Loading...
HomeMy WebLinkAbout2013 Water Renovations Certificate of Completion Certificate of Substantial Completion Project: 013 Water Renovation Owner: City of Bozeman Owner's Contract No.:NA Contract: same Engineer's Project No.: N/A This [tentative} defmi ' Certificate of Substantial Completion applies to: TI All Work under the Contract Documents: 0 The following specified portions of the Work: 9/26/13 Date of Substantial Completion The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor, and Engineer, and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof designated above is hereby declared and is also the date of commencement of applicable warranties required by the Contract Documents,except as stated below. A [fie] definitive list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. The responsibilities between Owner and Contractor for security,operation,safety,maintenance, heat,utilities,insurance and warranties shall be as provided in the Contract Documents except as amended as follows: ❑Amended Responsibilities 25 Not Amended Owner's Amended Responsibilities: Contractor's Amended Responsibilities: FJCDC C-625 Cerditcate of Substantial Completion Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1 of 2 The following documents are attached to and made part of this Certificate: Punch list This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of Contractor's obligation to complete the Work in accordance with the Contract Documents. Executed by Engineer Date Accep d yb Contractor Date z I l Accepted by Q4Nner Date RJCDC C-625 Certificate of Substantial completion Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Late. Page 2 of 2