Loading...
HomeMy WebLinkAboutMeadow Creek Subdivision Phase V ME W REEKS B IVISI N , PH SE V Awn-, w u Za 30 TO PROVIDE STREET SANITARY SEWER WATER Lu � AND STORM DRAIN IkPROVEMENTS � h0 W 0 � -o c Zo Q 3 PREPARED FOR: 3 MEADOW CREEK PARTNERS, LLC EM STONEMDOE DMM% SUM 1 WATER & SANITARY SEWER BOZEM , MT awls CERTIFICATION ONLY SET SHEET INDEX SHEET INDEX PREPAREDBY: SHEET DESCRIPTION SHEET DESCRIPTION 106 East Babcock SA N D E RS O N GOI Bozeman, Montana 59715 1 COVER SHEET 40 WATER PLAN-PROFILE ENTERPRISE BLVD STA. 22+00 TO STA. 28+00 ST E WA RT Phone: 406.522.9876 2 OVERALL SITEPLAN 41 WATER PLAN-PROFILE ENTERPRISE BLVD STA. 28+00 TO END www.sanderson stewa rt.com FOR TA N 3 VEET PLAN-PROFILE ENTERPRISE BLVD STA. 22+00 TO STA. 28+ 42 WATER PLAN-PROFILE SOUTH 2OTH AVENUE STA. 0+00 TO STA. 8+00 4 ST PLAN-PROFILE ENTERPRISE BLVD STA. 28+00 TO END Adr, 43 WATER PLAN-PROFILE SOUTH 2OTH AVENUE STA. 8+00 TO STA. 16+00 1C v ' ¢ 5 STREE AN-PROFILE SOUTH 2OTH AVENUE STA. 0+00 TO . 8+00 44 WATER PLAN-PROFILE SOUTH 2OTH AVENUE STA. 16+00 TO END E 6 STREET PL -PROFILE SOUTH 2OTH AVENUE STA. 8+00 TA. 16+00 45 WATER PLAN-PROFILE SOUTH 22ND AVENUE STA. 0+00 TO STA. 8+00 4/CENSE° �a 7 STREET PLAN"IN&OFILE SOUTH 2OTH AVENUE STA. 16+ TO END 46 WATER PLAN-PROFILE SOUTH 22ND AVENUE STA. 8+00 TO STA. 15+00 SfONAL 8 STREET PLAN-PR E SOUTH 22ND AVENUE STA. 00 TO STA. 8+00 47 WATER PLAN-PROFILE SOUTH 22ND AVENUE STA. 15+00 TO END 9 STREET PLAN-PROFIL OUTH 22ND AVENUE S 8+00 TO STA. 15+00 48 WATER PLAN-PROFILE EDWARD DRIVE 10 STREET PLAN-PROFILE NLTH 22ND AVENU A. 15+00 TO END 49 WATER PLAN-PROFILE BLAKE DRIVE 11 STREET PLAN-PROFILE EDW DRIVE 50 WATER PLAN-PROFILE NICOLE DRIVE > 4 12 STREET PLAN-PROFILE BLAKE E 51 WATER PLAN-PROFILE LANCE DRIVE STA. 0+00 TO STA. 7+00 W PE ® M 11 � ®®09®®w 13 STREET PLAN-PROFILE NICOLE D 52 WATER PLAN-PROFILE LANCE DRIVE STA. 7+00 TO END Q F ® N® ®fe®lffim 14 STREET PLAN-PROFILE LANCE IVE N 0+00 TO STA. 7+00 53 WATER PLAN-PROFILE BREE LANE STA. 0+00 TO STA. 7+00 = uj 15 STREET PLAN-PROFILE LA DRIVE STAIIIIII&OO TO END 54 WATER PLAN-PROFILE BREE LANE STA. 7+00 TO END a 3 HUFF INE LANE COLLEGE STREET _ U) 89 ®®�F�� ® 16 STREET PLAN-PROFILE E LANE STA. O+0 0 STA. 7+00 55 WATER PLAN-PROFILE SOUTH 21ST AVENUE Q Z ® ill 17 STREET PLAN-PROF BREE LANE STA. 7+00 TliCkND 56 VIND 13 & POND 11 LAYOUTS & DETAILS 0 w 2 Q ®� 18 STREET PLAN-P ILE SOUTH 21ST AVENUE 57 PO 10 & POND 8 LAYOUTS & DETAILS (n V)w Z M ®11 m ` 19 STREET PLA ROFILE ALLEY #2 STA. 0+00 TO STA. 8 58 POND AYOUT & DETAILS Or 5: a° Z w ®oUffis 20 STREET P -PROFILE ALLEY #2 STA. 8+00 TO STA. 15+ 59 STRIPING IGNAGE PLAN 0 Z z g V) 21 STRE LAN-PROFILE ALLEY #2 STA. 15+50 TO END 60 STRIPING & S GE PLAN m N�a Z w 3 22 S T PLAN-PROFILE ALLEY #1 STA. 0+00 TO STA. 7+00 61 STRIPING & SIGN PLAN N w 0 > 0 t o 00 KAGY BLVD 23 REET PLAN—PROFILE ALLEY #1 STA. 7+00 TO END 62 STRIPING & SIGNAGE N Y N O 0 k / BENCHMARK #2 24 SANITARY SEWER PLAN-PROFILE ENTERPRISE BLVD STA. 22+00 TO STA. 28+00 63 CROSS SECTIONS ENTER E BLVD w w m STUCKY ROAD 0 0 25 SANITARY SEWER PLAN-PROFILE ENTERPRISE BLVD STA. 28+00 TO END 64 CROSS SECTIONS SOUTH 20 VENUE ST +20.79 TO STA. 10+50 >Z 26 SANITARY SEWER PLAN-PROFILE SOUTH 2OTH AVENUE STA. 0+00 TO STA. 8+00 65 CROSS SECTIONS SOUTH 2OTH UE A. 10+82.82 TO END 0 00 a 27 SANITARY SEWER PLAN-PROFILE SOUTH 2OTH AVENUE STA. 8+00 TO STA. 16+00 66 1 CROSS SECTIONS SOUTH 22ND AVE STA. 0+14.50 TO STA. 10+68.19 O_ ® 28 SANITARY SEWER PLAN-PROFILE SOUTH 2OTH AVENUE STA. 16+00 TO END 67 CROSS SECTIONS SOUTH 22ND NUE 11+00 TO END 0 29 SANITARY SEWER PLAN-PROFILE SOUTH 22ND AVENUE STA. 10+50 TO END 68 CROSS SECTIONS EDWARD QAor Q 30 SANITARY SEWER PLAN-PROFILE EDWARD DRIVE 69 CROSS SECTIONS BLAKEJFVE Ld 31 SANITARY SEWER PLAN-PROFILE BLAKE DRIVE 70 CROSS SECTIONS NI C DRIVE ® ' 32 SANITARY SEWER PLAN-PROFILE NICOLE DRIVE 71 CROSS SECTIONS CE DRIVE 33 SANITARY SEWER PLAN-PROFILE LANCE DRIVE STA. 3+50 TO END 72 CROSS SECTI BREE LANE e ENCHM RK #1 34 SANITARY SEWER PLAN-PROFILE BREE LANE STA. 6+50 TO END 73 CROSS SEJANS SOUTH 21ST AVENUE CMK Z 35 SANITARY SEWER PLAN-PROFILE SOUTH 21ST AVENUE 74 CROSSOCTIONS ALLEY #2 DATE: 7/13/06 'a 36 SANITARY SEWER PLAN-PROFILE ALLEY #2 STA. 0+00 TO STA. 8+00 75 C SECTIONS ALLEY #1 REVISIONS:1o/25/06AB SITE F 37 SANITARY SEWER PLAN-PROFILE ALLEY #2 STA. 8+00 TO STA. 16+00 76 OREET DETAILS 38 SANITARY SEWER PLAN-PROFILE ALLEY #1 STA. 0+00 TO STA. 7+00 77 WATER DETAILS �' 39 SANITARY SEWER PLAN-PROFILE ALLEY #1 STA. 7+00 TO END 78 SANITARY SEWER & STORM DRAIIN DETAILS APPROVED BY: g GOLDENS IN LAN QBALNY ASSURANCE' g I 4 "CONFORMS TO CONSTRUCTION RECORDS" SCALE: NO SCALE VICINITY MAP UTILITIES — OCTOBER, 2006 FILE:PHASEV_COVER PROJECT NO.:Boz_osozi.oz SHEET 1 OF 78 CK -----LOT 3 --- 4972 ------- MINOR DTVTQTf) No. , ---------------------1 ------------------- ------�/------------------- ------ ------- ---- ------- - -—-- ------ ------------- --- --------------------- m 0 ­q E K u -6-347-SF SF 0"II SF 080� z I w \ 76985F /. .... 53519 SF 16- bl SF 58,74 SF ' � �1 `� 3 18 1-6 0 > 75PO SF A _sole SF 7826 SF SF "RI H-SF Q(iC K 2,6 x 9 LLJ 4rn � V 6222 S SCALE 1 100' ANDS I 2 od 0 93-188 uj �4�81`5 SF ------ V, 8111111:F 0 - 16043 25 LO ---w 2 )11 V 60,O�SF S 18 NOTE: 6015 SF 7053 SF 3003 -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERMCE UNES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEMSION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, V 10 2003.AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. ar �10 ji 6224 SF ----r -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. B22-4--S� SF- 5-T,fSF 7000 SF -BENCHMARK#1: SECTION CORNER(REBAR)COMMON M SECTIONS 23,24,25&26 179622 SF i N 34897.73 21 1 ----- 11 E 50303.75 ELEV.�5023,28 -6676,"SF VT I 1 1 jl'IJ -MMCSSA-YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23 24 WITNESS CORNER tull IN 40219.41 -BENCHMARK#2 16­� rn --------------- 20 72 jf S F Z� 8307 SF E 50397.83 6000 SF ELEV.=4939.18 595b,SF -DATUM=NAVD 88 t -COO BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION 4903.86 i-9--- -----T2-\" -SUBTRACT 19.45 FEET FROM BENCHMARK#1 OR#2 ELEVATION TO CONVERT TO COB DATUM. 6 00 SF 5906 SF ---- ---- -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. I N j ---- PRIOR TO BEGINNING ANY WORK. --- ---- THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIO ,x _p, z 6 13g O 6893 SF" SF 0 6,8,65 S1 FINK PARK' 6040 SF; 4Gil� ��i!! . 10 55109SF ----------- 4 7115 SF 7'3,9,3 SF 0 8666_SF �_7 J­q V 1�'o --------------- -------- x 1 1 —-—-—-—- ---------------- ----+4bd4 18 ----------- E44, I MI > 'j, 67f SF '�442 SF 2 1 64836 ,5 ---- ------ 12849,S-F--- -----I-- SF Ld 17 W SF T `7900 SF --------- 2 < Ld 4 i i vm 16 3 < 7349;SF 7404 SF -7200 SF 49 B L 0 CK 20, z Lu Z r\J 10550 S 4 b, 806 SF -- ' \ i tl�/ I 1 0 L3,:: < Q __-7.3q�SF 0 ---7-1-GL2-SF �,z 5 0 7806--sr "8�2`96 SF 6991-"SF 0 93 Ji, m <K 80-358 0< V) 5: A ------- 8532 �i _Z�52 SF ---------- ------ < _j W Ld LLI < T,- T1, 7: 12 12 0 LLJ 5:7 11 LAIN ol/j 8 6�,111.-Y,6 Ld �7230 SF PARK ----------- h235 S 12340 SF >Z 7230 SF 0 8356 SF ------------3 ""5 0 A '10 10 96?7A-5T 1 0258 SF 0 ",ocki 987 --SF 1 0 OR DENOTES "AS BUILT" CONDITION 153�`5 -------- 8009 SF I I----------------- ------- ------------------------------ ----------- I --- I. I" i �i; < 4 VS. .4. SF ------------- B LQ_G�----24 A— 'ISF 5 --------- 2 1 9-Qg 0 11 10 84)5f)--SF- o 3 w, 11331 15172 ---- / TII- I - �_� 840�0=-S—F —�"G�40o s=F —-- . Te8�0"�F— -- I— a 84'QO SF 8580 0 1 4 > CMK wIQ 11182 S 4 C.A.D. DATE: 7/13 REVISIONS:10/25/06AB 21 5344 SF 2 Q/ 9 DS SF Nv�-SF ------------ 8400 SF -----------]a --- S - ------ 7 ,­ APPROVED BY. ---i2� 2 SF _11-,M'SF j �EI�A��- 1, QUAID ASSURANCE: 80 _j2_221_0 SF ------------ ---------- q- TRACT 2 "CONFORMS TO CONSTRUCTION RECORDS" nif:PHASEV-BASE CERTIFICATE OF SURVEY No. 2177 UTILITIES — OCTOBER, 2006 PROJECT NO.:BOZ-05()21.0 SHEEI 2 or 78 I 9� M�5 -BLOCK 3- EX.SAN SEWER MH 23 RIM=4991.79 EX.STORM DRAIN MH FX INV.IN(E)=79.71 RIM=4991.97 INV.OUT(NW)=79.51 / I� E INV.IN(SE)=8.76 INV.ouT(sW)= .56 ----__ EX.STORM DRAIN MH � � / / 3 f,IP=4991.76 / .� u / INV.IN(E)=87.17 49724 SF � J� / INV.OUT(NW39.4' 7 39 4. x REMOVE�t pISPOE NEW HYDRANT / _ - ______ OF EX.BAR6'A11RE LOT 3 N 36920.19 FENCE WITHIN STORM DRAIN MH�T / ass / TEf 0 0.5� PROJECT LIMITS MINOR 'SUB RIM 499238� E EV-9.23 // SAN SEWER MH 77 O ` O / D DRAIN®0.5% NO. `,Z.3.rJ INV.OUT(W) 8800 38 LF 15'•STORM ARROW QGL/T RIM=4993.99 S 3 s n, - DRAIN®1.0% ELE j74994.89 / INV.IN(E)=82.23 EX.20'WIDE -W SUM BRA MR/N N -. 43 LF 12•STORM INV.WT(V__2.03 - STORM u" ds r 2z+ • , DRAIN 1T 1.0% // / S 88'93rOSN E __ PUEA EMENTBUC TM NEW 15"A-2000 PVC 5 0 RAIN MAIN __ ui os� W R s 6- 5 R �' °^23+09 EN RPRISE BQ�J p� R=,s N R=,s 5+00 NEW 8"MR 35 PVC SAN ul 0 79' L�ii e'' �41 S 88'S3'05" Q N = sExm uaN s sa ssros",c zx+oo ... __---- ze+oo ■ C• w m _ u \ / EA- Ex.a oP�a L-3.2Y =23.85• NEW e"ola WATER MAIN a 9 O 921 IA _ / N _ ui hL. e9 N = 85•--- --,------ ----------------- - -- ry 9 99 \ �AO Oi h., INV.= -----G - STA.21+46.2 / 8.86' ---------------- t.r.. -- / - ----- -- ------- - --- - ' �982F1 X.STORM OR £ 30 SAN EWER MH 76 100.02' STA.0+32.12= --- O -A __ ------- Iy _ __ / RIM=4993.13 STORM DRAIN � - 84.13' / 80.00• - ---------- - -- NLET Ri(TYPE II �63.44 SF 7 �ti // / 60.00' 0.00 80.00'--------60- -- -- C E%/J STREET TC=4991 21 f N}LME/STOP " INV.IN(E)=80.49 1 INLET T1(TYPE II) 9z RIM=90 7 GN 4982.70 °sy I„' INV.OUT(W)=Bo.29 6347 SF INV IN(S) 80 49 TRIM 991.63 I II I - �NT•E��I �w // 3 f W m N LO K 1 6 6 Z C 92.10 !V.OUT(NW)=87 7 = 2 i r-' INV.OUT(N)=88.63 T�- I '" ap - 6000 SF 4 ;Y w 0 PARK ' /� q m _ W 9 p 1 m , 5 6000 SF 38495 SF STA.0+33.57= BOCK 15 w INY- �40 flo 9'14 Ig N O „� 2 a / 6000 SF��0 6000 SF EX.STORM DRAIN 498: m I p 8315 SF z jN / O1 I n w D / / INLET Si TYPE II STA.0+39.12- , . II / N - A I `? I �? v R7-1 z rn 6000 SF j'• j°• a o j WNi, ( ) STORM DRAIN SCALE EX.HYDRA TC=4991.99 I NJ v I STA.0+3212= - A RIM=91.49 xl INLET T3(TYPE II) s ( a o v+ INV.OUT(N)=88.4�' I I TC=499224 1'll I STORM DRAIN / O a za 1 - 30 RIM=91.74 Z I I INLET T2(TYPE II) / 1 PLAN 1 rr r T- PROFILE y zs3 .r�.r T�- TC=4992.13 / // I INV.OUT(YJ88.68 I RIM=91.63 / E i INV.w(s)=88s3 / II � I IINV.ODT(N)=88.63 ,,- /' VERT. 1" = 5' 30 782 CF NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -BENCHMARK$1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 N 34897.73 E 50303.75 - ON TA ELEV.=5023.28 -BENCHMARK$2: WITNESS CORNER('MMCSSA'YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 IC N 40219.41 E 50397.83 A E ELEV.=4939.18 4n 610EN5E0 -DATUM=NAVD 88 -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 S�ONAI. -SUBTRACT 19.45 FEET FROM BENCHMARK#1 OR/2 ELEVATION TO CONVERT TO COB DATUM. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 22+00 23+00 24+00 25+00 26+00 27+00 28+00 5010 HIGH PUINT EUEV= HIGH POINT ELEV-4994.45 5010 W 00 HIGH POINT STA-23+25.72 LOW PONT STA-24+59.98 HIGH POINT S -27+95.99 Vl STA-234-17.39 PVI STA-24+62.41 w W VI ELEV-4993.21 PVI ELEV=4992.49 PIA STA 28+05 Q A.D._-1.50 A.D.-1.11 PVI ELEV 1.46 4 = H N A.D.--1.45 K=3&33 K=45.14 K= 4.54 a 3 J Q F 50.00'VC i 50. VC c Z L�N Z W W O a N o z ^F 0 v)> Z O ci O Q z 0 5000 W N $ $ 5000 >_ z a+ vas m /yQ O 0_N C4 m QZ � �N NQ II II EX.20:1 GRAVELm N j m m II II }j D_' Z Li1 Q a w TAPER BACK TO n a a w FINISHED N F Q 3 m GRADE W N 0� ONE +W N(� N N W L� N V) b w m il + Nc+� N� OR Os0 .B1R ---------- Y N 0 N r� - ------ -- W o m - EX.� -- -------- ul m ____ -_------ EX. ADE 0 W W Q m 4990 F] GRADE 4990 c o 0 �IINIV. U of oa ¢cwi, CLIN(S)=87.5 I IN IN(S)=88.30 0 �_ O W Q Z �EX.8"WATER MAIN NEW 8'WATER MAIN NEW 8"WA R MAIN W � II 4980 K-- ----- - 4980 SAN,SEWER O 0.0 INV.=49110,011 6 CCMK z p C.A.D.= DATE: 7/13/06 RENSIONS: �o o srn�nza �'om3 Ijr in III to vW z` mm K z n Nm ZZ $vaT 4970 - ��� 4970 APPROVED BY: II n n z , QUALITY ASSURANCE: mllz 16 vw II m ro ,_ol 4 yw Z II�� + m Y n Z+y + zzz + + + N n n N "CONFORMS TO CONSTRUCTION RECORDS" $CAFE; SEE SHEET q -u�i �o �� m� �v�i• u°4, nn �o ' "r UTILITIES - OCTOBER, 2006 FlEE:ENTER_PRO_SS T 'T "T 'T "$ 'a 'T T "$ a PROJECT NO.:B02 05021.0 24 Of 78 22+00 23+00 24+00 25+00 26+00 27+00 28+00 SHEEP T, A / O SAN SEWER MH 77 \ \_ \9 \ \ \ 0 RIM-4993.99 sz NEW HYDRANT \\LOT 3 \ \ \ \\ k INV.IN(E)-8223 EX.20'WIDE N 36909.29 MINOR - INV.OUT('I/)_8203 PUBLIC UMUTY / E 49829.05 5+ I 5��41DE EROSION \ EASEMENT .ARROW BOLT UBDIVIS ON CON OL PAD B'53'05" E — — — — — — - - - E . . . . . . — — — — — — — — — — — — —x— — —— — ELEv.=499soa No. ,235 — — MINus T'AD W ° — — NV.= M 566'S305" 2"°° _-- ENTERPRISE BOULEVARD BOULEVARD 1235.90'', \ as.zs \ O 628.52' 29+00 S PNC SM! MAIN i N - R-15 yM Te 9]S>_S�� 1 N ------ NEW 8-oid WATER Airy \ L=21.03' 19 o W L -- ---------- \ INV.- r -- - 0.00 60.00' -- --- --60.00, --- 60. 3 60.00, 68.4T \ 6000 SF f 4 3 Y w — O K 16 s j s000 SIF s000 sF s000 SF w s000 sF s000 SF j ENTHRPRISE�m= II II so LF,z' II w REMOVE&DISPOSE I I - PVC 0 0.. /11 4,�r, n `OF EX.BARBYARE 9 z_,p FENCE 7 98 SF I \ CONCRETE F., SCALE — fA �AN SEWER MH 78 DRAINAGE PLAN 1" 30' �/♦ 3 RIM-4992.02 O m I 1T29 OUTLET AND v INV.IN(SE)-83.99 I I LET CHASE PROFILE � vI h --_--_ °A' I INY.OUT(W)=83.79 o I I $,I SEE DETAIL H ORI Z. 1" = 30' ————— DTEI VERT. 1" = 5' P lNV NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBUC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -BENCHMARK ft SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 NTAp� N 34897.73 E 50303.75 IC ELEV.-5023.28 -BENCHMARK/2: WITNESS CORNER('MMCSSA'YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 A E E 50397.83 Tns 410ENSE0 ELEV. '4939.18 S�o/tlAl F,� -DATUM-NAVE)88 -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR g2 ELEVATION TO CONVERT TO COB DATUM. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COI WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 28+00 29+00 30+00 31+00 5010 HIGH POINT ELEV -4994.45 5010 HIGH POINT S -27+95.99 W PV1 STA 28+00 Q w PVI ELEV 4994.54 = H Z A.D.- 499 K- 4.54 a 3 W W � _j O 50. 'VC w C Z E H M iq9 O'^ Wwa a0 N Y < V/ 0 < 00 is Q N 5000 5000 a D_ Z J n wiu 1812 0 a-a as �c4 m QZ �N <II n n Of Z 3 n (n H0 Q W> n +w �w nJ -------- ------------------------- -0. �� nc� w o W m 0 N 6 w w Ul m <W $$$ Q N ft� 00 H E 4990 4990 O U Q Q Of Of Ln F- NEW 8" W TER MAIN 0 0 Z r W a 0 3 N. .0 Lcd G 4980 4980 U U U U U s w s s C.A.D. CMK °. DATE: 7/13/06 RENSIONS: Qz z z `z` z pea_ N N N N m m m m m Nmll�O 4970 z z z 2 +� 4970 APPROVED BY: n n n OUA R ASSURANCE: c4 c4 1 + + m+ + N H + qy3 om'eWai na aP''$Wa "rai "CONFORMS TO CONSTRUCTION RECO RDS" C : SEE SHEET -R Fl[f; ENTER—PRO—SSo UTILITIS — OCTOBR, 2006"; Q. PROJECT NO:eoz 05021.0 $ SHEEf is OF 78 28+00 29+00 30+00 31+00 od' �Waysi�-___--�/ Q N INV.TRIM: 9481 m� � // n�^-• I / u I oa �oN>'� / gok�kB�M��o? INV.1qW 26 8 __ )�5. INVNpU =8628 ��� SA �o//� I 268.82' (q / NW)>85.06 N // r Q h NV.-99.tOMH 80 "; // z y /T w / I .7 M ) 8 I Q�� C •i r e / fD M INV. (S a 8 20 g/ s \ �. E N / N /' /i 88.8T N INV.OUT�(N�.20 �paa \ / �'O O �� / �cr I VEN E 28 LF 15"STORM 'I. --- - J 0+0 5 OB'32'25"E I-__ 2+00 � DRAIN® � /� ~O _ / // —�— — — I— — 8 08�2'25f"E 4+ 209.83' �OTFrApE E---�— "< SAN SEµ£Rc 0' � L / x i� m Ra �:' up i 29 LF 12 STORM ;;==..�� ��s.sr °�'zs4s• INV �5003,301 SEWER a91.82 Q rn RI aS MH h S 9 Z o I N a ----- �— __—� //4�';. ----•.✓---- ' — / _ OUi(N)x9162 0_N INV OU�H)91, 4. —— V �NOJoI � I I s20THA1f room1�01.44' \ l 101.40'N�3ypRANi 1 rc p� a �_-- --- -- _—_— — �— >(r TN 20TN AVENUE —�_ � SOUTH"20 W � NEW7y 1DRA A' om�m� 496 rq H z N 364 NT 42.7 /E 6 3 = iigW^ - 6.22 u� I / ../ NT-vmo n4' mmmw t► g 49915.0 Q /� ARROW BO 2 I PA s 20TH s ftEV_5p LT � � �/♦ N zg3. 19 L ,g9z O so o��— pR ' m y�ili� Z n-�--z 0 I I ✓ Nr-Q�Q %''z � -o � O �/ 4989.54 �m I Iu l al // L..I — __�L ,. - h __ _ < V) m m of I � / I I / ro o z 3Z oa J/l O� / $I I < / /lo m rn // 1 '�• NEw --1 C ^I •''r. IW ^rn / / W im M ELERR W BOLT �tssl o g. s86y 1 d I r Y y / / U 'M / / I zW om m -saoSOL' � o� �NgetVa / m � � NI of N Qa ��mz olw o I �N o om ey .al _ S ohm 9&''ANI 1 y Ih S I I N o fn.`•�M;. 1 £8'89ea i ✓ I m ss oe.. 'NOTE: H W -BENCHMARK$1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO N 34897.73 THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, E 50303.75 SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO ELEV.=5023.28 CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -BENCHMARK/2: WITNESS CORNER('MMCSSA'YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, N 40219.41 83 2003,A NO THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. E ELEEV.V.-4939.18 SCALE -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A -DATUM=NAVD 88 PLAN 1" = 30' LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION -COB BENCHMARK/1110(ARROW BOLT ON HYDRANT)ELEVATION-4903.86 LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -SUBTRACT 19.45 FEET FROM BENCHMARK#1 OR#2 ELEVATION TO CONVERT TO COB DATUM. PROFILE -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. HORIZ. 1 = 30' -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. VERT. 1 = 5' 5030 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 5030 ON TA IC OR - DENOTES "AS-BU LT" CONDITION �' E to 410ENSF-p SS�OAIM-E�. 5020 5020 PM STA-7+50 PM ELEV 5003.18 A.D.--1.00 K- 50.00 50. VC �.I..I O O Q 000 z o _ H m o� a 3 W H 5010 ^ M a -M 5010 In _j 1n a8 Z ww 00 nll � � � 03� 0_H mad loe o ca°1 a o� Lei of m > QW> a Z 0 rc g _ O Q 0+0 I— QOZJm O a ay as Il lal __---_—_---_ 0 Z� 0 W 1 N HW �iW Q z m m Q3 ��i�Hl W fi fi c}r ------- —_-- UQl Q W N O K , e W q M� mGt N W _ d' Z 5000 N m m __ 5000 N w w w ao �n Ie > n II II II FIN SHED fL ac}I --__-- W W S W w, m W N NEW 8" ATER MAIN Y I O N r W wm I-'a as a 5 Mi co [if a _N_chs1r W O O ~>_ EX.GRADE fL _L.W + ---- LuQ Q Q P NEW 8"WATER MAIN Spµ 35 00< QO 6-1L.F. N - 1 - -------- --- ------- ----- 0 r4990 NEW B'WATER MAIN 4990 0 0 NEW 8 WATER MAIN Q LI..I N t m U �� m7 �m rc,pM 1� a o in 4980 <}� >0 4980 CAA. 7/13/06 - DATE .a^i a II I m i RUSIONS:10/25/06AB ^z y Win`3zj p v'n zzzo m� +�____ CONFORMS TO CONSTRUCTIONRECORDS" APPROVED BY: f N UMITIES - OC OBER, 2006 ODAP ASSURANCE: B$ a S }2 > g 4970 wZ_Z 4970 SEE SHEET o am _* 20TH3R0_SS o� rvM go <� nM n Mm FlEE: mA mg w8 �s oo a o 00 00 :a :a <a :a pa wa IT pa '� �2 8 �� �� PROJECT NO.:Boz 05021.0 SHEEf?s Of 78 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 \ m 400=0 �I=wl a w � - LACK 25- W - ; L.5 O �11 -l.( I li li Z Io ' � n � f � - v) v)p� W O LL / YJ 1� 4 Il vi xoaD N ,^ z ,,, - bw 3N I N w \ za » / ° N 11� 2�52' 72.49' lo 75.00' I %n 1100.00 75.00'I---- -- - -- ------ ------- 70-�,-- ----\ ���` I: / �x Flo ,RAN6�oLNI �_ 11C 12+00 - -S 1'0355' ' "1 00 16+oo - - _ O Z X O 536_26' V � Up m 188.06' O� I, / Ofa LU O�II ZZ r orN 57.64r�r I wow ¢M Ng �� g91x ow o �v 0] zz o ti�Qx ag a� 1 Z \ W Q] NK?? Nz QM 4 2 H �'[ W ttmul O KN W 0 no (p / n• \ m�w,rf�� rc�� tlo A Q �m 3zwaw \ nib I wN m�o3o' >m \ / 3.e" k lip aou 11 'oo \ O_ >< \ z Iw W \ w �_o ■.�■ M ?rn / 0 i a 5 / ott" �� � k ON15 Z� �� \ OW I \ 3 N�2, 1 IT 3zwQW W L z wLL \ m ON \ -C NOTE: m In x wx \�� 0 1 a O W< w p m I*i -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO oo SAN SEWS#MH 91 Y N SAN SEWER 00 92 aZ <wLL 11 it mwr�s THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, RIM=5003.89 O _ ^ oo SEWER,TELEPHONE&TELEVISION MAY NOT BE STRAIGHT ONES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO SCALE RIA�5003.8 Q N ( )� 10 0%e / - s y� a-'rc� 3�w ) ;INV.IN SE-94.33 n ti E ,. \ p' °YN s� CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS.ASIN IN IFl(SE)=91.82 a.-INV.OUT N 94.13 f " o �� � PLAN 1" - 301 INV.IN(W)-91.82 d N 8698 ti�P�tJ p $ -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS STH EDITION,MARCH, INV.OUT N)=91.62 0 °.° to / \ \ e - �W a. > PROFILE \ \ 6� zw \ 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. HORIZ. 1" = 30' 3 :?; Wy y VF i /fig II yj \ rc zap + -UNLESS OTHERW1SE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A N9. rcN \ `s,+ -�� p LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION VERT. 1" = 5' AVENUE 3 \ \ \ °O , LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. (wow-�) s tiroa'or w a1 ��3 / \ , Mo -^-..-.v�� -BENCHMARK gl: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 _, _ e+oo o , a^} / I ,o \C S w� , N34B97.75 OR - DENOTES "AS-BUILT" CONDITION s O ELEV.-5023.28 -BENCHMARK/2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 x IN E 50399.83 -,-- .I•. h -_ 8�$coo,00� �vois w^U o { K�\ sm.6 ELEV.-4939.18 DR ,�:1 a,o cj C5 z W DR M `m w / \ Iri^r -DATUM=NAVD 88 I .I 520TH .� o.Iiln��� s a 3 N�616.eo p I N�3:w Iw~ o \ \ �\ \ \�ygi$ -COB BENCHMARK/1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 CONFORMS TO CONSTRUCTION RECORDS R 0 608T U I J 8 o N ul / + / \ II / -SUBTRACT 19.45 FEET FROM BENCHMARK#1 OR g2 ELEVATION TO CONVERT TO COB DATUM. �z \ � ; \ �» V�5005.44 �^ ��, -~ - / \" -d _ \ u -- UTILITIES - OCTOBER 2006 I/ O z o I z I / o �\ -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. f L'C664 z I / m\\ THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. ='ANT .oil �� I dm Z / I m\ 1 1 1 9�Z'L66, 5030 9+00 10+00 12+00 13+00 14+00 15+00 16+00 5030 �ON TAp� PM STA 14+00 IC PM ELEV 5011.51 v A.D. -1.10 K= o.70 6n 410EN9F-O too. vc SS�ONM_ PM STA-11+00 o n P'A ELEV 5005.80 + 5020 p 5020 K- 6.80 $ 1 , STA=7+50 100. VC .EV 5003.18 + S •• N w -1.00 W 0.00 N a a FlNISHR C so.01'VC �p m •6 + rc n p X a r rc a ~ mM cows rcN Ooo pn J�U>1i 6T�i. ��' 0.0 -------- --------- Q Of (O m M m m jn Z N of W > Ld ' A -_-_ 2 H �a o$ a$ w $ °?> -------- -------- 5010 ' �M , m ' ' m m ' +w ----- - 5010 a 3� �N m GI , ca o_g II w >aI FINISHED rL 1 -- Z W w 00 II II W es , f II II p,j N� � N +G7 GRADE ---_ --_-_ O w 2 Q �H v>i 0�>y a -� mw + + ��' �(+I v)> Z O umi� mGtw �� m� wc+l mc� _--- }O Q ZO F O_ O JDO n n - 0. - - W --_--_-- E%.GRADE O� Z � 0 m N- ,< Ld 5000 5000 (/) w w W 8" VATER MAIN W Of W N Y o N }Z n W Nr 0 � A �.i � W(n m Q j Q 4 9, U oa a� 67 4F.a SDI 35 P •s�f z ofU)0 O n m O nv �zz 0 a 4990 yll �zz 4990 Q 0 g Z w W mm W 2 4g~W A N�101 + TH my Ot � Tp 22 S T k �1 W 1 . �NH p fw/IyH yV� W. 1. q iN� � 4980 �> 4980 CAA. CMK DATE: 7/13/06 N N RENSIONS: 10/25/06ne z s APPROVED BY: u u n i QUALITY ASSURANCE: aa N ,A U MI m 0 g M A 4970 + + a m 4970 $GALE: SEE SHEET M a Ig mmpFILE: 20TH_PRO_SS Mmmp,� O o0 00 O �� 00 00 00 00 $p � ' ^� _� ^ zN�Mn�� � � � nn � � PROJECT NO.:Boz 05021.0 SHEEf?� Of 78 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 \ \ I 1 1 I Hn v �A % O LO u i �2 ` v -- --rn--— z o ---aN—I ---------�—$ --r'')— ----IV) j.m� — — O z oN Muj M BLOC 7soo\ Ie I 5.00 \70.00' n n �Vm) -—— ---\ ------- e.7 \ I O 3 O — aCi I WQ RnNsnoN �=SOUTH 2OTH AVENUE — � 8 I � m� 15+0 — � 150.50' `- C 24 -I z v U Q �p M J 260.58 `r p - W z n y2zz Q va �I_I ! ,.R• Jm w, ' >t2 U 3/_ �z �w< = - J I SCALE �j O J m1� N �\ s w 3 I �c �) J m pg \ PLAN : 1" = 30' v Cn PROFILE v dMa�tr•ss £ sc VERT. 1" = 5' 5030 16+00 17+00 18+00 19+00 5030 �ONTA I I NOTE: IC c c -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO A E m THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, ,Z rc W ao SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT UNES OR AS INDICATED ON THE PLANS.STATE LAW REWIRES CONTRACTOR TO F`s TCENSE �� CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. m U m V o ` 1 -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, 6 a n II n N 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. b vi 1 1 II m 1 , N II• '� -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A 5020 m 5020 LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. w ___ r e t r W M w c� 2.80Y• _ rn w •� + n o. + �� ———— -BENCHMARK$1: SECTION CORNER(KEBAB)COMMON TO SECTIONS 23,24,25&28 m n ly 7 c� 1• _ _—— N 34897.73 > E 50303.75 a a FINISH +w ___———_ ELEV.=5023.28 GR �:EX. _ -- w •6 _ -- -BENCHMARK/2: WITNESS CORNER('MMCSSA'YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 Ld _ _———— N 40219.41 E 50397.83Q GRADE O rL ELEV.-4939.18 w H -DATUM=NAVD 88 a- Q W O 5010 NEW 8"WATER MAIN 501 O -COB SUBTRACBENCHMARK 19.45 FEET F110 ROM BENCHMARK/1 OR#ARROW BOLT ON 2 ELEVATION TO CONVERT TO COB DATUM. 3 J~ -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. Z W W O Q L 0- -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. O v) p � Z a->Of � a; � 0 ~� O a-I-- Z N m U,Q Z Li ll�D 5000 5000 (/) w � N w w Lu > Y Ofw N r¢ n N0 Oaf a 6.6 LLJ LU m Q H Mo .6 o >z zN 0 U O a a n,� n Of cn= D 5 31`0 •II`O O O O 4990 -4990 Q Ld W. d W. W. W. W �, �, �, W. C.A.D. cMK 4980 4980 DATE: 7/13/06 a N Z Z N REVISIONS: 6 6 z z < 41 41 N 41 41 < a a a a W w w x APPROVED BY: II II I II 1 1 QUAID ASSURANCE: M :t t " m m g + m+ + + + + 4970 n n m m 4970 m CONFORMS TO CONSTRUCTION RECORDS" SCALE: SEE SHEET q �m "�i 0 40 h� �n _ Fl[f, 20TH_PRO_SS 3 65 35 �m m �� UTILITIES OCTOBER, 2006 f �� 4 �� PROJECT NO:Boz 05021.0 16+00 17+00 18+00 19+00 SHEEP 28 OF 78 S.s N I aw /I / wI / zc1enril �I I.99 orc I � rl lip �I NI CV ts< n l <o m y m m m 04 M K �, n zm z$ o >1O / n m �m�oii 1� a no _ a'm (� - i o_00 zg rc 4 i$ N i$ $wm V) la I} / No�� - N o / o $ �o U�m U ml Iz waw m �o nm nz � n No >$ w� 1 °° _$ Q oomm�I $/ ����' E J �rnr M M Z�i ina N / o.l. . Z e n moo n ° N - 33 N m.1. J �� r 00.01 Q II II / �n< du) U ----_ ' 81.42' 65.00, / w Z / (,a a ..,,: -- - -- ----- -- -- --- Bs.00'/_ &�- 60.00, m Q -------------- m ^ I�-- -- - ---- - --- 6s.04' N f _ 60.00 ,Y -- - -r----- �r� -7---- -- r ---- -- - ---- - ---- -- --- ---- 6- - _ ----- B5.00•--- mm? -72.01'_- w / J L --- ------- -- -- ----- -- — ----- ------- ------ — "IOU L \ - - 0 .m — n — n •m _— _ EW 8' JS PVC SNI SENEN N/iN 26'0� 0 00 --- _ I,+00 WARP CROWN — 12+00 I // Q] } O / 1111 86 _ 5 01'02'49'W ,3+00 ,0 67 ICI WARP arowN o A\/Cffrf�_—_ — — — WA II / � \ w WATER MAN �4 — m v cRow>a _ I N W ul V­MAIN -------- --��= ifi nl i— — ------�--- � y ^ SOUN—T H 22fl �—b—E—UwE nM I Ig I . 1 N ———————— � n SCALE 6z4z' N ---- ---- _ 1 30'o.a2' cs a z BSoo 85.00' ----- PLAN W I 5.00 65.00 W ePI m Io - 65.00• PROFILE HORIZ. 11 301 S 0 5 MN VERT. 1 5 CV _cmC O W v ` v o U \\X \ --\-- U $ m NI N n r� J V) I V) 8 m ,A/ 3 II (S213NM0 101 o \ \ M \ o m 1n cb °'a 00 i$ AB)XlVM301S o (S213NM0 101 \ pp\ I \ N -- --= =--_ R A0)NltlM301S \ 00 I ' n 00 N 0, I oo 301M,S '1Oj .09 301M,S'1f13 \ ` \ oo O \— ——_ — }- C j 1 _ SAN SEWER MH 83 \ * \ \ \ NOTE: -BENCHMARK/1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24.25 k 26 N 34897.73 -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO E 50303.75 THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, ELEV.T 5023.28 SEWER,TELEPHONE k TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO -BENCHMARK/2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23 k 24 "AS—BUILT" 1 1, CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. O R — DENOTES A S—BUILT CONDITION N 4ESS C 1 -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS STH EDITION,MARCH, E 50397.83 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. ELEV.=4939.18 -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A -DATUM=NAVD 88 LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION -COB BENCHMARK/1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -SUBTRACT 19.45 FEET FROM BENCHMARK#1 OR#2 ELEVATION TO CONVERT TO COB DATUM. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COBI WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 5030 12+00 13+00 1 5030 �0 A TAPy 5 IC m n m n 410ENSEO �? U N 11 �IOo NA\. U� F II II 1 VI 5 m 5020 a a 5020 rn o $ FINISHED e w In m n a $ p m m 1 1 rL GRADE c� m U 5 m r UO O � Ub U m —___-- _— Uag' '�^^ mII 1 1 1 u�i H W m l II _ -------- V m� n� 5 5 1 5 5 FIN SHED __--- EX.GRAD OrL Q ow ow o. n n a o��w ADE ____-_- = Of H z L> _ J H � 1.OX --_ � Q W O 5010 so __ 5010 3 u) _ NEWS" �H- W O ----------------- i�:EX.GRADE WATER M kill Z LJ W p LO L1A w Q a- + 5 PVC S N.SE R O .0144 ft ft 0_ Cn V)� Z NEW 8"V ATE R MAIN / Q Of Z J Q O z � o m Q Z fl�W Of w 5000 R A 5000 (/) w o Q N z _ Y OfOf N >_¢ LLJ In or IS of in .oa °o LL I L1T 1n m Q 04 ��n end A o f C) O Q z N LIZ' Z H F -nrnH =• NN IZO II=O 0 QH p 4990 zz zz 4990 0 N Q LLJ Wrc rc Wrc 1rcJ 1rcJ rc 1rcJ 4z1 1rcJ fA 1�1 N YI 1n 1n N Y1 N YI WW Wy WK WK WW WK WK K N In In N N N N CAR CMK 4 4980 = _ _ _ _ _ = 4980 DATE: 7/13/06 I� 11 1 A 1 1 1 1 11 II RENSIONS:10/25/06Ae W b N W R O n O91 $ $ ORMS TO CONSTRUCTION RECORDS" APPROVED BY: UTILITIES — OCTOBER, 2006 oumm'ASSUME g 4970 4970 SEE SHEET rvIn O1 mn cmi Mn o$ mn , -9 mn en no FILE: 22ND-PRO-SS 9c od Sri ^v �v ay 6. �ri PROJECT NO:BOZ 05021.0 SHEEP is OF 78 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 - 1 1 5 I I I I ., I I 61 LF NEW DUAL I I II II m N _ 1 I 1 �__i 1 RCP(118 28 V EfOVA� w / 5000 SF 14 REMOVE&DIB WRE I . v F A � / M E BARBWOSE \ I I 1 CUL RT WITH F NEW HYDRANT 5000 SF FENCE \ I C \ 1 \ \ 1 INV.IN(SE)=Y82 /a. C 18 °•m �$ 17 // A� -BLOCK 16 N 49539.45 BUILD BENCH AROUND 13 �\ „ n zll II SETBACK INV.OUT(N�91.04 / �:-'4 o ZO z� / im E 4953OLT HYDRANT TO PROVIDE Ari \ m Gmmz� 30916 SIF / NEW HYDRANT Q 7013-SF 16 ARROW BOLT 5000 SF ) I o�� j m Y n A u s / SAN SEWER MAIN �¢.. 1 !b 1 1 NE36700.R3NT 7826 SF -a - -� m w r t^,I 1 r I I z / 27 LF OF 8" E SO086.NT m> ELEV.-4999.84 ADEQUATE COVER / Zpt 10 N po V 7s11 sF OL 12 -< 11 za mo I 1 $ _ z m N 36713.11 0 0.0040 ft ft ARRow 6'2 ,� 3 m z z E 49991.E 11 IA 1\1\ E 49284.41 // INV.- INV. / z - 9398 $F zm n I I <-< a I / OLT yl\ ARROW BOLT 4988.77 4988.57 INV. 5000/SF .3 0 7520 SF - < y .�$_<' w - I NEW 30'WIDE ELE4.=4997.40 LEV.=4997.72 4988.15 aw\r --- 1 I z_4 iO 1 L. m R=15' - - 88.43' 70.00 75.00' 49.94' -- II PUBLIC&ACCESSTM - -- �� 4 \ L 18.9T -- - / -------- --- --- - -- 49.95' - ---- 49_96' - -_- /4 8T -- - �" o EASEMENT -_ 75.18' � N� z w py�y\ \ N 'u.: 5.5] � 9800 96.Ia -_---- --- �- N-�- - -- --- - ------ - -- - � -- ^ _\- N�tl,} 111 I � / 62�8SF \ \ _ 6 } : _ -- 9540 -- _-_ ---- - $mmm°'� +00 ____ _ _ 102.50 DWA1\V �RI-Y 94.5) 96.I5� - �y,A Lu 8•DIP WATER wareP CROWN uN ee - _ - - i00 5 88D4'7" n wN too \ G -•A-.. - - / -- ---- -------------- NW 9 --- - - - - = - - -- INV�.= --- w�,r -_ --- a�g-- _--• y I\ 192N.2 53 6�85.2409 LF OF 8" INV.IN(NW)=88 10 yBLOCK 15 \\\ oMH,pp M u„ 9. _--- gala--_ --- __--- 15 ` \ SAN SEWER MAIN w •: o \ R=15 75.00' -- --- -- -- o. a Q \ L-28.51' IL 50.00 50.00' 50.00' x / m 65.00' - --_- -- `- 6030 SF 1 _I 00' \ SAN SEWER MH 98 85.00' � �\7p;pp\ \j SETBACK \ 886E SF RIM=4995.61 J SAN SEWER MH \ t INV.OUT(E)=87.81 -BLOCK 1 / RIM-4996.32 80913 SF 7 C 5,vNAVY 2 IN IN(W)-86.63 L� N�K n m 3 INV.OUT(E)=86.43 1 I.I m 7 3 m / / j/ u So LF 1. / 6W >m 7500 SF A e 5000 SF 4 n I 6 -k- 6500 SF J w $ II m ARD = I \ Pvc®os� \ \ S\0 HEpS) j j g 5 1 .3 3 / o, 1\I N TOP 0 P D=4995.00 \ \ °W/ - ?m 5000 SF z m I IIII 5000 SF N // 6500 SF r z \ ��\ g N \ \BWBATER 9N4..00 ___- - i\ 500�S� I I / zm a 9 �\ \ 11 .. m D=1 R�UOTTR�OSI ORAV1144115 CF ♦/� 'y 7848 SF z�, sro c s W�NA-�1519 CF �/♦ 3 4990.41 ----- \ / I 1 _ STA.3+66.29=� I 1 N (4:1 5IID $F� ES,SEE 1 6 �• SeORMTDRAIN o \ DETAIL)I I II Q R/N R/W 30• NOTE: SCALE 2�7 12 12' j, -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO PLAN 1" = 30' z THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, M , SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO PROFILE 3z 3. CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. HORIZ. 1 30' -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, VERT. 1 tt = 5' 4.1 Al M4X 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. WOVEN GEOTEXTILE FABRIC -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A UNDER SUB-BASE LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION (MIRAFl 550%,AM DO 2004 pLgp,T MIX ASPHALT SURFACING, LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. OR EQUO 200) COMPACTED SUB-GRADE 3"MIN.DEPTH -BENCHMARK/1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 6"OF 1 Yz"MINUS CRUSHED GRAVEL BASE COURSE 15"OF 6"MINUS UNCRUSHED SUB-BASE COURSE N 34897.73 E 50303.75 ELEV.=5023.28 TYPICAL STREET SECTION ON TA -BENCHMARK/2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 N 40219.41 (EAST OF SOUTH 2OTH AVENUE �' IC E '83 OR - DENOTES "AS-BUILT" CONDITION ELEV.==4939.18 NOT TO SCALE -DATUM=NAV)88 A E -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 to �rCENSEO -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR/2 ELEVATION TO CONVERT TO COB DATUM. `WS'�0/(A7.E�. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. "CONFORMS TO CONSTRUCTION RECORDS" -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. UTILITIES - OCTOBER, 2006 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 W HIGH POINT ELEV=4997.00 (n HIGH POINT STA=2+50 Q w PM STA=2+50 = H PV1 REV 4997.08 5010 A.D._-1.00 5010 a 3 u Li_ m K= 50.00 50. VC ZO W 2 Q m w v)j Z �i, F y i �_ O Q I LJ o c m A N m n vai Q H O 0-o r Of �a 5 Gi a 1 + m� mH 'S� Z a bq m m < >> $ .. .. A T'1a T'9a ; m <Z Ida a it vi v�i W m m w > < w as as I„la a oM z!o N< W 5000 0° n n A A s W n nI n n A m W z 5000 (n H o Q 3< 'qt.W N W d II FINISHE d d O tl N W M A II�jyy W A til I II p O_'�' LLI N W $ o�+ o c+l w 0 50 ��GRAD 0. R m c+l a 1+� m r+ m r tl low r W°Q Do 0 0 < n m t+l LJ w _ 0 oc� 1.1 -------- -------- a m� ec+l Ld Do m 4 - ---- -------- -------- ---------- ---� + H O Z Q Of TR\ _ O � 71 v `EX.GRADE III rl, ---- 9 4990 4990 NEW 8"WATER MAIN Q W v 9 LF A R 4 q 0 AN. E R L 0 z z rc rc rc rc rc rc i> W. 1. i� 1. io w 1. 1. m $ m m 5 5 5 5 5 5 5 5 5 5 n�5 5 5 5 5 5 5 5 '°ui w W W W W w m w W w w w w w CMK mm o g m y m o o ad N 6,6 A�• 7/13/06 N N n� II II $II II II 10/25/06A8 4980 <IIMZ o 4980 RENSIONS: Z N N a<i a zd z< < z< T<. z< z< z< 1*.Zzzz Z� i aZ KO^p�6 < 6 pll N N N .,ma N N N N N 41 . I___o z(u(/s1 •I��O +zj* < < < & a < d v e +�jj< a < < < a < < Zjjjj �j om �ZZZ omz �zz --- APPROVED BY: z z z _ z _ z _ z _ QUALITY ASSURANCE: A II II II 1 II II A „ II A 1 1 A 1 II II A II H a m e w m m n e m Y 0 < ri ri r n H m O i0 O} ♦ r Q H W O g 4970 O o + + + N N M M < < < a + ^g 4970 m o m EDWARSDE�E RSOH_ESEST m9 m m �4, FILE: a PROJECT NO.:Boz 05021.0� v .a mn c R. SHEEP 30 OF 78 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 EX.FORK OF I \ Iw DITCH TO BE I \ e �' / ABANDONED ;o w BLOCK 17 / OPEN SPACE, E o ' �, 3003 SIF NEW 6 1 1 c BLAKE m n REMOVE&DISPOSE 510EW _ I 1 1 N II OF EX.BAR / v jw jq FENCE \ BUILD BENCH AROUND /' 2 y ?♦ HYDRANT TO,PROVIDE 5000 SF 1 Ew= 1 I NEW HYDRANT 1 7 _ jm �j \ n ADEQUATE COVER , NEW HYDfj/ANT 3�w N/ g + 'I z m\Z I I \ \\ \ � ss.6s 1 I I N 36438.75 18 7053 SF 16 II rn \ >a 1 4\ w N 36433 37 Y z3 I m / \ 1 0 roi \ \ \ �� E ^ \ ~ E 49637�23 3 o I�ti j o °"o I I 51 .'� I I 11 E x93s4.1s 7g65 SF 5000 SF �+ 15 3v -Apvy _ z$ N• \ < o \ \A _ A 5000 SF -o 7846 SF ad C AkRow eoLr BOLr �,g 12 11 P, o N z INV.- I I 1 ELEV.=5001.30 J{5000 SF ELEV.=5003.12 _ QQQ$F 6197 $F� I �Pc p, \ \\ . u 4991.87 m 1 I o 69.20' 70.53' gp.00' / \ �N/ --- ol I � ,, _� --- -- -- ------- - --- - ---- - --- - So_o°°�- o.00' --- � 88.eK w m \\ � � 50.00' 99O_ .14 ----- -- - --- -/ - ----�- - --- - -- i ----- - - - ---- - L. 50.00' f� __ __ ----- 81.9T � iC TC- --- -TLC TC- \\ C L 7562 SF i� I I L=21.01' 9]B 9924 - _ __ _ L6�• I 99.96 99.92 99.38\ 9.02 \ wAff cdQ _ NEW 8"DIP WATER MAIN MH 1m - � - _-_5 EB'S4'3]"E - 2+00 � 3+00 / _ D1 BLAKE DRIVE_ - - m a _ 6,6.9,' _ _ E+DD __-- ass SPARK III SCALE W -BLOCK 15- II I N 99- -- HcwsmRasPVs T - --__ PCRow f 23454 SF II PLAN : 1" = 30' ai h I -004 D;a- - - _ _ _ -INV. - ---- R-15 9E pM I 1 PROFILE c _ ' -99.7i 99�9 - ------ - --�499T:6 _ --_--\--- - I3990.82 f =.94 \ -23.56'_ '�O «<si 1111 1 HORIZ. 1" = 30' y �n/ _ R-15 78.50 - INV.- _ VER T. 1 5uj 4993.95 N \50.00' ---- _ J9 69 ,', C u I 11 / � -- --- � � aT zZ�'um 11 1\ �50.00 ---- s+ 3s r I I I SAN SEWER MH 101 -- / 50'W' 0.00' 83. \ S z li`O \\ \ m o o Z RIM=4999.81 SAN SEWER MH 102 I I INV.OUT(E)-90.61 l a I N 2 >^ 3 -B ROCK 1 - RIM=5000.73 6 I N 3 � 7 T ���/$ \ O F o o o x \\ 7251 SF zo, +5000 SF ¢ 11 0N(W)-89.51 jo ng INV= z �- 9 1 0' _ 5900 SF INV.OUT(E)=89.31 5000 SIF zm 3 5000 SF jw ;o °"' c- a z_ 7000 SF jaD 4989.89 7515 SF a 5 L^i 7570 SF II C I IIoi/ \1 5000 SF i 8303 SF �m r^ } C C Q 3 rn NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -BENCHMARK/1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 N 34897.73 E 50303.75 ELEV.=5023.28 ON TAp� -BENCHMARK/2: WITNESS CORNER("MMCSSA'YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 N 40219.41 E 5097.83 3 IC ELEV.=4939.18 �. tr -DATUM=NAVD 88 -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 4n �TCENSEO -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR/2 ELEVATION TO CONVERT TO COB DATUM. SS�QNAI. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. LLJI V) Q I__ HIGH POINT E EV-5001.02 a Q W HIGH POINT A-3+00.58 In J PVI STA-3+00 W PM ELEV 5001.15 0 3 L [r o A.D.--1.02 N W Z 0- 5010 N K-9831 w 5010 rOf � zw oo 100.0'VC n J m < �_ Q D_ Q O Q C O C O ' N O 8 m m y l G N Z 0 EL Q `1.1 �ro �N II ao q II ryM� pp U q Upj II II U� Um W Q Z 22 pp�� mm p� MI H - O� r 22 N Z w Fp, IeMy 1 p LLa F > N O < > F1� (/)Q w m a II II II II 1 1 5 W U iti h W a a a 5 0 0 II II �w �a Ed Q Q j �w `Ow nw a 5 ED c9 W W o. m m FINISHED O_w N m + + IP GRADE m w tl a j j LLJ N O O C g o c+l o c+l v+i fi c+l `c m W W Q +w +w 5000 >z z 5000 -------- - U o a a --- - -__ Of EX.GRADE rE� 0 Or NEW 8"WATER MAIN NEW 8"WATER MAIN Q N W Y 4990 KB 0 04990 `J rc rc z rc z 6 t is i� i> i� rc rc w z a rc rc rc rc rc z rc rc rc z rc 5 5 CMK 5 5 J m NN in rn rn rn rK rK in rK om1� . g g mmm I C.A.D. 7/13/O6 p 1J W 1 9 y� y� I1�' m m y1 5 o+a DATE•al CNOi. YI 41 N 41 41 N y� •Opel 1 W I�1 N ���F RENSIONS: ZQ Z z Z` G G Z Z Q Napes M� t li N (li t li f<II V�i f</1 t<i� v<i p 50 z N (<il < mod' N 4980 =: +�zz N < < +` 4980 z z z z z z z 9. z z z -- W z < a APPROVED BY: C� 1 1 1 II II 1 II 1 II 1 II Z „ , z UAIM ASSURANCE: $g aD M 0p0� M fp EqD < aD Y 00 < 1 N N II 1 z z; aLLllVI O N ® 0 M a 40 q M} aD o� CI H aD I 1 S O O + + + + N N N0 M + N 8 O 0 a W x "C WORMS TO CONSTRUCTION RECORDS" $CAFE; SEE SHEET UTILITIES - OCTOBER 2006 8 "o Pom FlEE: BLAKE-PRO-SS 'R t a PROJECT NO.:BOZ oso21.0 's 0+00 1+00 2+00 3+00 4+00 5+00 6+00 SHEEI 31 Of 78 - - - - __ OF EX. ARBNIOR -(n o _ x xx _ FENCE \ C �\ x�xx - \�REMOVE&DISPOSE / � oN �' x 15 �� x�x ,x' x -x xx xxx x x �rh E 2 OF EX.BARBWIRE \ ��p b - � FENCE N / 14 BLOCK I18 x�V1 x "t- NICOL 1fl / / 5000 SF,' 1 8307 SF$ N 94.68\. 1 1 `� I / I vi n vi / NEW HYgRkNT 5000 SF \ o REMOVE&D SPOS N m 3I O 5950 SF I / z� i zy / wmy N 36174.00 BUILD BENCH AROUN m / E'49601.76 HYDRANT TO PROVIDE \ OF EX.BARBNIRE z = �,�.' EW HYDR 7 �vw I I16 FENCE na Ila <AmzE / EX.BARBWII _ / x GRROW BOLT ADEQUATE COVER \ jm \jq ,� q Irri p��m D / FENS '1`'� O N 3snass 1$ 17 Jo =so07.60 13 za < z° j� U ,K Nv.= ` E 493622 -,1�6 �3 INV.= mF 11 -< zO1 G 5.5' ARRow,Bo�7 7277\SF 6125 SF INv.- 5000 SF 12 -a N �`. > R7 ssso U E�Ev.�soos.3s \ \ 6125 SF_ LL o 0 95.22 4994 600 \ I�"6000 SF Z _ • 9B R-15' _- 7107'\ 61.25' 61.25' 50.00' I z z v \ h' LI23.3E - -- ---- -- ------- -- - - --- - -- -50.00' _ ----- 580.00' _-o0 0 - ---------- rc= -7c- ------- -- - -- __ 83.09' -BLOC "15 Ea 92 -� --- - _-- -- _N o I I 3.2 4.62 -- -�-- - --- -- -- _ -- - _- ___ �� �- �I I o 00 ,• - _ . A 95.30 12 - p wawa caowH -"�- s easa3r E 2+0o ucw e'ow waTsa uaw NICO - _- - - - m 5906 SF I 10 LE dRl °", - _ - - ao _ msr L=2 r s, I WNN�m \\ SCALE O W a+oo 6 o'o }<J n m asPwswww MAN - - _ _ waeaceowN _ 6+o PARK PLAN 1" = 30' Y♦ C c -_ R_15 '3454 SF \ PROFILE 2�6L �1 \ HORIZ. 1" = 30' O - - -- ------ -- - G 8/ ,2 TC= TC= 2< } � - x lA ro ---- --- -- -- 994. s99+ _ < VERT. 1" = 5' N N R115• 76.01 --- -- 6 �- - ---- - - ------- -_ %-.. -- 1--yoo _ ss ----� -- J.I2 CZAN DETENT�fy ms Z 5.00 65.00 ---- .. O L-23.7T SAN SEWER �� n 50. 50.00' i 63.00' --63.00' -- ------ -- ------ --- P z^; PO�10MH ER �'r \ 0 61 B LOCK SAN SEWER MF7�104 13 1 RIM-500L.15 \ 3 J1 RIM-5.4.67 T N $x y- G INV.OUT(E)=94.15 s 2 \ 3 �n a"' 4 INV.IN -93.08 " 6 7 i 95.92 6893 SF Z 7532 SF n m A NPo+� 3 3 8 ° NICOLE 1RiD u u N �6500 SF 1 e 6500 SF o 0 5000 SF \ INV.OUT(E)-92.88 I6300 SIF '0 6300 SF 6300 SF 'zM, _ \ C z_o, j°? �,_i Am no I,n a 9 \ \ M zp \� zY 5 i� i� iW im a 6865 SIF \ \ \ \ 5000 SF �� a a STA.e+at19�\\ _ STORM DRAINm"� \ q \ \ INLET Z2(TYPE II) \ \ x / TC=6004.10 RIM=3.60 \ \ ,I INV.IN(SW)=0.46 \ \ INV.OUT(NE)=0.46 NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. -UNLESS OTHERIMSE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -BENCHMARK/1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 N 34897.73 E 50303.75 ELEV.=5023.28 �ON TAp� -BENCHMARK/2: VATNESS CORNER('MMCSSA'YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 N 40219.41 E 5097.83 3 IC ELEV.=4939.18 �. tr -DATUM=NAVD 88 -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 fn �TCENSEO -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR/2 ELEVATION TO CONVERT TO COB DATUM. SS�ONAI. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 0+00 1+00 2+00 3+00 4+00 5+00 6+00 LL1 W Q HIGH POINT ELEV=5005.29 = ILd HIGH POINT S A=2+49.47 a 3 W 5020 5020 PVI ELEV 5005.35 ce A.D._-1.02 Z W Z 0 K= 48,94 O W w Q 0_ 50.0'VC W > Of I Q> m o < 0 ~� O WOf �y� C Q m m + + uNi n w rc Z Z Z K m y N } m , N q p U ri U ri II II •• g 'R < 7i U . K Z W J 5010 � LLI o �8 N , m . F II o„ o� 5010 N wo wo Q II II II II S m N w 1 1 II II N U! W LLI N Z nW a o. s m� Y �� N r II A I a 5 p j II W n W n w n w FINISHED u vi W II p N I LLJ Ul UI 0] Elf ow r W �ca' CL GRADE +w+ d � �j r� L Q Q + + o, ow >Z Z m+ U OQ Q GRAD E -------------- „ � O_ X. E O ----- ---- -_ _ -- 5000 5000 Q NEW 8"WATER MAIN Ld NEW "WATER MAIN C G '� LF 5 PVC WER O 0.0 40 ft ft I77 SAN.SEWER®0.0040 k ft w J I. ¢o w rc s s is is Tw, id � CMK W W W CA.D. U DATE: 7/13/06 4990Nav N W g g s s s 4990 RENSIONS: j W Z Y y" yam" g Q+�2 VI N VI 41 N y Z H h� 2 "� 3w. N N ^DWW s N N W y N z z Cora 1 APPROVED BY: w z z 9 3 a s „a II W ^z pUALIIY ASSURANCE: a a z w 3 3 3 3 1 e1n z z z No3� 3 z �., 3 3 ; v v +m3 ~q W W z z 1 II nl II II 11=0 z II z z z z 2 2 .Azz 1 II r m 1 ,.� II II II 1 z z }Zjjj 4980 iO a ,1po a o Al N + xzz + °I c, o n n zzz 4980 f1 ; SEE SHEET N $ m M ,� $ i M a h "g m m �� CONFORMS TO CONSTRUCTION RECORDS Fly;NICOLE�RO_SS o 'a o -6 o '� oa a no pa + + o §8 �8 �8 �8 �� 8 �s 1 �s �� �� �� �� UTILITIES - OCTOBER 2006 1 PROJECT NO.:eoz 05021.0 0+00 1+00 2+00 3+00 4+00 5+00 6+00 SHEEP 32 OF 78 22 I I z s �v V v� 80913 SF I i Vvc®o.e RSAN SEWER M 004.8 93 / A x v. z INV.IN(SE 95106 /---- 10 �V A V.OUT )-9418 x / � EW HY (I(�/TUT � v 8666 SF L-23.Sr I I I SAN SEWER G 105 w B OCK 19- \ for INV. \ ARsool ROW C \\ N \ RIM-5006.88 mw ' \ o's F� //// iaz �777Y"'T Tc- � � o \ N � INV.IN(W)-97.08 arc�-� \ \ o"9 4997.02 R-15 / \ ELEV. 5 0. �' 1 of \ II m II m \ FCC-F '1 / / o*� / / N 35 .3 ' .I .s31 le.s� iq m 1 INV.IN(S)-97.08 cm' 1 Z_ �' o \ / // �`. 'o u it _ z i \ i // N I I _v z_a \ z_a Zm INV.OUT(E)=96.88P- /ac= ? }E 5 4 ��:� I T8 N 18 17 16 15 -� m 13 ?Y _ z� III: / n� N \ Nv. S x w' _ 11 kz, 5000 SF�a owo 6300 SF - - -, i 7393 SF 650 SF 6500 SF\ 4998.59 � � i - 6300 SF ro 6299 SF I £ I \ \ 1�X21, ri �` _-_73.23'- --_ -_--- 65-00� ------ 65.00' - _- 50.00' 5000�F0 / 83.00' � s/ s.n3 � O14 rc��s----- -- -_--- - ----- -- - \ - -- �- - -- -- -----63.00' -- ---- . 7.40 /f / O--- - _�iR-15 o- T ��� - / ANCE DRI HEw e R vP` ul 3+0 � NEW 8•DIP�/A1ER MAIN - csa'sa'37•E s+00 3o3.oJ 's 5�5�� ��Oy @ oP� /� O T - _ s+oo - �- - - o - 8 88'543�E J+00 a15g.Rs�50 ;F, W ,y9 �I " _ =23.55 8 L=23.57• re= -______- rc o x t - ux t / 1F. �,� SETBACK�Iui est _ 23.55' = sa a, -914 84836 Tc m i L z3sr - -- - ,; _ r 553/5/ x/ •g. ----------------- _-- RE(IOVE�&DISPOSE /// I / s ' $F oPiO - ------------ - _ 100'8 \ OFF E. BARBWIRE ��^o' NEW HYDRANT 121.53' ---- --�- -------- I - ----------------------- SAN SEWER MH 105 \ FENCE 121. � NEW HYDRANT --_--_-__- .moo � PLAN - 30 C SCALE PROF 1 9.76 Ices' N 35878.03 q � N 35858.58 - rC= NA 71.69' RIM=5005.46 "+ za \ STA L 9.56 I I E ROW BOLT -BLOCK 2 1- \`E 496oaL I -o VICE 109.88' _-_ \ 103 LF NEW DIAL 24-ARCH �' O ARROW BOLT INV.IN(W)-95.88 Um \ STo HORIZ.E: 1" = 30' m o I ARROW BOLT - -1 INV.OUT(NE)=95.6 RCP 18"28)r EACH r9 992 ELEV=5077.84 ELEV.=5009.67 _ \-{ \ INLE 9 Nv= m p I N 17039 SF ctSLVET WITH FE1s A.10+ 2a2=` P c= VERT. 1" = 5' 5001.91 1 ITC= I a y-pL�,/V-�-20- \ INV.)N(SW)=2.89 -STORM,bRAI , \ \ �� 7442 SF I Nv i- _ � ZINV.OUNE)=1.34' L T X7(J,'PE II \o INV. ` > I TC¢¢005. -- a 3 •V. I�v I y\ro 1 8 V J.at ^ z W \ \ N 3588R.19 / /R =5?tZsoo w $ \ 7457 SIF INv. I I 1 12849 SF { \ 4999.41 + \ E 50022.2+ /IN OU( )_,17 0 or / I ,0 I. UT. 5'WIDE \ I S v 7.s DEWALK �I / / / �sAN MEwEs I ho.3P �� � - 4f o I I I �� ��/ -L- I-I INV.- --_ a __ INYi h / \ � /� 5002.88 INV. _- -}less f _ '-------- \\ �\ /// / '\ INV///OUT(NW)=97.37 F I I i0�9 / lo` s -R.ss h on.rn,r,.rncono� \ \t I MOVETYP.)c NOTE: &DISPOSE OF P =n-EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A U-•�....._.-� LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -BENCHMARK#I: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 OR - DENOTES 11 A S-BUILT" CONDITION N 34897.73 E 50303.75 �Q� �� ELEV.=5023.28 x 10 -BENCHMARK#2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 N 40219.41 E 50397.83 A E ELEV.-4939.18 fn 410ENSE0 -DATUM=NAVD 88 -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 -SUBTRACT 19.45 FEET FROM BENCHMARK/11 OR g2 ELEVATION TO CONVERT TO COB DATUM. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. W PIA STA=5+25 W ? PM ELEV=5007.50 A.D.=0.92 = W 5020 K-54.48 5020 W Q L o 50.06 vc 3 _JZ Ld Z Lu W 00 $ a g a g N A oo o n M rn Q O v)j Z O 1 1 H W O W < m n h U N ' 1,�n \ h J M IJ m w m N r O 01 6 pJp pCp j N / D_ Z a + �H�pp�>I�I Mlw 5 5 N .. LL� r8 U(G N b0 a K N KYI OG /yam 0 a- OG7 N+1(i� M(i� a s m m W W II II mN LL� d`�mp j1 V V V yq� � �a! W Q Z Q o> 1 1 II II Ti m W dm a u1. ,7j m< ma U1 Q I j 5010 Wg 5010 of z N w� < LdLLl 1 m(+I m+(+� NJ mW �J a0W m II o] W (n Of -- -------- _------- _ iw FINISHED +n rnc+' oi� +W IYLI ~� N �� t - _ ---- --- __-- Wry OL GRADE m o Lu y ---'---- -------- - _ -1.O6X al,.l W W m Q W p H U 8"WATER M IN \`E Q >Z Z Z X.GADE R O U o a Q Q O_ J 8"WA R MAIN O O O 5000 W 0 5000 8"WATER MAIN O Q 303 L.F.8 STIR 35 PVC SAN,SEWER O 0.00 2 ft ft cW " Q 250 L S N F.8 SDR 35 PVC SAN. WER O 0.0040 ft ft O F- N G n� H m 1 N. R _ rna &I �rcvtOia II W oW�:orn llw ! t rc n� WN�mF M C K K K Od K N w b U C mw K mom 4990 OCMK C.A.D. 7/13/06 IK n i 'g3^^i Z O RENSIONS:10/25/06AB z m �'s' 0 zz o va a ?o zz U c c a c a+gzzz 3 < +�ii zzz N -- W APPROVED BY: A N II II 1 II II II II 1 QUAD ASSURANCE: N r N a�0 v�i H uS b J 4980 $ m 4980 ~ m gg � g m m, g O SEE SHEET g Z FlEE: LANCE-PR0_SS s m PROJECT NO:Boz 05021.0 s 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 - SHEEP 33 OF 78 V INV.OUT(NE=17.50 A .5 5005.78 __ _ I \ \ \ \ \ \ \ sooeez 143 .z; /' sNo�oe.o4 V v PARK ss o V /INV= 13235 SF I c( / i 14= TC= 6 \ 15•FLARED ENDi DETENTI Of��� rl I N 4,11 3 F^ ;4. N ass a.sa POND 9 II °�- _ ' I O I .zs 10258 SF C 0 0 l q // ELEV.=11.50 N35300.65\ 110 x C 6 •% G n ) > I cHl / - 77 LF 12" E 49945.3 '' 4 qp OCK 2b '_� y -PVC®2.27% + + 142 c \ IX dI967O SF I .�. . � . .9 / 09 LF W DUAL 24"ARCH- / oBREE N p V w0Va $Frc= I I c= °�NE3527D08NT mI 5 INLET Y2(T�PEIRCPf18"28kC EACH) \ \I <� S4 v 9976 SF TC=50V,5.38 CULV7=RT VX FETS \ NEW HYDRANT\ ) E 49632.02 1RIM=1 88 INV.INS =12.19 + /� 35282.19BR 8 T` / ARROW BOLT X J ETBACK ( �o� E 50056.48 L �I6.6 b.,q / INV. N(S)=11.'�4 INV.OUT(NE)=11.02 _ ARROW BOLT o ELEV.=5017.91 96.81' I F. - 54836 SF I --" EV.=5016.72 D 8' -I ' INV. OUT(N) 11 74� � 109.25• 6. '/ � 54.12' � 2. ,6.,s - .. -- � (o f EL41.71' a9, ' --_ �--- - Yf ,556 33 TC V o R-1 R 15 / C _ a B' 67 W(TYP.)12"28 LF STOR s _ �15.\ � fA L-23.56' L 23.56 - - v+ _s6o DRAIN®0.86% a 86'SB°6'E _ W 8 fiiP ATER M L 003.55 \0 3 4 /------ 0 C 29 LF 12"STORM ` + L + �- - - "1� - niN - I 13130JSF- G W DRAIN®D.sD% BREE LANE 16.96 .- ht lb.fi3 EW= 5,4 ui L. --- ---- --- m -�---- ---- ---\ ,556 // _ _ ,fi zs �e \ 73.50' 73.00' x 94.46' STA 8+84.44= _ Ew= / 69.72' N 35210.53 6. - - -- - s.2s SAN SEWER MH 1D90^ STORM DRAIN E 49883.971 / 54.25' 83.49' C RIM-5016.32 " SAN SEWER MH 110 INLET 11 TYPE II \ \ / REMOVE&DISPOSE RIM15015.61 TC(5015.38 + / o w m,. ,I S. SCALE O o �^ INV.N(E) T 1 7 \ OF EX.BARBNIRE INV.W 17.61 RIM=14.88 - 3 J w i 5008.38 _ ` a :NV. T('�= _ _ PLAN 1" - 30' \ FENCE INV.OUT N=11.88 REMOVE&DISPOSE / ; �'��1"WATER SERVICE OPEN '�__ O OF EX.BAR�RCEE � / _13 "`� -BLOCK 24- PROFILE \ o p a (MAINTAIN 6.5' AREA 8820 SF \ \ r °6 COVER) N m 5006.14 HORIZ. 1" = 30' 3soo SF -BLOCK 23- \ m "90'BEND w VERT. 1" = 5' 3 s7sa,$F 1v SEtPACK �I > SETBACK i 5 3 V 11182 SF 85.04 SF � I rn Z 6220 SF � 9 g /8' \ ( / 11331 SF /�(T�J 15172 S -BLOCK 24- . SON TAly IC A'!"' gMl- 6 . W LOW POINT ELEV=5015.44 HIGH POINT E -5016.07 W LOW POINT A=8+84.44 HIGH POINT S A-10+15.51 Q w PVI STA=9+00 PVI STA 10+00 = H 5030 PVIA.D. 1'45 A.D.:-1.45 5030 NOTE: a- 3 -o K= 8.88 K- 8.82 U1 Z -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO ~ W 100 0'VC - 100. VC � THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, Z L'-I WZ 0 O SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS STATE LAW REWIRES CONTRACTOR TO O W W Q 0 a CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. (n Lj Z J o -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, 0 < Z O0 m vi a 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. 1 Q 0_ Z J 0 fo m o' € -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A Q ~ O W to u TTii F^ N 0 •• N n LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION Z Z � i c n LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. m Q- Q II p V ry- = NQ Z W� 5020 n j m m m II II 5020 -BENCHMARK#I: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24.25&26 3 OU c W n i j ^ II N 3489=7.73 �Y I N Ly10 E50303.75 w in LL, FINISHED ELEV./- 5023.28 oLIf~O r Q € -0.5 X ^ -BENCHMARK p2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 W N 0 m [if J E -------- --__-_- $$ - -_ E 50397.83 p H W ------ ELEV.-4939.18 _ ----- >Z Z LLI - -- --- -DATUM=NAVD 88 U O Q Q -COB BENCHMARK/1110(ARROW BOLT ON HYDRANT)ELEVATION=CONVERT O_ Q1 NEW 8"WA R MAIN EX.GRADE•rL Of Lf) -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR/2 ELEVATION TO CONVERT TO COB DATUM. 501 0 NEW 8"WATER MAI 5010 _ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. 0 Or c -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. Q 8 . SDR 35 PVC SAN.SEWER 0 0.0 40 ft ft G 8 �.Lucj G o- NEW B"SAN rc SEWER W. a rc ad oNF 5000 MN8 II 5000 C.A.D.D' �j13�os W. a DATE: v 8Ie 3 REVISIONS: •n 'no Vz +&zz 0 APPROVED BY: o m QUAD ASSURANCE:: z 4990 - 4990 IF ,n m m n SEE SHEET 0. m0 =� n.6 �.6 ui m -6 vo CONFORMS TO CONSTRUCTION RECORDS» A� ss�� A BREE-PRO_SS - 3 UTILITIES OCTOBER, 2006 Fl� PROJECT NO.:Boz 05021.0 6+00 7+00 8+00 9+00 10+00 11+00 SHEEP 34 Of 78 II II \ Iw \ x x—�—x �, ' r U / M m Nwom bIa n \ \ \ m I SS . 81 �3 �m o \ x / `�� pwo .a A ""w �� V -fix 3ON3d z $ 21$T �� wo 116LL 3p `\X W �w oED rn _ n 3H\M �tla'x33o N —x- �x_x=J x—fix w� n v_ e Sw o=� \m 3sodSIO 1P�3nON nm 1 - m` I x \ x—x z V I �,; I ��oo�^ s V L r tn. \ .: - — rc5 a --- -------- _\ — assa'x —xN i q� \ m 1 oo.sa• vas x�— O somrnw s$n n7 NM 8'W JS P1C SAN SEY.ER YaN -- \3yZZ�- ZCG ISO 000 WARP CROWN SO1 D2'49 W1 \ _ — ---- 3 w m a 28.03' V A 7� >y W rn o — zaz6m s+oo a g a. +oo __ �6Zr I I zzj n — ---- -- — — x am. �. Z OO NEW 8 DP WgiER MAIN o^; cV r I.rc� ■. ■ MH108� c"'i Ian ---t o �N p P26 ly W L / 9E"l ----- K� n — I — — :aims .e ---- we mom' 1 8.89' 33.3 \ Fn e 1 g N Sio N (J SCALE / — _—— _ x � — _ TvnreP re wN s oro�sa-w fi+oo or _ � I I^ z s i i�� � _ � / 81.1T 65.00----- -- — — — — o A� wmzz a J ____ ,� PLAN 1" - 30' Q -p 65.00' - �� - --__ z �I00 m PROFILE C 6o.t �---- v gl ���mm N T wmw^ 1 N SS"� 6s.ar ------_ L ---- - Jj j HORIZ. 1" = 30' 7 O Ala o 1< N o I cn x /% Ia_ p n —_i— — —— I I = ` M 00 �;I I� ap II 1n 'zm i ' o o '�30 \ w �n vl �� � 1 3o.t6' I -------- -�- --- ---- - W .:<.� VERT. 1'• 5' o 13z a -o, .g 35.t3• 6 ---- - --wz[ --- w reP< a < " ^ I gm rn ��g Im n ��3/ Ln� �z5 V cpa o< '� ii_ in // rn rn I / I n� Im o i W L OZ6664 / I 19 / m/ _o _- -q I, II a ^ V) g 2 ST �� W M o ' ` N In N �I sa // O<w 3 oz I z v�i N > m +} X7VA13015 M 8 d� a C o' 1 ml � �/I NOTE: /�� -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -BENCHMARK#I: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 N 34897.73 E 50303.75 ELEV.=5023.28 -BENCHMARK/2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 IN 40219.41 0 R — DENOTES "AS—BUILT" CONDITION osa Tiro E 50397.83 ELEV.1 4939.18 -DATUM=NAVI)88 � IC -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 tr -SUBTRACT 19.45 FEET FROM BENCHMARK#1 OR/2 ELEVATION TO CONVERT TO COB DATUM. <, 410E N6-ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. A1. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 0+00 1+00 2+00 3+00 4+00 5+00 6+00 5030 5030 LLJ V) Q o m 2 � a 3 W d o z V) J 5 Ce RE n N duimc m w Z O m OWQZ� W R n> I W Z 5020 N 5020 > I-- a a O H O J o. FINISHED m w +e'' e w m Q Z 0_W m o. ^' w qOX, E — N Z 3 vi N_ 1 n p U Of •fin 1 �j�jwy }} ----- — � W i o a N LL LLI Y N X. rL ~O O r 0 a 5 a 1.49 __ —_— GRADE O [IfI_LI N H 5010 _------ NEW 8"WATERMAIN 5010 W U m Q W O + nW �c��c� U O Q Q A _— YYIE SAN.SEWER O 0.019 O o r 1 8 62 L.F. SDR 35 PVC S N. R O 0.01 w 8 cc F NEW "WATER MAIN 5000 �J�B;, 5000 _ n 31 F rc z rc rc �"I_°z ,n IIi 5-1 �.:k E) J IR �o W rc r 'W rc W oll?oi 130 C.A.D. CMK --- zz DATE: 7/13/06 o'er RENSIONS:10/25/06AED e �q w y Nm_ozp N z F awm rn r� N v < v a+mii v e .1 4990 Via,II w z z z z -- z 3 4990 APPROVED BY: a w z 1 1 II 1 1 z UAID AN ENO ���pp QWWII ASSURANCE: Hi I--p z z N 7 O H Obi b N N }�777 m + N N $ ' It TO CONSTRUCTION RECORDS" _ es Y ,W+ m �x m o m UTILITIES — OCTOBER, 2006 SCALE: SEE SHEET g �I: o Apo �I: S�1 �m p� o � �a.7 �r9 �v � Fl�, 21ST�R0_SS S �� S. n5 np np 25 s n� u�i O 0 f Y PROJECT NO.:Boz 05021.0 0+00 1+00 2+00 3+00 4+00 5+00 6+00 SHEEP 35 OF 78 _ ----i - - -----51.4, _ - -- 60.30• - Dj +� IQ,- �'o amo, Cn, n!I I I v,"w o o¢`�--i gam/ / 55.77' 49.89 6•� U A Y / G� yI I I _y __- ' / z rn/ 4 N / oM J 4 4 _ "' U 4 n n / Zo ro N I m y I p� n Z► { �� �fn n m // /�" OM N / W n I°n I Irn^ 4 /kZl o \ N �' 70.35 Ili cvo / 4 / i m J � I h �� 0 n O o x w o r� w/ IIl In / rn A M 6G Ny^ i M� // I uo �: 1 ?: I � IQ / E^ tl SEVER Mi.,81 � p �u,m i " n IINV.IN(S I l I�50�Ip �../ I L Y o SANSE" GI1T(NW)a236 / k 6�46• �a pN 79' 60.08• 30.00' 70.38' 70138' / ♦ INV,IN 5.� / I l INV.OUT(N)8 3�8 n 60.35' ,n - 68.85, I I I /k I l + I °'/ 59.72• .w W pPit 57.93' I / 6 9 z� #2 M'oo oa 82.92' 68.34• �avc sw+�ylaN MMN ie z9 - 0.00' �m � C Q 1i/ �!! I I G Vmg'V63.45 1 - 57.07 / 67. 3 I-°so za IrE 80.00' / W M p W W % a9 - I LLI / L a/ t► 0.31' 60.30' / v1 Q y 14I 88. - ^13.39a O.gp% ti or s a��oa rs.o5 71.75 4 O 2N 0 % N M m AN SE O it a U tl N n 4 n O RIM R MN 8o Z + / N tl a, In 4997 77 W l'1 + ,l .N In I g0 a oa 0 v1 4 v >N V.IN(SE / zoe�' \ ro I 00' Iso.00- x ^ N z� INV.6U )-89.97 a O / 110, x k I /y�� N,I. N / $ p / T(Nq�a89.77 O I I II N w (C�0 4 01 m 7 z tl" / 20 / �n o 4 x� -�--- z ^ e / �� lo f rn ti SAN SE 62 4 177j, INV.IRI SOON N 04.1 0 I ® c= a x x NV.�T(N 95071 o 8w, x x� ,� � ,.,Mm -BENCHMARK#I: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 NOTE: N 34897.73 E 50303.75 -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING 70 THE BEST INFORMATION AVAILABLE TO ELEV.-5023.28 THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, -BENCHMARK2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 CSEWER, LL ALL UTILITY COMPAN TELEPHONE& NIESSIBEFORE EXCAVATION FFOR MAY NOT BE HEXACTSLOCATIONS.AS DICATED ON THE PLANS.STATE LAW REWIRES CONTRACTOR TO N 40219.41 SCALE E 50397.83 -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, ELEV.-4939,18 PLAN 1" = 301 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2GO4 AND ADDENDUM No.1. -DATUM-NAND 88 PROFILE -UNLESS OTHER SE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION -SUBTRACT 19.45 FEET FROM BENCHMARK$1 OR2 ELEVATION TO CONVERT TO COB DATUM. HORIZ. 1" = 301 LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. VERT. 1" = 51 -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 5030 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 5030 �ON TAp� "CONFORMS TO CONS RUCTIONRECORDS" I` ^/ A E � f ` �n 410ENSF-0 SS�ONAI E�. 5020 5020 LLJ V) Q o a = < O 5010 + ` 5010 a 3 _j 00 PM ELEV 4994.64 ai�Z E A..--0.50 m II Z W O Q KD W- OO.DO o p �o m m O Nw Z �(n > 50.0'VC n g m }0 < Z O a iPi ~ II N�,yy 0 1- O _j vl m np a s m n'w Z 0_O p rc 3 a cni n y i W a s +ca _ ---- ----- m Q Z m o o m +Q n °i o. 5 _- ---- U7< Z W Q pm Ym rn a pm < ca'a 11 a .53 K 3 OlV .o m II m� --- < W 5000 pap;Na+<mn �l W _ISHED _W _----- - 5000 w� N� W a 1 1 m nN ro m o f +� rlLLI NGRA E $� -- -------- -------- Y NO }V7 NC+I N 6 ----- 1.00% Nw W m <04 0k o� a+ - 4 W L1 ~ U O< < �c+l 1 - --- --- - --- --- EX.GRADE 6 FL O_ (n J --- - -- ------- O o < 4990 4990 n 15"S ORJ 6"WATER MAIN mm RAIN ma 224 LF e SDR rc `J a z rc n.l-I J rc rc 'o< rc rc rc rc ¢ s 5 5 s s .II EO S s CADs � s CMK g 15 DATE: 7/13/06 4980 RNSIONS:2 i 1 1 1 1. 1. 1. 1. w. N 1. W� z z z z zz z z z z z z z z z z I < < < < < < < '� ¢ < < < < < < < < < < "I N N N A .95 N N N N Vl 41 Z N fA VI Vl N N In N N N 41 +o$m t co N < w a a G a a s <n< a s a s < < < a < < APPRDIH S'I M++II lY IY a z z z z z z z z W z z z z z z z z z z z p1p n z u n n n n o 1 0 1 n n QUALITY ASSURANCE: dNWr z z z Z a W tbv N < MNf 1 . m 5 •1 zz o-p v� vr� II 1 u m n o' 4 �»> IT + + +N+ p N May' y Hy + + + + H + + + + � m 4970 4970 z z SEE SHEET 1 II m^ N m m m m m + O n o1 e� " m ALLEY2_PRO_SS� Fl�; 3M a d,44 s+ PROJECT NO.:BOz 05021.0 SHEEP 36 OF 78 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 60.42• N - \ ------ ---- 67.42' \Z .���� ---_ \A J 59.99 s22ND .99' o 0-1IN VarnI ,II I I m - I I` 0 ` Lc)rn � m - UN Of D o+ (sd 3NMO 10l V\ AA\ INSEWER MH 83 8 AH)YTVM301S ��NV RIM=5010.28 \ \ \ \\ A A V\ I II 0(Sb3NMO 101 1),e)>nVM3015 301% S lnj 0 mm A z o' z a .09 A A 1.28 >� V 6 a - 301M S ln` .I . �.... INVIN.=V. T 2INV•= INV.=42 2 \NV- 4 pp8,65- NRM15.8L 7 5004. 5005.31 5006 SAN SEWE RIM=50 \\\ II O 3W OU m \ I C gq �13.39m 16.05 59.80' 67.52' 67.33' \ 80.51' 61.10� \85.10' \ 66.10' 65.10' 65.10' O I 60.00' m \ fin` 60.00' 9�00 NEW B'SUR P SAN NIA S 04_14'S W 174,24'1 rt0 G +00 13 \ 229 e�+� - '50,04 - - - -i I- - 4'14'S3'W _ - I4+_ P,50 W' ALLEY 2 w T v �� m > ALLEY 41.71' 17.71' 59.80' 67.52' I I ,m N. I N 67.36' \ 60.00' / 80.51' I 61.10' 6.10' 8�5.10 .10 85.10 65.10 65.10 65 \ C 60.00' 4996.01 LL SAN S Z` MH 82 N/ I I V / \ m RI -soo4.o1 Z Y / INv= M \ / tl`il OT o INV.IN(S7'�=95.21 =p p.N /yd o cD N INV.= N \ INV.= tT INV.= N n m /rn II II I 1 Q / n;I I / 5001.35 5002.33 I N \ 5004.61 m k- 5005.66 `- 5006.72 N M / 5007.78 = / 5008.8E O rn Y 1 ON oO p a INV.0 T(N)=95.01 z_rn / Y ". I IJ �m I pm U / NO I = I 5003.5E r \ �1 r n =^ / =M // U zq A ° e �/ U 1 iNc orcb °D / oo / m J,' 1 -BENCHMARK q1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23.24,25&26 NOTE: N 34897.73 �LQ��•.-f ' E 50303.75 -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING 70 THE BEST INFORMATION AVAILABLE TO ELEV.-5023.28 THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, -BENCHMARK2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 CASEWER, LL ALL UTILITY COMPAN TELEPHONE& NIESSIBEFORE EXCAVATION FFOR MAY NOT BE HEXACTSLOCATIONS.AS DICATED ON THE PLANS.STALE LAW REWIRES CONTRACTOR TO N 40219.41 SCALE E 50397.83 -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WTH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, ELEV.-4939,18 PLAN 1" = 30' 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2GO4 AND ADDENDUM No.1. -DATUM-NAM 88 PROFILE -UNLESS OTHER SE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A -COB BENCHMARK#1110(ARROW BOLT N HYDRANT)ELEVATION=4903.86 LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION -SUBTRACT 19.45 FEET FROM BENCHMARK$1 OR2 ELEVATION TO CONVERT TO COB DATUM. HORIZ. 1" = 30' LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. VERT. 1" = 5' -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 5030 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 5030 ON TAp� Ic OR - DENOTES "AS-BUILT' CONDITIO\I ' E Tn 610EN8E0 SSJ F.� PM STA=9+75 ^p -ONAI PM ELEV=5007.55 + < PVI STA=9+00 A.D._-2.40 5020 PVI ELEV 5004.25 K=20.87xD. n n 5020 K= .88 50.00'VC ; z rc N < 100.0'VC �roo �� ��o �� W 5 +yymvLI v'1�5o5jdj 16 tau x m y+ygy, II I�Ij u > O jm 7v"$ .7g C _ w --- ----- m $ S�cW c�cW OJ OWStl 1.3% ___-__-- --- = W O Ng a n o FINI ED -__-__- < O 5010 + " gM a: m ' rtcR DE __ -_------- 5010 a 3 + ' ---__ - c Z w Z o ww Q uj < a H w ____ ------- V)> z I v) ------ --- ----_ 8"WATER MAIN c m N Z 3 0 U) H Of Of < N„ 5000 w W M � N< N VC SAN.SEWER 1 mw Y �� r� w NO O [if1n �� no LLI w m <0 a 4 oN' rcz U O Q <} d OL. N W V tv? W � O < "CONFORMS TO CONSTRUCTION RECORDS" o 4990 UTILITIES - OCTOBER, 2006 4990 w rs rs rs rs 4 p s 5 yKS ¢s K5 yK5 5Y sJ Ys �S g yK5 g g 5 p yK5 Y5 C.A.D. cMK N N N VI 41 f/1 41 41 N m m I/ N 41 m 41 41 7/13/06 4980 I5 4980 RENSIONS:10/25/06AB N VI m m m m 41 Z Z Z Z 2 2 Z Z Z Z Z Z Z z Z Z Z Z Z Z Z Z Z Z < Q aa QQ < < < < aa < < < < < Q N V N N N N N N N 1</1 m m N N N m m m m N m 41 m m m 41 F a v v a v c a a c a v c a e v v e APPROVED BY: Bi z z z z z z z z z z z z z z z z z z z z z z z z z u N n n n n n N NN1 n 11 II N 11 n n n 11 N po n 11 11 11 n p p QUAI_RY ASSURANCE: N M M N ro m O O O O W }}q H}} G O�} a}}D 0} O N N N1 !' + + + + } T + p + + N N N N M) M M Y Y o Lo + + 4970 m m 4970 $CAFE: SEE SHEET g m n a a m� "� $ "a °' of �i FlLE; ALLEY23R0_SS S � 8 Nag, 8 88 � g $ � 44 PROJECT NO.:Bo2 05021.0 N SHEEP 37 Of 78 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 _ o c\ MV.N(E)�7.04 SAN SEWER MH 110 INLET z ° 9002 SF I x / \ REMOVE&DISPOSE RIM'+5015.61 V5 \ INV.OUT(N)=6.84/ OF EX.BARBWIRE INV.QUT(W)=17.61 10 // 9 \V - - �--�-/ FENCE V INV.OL F -BLock 23- \�so,>__8400 SF 8400 SIF ��/ �\ 8 7 6 \ 5 J 4 OPEN, - 8820 SF _ K --- \84�00 SF 8400 SF 8400 SF \ 8400 SF 8580 SF AREA Mon-,3600 SF -BLOCK 23- /ass F v ------ �S I 11182 SF �`,� O �\\ G REMOVE&DISPOSE II o \ ioM 1 m "O� OF EX.BARBWIRE Iz� \ O FENCE \ zo NAN IN WER72H 114 >o V. n .7Q 00' s0,e -- --74.00' 71.50' 30.00' 73.50' % RNV IN(W)=9 21 O 1 \ 75.2' \ 70.00' i' 70.00' `\ 70.00' u N s i x e _ 70.00' M t0 00 73.00 W.90' I - ,I- - „1 Oo _ ALLEY #1 ~ O _4 58'O6"E 5t00 PARK KH�� - Nm e•son ss rvc sw S� um - ox or a 0 y y 74.95' X M, 11ui 48209 5 5.5 SAN SEWER 01 115 70.00' / 70.00' 'A 70. I 71.50, 30.00' 66.86' 66.86' Q RIM=5018.17 / �' 70.1 70.00' £ INV.OUT(E)=10.22x \ 13 / \ 20 22 86' - N 12 \ 8400 SF - 14 1 -- 17 -- SAN SEWER MH 115 -- 8994 SF 1 \ 1+ n II 8400SF RIM=5020.28 A,� _ORES}- 8023 SF 21 8023 SF > 840 SF - O 0� SF 15 �,^o i"'�' INV.IN(W)-B.B1 zg 18580 8023 SF Z NV:9U]jE)-8.61 18 19 AREA DETENTION 8.53 8400 SF �� \---- -BLOCK 2 -'R IIM IN Ila I ��400 SF SF 3600 SF � i POND 16 i$ \\ I / TOP OF POND=5019, 3 7.5FUT.y'W(DE \ �� �/ WAE30TER LOFEP 18.0016.50 \ 3 \ I1 SIDEWALK(BY \ -- /� REQUIRED STORAGE16.5 OF sp. ir- -LOT OWNERS) \ - - \\ s0,s- -/• (40R SIDE SLOPES,6SEE CF NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, 2003.AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -BENCHMARK ji SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24.25&26 SCALE N 34897.73 E 50303.75 PLAN 1" = 30' ELEV.-5023.28 PROFILE -BENCHMARK/2: WITNESS CORNER(-MMCSSA-YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13.14.23&24 HORIZ. 1" = 30' OS�TAp� N 40219.41 E 50397.83 VERT. 1" = 5' IC ELEV.=4939.18 v ' ¢ -DATUM=NAVD 88 A E -COB BENCHMARK/1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 410ENSEO -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR/2 ELEVATION TO CONVERT TO COB DATUM. S�ONAI. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 5040 5040 LL1 W HIGH POINT ELEV:5020.85 Q w HIGH POINT SA 5+9167 = H O PIA STA-6+00 a 3 W O J A.D.--1.29 H L� K- 54.46 LLJ Z W 200. VC O W w Q W H 1n> Z In 5030 n 5030 5: Q a z J o Sy p �_ O W w Yj N + N Z � O ^ n m Q Z + m a W NOf Z 30 u o m U) H Q W on w� LW 1n< 'oo g$ ro y �� N rc~i1 t of> a II FINISHED = w N F- Co [If w rL GRADE N LI 5020 , J 5020 >Z z oJ ; O a o r `\ EX.GRAD Oq ---- -------- O Q `EX. GRADE w (Q O ~ 0 O Q Z N LLJ r O & 5010 5010 U W a TmE. Tsr. 0 CA.D. CMK Z O N g O RENSIONS: €� Nm 1 N N N N la/1 la/1 Z Z z z N •I�O N Z 1/1 YI N W m 44 vao�'= a z z 5000 O0 W APPROVED BY: 5000 - QUALITY ASSURANCE: a ` � i z z z i ;a ;s w i W a e G a z „I II II A A II 1 Z Z Z z z i 3 II¢+ a a �/� Z z VI J po G ni rn m 1 A N N I II 1 1 s Z Z C c Q N N O p a O O N ^ 1 1 Z /NL/ + + + + G M d n n n n n ^ ^ $ ^ m �1fa�, 'm n m + o� 'n „�" O SCALE: SEE SHEET -oo -w rod -nm lip t �N �nF � s� s$ o ^ Z FILE: ALLEY13R0_SS a O U PROJECT NO.:Boz 05021.0 's 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 - SHEEP 38 OF 78 RIM=5016.32 SAN SEWER MH 110 INLET Y1 (TYPE II INV.IN E-7.04 TC=5015.18 // T INV.- ()- REMOVE&DISPOSE RIM=5015.61 \ s / 3 m w^ T 5006.38 INV.OUT(N)=6.84 OF IX.BARBWIRE INV.OUT(W)=17.61 RIM=14.88 - 1�w FENCE \ INV.OUT(N>=11.88 R MOVE&DISPOSE H -BLOCK 24- - .. f1l / I ; 3 0 '1, WATER SERVICE\ IX.BAR FENCE / / g \ \ FENCE IT-� MAINTAIN ER)6.5'_8820 SF V v / 6� ( COVER) soosa4 -BLOCK 23- / m I- 1"90'BEND v1\ SE��ACK u, SETBACK / w / 8760�SF I 11182 SF 8504 SIF x I - m Z 6220 SF 9 /6' 0 11331 SIF cf) //�(TYP.) 15172 SIF �� 1-4% `x x BLOCK 24 �� - 2 - � p� �, N I x W 60NEWDUAL II 98562 \ / EX = 0 \ .. - 24 ARCH RCP I \ 084. \ SA SEWER MH 114 _ (( II SAN SEWER MH 97 11 x \ RIM:IONU 99 ULVE IT TMEACH I- II I \ / i nse O INV.IN(W)=7.21 RIM=5017.63 \I V.OUT(E)-7.01 1 INV.IN(SW)-14.9 x I III \ / INV.IN(W)-5.60 ¢'_ m .y yo x INV.OUT(NE)-13.77 i I \ \ INV.OUT(N)=5.40 'd0- Lu 73.504 73.00 I x/ // 17"-5 I R�15'.- H! a. I \ 27.08' S0.04' ,Eee t-16.38''00� N INV7. - I O , 50005 6zos s.6o x _ 0.06 ALL Y , oa R=5' Taa 6 SCALPLANE: 1" = 30' W v+ " _ - -L=7.85' 15334 SF NEW 6'IDfl 05 PFC SAN SEWFA MAIN '� PROFILE Q 66.86' 66.88' - _ _6&86' 120.65' t o I 2.7' . Ee.n " ��' H ORI Z. 1" = 30' � 20 22 3 56.oa �Aso e 50 LF � �3 58.29 ` 61.88' EA= i C 8023 SF 21 8023 SIF 1®05% II E(49 sz.n �� �' y�i 'R-=15 / VERT. 1 = 5' 8023 SF A" A INv.= IliII / u v 8 L=16.52' EA-n� DETENTION • >� >^ ,s.zs l/ I / N D SETBACK / 14861 SF a 1e.6o M. :g POND 16 zg \ I „z 3 III / p 22210 SF / INV.- TOP INV.= OF POND=50,9. OUTFALL STRUC Uf� II / // 5007.57 INV7 0 3 WATER LEVEL=18.00 / BOTTOM OF POND=16.50 \ TOP OF STRUCTI RE V+ x 7 \ REQUIRED STORAGE=818 IF - / / INV.ON(SW)=,6. q III REMOVE&DISPOSE - / _ STORAGE SHOWN=837 IF I OF E%. DISPOSE /'� 11236 SF o19 (4:1 SIDE SLOPES,SEE \ INV.OUT(NE)=1�..�0 -FENCE - -BLOCK 24- /DETAIL) \ \ \ I II 165 LF EX,DUAL 24"ARCH ' \18"FLARED I -II �RCP 18"x28 Yt"EACH) STA.7+31.21-COMBINATION EI�DSECTION IEX.MH&INLET V1 r�. N\34966.04 1ICULV�RT WITH FETS INV IN(SW)=16.60 TC=5020.65 En 978422 4 ,as NV WT(NE)=15.90 So'M1 ON TA IC A E � Tn 410EN5E0 SS�ONAI E�. 5040 5040 LL1 NOTE: W Q -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO = ILd THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, a Q W SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO 3 CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. _j O Z -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, Z W Z O W 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. O 35 35 L" Q W O -UNLd LANDLLSURVEYOR LICENSEDSS ININ THE STD,ALL ATE OF CONSTRUCTION TANA LAYOUT AND BY ASTAKING PARTY CHIEF OR ENGINEALL BE ERING TECHNICIAN EXPERIENCBLE ED IN ARGE OF A ,CONSTRUCTIONU O Q I ~ 5030 5030 LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. ; w d Z Q O g a -BENCHMARK/1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 H�_ O + + r N 34897.73 0 Z r N c E 50303.75 m Q Z c ELEV.-5023.28 U1 Q Z W Q U W(n 0 -BENCHMARK g2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 (n H 0 Q IN 3~ r m ci 40219.41 w E 50397.83 co ELEV.-4939.18 Y N R LLJN 0 p A A A A II II =NAVD 88 LLJ I.- :DATUM COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATIN=4903.86 LL.I LJ 10 0] Q W SOZO y j 5020 -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR$2 ELEVAT1N TO CONVERT TO COB DATUM. 7 0 z J -0. R GRADE LL ! ± -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. 0 Q Q Q -------- ---------- 1n -- ---- 1' ---- -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. D_ ---------- ----- ---- - -------- �\ �� _-- -- -------- 0 0 0 o IX.G 1ADE O rL Ea F Y & 5010 5010 5 J W j F A 00 f C.A.D. CMK i w r' � � � s s g DATE: 7/13/06 N N N g g _ REVISIONS: x < m �•i a � y no � rn 5000 z ik I z < 5000 Z � � '�II APPROVED BY: �� a n 3 <_< OUAIR ASSURANCE: N' aD5 z Z 'll�o w "w zz N .III e�( A II II +�22 Z m S o -- °" "CONFORMS TO CONSTRUCTION RECORDS" SCAEE SEE SHEET n m + n o.`j m t"i �� �� A�� ♦ W w o �A n ^c ^o� + � °,^a � �m r; m "'O ALLEYI�RO_SS N 3o 31 Gall �� UTILITIES - OCTOBER, 2006 FlEE: 8 a W; N h PROJECT NO.:BOz 05021.0 's 7+00 8+00 9+00 10+00 11+00' SHEEP 39 OF 78 Mee BLOCK 3- EX. 3- EX.SAN SEWER MH 23 / RIM=4991.79 E%.STORM DRAIN MH INV.IN(E)=79.71 RIM=4991.97 INV.OUT(NW)=79.51 INV.IN(SE)=8.76 / - O INv.our(sw)= ss / �� x xv EX.$TORM DRAIN MH / / ,RIM=4991.76 \ \ / . V 3 / INV.IN(E)=87.17 \ / \ 49724 SF / INV.OUT(NW)=86.97 �. __ 39 4. x REMOVE ht DISPOSE \ NEW HYDRANT / Q _ Z OF EX.BAR6'A11RE LET 3 M N 36920.19 / / ------ STORM DRAIN 9238 ,,11II��FENCE WITHIN RIM 499238 ass / 7Z1`72"ST8RR7- PROJECT LIMITS MINER 'SUB \ E 492fi9.23,� / SAN SEWER MH 77 0 No. 235 INV.oUT(W) 8a 00 38 LF is"STORM ARROW BOLT 993.99 0 s a, � DRAIN®0.57< ---_ / INV.RIN E4 8223 EX.20'WIDE s^ DRAIN®1.07, ELEV�499489 () 43 EUC UT' ��14� SUM ORa MHul MH P6A 2000 PVCSO A 588'S3'OS'E 24+00 1 503LF 12•STORM -/- INV OUT(W) 82.03 - _ - - - - - - PUEA EASEMENT •✓ J_ n2. e 1 NEW DRAIN 1 0% / S 88'53'O5" - �� f A W / 079 L�3,e o 3s41 ao 23+00 o MH / - � v ;,21 '.a' EN RPRISE BQ R=15• R=,S 25+0 NEW 8'SDR 35 PVC SAN SEWER MAIN , O o S 8853.OS,£ 2J+00 _�_ u O Ex.a DIP�a 3.27• =23.85• NEW 6'DIP WATER MAN `` \ 49IL _ O 921 ^ __ 91.r TD Rn1`s/ --_ y90' N 9,99 85• STA.21+46.2 ---------------- r - ---- -------G- _ X.STORM DR £ 8.86' \ 30 SAN SEWER MH 76 100.02' STA.0+32.12= - 0 __ - -- � RIM-4993.13 D^' 84.13' / --- 2-- NLET R1(TYPE II 'a E% STREET - STORM DRAIN 0 00 -- /J x �63,44 SF INV.4993.180.49 .I r z : // 60.00• / 60.00' 60.00' 60.00' C TC=499121 f N}LME/STOP \ 1 INLET T1(TYPE II) 9zi -- lO 33I( 6347 $F - �NIE I 3 f o m� -B L O K 1 6 W 4- Z c RIM=907 ON \x INV.IN(S)=80.49 TC=4992.13 -6L70 !V.OUT(NW)=877 - 41 sy I„' INV.OUT(W)=80.29 RIM=91.63 ICI / rn - ,� '' I //''�� - _ m INV.ouT(N)=89.63 T6- ;" 6000 SF 4 3 Y w 5 /� N 3849 5 SF STA.0+33.57= B UOIJK 53w o -_ 9 aD f�o g�'F4 g NND O �- 2 // 6000 SF 0 6000 SF �/ EX.STORM DRAIN "+ p 8315 SF z w 6000 SIF 1- �I�,1 STA.0+39.12= w " N p 6000 SF D / INLET Si(TYPE 11) 1 N STORM DRAIN e ( v 8 ' R,-1 LL D SCag O EX.HYDRA T Al / I I TC=4991.11 INLET T3(TYPE II) " STA.0+32.12= (30'x30") RIM=91.41 ( STORM DRAIN PL fir^♦ n Z TC=499224 �( LSO' INV.OUT(N=88.4 x( INLET T2 TYPE II PRE y zs3 rc- ( ) Q RIM=91.74 Z ( TC=4992.13 ) 926e INV.OUT(N88.68 RIM=91.63 , -------- 9' _ F'IO �" 3O1 mINV.IN(S)=88.63 / INV.OUT(N)=88.63 // VE : 1" e' 3 0 To- ro- ag cF 929q 929D NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO Q` THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO THRUST RESTRAINT CALCULAlIONs� CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. DU -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, NNN HOR2oNTAL ButD lEE BRANCH RESiRNNTN DEAD ENDS tz a NExncAE OFFBET tt.25 2DO3,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM NO.1. N tt. .Mgt. t2 ,wD vuvEsta .9 12.N ]0.a1 A3.93 2.9 1 1 NA NA NA N N -UNLESS SURVEYOR SPECIFIED,ALL ATE OF MONT LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A to LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION 7.22 Is.ee Dz.4a 7a.x I.aa zaae eo.ae 2eaas ilwlii Mn Mu igaini NA NA LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -TRUST CALL ONS WERE aAED ON TRUST RESIRNNT XBIGN FOR D-LE IRGN PIPE,El I MINION.zam,PUBLISHED BY TE OUCTLE IRON PPE RESEMON ASSOD-ON.ALL UN LENCTS ARE IN FEET. -BENCHMARK$I: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&28 0 MINIMUM LLNGT TIE RESTNNED IN aDT OIRECng15 FR011 FlT11NG.fb DECREE BENDS AL50 REWIRE CIXItlSIE TRUST BLOCK N 34897.73 DIMNN TO BE RESITIE TD GREATER TAN a FEET.MINIMUM 1ENGT TO BE RESTNNED IXI BRANW SXOWN.CIXItlSIE TRUST BLOCK ALSO REWIRED. E 34897.73 DIMIN I 1ENGT TO BE RES GREA FR011 AND ENDS AND FROM BOT gRECTONS FRgA VALVES. ELEV.=5023.28 L•�LRESTNNT 1ENGT L,IS FOR TE LARGER PIPE.IF TE STAIGHT RUN OF PIPE ON TE SMALL SIDE 6 TE REDUCER E%CFEDS V,TEN NO RESTNNEO JpNTS ARE NECESSARY. - ,.®OS�TL}J� RESTNNT 1ENGT L,IS FOR TE UPPER PIPE FRtlA TE BEND.TE PIPE BETWEEII TE BENDS le TO BE ENTRELY RESTNNED. N -BENCHMARK/2: WITNESS CORNER('MMCSSA'YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 1C N 40219.41 E 50397.83 ELEV.-4939.18 -DATUM=NAVD 88 F`S 6ICEN5E0 -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 S�ONAI F'� -SUBTRACT 19.45 FEET FROM BENCHMARK#1 OR/2 ELEVATION TO CONVERT TO COB DATUM. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 22+00 23+00 24+00 25+00 26+00 27+00 28+00 5010 - - HIGH POINT ELEV-4994.45 5010 W O HIGH POINT STA-23+25.72 LOW PONT STA-24+59.98 HIGH POINT S -27+95.99 Vl STA-23+17.39 PVI STA-24+62.41 w W VI ELEV-4993.21 PM ELEV-4992.49 PIA STA 28+05 Q A.D.--1.50 A.D.-1.11 PN ELEV 1.45 4 = H N A.D.--1.45 Q K=3&W K-45.14 K- 4.54 a 3 Q H w F 50.00'VC i 50. VC Z N w i SLI rr� Z W LW Q G r < N rT O LLI w Q J LLJ O 5000 ; N a M rc m o7 m 5000 r o 0 W W 1.3 U 'on am am a ai� � <% 0 'I N C4 mII II II II � o a wT mm "t nIn m m aII a11 �?(M N NFQ Z ZN QJm E%.20:1 GRAVEL Z Q Q 0-I__TAPER BACK TO N m 0� ONE +W Edw �N m 1.00% _____ _ ________ ________ 7F _______________ /r w ~ O Q J _-__ _--__-_- LIJft� LI m m 4990 GRADE 4990 >z W COVER U d Q N r -- CL NEW 8"DIP WATER MAIN 0- a O V.IN(S)=87.5 I IN IN(S)=88.30 0 W _ W --- �EX.a"WATER MAIN c 1 G O 1 1 S S E 1 1 1 1 1 1 1 1 4980 -- --------� 4980 II II s qe ° `^�zg^a 11 K I IIm K 1iw5 t UC 1�J 1�J U� i11t CMK3 5 C.A.D. DATE•oI� Q 11F S. Ki K K K3 7/13/06 111 I < w RUSIONS: 3/28/07AB man o sm llza � m Q�m3 � i < o+� +�zz < om < < 3 3 3 3 3 3 m0, T^. N iD iD iD YI II m z� 00 m z z 3: 4970 �m - 4970 APPROVED BY: MpY II Z Z Z Z Z Z Z Z ! II , ri II II n n n , , , , u OUAERY ASSURANCE: m IIZ N� wmV�� II Zz0 C7 N7 ri + Z3 Q + + + + + + + Kc,iN + "CONFORMS TO CONSTRUCTION RECORDS SEE SHEET Y M ^ n N N N PI rl ♦ n o " -PRO-WA lUTILITIES - 200 n[f:ENTER ,a 44 "a 'a "$ 'a 'a a "$ a PROJECT NO:BOz 05021.0 SHEEP 40 OF 78 22+00 23+00 24+00 25+00 26+00 27+00 28+00 T, A / - 92__ Awn-, I \ \ ` \ C I E v ��� u 0 x \ ZSAN SEWER MIT 77 \9 \ 0 RIM=4993.99 sz NEW HYDRANT `�LOT 3 \ \ \ INV.IN(E)=82.23 EX.20'WIDE , N 36909.29 MINOR \ - I NV.OU T(W)_8203 PUBLIC UTILITY / E 49829.05 SUBDIVISION S�E41DE EROSION \ II EASEMENT ELEVR�9 E5 LOT NO.`�35 CON OL PAD(5" \ F O B*53*05N E - - - - - - - - -x- -_ -- -- MINUS R(PRAP) \ I .w UJ - V, s ae ssas-.E v10o 1235.90`., N.25 C - ENTERPRISE 13OULEVARD Bs.zs NH J2 - 628.52' 29i00 R J5 PVC SAN 5 KE M,AIN 3DToo S G i Y of"r wAiER NN \ L=21.03'15 190 W L pq x r: I 60.00' 0.00 60.00'--------80.00' --- --- 60. - - -- -- - ^- -- 80.00' --68.47' \ Z 3 = I �, \ m 6000 SF f 4 3 Y w -B LO K 16 6 \ 600o sF�<3 5 s000 SF 6000 SF 6000 SF ENTERPRISE-a I I ; .w o 6000 SIF `0 [O'EMOVE&DISPOSE 1 9 I I \\ O _ \ paCL®10.. LL o o EX.BARBWRE N FENCE 7 9 8 SF 2 CONCRETE S SCALE 3 AN SEWER MH 78 \ DRAINAGE o PLAN 1" = 30' \ RIM=4992.02 I I V OUTLET AND I(NV.IN(SE)=83.99 I I N LET CHASE PROFILE ------. ------- / INX/ a, SEE a I I \ SEE DETAIL HORIZ. 1" = 30' DT^E�II VERT. 1" = 5' / P NV NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. THRUST RESTRAINT CALCULATIONS- ro -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A NaN HIXiIZONTAL BEND 1FE BRANCH RESIRAINTUI DEAD FNUS nCAL OFFSET 11.25 LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION „ 11. B 1 AND vA,R- L L L LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. a NA NA 12 4. 16 1 4.4 114. 1 A I 14. A -BENCHMARK ft SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 24 NA - �ONTA IN34897.73 A A E 50303.75 • RUBT CALCULAn0N5 MERE BASED ON THRUST I-ANT DESIGN FOR DUCn1E IRON%PE FIFTH EDIT 2o02.PUBLISHED BY THE DUC AtON%PE RESEARCH ASSOCIAnON.ALL 31 Td ELEV. 5023.28 R�SIRAINT IENGn15 ARE IN FEET. IC O MNMUM LENGTH ro BE RES1HaNE0 IN BOTH qR MNS FRpA Fl1nNG.80 DECAEE BENDS ALSO REQUIRE CONCRETE THRUST BLOCK AMAIN ro BE IS5IRANED ro GREATER THAN 5 FEET.MINIMUN IfNG1H ro BE RESTRAINED ON BRANCH SHONN.CONCRETE THRUST�OIX A150 gEGURED. •9 O= -BENCHMARK/2: VATNESS CORNER('MMCSSA'YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 %MNMUN LENGTH ro BE RESTHaNEO FROM DEAD ENDS AND FRau BOTH pRECRONS-D VPLVES. N 40219.41 n1RE51RAMT lfNGM L,IS FOR THE LMGER%PE.B THE S1RaGHT RUN aF PIPE qi THE SAIP11 SIDE OF THE REDUCER E%CEEDS Lx,THEN NO RES11tANED JpN15 PRE NECESSARY. Zw E 50397.83 RESIRNNT LENGTH L,IS FOR THE UPPER PIPE FltOIA THE BEND.THE PIPE BEIMIDI THE BENDS IS TO BE ENTIRELY RESTRNNED. �s 410ENSEO G•\ ELEV. '4939.18 S�O/tlAl F,� -DATUM NAVE)88 -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR g2 ELEVATION TO CONVERT TO COB DATUM. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'B WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 28+00 29+00 30+00 31+00 5010 HIGH POINT E EV-4994.45 5010 LLI HIGH POINTS =27+95.99 W P,A STA 28+00 Q PVI 4994.54 = I__ Z A.D.D._-1.45 K= 4.54 a 3 W so. 'VC w C O Z L,,Iz, n N PRi < (O 35_n LLLI LIDQ J O h W Of - > Z N a N a N }O Q 0 Do 5000 5000 > a z Ex N n iu Fs p <0- o a a m ci Z Z � Z I- v m Q- Q N cII II A N< Z J M U7 o Q m> n IUD -0. +� +W Y Of N w m - -------- ------------------ �`� n� -- 77: W v~ior O ¢w _-- W UD cn m 1n I - -------- -- ft� cm EX 4990 4990 U o a EX & COVER INSULATION,CENTERED of W OVER PIPE O_ NEW 8"DIP WATER MAIN 0 0 W a 0 6 W r g 4980 4980 X YS YS !Y 8 Y! 16 CAA. CMK g �p DATE: 7/13/06 I oIIII RENSIONS:3/28/07AB 3 3 3 3 pplz rc m w3 Y� > ox VI IIZO S N 40 pp ZQ �jj 4970 lz w ' 4970 APPROVED BY: DUALITY ASSURANCE: N SEE SHEET "CONFORMS TO CONSTRUCTION RECORDS" me P4 4 m4 Fl[f; ENTER-PRO-WA m UTILITIES OCTOBER, 2006'a PROJECT NO.:BOZ 05021.0 $ SHEEf 41 Of 78 28+00 29+ 30+00 31+00 00 ziD / 000 OpOO: W / Z� (nm°.�o$ / W c>rJ<>w aa'--- / F_/ 1 a�"�m ' -- � I �> Z vt Wn WDY i[ --_` i �aFJm 3? Q V1 SANS EWER MN 8U3 �W INV, RIM=499d.67 IN(SE )Y§5.26 / 02l aOK�yW ~ O INV IN85.26 H / INV.our'(E)=85.zs 9 A 268.82' (/J /(NW)=8$ RI "EwER MH s z y X INV.IN999.10 ■ i 88.8ra N NV oUT(w)a.eo /'�/ ip999 // \ /// � � `'(�'� E / h 7p-�� VEN E 28 LF 1s"sroRM O oD 4 to o+o/ LO 1 rl A VEs2'2s^c laoa_ I_ zss.ss z+oa DRAIN®0.70%,- •I / /� F-Z ____._ - i O M�. n E - I. - - 3+0o s a�rzs�• _ _ / w 90 SAN // LL L_--_ D E a+ ,O h D9 s3'-� do SEWER M 4 Fry m 0~� I hM �N s+ _ i m �m a.°, / 29 LF 12 STORM c=so5 ts• 9.so'L�3.st as• a� // INV. 80033p1 y SAN SE,wER 0 __ _ -- ------ _ ' •� � -- ----- / r m- 1' / .._ OU(N))91'62 0_�IN NOUT(NW)5 y473 m �N�F -- TH 2OTH AVE D,oaSOUTH, / 66.98 _- O W v _ "SOU �N --- dz $ 20TH molvm Nil _ Em ro3 E49873.55 <' 2 HAE / m1Z= of ' �m$ N1DR EN 2 N L^ YO 1+3644ANT 1 In N ^N� VE s61 Daor ORPea C ry _ 2naoa I z' ELEV,aW BOLT S rs /B_z-.o n ^ w,a to°i a z ARRO vm o � �u u w ^ cTfe / E 4W BOLT �o D: 2UT _ o.tDs Mx ( / I vl o Y 11 u 1 1 // / `O a°'o,o�,/''ory u_3w �i_ ova GQ.73 I 1 H 99.s7• - - - M 9 e W n�Ca -w.Q-v�i��mrnz � W 0] 1 I �N nlI n Oyam /9 //nmom y we Il I Q 7 Nroz 71 NEW W �88'_1R_g8 1 'M•"r, t/ B R.z67 oo _� aos �Q 0 tf O ro ARs M mEa G r 20TH A E _a ez a y g �I I I �I 1 1 / u"I I m l�� oI I h o o� ��� az� V♦ 3 \p 8 c0 0 om e'y j OI -m1 I ' of ;I y v �w o z z' 3 c $Atm 4 oSILI $ CC)o m NI i I 1 i m NOTE: -BENCHMARK#I: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO N 34897.73 THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, E 50303.75 SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO ELEV.=5023.28 CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -BENCHMARK/2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, N 40219.41 83 2003,A NO THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM ND.1. E ELEEV.V.-4939.18 SCALE -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A -DATUM=NAVD 88 PLAN 1�� = 30� » rl LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION -COB BENCHMARK/1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 CONFORMS TO CONSTRUCTION RECORDS LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -SUBTRACT 19.45 FEET FROM BENCHMARK#1 OR#2 ELEVATION TO CONVERT TO COB DATUM. PROFILE -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'9 WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. HORIZ. : 1" = 30' UTILITIES - OCTOBER, 2006 -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. VERT. 1" = 5' 5030 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 5030 �ON TAp� THRUST RESTRAINT C CULATIONS- A A MNN NIXVIZg1TAL BEND TEE BRANCH RESIRAINIM BEAD ENDS 1 nCa.OFFSET 1.25 N IC M M 1. B 8 12 AND VALVESm 8 2.96 fl9J 12.44 36.03 43.93 J3.93 122 5 95.8S NA NA NA NA NA NA A E Ty 4.20 fl18 IJ.86 42.84 29.5J 82.92 114.J8 138.85 NA NA J253 10flO1 14.52 I A 24 9. J5 3B8.05 24.21 B03.za "ASNDITION {ns LTCEN5E0 �� "THRUST CN.WLATONS 11ERE ASED OH T9NST RESTRNNT DESIGN FOIt DUCTILE IRON PIPE.FIFTH EDITDN.2W2.PUBUSED BY TIE UCIIE RON PIPE RESE,1Rtl1A&B MININ.KL I�pTRNNT LEN I ARE IN T. YNMUI ILDTGIH TO BE REIN OMANM IN BOTH BIRECnONS FRW RTTNG.90 BEOTEE BENDS ALSO REWIRE CONCRETE THRUST BI-N. INMNN TO TO GREAT BE RESTRNNED ER MM 5 FEET.MINIMUM ILENGTH TO BE RESTRNNED ON BRANCH MOM.CONCRETE THRUST BL N.50 REWIRED. I'9.N..ILDTGTH TO BE NED FROM OEAD ENDS AND-E.M pR-0NS FR.YALVEfl 5020 IWRES -T ILENGTH L,IS THE ANGER PIPE.IF ME STRAGTIT RUN OF PIPE M TIE-SIDE OF TIE REDUCER E%CEEDS U. W RESTRNNED MNTS ARE SOZO 1 PIPE FROM THE BEND.ME PIPE BETNEEfI ME BENDS IS TO BE EN'FRELY RESMUNEO. PVI STA-7+50 PVI ELEV 5003.18 A.D.--1.00 K- 0.00 50. VC E.I.. O � O Q w 000 z c _ H Lmy n Tm >> 5010 n �;s �„ 5010 In N $ a8 ..� a$ Z ww O m m 1 1 IM II B I 1 1 0 LJ H W Q J z ao� i�i of m umi> o>1y a a,> U7> Z �00 1e rcm Yn �Ip as m� mpw �� _ >_O < Q 0 0 0: as coiw �'a I I II II n n > H� Z a-O O Mmi I- f II I r J I�i w - Z Z Z< K m 1 1 1 1 ID w } y m <- <H p O F N O, K e m H J > N W m m fil --' U)< Z J(� < ___ _ 5000 W W W a W N W v II I FIN SHED f! -- Y Of O N H W w r <> cli H m W w� ---- NF- m I a 1 1 1 I w + c+i Gil ---- /r �EX.GRADE DL w W < N Z o n N+w _ MIN.6.5' U O Q 0 Bc �Id OMI 1.0 -_-_- CO d N .. �313� _-__---- --- NEW 8"DIP WA MAIN O 1 Q 1 O 2 --- ------- ----- INSULATIEN,CENTERED 1 0 0 a 4990 N 2"BLUEBOARD RIG 0 1 4990 O INSULATION,CENTERI W OVER Pli E 1 1 1 k IQ X X rc -: .n IIz m rc 1 1 1 m�a1 Ky{ NmS 1 mm in VmI pN mmm tn�II I C.A.D.- 1. CMKm ma /13/os498 4980 DATE: RUSIONS:3/28/07AB o o lz I F m I src O w0�uwi3zr <� j< N mwrn�`^ti• <X 1xci 3 rnMm n y" iD > uto uzzzo > n > 16. a �M �� �N m m rna > I m m a+'zzzz m I m iD iD a+�zZ m I m iD m iD APPROVED BY: Z w 3 Z w Z "II 1IIT I "II C[ yq i O II --- Z Z Z Z Z QUADI ASSURANCE O w atAr Z map Mal 0 ��p m Y N O O"m O n W NVT ,.: it v zp II 1 1 < ri S Hi Vi ri t•1 ri � � m +�-ZO Is n Oi N'S N N N }}~ w+ + + + +2 ~ + ? 9+0 + <•�1 < m m m n1 n n n m 4970 + + + 4970 SEE SHEET o am m o m m In o m m o a m n �o -m -m em <m .,a, �n n N'4 �m ^m FIEF:20TH3R0_WA 3 °'a m °m ma mm °`'a °='m ma mm wm °W'm mm wg �o 00 mn o 00 00 `a 'a `a `a `a `a `a `a `a `a `a `a `IQi SIR h$ g $ ��+ �$ PROJECT NO:BGZ 05021.0 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 SHEEP 42 OF 78 \ boo=o \ w Z DIE \ N �I w I m -BLOCK 25- w - M ° H O orngn �Q,I nw I I q� z1 0 \ I ,ojjz> °\�� I ow ai � w m rn a1 s< YID j N ti � L4- 04 II �l. \I `UO ) N Oo � � - Il Iz1.52' 72.49' 75.D01N/ � \ \ 0 _-- - -------- ---- 75.00'------- -_-- .00---- - -- \ _88.Do 75' ��%IVA �` I: \ y \\\ \ z .� u - 5 SOUTH -LOTH A �U£ O 1 -- -\ x\ 2 W lA ° ry jT _ +°0 _ _ �� o0 or II a o � x 't'y�SF Stp� �f,®ro' >j+as . 0 x �r •Om O'D^w w \� O �m3m lrc lm 11 Mtn ¢z,^�mo Yli ¢m^II 3M,Q,�� � \- �m 188.06' O \ yll a ° �4w � x Lu �"P mustz»zo> � e °,yA_Y h3�•Y��x� Rx��iom xmoci hoII wII v\ n°iO^z' � \s\¢w �w vo�1i 76A .>'mn'ri 260.I°e' WU, \ �m,z ww I:m o, z o � S L I TH A� W3 pra�Y Nm^mvo�a31�WNni Op QE2? zo �Uro 6 WLL w MCIA3 \ DI Lu /LD x$, � 0o a i Z� / Z S // �,�^4 Q to x - z\ \ C - /i g�Q� 0]Go x �� �\ NOTE: 7 O i �� w -EXISTING UNDERGROUND INSTALLATIONS h PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO SAN SENDER MH 92 _- V) GO mo aw M SAN SEWS#MH 91 �' /BRIM=5003.89 -O�� �- - J �� wW 1 l mNr - THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE UNES(WATER,POWER,GAS,STORM, RIND 5003.30 Q INV.IN(SE)=94.33 --- ,5 G'6N"�° ° Y s� yg 'gym w.� w �� op SEWER,TELEPHONE h TELEVISION)MAY NOT BE STRAIGHT UNES OR AS INDICATED ON THE PLANS STATE LAW REWIRES CONTRACTOR TO INV.iNI,E)=91.82 a/INV.OUT(NW)=94.13 Vf ®" "e^ ' � om NX'� ✓m '�\ CALL ALL UTIUTY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. SCALE ING.IN(W)=91.82 d N 6898 tig P��o s;� / �• .V7`� OX <N � + -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS STH EDITION,MARCH, INV.OU T(N)=9t.62 // OR y.° SZOO ,�� \\ \ 6,aw ���o��i> zw \ 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. PLAN 1�� = 3O� IA ti i' nn \\ FJ sd a0 w __ PROFILE v+ 3 OF A LAND LLSURVEYOR SS OTHERWU ENSEDI N�E STATE OF MONTANA AALL CONSTRUCTION NID BY A PARTY CHIEF OR ENGINEEERING TECHNICIAN EXPERIENCED INHCONT AND STAKING SHALL BE PERFORD UNDER THE RESPONSIBLE ESTRUCTION HORIZ. 1 = 30' AVENUE ° �I \\ LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. VERT. 1 = 5 5 61'04'Of W �j, \ 6 // -BENCHMARK/1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24.25 @ 26 N 9,s+oD E 50303.75 cr) N \ / a W N -- ELEV.-5023.28 \ THRUST RESTRAINT CALCULATIONS* m TOO h \ova \ -BENCHMARK/2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 D W S,5 J� Sl y \ / N 40219.41 MAIN HOIIEONTAL BEND U eee ,lE BRWIOI ESIRAINTm 0-ENDS 12 B TC11 OFFSET 11.23 J P R 3 r m vi M 1. AND Y wSTN L oo it iI Y f E�yea ,� \ / m E 50397.83 --- / _ BAB= o,omm¢"ndzU S°gip/ 1 ° so SN\k\m im T�i T ELEV.=4939.18 ,z 13B.Ds m - m O a a , < tr V II Z 5.42 10.94 22L 55.02 14.58 51.41 1OI.03 1TT.49 )5.J4 10O.B4 12B.4B 258.4T NA I IA W YDR. we ,� r / g7 ' \ \ -DATUM-NAVD 88 ♦ 1. 1. zss.es 1Ba.Ts 31Ts.as zz4.n slu.ze N 5 LOTH ATE moll II IFm� gwo� / N lS618.80 n R He m vN 3 w m Iw o / \ \ c�\ \ \ u, -COB BENCHMARK�'1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 E 149914.83 I p I, ,�z II / -SUBTRACT 19.45 FEET FROM BENCHMARK#1 OR#2 ELEVATION TO CONVERT TO COB DATUM. •111RUST CALWLATONS MERE BASED ON THRUST RESERNNT DESIGN FOR DUCTIE IRON PIPE,IFFTI EOI110N,20OZ PUBUSHEO BY TIE DUCTI£IRON PIPE RESEARCH ASIDCIATON.ALL RROW BOLT "' S 1+. .0 N U Z F Z / / \ \ > / RESTRAINT HEN- ARE IN FEET. (n G _ / ,n b N I,Z TOMINIMUM IENGIH TO BE RESTRAINED IN B0T1 pRECTgiS FROM F-G.90 OEGREE BENDS ALSO REWIRE CONCRETE THRUST BLOCK. V.=5005.44 J -o \ \ ° \ -- -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'B WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. IU AN To BE RESTANED TO GREATER THAN 5 FEET.MINIMUM LENGTH To BE RESTRAINED ON BRANCH 9HDMN.CONCRETE THRUST aLaa ALSO REQUIRED. o) m > I / a, \ / § 'MINIMUM LENGTH TO E RESTRAINED FROM DEAD ENDS AND FROM BOTH OIRECTOiS FROM 1 U ?j I / �\ RESTRNNT LENGTH L,IS FOR THE LARGER PIPE IF THE STRAIGHT RUN OF PIPE ON THE SMAUL SIDE OF TIE REWCER EXCEEDS U.THEN NO RESTRNNED JONTS ARE NECESSARY. 00 \ \ 1 ) -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. mREBmaNT UNGTH L,IS FOR lE UPPER PIPE FROM THE BEND.THE PIPE BEINFIII THE ENDS IS TO E ENTRFLY RESTRNNED. m � Z z / I s l \ I 5030 8+00 9+00 10+00 } 12+00 13+00 14+00 15+00 16+00 5030 N TA OR DENOTES "AS-BUILT" CONDITI N PM STA 14+00 Ic PM ELEV 5011.51 v A.D. -1.10 K= o.70 Gn 410ENSF-° too. ,vc PM STA-11+00 n PVI ELEV 5005.8o + 4 5020 115 K- 86.80 1 5020 STA=7+50 loom,VC �+' o $ r .EV 03.18 1. 5 5 0.00 Y! d a FINISHE 5 GR C rc n p an + n m 64% + rc m m m mo + m on HR L48 0.0 ----- --------- Q (O r e o op - Ic CM W n �jNH� ^ IO am c, 1 1 _-_-- 2 ~ 5010 -------- --- Q ng H:I z„ rcg 1 1 II II 1 1 1 ___----- --- 5010 ce J� 8p II II N n i H., FINISHED rL am a _ Z wZ _ j O w2 a O� II II w 1 1 1 II II m> wT �Hy }w +w GRADE ___-_�- Mmip wnHH>yyn .+cWa md(+' o�' o^I ------ -------- _ �O Q �O - }0 H n n 0• ^ ___- COVER > Q o- Z Z + -------- -------- ------- i-- NEW 8•DIP WATER MAIN 6 0 ~ O J DO _--_--_- _--_-__ E%.GRADE O� _----- �\ , 6 m TQ 2"BLUEBOARD RIGID INSULATION,CENTERED • Of Z W N 5000 ' 5000 (/) LLJ � w LY N Np w - co �> € 1 W wQ Qa lit U o 3� o a 0 n 1 6 6 a N "CONFORMS TO CONSTRUCTION RECORDS o 4sso UTILITIES OCTOBER, 2.006 4990 w o 3 c H tt II IIZ tt 3 H ,z rc w� 3 Tn r iT Mi mn II -O K m n zz0 K J 'O O J y J J 5 He Mi I rn� m tO <+ »> m I I i3 i> of iD Ei C.A.D. CMK U3 <+_ n DATE: 7/13/06 i, 4980 i m i 4980 REVISIONS:3/28/07AB <> m > Q'mn o m io x vo, eo aD Q=M, eD m m m m ^ ^ ^ ^ ^ APPROVED BY: w w w Z z Z lz lz Z z z Z Z Z w1 11 DUALITY ASSURANCE: 1 {� nm + + + + + 8+ + +� + + + + + +� + $ + + m a0 m m 4970` n n n m m > o o� m N N M� M m 4970 SEE SHEET 20TH-PRO-WA IrMN,, nm nO, naMa ampp �O -M♦M,, m M mm�m nn ammm npmm, -Iq 8 nM m wm ..�M n nN FlI C�roM O o0 00 00 00 00 00 O 00 00 00 00 LL. a 8 "8 "8 "8 "8 "8 "8 8 �8 8 "8 "8 "8 "8 �6 S "$ R �� "§ "$ "4 "� PROJECT NO:eoz 05021.0 s EEf 43 OF 78 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 SH in 0 04 In IL p O m Il�ro NMI Mvroi I °'Y °° �o J \\ W —BLOC 241'— 1 1 m _ \ 'z39 \I y 75.00", ------ BS.00' \70.00' N --------- ———— --------- --- —_-- --- ---- \ <\ <� 1 o LIG �-/w�' 0 IIA D6 TRANST6N �aLu 87.53' H 96 �=SOUTH 2OTH AVfNUE t5+00 _ — NR yJ _ I 536_16' _ _16+00 t50.50 N C Al,LS,IZ.iO � 00 ' I _ n _�% W \ MN nub \\ V Q of \ m m m Ia 260.58' j J I IY Z p m LJ ryi�� a 0)MN 0_in W I as �m I rcz ro I �I bb• v, aN 9 2 TH A� Q�S3$ Y w��o I 3 3 wo i 3zw<Wa 0 - J I mpl� SCALE �' - I g PLAN 1" = 30' o m \ a PROFILE v I 00 HORIZ. 1" = 30' �N,vAanil;•ss VERT. 1" = 5' 5030 16+00 17+00 18+00 19+00 5030 �0NTA I I NOTE: IC c c -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO A E m THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, ? Ne W SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT UNES OR AS INDICATED ON THE PLANS.STATE LAW REWIRES CONTRACTOR TO F`s 10ENSF- CALL ALL UTIUTY COMPANIES BEFORE EXCAVA71ON FOR EXACT LOCATIONS. m X n U m V o 1 1 -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, o n le m Mi n'o Mi a in II n N 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. u� b cs Mi voi 1 1 II m 1 1 N II• n -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A 5020 II n II m j ?? 1,. ND 5020 LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION w LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. 1 Mid MW �laI ___ rn +W n a + -BENCHMARK#I: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 n Ly 7 1, _ N 34897.73 > E 50303.75 a a FINISH +w ___---_ ELEV.=5023.28 GR �EX. _ ---- w •6 _ -- -BENCHMARK/2: WITNESS CORNER('MMCSSA'YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 V) _ _---- N 40219.41 E 50397.83 Q Z GRADE O rL MIN.6.5' ELEV.-4939.18 = WCOVER -DATUM=NAVD 88 a Q p -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION-4903.86 3 5O1 O 5O1 O -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR g2 ELEVATION TO CONVERT TO COB DATUM. in H -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. Z 3 W W p -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 0 W W Q J_ 0 NEW 8'DIP ATER MAIN O v)O Q W CO O 5: Q f 0 ~ O ~ Z : (n m Q Z Z Tn Of< Z -5 5000 5000 THRUST RESTRAINT CALCULATIONS* UI W Q Z MAIN Hmzw..BEND U aee U TEE BRANCH RESTRANTm DEAD ENDS 12 B OFFSET 11.25 Of w W w in 1. 1 AND VALVESGn L L L Y N W Q .. 12 N O 16 5.42 10.94 22.70 55A2 14.55 51.41 IOJ.OS IJJ.49 N. 100.94 129.18 25&4) NA NA w W� m y w a 24 1 1. 9 1 4.1 A N N -UST(A UTARONS MERE BASED ON THRUST RESTHANT DERGRN FOR DUCRLE IRON PIPE,FIFTH E 011,2 Z PUBLISHED BY THE DUCOLE IRON PIPE IES".ARCH ASSOCIARON.ALL U O Q 04 II GNRESTRANT LERm115 ARE IN FEFf. K� II Z MINIMUM LENGTH RGTO BE R6TRANED IN BOTH DIRECOONS FROM FTTNO 90 DEGREE BENDS ALSO REWIRE­ THRUST BLOCK. ofMAN TO BE IESANED TO GREATER THMN 5 FEET.MINIMUM LENGTH TO BE RE TRANED ON BRANCH 9gTM.CIXNCRETE THRUST BLOCK A­REWIRED. R6TRA d w� 3r GnMINIMUM LENGTH TO BE NED FROM OEAD ENDS AND BOTH FROM DI 011S FROM VALVES G+IRESTRANT IENCIH L,IS FOR THE LARGER PIPE IF THE STRAGHT RUN OF PIPE ON THE SIAAI.SIDE OF THE REOUGER EXCEEDS U.THEN NO RESTRANED JUNTS AE NECESSARY. O D GNRESTRANT IENCIH L,IS FOR THE UPPER PIPE FROM THE BEND.THE PIPE BERIEEN THE BENDS IS TO BE-RELY RESTRANED. O ¢++ �� Q 4990 -- 4990 Q Ld J g� 9 J J J m M! 4980 5 S 4980 C.A.D. CMK 7/13/06 DATE: m < I rn Q � REVISIONS: 3/28/07A IE N > 3 w APPROVED BY: s ZII Z.B Z. Z.1 QUAD ASSURANCE: 1 B a + m +IF m 4970 " ry —1 "n 4970 $CAFE: SEE SHEET "CONFORMS TO CONSTRUCTION RECORDS" Fl[f; 20TH_PRO_WA UTILITIES OCTOBER, 2006 PROJECT NO.:eoz 05021.0 16+00 17+00 18+00 19+00 SHEEP 44 Of 7s C\j84 00 x;� II 11 1V 1'a l 11 \ z > vtom m l l l l 11� l / I I I �� 1 5 22ND uE N b / l I �l I '`'I I o s �� 9 4 n _z Rtl I J = 3a I p 4 �_I I •-u1 ��"M n u Qy g I 1 rn �w� °22ND I m U of N 4_5.-_------ -- -.• /W� J`al z'' -� 81. � m � Ix o - I I / N a � a m / _ ND IE 3 o° I _ -t---- --I__ 11e.zo• ' °Oz Q� �h Imo" / g� ' o STORipRA N• m -__ 81.58% _ ,1 F m:. _ ///_g m���3�.o I�^�ti�Z®-0 _h�N .v. `• 0!Ie rnm�„_�tip s i_nD ���VE�IV___ ;ry m�'��m m ¢_m A 1]-_-- -----. --pW S n A5�2`�2�L S-OW UZH•2"2No 0S v�oA eV EEN U_ " P __-__4.�0o ---p�1 0-'S 0'S9•R 30e.o\0._o G•L=16e.sa• _58+000 S--U T-rF '�2- -]O_IsL•o 3�P�+GG - m N I W `S1 o I II N Lu ul _ Tod.Q1• 0 WARP a VE _B 21' ZI 6wG/ OC M Ba.¢9N^� 60.10 eo.ss ----_'-'-�__\ BGo H 22NDAVENUE W L m Cy�y o Q o ¢? �m ar 55.77 __---- 8.1 /9 w L(r 8of OD �J I z o o4"4 / / 1F► / �a3o v Y / 59.99tk ' I l� g 00� m u / r iw O n L r h 4 x arm o y i �/ ��� �Om \\ ♦A 3 a N / $ I m sE /y� 'INV.IN(000.36 I I.l l is� W II \\I -BENCHMARK#I: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 NOTE: N 34897.73 E 50303.75 -EXISTING UNDERGROUND INSTALLATIONS 8 PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO ELEV.-5023.28 THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, -BENCHMARK2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 CASEWER, LL ALL UTILITY COMPAN TELEPHONE& NIESSIBEFORE EXCAVATION FFOR MAY NOT BE HEXACTSLOCATIONS.AS DICATED ON THE PLANS.STATE LAW REWIRES CONTRACTOR TO N 40219.41 SCALE E 50397.83 -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, ELEV.-4939,18 PLAN : 1" = 30' "CONFORMS TO CONSTRUCTION RECORDS" 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2GO4 AND ADDENDUM No.1. -DATUM-NAM 88 PROFILE -UNLESS OTHER SE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 UTILITIES - OCTOBER 2006 LAND SURVEYOR" IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION -SUBTRACT 19.45 FEET FROM BENCHMARK$1 OR/2 ELEVATION TO CONVERT TO COB DATUM. HORIZ. 1" = 3O' f LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'B WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. VERT. 1" = 5' -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 50300+00 0 2+00 3 00 4 00 5 00 6 00 7 00 00 5030 ON TAp� THRUST RESTRAINT CAL LATIONS• A A MAIN NIXVIZWTAL BEND tTEE BRANCH RESTRANT OEAO ENDS 1 8 CAL OFFSET(11.25fN IC M M e e 13 AND V m. "AS-BUILT" f ff S 2:l18 S9J 12.M 30.03 43.93 J3.93 12215 95.85 NA NA A NA NA NA OR DENOTES A S-B U I L CONDITION E ti 4.20 1 1 1].68 4284 29.5J 8292 114. OB.B.5 NAplift 14,55 zs .zt e v Tns�ICENSE"��� "RUST CAIWLATIONS BABED ON THRUST RESTRAINT DESIGN FoR DUCTIE IRON RPE,FIFTH E 011,2002.PUBUI-I BY 111E 0U.XMLE IRON PIPE RESEARCH ASSOCION.ALL ^ SON AI' NESTRAINT IENGIHS ARE IN FEET. tl YNIMUM LENGTH TO BE RESTRAINED IN BOTH DIRECTIONS FROM FITTING.90 DEGREE BENDS ALSO REWIRE C0f1CRETE THRUST BLOCK mMAIN TO BE RESTRAINED To GREATER THAN 5 FEET.MINIMUM LENGTH To BE RESTRAINED ON BRMW SHOMH.C0f1CRETE THRUST BLM C ALSO FOUIREX mMINIMUM LENGTH TO BE VIED FRON DEAD ENDS AND FRoA BOTH DIRECTIONS FROM VAI.TES. 50]O N ES RANT LENGTH 4 15 FoR E IAHGER RPE.IF THE STRAIGHT RUN OF PIPE ON THE SMAIL SIDE OF THE REDUCER E-IS T I No RESTRAINED AUNTS ARE NE sARY. 5020 L t PER PIPE FROM TIE BEND.TIE RPE BEIMFEN THE BADS IS TO BE ENTIRELY R61R W O Q 000 IN 2 Q �z$"mE ce 0. $mIIv Za IIIY w Z JLLO 0WLi <w N 1Y V/ + O <5010 w N~O+_ m c E c2w mq dm a nc� ^ - <O_ Z a-O m _ N vj UMi Q N oo am _---._--- --_- Z Q of J + °' a s a B v LD W < a S m --- - m N Q Q~ 5000 m < " E E a ---- 5000 (n o < a w rc an �.I 1 Il In _-- - w �� < �m nw a rn> �� mw ILL GRADE - _--- Y �W N WZ +� + +w R+cV --_ ----------------- W NF_ <Q w LLI UI W r i1T 1" 1 ----- ----- GRADE O rt -- w + ------- --- U O< Z oc� al - -------- - MIN.6.5' N CO ER 3pp -1.SoR 1-S-- NEW 8'DIP WATER MAIN > O_ N __-- 0 o r 4990 4990 Q o W g � NEW 8"SAN SEWER rc 6 N r in n r in r io r rc 0 rc 6 W rc N rc m rc rc rc o rc rc m rc n rc rc rc 16 rc CAR CMK 4980 " " " 8 " U 4980 DATE: 7/13/06 I ggj z W.W� � ��j ge m .1 �N � WI m KpN � �gj � � REVISIONS:3/28/07AB m > 3 3 3 9 > SRO 3 > > 3 3 3 > ; ; 3 b > 3 10 iom APPROVED BY: E E n n n mE n E Ey mn mE n u R on m9 E E n E n n E n n QDAERY ASSURANCE: 0 W m 1mn� I•I n MI m I.1 O 17 cm^mD .00 V m � O H m S H N n O nl O }} ^ m N N Im0 4p W Y}} O} O}} O M} t M}}0 r W}} n} M m N IT C 4970 O O + + N N N N N N M 1� Y IF+1 IO m h m `� n n 4970 RI�T SEE SHEET In c,N T N rN Nd 1. no .1map •0R mIn V mN m rn0 o1 < aq "`4 a"",w ""' ma mW °"'� "^ �^ �0a ag 8S So S S'� FIEF: 22ND�R0_WA s .a <R e� e� <� ep e� :� e� e� a e� �� m� �s PROJECT NO.: BOZ 05021.0 SHEEP 45 OF 78 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 I "I / I •S.SI N ijw // W 04GO W< IPozll s 22zl�ALE\Qa o i ^ I \tiw.+-lli t Im'om' I cMI `,p z NO z O< e C n o N 31`PivNe O .'a rc�l N ----I --------- Ne J -- — _/ O U ------ o0. 1oo.or 1az_ Bs.o 80.00'z =— ------_--------- 0 ""w^ SOUTH 22ND 71yENUE `n -- I Ke ^ AN SEWER MAIN L / uN In I o 8+00 ~ \I 5001]42"W - i� _ _ MH e6 - — 9+00�� 2a0 D 10 0 m II , MH B6 _ \ _ + �� Q f 11+00 WARP CROWN - - 12+00 5 WARP CROWN- - o - - 8 S 0,92'49"W 13+00 - x — —— m W, I— _ ,4+Do em ..l n _ + - -_ _ _ -_ u UP WAIER MAN -- M " NEW Y '�. ,•� I 5 n l'm o+ \s -- --- --- --- ----- ___ „c En inn - �� --- -------- m — --------- --------- P ~� J-- r 39.99' S9.99' \ 70.35\ 59.\2 87.42' JI II Na• u`°i`n°v`°i 87.11' --- -- — _�>` -- — _-- ------ -_ ------- -- -----------------�----I ------ - -----�--- LJJ h In \ \ gel so.az' \ ss.00 Bs.00 -------- ---------- ------ — --- III ow to \ Ih rn \ \ LA.I m "P it it -f \ wm^ ro 0/ I 5.00 yrc LL N� �� 3 'W� \ o � I 1 WmN^ I _C 03 Z. x oI, ol b"< �I \ moo o. o // O oI J V n �" M III Ix m o LL V U V —_ n In v ----- 1 .00 m aI N v 7 rn M o n - Cn n m Lb N Kam^ V) 3 AB)3N M301S g� S 3NM0 101 n\ m I N o N m co r \ 301M,S"lflj AB)NltlM3015 \ 7o Dp O� \ \ I ,09 3CIM,S'1I13 SAN SEWER MH 83 \ \ 0 -BENCHMARK#1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25 h 26 NOTE: N 34897.73 E 50303.75 -EXISTING UNDERGROUND INSTALLATIONS 8 PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO ELEV.-5023.28 THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, E CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 SEWER,TELEPHONE h TELEVISION)MAY NOT BE STRAIGHT UNES OR AS INDICATED ON THE PLANS.STATE LAW REWIRES CONTRACTOR TO -BENCHMARK 2: WITNESS 1 CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. E 50397.83 SCALE OR - DENOTES "AS-BUILT" CONDITION -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, ELEV.-4939,18 PLAN 1 = 30' 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2GO4 AND ADDENDUM No.1. -DATUM-NAM 88 PROFILE X -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A :COB BENCHMARK$1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION -SUBTRACT 19.45 FEET FROM BENCHMARK$1 OR/2 ELEVATION TO CONVERT TO COB DATUM. VE R . 1�� = ' LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'B WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. VERT. 1" = 5� -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 5030 8+00 9 00 11+00 12+00 00 00 15 00 5030 �ON TAp� THRUST RESTRAINT ALCULATIONS• �. �. REW IC MAN HgtIZONTAL BEND E rax O TEE BRANCH RE IN DEAD ENDS 12 CAI. 11.25 - 11.25 225 15 80 AND VAL RR L L L •17 88 .9 1 M .8 8 NA NA NA NA NA 2 IB 5.{2 10.94 22)9 5502 1{.58 51.{1 10).03 1T).49 T5.34 1 .48 25R{ 410ENSF-0 ♦ 1 1. 1 .TS {.1 N pp•ETEHRUST CALCULATONS WERE BASED ON THRUST REBIRANT DESIGN FOIt DUI IRON PIPE,FIFTH EDITION,203,PUBUS W BY E DU IE WdN PIPE RESEARCH A1NN.AU. S�ONAI PA STA=9+00 P,M�INIMUM LENGTISTO BE RE RTAINm IN BOTH DIRECTg15 FRpI Fl1TNG ID EGREE BEN05 AL50 REWME CONCRET:TIRDST mM"' T)BE RES1RANm TO GREATER THAN 5 FEET.MIN IMUM LENGTH TO BE RESTRANm ON BRANCH SHOWN.CONp1ET:TiRU BLOC(ALSO REQUIRED. PVI ELEV 5005.75 m OMINIYUM LENGTH TO BE RESTIEANm FRO-DE1D ENDS AND FRW BOTH DIRECTIONS IRON VALVES. 5020 .. 3 <BRESTTANT LENGTH L,IS FOR THE LARGER PIPE V TIE_SIRADIHT RUN DF NPE qN TIE SMALL SIDE OF TIE REDUCER IX VIED SOZO o HNRESTTANT LENGTH L,IS iqt THE UPPER PIPE FRW TIE BAND.TIE PIPE BETWEEN THE BENDS IS lb BE ENTIRELY RESIRAINm. K= 5.64 j a m J ,n a � II II ol o m m m 50.0'VC X ro Ie h z h F J o Goi o g g Eoi'?Loa No > ri D. a$ II II Ui II II am a q 5 5 ---- w 0 w m vmoi II m jw II II m 5 N]n] V A 1 o N > tl W D. D. .> a s �w FINISHED --_— _--- && `��a G7 GT �+ RADE — ———— = w a m > 5 ���G0 o o _ sa �8 m ———— — _ 5010 1n 5010 m _ La Fi am 40% _ _-- ---_ �IX.GRADE rL Z W Z O W H MIN.6.5' W n II F •t _—_ COI O LLj LLI L Q J �> nq? +w — --__—_"-(�\./-- NEW 8"DIP WATER MAIN 1n O Q 00 H 0- ZO a-DO ^ 1 1 1 Z m Q Z Q 1 U) (n, Z JIn 5000 1 1 5000 (/) w g a w 1 1 c W w z P 1 1 W N 0 Q j LLI a W w� m �¢ � 1 24 N cm it 04 w U 0 Q �Z 1 004 1M it O O Or = Qom»yzz �p 4990 -- 4990 Of 00 W 0 04 U W O yC H Ua H y1W'� MCWN 1LLW�' Lo K K K J F- U m U U V H N in U U U U U U U U U U W W U U U CMK 4980 w w KK n s s s s LE s s s LE LE 5 5 $ s s w 4980 N D DATE: 7/13/06 aI m m y'm N I vmi I m m Iwn rw/N Iwn m rw/I H w. H N '� '� Z 3/28/07A8 m O REVISIONS: a ` Q a a < a < < a < < < a a < < < I 3 > > 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 U m m ai a;m z z z z z z z z z z z z O � w w z W APPROVED BY: iE n E n E j n E n n n n E n n E n E n n QU P ASSURANCE: 91 N o no o n Iv n S S T., F $ asy as a 'n a ci asy N a a � J M b 0 N ,O m N + O n n < + O O m m N n + Q m r ^ ^ O O O N N M W) W1 W) Y m Of 4970 4970 O SEE SHEET lz om n ,i, el� �n mn n "n oL°$ Pn -,7i, hLN ro -� mlia Z FlEE: 22ND_PRO_WA O PROJECT NI05021.0 s m U SHEET as Of 7s 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 - wI I I I I/� „I I I � / I � �� rl I/ I I i 04 O �I � .0 � I" IRAJ Qm m R l s N �.�' m an$ > w ('du) o U _—_— -- _ � 65.00' _ Lu --- -- ---/----— — —L----- / O H 9T_ 14100 •I q L / O fiaSSD lis ioD _ _ _—lezno w ceow>, _ II ICI f A L N SOUTHAR22N A AAVENUE_ I ig N o O ------ --------------�----I r,0 W y �, L 65.00' 5.00 65.00 65.00' _ 3 B 22ND- I M c m N SCALE Z O PLAN 1" = 30' PROFILE Q 3 ------- m "I I. O HORIZ. 1" = 30' 3 N 8 O m N VERT. 1" = 5' 3 n 0�O 10 \ 5030 17+00 5030 ON TAPy n 5 IC m m r 410EN6F-� �? FSSrON A l U� F II II 1 C N W C4 1 1 $ $a 5020 a +� 5020 FINISHED�21 GRADE — NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO w __ _--- MIN.6.5' THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, _— EX.GRAD •rL COVER CAUL ALL TELEPHONE UTILIT &TELL ASIBEFORMAY NOT BE E EXCAVATION FOR HT LINESACT LOCATIONS.OR ASINDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO V) -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, _ LL' 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. a Q O 5010 5010 -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A 3 U ~ NEW 8'EIP LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION Z O WATER M IN LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. Z LJ w O -BENCHMARK#1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24.25&26 O W m Q J + N 34897.73 }O Q I17 LLI z E 50303.75 V] ELEV.=5023.28 \ 6 —BENCHMARK$2: WITNESS CORNER('MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 / H Q H 6 N 40219.41 E 50397.83 ELEV.=4939.18 m Q Z=) (")K Z J j SOOO 5000 -DATUM-NAVD 88 (n I_p Q D-Z -COB BENCHMARK/1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 LLI :2 W -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR g2 ELEVATION TO CONVERT TO COB DATUM. Y �m NW LLI w Q -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. L.I..I (N O Q Q —THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24—HOURS PRIOR TO BEGINNING ANY WORK. LLI m Z 9 p p N U O Q N Of S A � LL H C O0 o 4990 4990 THRUST RESTRAINT CALCULATIONS" Q MAN HOR120NTAL BQHD rMF./TEE BRANCH RESTRNNTNH DEAD ENDB 12 U e VERTICAL OFFSET 11.25 W M 11.25 22.5 15 BO B 1 8 AND VALVESW L L L C .8 12.H J0.0.1 AJ.B .8J 1 Na NA NA NA NA C 1 1J.6fi 42 1 J2.SJ 16 4 1 4 1 1.41 1 1 .48 1 .4 1 4 N 1 I. 1 N gi -THRUST CALWLATIWS MERE BASED ON THRUST RESTRAINT DESIGN FOR DUCRE IRON PIPE,FIFTN EDITION,MZ PUBLISHED BY THE WCTILE IRON PIPE RESEARCH ASSOCIA—ALL STRAINT LENGTHS ARE IN FEET. MINIMUM LENGTH TO BE RESTRNNED IN BOTH DIRECTIONS FROM Fl NG.N DEGREE BENDS A—REWIRE CWCRETE THRUST BLOCIL MMAIN TO BE RESTRAINED TO GREATER THAN 5 FEET.MINIMUM LENGTH TO BE RES7RANEO ON BRANOH SHOW.CWCRETE THRUST BLOCK ALSO REWIRED. L� MINIMUM LENGTH TO BE RESTRNNED FROM DEAD ENDS AND FROM BOTH DIRECTIONS FROM VPLVES. Lr Lr Lr No �HRESMMNT LENGTH L,IS FOR TIE LARGER PIPE IF ME STRAIGHT RUN OF PIPE ON THE SMALL SIDE OF THE REDUCER I—EEDS Ly,THEN NO RESMMNED MNTS ARE NECESSARY. U U U U U U U h WRESMMNT LENGTH L,IS FOR TIE UPPER PIPE FROM THE BEND.THE PIPE BETMEOH THE BENDS IS TO BE ENTIRELY RESMMNEO. C.A.D. CMK 4980_ W W W. W W $ $ 4980 DATE: 7/13/06' W. Hn " W. RENSIONS: 3/28/07A 3 3 3 3 3 3 310 W. 3 3 3 3 3 3 3 APPROVED BY: OUAIM ASSURANCE: � ccDi Yar of a a a a n ,m,op N FO N W m N N b HD 4970 $ $ $ = = ^ ^ = 4970 "CONFORMS TO CONSTRUCTION RECORDS" UTILITIES - OCTOBER, 2006 FlLE:SCALE: SEE SHEET 22ND-PR0_WA S� PROJECT NO.:BOz 05021.0 SHEEP 47 Of 78 14+00 15+00 16+00 17+00 � �- -- ---- -- - ------ i 61 LF NEW DUAL / 15 \ 24"ARCH 1 RCP 181 V EACH) WARD q / 5000 SF 14 REMOVE DISPOSE 1 o I I v v F / n NEW HYDRANT 5000 SIF OF EX.BARBWIREFENCE \\ 'o II 11 1 \ \ JI CULVERT WITH F `1. ® M -BLOCK 16 SETBACK INV.IN( 1.82 ' D of N.m A N 38695.27 z V A INV.OU -91.04 N / NEW HYDRANT O o z°i z� 17 i io, E 49539.45 HYDRANT TO PROVIDE A r \ i° �smzF I I 30916 SIF ` 1 ��:� 18 a >m m BUILD BENCH AROUND 13 w}^ A n m A 27 LF OF 8" ' 1 F) ARROW BOLT SOOO SF I I per¢ jm N A pAmmxt $ SAN SEWER MAIN IP 7013-SF 7511 SF ADEQUATE COVER ' 11 a 10 mfm�la I 1 _ N 36713.11 I ®0.0040 ft/ft , I I 1 1 NEW HYDRANT 782E SF - i -a -� m I I / N 36704.44 b N 36700.13 Bo ELEV.4999.84 z v 8 z° n o _ E 50086.12 V 12 m 3 >q m s E 49991.E BOLT 4928.41 i z - 9398 SF m m .,o z>, i INV.- NV. z ua I I a all ARROW BOLT 1 49881 4988.57 INV. 5000/SF F 0 7520 SF -< NgmN� 1 I `'<� I` I NEW 30'WIDE LE997.72 4989.15 _- p1 m � _ T_C-------_ - 91 1T1 miIn miIn tmInI o�o u 1 I vuuuu 4 97J EASEMENT / i 0 18.9 49.9 &ACCESS 4 _ _62�2SF uTC 100 94.91N En WARP CR J O LM O BLOCK 15 \ C N 36653.49 y INV. rc= rc= / - - - E-500 - 100uj 49a63 -- --9�c'-- SIB IB M --- INV.= _ _ _ R- Oy gg I SAN SEWER MH ,D =21.0� 9a.a3 _ INV.N95E08 L._ ------------------- - I INV= _ _ _ 5 NR\ - ------------ _- --_------ 98. - -- - - --- --- 95.4 ---- --- 11 1 1/9N2.25 SAN SEWER ft N INV.OUTS)=85. _ wv. ,�J ` DPONDTIO °AI _ _ 498-- �1 ®aooao rc/rc w � \ R=15' / 75.00. --------- - --- - I I � ++ 498T. 7- - _-- L 1 IINV.ouT(sw)=esso � 6030 SIF o. <? �N \ L-28.51' 1 so.00' 50.00' so.00' 00' 6s.00' - -- 5. -- \7a:oo� ---- 1 \\II SETBACK I C\ AN SEWER MH 98 } / 85.00' $$6$ SF RIM=4995.61 -BLDCK 1 /� SAN SEWER MH 99 /\ t Q ��\ m I 1 \ \ $1.0913 $F 7 0 INV.OUT(E)=87.81 �./ RIM=4996.32 1 y, _ i ` \ \\ \ 2 \\\m FLIT"5 Wl��,p9 II m 2 3 INVVOUT(E)=86.43 1 I.I `� h 7 3 vm / / /��// \ AIR N_ I II 5. \ \ \ PVCL®1os% / M \\ \ G \ 9' gOEW REVS) >a! 7500 SF a 5000 SF 4 g 5 / I 1 6 ms_- °6500 SF i°3 3 / $ n m I\I N TOP 0 P D=4995.00 / 5000 SF 3 E / I IIII 5000 SIF o o // 6500 SF r z \ ��\ 1 y�.g �, \ \WATER 500(TS�/\ z ri w \ o SBOTTO OF 10N6 92 15 F - \\ / _/ m a 9 �' 1 1'.. AT yr R�UIR S RAGE=1415 CF '� / 7848 SF I 1 z- sT00 G S WN-1519 CF 4990.41 ----__ \v a+ \ / I I _ STA.3+66.29=� (4:1 5ID S�l ES,SEE 6 _..t.5 WI�a rv,„r. \, I \ /l l I 1, 1,��I iui�T SeORM,�DRAiN \\ ,II o IN o DETAIL)\ I li R/W R/W 30' NOTE: ?,�J 12' 12]-EXISTING UNDERGROUND INSTALLATIONS k PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO SCALETHE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVCE LINES(WATER,POWER,GAS,STORM, CALLSEWER, TELEPHONE &TELEMSBEF)O MAY RE SNOT B STRAIGHT UNES OR EXACT LOCATIS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO PLAN 1 = 30' PROFILE -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, HORIZ. 1 N = 3Ot 4;1 4'i Mqk 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A VERT. 1" = 5� WOVEN GEOTE FABRIC XTISU LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION UNDER SUB-84SE LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. (MIRAFI 550X,AMOCO OR EQUIVALEN2004 PLANT MIX ASPHALT SURFACING, COMPACTED SUB-GRADE T) 3"MIN.DEPTH -BENCHMARK/1: SEC34897.73 TION CORNER(REBAR)COMMON TO SECTIONS 23,24,25 k 26 THRUST RESTRAINT CALCULATIONS- 6"OF 1 X*MINUS CRUSHED GRAVEL BASE COURSE 15"OF 6"MINUS UNCRUSHED SUB-BASE COURSE N E 50303.75 ELEV.=5023.28 MAIN NoflrzalNrAL BEND a 1TEE BRANW REsnNUNrm DEAD ENDS ,z ncAL oPPSEr n.25 F 11.25 225 45 90 B B ,2 AND'E" L L L TYPICAL STREET SECTION - 298 SBJ 12H JO.m N3.93 JJ.83 12215 95.85 NA NA NA NA NA NA QINTA� -BENCHMARK/2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 , ,B ,a.ss m. N 40219.4197.83 �. �. 24 ).J2 15.5932.M JB.JB 1.W 28.89 255.88 188.J5388.05224.21RB3. NA NA E 503 EAST OF SOUTH 2OTH AVENUE IC ELEV.=4939.18 "MRUST CALG,LATONS WERE BASED GN MRUST REBiRMIT DESIGN FOR DUCTILE IRON PIPE DFM EGTGN.2002.PUBMS11M BY ME DUCTILE IRON PIPE flESEANGI ASSoa nm.ALL R�SiRNNT LEN0M5 AAE IN FEET. NOT TO SCALE A E W -DATUM=NAVD 88 ('MINIMUM LENGM ro BE AESMNNED IN BOM OIAECnONB FRG.I DTTNG>b OEGPEE BENDS ALSO REWIAE CONgKIE MRUST BLOGC. �+ -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.8E <aMwlwuw LBEENM mu IE RE�TR�uNED IN oE.n�EH�D"s"Arl"ND FRw olriDq�REC�ilops-N-VUV�ES�-:N::-MRUST--AL50-IRm. an �TCENSF'O -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR/2 ELEVATION TO CONVERT TO COB DATUM. rog61R VMT l�IINOiH L i5 FF'O�R TIE UPPER PPPE FRGI ME BENo ME PIPE BPETMEQN ME BENDS SIIS TO BE ENTRELY�flESiRNNED.� MEII NO flESiRNNm JOINTS AflE NE[£SSNtY. AA Af SLf��I(AI. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. �, S6 CONFORMS TO CONSTRUCTION RECORDS -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. UTILITIES - OCTOBER, 2006 OR - DENOTES "AS-BUILT" CONDITION 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 W HIGH POINT ELEV=4997.00 W HIGH POINT STA=2+50 Q 0_ PIA STA=2+50 = Ld H PVI ELEV 4997.08 5010 A.D.=-1.00 5010 a 3 u m K= 50.00 F50.011),VC F Z W W p 0 W 2 Q Ld m m W V)> Z L� a o J $ a n a $ vi J rc o a a > 0_ Z Of � Z c m A a N+"I m n m ' y rcm rcn o m a N Q ~ 0 �I 5- K A .. < 6i O A M N 'SO Z n bq p m a $ .. o .. A Z'Ta A'Da ; a m Q z Z aND $ �qn Z JCC �w �c a pa 5 W m m w > W as as lda a o zvi N in 5000 o n n A A n ny n n A z o D 5000 U) H o Q D 'R.W N W a II FINISHE o. a o tl N W n w A II I>Iyy qA A Lil I II p W W W o old o L+l �q GRAD 0. R m c+l a L+l m r+ m r tl low n Ld Y DO Q -------- -------------- '+ m� e� n mt+ LLJ w� m w 0 50 _ ______ ________ - U oa MIN.6.5' v _ TR\_____ __ _ ____-_ � CO `EX.GRADE �/y��/' NEW 9'DIP WATER MAIN 2"BLUEBOA D RIGID (1) z8 ��� \`a+ 0 0 d INSULATION, NTERED 2"BL EBOARD RIGID 4990 INSULATI N,CENTEPPE 4990 OVER Q W lz a q + INmi a rc rc J rc rc rc rc rc j n and O1 j am � mmZ C.A.D. CMK 4980 DATE: 7/13/06 NN h z w4980a 1 REVISIONS:3/2a/o7A6 m Z J m m rc m Z j rc m rc rc w�a3z�� p in Dom'• C a a 6 6 Q < 6 < < a Q < < < < 6 6 < 6 Q < a N p Z N Q < Z II z z 0 z 3 3 m m� 3 0p "m S S I SD EO 00 N Ezzzz z 1 �, APPROVED BY: A z z z z z z z z z z Z Z z Z z z z z z z z = z m pUAEIIY ASSURANCE: 0 1 Il j B A N II II 1 II Il j A A I A A A A A II 1 II A A II II 1 A II Il j l ¢ Im: n o P'39 S ri n $ 1 a oVmi' $m+ + + + + + + + + r"•( Na m+ + O 4970 4970 m SEE SHEET m9 oS �$ n rm �$ a om EDWARDRO_WA mM �N mae mlz w c w 6 mN m6 wv ma v a FIFE: � PROJECT NOI 05021.0 SHEEP 48 OF 78 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 EX.FORK OF DITCH TOBE o 0 1 1 u, _ V ABANDONED I I 1 OPEN sPACE, N BLOCK 17 0 6'"MQE 1 I z BLAKE m REMOVE&DISPOSE / s \ 3003 SF N EWA� I 1 v of Ex.aARBN1RE FENCE BUILD BENCH AROUND I 1 � / \ HYDRANT TO\PROVIDE 5000 SF o m m / / \ I I I \ \ \ k \ ADEQUATE COVER <� `$F \ t EW= ' 3 Y w �` I:ss.fis I NEW HYDRANT 1 7 m \ \ NEW 43Y7 T / II G I I %�. 1 I N 36438.75 18 � 16 1¢ � N 36433,37 ,�Q z3 7 O A I\ 1 T I I E 49354.15 7053 SF 15 \ _ E 49fi3.23 .3 / 10 oFm I I a 5� II I I ARROW BOLT 7965 SF 1 5000 SF -------atROw'BOLr / 1 2 11 og'ay Pc \ C L 5000 SF \ 5000 SF �o �7846 SF u� m 1 I S 1 LEV.-5001.30 69 20, OO N \ ELEV.-5003.12 _ "v,-✓ 5000 SF 8197 SF \ I I --- 70.53' --- 50.00' of I :Y - ----- -- ------- - ------ - ---- so.00' _ So.00' __ o.00' 1 - Ml RRAv 8 zt 1 R 15' gage 992 _ L9�' / 9996 99.92 99-38\ 9902 `� \\ L= 7562 SF _ Weep rRn - � - e•oP WATER M,w _ _ I11 \ - - 5 88'S4'3]"E 2+00 BLAKE DRIVE MH,D, _ _ _3+GD _ MN,G2 - -� G ---- L-zss' a JPARK IlIII \ SCALE O W -� - 616.97' - 5+00 -- -BLOCK 15- ' ', - P6sAnSEWR _ -n-- _ P6R6W 5 ♦� (n ---- W 5"sDR 3 m _ f 23454 SIF 1�I PLAN 1" = 30' �+ - --_ - R 15 - -, -------- - N \ -- �- //- - 9 B o«A' ; PROFILE y 72s1 �- - --- -- - --- - �s96 9s.aa =23s6'_' HORIZ. 1" = 30' to 78.50 --- _ �s969 c VERT 1 = 5 W - N L-z5.oe o.00 - ------ - ------ o2:E �50.0 \� SAN SEWER MH 101 V`0.00' -- n 50.00' 0.00' 83.01' \ '�° \\\ \ Z RIM=4999.61 � -B OCK 1 -SAN SEWER MH 102 a T �/ \ N fmrooA \\ \ Q 3 Ir lJf� RIM=5000.73 N 7 i N II _ ww I INV. OUT(E)=90.61 �l0 5000 SF ¢ INV.IN(W)=89.51 6 3 Y $ o f C 2_z- N D I 1 7251 SF O- 5000 SIF �- 7000 SF = 2 0 \\\ 9 < -- 5900 SF INV.OUT E-as.31 3 5000 SF ., BLAKE I Z O 7570 SF *Rl 12 7515 SIF 5 o 9 y 5000 SF I.A y 8303 SF z \ vsrrI / NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. THRUST RESTRAINT CALCULATIONS- -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, D 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. INN HORIZONTA BEND D YmRT Tn5E m M 1.25 225 45 90 8 8 12 AND VALVESw L, V L, Lv L, -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A .sa s.sT T2.aa x.a5 a 1 .1 nA nA NA NA NA LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION 1z LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. 18 7.Tz 1a5B 5zas lax 1.ao za.ea BUSS z55.99 1ERI.15 x8.05 22A21 88D.28 NA NA -BENCHMARK/1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 -RUST CALLYILATONS WERE BASED ON THRUST RESTRAINT DESIGN FOR DUCTILE IRON PIPE,FIFIN EDITION,2m2,PUBIISNED BY TIE DUCTILE IRON PIPE RESEARCH ASS 014.ALL N 34697.73 RESIRNNT LENOTIS ARE IN I FE£f. E 50303.75 ."NIMUM LENOIH TO BE RESTRAINED IN BOTH OIRECTGNS FROM FITTING 90 DEGREE BENDS ALSO REWIRE CONCRETE THRUST BLOCN. MNN To BE RES-NED TO GREATER THAN 5 FEET.MINIMUM IENGTIi TO BE RESTRANED ON BRANCH SHOYM.CONCRETE THRUST BLOCI(ALSO REWIRED. ELEV.=5023.28 wMINIMUM LENGTH TO BE RESTRAINED FROM DEAD ENDS AND FROM BOTH DIRECTIONS FROM VALVES I9RESTRNNT LENGTI L,IS FOR THE LARGER PIPE IF TIE SIRNGHT RUN OF PIPE ON THE SHALL SIDE OF THE REDUCER EXCEEDS L,.THEN n0 RESIRNNEU JOINTS ARE NECESSARY. NTL.}Jd -BENCHMARK/2: WITNESS CORNER("MMCSSA'YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 MIRE-14T LENGTH L,IS FOR THE UPPER PIPE FROM THE BEND.THE PIPE BETWEEN THE BENDS IS TO BE ENTIRELY-NED. N' N 40219.41 E 5097.83 3 IC ELEV.=4939.18 -DATUM=NAVD 88 -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 4n �TCENSEO -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR/2 ELEVATION TO CONVERT TO COB DATUM. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. L.I..I Q w I-- HIGH POINT E EV-5001'02 a < HIGH POINT A-3+001.56Ce H PVI STA-3+00 Z PM ELEV 5001.15 0 3 W W A.D.--1.02 N> Z K-98.31 (n z }0 < O LLJ 5010 o J F N 100.0'VC n J m 5010 <0- Z ZZ Z� rom U of Ooi II N oo oo II Up7 Om In U7 Q Q W 22 pp�� wq wW MI f- O, r 2 N 5 Z J w a II II II II 1 1 5 W U iti Iiia 5 B B II II �Iw �a V/ H� Q m FINISHED GI a `m"I>Iyy g I>Iyy 1 1 II II Y 0 N L�L1 m + + GRADE m E9 tl a LI.I N O Q 0.1 -. R J fib +w +w Ld w� m 5000 _ 5000 >z --- -------- -------- -------- ---------------------- _ _ -------- -------- _ U 00< e MIN.6.5' __-_ _ CO R EX.GRADE q� 0 Or NEW 8'DI WATER MAIN 0 Q Ld >F � i 4990 4990 5 J g m !Y YS 8 Yi LY YS YJ Yi ; Y! LY YS Yt Yi �i �i m� CAA. CMK 1rc1Y w w m �, W II 7/13/O6 I Q N VI ID N w w N 41 < 41 N N UI 41 10 N I OO V y DATE: w sI µ, Pp; Wk' m II II 3/28/07A m m n a a a Q Q Nma3v: RENSIONS: a < < < a a a <. < < a u > N 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 > m II Q - 4980 4980 3 n w n W' W q W N W M W w W N b Wb W m W H W M N W O W W W O m m ¢��Z_Z eD��11 z� Z� Z� W WW z p1 Zq Z� Z Z W Z W Z W Z Zq W Z WW Zq Z W Z W Z W Zq Z W Z W W Z": Z� P"""'"�' c 1 �a a a a ♦ a ♦ a ♦ ♦ <♦ ♦ a ♦ ♦ ♦ a a a ����0y a II a l p 1>1 II II 1 1 1 1 1 1 II I 1 1 II II 1 1 II II 1 ">II II II 1 1 1 1 II II II II 1 1 1 1 1 O a O p QVI1M11 ASSURANCE: �> .i > ai wi ai }}� M z .z mz z gz oz gz wz �z z !i K 14 nz w}z }_oz_ }z }z gz z I 69 O z O 3'hD O PhD O YD ±Y0 ± ±,0 N 1h0 N 40 N QO A to m A v. MI.0 M EO M <EO Y u0 b u0 u0 2 2 If N "CONFORMS TO CONSTRUCTION RECORDS" SEE SHEET UTILITIES OCTOBER, 2006 "$ FIEF: BLAKE-PRO_WA a PROJECT NO.eoz 05021.0 's 0+00 1+00 2+00 3+00 4+00 5+00 6+00 SHEEI 49 OF 78 _____ ' a _ __ - REMOVE&DISPOSEOF EX. - BAR - /I V -x-�0<_� x rl x x FENCE \\i i p� \\ �xx _ X��REMOVE&DISPOSE x 0 = - x x x -x 'x x x x o = OF EX.BARBWIRE N % / 15 " x x x x -r h FENCE •- NICOL �^ // / S000 sF." 14 BLOCK 18 x�� x x� �- 1 1 8307 SF 8 1 N NEW HYDRANT SOOB SF ) REMOVE&DISPOSE m 31 O 5950 SF I� / / w m N 36174.00 BUILD BENCH AROUND EW HYDRANZ �"w / I FFENCE.BARBWIRE <zmzf / EX.BARBWII H E"49601.76 HYDRANT TO PROVIDE � � � / x ARROW BOLT ADEQUATE COVER ) '1� FEN %141MV O1$ 1 7 3 ELEV.-5007.60 13 K _ D /9362.2�T \ --1'6 �"3 ro 11 `O�a G \15.5' RROW BOLT 7277 SF 6125 SF - 6125 SF- o /5000 SF 1Z \ 6000 SF Z sss0 .� U V.35005.35 \ � '_`ut� 600 g w o � R-15' -- 720Y\ 61.25 \ 61.25' L=23.35' - ------- Ea --rs - rc--- 7c- - ----- - -� - -- ---- -- --- -- -- 3P 4.62 50.00' NENW BB'GIDRP 3W5ATER PAINH s EER6-M0a.-00' ----�\ Via•, io=,Ot�zO Ni,lD ANO���2' \ fA o -BLOCK'15 3.7' 00 O1Z Ssos SF I' N NI_OLE 021 SCALE W PARK PLAN 1" 30'p CR "+N -� ------- -- -- R-,5 23\454 SF v PROFILE C 3:. �:lc / -'=�- --- =s - =62 \y- ------ -- ----- -- -- -- _ LTc- - =1 z \ HORIZ. 1" 30' -- EA o� N R115• 76.01 - ---- -- 65.00'- - 65.00' m so. - ------------ -=- -- ------ - _- ---- ... DETENT�fy 1 ° O z 3s3 � � VERT '/� � 0 L-23.7Y SAN SEWER 50.00 s3.00' s3.00' - ------ ------ --- PvUm\POND 10 H W N m i MH 103 SAN SEWER MW104 13 1 RIM=500a.15 v 3 B OCK Y RIM=$004.67 % / 7 Np l ){ - m>o u C INV. OUT(E)=94.15 Z 3 1n J z 4 INV.IN(,W)=93.08 6 8 m °+ ro 6893 SF / m 7532 SF 3 3 I - / NICOLE i w w ti Z ..6500 SF 6500 SF N 5000 SF \\Nj o/IaY(E)=sz.ee 6300 SF .J / 6300 SF 6300 SF 9 C o I / ` 50 0 SF / 8885 SF STA.8+81.1s��� N STORM DRAINm,� .-/ / INLET Z2(TYPE II) 1 \ N/ x TC=5003 (RIM-3 \ \ INV.IN(sW)=0.a6 INV.OUT(NE)=0.46 \. , NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, THRUST RESTRAINT CALCULATIONS- 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. REDUCE To NNN NORIZgITAL BEND -BRANCH RESIRAINTLB DEAD ENDS 12 TCAL OFFSET 11.25 -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A M 5 e lz AND vALwsP1 , LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION a z9B s.9T 1zu 3ao3 4J.93 )J.93 1221s 9SBs NA NA NA NA NA NA 0.20 &IB 1T.86 {28{ 29.5) 82.82 11 a.T8 1J8.85 NA NA T25J 108.OT IL- NA LAYOUT AND STAKING TECHNIQUES AS ARE REWIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. 1 za a.1 -BENCHMARK/1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 N 34897.73 'THRUST CALCULATONS W BASED ON T WR T REIM-T DESIGN FOR DUCTLE IRON RPE RM EDITON.2002.PUBLISHED BY T E DUCTLE IRON RPE RESEMLN ASSOCIATON.ALL E 50303.75 R�SIRAINT LENoT$ARE IN FEET. I'MINIMUM LENCTI TO BE RESIflIJNEO IN BOTI OIflECTMS fAW FlTTNC.90 DE_BENDS ALSO flEM CONCRETE TIRUST BLOCK ELEV.=5023.28 wMAIN lb BE flESTiAINEO lO(AEAIER TIM 5 FEET.MINIMUM LENGTI 1O BE flESiRAINED ON BRMCH SHOWN.CONCRETE TIRUST BLOCK ALSO REWIRED. 1nMINIMUM LENCTI TO BE RE- NEO_OM DEAD ENDS AND FROM BOTi DIM ME FltOM VALVES. - „®QS�TL}f� -BENCHMARK 2: WITNESS CORNER MMCSSA'YELLOW CAPPED REBAR TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 flEsmuNT LENciH L,IS f01t TIE LARGER PIPE.IF TK 51RAlGHT RUN aF RPE ON T E 83AALL 9DE OF T1E REDUCER E%CEEDS V.TiEN NO RESTRAINED JOINTS ME NECE95MY. N 40219.41 (s ) RESTRAINT LENCM Li IS f01t TIE UPPER PIPE FRW T E KENO.TIE PIPE BETWEEN TIE BENDS IS iD BE ENTRELY RESTRAINED. E 50397.83 IC ELEV.=4939.18 -DATUM=NAVD 88 -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 an �ICENSF-0 -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR/2 ELEVATION TO CONVERT TO COB DATUM. SS�ONAI -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 0+00 1+00 2+00 3+00 4+00 5+00 6+00 LL1 W Q HIGH POINT ELEV=5005.29 = ILd HIGH POINT SSTA A=2+49.47 a 3 5020 PM ELEV 5005.35 2+50 Ce 5020 � A.D._-1.02 Z W Z K= 48,94 0 W W Q J_ 50.0'VC rc V)O Q LL_ p LLJ N n N N N E3 N m O < Q p a Q m m + p O + N7 + 0i` J K Z Z Z Z K m Y N /yam W Q- L`rlq c Uri Uri II B •• g Mg $ 7i UM N N< Z JJ 5010 0 8 N , D, .. F II D N D ry 5010 (/) w o o 0 Q II II II II S m N w 1 1 II II N a UJ m LLJ LL Z .. nW a o. 5 m� �' Y Ofp N H II A 1 �� a 5 O> B W n W n w n IM FINISHED o. Mi W II II A I LLJ V)H p Q GRADE +c+'+c+I N W LIJ m O + + nmu IIof'y o w f >Z m L+ U O Q 1.04X Of -------- ----- -- - EX.GRADE Oq ------- O_ 5l ------- -------MIN.6.5' O O CO R 0 5000 5000 Q W J u 1 1 J ~ � - u) J z z j i ? S CA.D. CMK 4990 iJ iJ W w w o m W W W z W �r 1 7/13/06 4990 DATE: G 1n w. w. M RENSIONS: 3/28/07AB 3 s sN a1 A II;,' a1 aII NII mII YaIIi II `Z1 B II m>;' II n1 B 6II II m1 mII mW1 M'nHII� e000NII IL�F1. zO APPROVED BY:3z s zs lz z z w QUALY ASSURA NCE: CI nam o G p IF 4980 ni A, < < < N N -Zzz 4980 (.J SEE SHEET e n �� $ m ,� �� g �� "CONFORMS TO CONSTRUCTION RECORDS" Fly;NICOLE�RO_WA ^'r1 r) u) �Mi u) EMI o< �< '"n rl M f'rl s 3g UTILITIES - OCTOBERA 2006 PROJECT NO.:BOZ 05021.0 0+00 1+00 2+00 3+00 4+00 5+00 6+00 SHEEP 50 OF 78 If I I I I 2 11 7.22 TOP OF POND 350 A WATER LEVEL=.ND5 BOTTOM OF POND=200 I REQUIRED STORAGES =3994 OF STORAGE SHOWN I 1 9=4380 OF i DETENTIO / �L103 ` 16 �� - - (a:1 s1D�4LOPEs,SEE / / o - SAN SEWER MH 105 „ ��- / �� ` RIM soossa BL0 07 DETAIL,} POND 7 / I I `/ 6984 SF N D �, �� ,� - m / Irc �__ \ INV.IN(W)=97.08 a0=/-\ K ' E / N?/ om� N las -�� ` INV.IN(S)=97.08 em' �\ ' C o v s3 y N N I 1 I ` INV.OUT(E)=96-88 EX.STORM I m I I \ RI 15 z •I 1 T om. 15 _ m 13�s �� DRAIN I ` f' N 18 - �7 15 6300 SF u Ex.te•n 2000 PVC MH U '° I I EX.STREET -BLOCK 1 5- ~w p ' s a 1 1 6500 $FT, 5000 SF1D mwc, 6300 SF �� ro � STORM DR IN MAIN RIM= / I I NAME/STOP N =� I £ I 7393 SF 6500 SF / .0 $ I v 6299 SF Q ` 5007.80 2504' SIGN 105.06' 14 / 18' FLARED INV.OUT I� -------- ----- _= 107.8Y LANCE I I �\ / 0 END SECTION •- 73.23' 5000 SF I (Nw)=4.2 I EA= --Tc= ---- Tc---- - I 9= ------- - -------- 85-00- ------ 85.00'_-` ---50.00' --- -- / - ---- ---------- -- ------ _ N 35yfj4.81 O ].z] - r - -- - - - ____ 0.S .�. rza i', _ -5 _ 63.00' -rt 972.65 CEI s.3a s.sz I - L9 14 9 as -re -- 55.61' ].89 1E INV.=2.00 y • � _ _ I 9 ----- ,�\ -----� ---------- -- ---� � 26 LF 12"STORM __- � R=15 rE _ uj rc DRAIN 0 0.5% I s sa 3] E --2 _ n9sa � oo' s+o -23.35 ANCE DRI E 9 n NEW e•aP WATER yaN - C " �- CARP T,'ROVM�-�- 5 88'S43]'E• - 9 61 ul I D aIN, STQHM ---LANCE DRIVE ap�wnRP-� 6.DD o /DRAIN�059 ----- s+Do x R=15' ' � �Dp 2 wARP ' - o R- __ 3]' _ a+oo N nN o H ID - / - / - L I /1 X. 10+76.9 IN I / 6` a m a n -_-_- e.a2 --a_s3a_ s as Tc I _1 - - ul -- --___ __ -- L=23.55 L=23.5T Lu EX.STORM DRAIN / / - -- --- _____ --- 1w .s- .' INLET U3(TYPE II) STA 0+28.5 __ -_ gym¢ - 9.eI >"' --_-- TC=5008.1 7 f IEX.NLET STORM DRAIN 111.63' SAN SE WE MH 85 c 1 ---------------------------- NQ-� #M-5009.56 9 I NEW HYDRANT 121.53' ------ ---- I - ------------_ -_ NV.OUT(NE .6 R-45 R 5008.07 V INS-99.76 r.ei N 03 49360.53 121.5'�� NEW HYDRANT - ------------ C RIM=7.� F� I I INLET U2(TYPE II) 7345 $F �j I N 35858.58 Tc- DR 109.86' 71.69' 24 LE 1'2' STOR I L=22�09'INV.OUT(NE)-4.57-B LOCK m o o / ()- 9.9z `I o I ARROW BOLT - C y7 \� ]_os NICE -_-_ - 0 I o J�" ENV.OUT(E)-99.s6 I : I BLOCK 2 1- `E 49608.0 I I Z DRAIN®0.5 K I I o o ARROW BOLT w -}- M Tn_ ELEV.5011.84 TA, 10+ea.7o Ex.HmRaNr 9921 \ ELEV.-50o9s7 w I 17039 I I X. STORM DRAT -BLOC 20- / LET U1(TYPE I) II m %, 76 N SF a I �' \ 7442 SF008. 1 °,I/ 2 - SF ff AA v �1 1 �> y lP 18 V I 3 i RIM=7. i I ^ x / INV.O T Q/ / $ \ \ UT.5'WIDE \) � � I I �� _ � I 7457 SF \ \ I I I I DEWALK B2849 SF 7.5"OWNERS) - / / T, 2, 0. - // I I ` 50pe o Pt I m Tc�, Lin �(TYR.) NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO SCALE THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, PLAN 1" = 30' CALL AL TELEPHONE Y &TELEVISION) MAY EXCAVATION BEOSTRAIGHT E%ACT LO R AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO PROFILE THRUST RESTRAINT CALCULATIONS+ -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE 1MTFi MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS STH EDITION,MARCH, MAIN HIXiIZONTAL BEND /TEE BRANCH �12 OFTSET 11.25�To HORIZ. 1" = 30' ran RESTRAINT. 8 VERRCN. 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. in 11.z5 zz.s as 90 j" AND DEAD ENDS vuVESR L L L VERT. 1" = 5' -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A 12 .e a 16 I 5.42 10.94 2279 1 14.58 51.41 LOT. 17).a9 75.3a 100.94 129.a8 25&47 NA LAND SURVEYOR LICENSED IN THE STATE OF M AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED N CONSTRUCTION a t z.ae a. t. t zz4.zt ee 9 N LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED 7-BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -BENCHMARK gt: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 RESRAT LENGTHS NS FIRE BASED ON THRUST RESTRAINT DE9GN FOR DU-IRON PIPE,FIFTH E-ON.2002,PUBLISHED BY TIE CUT MOON PP ARC E RESEH ASSOgATON.ALL - ,.®ONTA N 34897.73 GIMINIMUM LENGTH TD BE RESTRAINED IN BOTH DIRECRONS FROM FIT11NG.SO DEGREE BENDS A-)REWIRE CONCRETE THRUST BLOCK. A N A mMAIN TO BE RESTRAINED TO GREATER THAN 5 FEET.MINIMUM LENGTH TO BE RESTRAINED ON BRANCH SHOMN.CONCRETE THRUST BLOCK a REWIRED. 31 Td E 50303.75 M INIMUM LENGTH TO BE RESTRAINED FROM DEAD ENDS AND FROM BOTH DIRECRONS FROM!VALVES. IC ELEV.=5023.28 WRESRNNT LENGTH L�IS FOR THE UPPER PIK FRgA THE BEND.THE PIPE BETMEIIi THE BENDS I IS I'DR THE-PIPE.IF THE SNAWT RUN OF PIPE ON�SMAU­ S TO BE EN RELYYRRESRaINED.DS U.THEN NO RFSRaNEO JOII15 ARE NECESSARY. -BENCHMARK#2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 A E N 40219.41 6n 410EN.S ELEV397.83 4939.18 "CONFORMS TO CONSTRUCTION RECORDS" -DATUMN NAAR88 UTILITIES - OCTOBER, 2006 -COB BENCHMARK/1110(ARROW BOLA ON HYDRANT)ELEVATION=CONVERT 6 0 R - DENOTES "AS-BUILT" CONDITION -SUBTRACT 19.45 FEET FROM BENCHMARK#1 OR N2 ELEVATION TO CONVERT TO COB DATUM. -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. X -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 2+00 1 on 4 00 5 00 6 00 7+00 > L.I..I PM STA=5+25 (n PVI ELEV=5007.50 Q O o A.D.-0.92 = uj H O K-54.48 + 5020 <5020 < w o: n rc 50.00 VCD. (n w ro D. (�p m K N K N N D,N C N m 2 ~ Q a o < r + o N $ C�U�oI �i 0oi �Omii �°' o°' $ O �p a O 3w Z O m M l 'n 1 Q VOi " O LL LL 1 1 O O M C V I LLJ Z LJ-L O oN m ?r cz mn > n II In> O> F w N �^ mN OH 'oo w'uwi av�i min " dcoi,n w 1R " n� n� o nw r°¢w " Iri .. rri n i0� �' rcq < Z a-O II II II II 1 1 II q II 31I a 5 II p S + +w �> + + 4 d m > LT 4� m8r FQa � O O t3I II N CV N 1 CiIIn 6,n Q Z � Z + �w nw u nz vow FINISH + 1 o w "'R q GR DE "� c> II n 1 1 DO< Q O 5010 +J o� o�4 a 5010 y z oc� 1.1 0.7 +� +c+I mail N w W O Of 0 W E CL GRADE \� \ _ _---- ----- -------- -------- -0. -_ N O Q �w `t ---- J _-__ ----- -------- -------- H <1 ----- -------- ----------- COVER 1.7 TAPER BACK EX.GRADE O Z O TO EXISTING NEW 8"DIP WATER MAIN //l� INV.IN(SE)=4.47 V O< LLI _ INV.IN(SW)=4.49 EX.8"WA R MAIN a U INV IN(SE)=4.59 --� - Z O < 5000 ---- - 5000 0 ~ J INV. M Q "ANEERW 8'SAN 1 1 1 Q w II 1 1 1 SEW 1 C e > G 3 1 1 1 a III i III 'z N vi ILO N F F NNII?O F J � j j•i"n < rom gl » I"w ii W. W. i' CMK C.A.D.-4990 N N 7/13/os4990 N RNSIONS: 3/28/07A BW € _ > 3 3 � i"' m x eo m +�'z'z'z m II _ z APPROVED BY: B 6 1 1 n n> n n n 1 1 n 1 1 n n OUALRY ASSURANCE: 26 a a a�D 'r m m n Ii> 1. n Ii> m m + R r°I n "rl + +IM + + +� + + + + + + + + + 4980 O " M " " 4980 a o " o pp In tp ��pp ID ttpp m m M m SEE SHEET gg 0 ggM ggm gg ggO gYf gg< N ggin gm �n M gg m t0 y(M FlEE:LANCE-PRO_WA a PROJECT NO.:Bo2 05021.0 s 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 SHEET 51 Of 78 \\� 80913 SF SAN SEWER 93 RIM=5004.8 - / INV.IN(SE) 95106 JL\ \ INV.IN(S 95106 rr 10 \\ \ \ V.OUT()=94)8 EW H NT/ 105 -BIT OCK 19- ��� s,8666 SF L=23.5T E 359 / /{ �� ` )6.88 \ !00� m, i a2 a. ARROW / / `,�•'' ■ E )7.08 0. 0 9! )7.08 Sa I 36.88 i F,�C-C• 'I OEE�PJ 15 ice/ /a e- � V /ODD 13 12- 11 s. 54a ,5; / i W it 6300 SF -6300 SF g 6299 SF TC_ /\ // / ����• ` / W. TC= / fl- � 5�/ •s \ 9�ryy E � � F O ; _ 83.00' __ -63.00, __ 55.61' 7.40 --59.59 c \ s .w W E 7T00 2113J' _ Sij00 p_S'58�59•Rz150.° •5�. - .f P� ;�Sly ,E6 ` SETBACK �, uj N L=23.5T 5.53� ssa '• ���� 84836 SIF •. .r - x---------------------------- ''w6 REMOVE / / �, � SCALE -� ___ _ --- ----_ -'toQ• \ / oo PLAN 1" = 30' Oft EX. DISPOSE �! C ------ 109.86'- - ------------------ SAN SEWER MH ION FENCE EW- ,� PROFILE 0 NICE 71.89' RIM=5005.46 -------- _________ INV.IN(W)=95.88 103 LF NEW DEAL 24"ARCH } - 29 _ �_ -} \ INV.OUT(NE)=95.6 RCP(18"$28 kl EACH1 �a F'IORIZ' f 1" = 3O' fq N 17039 SF I CULVERT VATH FETS n.10+ 2112- VERT. 1" = 5' y-BLOCF�20- INV. (SW)=2.89 STORM bRAI A 2 \ 1 INV.OUT(NE) 1.34 L T Xl Yos.II lEWALR 1 N 35865 J IR =547-5005-w 12849 SF E 50022 j K 5'WIDE /IN OU( )-/y,/17(BY I �/ / /l SAN SEWER 7.51"OWNERS) + /`� / // /`RIM=5006.37 > INV//OUT(NW)=97.37 - - - / �RE,A/OVE OSE \>) &DISP 0 P = OR - DENOTES "AS-BUILT" CONDITION �0NTAp� X I A E � Gn 410ENSF-0 SS�ONAI E�. NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REWIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. > -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. LI..I -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A V) LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION Q LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. uj 5020 5020 -BENCHMARK I/1: SE TION CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26 34897.73 a Q Q E 50303.75 �'0 W ELEV.-5023.28 D:I-- -BENCHMARK g2: WITNESS CORNER("MMCSSA"YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 Z L W 00 N 40219.41 0 W Q J E 503997 83 (n j Z L� n J F w ELEV.=4939.18 V] O o m rc o N -DATUM=NAVD 88 �_ Q d Z a N II m m -COB BENCHMARK/I1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 F- O w -SUBTRACT 19.45 FEET FROM BENCHMARK g1 OR#2 ELEVATION TO CONVERT TO COB DATUM. 0 Z Z Z Lip ai w m m g -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. m N Q Z J Q 5010 K U) w> a a �'a II II -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. (n I_0 Q W J m w w E E - W Li O j m� n> LLI W �> Of Ld FINISHED +w +ry m c w Y p 0 � - m N ------ q GRADE +w 3Ly w N F- Q p -1.6% LI..I W� m W SC �EX.GRADE O�L - O Q Z Of Q m IN IN.6.5' COVER a NEW DIP THRUST RESTRAINT CALCULATIONS- Q rO 5000 RDUDE o 0 MAIN HORIZONTAL KENO E TEE BRANCH RESTRAINT- DEAD ENDS 12 8 nCa.OFFSET a' F 6 8 12 ANO VALVES- < NA W ta I gm I 1.BB 42.04 I J I B 9I 114.L 11 NA NA 108.0 1­1 1 A 8 24 1 1.11 1—,1 32.46 I JB.J6 I 1.00 1 26.89 1 90.58 1 25566 18&JB 386.08 224.21 683.29 NA NA -THRUST CALCIILATONS RERE BASED ON THRUST RE MNT DESIGN FOR DUCTILE IRON PIPE n M EDITON.2002 MSUSNED BY ME DUCTILE IRON PIPE RESEARCX ASSOCIATON.E IN ALL 7 �1MIN MUM LENCMSTO BE RESIRNNFD IN BOTH gRECTMS FROM FITTING.BO OECNEE BENDS ALSO REW"E CONCRETE THRUST BLOq(. -MAIN TO BE RESRMNED m GREATER MAN S FEET.MINIMUM LENGTH TO BE RESTRAINED ON BRANCX SNOAN.CONCRETE THRUST BLOCK ALSO REWIRED. !; J J LnMINIMUM LENGTH TO BE RESTRAINED FRpA DEAD ENDS AND FROM BOTH gRECTONS FRpA VALVES 33 1"IflESTRNNT LENGTH L,IS FOR ME LARGER PIPE.IF ME S_ONT RUN OF PIPE ON ME SMPll 4DE OF ME flEDUCER E%C®S L:.MEN NO RESTRAINED JpN15 ARE NECESSARY. J J J F m m WflESTRNNT LENGTH L,IS FOR ME UPPER PIPE fROM iLIE BEND.THE PIPE BEIY,EEq ME BENDS IS ib BE ENTRELY flESTRNNED. P v m A 4990 I I "' I 4990 C.A.D. CMK DATE: 7/13/06 m m m N w�NNN� RENSIONS: 3/28/07AB Ali N 6nzzo m ao m m <+E»> _ Ili_ _ _Im _ _ ---- APPROVED BY: E II E II E II II E DUALITY ASSURANCE: SO E + o IF4980 m m - - 4980 R M = m m "CONFORMS TO CONSTRUCTION RECORDS" ) SEE SHEET q � g $ FlLE;LANCE_PRO_WA 3 UTILITIES - OCTOBER, 2006 7+00 8+00 9+00 10+00 PROJECT SHEEP 52 OFF O i.0 os78- SAN /// � I I I \ \ gp#z•` I o �/ �/I II_-_ I I63a 21 6�3 9 RIM=5S0EWE.R3 0 MH 81sINoVo.e.o4BLOC INV.ouT(N)=8.30 1 \ \ \ C N I soo9.75 15" 2 8539 SF a u, w -- REMovE&DlsaosE D i� �< 81 I p v n OF EX. REWIRE o F" _ m 1 / III N _ 1 W m y __ a o q / __ FENCE f' N / / II)I N �� -BLOCK 21- '�i� \� I N -�OC K 2� z, '�''' Q 0 IR=15' I EX.HYDRANT ,� -$LOCK 22 nl = NEW HYDRANT 10 'l'30 \ 9 cn s I // 9670 SIF '-} STA. V I EX.STREET I I 9 3 �az I I .� n L I25.05' - / 80.17 \ Tc= //I I NAME/STOW' ----__- 11 9241 SF _ N 9349.62 8009 SF 0 80018 SIF I m I c= y N 3 HYDRANT 5 INLET Y m aq - 132.79' 143. s I\ _ \ Ps.ls I ,01 s.9q' �° E 49632002 ��I 9876 SF 1 -- --- -- BREE q I � ]`B Af1RaW BOLT Z ------ -- ----- --------------- I I ELEV_501$59 111.22' E Ix c= 8 ARROW BOLT INV.I I Po> s96- - -- TF ----- -- ------ -------- ------ - ---------------- _ ,,,.zz BRE 63 6.I� / ELEv.son.9, 96.8, / C o -- Is,I Iss9 ns I ------ \------ E so ----------- 90.73' INV.OU 0 / rn s_ - = c ------ ---------- sl - ----- ------ ---- ---- BREE LANE R-, R__15, 0 _): (D ---- 3 L-23.58' as.tt .. =3.57' R-15 � 88'S8'O6"E i 3+00 00 NEW B'qP WA1ER..Mo L=23.56' \E \ � / - 190.69 PARK R=,s 5" - BREE E +DO e 62 RE _ 1++00 - L 23.Ss• °"� - ' B E LANE MaH+rD 6B8VbX E C TC-- - LANE x 48209 SF - Tc_ 09 I N - -s ,' I m I6.1 a 75.02' - - A -_S6,a2 __ � 16.96 = '�� 16.63 _c . u.uu N 70.00• ---o Y Z I` ¢3 SAN SEWER MH 109 y°+/ \ STO o N J f \ / \ \ 70.00• ¢0 71.50• W 0.0 IN SE 6 R MH / REMOVE&DISPOSE - --- - R MS5 1 64MH'110 INLETATC C 0 -BLOCK 23- v 3 Z O ° 9002 SF I x / 'w p \ O / OF EX.BARBMI E INv.OUT W=17.51 f -BLOCK 23- 1° 9 o ;N °D1(N,=6.8' FENCE � INV.GUT \ so,>_ PEIXk _Baoo SF ___ Baoo sF 8 7 6 5 4 �REA 8820 SF \ ; -- 8400 SF 8400 SF 8400 SF 8400 SF 8580 SF \ 3600 SF -BLOCK 23- / 2 3 8760...SF 11182 5F NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO O THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REWIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WIT,MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5Ti EDITION,MARCH, THRUST RESTRAINT CALCULATIONS• 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. flEWCE O -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A MAN NofllzallrAL BEND a ,TEE gtANgl RESTRANToI DEAD EN05 , ncAL aFFSET tl.zs LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION M B e M AID vALV - a LAYOUT AND STAKING TECHNIWES AS ARE REWIRED BY THE SPECIFlC TYPE OF WORK BEING PERFORMED. a.zD a,e n.B6 {ze{ zB.s� Bz.ez tt{.)B tx.es NA NA TzsD toaw tIN NA 1 1{. 1 8{128.18 4 N A -BENCHMARK/1: SECTION 7CORNER(REBAR)COMMON TO SECTIONS 23,24,25&26IN 24 a I.73 SCALE E 50303.75 •MRUST CALCULAT04E HERE BASED ON THRUST RESMANT DESIGN FOR DUCTLE IRON RPE R M EDITOR,20M.PUBM.M BY ME DUCTLE IRON RPE RESEARgI AS ATION.Al PLAN 1" = 30' ELEV.-5023.28 IN Al IENCMS ME"FEEr. MINIMUM IFNCM io BE REBMANEO IN BOM OIRECTONS FRoM FliTING W OEGREE BENDS AL50 REWIRE CONCPEIE MRUST BLOCK. IN TO BE PESMANEO 10 GREATER MAN 8 FEET.MINIMUM LENCM To BE.SMANED qi BRANCH SHOWN.CONCPEIE MRUST BLOCK ALSO REWIRED. PROFILE -MINgUM LENCM To BE flE51RANE0 FROM DEAD ENDS AID FROM BOM gRECT0115 FROM VALVEB. -BENCHMARK/2: WITNESS CORNER('MMCSSA'YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13.14.23&24 <ORE5IRANT IENCM LI IS Fqt ME IARGER PIPE.IF ME SMAGHT RUN OF RPE ON ME AAALL SIDE OF ME REDUCER EXCEE05 V.MEN NO RE5IRANEO JpN15 ARE NECESSARY. - ON TA N 40219.41 .RESiRANT IENCM L,IS F.ME UPPER PIPE FlmM ME BENo.ME PIPE BETWEEN ME BENDS IS 10 BE ENTRELY RESMANED. H ORI Z. : 1" = 30' E 50397.83 ELEV.=4939.18 VERT. 1" = 5' IC -DATUM=NAVD 88 -COB BENCHMARK#1110(ARROW BOLT ON HYDRANT)ELEVATION=4903.86 -SUBTRACT 19.45 FEET FROM BENCHMARK#1 OR/2 ELEVATION TO CONVERT TO COB DATUM. an 410EN5EO ' F� -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB's WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. -ONAI -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 1+00 2+00 +,00 4 00 5 00 6 00 7+00 W V) = w O 5030 5030 W ¢ + z 3 Ce W Q O w2 Q j Z OU W p o ¢ 00 3� Tie z mJ� it w �n �� rc� N m � �� H �~ U-2 U?^ ] Qm UGp (iI IA no m N JM H 0 O H N m; Q Z 0 0 "' 6 U" m ID 1 UN m W 1 1 II ^II I N LL H O Z Z Q II A 1 3:1 II 1 3 1 5 IQi o.,Qi m ¢ ¢ + 5020 N M�w a=w "w W n' 5020 0< z J o o w r 'z� 6 z� NISHED '+ yy n> 1>>>>y N 0_ MUW M M UW +� �� Mtil N� J r� V/ LLj F ¢ o w o Id o mc+I + +Wm� GRADE �I Ell �ej ----- mL+I rjI + ,.129 ----- - -------- -------- Y ,0 N t~iI -- -o. -- W N� m ¢w MIN.6.5 ------ ---- --- - - N Q Q Q sf EX. GRADE EX.GRADE•q, COVER Q O Q _J W NEW 8"DIP WATER MAIN O d Ld Of 5010 EX. WATER MAIN 5010 U O o m W 0 O Q INV. 500Y.1 W O N z 8 U W a a m n y ` Ir rc rc rc i Jrc rc rc rci J JO oo ¢ m rc O i wi 5000 W g " " " �oM� g " 5000 �N U CA.D. CMK W w H I w I < y w. w I .II II m I y Z p DATE: 7/13/06 5 5 or O RENSIONS: 3/28/07AB € Ix u' w 16 1u m oo to m a+x»z M • I z I I - e0 x I w z _ z z z z z Z wz z L" z I- W APPROVED BY: M a Y < n m MR ASSURANCE: ip IA to M m m m r N r 1;. µµ m m ill N r n N N m M //N J r m `a� m V A 4990 M+� + + + + + + + + + $� $ + m ' m "� 4990 � ~ 03 Osi O N N M M M M L O m N M m M m M m M m M m M m M SEE SHEET ma nEp n0 mM om mm ml� nm -N Iq 11 nm �N mpm u^ �n mn m^ e^ e^ n SCAM "$ '�$ "$ "$ '�$ "$ " $ "$ "$ "$ "$ Z FILE: BREE�RO_WA s N OU PROJECT NO B02 05021.0 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 - SHEEP 53 OF 78 "p INV.OJT(NE 5.5 T= ' I INV I . \ \ \ \x � \ / 5.5 / \ \ \ _ 5008.04 \ PARK ao 500882 14- �111:23 INV= V� I I / 13235 SF \ x \ 9.75 / T4= 6 \\ 15"FLARED ENDi DETENTIOf��� r1 I N ;`„ 3 q�q - ��N 35295.23 POND 9 v II I ��- - 0 10258 SF I N i/ \ e E(LEV.=11.50 N 35300.65\ m +\ I 2 I C ,4ss n I > 4 77 LF 12" E 49945.3 T �I / ,'F Tc- I -I ' r - OCK 2b-_� PVC®2.27% I I z o ��� o \ w D� I STA. e+ 4.aa �9 y / 9670 SF STORM�DPAIN 109 LF�W DUAL 24•ABCTN-\ I o / BREE N p .� V rc= y,NEW HYDRANT °JI 5 INLET Y2 T�PE II RCP X28-Y!EACH I 'S / o= ( ) (y8 ) �� NEVI 35282�9 O o - INV= w 8 SF fi rs.ls I I s.9c) g N 49632.08 9876 SF TC-50\5.38 CULV7=RT VATH FETS �\ /1.< \ BREE E ROW BOLT 1 RIM-1 88 ETBACK INV.IN(SW)=12.19 2 4998.88 \ Ix c- 8 Tc- ARROW BOLT J -_ - w E 5W BOLT L li6'] - 6'q ELEV.5017.91 g8,81' I 90.73' INV. OUTINV (N)=11.74, 84836 SF INV.OUT(NE)=11.02 _ --i V.ARR�0 6�72 I> 8' 0 I I 109.25' 6. '/ / 54.12' "'. 16,s -- ,o f 41.71' as, 76 sss Tl- R L c Is.DD o C la R-1 R 15 _ I'^ L-23."REEL 6' L 23.56 -- \ 28 LF 12'STOP so,]- �a - ) 6+00 x DRAIN 6 0.86% - 15•\m �(TYP. � 7+I0 NEW a•DIP WATER MAIN L-23.55 \o 4 --- Q BREE LANE ""109 - Ma E 'O6 E _ 9 6Q _ 9.49 66 00 3 / 29 LF 12"STORM 13130_$F DRAIN®0.50% EW - i BREE LANE �f I T� a 16.96 .- h; lb.fi3 ill EW_ i <= 5,4 W L M \ 30.0 _-- - 73.50' / // -- 73.00' x \ 94.48' STA 8+84.44 Ew- STORM DRAIN 69.72' N 9883.9 8. 4, in - - 6.25 SAN SEWER MH 109 g`O I E 49883.97 / 54.25 83.49' 15.8T C \ RIM=5018.32 �'' �/( SkN SEWER MH 110 INLET Y1 (TYPE II) \ a "^ SCALE 0 INV.IN(E)-7.04 REMOVE&DISPOSE RI 5015.61 TC=5015.38 s J U,n T \ / RIM=14$8 5008.38 In INV.OUT(N)=6.84 OF EX.BARBWIRE INV.dUT(W)=17.61 W _ PLAN 1" = 30' \ _ FENCE \ INV.OUT(N)=11.88 REMOVE&DISPOSE�' m / I W 13 v'3 0 moo' �1•WATER SERVICE o -B PROFILE OPEN -�` TOP EX. ,,/ �./ _ LOCK 24 Q ; \ \ FENCE r o my (MAINTAIN 6.5' 8820 SF \� \ /I I/ / ��/ �` COVER) w Ooa.0 HORIZ. 1" = 30' 3600 f F -BLOCK 23- �\ I/ I "'lllrrry111 / OD F 1.90'BEND w VERT. 1" = 5' 3 117661,SF 1`\ SE�`�ACK x l I > SETBACK i / 5 3 V 11182 SF 85.04 SF I (I / 8220 SF / 11331 SF �(TYPJ 15172 S -BLOCK 4- ,�' SON TAly NOTE: -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO IC THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE&TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REQUIRES CONTRACTOR TO A E CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. Tn 410EN5E0 -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS STH EDITION,MARCH, S�ONAI F' 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM NO.1. -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. -BENCHMARK/11: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24.25&26 N 34897.73 E 50303.75 ELEV.=5023.28 -BENCHMARK g2: WITNESS CORNER(•MMCSSA•YELLOW CAPPED REBAR)TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 w N 40219.41 LOW POINT ELEV=5015.44 HIGH POINT E -5016.07 E 50397.83 V) LOW POINT A=B+84.44 HIGH POINT S A-10+15.51 ELEV.=4939.18 Q PVI STA=9+00 PV1 STA 10+D0 -DATUM=NAVD 88 LJ 5030 PW 5030 -COB BENCHMARK p1110(ARROW BOLT ON HYDRANT)ELEVATION 4903.86 a 3 Q A.D. 1.45 A.D._-1.45 -SUBTRACT 19.45 FEET FROM BENCHMARK/1 OR#2 ELEVATION TO CONVERT TO COB DATUM. K= 8.88 K= 8.82 U1 Z -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY 008 PERSONNEL ONLY. Z LJ 1OU 0'VC - 100. VC ? -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. O 35 W L" Q LLJ J O J �< �;Of 0 Z H m rc n m vi " Q Z 0- + Gi .. v�1i �^ Mai X"l m QZ Z II II V GJ a o N Q Q Q 5020 r 5020 Q z J N W � (n �+ FINISHED o Iy + Y Of F x N H Z GRADE �'�' ^w -0.5 16 THRUST RESTRAINT CALCULATIONS{ LI..I N O Q Q RFl1UCE To LI..I LLI U) 0] MAIN XORIZWTAL BEND reae]lF£BRANCX RESTRAINT"ANDAVALNMESn1 \ERTCAI.DFTSET 11.25 Q Q LL.I ------ 8 LLI 12.44 ]0. .BS 0 Z Of 12 4.20 8.48 17.22 a28{ 29.57 82.92 11{.78 1]8.85 NA NA 72.53 1050T 14.52 NA O Q _ MIN.6.5' 24 .a 1.a zz.79 ss. u. 1.a 1 {1 .a 1 .a NA A L'p (1)4'x8'SHEET OF / EX.GRADE•rL COVER O_ 2•BLUEBOARD RIGID 1HRUST CALWLA110NS WERE BASED ON THRUST RESTRAINT DESIGN FOR OUI IRON PIPE,DFTH EDITON,2002,PUBUSHED BY THE OUI IRON PIPE RESEARCH ASSDCIATW.ALL O INSULATION,CENTERED ;,1TRAINT LENc1Hs ARE IN FEET. O r 5 MINIMUM LENGTH ro BE RESTRAINED IN BOTH DIRECTONS FROM RTING.W DECREE BENDS ALSO REWIRE CONCRETE 1HRUST BLOCK. 501 0 EW 8•DIP WATER MAIN 5010 AMAIN TO BE RESIRAINED TO GREATER THAN 5 FEET.MINIMUM LENGTH TO BE RESTRAINED ON BRANCH SHOWN.CONCRETE 1HRUST BLOCK ALSO REWIRED. Q D,MINIMUM LENGTH ro BE RESTRAINED FROM DEAD ENDS AND FROM BOTH DIRECTOFIS FROM VALVES. R•'R..NT LENGTH L,IS FOR THE LARGER PIPE.IF THE STRAIGHT RUN OF PIPE ON THE SMALL SIDE OF THE REDUCER EXCEEDS 4,THEN NO RESTRAINED JOINTS ARE NECESSARY. m NIRE5IRAINT LENGTH L,IS FOR THE UPPER PIPE FROM THE BEND.THE PIPE BEIWEEH THE BENDS IS V BE ENTIRELY RESTRAINED. € NV. 500Y.1 O NEW SAN W S 1 S WE 1 1 rc 5000 " m U U Ww s 5; " 5000 C.A.D. CMK N DATE: 7/13/06 w� II F J 3 B, Om REVISIONS: 3/28/07AB F > •m n�I?o < > rc 3 i 3 i Tz,T • Q Mi bOh In mrw w w �� Z z ; ; o ; APPROVED BY: N rIp n N N m M O M M N r N QUAI 1 1y ASSURANCE: + + 4990 " " m " °° °�= 4990 » Sol nn ^� n e� m� o e CONFORMS TO CONSTRUCTION RECORD ; SEE SHEET UTILITIES - OCTOBER, 2006 f1EE: BREE-PRO_WA s PROJECT NO.:Boz 05021.0 s 7+00 8+00 9+00 10+00 11+00 SHEET 54 Of 78 m w \ I m o , del �>z l o _m�-�--,---- ` ---4!- m< ----���N E ,-"SOR 35 PV C SAN SEWER MAN oa \ ry -8 _ aa<w _o i-'z 6$ _3 w 28 ' vv v Za¢Qmoo"z�'sNoWvJomzan�$ Il I v �• 6G 3C° INA' 06., x I 2 21ST 0 ; m Wm x xo x a3M 73o x �� x13soasl0avoW3a - 117. -„ � 100.64' n a I o C o O 99.94' x----x-- x ml. mo _ . 81 RP c V) (' -fir _2azea m N/ r-0 - NI B'DIP WATER MAIN - -_- - - - G 04 ---- �^ _ - - - - -- U SCALE Lu -_ Si00 F - I F m O W YA-�- -- -----1- - -T - N P oro,sa w a+oom _ ^ m »�o O PLAN 1" = 30' / rc 81.1T 85.00 65.00' - �- - ------ - \ - -- 1 .J / (del) -' I 26.89' 33.32 --- _--_---_ L - -__ - Q ., 1DID = I � �n I I � fio.1 �- Z I I 1 m PROFILE � C En gl I ID: omo W Imwn \ T 6s.4y --__ _ _ _ 1 I HORIZ. : 1" 30' O J o«m - -_ -- ---- VERT. 1" = 5' Z 'n oo I Qa�N N II N m Ilia I"')o F3o \ m �ro w / I Iyi1 �o3il \ 30.18' I 35.13' ----- -- --�OZL --- Iui OU ���. n o / n ��w, Ina �� / / I 65.05. -�- -- ---- / I z / a N / D. a �= 1c0a 3 / t I' Q` o�LL ^ z� // rn n ; [0 S /LL�Lv� � �� ti I B21$T "" III �g •s'e n V) rn DID 00 v m xTrm301s n � I In $I n/ V I m l "� NOTE: �/ /� / I' DO -EXISTING UNDERGROUND INSTALLATIONS&PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER.THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES(WATER,POWER,GAS,STORM, SEWER,TELEPHONE @ TELEVISION)MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS.STATE LAW REWIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 5TH EDITION,MARCH, THRUST RESTRAINT CALCULATIONS- 2003,AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS,DATED MARCH,2004 AND ADDENDUM No.1. REDUCE ro MAIN HORIZWTAL BEND tl e J TFE BRANCH RESMNNTID DEAD ETIDS 12 B VERTCIL OFFSET 11.25 -UNLESS OTHERWISE SPECIFIED,ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A m e e tz AND vAUEsw 2.88 S9T 1244 311.03 43.9J T3.9J 122.15 B5.85 NA NA NA NA NA NA LAND SURVEYOR LICENSED IN THE STATE OF MONTANA AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION 4.a 1.ea 42.22 iM 6 8 I 6 1 NA NA 1 .O 14. NA LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. le 24 1 .T2 1 15.59 1 3248 1 28.89 1 90.5E I 255.86 lBET5 J8a.05 224.21 881.29 NA A -BENCHMARK/1: SECTION CORNER(REBAR)COMMON TO SECTIONS 23,24,25 dt 26 N 34897.73 'THRUST GLCULATONS WERE BASED ON THRUST RESIRNNT DESIGN FOR DUCTILE IRON PIPE.nm EDITON.2002 PUBLISHED BY TIE DUCTIE IRON PIPE RESEARCH ASSOCIATION.ALL RFTSTRAINT LENGTHS ARE IN FEET, E 50303.75 0 MINIMUM LENGTH TO BE RESTRAINED IN BOTH DIRECTONS FROM F"NG 90 DEGREE BENDS ALSO REWIRE CONCRETE MRUST BLOCN. ELEV.=5023.28 mMNN TO BE RESIRNNED TO GREATER THAN 5 FEET.MINIMUM LENGTH TO BE RESTRAINED W SRMGI S1100.CONCRETE THRUST BLOCK ALSO REWIRED. IPMINIMDM LENGM TO BE RESTRAINED FROM DEAD ENDS AND FROM BOTH DIRECTIONS FROM VKO -BENCHMARK 2: WITNESS CORNER MMCSSA"YELLOW CAPPED REBAR TO SECTION CORNER COMMON TO SECTIONS 13,14,23&24 RESMMNT LENGTH L,IS FOR ME LMGER PIPE IF THE STRAIGHT RUN OF PIPE ON THE SNALL SIDE OF THE REDUCER EXCEEDS V.MEN NO RESTRAINED JOINTS ME NECESSARY. B C ) RESMMNT LENGTH L.IS FOR ME UPPER PIPE FROM ME BEND.ME PIPE SEINEEN ME BENDS IS TO BE ENTIRELY RES RANED. N 40219.41 E 50397.83 SON �� ELEV.L 4939.18 -DATUM-NAVD 88 IC -COB BENCHMARK FEET (ARROW BOLT ON HYDRANT)ELEVATION O CONVERT 6 OR - DENOTES "AS-BUILT" CONDITION m -SUBTRACT 19.45 FEET FROM BENCHMARK$1 OR#2 ELEVATION TO CONVERT TO COB DATUM. E �� Cn LTCENSEO -ANY EXISTING OR NEW VALVES WHICH CONTROL THE COB'.WATER SUPPLY SHALL BE OPERATED BY COB PERSONNEL ONLY. x -THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING ANY WORK. 0+00 1+00 2+00 3+00 4+00 5+00 6+00 5030 - 5030 LLJ V) Q Of 2 � m a 3 4i o z ce J m g H wul Z wz m � w w Mi + 3 _ wi z �� -18 (n �> L z 5020 m N >>yy 50205: Of 0 � 0 w W (s� mW N 0 ~& 0 aQ} L5 n FF H Z Q_ Ll �' 1 1 0. a "J FINISED 300% m Q Z!n D. Il Bjgj �> fi c+I GRADE _ - ---- - =) N< Z �N m } H Of Q iJ n F.� a$a$ in c Y� _-- ------- YOf W N Ld~ To II B E E 5 n "t -- -_---- .GRADE O@ ~ O Q i v a Sa + m O h E II II ���� N ---- ----_- W Q 5010 5010 U oa s + ^y� Of m_ OHUI ___----- O_ __-_ --- M�6.5' O O 0 0 NEW 8"DIP WATER MAIN 1 Q R(( 1Ld IF 1 � 1 5000 1 5000 1 SON nII 1 1 rc rc F 3 N I�z c4 1 le 1 rc 1 rc rc ei a m a rc I?o 4 Y! dw 1. 1 <`+ » C.A.D. cMK z w -- DATE: 7/13/06 REVISIONS:3/28/07AB ( m a 3 " IN F � � mmm m x l � � � � � r- eo � m � � � � a0 m 4990 z iI�' _ z z z z z z z z 4990 APPROVED BY: g n WNNN3F E n> E E n n E E E n E n n E n II 1 n QUALM ASSURANCE: g o v, m a m ut N `�EZO RF� 9 pn yoro "CONFORMS TO CONSTRUCTION RECORDS" �__= o o o OCTOBER, 2006 SEE SHEET UTILITIES - n m m N V�^�+• Rg ^om �S �v N FlEE: 21ST-PR0_WA nm ID nb PROJECT NO:BOZ 05021.0 0+00 1+00 2+00 3+00 4+00 5+00 6+00 SHEEP 55 OF 78 NO VERTICAL REQUIREMENTS— PROPERTY STEEL POST MARKER LINE OR PAINTED BLUE T EASEMENT WATER OR SEWER MAIN N��- I LINE (V SPECIFIC SCIENCES DEPARTMENT OF HEALTH AND B :` ENVIRONMENTAL SCIENCES APPROVAL IS REQUIRED FOR A BOULEVARD HORIZONTAL SEPARATION DISTANCE LESS THAN 10 FEET �` VARIES 4' WATER OR SEWER MAIN AND FOR A VERTICAL SEPARATION DISTANCE OF LESS THAN ',� REDUCER 1.5 FEET BETWEEN WATER MAIN AND GRAVITY SEWER. �, B STREET SURFACE ( SIDEWALK GROUND SURFACE J 1' 10'-0"MIN .'I 3\ \ A (TYP.) Q EQ NO EXCEPTION TO THE MINIMUM SEPARATION ``' C REQUIREMENT(VERTICAL OR HORIZONTAL)IS PERMITTED �.� V I WHEN THE SEWAGE CARRYING PIPE IS A FORCE MAIN. ALL 1• 5' CROSSINGS SHALL BE ARRANGED WILL THAT THE SEWER MAIN CURB BOX PARALLEL ARRANGEMENT OR SEWER FORCE MAIN JOINTS WILL M ADEQUATE AND A. '`}/ FAR AS POSSIBLE FROM THE WATER MAIN BEING CROSSED. � L VARIES PROVIDE 5'STATIONARY WHERE LESS THAN 18 INCHES OF VERTICAL SEPARATION 0 ROD IN ALL CURB BOXES L 4 L 4 HAS BEEN APPROVED BY BOTH THE CITY OF BOZEMAN AND O THE MONTANA DEPARTMENT OF HEALTH AND ENVIRONMENTAL L 2 L 2 SCIENCES,THE NEW GRAVITY SEWER MAIN,OR THE NEW WATER 8 V MIN. MAIN,AT THE CROSSING SHALL BE MADE FROM A FULL LENGTH COVER EXISTING OF PIPE CENTERED ON THE CROSSING,AND THE CROSSING . UJ ANGLE SHALL BE APPROXIMATELY 90 DEGREES. NEW GRAVITY 8, Hl MAINS CROSSING WITHIN 18 INCHES OF A NEW OR EXISTING WATER C (TYPICAL EXCEPT IN SPECIAL MAIN MUST ALSO MEET OR EXCEED THE REQUIREMENTS OF O SEE DETAIL CIRCUMSTANCES WHERE CITY HAS NEW PIPE "RECOMMENDED PRACTICE FOR LOW-PRESSURE AIR TESTING OF BELOW APPROVED ALTERNATE LOCATION) ® INSTALLED SEWER PIPE-(UNI-8-90.OR LATEST VERSION). N—TAP BY 8D EXISTING gE TEE(pW(x;Em BEND CONTRALTO PIPE PIPE ® "L•IS THE LONGEST AVAILABLE STANDARD LENGTH OF PIPE W L. CURB STOP m O AS SUPPLIED BY A PIPE MANUFACTURER. DIMENSION FOR THRUST BLOCKING ® ADEQUATE STRUCTURAL SUPPORT FOR PIPES AT Q CROSSINGS SHALL BE PROVIDED. C REwcwS a WATER MAI I TEES a PU1G5 9D'BEND a3'BEND a WYES 22 1/2'BEND 0 �M A B A B A B A B NO COUPLINGS OR OTHER JOINTS ALLOWED ON SERVICE PIPE FROM BASE MATERIAL a CORP.STOP TO CURB STOP FOR 3�AND 1"SERVICES. CROSSINGSO 1'-Y 1'-Y 1'-9• 1'-6' 1'-B• C-1o' 1'-Y o'-6' STRAIGHT COPPER PIPE SHALL BE USED FOR 1 Y!AND 2"SERVICES. 6• 7-0• 1'-11• Y-S• Y-Y 1'-10• 1'-Y 1'-9' N-10• e• Y-e• Y-9' Y-Y Y-o' 2'-s' Y-1' 1'-e' 1'-e• DETAIL OF A SELECT MATERIAL BACKFILL AREA WATER AND SEWER MAIN ; 10• Y-a• Y-3• e-0• Y-IW Y-o• Y-9• 2'-2' V-11' PROPERLY CORPORATION STD (SEE SPECIFICATIONS) SEPARATION DETAIL 3 Ir a-o• Y-1o• e-Y a-B' Y-B' Y-3' 2'-Y 2'-Y CORPORATILED ONINSTAL / � // /� u" s'-s' Y-1o• C-e' a'-n' a'-9' Y-s' 3'-s' 2'-5 TAP MAIN AT �j%// / // / � / � //j NOT TO SCALE NOTE.SgIL TABLE I PRESSURE.ON ISO PSI MAIN PRESSURE 2D00 PSF SPRINGLINE. i /// // ////j// //j///j// //j/� /jj/SERVCE PIPE •MONTANA PUBl1C WORKS STANDARD SPECIFlCAlI0N5-STANDARD DRAWNG N0.02860-2 BEAMI MAP Au FITFNGS NTN POLYEINYLENE 2 B"MIN. UNDISTURBED �y THRUST BLOCK DETAIL /% 1 3 EARTH FOR WATER MAIN FITTINGS '=�\\�\ 4 ��\\%\—�\\ \\\ \\��\\�%\\�% GQNGRE,E THRUST MJ GLAND \/ /\\�%\\\�%\\\�i\\�TREN\CH OTTOM\/%\\\� BLOCK(TYP) \% i\\\ \�\ MJ GLAND . NOT TO SCALE %\\�\\\%��\\�%\\\%\\\\\\%\\\\\�\�\\\%�\\\��\�\ \�\\ \ . •MONTANA PUBUC WtlPo(S STANDARD SPECIFICATIONS-STANDARD DRAWNG NO,U660-1 \\\/\\ D.I. MJ TEE D.I. ® D.I. GENERAL NOTES• PIPE PIPE PIPE 1, WATER SERVICE LINES SHALL HAVE A MINIMUM 6 YA FOOT COVER MEASURED FROM THE EXISTING GROUND SURFACE EXCEPT THAT COVER SHALL BE MEASURED FROM CENTER LINE STREET GRADE WHEN SERVICE LINES ARE LAID TO A STREET SIDE WHICH HAS AN t)PHILL SLOPE.WATER SERVICE LINES SHALL HAVE A MAXIMUM 7 Y2 FOOT COVER AT CURB STOP. MJ VALVE 2. WATER SERVICE ONES SHALL BE INSTALLED WHERE SHOWN ON THE DRAWINGS OR AS SPECIFIED. 3. BEDDING SHALL BE 1"DIA.MAXIMUM"THIN 6"OF SERVICE PIPE. 4. INSTALL CURB STOP SO THAT OPERATING KEY IS PARALLEL TO STREET IN OFF-POSITION. MJ GLAND D.I. ON TAp� WATER SERVICE LINE DETAIL RESTRAINING ROD,CONFORMINGV MIN.CORROSION RESITANTO ASM A 42-81. INSTALLED IN HALF THE AVAILABLE MECHANICAL JOINT IC NOT TO SCALE BOLT HOLES(TYP.)WERE NECESSARY,CLAMPING �. W LUGS(ROMAC"DUCTILE LUG-OR EQUAL)DESIGNED A E •CITY OF BOZEMAN STANDARD DRAWNG N0.02880-8(DEC 2003) ® TO FIT DUCTILE IRON D.I. PIPE.AND CONFORMING Tn CENS 0 REBAR ANCHOR • O" ( ) Y MJ VALVE ASTM 5 MAY BE USED IN CONJUNCTION WITH �+ f WITH THE RESTRAINING INING RODS. S�ONAI E " \ MJ GLAND J D.I. < - PIPE C. ° -D MAX. TYPICAL VALVE/TEE RESTRAINT DETAIL ° 3-0"MIN.CONCRETE NOT TO D SCALE W ANCHORS /\ �f\l� �� INSTALL PLUMB WITH TO BACK OF CURB �/� PUMPER NOZZLE •Cltt OF BOZEMAN STANDARD DRAWNG N0.02860-10(DEC 2003) V/ •B• NW HYDRANT, •A• FACING STREET MEUELLER SUPER Q CENTURION 250 H NOTE: COAT RODS WITH"KOPPERS•BITUMASTIC NO.50 COATING OR EQUAL a 3 MIN.4'-0"CLEAR ALL Z W W AROUNDDGES,ND(TREES,HE THRUST BLOCK DIMENSIONS BUSHES,ETC.) ?� AnMo. 100 PSI 150 PSI 200 PSI 250 PSI 300 PSI 0 W w Q 2 A B C A B C A B C A EI C A B C > Z z-o•x•- z-9 z-O r-0 z-c 2•-9•at- r 2•-e 2" 2' x•- �_ OQJ1 2 x•-o•z z z<x•�z-0 x•-e• r r X_ r-0 r-0 ELEVATIONS AS SHOWN 1 2 -r r z s-0 s r-e s-s• r s• r-1 r-0 r-0 _ Q Z Q ON PLANS OR 0.2'x-s•z z s�s• r-0 c-e• a• a• a•s e-0 a_D ADJUSTABLE SCREW �_ O1 a• ABOVETOP OF CURB TYPE VALVE BOX0 WGRADE 18 Y-e•s s• s•�s m-0 s-1• a a c sv W-D IF WITH LID m Q Z 24 a•-a•c c e•�c a•-0 e•-e• e• e• T•-I e•-D e-0 N Q GROUND LINE N H 0 Q W NOTE PRESSURES SHOWN ABOVE ARE MAXIMUM WORKING PRESSURES IN SYSTEM. W � F LLI M LLI Q Of w 5 THRUST BLOCKING AND ANCHORS ARE REQUIRED ON ALL 6"VALVES AND LARGER UNLESS SPECIFIED BY THE ENGINEER. C\^'•\\\ w N F O B MEAG-LUG OR APPROVED EQUAL JOINT RESTRAINTS MAY BE USED IN LIEU CONCRETE THRUST BLOCKS. %\y��\ m THRUST BLOCKS NOT REQUIRED ON TAPPING VALVES. \��\ W p p UNDISTURBED >Z THRUST BLOCK DETAIL EARTH Z\' MIN.6.5 COVER U 0 Of (FOR WATER MAIN VALVES) `�\ I o NOT TO SCALE •CITY OF BOZEMAN STANDARD DRAWNG NO.02S6 1(DEC 2003) •CONCRETE ��\\�\\ \, LI J THRUST BLOCK �\i\\\�\\'�\ 6 P a TO MAIN LINE PROPERTY LINE CURB @ GUTTER JOINT1\y\�\\\\� \\ AS REQUIRED FOR PIPE SPECIFIED SIDE ALK \_�y��\ �� wv CA.D. /1 vv�`vvvvvv7`v DATE: s/os FIRE HYDRANT \\\\\\\1\ \��\ RENSIONS: \\ VARIABLE NEW 6"AUXILIARY GATE VALVE 3'MIN. MIN.YA CUBIC YARD WASHED GRAVEL FLANGE JOINT APPROVED BY: �I � *MEGA-LUG OR APPROVED EQUAL JOINT RESTRAINTS MAY BE USED IN LIEU OF CONCRETE THRUST BLOCK OUALRY ASSURANCE: VALVE FIRE HYDRANT DETAIL a WATER MAIN NOT TO SCALE "CONFORMS TO CONSTRUCTION RECORDS" SCALE: SEE SHEET ' (TY •Cltt OF BOZEMAN STANDARD DRAWING N0.02660-4(DEC 2003) UTILITIES OCTOB ER, 2006 FILE: —DETAILS P.) 8 HYDRANT LOCATION DETAIL PROJECT NO.:BOZ-05021.0 $ NOT TO SCALE SHEEP�7 Of 78 •CITY OF 902EMAN STANDARD DRAWNG NO,o2eea-5(DEC 2010) FRAME AND CONVER TO BE EITHER D&L A-1172 NTH 1"COVER,MCI 305 FRAME, 305A COVER,OR IFCO 772 FRAME,772-8 COVER,OR DEETER 1025. COVERS SHALL HAVE TWO 1"PICK HOLES. 7" NOTE: ALL JOINTS BETWEEN MANHOLE SECTIONS,MANHOLE RING& ` ADJUSTING RINGS, TAP SECTION,AND AROUND SEWER PIPE INTO MANHOLE SHALL BE M 2'MIN.,12"MAX. WATERTIGHT.JOINTING MATERIAL SHALL BE'RAM—NEK'OR EQUAL `�, % FOR ALL JOINTS EXCEPT BETWEEN SEWER PIPE AND MANHOLE WALL —D14.� u SIDEWALK CHASE SIZING `` 2•-0• eou_ZD xIOTN n(n)a 1.51t w(n) Cove e SIDEWALK CHASE k MIN.SLOPE 0.5'MIN. MID1N k PROPERTY 5• 5' Bs � LINE OR V EASEMENT d-0• PRECAST REINFORCED CONCRETE MANHOLE RISER LINE AND ECCENTRIC CONE TOP MANUFACTURED IN 0 GREEN STEEL POST ACCORDANCE NTH ASTM DESIGNATION C-478. O BOULEVARD AT END OF SERVICE 4. MANHOLE STEPS VARIES A7 16"CENTERS 0 STREET SURFACE 5'SIDEWALK GROUND SURFACE W + GROUT INVERT TO ( ') SPR OF PIPE IF GAP BETWEEN I.— PIPE C \ II AND CHANNEL IS V. O 2.5' GREATER THAN)6 BACK OF CURB M 8 PRE-CAST CHANNEL VARIES 12 FLOWUNE W V 4 (TYPICAL EXCEPT IN SPECIAL � FLOWUNE SOLID COVER �VAPoES gRCUMSTANCES WFIERE CITY HAS-" 5' 5.5'(TYP.) APPROVED ALTERNATE LOCATION) I 1' o m SIDEWALK BOULEVARD Q VARIABLE I w 4'-0' �m (MIN.) '-. C o SHELF-SLOPE 1" 2^X 2" a< PER F00T TOWARD FLEXIBLE GASKETED JOINT TYPICAL a WOOD iv o a CHANNEL SEE ( EXPANSION JOINT MARKER CHANNEL DETAIL. FOR PRECAST BASES-SEE DETAIL) A SERVICE UNE.SLOPE=Ya" PER FOOT MIN.,Yt PER FOOT CHANNEL=DIA.OF PIPE 45'ELBOW MAX. '.... 1 1.5' 1 EXPANSION JOINTS SEWER MAIN p PRECAST OR POURED-IN-PLACE BASE. , POURED-IN-PLACE BASE,MINIMUM Li 4 BARS CONCRETE THICKNESS BELOW PIPE IS 5'74'DIA. 8 INCHES.PRECAST BASE,MINIMUM IN UNE WYE FITTING FOR PLUG THICKNESS IS 6 INCHES.ALL BASES NEW INSTALLATIONS. REINFORCED AS SHOWN. NORMAL NORMAL CONCRETE SADDLE FITTINGS ALLOWED T DROP CURB HEAD GUTTER UNE SERVICE INVERT NO FOR EXISTING INSTALLATIONS CONCRETE OUTLET CHASE ONLY) LOWER THAN SPRING ONLY UPON APPROVAL OF RADIUS OF CHANNEL LINE OF SEWER MAIN CITY OF BOZEMAN SEWER MANHOLE FOR WYE FITTINGS. DEPARTMENT. SLOPE AT 1' PER FOOT - IFCO STYLE S(SOLID COVER) k� FU ANNEL TO TRENCH GRATING WITH LL PIPE STYLE B FRAME,D&L P NOTE: STORM DRAIN MANHOLES SHALL FOUNDRY"J SERIES" NOT HAVE FORMED CHANNELS AND THE WffH SOLID,BOLT DOWN DIA.OF LOWEST PIPE INVERT SHALL BE 9"HIGHER COVERS,(OR APRROVED SEWER THAN BOTTOM OF MANHOLE. EQUAL) 17 SANITARY SEWER SERVICE LINE DETAIL PIPE PLAN VIEW IFCOWTH STYLE B(SOLID COVER)TRENCH GRATING NOT TO SCALE WITH STYLE B FRAME,D&L FOUNDRY'J SERIES' WITH SOUD,BOLT DOWN COVERS,(OR APRROVED EQUAL) �Oj�TI}fd •CITY OF BOZEMAN STANDARD DRAWING NO.02730-2(DEC.2003) SECTION A—A FLOWUNE 2R EXPANSION JOINTS IC SANITARY SEWER AND STORM DRAIN MANHOLE DETAIL H �-1.5%MIN. 6" NOT TO SCALE J��REQUIRE�D ......... ..........'............................................. (ns 10ENSE ........... S F' •CITY OF BOZEMAN STANDARD DRAWING NO.021T0-J(DEC.NO) 4'BASE COURSE d0/IpL `�_\REQUIRED 1'5 SIDEWALK BOULE RD2 `END CHASE\_END COVER CURB&CUTTER INLET CHASE NOTE: WHERE TRENCH PASSES THROUGH EXISTING PAVEMENT IFOO STYLE S(SOLID COVER)TRENCH GRATING > INLET CASTING THE PAVEMENT SHALL (GUT ALONG A NEAT VERTICAL WITH STYLE B FRAME,D&L FOUNDRY"J SERIES" IFCO 51 -7,OR, UNE A MINIMUM OF 12'(30cm)FROM THE EDGE OF THE TRENCH DEE 51504 L. OPENING.WHERE NEAT UNE IS LESS THAN 3'(0.9m)FROM EDGE WITH SOLID,BOLT DOWN COVERS,(OR APRROVED EQUAL) DEFTER 2047L,OR OF EXISTING PAVEMENT OR CURB AND GUTTER SECTION, w D&LI-3519 REMOVE AND REPLACE ENTIRE PAVEMENT SECTION BETWEEN TRENCH AND EDGE OF PAVEMENT. FLOWUNE VI (n X Q J 4.1 MA' H 6, _ La Q 36"SMOOTH ROD ........... —y CENTERED IN OPENING ' TSTREET SURFACE .........................................................i. -4"BASE COURSE a 3 W L 2'CURB VERTICAL TRENCH WALLS WITH &GUTTER Z Z_ -.. 12"(30 Rxn)MIN. SHORING TO CONFORM TO O.S.H.A. AS � 1 5' 5' 5.5'BOULEVARD I PER STD. Z W LJ FLAT TOP 6' 2 OPEN NG SQUARE REQUIRED SIDEWALK BOULEVARD DRAWING O W 2 Q Q REGULATIONS* 3: SUBGRADE OR GROUND OUTLET CHASE 02528-1 — � Z d' SURFACE 0 IFCO STYLE S(SOLID COVER)TRENCH GRATING > Of Z WITH STYLE B FRAME,D&L FOUNDRY'J SERIES" Z Z W+2 V WITH SOLD,BOLT DOWN COVERS,(OR APRROVED EQUAL) Q - O O a m N Q Z (� 36"R.C.P. BACKSLOPE AS SPECIFIED SLOPING,BENCHING OR Of A57M C-76 TO CONFORM TO O.S.H.A. INSTALL DETECTABLE SUPPORT SYSTEMS IN THIS H LLI I_0 Q CLASS 2 REGULATIONS- AREA TO CONFORM TO 4"SIDEWALK 8" W 8" DIMENSIONS W AND H VARY,SIZE WARNING TAPE 18"(45cm) O.S.H.A.REGULATIONS' TO BE DETERMINED BY ENGINEER W W LLI (OPTIONAL) EXPANSION JOINT ........ 6" .......... BASED ON 25-YEAR EVENT, BUT NO Y �O N LMAX .......... O t LESS THAN 8"AT CURB OPENING. W N� W m c RASE COURSE1. CONCRETE SHALL BE M-4000. 4'MIN. COVERS MUST BOLT DOWN TO FRAME. U O Z �. w TYPE A "B" C C" CONCRETE STORM DRAINAGE OUTLET AND INLET CHASES BLOCK OUT FOR TRENCH BACKFlLL c (i � £ INLET PIPE 6'(15cm) NOT TO SCALE O O Z �/ jj •aTY OF 1IO2EMAN STANDARD DRAWNG NO.02529-14(DEC.2003) ~ N SELECT TYPE I BEDDING 0 MATERIAL PLACED t \ IN 6 15cm TYPE PIPE BEDDING '( )LAYERS& c PLACED IN 6"(15cm)MAX. o� ° o COMPACTED AS SPECIFIED L.L.I LAYERS AND COMPACTED o o°o °o oo Yl IN SECTION 02221 THOROUGHLY 0 ab 0. 0 9"SUMP omzo 4%10cm) o0g OOoo /% g TRENCH WIDTH-O.D.OF PIPE %V CA.D. CMK n °° TYPE 2 PIPE BEDDING % PLUS 2'(60cm) ///� i WHERE RE FOR \ DATE: r' SOFT OR UNSTABLE MIN.TRENCH WIDTH=3.5'(1.1m) 7/13/O6 QUIRED RENSIONS: 6'PRECAST BASE FOUNDATION /// // // 44"O.D. •SEE O.S.H.A.CONSTRUCTION STANDARDS APPROVED BY. FOR EXCAVATIONS. UP ASSURANCE: TYPICAL UTILITY TRENCH DETAIL 36" STANDARD STORM DRAIN INLET DETAIL NOT TO SCALE "CONFORMS TO CONSTRUCTION RECORDS" $GALE; SEE SHEET •CRY OF BIWNGS STANDARD SPECIFICATIONS-STANDARD DRAWING NO.02T21-1 NOT TO SCALE UTILITIES - OCTOBER, 2006 FILE:PHASEV—DETAILS CITY OF BOZEMAN STANDARD DRAWING NO.02720-1A(DEC.2003) 8 PROJECT NO.BOZ-05021.0 's SHEET 78 OF 78