Loading...
HomeMy WebLinkAboutA13004 Simment Annexation staff report- Corrected maps Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Chris Saunders, Policy and Planning Manager Wendy Thomas, Community Development Director SUBJECT: Simmental Annexation, annexation of 4.309 acres located southeast of the intersection of Campbell Road and Springhill Road. File Number – A13004 MEETING DATE: January 13, 2014 AGENDA ITEM TYPE: Action RECOMMENDATION: Approval of the Simmental Annexation located southeast of the intersection of Campbell Road and Springhill Road. It is legally described as Lot 1, Block 2, Walker Property PUD Subdivision. RECOMMENDED MOTION: “Having reviewed the staff report, the application materials, considered public comment, and considered all of the information presented, I hereby adopt the findings presented in the staff report for application A-13004 and approve the Simmental annexation subject to the identified contingencies.” Staff report page references: terms of annexation, page 5; findings criteria, page 8. BACKGROUND: The property owner First Montana Bank, made application to the Department of Community Development for annexation of approximately 4.309 acres. The site is presently vacant. The subject property is located southeast of the intersection of Campbell Road and Springhill Road. No public comment has been received regarding this application. If the Commission approves this application the staff and applicant will draft and complete an annexation agreement for consideration by the City Commission at a future meeting. UNRESOLVED ISSUES: None identified. ALTERNATIVES: 1) Approve the annexation as recommended by the DRC. 2) Deny the annexation FISCAL EFFECTS: None identified. Attachments: Staff Report, Applicant’s submittal materials. Report compiled on: January 2, 2013 90 Page 1 of 11 A-13004, Staff Report for the Simmental Annexation Date: City Commission meeting is on January 13, 2014 Project Description: Annexation of 4.309 acres. Project Location: Southeast of the intersection of Campbell Road and Springhill Road. It is legally described as Lot 1, Block 2, Walker Property PUD Subdivision. Recommendation: Approval with conditions Recommended Motion: Having reviewed the staff report, the application materials, considered public comment, and considered all of the information presented, I hereby adopt the findings presented in the staff report for application A -13004 and approve the Simmental annexation subject to the identified contingencies. Report Date: Monday, January 13, 2014 Staff Contact: Chris Saunders TABLE OF CONTENTS SECTION 1 - MAP SERIES .................................................................................................... 2 SECTION 2- RECOMMENDED TERMS OF ANNEXATION ............................................. 4 SECTION 3 - RECOMMENDATION AND FUTURE ACTIONS ........................................ 6 SECTION 4 - STAFF ANALYSIS........................................................................................... 6 Resolution 3907 Criteria ..................................................................................................... 6 APPENDIX A –PROJECT DESCRIPTION AND BACKGROUND ................................... 10 APPENDIX B – NOTICING AND PUBLIC COMMENT ................................................... 10 APPENDIX C – PROJECT GROWTH POLICY AND PROPOSED ZONING ................... 11 APPENDIX D - OWNER INFORMATION AND REVIEWING STAFF............................ 11 A-13004, Staff Report for the Simmental Annexation Page 2 of 11 SECTION 1 - MAP SERIES Vicinity Map showing adjacent zoning Surrounding Zoning and Land Uses North: Unannexed, vacant: zoned AS, Agricultural Suburban South: N. 19th Avenue : zoned B-1, Neighborhood Commercial East: Unannexed, open space: zoned AS, Agricultural Suburban West: Unannexed, Retail: zoned B-1, Neighborhood Commercial A-13004, Staff Report for the Simmental Annexation Page 3 of 11 Vicinity Map from Figure 3-1 of the Bozeman Community Plan A-13004, Staff Report for the Simmental Annexation Page 4 of 11 Vicinity Map of existing City boundary SECTION 2- RECOMMENDED TERMS OF ANNEXATION The following terms of annexation are recommended to enable the application to comply with the City’s Annexation Policy and the requirements of state law for the provision of services. Recommended terms of annexation: 1. That the documents and exhibits to formally annex the subject property shall be identified as the “Simmental Annexation”. 2. That the applicant execute at the Gallatin County Clerk & Recorder’s Office in conjunction with the annexation a waiver of right-to-protest creation of S.I.D.’s for a City- wide Park Maintenance District which would provide a mechanism for the fair and equitable assessment of maintenance costs for City parks as part of the Annexation Agreement. 3. An Annexation Map, titled “Simmental Annexation Map” with a legal description of the property and any adjoining unannexed rights-of-way and/or street access easements (including for Campbell Road) shall be submitted by the applicant for use with the Annexation Agreement. The map must be supplied on a mylar for City records (18" by 24"), a reduced 8 ½" x 11" or 8 ½” by 14" exhibit for filing with the Annexation Agreement at the County Clerk & Recorder, and a digital copy for the City Engineer’s Office. This map must be acceptable to the Director of Public Works and City Engineer’s Office, and shall be submitted with the signed Annexation Agreement. 4. The land owners and their successors shall pay all fire, street, water and sewer impact fees at the time of connection; and for future development, as required by Chapter 2, Bozeman Municipal Code, or as amended at the time of application for any permit listed therein. A-13004, Staff Report for the Simmental Annexation Page 5 of 11 5. That the applicant executes all contingencies and terms of said Annexation Agreement with the City of Bozeman within 60 days of the receipt of the annexation agreement, or annexation approval shall be null and void. 6. This property is located within the Bozeman Solvent Site Payback District (Commission Resolution 3519). The payback specifies that the property shall be assessed $0.082 per square foot (plus the cost of the consumer price index adjustment). This assessment is due in full to the City of Bozeman at the time of hook up to municipal water. 7. The applicant shall provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SID’s) for the following: a. Street improvements to Springhill Road and Campbell Road including but not limited to paving, curb and gutter, sidewalk, and storm drainage improvements b. Improvements to the intersection of Springhill Road and N. 19th Avenue. c. Improvements to the intersection of Springhill Road and Frontage Road (US 10). The document filed shall specify that in the event an SID is not utilized for the completion of these improvements, the developer agrees to participate in an alternate financing method for the completion of said improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development, or a combination thereof. 8. The annexation agreement shall include notice that, prior to development, the applicant will be responsible for installing any facilities required to provide full municipal services to the property in accordance with the City of Bozeman’s infrastructure master plans and all city policies that may be in effect at the time of development. 9. Prior to any development of the subject annexation, a stormwater drainage and grading plan shall be provided to and approved by the City Engineer. The plan must demonstrate that adequate treatment of runoff from the public streets and all future lots will be achieved by providing spot elevations, flow direction arrows, detention and/or retention basin details (including basin sizing calculations and basin typical sections), outlet structure details, and culvert capacity calculations. The plan must also locate and provide easements for adequate drainage ways within the annexation area to transport treated runoff to the stormwater receiving channel. 10. The applicant shall provide and file with the County Clerk and Recorder's office executed Public Street and Utility easements for the following: a. East half (50-ft) of Springhill Road (Minor Arterial Standard Right of Way). 11. At the time of future development the portion of Campbell Road fronting this property will be required to be improved to a City standard local street including curb/gutter, boulevard, and sidewalk or as specified in the Walker Property PUD. 12. Prior to development of the subject annexation, the applicant’s engineer will be required to prepare a comprehensive design report evaluating the existing capacity of both the water and sewer utilities. The report must include hydraulic evaluations of each utility for both A-13004, Staff Report for the Simmental Annexation Page 6 of 11 existing and post development demands. The report findings must demonstrate that adequate capacity is available to serve full development of the annexation area. If adequate water and/or sewer capacity is not available for the full development, the report must identify the water and sewer system improvements required to provide the necessary capacity. Any improvements necessary to serve the full development must be in place prior to further development of the site. 13. The applicant must perform a water rights search to determine if any exist for this property. Any water rights that exist for this property must be transferred to the City of Bozeman prior to development. If insufficient water rights exist, cash in lieu of water rights, in an amount determined by the Director of Public Service, must be paid prior to development. SECTION 3 - RECOMMENDATION AND FUTURE ACTIONS Project Name: Simmental Annexation File: A-13004 Having considered the criteria established for an annexation, the Development Review Committee (DRC) voted on November 27, 2013 to recommend approval with the contingencies identified above. The City Commission will hold a public meeting on the annexation on January 13, 2014. The meeting will be held at 121 N. Rouse Avenue, Bozeman. The meeting will begin at 6 p.m. SECTION 4 - STAFF ANALYSIS In considering applications for approval of the requested annexation, the advisory boards and City Commission shall consider the following: Resolution 3907 Criteria Resolution No. 3907 Goals Goal 1: It shall be the goal of the City of Bozeman to encourage annexations of land contiguous to the City. The property in question is contiguous to the City limits on the south and west sides of the property. Goal 2: The City shall seek to annex all areas that are totally surrounded by the City, without regard to parcel size. Not applicable. The property is not surrounded. Goal 3: The City shall seek to annex all property currently contracting with the City for services such as water, sanitary sewer and/or fire protection. Not applicable. The property is not currently receiving services. A-13004, Staff Report for the Simmental Annexation Page 7 of 11 Goal 4: It shall be the goal of the City of Bozeman to require annexation of all land proposed for development lying within the service boundary of the existing sewer system as depicted in the Bozeman Growth Policy, and to encourage annexations within the urban growth area identified in the Bozeman Growth Policy. The subject property is proposed for office development. The property is located within the City’s water and sewer service area and is within the identified growth area for the City on Figure 3-1 of the Bozeman Community Plan. Resolution No. 3907 Policies Policy 1: Annexations shall include dedication of all easements, rights-of-way for collector and arterial streets, water rights, and waivers of right-to-protest against the creation of improvement districts necessary to provide the essential services for future development of the city. The Recommended Terms of Annexation include requirements for provision of easements and appropriate waivers of right to protest a park maintenance district and improvements to streets. The annexation agreement includes a provision addressing this requirement. Policy 2: Issues pertaining to master planning and zoning shall be addressed in conjunction with the application for annexation. a. The initial application for annexation shall be in conformance with the current Bozeman Growth Policy. If a Growth Policy Amendment is necessary to accommodate anticipated uses, said amendment process may be initiated by the applicant and conducted concurrently with the processing for annexation. The property is designated as residential on Figure 3-1 of the growth policy. The zoning requested in conjunction with annexation is consistent with this designation. The site has an unusual zoning approval history which is discussed in detail in the zone map amendment staff report. It has been determined that no growth policy amendment is required. b. Initial zoning classifications of the property to be annexed shall be determined by the City Commission, in compliance with the Bozeman Growth Policy and upon a recommendation of the City Zoning Commission, prior to final annexation approval. The applicant has applied for a Zone Map Amendment (#Z-13255) to establish an initial municipal zoning designation of 4.309 acres as R-O (Residential-Office district). The zoning commission made a favorable recommendation on December 17th. c. The applicant may indicate his or her preferred zoning classification as part of the annexation application. The applicant/owner has indicated that they prefer a zoning designation of R-O (Residential Office District), and that item is addressed under that respective agenda item and packet materials. Policy 3: Fees for Annexation procedures shall be established by the City Commission. No fee will be charged for any City-initiated annexation. The appropriate application processing and review fees accompanied the application. A-13004, Staff Report for the Simmental Annexation Page 8 of 11 Policy 4: It shall be the general policy of the City that annexations will not be approved where unpaved county roads will be the most commonly used route to gain access to the property. There are no unpaved county roads used to access the property. The site is adjacent to Springhill Road and Campbell Road. Access will be taken from Campbell Road which is paved. Note: The annexation and the placement of a zoning district designation on the property by the City does not guarantee available services. Section 38.07.010.C of the Unified Development Code states: “Placement of any given zoning district on an area depicted on the zoning map indicates a judgment on the part of the city that the range of uses allowed within that district are generally acceptable in that location. It is not a guarantee of approval for any given use prior to the completion of the appropriate review procedure and compliance with all of the applicable requirements and development standards of this chapter and other applicable policies, laws and ordinances. It is also not a guarantee of immediate infrastructure availability or a commitment on the part of the city to bear the cost of extending services”. Policy 5: Prior to annexation of property, it shall be the policy of the City of Bozeman to acquire usable water rights, or an appropriate fee in lieu thereof, equal to the average annual diversion requirement necessary to provide the anticipated average annual consumption of water by residents and/or users of the property when fully developed on the basis of the zoning designation(s). The fee may be used to acquire water rights or for improvements to the water system which would create additional water supply capacity. The property is of a size and development type that allows deferral of payment until future development as authorized by Section 38.23.180, BMC. The annexation agreement includes a provision addressing this requirement. Policy 6: Infrastructure and emergency services for an area proposed for annexation will be reviewed for the health, safety and welfare of the public. If it is found that adequate services cannot be provided to ensure public health, safety and welfare, it shall be the general policy of the City to require the applicant to provide a written plan for accommodations of these services, or not approve the annexation. Additionally, annexation proposals that would use up infrastructure capacity already reserved for properties lying either within undeveloped portions of the City limits or lying outside the City limits but within the identified sewer or water service area boundaries, shall generally not be approved. City infrastructure and emergency services can be provided upon development of the property. The City provides services to adjacent properties at this time. This property does not intrude on capacity reserved for another property. Policy 7: It shall be the general policy of the City of Bozeman to require annexation of any contiguous property for which city services are requested or for which city services are currently being contracted. The applicant intends to develop the property as offices. This will require municipal services in the future. No services are currently being contracted. The provision of municipal services is the primary focus of the annexation agreement which establishes the basic responsibilities for the private parties and the City. A-13004, Staff Report for the Simmental Annexation Page 9 of 11 Policy 8: The annexation application shall be accompanied by mapping to meet the requirements of the Director of Public Works. Mapping to meet the requirements of the Director of Public works must be provided with the Annexation Agreement. Typically, this includes an 18-inch x 24-inch mylar map, a reduced 8½-inch by 11 or 14-inch annexation map exhibit, and a digital copy containing the metes and bounds legal description of said property. (Mapping requirements are addressed in Recommended Term of Annexation # 3). Policy 9: It shall be the policy of the City of Bozeman to assess a system development/impact fee in accordance with Chpt. 2, Art. 6, Div. 9 Bozeman Municipal Code (Impact Fees), and in accordance with the Bozeman Growth Policy and other policies as they are developed. There are no existing buildings on the site. This will be addressed at the time of future development. Policy 10: Public notice requirements shall be in compliance with Montana Code Annotated. In addition, notice shall be posted in at least one conspicuous location on the site in question, and mailed to all owners of real property of record within 200 feet of the site in question using the last declared county real estate tax records, not more than 45 days nor less than 15 days prior to the scheduled action to approve or deny the annexation by the City Commission, specifying the date, time and place the annexation will be considered by the City Commission. The notice shall contain the materials specified by Section 38.40.020.A, BMC. In addition, where a commonly identifiable street address is not visible on the property to be annexed, the notice shall provide a map of the area in question so as to indicate its general location and proximity to surrounding properties. Notices of the public hearing have been sent and posted on the site as set forth under this policy. Notice was also included as part of the related zoning change. Policy 11: Annexation agreements shall be executed and returned to the City within 60 days of distribution of the annexation agreement, unless another time period is specifically identified by the City Commission. This policy item is specified in Recommended Term of Annexation #5. The agreement shall be prepared upon action by the City Commission to approve the annexation. Policy 12: When possible, the use of Part 46 annexations is preferred. This annexation is being processed under Part 46 provisions. A-13004, Staff Report for the Simmental Annexation Page 10 of 11 APPENDIX A –PROJECT DESCRIPTION AND BACKGROUND The Simmental annexation and zone map amendment were submitted on October 30, 2013. The site is approximately 4.309 acres located southeast of the intersection of Springhill Road and Campbell Road. The initial application also included a growth policy amendment (GPA). After researching past zoning actions on the property, staff determined that the GPA was not required. The history outlined below provides the explanation as to why the GPA is not required. The Walker Property PUD was approved in the early 1990’s by the Bozeman City Commission and was subject to the municipal zoning code. Although the property at that time was outside of the City, and is only now being annexed, the City had extraterritorial zoning authority in place. Developments outside of the official City limits but within approximately 3 miles of town were reviewed by the Bozeman City-County Planning Office and municipal zoning applied. The project site was, at that time, zoned as Residential-Office. When the extraterritorial zoning was terminated in July 1999, the County reestablished the same Residential-Office designation on that site through their zoning authority. The present project now seeks to designate the property within the City as Residential-Office. The site is planned for residential uses and the Residential-Office zoning district is an implementing district for the future land use designation. See Appendix G of the growth policy. The applicants wish to construct an office building on the site. The Residential-Office zoning district requires that a residential component be included. However, the Walker Property PUD specifically lists the allowed uses for the subject lot, including offices without residences. The City respects entitlements which have been established for specific lots. It is an unusual situation for the property to have obtained a development entitlement from the City, left the City’s jurisdiction, and then come back into the City’s jurisdiction. Due to the pre-existing entitlement granted by the City prior to the current annexation the site will be allowed to develop as a purely office development. APPENDIX B – NOTICING AND PUBLIC COMMENT Notice was published in the legal section of the Bozeman Daily Chronicle on September 29th, December 1st and December 15, 2013. The site was posted on November 27, 2013. Notice was mailed to all property owners within 200 feet of the outer boundary of the site on November 27, 2013. Notice was provided at least 15 and not more than 45 days prior to the Zoning Commission public hearing on December 17, 2013 and the City Commission public hearing on January 13, 2014. As of the writing of this report no public comment has been received. Any comments received will be provided to review agencies prior to or at the public hearings. No public comment was received at the public hearing held by the Zoning Commission. A-13004, Staff Report for the Simmental Annexation Page 11 of 11 APPENDIX C – PROJECT GROWTH POLICY AND PROPOSED ZONING Zoning Designation and Land Uses: The intent of the R-O residential-office district is to provide for and encourage the development of multi-household and apartment development and compatible professional offices and businesses that would blend well with adjacent land uses. The primary use of a lot, as measured by building area, permitted in the R-O district is determined by the underlying growth policy land use designation. Where the district lies over a residential growth policy designation the primary use shall be non-office uses; where the district lies over a nonresidential designation the primary use shall be office and other nonresidential uses. Primary use shall be measured by percentage of building floor area. Adopted Growth Policy Designation: The property is designated as “Residential” in the Bozeman Community Plan. The Plan indicates that, “This category designates places where the primary activity is urban density dwellings. Other uses which complement residences are also acceptable such as parks, low intensity home based occupations, fire stations, churches, and schools. High density residential areas should be established in close proximity to commercial centers to facilitate the provision of services and employment opportunities to persons without requiring the use of an automobile. Implementation of this category by residential zoning should provide for and coordinate intensive residential uses in proximity to commercial centers. The residential designation indicates that it is expected that development will occur within municipal boundaries, which may require annexation prior to development. The dwelling unit density expected within this classification varies between 6 and 32 dwellings per net acre. A higher density may be considered in some locations and circumstances. A variety of housing types can be blended to achieve the desired density. Large areas of single type housing are discouraged. In limited instances the strong presence of constraints and natural features such as floodplains may cause an area to be designated for development at a lower density than normally expected within this category. All residential housing should be arranged with consideration of compatibility with adjacent development, natural constraints such as watercourses or steep slopes, and in a fashion which advances the overall goals of the Bozeman growth policy. The residential designation is intended to provide the primary locations for additional housing within the planning area. APPENDIX D - OWNER INFORMATION AND REVIEWING STAFF Owner: First Montana Bank, 1336 Stoneridge Drive, Bozeman MT 59718 Applicant: American Simmental Association, 1 Simmental Way, Bozeman MT 59715 Representative: Madison Engineering, 895 Technology Blvd, Ste 203, Bozeman, MT 59718 Report By: Chris Saunders, Policy and Planning Manager 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134