HomeMy WebLinkAbout03-20-13 Downtown Business Improvement District (BID) Minutes/
Downtown Business Improvement District
Board Meeting Minutes
March 20, 2013
Attending: Mike Basile, Eric Bowman, Ileana Indreland, Steve Stinson, Eric Sutherland, Buck Taylor, Chris Naumann
Absent: Dan Himsworth
Public Comments
None
Disclosures
None
Minutes
ACTION: Buck
Taylor moved to approve the January minutes as presented.
Mike Basile seconded the motion.
All voted in favor.
Finance Report
Chris presented the Finance report reviewing the revenues
and expenditures to date. He noted that all of the expenses were as anticipated and budgeted. The Board had no further questions regarding the finances.
Program Director’s Report
Executive
Director’s Report
Maintenance Program Update
Below are the FY2013 year-to-date maintenance statistics with the comparable time period from FY2012. As the numbers show we are seeing a
decrease in the amount of trash collected and a decline in the number of graffiti tags removed. The fall maintenance staff currently consists of just 1 PTE.
FY2012 to date
FY2013
to date
Difference
Trash Emptied
2332
1817
-515
Graffiti Removed
57
47
-10
Downtown Construction Updates
The Mendenhall Underground Utility project
will start during the second half of May 2013 and will last 90 days or less. The project will extend from Broadway to 7th Avenues and involve the installation of new water and sewer
lines. Only two or three blocks will be under construction at any given time. The contract stipulates that Mendenhall must be open to through traffic during all downtown events during
the period of construction.
Flower Basket Program Update
I finalized the baskets for the upcoming season with Wagner Nursery. The program will be exactly the same as last year. We will
have 230 baskets (162 18” and 68 14”) delivered and
installed in early June. Wagner will prune twice over the course of the season. We will water 7 days a week and fertilize 5 days a week. Wagner’s quote is for a total of $17,524.60.
I will account for $18,000 to $18,500 in the FY2014 budget.
Downtown Parking Updates
/
/
Discussion and Decision Items
Recycling Program
The board discussed the pending recycling program. Chris indicated that the TIF had not purchased the receptacles as previously discussed
because the City of Bozeman was considering transitioning to single-source recycling. There was concern expressed about the size, color and quantity of the proposed receptacles. There
was discussion about how many of the receptacles should be located on Main Street and if any could be located on the side streets instead. The board decided that black receptacles with
green lids and the corresponding decals would look best.
Summer Maintenance Plan
Chris presented a plan to bolster the maintenance employee hours invested in downtown this summer. In
essence, he plans to hire one employee to water the flowers Monday-Friday which would equate about 30-35 hours per week. A second employee would work 30 hours a week Monday-Friday to
empty garbage, remove graffiti, remove posters/stickers, clean Soroptomist, etc. A third employee would work Saturday-Sunday watering flowers and emptying garbage. Chris said this would
equate to approximately 375 more maintenance hours and an increase of $4,500 in payroll expenses. The FY2014 draft budget takes into account this increase cost.
Eric Bowman proposed
shifting the second employee to work over the weekend as that is when downtown is the busiest and needs the most maintenance attention. Chris agreed that having two employees working
Saturday and Sunday was a better plan. The board concurred.
DURT Project: Phase I
Chris presented an overview of the plans to transform the Mendenhall corridor as follows:
DURT Project
Phase 1: Mendenhall Street
The primary objective of the Downtown Urban Route Transformation (DURT) Project is to upgrade Mendenhall and Babcock Streets into “complete streets”. These
urban routes which flank downtown’s historic Main Street need to be transformed into modern complete streets so as to better serve all modes of transportation. In current form, Mendenhall
and Babcock lack the pedestrian amenities found along Main Street and many of the north-south side streets. There is also an opportunity to service the downtown district with bike lanes
along Mendenhall and Babcock. Phase 1 of the DURT Project will focus on making strategic improvements along the Mendenhall corridor. Improving the Babcock corridor will be Phase 2 but
is not scheduled at this time.
PARTNERSHIPS and STAKEHOLDERS
The City of Bozeman and the Downtown Bozeman Partnership have collaborated to organize and implement Phase 1 of the DURT
Project.
The City and Downtown Partnership will work in conjunction with the Montana Department of Transportation and the Transportation Coordinating Committee.
The City and Downtown
Partnership will work with the Downtown Business Improvement District, the Downtown Tax Increment Finance District, and the Downtown Bozeman Association.
The City and Downtown Partnership will seek significant public involvement from downtown property owners, downtown business owners, downtown residents and Bozeman community members.
PROJECT
AREA
The project area extends along Mendenhall Street from Broadway Avenue to 7th Avenue. The different components of the scope of work will be performed along specific stretches of
this roadway corridor as designated below.
/
SCOPE of WORK
The scope of work for the DURT Project will include the following components completed over the course of two years:
Utility
Upgrades
The sewer and water lines located under Mendenhall Street will be replaced between Broadway and 7th Avenues.
Roadway Resurfacing
Mendenhall Street will be milled and resurfaced
between Broadway and 7th Avenues. Restriping will include thermoplastic inlaid intersection crosswalk markings and a single, one-way bike lane between Rouse and 7th Avenues.
Streetscape
Replacement
The streetscapes will be replaced between Rouse and Grand Avenues. The new streetscape design will replicate those in place along Main Street and many of downtown’s north-south
side streets. Streetscape elements will include new concrete sidewalks; “historic” streetlamps; street or boulevard trees; pedestrian benches; trash receptacles; and bike racks.
TIMELINE
June-August
2013 Underground Utility Work
May-July 2014 Streetscape Improvements
July 2014 Pavement Resurfacing
With no further new or old business, the meeting was adjourned.