HomeMy WebLinkAboutRe-Entry Building, Law & Justic Center Fire Service Line T STA. 0a82.93 - INSTALLED 4'
45' BEND w FIELD LOK 350` I II
T GASKETS �• STA. 1+34.49 - INSTALLED A" I '-
90' BEND w FIELD LOK 3501
GASKETS STA 1.52 - INSTALLEDBEND' -
1+20 w/TNRUDT BLOCK AND R DI-R00
(SEE COB. STD DWG Nb. 02660-t 3) -
`7 Ox INSTALLED APPROY. 10 LIF Of
VERTICAL 4" D I PIPE A/ 4'
INSTAL 4� S - OSRY VALVE—
St DUCTILE IRON I
�pQ MSTALLATION jF FIR£ -EFv11.F LINE AFTER THE
1 &Y JAL�E BY JiHERS MAY BE VTR TiC AL !iR
HURIZJ)NTAI Art C)RDINf Tr, THE COY rIF .
E107EMAN , _ `_.R/_E ENE ,TANL•�F'('. .
��. RE-ENTRY BLIII DIN13
6400 SO F T'
FF-483T AU
00 �� I
oX
STA. D+00 - INSTALLED 6`YA' TAPPING SLEEVE
AND 4 TAPPING GATE VALVE W THRUST RLOCKS
AND VALVE BOY- THE A'GATE VALVE WAS II
RESTRAINED TO THE TEE. ?
IN5TALLED SADDLE CLAMP AND TAPPED EKISIING I
S'�AATEIFFAM T -W. Tw-t,6w"TfFwRR j
SERVICE,INSTALLED CURB S70P /ALVE 6' BEYOND
EDGE Of ASPHAI.T. - --- -
I M
NII ,
I �
AS-BUILT DRAWING
I
1 FIRE LINE DET_tiil_ - CL-A;- 1 S ^.1
I
GENERAL NOTES
.. .. - .. UNDERGROUND UTILITY LU(,ATTN•, ARE APRR:OWb I ..
... BE CONSIDERED COMPLETE THE I_ON1RAC7OR - 'J;: ..T, Its
DF AU BURIED 01,LITIES PP.1,)P TO THE BE.:INNINC OF
r r�7 T P 7/L / THE CONTRACTOR SHALL PROTECT ALL LYISTIN!, UnLIT, Dr.: L'%'ll
FIRE"
��li/1 CONSTRUCTION ALL UTILITY LINES DAMAGED DURING GNSTF'Ut-TIJN
W. A(TIvITIES SMALL BE REPAIRED AT THE CONTRACTORS EXPENSE
�mm
ALL CON$TRUCTiTNv SHALL CONFORM TO THE AC<CIMPAN YtM; PLANS AND THE
La�W ILOOR MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, FIFTH EDITION, DATED
n i MARCH 2O03, AND THE CITY CIF BOZEMAN MODIFICATIONS. MARCH 2,
NC CHANGE OR MODIFt(ATION OF THE AP VE
PR:i' D PLANS AND SPECIFI'.%'SN
SHALL BE MADE w1TH0UT THE PRIOR WRITTEN APPROVAL OF THE ENGINEER
AND THE CITY OF BOZEMAN ENGINEERING DEFARTMENI.
as°��
i c L oo� n PRE-CON STRUCTIUN MEETING SN A{L BE HELD PRIOR TO GOMMENCEMEN f
OF WORK THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER
0
WORKIN/} URAVANGS. SPECIFIC 4TION SHEETS. ETr TOR ALL EQUIPMENT AND
o :jig $n MATERIALS TO BE USED ON THE PROJECT AT LEAST LTNE WEER. PRIOR TO
IHF PRE-CONS TRJC TION MEEIING. INSTALLATION SHALL N:_J BE
�� ?` i o`.� MADE 'MTHOUT THE PRIOR WRITTEN APPROVAL OF ALL EQUIPMENT AND
MATERIALS BY THE ENGINEER
`^ i✓ +1i v�o THE ENGINEER AND THE CITT OF BOZEMAN ENI;INEERINi_ DEPARTMENT SHALL
°♦�y -ask ±�u BE NOTIFIED AT LEAS, 24 HOURS PRIOR ') BEGINNING CON STRJCTION. AS-BUILT DRAWING
N TYPE T OR T(PE z TRENCH EXCAVATION MAI BE !ISEL AT THE
DISC"kE
I)F THE CONTRACTOR
.TM PROJECT BENCHMARK: THE EAST BOLT STAMPED '359" ON THE FIRE HYC-RANI
LO(ATEC) 100' 5 OF THE SE UORNER OF THE LAw & JUSTICE RENTER
ELEVATION - 4834.80 �CITI (1F BOZEMAN DATUM)
—
'1d'�= ALL CONSTRUCTION SHALL MEET APPLICA
BLE OSHA SAFE T, 514ND4RI;S.
THE CONTRACTOR SHALL REPAVE ALL AREAS OF EXISTING ASPHALT REMOVED
DI1RING CONSTRUCTION ACTro TIE=. MATCH EXISTING: PAVEMENT 1Nn:KNESb
THE LONTRACTOR SHALL HE RESPONSIBLE FOR PROPERLY AND SAFELY FENCING
ALL OPEN EXCAVATION`, THE FENCING, SHALL. BE MAINTAINED EF( THE CrINTRAI_TtiR
THE CCINTRACTCIR SHALL BE RESPONSIBLE FOR NOTtFYINL_ THE CUT) OF BOZEMAN
FOR INSPECTION OF ALL SERVICE CONNECTION5 BEFORE BACK FILLING THE TRENCH
I-IRE SERVICE LINE INSTALLATION SHALL FONFORM WITH THE REQUIREMENT! 4F
AS-BUILT DRAWING THE CITY of BOZEMAN FIRE SEPOIE LINE ;TANDARD THE 4° FIRE EFJcE LINE
N(.LUDIN, THE OS&Y 'v ALVE. ARE TO BE INSTALLED AS RAPT (iF THIS PROJECT
ONL_i FLANGED FITTINGS CAN BE OSED ON THE FRE SEPOCE LINE INSIDE !F THE
B•-IILDING
Rocky Mountain Engineers, P.L.L.C.
5H CEN'TpT-ATE'3
Civil Engineering & Land Surveying ¢;i:V..
- - -- NOU 1 4 2005 i
�JL L; LI�I