Loading...
HomeMy WebLinkAboutWater Treatment Facilities Improvements1999 WATER TREATMENT FACILITIES IMPROVEMENTS AS CONSTRUCTED Prepared for: City of Bozeman, Montana Location Map SET NO. SHEET INDEX: M C T A N A � GREAT FALLS MISSOULA .LEWISTOWN ��� 1 . . . Cover Street HELENA / 2 . . . New Chemical Feed Building BUTTE BOZE AN �- B[LLINGS Site Plan and Section DILLON 3 . . . New Chemical Feed Building Plans �C Elevations Project Location 4 . . . New Chemical Feed Building Construction Details Prepared by: 5 . . • New Sludge Drying Bed ONT-Ati'' s Site Plan and Details (Additive Alternate A ) =19,� 10;A�° M. Damschen & Associates, Inc. 11 i _ CONSULTING ENGINEERS 20 6 . . . New Chemical Feed Building 30 11th Ave., Suite 11 ss " � , • • •HELENA, MONTANA• Mechanical ' . . . New Chemical Feed Building BIacK � eatcn Electrical Denver, Colorado Kansas City, Missouri RECEIVED JUN 1 }ggg I II IIIII// I)AVED ACCESS ROAD IINLY SMALL DUANUUV,(50 TO 150 CY.)OF EXCESS MATERIALS iP5 NO SCALE ARE ANTICIPATED.X;IPATED.R THE RESPONSIBILITY OF 11E CON1PIClOR S , ill /,��_ ADDITIVE ALTERNATE B TO VERIFY MATERIAL QUANTITIES,EXCESS MATERIAL MAY BE . = STOCKPILED AT THIS LOCATION.SMALL DUAHTMES OF EXCESS MAY —l'ASPALI?IF CONCREII ALSO BE INCORPORATEII N1T0 EMBANKMENTS AS APPROVED BY /A, INO pR0 TM ENGNECR.IC SEAM OOANTKMS DE ADDITIONAL EARTH MATERIAL ARE RCOU•E7,THEY MAY BE TAIQN FROM EXISTING/ MATCRAIS SIOCKPIUEO AT THIS LOCATION, f U —._EXISTING 12 I— COURSE TPA rl S LEVELING ® Ar -- ----- -- -- couRSE O oFf GRAVEL NEW SLUDGE DRYING BED I BLADED AND COMPACTED AS NECESSARY)AS ALTERNATE A) w (n N I 1 i U 1 Q 1 TPj C/7 i • V) I I 11 1 EXISTING FENCE H F A -y Rom—•-- -1r�--a r r r r \ r i I 1 EX5TINC1 QASINS IQ BE(ILISO WITH Wj - 1 1 AND REVEGEIATED(COMPACT TO 90% - 1 STANDARD PROCTOR) N I L j y � I� CU m 1 .0 SCOP I EXISTING 1 �L.p aroL - FIELD APPROXIMATE LOCATION OF EXISTING BURIED I EEH" Rl / ip rgngl� ELECTRICAL CABLE TO DRAIN SUMP 0 Awn EXISTING ACCCS5 ROAD TO RECEIVE I 1 Q311 T 1 [# I�N�FS NEW! LIFE Of PAVEMENT , 1, 1 1 W API J I FvruRE EXISTING (ADDITIVE ALTERNATE B) EXISTING �1 1 YE _ I SACNwASH t BACKWASH GARAGE _A4 I � --I ,r r' SURGE BASIN SURGE BASIN I EnSnWC PAYED GARAGE ACCESS --- l e,i /y/1�/" L(1'. ^'e W TO BE REMOVED AND REPLACED-- i III 1 . Zz RAlsf EXISTING SEWER ClfA1gU1 r s ci a OI E�'-RA_ .�_.1 l,r` f �f C --14^; F i` .• t0 BE FLUSH M111,MW ASP/VLT m OIL NEw LID l)lA1 IS ACCEPABIE y .- nY:r STRFET APPIICATgNS y EHTRANC( / 1 / - Z m m m \ O ]� 'OBAOC NEW ASNNiT Y < 1 ti0~/ BY�INOIIIEEAR NEC DIED EMMBNMUNIEXTEND T SLOPES SFAUL BE EW PAYED DRIVEWAY AAA , a W F AND h I .� .ES ' ��p5 y (STRIP)OPS(II N,ZC EXCAVATED SOIL a �i 0 b�i / y'�C WR PxOT (ROM OfE�pOjEORIG-AS SLUDGE DRYING INTO NOFM �> p / I /I TO PR (R�AS AFCESyA'r PROVIDE GRAVEL I a BASEEW_—P,NA\VIW 0.1 SE CRSE A}'PAVEMENT ITT MA"IN 10 FXWNO ASPHALT_ . EDGE TO PROVIDE A I 1 VERTICAL JOINT 0 BEGNMM:or 1 _ NEW ASANET. ' _ T 'AC A(w YIAZ MIDN��-- -- _ _----- -- - - - NFw r-FM •,,F!STv, N .— -`�n iwu Me�H - �e Mc141_m ___ _ _ _ _� Q Z A,EF DLH IN --- —-------r--_______„�`_"_____ - _� ___ E'Al Lill•WERE NT UJ __________ w i{ • �' J ED TO FEED GAJ"C, CL T w�2a r[C witCCTtn IN:r LL CLZ ' RFVFI HIROUCM v ILU I kf.IFYnll Anal SAMINC WATER J w Q J M'�Ni:UI,01 FRS!II'MVk[v4 Q CNJF <ic - � �� W w o EXISTING BACKWASH 1 I 1(D w EXISTING WATER B.vNs TREATMENT PLANT =Z BUILDING UQ Z Q U �_Jaz n. .—MITAI N001 w� Q ../.. 1,-. rl nI nl CMU M.A, LF ti ie>TMC NOnOWAIj PARNtN. Sµ0FN6 {I / 4: CALRtCGS9fA Z•EOM LXISIING GROUND__.l - _ f NEW CHEMICAL FEED BASIN Q z y TIwsH cRo 0 - - _ _ - rL..A - --------- =-- - ------- SITE PLAN z a; SCALE T" 30' 0 EXi�IIHf,A;PHNT �.�G.MPHONAi _ (���! F•M 45 L'HA:iI( CCNt;'tilE'vAJiME'• C) NEW CMEMIUI R[0 WILD'. i ~ 4wy I + 12'BASE COURSE --COMPACTED FILL FROM NEW NEW CHEMICAL FEED BUILDING t10BGFI"A`CTEIDIN8ON '` �"'-` ' "`H SUBCRADE—/ (TO BE COMPACTED IN TO �� JCAi MOLSFlED PROCTOR) 70 5'.T ;� SITE SECTION TYPICAL SECTION FOR .�S�M vLm NOT TC SCALE PAVED_ DRIVEWAY AREA NO SCALE BASE BID of 7 OPFN/NG-ONG"t DUI-t EAST ELEVATION WEST ELEVATION SCALE: 1/4 METAL RIDGE VENT 0. L SCALE: 1/4" V- 0" "'6 nv,rU .... ......TR'P, P, DOW M AL ROOFING BOND METAL FAS11-' BEAM SPLIT FACE CMU (BROWN) LOUVER LOUVER (TYP,) CD_I CD-2 BONI) MT. HT, = 6'-8-ABOVE I FINISH GRADE BEAN I OPERATING FILR TO TO' (TYP I t o T - GRADE TO DRAIN A Ay -L L'J� F ROM BLDG 2% MIN BOND 4-- 5204,5 1 1 1 T BEAM h-1- -,�c z L 204ti 13 z N 0 T E 5 CONC. IDN — W (TYP) I _L-_ 46 0 1. SEE PIPING SCHEMATIC FOR ADDITIONAL BOND BEAM -ELF z -If REQUIREMENTS EXISTING GROUND I- ,w7l 2. MAINTAIN 6.5' MIN, COVER ON BURIED FLOOR PLAN SAMPLE AND SOLUTION LINES. 3. PROVIDE WALL SLEEVE AND MODULAR WALL N o r t I SEALS AT PIPE WALL PENETRATIONS EXISTING MATERIAL MAY BE TANK fLR -ADD- C OF TOPSOIL & -- ------- -- - LUNG In SCALE: 1/2" 1'- 0" 4. TANK TO BE BOLTED TO ITS CONCRETE BASE USED FOR BACKFILL AROUND LEVEL REAGETATE PER SEEDING ER MANUFACTURER'S RECOMMENDATIONS. FDN WALLS. COMPACT TO 95% SPEC p MAX DENSITY PER STRUCI EMB.' Fin III, Eiev 1. PROVIDE BOXOUT IN TANK BASE FOR TANK OUTLET SPECIFICATIONS 19620 ----- --- - - --------------------------------- ------------------------ ­=­­---------------- ---------------- 20'-0* STRUCTURAL- /*,e EMBANKMENT IT CPVC OVERFLOW, EXTEND TO FLOOR AND TURN UP 2' FOR ODOR TRAP 1.4 tL[AR TRIM 0 0 CMu I, ROOF INTERFACE (TYP 0 (ABLE ENDS) 12*HIGH CONIC. t GUTTER & I I D SE DOWNSPOUT GUTTER & I 1- 7 1 DOWNSPOUT CEILING L MOUN ED I ---- ci m 3' VENT LINE BLOCK UP WITH 2" HFATIR ELEV. 2 - I CMU FULL FIT. 0 z IT GABLE ENDS AS I TANK FILL LINE m f I I SHOWN m yam0 24 SO. x 6-THICK 0 MATCH IN TO DRAIN PAD w/ 6" FUR. EXIST. PAVEMENT 7 T DRAIN o o < u 2*TANK L -i;—- Fin, Fir Flev 6000 GALLON FILL LINE T 204 CAUSTIC SODA TANK CONIC SPLASH BLOC, CONIC, SPLASH BLOCK 34 (36'L 12"W MIN _T 136"L z 12"W MIN.) EXIST GROUND 0 ij u WOOD WALKIN, PLATFORM LLI I"D ADDED C URN CONSTRUCTION , ------------ ------------------ - LLJ _J ----(--------- ------------—--- TANK LEVEL Lij LU CIO `L�" HANDRAIL SIGHT se -RAIL SYSTEM) 01 (3 TUBE NORTH ELEVATION STRUCTURAL EMBANKMENT • _j If PER SPECIFICATIONS UNDER SOUTH ELEVATION < �A.N K 200 GALL DN Ii ATER SCALE: 1/4" V- 0" ALL FOOTINGS & SLABS z r I,f TEMPORARY TiNK SCALE: 1/4" 0" "JIM L24' DIA MANWAY DRAIN < N"! 1 Al",H 2" SUCTION now _j 18" SQUARE 1, 18" d TO CnNTPr)( CFNTFP HFAOFR Uj CL R Bot Of Ft El 20_O` L) lAil NATURAL GRAVEL BASEL) 1, HEADER IPPLIR) VAIERIAL. 12" HIGH CONC, 13'-4" Ft EV - 201 3r TANK BASE _j SHP MOTOR STAFFER Top Of Wall I 4 ------------ EE SHT F FOR PIPINIL, ';(HtMAT!C MEIERINC P-P AW­i, IN 0 T E SUB-EXCAVATE TO SUIT;, PVC PIPE )01 9'T 3/4 C CONTROL CENTER CONNECTED TO 1/2" PH SENSOR (AS APPROVED BY THE PVC TUBING HERE 2" SAMPLE WATER HEADER 1 112- BACKFLOW WITH STRUCTURAL EMB,'', PFCIFICATIONS z (CPVC) C ELEV = 207.00 PREVIENTFIR DEPTH SHOWN IS APPR� YAT� ',NI) SEE 3 0" _ I -ell! rn RE QUIREMENTS FOR NEARBY TEST PIT OF-ERATtNG F-LOC)R z FIT Elev 204 7 LAB SINK L............................. ----------- IT 2*CPVC LINE TO SAFETY .. ... .................................. CARRY PVC TUBING TO.CLEARWW L EQUIP FY[WA'_.H CABINET I,' CASE CABINET fE ELEV. 198. 0 ----------------------------------------------1-11,111,.......... NEW SUMP LOCATION 7/15/9 -�/�21' Pt :VHI V",N,I N o PULL BOX 0 Y. AL I. lkllt�)14, 1, 1 N6 �LEVATIONE ARE RELATIVE.1 1 J I N 6 TO OPERATING FLOOR. FINAL BUILDING FLOOR 0. 0 L) ELEVATION WILL BE SET BY THE ENGINEER IN THE z E N S,TE DRAINAGE REQUIREMENTS AN[ FIELD BASED 0 Top Of Wall IeY II MATCHING EX'STING PAVEMENT SLOPES, 204.31 II PL UMBIC G VENT ZZ ------------------ lo 2- RECIRCULATING SAMPLE DRY CHEMI Al. TANK TANK FILL LINE L--------------------------------------------- 4i — — — — — — I WATER LINE TO CHEMICAL W/ COrK CnUPtFR 4"CONC SLAB 4 DIFFUSERS IN WTP, q ELLV AHOVE CABINET TOP (SEE DTL RLH CL ELEV. 19120 Ic. SEE DTL. COMPACTED FILL PER SPEC, IM j c 5'-4 4'-8- 24'SQ. 6" THICK FOtTNDATION PLAN 'Ll 14 DRAIN PAD ./ 6" RR. SCALE: 1/4" = 1'- 0" — — — — — — ';HIFT NO DRAIN . 8- � 20."CUNT CONIC. (TO BE CONNECTED TO BUILDING DRAIN) F, Ft� I DL L h LEY 4'_­[� 3 4" DROP FDN. 4'THROUGH DOORWAY of 7 CONTINUOUS VENT O RIDGE STAIR SIDE VIEW RETAINING WALL SECTION Qr Wale pZv 1/2" OSS SPAN-RATED NOTE: LAYUP MASONRY TO ALLOW 3 4 SCALE: 1 2" = 1'-0' NOTE: STAIR fDN.WALL NO SCALE S EATNING UDDER FRAMING O GABLE ENDS / CHAMFER JOINT BETWEEN p a WITH 2x6 SUB-FASCIA UNDER NOTE: BEND 8- NOSE WALL IX STEP POUR 150 ASPHALT SAT.FELT --- 4"CONC. SUB W I 2" EXPANSION JT MAT'L BAR N'MIN. PER DETAIL. 4- 24 GA. MIN. METAL FASCIA / / QF / // O t2"O.C. EA. WAY O SLAB JOINT W/EXTERIOR WALL NIL UU!`,Illf pR METAL ROOFING ,/2"x 8"A.B. I,ONL. FDN. WAIL 16 BARS E III�I"` O 48 O,C. 16•O.C. EA. JOINT DT. OPERATING FLOOR WAY ENGINEERED TRUSS- —� INSULATION / / SIMPSON H-1 HURRICANE TIE 1 1/2'CHAMFER - O 24"O C BAFFLE RE D / (TYP. O RAFTER ENDS) THROUGH JOINT -- - _ 204?0 MAINTAIN 2' MN. AR :f'ACf 5 DOWEL O 12"O.C. BE /4 NOSE -��--•� ~ R-38 INSUL. ABOVE INSULt.�,. �- - -2.8 PR. TR. PLATE SEE ELEVATIONS FOR GUTTER• DOWNSPOUT 2x4 KEYWAY' BAR 12'MIN. SEE ELEVATIONS FOR GUTTER 8: DOWNSPOUT - 11e I(MOTYP )STAIR WALL . 2.4 SOFFIT FRAMING AS RED•D I + O 41x8 O.C, A ONG lOP / CONTAINMENT FLOOR SLAB � I 6 MIL POLY V.B. - Ixl WOOD TRIM J - (ANCHOR TO BLOCK WALL) �� (SEAL JOINTS PER SUB DTL.) OF WALL POUR 7/2" OSB SHEATHING DETAIL •� 5/8"GYP. B0. ` 24 GA. MIN METAL FASCIA A U 12' WITH UPPED SEAM O 7" 2 FROM TOP F NDATION REINFORCING: m ALTERNATE ?AILS 4 4 NO SCALE 0 DOUBLE BOND BEAM W/ 2-/1 - \ (PREFINISHED PER SPEC,) 1 VEV RI C-AL - �S BARS O Ij O.C. CON 7AINMEN7 FLOOR —j- /4 BARS IN ETC. I HORIZ. - /5 BARS O 16' O.C. 7'-4" VENTED METAL SOFFIT 'T (METAL SOFFIT O GABLE ENDS) NOTES: 1.)CONTINUOUS BOND BEAM -- 1.2 CEDAR TRIM W/COLORED CALK C STAIR SECTION REO'D O 8'-0'WALL HEIGHT O EXPOSED JOINT - 2-)JOINT REINFORCEMENT REO'D --- 8" SPLIT FACE CMU WALL PER SPEC. ALTERNATE TAILS �- DOT-_OF FOOTING- 3 4 NO SCALE O EVERY SECOND COURSE. W 195.OJ (BROWN) B• A DROP FDN WALI FAS 7 IRST 3.)ALL EXTERIOR CMU WALLS - \--3-/1 CONTINUOUS IN CONC, FTG. FOR SUB STL. SEE D'I REO'D TO FORM FIRST ARF f0 BE INSULATED WITH 04S DES•OFCAILERT. MIN.OPENINCS■ ' I•-e' ��- /STAIR RISER LOOSE FILL INSULATION PER SPEC. SECTION 07/210. BOND BEAM W/ 2-/4 �OPERATIN6 Ir L00k _- 4.)INSULATE EXTERIOR FOUNDATION l0a/0 /5 BAR f WALLS UP 70 6" BELOW GRADE -WITH RIGID INSULATION PER SPEC. SECTION 07/270. _ 2x4 KEYWAY 2"CPVC PIPE WITH / P•.0 7.`9.�i*f RF Lr VALVE ��--�� TUBING INSERTED FC _ -- CAUSTIC SODA INTO _ 1 - - BONO BEAM W/2-/4 IR TRANSMISSION LINE /2 OCEL OINX 3 / GRADE 10 DRAIN AWAY FROM BL "OC 1 ALL THE WAY AROUND FOUNDATION n TOP OF FOUNDATION CORE DRILL AND PROVIDE h � /4 M ELEV.VARIES - SEF F^,uNDA710N PUN V - 6• BUTTERFLY VAI [MODULAR WALL SEA (TYP COMPACTED EARTH (TYv.)USE BAR / APPROX_ LIMNS OF FILL I 36"TRANSMISSION RA ROOM6x6-W2.OxW2.0 wwf 1/2" EXPANSION JT MAT'L o CAUSTIC LINE ---_ GENERATOR FLOOR FLOOOR SLAB _-- (SET 3/1" BELOW TOP 8 �+ SODA /5 BAR m SEAL W/ SILICONE SEALANT O DISCHARGE _ - OVER APPROVED BACKER ROD) -- DIRECTLY W -- -- DAMPROOFING PER SPEC. NTIJ r2x4 KEYWAY oI a R // ---- \ WATER STOP PER ^-- ---- SEE FOUNDATION PUN FLFARWELI - -. 30 BUTTERFLY VALVE LwE m Z U m _CONC. SUB CONTINUOUS CONC. }0'rRANSMISvoN RCINF. W 1 BARS FDN_WALL O 12" O.C. EA. WAY J - p 6"COMPACTED --- \ DTL. O SUB / AND ELEVATIONS FOR > PENETRATE RECYCLE LINE f GRAVEL FILL `y FTC. JOINT --- --- ELEV. CHANGES IN TOP WFP OPERATING m m > ` OF CONC. WALI. NEW CHEMICAL 8' DOA'EL O T FLOOR HERE PIPING NOTES: 8" O.C. p DIFFUSER (TYP.) HEY+ TARPINC 2"CPVC PIPE FOR m W TOP F FOOTING U SADDLE (TYP.) R LATK)N/ 1. ROUTE 2 AIR PIPING AS POSSIBLE. SAMPLE STAIR SECTION Z U w SAMPLE WATER - AVOID AND LIQUID TRAPS - 3 0: O W r BLOT. OF FOOTING 2. ALL ITEMS EXISTING UNLESS OTHERWISE NOTED. \4 4 NO SCALE n 6 MIL POLY VAPOR BAR. - 1 •• ' CHEMICAL DIFFUSER DETAIL (PLAN) NOTE. STRUCTURAL AREAS (THIN L FOUNDATION REINFORCING: (AT_WATER TREATMENT BUILDING) IN ALL FILL RIM WITHIN VERTICAL - /4 BARS O 16'O.C. BUILDING PERIMETER h HORIZ. - /4 BARS O 18" O.C. \ NO SCALE 0 � UNDER FOOTINGS. %, Z J 3-/4 CONTINUOUS IN Co.,:. FTG. . IAILS �_ 36"TRANSMISSION LINE Q ALTFRNATI Q _ -- ------ - — HEAD J NOIL. MAINIA;N C' OF COMP w GRAVEL FILL UNDER ALL q BUILDING SECTION - 8" SPLIT FACE CMU WALL m INTERIOR SLABS ------- --- 3 4 SCALE: 1/2" = i'-O" NEW 2'CPVC RECIRCULATING [] 0 Z SAMPLE WATER LINE WITH BALL VALVES (LEAD _ - w 0 1/2•EXPANSION JT MAi'L -_- _ (SET 3/4'BELOW TOP h - 2-/1 BARS O HEADER BOND BEAM /^\ SEAL W// BE SEALANT • • w OVER APPROVED BACKER ROD) INSIDE FACE OF e' CMV WALL CMU WALL 6"CoNC. SLAB W/ - /a O 12" D.C. U. WAY- - --- 2-/4 BARS O HEADER BOND BEAM 11"���1 • • 4"'THREADED LENGTH CAL SILICONE CAULK Al PERIMETER CONNECTION TO CHEMICAL � w N Z PIPIN - - O FOUNDATION WALL CAULK FULL PLRIMIIER 1 - MIL,DRIP EDGE = BOTH SIDES OF WAIL - U U T ALUM.SLIDING WIN) QUICK CONNECTION 2,J \-CAUU(AROUND FRAME (IHCRYAI BREAK FRAME) ADAPTER WITH CAP (SILICONE PER SPCC.) (FlXCD ALUMINUM WINDOW SIMILAR) AS SPECIFIED AND AS H.Y.FRAME PER CHEM.SUPPLIER'S WATER STOP MATERIAL , ' I REQUIREMENTS. � �)N.Y.DR.PER SPEC. JAMB I�.I WA EENSTRLAK / 705)- _ -- FOOTING COtIPI IN(; AS REQUIRED ----- t—. I 9/16! .y t 15/16' / 2-/4 BARS .• • •,.y /E CONTAINMENT AREAINTERIOR _ FLOOR SLAB ----- �' 7 1/2 '1 z r. � CIS 1 1/2" 1=0" �--- --- --------- JAMB AEINFSORm CYU•OPENING LL 3 4 = FLANGE VBTH SIUO SOUS. z THREADED S S. FLANGE.1 WELD TO PIPE. 2-// BARS- -• • 0 f;ELD INSTALLED — CORE ORtll HOLE I', MASONRY FOR Fill ��. PENETRATION O E ' Y E-X TE�IO12 „7 � O CAUL%AROUND PEC.) T 1/2• EXPANSION JT MAT'L WALL WIDTH / / (SILICONE PER SP(C.) r`T L N.Y.FRAYED l!'Vy C-` (SET BELOW WATER STOP) WEATHERSIRP FRAME PERIMETER- I..I SEAL JT. W/SILICONE SEALANT O _ OVER APPROVED BACKER ROD)-1 i6•8" O.C. EA. WAY IN TANK BASE � GCS —�T _FILL LINE DETAIL3-NO SCALE MIL 7HRESK RSE OLD \ WEATHEAL r_ • `I • ■ �, 3 4 _ SILICONE CAULK Al PERIMETER CONC SLAB WATER STOP MATERIAL - FLOOR SLAB (CREENSTREAK / 705) / "ILL A:K 1 - SILL 2-/4 BARS - y-.. Qi .,sp, J.B.M. IN IN • . • L - DATE RF.�"ION SHEF' -- Tn H DOOR OPENING I TYPR AL WINDOW OPENING F TANK BASE FLOOR SLAB 3 4 SCALE:, ,/2,,_D SCALE: 4 3 41 SCALE: 1 1/2" = 1'-O" of 7 2- N4 HORIZ. BARS OTOP "`>"E11111a (3" CLEARANCE) 5200®-- F--1 2 -#4 BARS O 1' O.C. k4 HORIZONTAL BAR 5; la: 1 -N4 BAR O 1 O.C. lflj 1�49 CONCRETE RAMP (3:1 SIDE SLOPE) 6" TOPSOIL ON DISTURBED AREA 000°—®5197.5 NATIVE MATERIAL '� 0 8 o a p pp e a p o o° o° o i 12"CRUSHED GRAVEL (:,EL NOTE) COMPACTED BACKFILL SUB-RADE STABILIZATION Hy (90% STANDARD PROCTOR)! ° - --- °_ FFA6BRRIC ^ NATIVE MATERIAL COMPACTED BACKFILL (95% MODIFIED PROCTOR) O NEW SLUDGE DRYING BASIN /'� , o r-I (\T , r r / / / y`T' EXISTING GROUND -- '_.�II' #4 HOR�IZ. BARS O TO- COMPACT EXISTING GROUND ON95% P) U J 1�, PLAN S7g3 r / r - MODIFIED PROCTOR O A_ J ' r / / / r / N4 BARS- 12" O.C. �•• 12• ✓n R. EXISTING CONTOUR (IYP.)-----�� / r r rr 7 i ALTERNATE TAILS ---tg 5194 U; SCALE: 1" = 30' FINAL CONTOUR (lYP) _ ,/ r / r / > +� /' / ,' NOTE: GRAVEL BOTTOM FOR SLUDGEJIM& .. / / , DRYING BEDS SHALL BE COMPACTE! /' _y r ,� // p // /� / SECTION A—A IN 12-INCH LIFTS SHALL MEET MODIFIk.L 5194 �_ i- �-� � /� � i PROCTOR AND SHALL MEET THE NEW f'�CHAIN LINK I��� rr i NO SCALE FOLLOWING GRADATION REQUIREMENTS: N L//^----_ --mom/ FE E AROUND .ti -i r DGE DRYING BASIN {� /r r SIEVE SIZE PERCENT PA�r4,' J `z COMPACTED / / / -'L----W 10P OF WALL 1 INCH 100% EARTH BACKFILL 5195---------- r r N4 SIEVE 25-60% �[ i / f— �i FUTURE // PROPOSED NEW 6' CHAIN LINK FENCE , �200 SIEVE 8-12% SLUDGE DRYING rr r CO W BASIN / / FENCE POSTS SHALL BE EMBEDDED 20' WIDE ROAD - b �✓� / �, /'� , G� 1. "� iW' Iso') ,10 OR ANCHORED TO TOP OF CONCRETE 5196-------_ /t:� /�/ /, /�/ /,/ // /,0 WALL PER APPROVED SHOP DRAWINGS ,�.:� / VJ�OVIDE SWALEIfO,DRAIN SLOPES. THREE 20' WIDE OPENINGS EACH WITH \ . . i/ / ­,APPROX. DRAIOAGE SLOPE 1,14 5200 Q-- 2- 10' WIDE CHAIN LINK GATES 2- y4 HORIZ. BARS OTOP -'��``_ N4 HORIZ. BARS O 10" (,3" CLEARANCE) NATIVE MATERIAL COMPACTED BACKFILL (90% STANDARD PROCTOR) 6"TOPSOIL ON 5197.5 �i w DISTURBED AREA 12" CRUSHED GRAVEL (SEE NOTE) z /' / , SUBGRADE STABILIZATION J n ELf j: 5199.5/� /'� / -� i /,' FfABBRIC m uL o - - ( ———— �� , /� • EXISTING GROUND / NATIVE MATERIAL _ --__NA Z m Y I- -;- COMPACTED BACKFILL m (95% MODIFIED PROCTOR) 5199 — 10' GATE / EXISTING GROUND (TYP.) .r O W I --E'IS TING�FENCE TO IBE REMOVED -,-.- /f4 HORIZ. BARS ® 10" COMPACT TO 95% 1 MODIFIED PROCTOR a o #4 BARS- 18" O.C. I { ALTERNATE TAILS5200-_--� 0,/- 1 ill --�5194 Q I 5ti � cn ui LU Q I-- TI — m Q SEC ON B B W ' I NO SCALE I Z� W I 1 [uTOA[ EXISTING � Q Q Q "csws. BACKWASH 5200�__I. sun["SIN SURGE BASIN NAIVE MATERIAL - - Z ( - COMPACTED BACKFILL i W r v i W (90. STANDARD ROTOR i A Boa ,. CONCRETE RAMP p� F— r' I • j EXISTING 6" TOPSOIL ON �' W 0 -t -�- - - -- -— FIELD DISTURBED AREA ) _ f HtHndCC 1 ; �� O \\ 7. ---_1 I I off° o b 00p00 0080 ° �--I `----®St9 :, \ I I 12"CRU-S ED GRAVEL (SEE NOTE) 1 I I EXISTING GROUND _( SUBGRADE STABILIZATION Vj [vsr ww[H� FABRIC .. EXISTING GROUND (TYP.) py COMPACT 9 k4 HORIZ BARS O 10" MODIFIED PROCTOR ,. - ----------- - Z� .r --- -- a4 BARS- 18" O.C.- Iz' ►►••••�� �• -------------- -- - - - -- ALTERNATE. TAILS -�5194 0 •Id GJ r1�I G � � `TC'T10N C- C Q 1" NO SCALE Q[ UuSTIHG B.CI[wASH ��//�� C-4 EXISTING WATER e.vHs V1 N�1..1 TREATMENT PLANT C y BUILDING r.+ I 5204 00 - J°t -6. Ev51y.[.GHGvxG(tro.7—\I Af'Ex[ SLFv 5200 )0 - ,�fi0R0°OE 5196.00 ---_- 5192.00 - 0.00 40.00 80.00 120.00 160.00 200.00 sP -- P� ON S UCN T N D D i"=20' HORIZ. --- - 5 1"=5' VERT. of 7 1 2 3 4 5 I 6 7 9 9 10 fff }'VENT CITY SHOULD ADD PLUG "TANK -- BACKFLOW PREVENTER HERE ` I/ FILL PLUMBING EQUIPMENT SCHEDULE TANK LEVEL FLUE 1'FLUE PRESSURE HEMICAL FROOTI, P UP THRU GUH-2 SYMBOL SPECIFICATION 0 SENSOR DELIVERY HOSE OUICK COUPLER -3/4' ROOF BOT EL GUH-, �cA �szosso FLOOR DRAINS causnc -- BOT EL SODA -- STORAGE 5206 50 ---� \ f FD-1 J.R. SMITH 2310 SERIES TAN (r sHsr-, FLOOR CLEANOUTS VALVE CD-2 D FCO-1 J.R. SMITH 4033 SERIES HOSE TRANSITION }-TANK DRY CHEMICAI 4(OUV'N (TYP) OUTLET A NOZZLES(TYP) -, SINK 3/4' [0 �FR SINK 18 GAUGE STAINLESS STEEL, DRAIN OPENING FOR PRESSURE hAIN TEMPERAVRE }"TRANSITION P STANDARD CUP STRAINER, ONE FAUCET HOLE. RELIEF VALVE PUMP POO FLANGE -y"GA 3/4- TEMPERED (TYP OF 3) GA5 JUST 'MODEL SLX-2225-A-GR" WITH MOEN "MODEL WATER t/z-REINFORCED PVC TUBING TEMPERED 7551" FAUCET. TA _ IN 2'CPVC PIPE 10 CLEARWELL WATER TANK '/2 ,/ WTP CLEARWELL NOTE 1) /2' `1/2' -2'BU EMERGENCY SHOWER/EYEWASH SINK 1 LOCATE BELOW ES EEW SPEAKMAN 'SE-690' 1 XISTING P.WATER F3ACKFLOW PREVENTER) / HOSE BIB I/2 ES/FF+ 3/4" WA R31 OTRANSMISSION _. PRE SSI.RF LINE �CAUCE ��� JN W� / ACKFLOW - I'// 1 J TO____MODULAR R (RYVEN TR COPPER CPVC DRAIN 2 B 1 1/2" 3'F 1 I 3' SLOPE 3'FCO-1 /T' 3'SANITARY 1 1/2- H iAPHRAGM DRAIN PRV-1 E,ER y�yE DIFNSER /'EXI•S1TING 2'BU - - -� l ACK (TYP OF 2) ASSEMBW/TAPP NG r/ W TE POTABLE 3' j 3- MECHANICAL ABBREVIATIONS PSRusi wuFG) wNE R TRANSMISSION SADDLE(TYP) T /2 VENT VALVE - AFF ABOVE FINISH FLOOR (NORMALLY CLOSED) f - AD ACCESS DOOR I 1 1/2'V INK EDUGER 1 1"GAS BU BELL UP TYP) 1 FOR CONT DRY CHEMICAL 1 SEE SITE CONTAINER CD CONTROL DAMPER BALL VALVE PLAN �I E ELECTRIC OPERATOR (TYP) El ELEVATION ES/EEW EMERGENCY SHOVER/EMERGENCY EYEWASH ��, ,,,��� ///���___ ''' m CORP STOP FCO FLOOR DRAIN ICI aND TAPPING FD FLOOR DRAIN HEADER J/I //yfl -SADDLE [EL.5201.50 CUR GAS UNIT HEATER CHECK --- I•f----- -- VALVE CEN TRINGAL WON PF PROPELLER FAN (TIP) PUMP,SHP-, (TYP) PRV PRESSURE REDUCING VALVE 2-� SAMPLE LINE NOTE: FLUSH PVC TUBING WITH CLEAN L. T THERMOSTAT WATER PRIOR TO REMOVING OR TYR TYPICAL PERFORMING MAINTENANCE MECHANICAL/HVAC V VENT FLOOR PLAN VTR VENT THRU Roof PIPING CL-II.CL-30.CL-20,GL-X S H MA IC NO SCALE 2"MIN 1 1 2'MIN TO CLEARANCE FOR ED SURFACE, BETWEEN 3"MIN TO UH-1 WALL MOUNTED LIGHT GUH-2 CONDUITS EXCAVATION PCC-1 _ MARS AXB SPACING MS ` ` � 1/0 TOPNS_URFACEA% D ^d T [Q CO-2 DM ,:D-1 `312 BA�SB - t� LObAP 8 PF_1 MEAT OO NOTE: MIICERAN s� A NOTIO 8) 1 a AND REBARS 3 I CARLONHIGH IMPACT NOTE, SERIS28ES AND SPACERS ENC TYPE 4x TO PULL f�JK " SERIES SPACERS Z ,1 ENCLOSURES �" ON 0'-0'MAX J •+ CENTERS CONDUIT NUMBER •• (TYP) STA TER �- 2-WALL MOUNTED LIGHTS A S CONSTRUCTED F SHP-t WALL MOUNTED LIGHT---�"'� FOSR SHVI- O PCC- E HF 1-,/Y x e" TO PULL BOx� I F1 - CONCRUNDER EPPACERS NOTES; yI GFI SPARE -J 1- CONTRACTOR SHALL PROVIDE AND INSTALL 2-LAMP FLUORESCENT W/ABS THERMOPLASTIC HOUSING AND IMPACT RESISTANT ACRYLLIC DIFFUSE SUITABLE FOR WET AND CORROSIVE ENVIRONMENTS- LITHONIA MODEL EyS TYPICAL DUCT BANK DM240AR120 OR APPROVED EQUAL.PENDANT MOUNT FIXTURES 8'6"FROM FLOOR. �U TYPICAL DUCT SECTION A SECTION FIRE SYSTEM T GFI 2-CONTRACTOR TO PROVIDE AND INSTALL OUTDOOR,WALL MOUNTED, PULL BOX NO SCALE E_2 NO SCALE AT EXISTING WATER TREATMENT PLANT, CONTRACTOR TO VERIFY EXACT LOCATION OF CONTROL ROOM WHERE EXISTING PLANT CONTROL CENTER-PCC'AND TO PeNEL'CL' EXISTING LIGHTING PANEL"CL'ARE LOCATED APPROXIMATELY 60 FT SOUTH OF TO EXISTING BUILDING ENTRANCE. CONTRACTOR TO FIELD DETERMINE EXACT PANEL PULL BOx (TYP. ROUTING OF CONDUIT INSIDE THE EXISTING WATER TREATMENT PLANT BUILDING. IF- MA UAL SWATCH E_2 3.CONTRACTOR TO INSTALL SOW HIGH PRESSURE SODIUM WALL-PAK,DARN BRONZE DIE-CAST ALUMINUM HOUSING,PRISMATIC GLASS REFRACTOR, 120V FIXTURES 8'6'HIGH. `iT O PANEL"CL'COI ON 11E4.CONDUITS SHALL BE ROUTED OVERHEAD OR WITHIN WALLS TO ELECTRICAL EQUIPMENT r ` r LOCATED`WITHIN THE CONTAINMENT AREA. ! SHEET 2 OF 7 :.J I.- A,S CONSTRUCTED C H A N V E S 5.SEE DRAWING E-1 FOR ELECTRICAL LEGEND h ABBREVIATIONS AND GENERAL REQUIREMENTS. PEA DAMSCHEN AND ASSOCIATES ELECTRICAL FLOOR PLAN CITY OF BOZEMAN, MONTANA - WATER TREATMENT FACILITIES E-1 DESIGNED BMC.ROJ.KLM PROJECT NO. Damechen k Associates, Inc. DETAILED JRT,KLM Black 6 Vleatcrf ELECTRICAL/MECHANICAL _ CHECKED_ AWE Denver, Colorado FLOOR PLANS AND SHEET 5/19/99 AS CONSTRUCTED I R,H. �"'��µ' APPROVED Kansas City, Missouri 28678 6 OF 7 DATE REVISIONS AND RECORD OF ISSUE NO. BY CK AP DATE 23 SCHEMATIC CCG.DWG.NO: 28670 300 OUO-LO02 I 1 2 3 0 5 I 6 7 B g 10 ONE—LINE DIAGRAM LEGEND PH METER A AMBER, AMPERE.ALARM GUH-1 GUH-2 y� AC ALTERNATING CURRENT o AR ALARM RELAY AWG AMERICAN WIRE GAGE NOTE I CO CIRCUIT BREAKER CHEM FEED PUMPS t THRU },PF-1 CK1 CIRCUIT `\ CT CYCLE TIMER OR CURRENT TRANSFORMER 4'C 4'CONDUIT CMEM FEED LTG/RCPTN AND PRE SUPRESSION DM DAMPER MOTOR 3-1PR/I6S,1' ITM ELAPSED TIME METER FVS EMERGENCY VENTILATION SHUTOFF ry + n n •a ^ ^ n - R f. GREEN OR GROUND o PH ANALYZER, GUH-1, GUH . q8G Ifs GROUND WIRE a' NOTE CIRCUIT FOR PUMP SHP-1 NOT SHOWN. H7 HERTZ(CYCLE) a = 14 lv xl n I;0 INPUT/OUTPUT !� u U u a I/I I/I II NOTE 5 U JH JUNCTION BOX F:VA KILOVOLT AMPERE MS MS a N MAGNETIC MOTOR STARTER 1/20 DM OM CS EVS T T 2 MFR MANUFACTURER MS MANUAL MOTOR STARTER 2P 2 POLE U (,, R RED,RAISE,RELAY OR REVERSE U d 2T IRLCP RECEPTACLE U U \ CPT F u z CB J ON/OF• O) S2 SIZE 2 STARTER M SS SELECTOR SWATCH n L-G UNDERGROUND Z Z O ¢2 WI ¢2 VOLrs vA VOLT AMPERE o Wm WEATHERPROOF z c`3•g o o u izzz w n �> > �y��++ o aI > x ikl SOLID LINES NBICATE NEW WORK OR EQUIPMENT. 2 SCREENED LINES( >INDICATE EXISTING WORK OR EQUIPMENT. PROPELLER FAN PF-1 GUH-1 GUH-2 PUMP SHP-1 PH MONITORING SYSTEM ONE—LINE ONE—LINE ONE—LINE ONE—LINE ONE—LINE (TYP. OF 2) CONDUIT & WIRING INSTALLATION LEGEND METERING PUMP CONTROLLER NOTE 5 EXISTING PLANT CONTROL CENTER'PCC PUMP (NOTE4) SHORT DASH FOR EACH PHASE CONDUCTOR. LONG DASH FOR NEUTRAL CONDUCTOR.CIRCULAR DASH NOTE 4 FOR GROUND WIRE. ( CONCRETE ENCASED CONDUCTOR 120VAC PANEL'CL' CB) ELECTRICAL SYMBOLS D NOTE 2 SS m • WARE INTERSECTION POINT m � \ fV��OFF� CD-t� CD-2 0 Ol j �� M Q. n d l- NORMALLY OPEN CONTACT CD-1� EXISTING G SCADA DM - - NORMALLY CLOSED CONTACT j CD-20 Ou a a DM STARTER,CONTACTOR OR RELAY COIL i a NOTE 4 M ry WALL MOUNTED LIGHT MOTOR a m ii o i i I I ® FUSE a n a a LT CONTROL POWER rvrv� TRANSFORMER PROPELLER FAN P —1 `FIB RECEPTACLE E US DISCONNECT SWITCH SYMBOL LEGEND: IC T, MOTOR STARTER g w REMOTE FROM STARTER AND DRIVEN EQUIPMENT IL'N _ i Q AT DRIVEN EQUIPMENT O UNDERGROUND FLUORESCENT LIGHTING FIXTURE n �^ uT` a o � g z a NOTES: n a a 1i� o a� u z 1.CONTRACTOR TO COORDINATE WITH OWNER EXACT PANEL CIRCUIT TO BE USED. I/I ELECTRONIC SIGNAL BOOSTER ISOLATER i i =_ < uWN F PROVIDE 2P-20 AMPERE CIRCUIT BREAKER AS REWIRED WITH SHORT CIRCUIT n 2rc �S xcwi w INTERRUPTING RATING 10 MATCH EXISTING. 2. CONTRACTOR TO VERIFY LOCATION OF EXISTING SCADA PANEL IN PLANT CONTROL ROOM. CS CONTROL STATION }.CONTRACTOR TO LOCATE EXISTING PLANT CONTROL PANEL IN CONTROL ROOM. F METERING PUMP SHMP-1 METERING PUMP 4.OWNER SHALL BE RESPONSIBLE FOR COORDINATING AND SUPPLYING 1/0 DISCONNECT SWATCH (TYP.FOR SHMP-2 AND SHMP-3) CONTROL PANEL CARDS AND PROGRAMMING FOR EXISTING SCADA SYSTEM AND PCC. CONTROL PANEL ONE—LINE ONE LINE 5. CONTRACTOR SHALL PROVIDE A SELECTOR SWITCH FOR SELECTING EITHER SIZE I COMBINATION STARTER (TW OF 3) OF THE PH METERS. AS CONSTRUCTED NO [F: A'D CC'N '-ST T E D CHANGES "t N AND ASSOCIATES CITY OF BOZEMAN, MONTANA WATER TREATMENT FACILITIES E-2 DESIGNED KLM PROJECT N0. -- --- - - Damschen & Associates, Inc. DETAILED KLM Bh3CK6NIeStCh --- ---- CHECKED AWE � Denver, Colorado ELECTRICAL 28678 SHEET APPROVED Kansas City, Missouri ONE—LINES AND BLOCK DIAGRAMS 7 of 7 DATE REVISIONS AND RECORD OF ISSUE NO. BY CK APE DATE CCG.DWG.NO: 28678-300-000-EOOI