Loading...
HomeMy WebLinkAboutStadium Center Utility Improvements - Storm Drain MHy 2,(48"DIA.)STA 2+59.25 t RIM 4913.78 _ - - - - __ _ - - - - - - - - _ _ _ - ` -INV.IN =4910.35 E - - - _ _ _ - /., _ I INV.OUT=4910.19( - _ �I �e FUTURE So. 11th AVENUE (I TEL OHE OHE TEL TEL So. 11th AVENUE - } �- --- --8"W-------8'w--- --T---12"W-------12"W`- ----1�W---- - tYw---- 1t d D D ( I 3 h FUTURE RIGHT-OF-WAY LINE SIDEWALK - k _ 1 I EASEMENT GENERAL NOTES ICq bD,of 1 66 I{ I W �x 1. UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE AND ARE NOT TO IBE CONSIDERED COPLETE.I I OF ALL BURIED UTIILITE PRI RE TO ACTOROTHE BEGINNING OF CONSTRUCTIONCATION THE COTRACTOR SHALL PROTECT ALL EXISTING UTILITY LINES DURING ------ I I IZ CONSTRUCTION. ALL UTILITY LINES DAMAGED DURING CONSTRUCTION DETENTION BASIN OUTLET PIPES I I ( �� /�/ I ACTIVITIES SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. � \ I I I 2. ALL CONSTRUCTION SHALL CONFORM TO THE ACCOMPANYING PLANS AND THE BASIN STORM DRAIN OUTLET OUTLET' OUTLET OUTLET I I i� �� /� �\ I I I MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, FOURTH EDITION, DATED No. STATION PIPE olA. STRUCTURE DIA. SLOT vnonl STRUCTURE ELEv, I JANUARY, 1996. ADDENDUM No. 1, DATED JUNE, 1998. AND THE CITY OF BOZEMAN I i I I MODIFICATIONS, DATED MAY, 1997, ADDENDUM No. 1, DATED FEBRUARY 28, 1998. #2 0+87.8 12"PVC 24"RCP 2-0" 4907.72 I 1 - I " I I 3. NO CHANGE OR MODIFICATION OF THE APPROVED PLANS AND SPECIFICATIONS M3 0+83.9 12"PVC 24'RCP 2-7/8- 4908.46 y4 2+60 B" PVC 15"RCP 1-3/8' 49111.46 I i II �• �1J, � I I SHALL BE MADE WITHOUTBOZEMAN THE PRIOR WRITTEN APPROVAL OF THE ENGINEER (\/' AND THE CITY OF BOZEMAN ENGINEERING DEPARTMENT. N6 2+80 8' PVC 15'RCP 1-1/2' 491248 \ p MH/4, 4+08 e' PVC u"RCP 1-1/2' 49,z.ee q 1�. I I I a 4. A PRECONSTRUCTION MEETING SHALL BE HELD PRIOR TO COMMENCEMENT 5 5+60 8' PVC 15"RCP t-1a 49,6.32 I I I I OF WORK. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER rY8 MH{' / WORKING DRAWINGS, SPECIFICATION SHEETS, ETC., FOR ALL EQUIPMENT AND $ I Z / RIM =4913.z0 --- MATERIALS TO BE USED ON THE PROJECT AT LEAST ONE WEEK PRIOR TO •SEE SITE GRADING AND DRAINAGE PLAN FOR HEIGHT AND DETAIL OF OUTLET STRUCTURE. I I I I MHM 1,(72"DIA.),STA G+00( / I INV.IN = 4913.20(SW) W/RING AND SLOTTED COVE I NV.IN = 4909.76(B'PVG) I I & THE PRECONSTRUCTION MEETING, INSTALLATION SHALL NOT BE DETENTION BASIN OUTLET STRUCTURES AND PIPES TO BE INSTALLED WITH STORM DRAIN ;D 1 RIM -4909.54 / INV.OU7 =4908.0 (N) I 1 MADE WITHOUT THE PRIOR WRITTEN APPROVAL OF ALL EQUIPMENT AND MAIN FOR DETENTION BASINS Nos. 2,3,4,6,7,AND B. INV.IN =4905.60 E W) I I MATERIALS BY THE ENGINEER. F: INV,OUT- 4905.38 ';A-z` CONNECT DETENTION BASIN OUTLET PIPES TO STORM DRAIN MAIN NTH I I - II , �/ �) y`' l s� I I I �B SNN�7 I I I;STA�ED CATCH BASIN, 5. THE ENGINEER AND THE CITY OF BOZEMAN ENGINEERING DEPARTMENT SHALL FOWLER MANUFACTURING COMPANY INC."INSERTA TEE'. z w 4'RT-S A 8+1&92 F - o �\ )ETEN If ) C.O.B 48;COMBINATION BE NOTIFIED AT LEAST 24 HOURS PRIOR TO BEGINNING CONSTRUCTION. 24"OUTLET STRUCTURE FOR DETENTION BASINS p2 AND/3 TO HAVE OPEN I •U, I 1 BASIN/4 B.W, 1 I STORM DRAIN INLET(02721-2B) 6. TYPE 1 OR TYPE 2 TRENCH EXCAVATION MAY BE USED AT THE DISCRETION TOP WITH IFCO 788 BEEHIVE GRATE. .�]! a I I I I GRATE EL =4915.83 t"• Y I II / / 5}A 8+14.92-INSIALIEO INV.OUT-4913.41 (W) OF THE CONTRACTOR. d s (� STORM DRAIN LINE "A" _ - O _ 8'x2814'ARCH END INSTALL SILT FENCE.10'DIA, I , - - -J ° I 1 I AROUND CATCH BASIN. 7. PROJECT BENCHMARK: NORTHWEST BONNET BOLT. FIRE HYDRANT 605 AT En 'z I ----4+0 SS THE SOUTHWEST CORNER OF WEST KAGY BLVD. AND SOUTH 11th AVE. 1+00 2+00 _ 3 I ELEVATION = 4914.13 (PROJECT DATUM) 3+00 e,W 8. ALL CONSTRUCTION SHALL MEET APPLICABLE OSHA SAFETY STANDARDS. - � I -� - _ o INSTALLED 18'x28Yr-ARCH RCP �7 '\ \ I 9. THE CONTRACTOR SHALL OBTAIN STREET CUT PERMITS FOR ALL WORK DONE '•"' F -\ �/��a�u 1 I WITHIN PUBLIC RIGHT-OF-WAY. NSTALL 24'CLASS III w• I MH/ 6,(60'DIA.),STA 7+18.92 MHy 3,(BO'DIA.)).STA 0+48.83 - � DETENTION S I INSTALLED 14 LF,24-CLASS III RCP 10. THE CONTRACTOR SHALL REPAVE ALL AREAS OF EXISTING ASPHALT REMOVED RIM =4904.74 a RCP(TYP.) \ \ I BASIN x AT 0.4%SOUTH AND PLUG INV,IN = 4906.03{5) I z \ \ ,� I / �O �I MHM 5.(48'DIA.),STA 5+60.12 RIM =49n.24 DURING CONSTRUCTION ACTIVITIES, MATCH EXISTING PAVEMENT THICKNESS, INV,OUI=4905.82(E) INV.IN =4912.90(E L_ RIM 4915.96 INV.IN =4912.83(5 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY AND SAFELY FENCING IN = 4917.u7 S (N))) ALL OPEN EXCAVATIONS. THE FENCING SHALL BE MAINTAINED BY THE CONTRACTOF / 1 INV.IN = 4912.57 8)'PVC) INV.OUT= 4912.87 U A.5• I„ INV.EL =4912.89 y. INV.OUT=4911.6E( L - 1 � -e•ss e"ss� 'SS s SCALE: 1"=50• 1� y}+� \ ;I Im I n I� FNE AS-BUILT DRAWING OLERIM ELEVATIONS WILL CHANGE JUNE 1999 15 DJUSTED TO FINISHED STDETENTIOt REET GRADE. BASIN 0 _ N \ \ 16 Nm� qO,q STORM DRAIN LINE B 3 STORM DRAIN LINE A 4920 < mno, ao i a a.°iiY 1 IF 492c, orioo _m 3 Src, ; InII 4 } u 1 1 vo mm� V� xm,� i +om EXISTING GROUND PROFILE $ oo� 8 $g oga c- i > o n 1& 4915 0 X 1 « PROPOSED FINISHED GRADE- 491` < < nll EXISTING 21'RCP ��_ N1 z� ��/^a ! 2.27R ,59 L.F.24'CUSS III RCP O D.SOS 100 L.F.18'0?, A"Lq"11 3a gzz �- gzz �"&zZ _ '� GLP111 RCP O RCP 0491D .F.24' MIN. 4310 _ 15,2 SEPARATION MIN. 259 L.F,27'CLA _-_ ( - � 359 L.F 24'CLASS III RCP O 0.5x_ MIN.SEPARATION SS III RCP - MIN. SEPAR,TION 15' O 1,7 � U SEPARATION eo M1905 1.5' w �u-w rs 4905 4•w 49 L.F. m 0 RC P O 0.517L CLASS III III "1 sY va I a mz I r O yo unnu mi 4 ¢Jn ~X Vt ' 4900 2ii �m a��� <o 490C AS-BUILT DRAWING V~U. EXISTING GROUND ElEVAYlONS� STORM DRAIN INVERT ELEVATIONS JUNE 1889 au�I: 489s 4895 M m;n rn V11p r`rnOm� rn-r o°ai rnallo°d' rnaonm� rna•Oat1 rna 1v` 1 a0 Ma 0�Ornan 0,emErnaO rrn< aVmd) rnnxY aoNm hrn h a ro 0I InO NNn O No o ,rn rno 1O rn0 yO e0 O yO m morn am mWn mlrV`n;;io[I ht0 0 Nn�m < 2+00 1+00M., 0+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 Rocky Mountain Engineers DESIGN BY: DATE: DRAWN BY: DATE: DRAWING SCALES: i � R0.YH. •�* RHC 09/20/98 RHC/AOR 10/07/98 PLAN VFW: HORIZONTAL: 1" = 50' �4LQD�C�J,C'�.11 C�CG:I4CG3 M40d[l4�'lG30�/CG�C14� ����� BNTER Tee_ REVISIONS: DATE: CHECKED BY: DATE: CONTOUR INTERVAL: 1' to- 5653 ES C.O.B. Redline 02/12/99 Civil Engineering & Land Surveying '. , r ;s+ AS-BUILT 06/10/99 PROFILE VIEW: HORIZONTAL: 1" = 50' 1700 West Koch Street, Suite 7, Bozeman, Montana 59715 (406)-586-4859 .:,TKO T��11L` DRAWING FILENAME: /787WATER.DWG 07/20/99 VERTICAL: 1" = 5' - ENGI �a_9_o•