Loading...
HomeMy WebLinkAboutIrving School - Sprinkler System Layout NEW 4" FIRE SERVICE LINE 3 DAVI J. _ TO 6" CITY MAIN. PEIZ INSTALL NEW 4" FIRE LINE _.-e N�`` SERVICE WITH 6" MINIMUM ©. CLEARANCE UNDER EXISTING 1 _5" FINISHED GRADE FOUNDATION WALL. - II EXISTB4G SIDEWALK - ��� I ZOO I I REQUIRED FOR BE CONSTRUCTION ml pl 1 I Z 4,H Q UL LISTED 4" FLANGED OS&Y RECORD DRAWING yml ; ~V)0 ° 1 3'-6 TO BE INSTALLED PER CITY OF l I I � i II 'O BOZEMAN STANDARD DRAWING I "I-i" Z Q II z_ NO. 02718-6A w1 Oz Z Q I a II 3 E---1 II r ----- p p U]x H m y� � J I I I O:J I I XI J N 11 L--FOOTING--� ::.:s UI U� Q N 3-6"X 3'-0" it.I.,`� UY FOOTING -FOOTING , lI I NOTE: I I Z o ZQ SAW CUT 2'-0" X 2'-0" OPENING IN BASEMENT FLOOR TO INSTALL 4" ELL, l p w — SEE DETAIL 1 RISER, RESTRAINING RODS, SLEEVE, Zl ZO W N AND THRUST BLOCK AS REQUIRED BY 2CITY OF BOZEMAN FIRE SERVICE LINE 3 0 a,/ Q w m GROUT ANNULAR U P CON RET z EEN DSLEEVE SECTION A z N AND PIPE. PLAN W-i L 6- 1 cX I Z' of i p rYn BUILDING SUPPLY LINE ENTRANCE I I E- 00 NO SCALE BUILDING RISER SEE DETAIL ej (n cn 2 �www F.D. CONNECTION 2100 _ 3' ABOVE ON WALK ADJACENTT E ADJACENT TO EXIST. DOOR 107 t o �yl I I SEE SERVICE ENTRANCE F-~ DETAILS THIS SHEET. ." pl pl 0 113 ELI I I 4" ----- ----- ------ 4"-------- -- o_ m m m I 11 N 1Sh 2 " 2Ve" 14" INSULATION J ,• __ 3ETWEEN PIPE BACK OF CURB - AND WALL pm ro sit 2 O 'i` '� 7'-1 t" 9'-8` 6-1" E-:i 4" CONC. WALL I_ 4'-0" �5' SIDEWALK I 7'-6" W/6"x16" FOOTING I- T ,,_ I 3 2 Vz' c' P" `V NOTES SPRINKLER SYSTEM DRAINS SHALL BE PLUMBED TO FLOOR DRAINSIN BASEMENT Q OR TO THE BUILDING EXTERIOR. z \ ALL PIPE SIZES SHALL BE 1" DIAMETER w UNLESS OTHERWISE NOTED Q z DIMENSIONS SHOWN ARE FOR REFERENCE C:) LLJ Q ONLY AND ARE APROXIMATE CENTER-TO-CENTER U LENGTHS. THE CONTRACTOR SHALL BE RESPONSIBLE (/] FOR DETERMINATION OF ACTUAL PIPE CUT LENGTHS. rr tk. z LJ HYDRAULICSYSTEM CALCULATIONS RS WELL z vy...0.• 10. G., V LJ 1"" 1 9-''G•-�� APPROVAL S BASED ON SCHEDULE 40 P PEA HEAD SYSTEM Q t^,'-1G" 10'-10 LOCATIONS, AND PIPE SIZES AS SHOWN. ANY DEVIATION F--� w WILL REQUIRE APPROVAL BY ENGINEER PRIOR TO w u) CONSTRUCTION. _� Q R' N y m LEGEND m z SPRINKLER PIPE DIAMETER t h" SIZE _ PIPE LENGTH (CENTER TO INSPECTORS CENTER DIMENSIONS) TEST VALVE 0 UPRIGHT TYPE SPRINKLER HEAD - 165'F - 3/8' ORIFACE VERTICAL SPRINKLER RISER 0 4' 8' 12' I I II I SHEET NC_ ' S C A L E B9604-1.DW SHEETSI DAV J. ` ti P 4" FIRE DEPARTMENT CONNECTION MIN. 3'_ ABOVE GND. SURFACE FLOOR PENETRATION I Q Z Q TO BE SLEEVED --- I¢I ZpI AND GROUTED ,,,I�I Z Q' VI Z ZO I 10 ~ Q wl Z Z Z Q 3 4" DIA. CAPPED LINE FOR ~m m F- FUTURE SYSTEM EXPANSION - ------------ ¢p O J ICI a I Z In UI UI 0 j - - -- -- 2" MAIN DRAIN TO 31 UI U Y I BLDG EXTERIOR ~I ply j Z 0 z 0 0 zQ li w> W xW zi N BACKFLOW 3 U X Q W O Wm PREVENTOR Q w a _Z 4" DIA. PIPE t/1 FROM EXTERIOR C9- z �ZQw() FOR BUILDING SUPPLY 3:1 I I W I`ZF LINE ENTRANCE SEE DETAIL e QQL'� A of I I Q y O S_. U�q� �0W 4" DIA. 90' PIPE�� I I BEND SUPPORTS 4" DIA. 90' BEND 4" DIA. 0.5. k Y. CONCRETE FLOOR VALVE z w w w SLAB p of RECORD DRAWING' � 3. 6.. _I �� I , H aUjw Q BUILDING RISER DETAIL 2 m>- mm 2 EXCAVATION _ IfPE A BACKFIII i I i i I I �I SPRINKLER SPRINKLER HEAD �- 'AHEAD 840 Q (n EXISTING 4' WALL ,� GROUND /FENCE Q Q -------------�- - r o T PIPF/ rW � 0 Lli 5' SIDEWALK U FLOOR EL= INSULATION U 830.5 v �_. 830 Z 110 L.F. 4" D.I.P. CLASS 52 z C J �1 L > W N 0 r OXm 825 fy 0M y O zpm Q W w s,m U F>OJ ;o.N m CONCRETE FLOOR w SLAB 1 Z OIZ wo p m z U0'a�wo PIPE & SPRINKLER HEAD SECTION A 2 Z' 00 $'.oho 4 C 20 0 WATERLINE PROFILE 2 2 B9604 2.DW SHLEIS