HomeMy WebLinkAbout14-02-24 Materials for J Graff - Irrigation pipeline Tea -
pafss
S9fyS 331 Fij x
w
rq Jryn5. ,-q-r-� O .
y n r?I„b x t
Y3 f xva a
o �' d-
F
� � 4
T O u.
mm
fn
1�
J
Ta
sL f Ot E3
To
tM
T �
T'IN
N
�N 1
b �
= S
d-ti 8
4
o m- N -
Q
Ld
ca
a T
H
F
Raser Ass emlzly Sprio kler Val✓r-
clnd An('i Ass«-,6/y e�cf PIU9
t
z RisCf �'i�cs VarJ in
j4 •�
5 i
Sec Plcn PrCf;!c For Locc,61 5
1a n inC Pipe
�y
Prpep'a1-13f, -.0rn 27 +v IG'
R ( S L A,,\Ji'j DFAIN DETAILS
6"
t 4" R',sr-r
m J Thrust Block
Lj,znoIxov AO sN[qw,LxvaRa • s-nTVD
i
o
z
z z
o Q
V)
� i w
Li
7- --IINI -1 TIU06d w
j L
LLI tr,E v` L y
�j
oil
c� Ojl
L L
o
t
J
Vi
Ct
AAA U.S. Department of Agriculture MT—ENG-7
Soil Conservation Service 10/1/92
CONSTRUCTION SPECIFICATIONS COVER SHEET
For
ill
Land user: MAYNARD BORDER GROUP PIPELINE w
Job description: IRRIGATION PIPELINE
Location: NORTH WEST BOZEMAN MONTANA
Planner: AO & FO te : 1/92 C cke by : FEB Date: 12/92
SCS Approval by : wro4 Date: /--5— 93
Title and Office: SC —
It is the responsibility of the owner to obtain all necessary permits and/or rights, and to comply with all
ordinances and laws pertaining to this construction.
Construction shall be in accordance with the following provisions, specifications and drawings and as staked in
the field.
List of Drawings
Maynard Border Group Pipeline Sheets 1 through 7
List of Specifications
MT-1 GENERAL CONSTRUCTION
MT-2 PIPE STRUCTURES
MT-3 REINFORCED CONCRETE — CLASS 3000
MT-4 EARTH FILL
MT-6 GATES, VALVES, AND MISCELLANEOUS METALWORK
MT-7 VEGETATING STRUCTURES
MT-430—FF IRRIGATION WATER CONVEYANCE STEEL PIPELINE
MT-430—DD IRRIGATION WATER CONVEYANCE, HIGH PRESSURE,
UNDERGROUND, PLASTIC PIPELINE, LESS THAN 20 INCH
DIAMETER
MT-430—DD—A IRRIGATION WATER CONVEYANCE, HIGH PRESSURE,
UNDERGROUND, PLASTIC PIPELINE, 20— to 36—INCH
—DIAMETER with SDR <= 51
Special Provisions
Special provisions are on attached sheets: 1 through 10
Pipe Appurtenance Tables, sheets: 1 through 3
Owner/Operator Review
I have reviewed the special provisions, drawings and specifications and agree to construct this project in
accordance with them.
I acknowledge all responsibility for acquiring the necessary permits and/or easements and for compliance with
all ordinances and laws pertaining to this construction.
Additionally I acknowledge responsibility for notifying all utilities affected by this project.
Owner/Operator Date
(
Return after recording to: J lj . 2e: of 16 e,2014 1?:12:2s pM Fee: ¢112.00
9 - Charlotte Mills - Gallatin County, M7 MISC
Bozeman School District 7 Ilillilllllllllllllllllllillllllllllllilllllllllllllllllllllllllillllllllllllllllllll Attn: Mr. Kevin Barre
P.O. Box 520
Bozeman, MT 59771-0520
'2467970
?,k?n6fit _ Page: i of 16 11/13l29f3 02:23:47 PM Fee: $112.00
Charlotte Mills - Gallatin County, MT MISC
i IIIIIII IIIIII III illil IIII IIIIRI illlll IIII IIII IIIII IIIII Illilli III IIIII IIIII IIII!Ilii IIII
GRANT OF EASEMENT FOR IRRIGATION PIPELINE
AND TERMINATION OF EXISTING EASEMENT
THIS GRANT OF EASEMENT FOR IRRIGATION PIPELINE AND
TERMINATION OF EXISTING EASEMENT (hereinafter referred to "Agreement") is
made by and among Bozeman School District 7 of 404 West Main Street, P.O. Box
520, Bozeman, MT 59771-0520, (hereinafter referred to as "Grantor"), and DELBERT
AND DENA RICHTER, of 2950 Harper Puckett Road, Bozeman, MT 59718, SIMGRAF
CORPORATION of 326 N. Broadway, Bozeman, MT 59715, MICHAEL COK AND
KATHLEEN R. COK, of 3300 Harper Puckett Road, Bozeman, MT 59718, WILLIAM
AND MARGARET TATARKA, of 19 Lake Road, Bozeman, MT 59715, THOMAS AND
JUDY KINGMA, of 3490 Harper Puckett Road, Bozeman, MT 59718, EDWARD
HARRINGTON, of 2196 Harper Puckett Road, Bozeman, MT 59718, PAUL AND
DIANE PETERSON, of P.O. Box 373, Bozeman, MT 59771-0373, DENNIS AND JEAN
MOYLAN, of 1455 Hidden Valley Road, Bozeman, MT 59718, THE ESTATE OF
Page 4