HomeMy WebLinkAboutStormwater_Permit_Under_1_Acre BU2�,�t THE CITY OF BOZEMAN 9� 20 E. OLIVE • P.O. BOX 1230 * * BOZEMAN, MONTANA 59771-1 230 �i pp ENGINEERING DEPARTMENT 9?j�GCVO 0 PHONE: (406) 582-2280 • FAX: (406) 582-2263 Storm Water Management Regulations For Land Disturbance Sites LESS Than One Acre Storm Water Management is increasingly important for the purpose of maintaining clean water and preserving waterbodies such as streams, rivers, and lakes.The City of Bozeman's Storm Water Management Ordinance#1763 went into effect April 22,2010,as mandated under the Federal Clean Water Act(CWA)and the Montana Pollution Discharge Elimination(MPDES)regulation. These regulations are designed to improve water quality in waterbodies by reducing the amount of pollutants that storm water collects and carries into storm conveyance systems. Permit and Fee Owners/operators of construction sites considered a Sketch Plan or higher are required to apply for a City of Bozeman Storm Water Management Permit(SMP). The SMP requires submittals of an application form and a Storm Water Management Plan in compliance with the City of Bozeman's Storm Water Management Ordinance#1763. The Storm Water Management Plan shall contain the following items: 1. A completed Storm Water Management Plan checklist which outlines the project site's Best Management Practices (BMPs); 2. A short narrative explaining how the permittee(s)will implement BMPs described on the checklist; and 3. A map of the construction site showing the locations of the BMPs. Inspection and Review Site plan review and inspection programs aid in compliance and enforcement and provide an opportunity for guidance and education. The City will perform a site plan review of potential water quality impacts at the time the SMP is submitted and will conduct regular inspections of the construction site. The permittee(s)will be required to perform site inspections every 14 days and after major storm events to ensure all BMPs have been constructed and are functioning properly. The purpose of such inspections will be to determine the overall effectiveness of the control plan and the possible need for BMPs.All inspections shall be documented in written form, kept on the project site, and made available for review by the City. Violation and Enforcement If any violation is found, a notice will be issued to the Responsible Party.The notice will state the nature of the alleged violation(s),the action required to fix the violation(s), and a time limit to remedy the violation(s).Any person, firm, or corporation violating any of the provisions or terms of Ordinance#1763 of the City of Bozeman may be subject to penalties as a municipal infraction pursuant to Title 14 of the Bozeman Municipal Code. If you have any questions contact the City Engineering Office at 406-528-2280. HOME OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK City of Bozeman,Montana Storm Water Management oF' ?F Permit Number Permit Application Date Submitted a�• Final Stabilization Date r�k 00.rp� Engineering Department P.O. Box 1230 Bozeman, Montana 59771 406-528-2280 Note:This permit is separate from any permits required by the Montana Department of Environmental Quality. A State Storm water Construction Permit is required for all land disturbance activities equal to or greater than one(1)acre or for land disturbance less than one(1)acre that is part of a larger common plan of development or sale that would disturb one 1 acre or more. (1) Contact Information: Project Owner Contact Person: Company: Mailing Address: State: Zip: Phone: Email: Fax: Cell Phone: Contractor Contact Person: Company: Mailing Address: State: Zip: Phone: Email: Fax: Cell Phone: Engineer Contact Person: Company: Mailing Address: State: Zip: Phone: Email: Fax: Cell Phone: (2) Project Information Project Address: Lot Number: Subdivision(if applicable): Project Size: Project type: (Land Disturbance) (Planning Application) (3) Project Information Check the appropriate box(es)or provide a brief description that indicates the general nature of the construction activities:❑Single Family Residential❑Multi-Family Residential❑Utility ❑Commercial/Industrial❑Highway/Road❑Other(describe): Description of proposed work: City of Bozeman,Montana Storm Water Management ora_0z Permit Number Permit Application Date Submitted Final Stabilization Date co.M?fit (4) Project Schedule Start Date: Completion Date: I Final Stabilization Date: (5)Waterbodies and Storm Conveyance Systems List Waterbodies within 200' of project Streams: Lakes: Wetlands: Rivers: Sloughs: Other: List Storm Conveyance Systems within 100' of project Ditches: Swales: Detention Facilities: Storm Drain Inlets: Pipe Inlets/Outlets: Gutter: (6)Acknowledgement Certificate: I certify that I am the Owner or Owner's authorized agent.If acting as an authorized agent,I further certify that I am authorized to act as the Owner's agent regarding the property at the above-referenced address for the purpose of filing applications for decisions,permits or review under the City of Bozeman Ordinance----and have full power and authority to per form on behalf of the Owner all acts required to enable the City to process and review such applications. 1 certify,that the information on this application is true and correct and understand that 1 shall not start this project until this application is approved.1 shall comply with the laws of the State of Montana and the ordinances of the City of Bozeman. Signature of Legally Responsible Person Date signed Printed Name Title **For Official Use Onl ** LESS than one acre Received City By Date SMP Checklist Yes No Field Visit SMP Plan Yes No Approval SMP Map Yes No Comments: Payment-$ Yes No Greater orequal to one acre Received MT Stormwater Discharge Permit(NOI) Yes No SWPPP Yes No Site showing BMPs Yes No MT Stormwater Discharge Permit(NOT) Yes No SMP Checklist Yes No SMP Plan Yes No SMP Map Yes No Payment-$ Yes No City of Bozeman, Montana Stormwater Management Permit Number: Checklist Date Submitted: of soz� LESS Than titi�;;.._........., U One Acre n F=< v:. OT�ti.Co,.�OQ Site Name/Adress: 1 Prevent silt,dirt,topsoil,etc.from washing into the streets,alleys,drainage easements, drainage conveyance systems,and storm drains. Implement and maintain erosion control BMPs 2 to prevent the erosion and transport of sediment by water/rain runoff. Include spoil areas and staging areas as part of 3 the project/construction site. 1 4 Establish permanent erosion control for all disturbed land areas related to the project activity before final occupancy of structures located thereon. 1 Identify all erosion and sediment control BMPs 5 to be installed and maintained throughout the duration of the project. Use clearing techniques that retain natural 6 vegetation and retain natural drainage patterns 1 (where feasible). Stabilize soil within 14 days of clearing or 7 inactivity in construction. Stabilize or cover soil stockpiles at the end of S EACH workday. Employ wind erosion techniques to prevent the 9 blowing of dust or sediment from the site. Employ techniques that divert upland runoff 10 past disturbed slopes(where necessary). Provide sediment controls in the form of 11 settling basins,sediment traps or tanks,and ai perimeter controls(where necessary). LessChecklist � 1 1 i I • ' 11 1 1 1 1 . ' ' 1 I t 11 Protect adjacent properties by the use of a 12 vegetated buffer strip,silt fence,fiber rolls,or other BMP perimeter controls. 13 Keep solid waste materials in a container or an enclosed waste collection area on site. Store chemicals,paint,petroleum,fertilizer 14 and pesticides in a covered enclosure. Dispose of empty/unused chemical and 15 hazardous waste containers in accordance with label instruction. Segregate potentially hazardous waste from 16 non-hazardous waste. Perform daily cleanup of construction site to 17 ensure that all litter is contained in an appropriate enclosure or container. 18 Recycle waste materials where feasible. Contain concrete truck washout water on site 19 in a designated washout pit.Remove and properly dispose of concrete residue at conclusion of construction. 1 20 Ensure exposed aggregate waste wash water does not leave the construction site and or get into the curb and gutters,catch basins or any other storm conveyance systems. 21 Locate sanitary waste facilities a minimum of 15 feet from storm drain inlets and receiving waterbodies. Delineate and stake the Flood Plain and install 22 perimeter BMPs. List waterbodies within 200'of project 23 (stream,lake,river,wetland,slough,other). • 24 List stormwater conveyance systems within l 00'of project(ditch,swale,detention facility, storm drain inlet,drywell,gutter,pipe inlet/outlet). STORM WATER APPLICATION FEES Planning Application Storm Water Permit Fee Major Sketch Plan/COA $25 Major Sketch Plan/COA $50 Commercial Final Site Plan $75 PUD-Final Plan $150 Subdivision Final Plat $150 (minor) Subdivision Final Plat $250 (major) After-the-Fact Permit $250