Loading...
HomeMy WebLinkAboutRe-Entry Building, Law & Justic Center Fire Service Line T STA. 0a82.93 - INSTALLED 4' 45' BEND w FIELD LOK 350` I II T GASKETS �• STA. 1+34.49 - INSTALLED A" I '- 90' BEND w FIELD LOK 3501 GASKETS STA 1.52 - INSTALLEDBEND' - 1+20 w/TNRUDT BLOCK AND R DI-R00 (SEE COB. STD DWG Nb. 02660-t 3) - `7 Ox INSTALLED APPROY. 10 LIF Of VERTICAL 4" D I PIPE A/ 4' INSTAL 4� S - OSRY VALVE— St DUCTILE IRON I �pQ MSTALLATION jF FIR£ -EFv11.F LINE AFTER THE 1 &Y JAL�E BY JiHERS MAY BE VTR TiC AL !iR HURIZJ)NTAI Art C)RDINf Tr, THE COY rIF . E107EMAN , _ `_.R/_E ENE ,TANL•�F'('. . ��. RE-ENTRY BLIII DIN13 6400 SO F T' FF-483T AU 00 �� I oX STA. D+00 - INSTALLED 6`YA' TAPPING SLEEVE AND 4 TAPPING GATE VALVE W THRUST RLOCKS AND VALVE BOY- THE A'GATE VALVE WAS II RESTRAINED TO THE TEE. ? IN5TALLED SADDLE CLAMP AND TAPPED EKISIING I S'�AATEIFFAM T -W. Tw-t,6w"TfFwRR j SERVICE,INSTALLED CURB S70P /ALVE 6' BEYOND EDGE Of ASPHAI.T. - --- - I M NII , I � AS-BUILT DRAWING I 1 FIRE LINE DET_tiil_ - CL-A;- 1 S ^.1 I GENERAL NOTES .. .. - .. UNDERGROUND UTILITY LU(,ATTN•, ARE APRR:OWb I .. ... BE CONSIDERED COMPLETE THE I_ON1RAC7OR - 'J;: ..T, Its DF AU BURIED 01,LITIES PP.1,)P TO THE BE.:INNINC OF r r�7 T P 7/L / THE CONTRACTOR SHALL PROTECT ALL LYISTIN!, UnLIT, Dr.: L'%'ll FIRE" ��li/1 CONSTRUCTION ALL UTILITY LINES DAMAGED DURING GNSTF'Ut-TIJN W. A(TIvITIES SMALL BE REPAIRED AT THE CONTRACTORS EXPENSE �mm ALL CON$TRUCTiTNv SHALL CONFORM TO THE AC<CIMPAN YtM; PLANS AND THE La�W ILOOR MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, FIFTH EDITION, DATED n i MARCH 2O03, AND THE CITY CIF BOZEMAN MODIFICATIONS. MARCH 2, NC CHANGE OR MODIFt(ATION OF THE AP VE PR:i' D PLANS AND SPECIFI'.%'SN SHALL BE MADE w1TH0UT THE PRIOR WRITTEN APPROVAL OF THE ENGINEER AND THE CITY OF BOZEMAN ENGINEERING DEFARTMENI. as°�� i c L oo� n PRE-CON STRUCTIUN MEETING SN A{L BE HELD PRIOR TO GOMMENCEMEN f OF WORK THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER 0 WORKIN/} URAVANGS. SPECIFIC 4TION SHEETS. ETr TOR ALL EQUIPMENT AND o :jig $n MATERIALS TO BE USED ON THE PROJECT AT LEAST LTNE WEER. PRIOR TO IHF PRE-CONS TRJC TION MEEIING. INSTALLATION SHALL N:_J BE �� ?` i o`.� MADE 'MTHOUT THE PRIOR WRITTEN APPROVAL OF ALL EQUIPMENT AND MATERIALS BY THE ENGINEER `^ i✓ +1i v�o THE ENGINEER AND THE CITT OF BOZEMAN ENI;INEERINi_ DEPARTMENT SHALL °♦�y -ask ±�u BE NOTIFIED AT LEAS, 24 HOURS PRIOR ') BEGINNING CON STRJCTION. AS-BUILT DRAWING N TYPE T OR T(PE z TRENCH EXCAVATION MAI BE !ISEL AT THE DISC"kE I)F THE CONTRACTOR .TM PROJECT BENCHMARK: THE EAST BOLT STAMPED '359" ON THE FIRE HYC-RANI LO(ATEC) 100' 5 OF THE SE UORNER OF THE LAw & JUSTICE RENTER ELEVATION - 4834.80 �CITI (1F BOZEMAN DATUM) — '1d'�= ALL CONSTRUCTION SHALL MEET APPLICA BLE OSHA SAFE T, 514ND4RI;S. THE CONTRACTOR SHALL REPAVE ALL AREAS OF EXISTING ASPHALT REMOVED DI1RING CONSTRUCTION ACTro TIE=. MATCH EXISTING: PAVEMENT 1Nn:KNESb THE LONTRACTOR SHALL HE RESPONSIBLE FOR PROPERLY AND SAFELY FENCING ALL OPEN EXCAVATION`, THE FENCING, SHALL. BE MAINTAINED EF( THE CrINTRAI_TtiR THE CCINTRACTCIR SHALL BE RESPONSIBLE FOR NOTtFYINL_ THE CUT) OF BOZEMAN FOR INSPECTION OF ALL SERVICE CONNECTION5 BEFORE BACK FILLING THE TRENCH I-IRE SERVICE LINE INSTALLATION SHALL FONFORM WITH THE REQUIREMENT! 4F AS-BUILT DRAWING THE CITY of BOZEMAN FIRE SEPOIE LINE ;TANDARD THE 4° FIRE EFJcE LINE N(.LUDIN, THE OS&Y 'v ALVE. ARE TO BE INSTALLED AS RAPT (iF THIS PROJECT ONL_i FLANGED FITTINGS CAN BE OSED ON THE FRE SEPOCE LINE INSIDE !F THE B•-IILDING Rocky Mountain Engineers, P.L.L.C. 5H CEN'TpT-ATE'3 Civil Engineering & Land Surveying ¢;i:V.. - - -- NOU 1 4 2005 i �JL L; LI�I