Loading...
HomeMy WebLinkAboutRecomendation Letter from Comma Q June 4, 20131 � I �CIIIIIII1 Comma-Q Mr. James Goehrung Architecture, Inc. City of Bozeman 101)N Bosse Avenue,a,, P.O. Box 1230 Bozeman,MT 5971 Bozeman, MT 59771 4M585 1112 Dear James, Today, June 4, 2013, City Clerk Stacy Ulmen, received construction Bid Proposals for the City Hall Masonry Repair project. The Proposals were submitted per the Contract Documents(dated May 20, 2013)as prepared by Comma-Q Architecture, Inc. Stacy received three(3) proposals for this work. See the attached Bid Tabulation Sheet. Proposal One was received from Western Heritage Masonry, of Clyde Park, MT with acknowledgment of Addendum 1,without a bid security, in the Base Bid amount of Forty five thousand, seven hundred and three dollars($45,703.00). Proposal Two was received from Anderson Masonry,of Bigfork, MT with acknowledgment of Addendum 1,with a bid security, in the Base Bid amount of Seventy thousand,fifty one dollars ($70,051.00). Proposal Three was received from R&R Taylor Construction, of Bozeman, MT with acknowledgment of Addendum 1,with a bid security, in the Base Bid amount of Fifty thousand four hundred dollars ($50,400.00). With the non-inclusion of a bid bond security in Proposal One,we are required to reject this proposal from Western Heritage Masonry. We have discussed this with the bidder and they understand the reasons behind the required rejection of their bid. This results in the next apparent low bid being received from R&R Taylor Construction. Comma-Q Architecture, Inc. has reviewed the Proposal and Contract Documents for the Construction Contract and has found all documents to be in order. We have also discussed the scope of work with the Bidders, based on this review and discussion, recommend award of the Base Contract to R&R Taylor Construction in the amount of$50,400.00. Respectfully Submitted, Ben Lloyd (Architect/President Attachments: Bid Tabulation Sheet Copy: Tripp Lewton Kim Everts File