Loading...
HomeMy WebLinkAboutApprove Resolution 4516, Change order 7 for Hyalite-Sourdough Water Treatment Plant Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Bob Murray, Project Engineer Rick Hixson, City Engineer SUBJECT: Hyalite/Sourdough Water Treatment Plant Replacement Project – Change Order No. 7. MEETING DATE: March 17, 2014 AGENDA ITEM TYPE: Consent RECOMMENDATION: Authorize the City Manager’s signature on the Hyalite/Sourdough Water Treatment Plant Replacement Project – Change Order No. 7. BACKGROUND: Attached is a copy of change order number 7 for the above referenced project. This change order includes ten items. Two are credits and eight are additions. Pages two and three of the change order entitled “Change Order No. 7 Summary” provide a short description of each of the items involved with this change. The remainder of the document contains the detailed backup cost information for each item. Overall this change will increase the contract price by $44,774.00.00 and the contract time by 38 days. The final recommended change in cost and time for these items is reasonable and commensurate with the work involved. UNRESOLVED ISSUES: None ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: Overall this change order increases the contract amount by $44,774.00 from $27,040,073.00 to $27,084,847.00. This will decrease the contingency on the project from $1,512,892.00 to $1,468,118.00. The contingency is included in the overall budget for the project but not in the construction contract which is why the change order must be processed. Attachments: Change Order No 7, Resolution No 4516 Report compiled on: 3/5/14 117 1 of 2 COMMISSION RESOLUTION NO. 4516 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH APOLLO, INC., KENNEWICK, WASHINGTON. WHEREAS, the City Commission did, on the 25th day of May 2011, authorize award of the bid for the City of Bozeman Hyalite/Sourdough Water Treatment Plant Replacement project, to Apollo, Inc., Kennewick, Washington; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Apollo, Inc., as contained in Change Order No. 7, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. 118 Resolution No. 4516, Change Order 7 for WTP Replacement 2 of 2 PASSED AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 17th day of March, 2014. __________________________________________ JEFFREY K. KRAUSS Mayor ATTEST: ________________________________________ STACY ULMEN, CMC City Clerk APPROVED AS TO FORM: _____________________________________________ GREG SULLIVAN City Attorney 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162