HomeMy WebLinkAboutWALTON HOMESTEAD CONDITIONS OF APPROVAL FOR A CONDITIONAL USE PERMIT
WALTON HOMESTEAD FINAL PUD, #Z-04015 PAGE 1 OF 3
CCONDITIONS OF APPROVAL OF A CONDITIONAL USE PERMIT FOR
WALTON HOMESTEAD PLANNED UNIT DEVELOPMENT
WHEREAS, the undersigned property owner acknowledges the receipt of a Planned Unit
Development Conditional Use Permit from the City of Bozeman to allow a mixed-use development on
property located in between Oak Street and Durston Avenue, west of the Gallatin County Rest Home;
and
WHEREAS, the subject property is legally described Tracts 1 – 4 of Certificate of Survey No.
2085 and that parcel described in Book 144, Page 373, located in the SW ¼ of Section 1, T2S, R5E,
PMM, City of Bozeman, Gallatin County, Montana; and
WHEREAS, the Conditional Use Permit is subject to the following twenty-three (23)
conditions and code provisions:
1. The pocket parks shall be better connected to one another by trails and sidewalks
with appropriate public access easements clearly depicted on the final site plan.
2. The open spaces along Durston Road shall be well-defined entrances with extensive
landscaping features, public outdoor furniture such as benches, and appropriate
lighting and noted accordingly in the developmental guidelines.
3. The final site plan shall include an open space exhibit that clearly depicts all land
and square footages used to meet the open space requirements as defined by Section
18.54.100.1.12.
4. The final site plan shall include a detailed “Parks and Open Space Plan” that
includes, but is not limited to, the following:
a. Detailed landscape guidelines for the public park, each of the pocket parks, the
trail corridor, and the open space
b. Landscaping details, lighting details, and any picnic and/or playground facilities
c. Detailed cross-sections of how the detention areas work with the landscaping
and parks or open spaces.
5. The applicant shall include concrete pedestrian pavers where pedestrian pathways
cross both public and private streets as part of the final site plan.
6. All sidewalks shall be clearly depicted on the final site plan.
7. The final site plan shall include a well-defined pedestrian and potential future access
connection point to the mobile home park to the west.
8. Prior to construction, the North 15th Avenue proposed bicycle lane infrastructure
striping and signage shall be subject to review and approval by the Bozeman Area
Bicycle Advisory Board (BABAB).
9. The applicant shall supply, in detail, sketches and drawings for architectural
guidelines contained within the covenants. The revised covenants shall be provided
to the Planning Department for review and approval prior to final site plan
approval. The covenants shall include, but not be limited to, the following:
a. The architectural guidelines shall include a common signage plan for said
project depicting a general signage theme including approximate locations,
styles, sizes, materials, colors, and method(s) of illumination. The common
signage plan shall include any proposed subdivision signs (identification signs)
which must obtain sign permit approval through the Planning Department and
are also subject to code provisions under Section 18.65.
b. The guidelines shall include typical lighting details and specifications outlining
the general lighting requirements including the style of light, the height, the type
and wattage of the bulb and a polar distribution chart for the parking lots,
pedestrian nodes, and parks.
c. The applicant shall install the minimum allowable lighting levels under code
requirements.
d. The guidelines shall include language that all roof-top and/or ground-mounted
mechanical equipment shall be noted accordingly on the individual site plans
and exterior elevations, and shall be properly screened from adjoining properties
and streets, and that typical details of all screening devices shall be noted
accordingly on each site plan, for review and approval prior to individual final
site plan approval for commercial projects.
CONDITIONS OF APPROVAL FOR A CONDITIONAL USE PERMIT
WALTON HOMESTEAD FINAL PUD, #Z-04015 PAGE 2 OF 3
e. The guidelines shall include a provision that prohibits fencing along lot lines for
lots fronting a park or trail. Patio or deck fences may be allowed.
f. The guidelines shall include additional language regarding architectural
character-giving features that demonstrate a unified plan of high quality
development, yet allows for flexibility in the design of individual lots.
10. The applicant shall supply, in detail, sketches and drawings for landscaping
guidelines contained within the covenants. The revised covenants shall be provided
to the Planning Department for review and approval prior to final site plan
approval. The covenants shall include, but not be limited to, the following:
a. The guidelines shall include language that the developer will be responsible for
proper irrigation for the open space areas and parks.
b. The guidelines shall include language that boulevard trees shall be installed by
the developer at one tree per fifty lineal feet of frontage along all public and
private streets fronting the public park, the pockets parks, and defined open
space. All boulevard trees shall be located outside the street vision triangle.
The applicant shall obtain the necessary boulevard tree permits from the
Forestry Division.
c. The guidelines shall include language that boulevard trees shall be installed at
one tree per fifty lineal feet of street frontage by individual property owners at
the time of construction.
11. The Declaration of Covenants, Conditions, and Restrictions for Walton Homestead
Subdivision and the Architectural Guidelines shall be consistent.
12. The Declaration of Covenants shall be revised to include and/or change the
following:
a. The requested parking relaxations shall be recorded with the covenants.
b. Trails, walkways, and all sidewalks shall be for public use with a corresponding
public access easement.
c. Fencing regulations within the covenants should match those of the
architectural guidelines.
d. The use of “Uniform Building Code” shall be replaced with “International
Building Code” and “International Residential Code” (2000 edition).
13. The covenants under the Construction Design Review section shall contain the
following: “The Walton Homestead Architectural Review Committee’s approval
letter must be attached to all City of Bozeman building permit applications.”
14. It shall be noted within the covenants that the 1.1 acre park, including the
surrounding sidewalks, will be maintained by the Homeowners’ Association until
such time that the City of Bozeman establishes a City-wide Parks Maintenance
District.
15. All open space areas and pocket parks, excluding the larger dedicated 1.1 acre public
park, shall be noted as common open space on the final site plan, to be owned and
maintained by the property owners’ association.
16. Retention/detention ponds shall be shall be noted accordingly on the final site plan
and shall not make up more than 1/3 of the lot frontage and shall not exceed a
maximum slope of 1-in-4 and a depth of 1½ feet.
17. A detailed list of specific allowable retail uses that are consistent with a
neighborhood commercial scale shall be included as part of the final plan submittal
and noted accordingly in the protective covenants. Said uses shall be subject to
review and approval by the Office of Planning and Community Development.
18. Section 5.03 “Review Process” shall be revised to note that construction may not
commence without the proper approval from the City and until all necessary
permits are obtained and fees collected.
19. Conditional approval of this PUD does not exempt the apartment, office, and
retail/commercial lots from applicable site plan review. Building footprints
delineated on the preliminary PUD plan submittal are conceptual in terms of
approval. Final approval is contingent upon individual site plan review. Individual
single household, two-household, three-household, and four-household residential
units, each on individual lots shall require only a building permit unless variances
beyond the PUD relaxations are requested.
CONDITIONS OF APPROVAL FOR A CONDITIONAL USE PERMIT
WALTON HOMESTEAD FINAL PUD, #Z-04015 PAGE 3 OF 3
20. Seven (7) copies of the final site plan containing all of the conditions, corrections
and modifications approved by the City Commission shall be submitted for review
and approval by the Planning Director within six months of the date of City
Commission approval. A copy of the approved final site plan shall be forwarded to
the Building, Street/Sanitation, Water/Sewer, Engineering, and Fire Departments
by the Planning Office; and one copy shall be retained in the Planning Office file.
21. Building permits must be obtained prior to the work on each individual subdivision
lot, and must be obtained within one year of final site plan approval, if applicable.
Building permits will not be issued until the final site plan is approved. Minor site
surface preparation and normal maintenance shall be allowed prior to submittal and
approval of the final site plan, including excavation and footing preparation, but
NO CONCRETE MAY BE POURED UNTIL A BUILDING PERMIT IS
OBTAINED.
22. The applicant shall enter into an Improvements Agreement with the City to
guarantee the installation of required on-site improvements at the time of final site
plan submittal. Detailed cost estimates, construction plans, and methods of security
shall be made a part of that Agreement.
23. Upon submitting the final site plan for approval by the Planning Director and prior
to final site plan approval, the applicant will also submit a written narrative outlining
how each of the above conditions of approval has been satisfied.
NOW, THEREFORE, BE IT HEREBY KNOWN, that the above-noted twenty-three (23)
conditions and code provisions of Planned Unit Development Conditional Use Permit approval shall be
binding upon me, the undersigned owner of the subject property, my successors or assigns, as long as
the subject property is being used as the Walton Homestead Planned Unit Development.
DATED THIS _________ DAY OF _________________, 2004.
PROPERTY OWNER
_______________________________________
BY: KEVIN G. COOK, Vice President
DURSTON DEVELOPMENT CORPORATION,
A MONTANA CORPORATION
STATE OF MONTANA )
:ss
County of Gallatin )
On this _____ day of _______________, 2004, before me a Notary Public of the State of Montana,
personally appeared Kevin G. Cook, Vice President of Durston Development Corporation, a Montana
Corporation, known to me to be the representative that executed the foregoing Improvements
Agreement, and acknowledged to me that he executed the same for and on behalf of said Corporation.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal the day and
year first above written.
(SEAL)
___________________________________
___________________(Printed Name Here)
Notary Public for the State of Montana
Residing at _______________________
My Commission Expires:____________
(Use 4 digits for expiration year)
planning zoning subdivision review annexation historic preservation housing grant administration neighborhood
coordination
CITY OF BOZEMAN
DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT
Alfred M. Stiff Professional Building
20 East Olive Street
P.O. Box 1230
Bozeman, Montana 59771-1230
phone 406-582-2260
fax 406-582-2263
planning@bozeman.net
www.bozeman.net
MEMORANDUM
TO: Bob Murray, Project Engineer
John Alston, Water & Sewer Superintendent
Neil Poulsen, Chief Building Official
Greg Megaard, Fire Marshall
John VanDeLinder, Street Superintendent
FROM: Susan Kozub, Planner I
DATE: February 10, 2004
RE: Walton Homestead Zoning PUD, #Z-02231 & #Z-04015
Attached, please find the proposed Final PUD for Walton Homestead. Please review and route back to me
at your earliest convenience.
For your reference, on March 24, 2003, the City Commission voted 4-1 to approve the Conditional Use
Permit application for the Zoning PUD with the following twenty-three (23) conditions of approval:
1. The pocket parks shall be better connected to one another by trails and sidewalks with appropriate
public access easements clearly depicted on the final site plan.
2. The open spaces along Durston Road shall be well-defined entrances with extensive landscaping
features, public outdoor furniture such as benches, and appropriate lighting and noted accordingly in the
developmental guidelines.
3. The final site plan shall include an open space exhibit that clearly depicts all land and square
footages used to meet the open space requirements as defined by Section 18.54.100.1.12.
4. The final site plan shall include a detailed “Parks and Open Space Plan” that includes, but is not
limited to, the following:
a.Detailed landscape guidelines for the public park, each of the pocket parks, the trail corridor, and the
open space.
b.Landscaping details, lighting details, and any picnic and/or playground facilities.
c.Detailed cross-sections of how the detention areas work with the landscaping and parks or open
spaces.
5. The applicant shall include concrete pedestrian pavers where pedestrian pathways cross both public
and private streets as part of the final site plan.
Page 2
6. All sidewalks shall be clearly depicted on the final site plan.
7. The final site plan shall include a well-defined pedestrian and potential future access connection
point to the mobile home park to the west.
8. Prior to construction, the North 15th Avenue proposed bicycle lane infrastructure striping and
signage shall be subject to review and approval by the Bozeman Area Bicycle Advisory Board (BABAB).
9. The applicant shall supply, in detail, sketches and drawings for architectural guidelines contained
within the covenants. The revised covenants shall be provided to the Planning Department for review and
approval prior to final site plan approval. The covenants shall include, but not be limited to, the following:
a. The architectural guidelines shall include a common signage plan for said project depicting a general
signage theme including approximate locations, styles, sizes, materials, colors, and method(s) of
illumination. The common signage plan shall include any proposed subdivision signs (identification
signs) which must obtain sign permit approval through the Planning Department and are also subject
to code provisions under Section 18.65.
b. The guidelines shall include typical lighting details and specifications outlining the general lighting
requirements including the style of light, the height, the type and wattage of the bulb and a polar
distribution chart for the parking lots, pedestrian nodes, and parks.
c. The applicant shall install the minimum allowable lighting levels under code requirements.
d. The guidelines shall include language that all roof-top and/or ground-
mounted mechanical equipment shall be noted accordingly on the individual site plans and exterior
elevations, and shall be properly screened from adjoining properties and streets, and that typical details
of all screening devices shall be noted accordingly on each site plan, for review and approval prior to
individual final site plan approval for commercial projects.
e. The guidelines shall include a provision that prohibits fencing along lot lines for lots fronting a park
or trail. Patio or deck fences may be allowed.
f. The guidelines shall include additional language regarding architectural character-giving features that
demonstrate a unified plan of high quality development, yet allows for flexibility in the design of
individual lots.
10. The applicant shall supply, in detail, sketches and drawings for landscaping guidelines contained
within the covenants. The revised covenants shall be provided to the Planning Department for review and
approval prior to final site plan approval. The covenants shall include, but not be limited to, the following:
a. The guidelines shall include language that the developer will be responsible for proper irrigation for
the open space areas and parks.
b. The guidelines shall include language that boulevard trees shall be installed by the developer at one
tree per fifty lineal feet of frontage along all public and private streets fronting the public park, the
pockets parks, and defined open space. All boulevard trees shall be located outside the street vision
triangle. The applicant shall obtain the necessary boulevard tree permits from the Forestry Division.
c. The guidelines shall include language that boulevard trees shall be installed at one tree per fifty lineal
feet of street frontage by individual property owners at the time of construction.
Page 3
11. The Declaration of Covenants, Conditions, and Restrictions for Walton Homestead Subdivision and
the Architectural Guidelines shall be consistent.
12. The Declaration of Covenants shall be revised to include and/or change the following:
a. The requested parking relaxations shall be recorded with the covenants.
b. Trails, walkways, and all sidewalks shall be for public use with a corresponding public access
easement.
c. Fencing regulations within the covenants should match those of the architectural guidelines.
d. The use of “Uniform Building Code” shall be replaced with “International Building Code” and
“International Residential Code” (2000 edition).
13. The covenants under the Construction Design Review section shall contain the following: “The
Walton Homestead Architectural Review Committee’s approval letter must be attached to all City of
Bozeman building permit applications.”
14. It shall be noted within the covenants that the 1.1 acre park, including the surrounding sidewalks,
will be maintained by the Homeowners’ Association until such time that the City of Bozeman establishes a
City-wide Parks Maintenance District.
15. All open space areas and pocket parks, excluding the larger dedicated 1.1 acre public park, shall be
noted as common open space on the final site plan, to be owned and maintained by the property owners’
association.
16. Retention/detention ponds shall be shall be noted accordingly on the final site plan and shall not
make up more than 1/3 of the lot frontage and shall not exceed a maximum slope of 1-in-4 and a depth of
1½ feet.
17. A detailed list of specific allowable retail uses that are consistent with a neighborhood commercial
scale shall be included as part of the final plan submittal and noted accordingly in the protective covenants.
Said uses shall be subject to review and approval by the Office of Planning and Community Development.
18. Section 5.03 “Review Process” shall be revised to note that construction may not commence
without the proper approval from the City and until all necessary permits are obtained and fees collected.
19. Conditional approval of this PUD does not exempt the apartment, office, and retail/commercial
lots from applicable site plan review. Building footprints delineated on the preliminary PUD plan submittal
are conceptual in terms of approval. Final approval is contingent upon individual site plan review.
Individual single household, two-household, three-household, and four-household residential units, each on
individual lots shall require only a building permit unless variances beyond the PUD relaxations are
requested.
20. Seven (7) copies of the final site plan containing all of the conditions, corrections and modifications
approved by the City Commission shall be submitted for review and approval by the Planning Director
within six months of the date of City Commission approval. A copy of the approved final site plan shall be
forwarded to the Building, Street/Sanitation, Water/Sewer, Engineering, and Fire Departments by the
Planning Office; and one copy shall be retained in the Planning Office file.
21. Building permits must be obtained prior to the work on each individual subdivision lot, and must be
obtained within one year of final site plan approval, if applicable. Building permits will not be issued until
Page 4
the final site plan is approved. Minor site surface preparation and normal maintenance shall be allowed
prior to submittal and approval of the final site plan, including excavation and footing preparation, but NO
CONCRETE MAY BE POURED UNTIL A BUILDING PERMIT IS OBTAINED.
22. The applicant shall enter into an Improvements Agreement with the City to guarantee the
installation of required on-site improvements at the time of final site plan submittal. Detailed cost
estimates, construction plans, and methods of security shall be made a part of that Agreement.
23. Upon submitting the final site plan for approval by the Planning Director and prior to final site plan
approval, the applicant will also submit a written narrative outlining how each of the above conditions of
approval has been satisfied.