HomeMy WebLinkAboutCompletion of City Hall Masnry Repair.pdf AIA
TM
Document G704 - 2000
Certificate of Substantial Completion
PROJECT: PROJECT NUMBER: 13/10 OWNER:❑
(Name and address) CONTRACT FOR:General Construction
City of Bozeman-City Hall Masonry CONTRACT DATE: ARCHITECT:❑
Repair CONTRACTOR:❑
TO OWNER: TO CONTRACTOR: FIELD:❑
(Name and address) (Name and address) OTHER:❑
City of Bozeman R&R Taylor Construction,Inc
P.O. Box 1230 P.O. Box 1234
Bozeman,MT 59771 Bozeman,MT 59771-1234
PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE:
All work according to contract documents, excluding punchlist items dated 11/18/2013,or additional work requested
by owner.
The Work performed under this Contract has been reviewed and found,to the Architect's best knowledge,information and belief,
to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion
is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its
intended use.The date of Substantial Completion of the Project or portion designated above is the date of issuance established by
this Certificate,which is also the date of commencement of applicable warranties required by the Contract Documents,except as
stated below:
Warranty Date of Commencement
1 Year 11/18/2013 I I
Comma-Q Architecture, Inc. L 2-117 rs
ARCHITECT BY DATg OF ISSUANCE
A list of items to be completed or corrected is attached hereto.The failure to include any items on such list does not alter the
responsibility of the Contractor to complete all Work in accordance with the Contract Documents.Llnless otherwise agreed to in
writing,the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of
Payment or the date of final payment.
Cost estimate of Work that is incomplete or defective:$1,000.00
The Contractor will complete or correct the Work on the list of items attached hereto within Zero(0)days from the above date of
Substantial Completion.
R&R Taylor Construction,Inc / //
CONTRACTOR ' DATE
The Owner accepts the Work or designated portion as substantially complete and will assume full possession at 8:00 am(time)on
11/18/2013(date).
City of Bozeman 2 6 O
OWNER BY DATE
The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work and insurance shall
be as follows:
(Note: Owner's and Contractor's legal and insurance counsel should determine and revieli,insurance requirements and coverage.)
None designated
AIA Document G704TM—2000.Copyright 9 1963.1978.102 and 2000 by The American Institute of Architects.All rights reserved.WARNING:This AIA®
Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIAt''Document,or any
portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was
produced by AA software at 14:48:21 on 12/04/2013 under Order No.9138946765_1 which expires on 05/17/2014,and is not for resale.
User Notes: (1397049166)