Loading...
HomeMy WebLinkAboutMountain View Building - Fire Service Plan LEGEND31 I �'�•�_ I� r I Air _ ❑ ® EXISTING SANITARY SEWER MANHOLE _ - Scale In Feet 0 PRESSURE GAUGES OR PRESSURE GM1GE FaTNGS WILL BE LEGEND BaCNf1DW ASSEMBLY TO BE SO BEND OShT VK E NOTE 6 ALLOWED ON T1E TEST PORTS OF M11'B>aMFLOW ASSEMBLY f - 8"SS EXISTING SANITARY SEWER UNE S /�£ \ 30 0 30 6„W // $FLANGED OS&Y VALVE / 1 EXISTING WATER MAIN �� I r m 9 _ 9 0 9 -GE TO BE THREADED DN STANDPIPE. n m f ' Etlge ofl spM1alt - GAS EXISTING GAS LINE (1vP�TCOu FOR w.R_RISER��cDnwnoTrrslLL DOUBLE CHECK VALVE ; I �o � „ro o z ( to _ "a Scale In Meters MIN. REQUIREMENT) �}ym o] T EXISTING HYDRANT 4" OR LARGER CLASS 51 AS INDICATED ON w I� DUCTILE IRON PIPE(TYP.) •MIN,2•wc.ASDVE n Po FLOOR B.IIm R00R iAEB&QM PLANS -z () I a I W PROPOSED WATER UNE - � � 5s: � � Sheet I OF I PP EXISTING POWER POLE I �; ; I F a 3 4" MIN. Redi Rod INSTALLED IN EVERY OTHER AVAILABLE M.J. O MECHANICAL / � ° \ o I ._. �9 ep U _ F m JOINT BOLT HOLES (TYPICAL)- 5/8" RODS ACCEPTABLE FOR 4" LINES � T � o� � C ❑E EXISTING ELEC BOX z I U MAIN J �� m h! u' C u m T �m c O EXISTING TELEPHONE BOX - _ 90' BEND WITH THRUST BLOCK ^.rn Previous Boundary Lire Un x(64-5) PROPOSED SPOT ELEVATION TI{qusTf, BLOCK o C.O. SEWER SERVICE CLEAN OUT TAPPING TEE&VALVE, CITY OF BOZEMAN REQUIREMENTS FOR INSTALLATION OF Y I y n� 7 ` DOUBLE CHECK VALVE ASSEMBLY oR, mkg • I U m u1 OR INSTALL VALVE AT .9'( g n 3 f C a ® PROPOSED CURB STOP PROPERTY LINE(TYPICAL 00 ,� I N e ndary L w � J f; O tD o PROPERTY LINE FOR ALL RISER CONFIGURATIONS) 1. The FIRST fitting inside of the building hall be a UL listed flanged o m� 1 @ m C sI s `\ American Flow Control,Kennedy or Mueller OS&Y valve the some W _ I C a m a ADJOINING PROPERTY UNE sze as the Fre service line. ,p a� a 2. All Double Check Valve Assemblies shall be. �4 5 ® m EASEMENT LINE a. UL - r E ^ W b. Approved by tthe University of Southern CaliforniaFoundation for `< ev m NEw w. .� PROVIDE FLEXIBLE, c SEE NOTE 6 Cross Connection Control and Hydraulic Research(USCFCCCHR)for z o YARD SETBACK LINE WATER-TIGHT CONNECTION �' I " - I... + + C u FOR ALL WALL OR FLOOR operation in the proposed position(vertical or horizontal)as shown on z Q n W PROPOSED CURB approved plans. "' PIPE PENETRATIONS. c. Installed as shown on the approved plans. e_ fan-q2<85"o R k installed immediately follow'ng the z mLla ��'3�rFi A o � �"� - D A flow detection device shall be valve,flow sensor I Double Check Valve Assembly(alarm check /a arm, � "�AS7�s'"sm$ xcw z z m^ meter,etc.)os shown on the approved plans.Paddle-type flow alarms not permitted on dry systems. - o F1'NIN..2'W%.ABOVE 4. A Double Detector Check Valve Assembly may be used with a standard A -.1 mm � es m > m o I I 1 N SHED FLOOR flAOR City of Bozeman meter. The meter loop of the Double Detector Check R R• I o Rzy m 'li i IA O Valve shall have a Double Check Valve Assembly installed which meets gfi moo A o �m 1 / the same installation criteria specified above in requirement number two. ro =oo ,�o g z IF N o \ / I 5. Horizontal installations must be a minimum of 2'above the finished �� 2 a ;'�_ VV W yt MECHANICAL floor. J o JOINT Imu service ri er minimum f./ ;�9 m9 a 6. The fire ae s must be a m of 2'from any outside wall, mTAi �-`~z 3 and a min' m of 1'from any interior wall. o F�migo I ��� ory a 7. The incoming fire service line shall be a minimum 6.5',and a maR- I F. z2v o�v'R o rTl mum of 7.5'below the finished grade. a4 9ga y y �' a € II W 90' BEND WITH 8. All fire service line appurtenances shall have a minimum pressure m z 'S o S I £ \ x n 5 THRUST BLOCK eJ I�rating of 175 PSI. n 9. All fire service lines 4" and larger shall be Class 51 Ductile Iron Pipe. I N snow sTORncE ow srow,cE I p,P1 �4' T S7orrACE W 10.Line izi in The Double Check Valve Assembly shall be equal in srze o 4 o z- New Boundary Line ato the outgoing pipe diameter(downstream). .18 3 �1' MIN., 2' MAX. _ xmFz 3's Egi 2' MIN.,3' MAX CLEARANCE PLAN VIEW coATm srm ABOVE FINISHED FLOOR SCALE: 1 =30 1NicNNar �G ��y.�P��' STANDARD FIRE SERVICE CITY OF BOZEMAN SCALE: LINE INSTALLATION NO. 02660-13 ��;P�o45 STANDARD DRAWING NONE FOR CLASS I, II, & III SYSTEMS DEC 2003 REV: JAN 2008 o BY OTHERS 4815 � CITY APPROVED OS&Y VALVE GENERAL NOTES 'I T.O. SLAB=4812.52 1. ALL CONSTRUCTION SHALL CONFORM TO THE ACCOMPANYING PLANS AND SPECIFICATIONS. 2. NO CHANGE OR MODIFICATION OF THE APPROVED PLANS AND SPECIFICATIONS SHALL BE MADE WITHOUT THE PRIOR WRITTEN APPROVAL OF THE ENGINEER AND THE CITY OF BOZEMAN EXISTING GRADE---- F�1 ENGINEERING DEPARTMENT. 4810 TION NG, THE CONTRACTOR SHALL T TO 3. PRIOR TO THE ENGINEER AND THE CCITY TOFCBOZEMAN¶WOR WORKING DRAWINGS, SPECIFICATION ISH ETS,EETC., PROPOSED G POE fie/ FOR ALL EQUIPMENT AND MATERIALS TO BE USED ON THE PROJECT. - 5 INSTALLATION SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN APPROVAL OF ALL _ A/ EQUIPMENT AND MATERIALS BY THE ENGINEER. (APPLIES TO PUBLIC SEWER/WATER MAINS AND STREET IMPROVEMENTS ONLY.) rTl 4. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL BURIED UTILITIES PRIOR TO THE FTwil �j BEGINNING OF CONSTRUCTION. 4805 _ Vl 5. THE ENGINEER AND THE CITY OF BOZEMAN SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO BEGINNING CONSTRUCTION. 6. TYPE 1 OR TYPE 2 TRENCH EXCAVATION MAY BE USED AT THE DISCRETION OF THE CONTRACTOR. 7. TRENCH BACKFILL SHALL BE TYPE A, FOR ALL AREAS TO BE PAVED. EXISTING 6"DIP 8. ACCORDING TO CITY OF BOZEMAN REQUIREMENTS, APPROVED DOUBLE CHECK BACKFLOW 332.3 LF OF 4" CLASS 51 DIP O PREVENTION DEVICE MUST BE INSTALLED BY THE OWNER FOR THE NEW BUILDING(S) SHOWN IN ACCORDANCE WITH COB DRAWING NO. 2660-13. 4800 9. FIRE LINE INSTALLATION SHALL CONFORM WITH THE REQUIREMENTS OF THE CITY OF BOZEMAN FIRE SERVICE LINE STANDARD. THE FIRE SERVICE LINE INCLUDING THE OS&Y VALVE ARE TO BE S-B U I L T INSTALLED AS PART OF THIS PROJECT. 10. THE 4" FIRE SERVICE LINE IS TO BE PRESSURE TESTED AND CHLORINATED BY A SINGLE CONTRACTOR FROM THE POINT OF CONNECTION AT THE CITY WATER MAIN TO THE OS&Y VALVE IN THE BUILDING 11. APPLICATIONS FOR WATER SERVICES MUST BE MADE BY CONTRACTOR/OWNER AND APPROVED BY COB BEFORE O /O H 2 THE FIRE SERVICE LINE AND DOMESTIC SERVICE LINE CAN BE INSTALLED. 12. THE 6.5' MINIMUM COVER OVER THE NEW FIRE LINE MUST BE IN PLACE OR SUFFICIENT INSULATION INSTALLED OVER THE FIRE LINE IF 6.5' OF COVER CAN NOT BE MAINTAINED, BEFORE THE LINE WILL BE ACTIVATED. Drawing Date:O'1102/13 13. THIS PROJECT WILL BE CONSTRUCTED IN ACCORDANCE WITH "MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 6TH EDITION", APRIL 2010 (SECTION NUMBERS WITH MPW PREFIX), AND SUBSEQUENT AMENDMENTS, AND "CITY OF BOZEMAN MODIFICATIONS TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 6TH EDITION, MARCH 2O11." 14. FIRE LINE IS A CLASS 1 SYSTEM. 15. FLUSHING ORIFICE TO BE AT LEAST 2" IN DIAMETER OR AS SPECIFIED BY ENGINEER. 16. C&H ENGINEERING AND SURVEYING INC. WILL PERFORM INSPECTION WORK ON THIS PROJECT WHICH IS SOLELY 0+00 1+00 2+00 3+00 FP1 RING THAT THE OJECT IS THE ROVED PLANS AND SO SO EYURESPONSIBLE FORRENSU ENSUING THATTTHERPROJECTPMEETS ALL OSHA REQUIREMENTS I AND THE THATCONTRACTOR j FIRE LINE PLAN AND PROFILE MEETS ALL OSHA REQUIREMENTS AND ALL APPLICABLE SAFETY REQUIREMENTS BOTH FOR THEIR EMPLOYEES AND ANY SITE INSPECTION WORK PERFORMED BY THE ENGINEER. FP1 SCALE: (1"=30'-O" HORIZONTAL) (1"=3'-O" VERTICAL) //11120