERA.AUSTIN MUTUAL INSURANCE COMPANY ..._..._._..._._... INSURED� .—.-----....--._.._. ___.._... INSURER q DON DICKSON INSURER C: TRIPLE R MITIGATION INSURER D: 6640 SYPES CANYON RD INSURER E: BOZEMAN MT 59715 INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. I R ADDL s Y POLICY TYPE OF INSURANC POLICY NUMBER POLICY IYYY MM �Y LIMITS GENERAL LIABILITY EACH OCCURRENCE $1,000,000.... A BP 1731015 09/12113 091 12/14 DAMAGE To RENTED_..__.. .._ .. x COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence $100,000 CLAIMS-MADE OCCUR MED EXP(Any one Person) $5,000 PERSONAL B AOV INJURY $1,000,000 GENERAL AGGREGATE $2,000,000 GEN'L.AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGG s2,000,000 POLCY PRO- LOC ,ry.+�,r q r+, !.I i fs $ A AUTOMOBILE LIABILITY BA 1924640 09/12/13 09/12/14 COMBINED SINGLE LIMIT $300,I]0� ANY AUTO BODILY INJURY(Per person) ALL OWNED SCHEDULED BODILY INJURY(Per accident) 3 AUTOS 7X NON-OWNED OP cidentrMAGE $ HIREDAUTOS AUTOS _._.__._... 3 UMBRELLA UAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CL4IMSMACE AGGREGATE $ DED I I RETENTION$ 5 WORKERS COMPENSATION 4NC STATU- OTH- AND EMPLOYERS'.LIABILITY YIN FiY-1^! T .�........ ......m_ ANY PROPRIETORIPARTNEROEXECUTIVE NIA E.L_EACH ACCIDENT 5 OFFICEWMEMBER EXCLUDED? tMandatory in NH) E.L..DISEASE-EA..EMPLOYE $ II yes,describe under � DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS f LOCATIONS I VEHICLES (Attach ACORD ID1,Additional Remarks Schedule,if more space is required) CERTIFICATE HOLDER CANCELLATION .JAMIE cot JUST NE BOTTCHER SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 2010 GILKERSON THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN BOZEMAN, M.I.59715 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE CADE RASMUSSEN q 1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD Printed by CCR on October 18,2013 at 08:46AM