HomeMy WebLinkAboutIndustiral Drive - Water Main Extension W W J
YZ O ci'J¢Z O� U
Ua OV) W3NF ZjQ 0
UI r LL Q O O Z VI m
R ll
3 JQ 7 C,LL Nm;W Q _
>1 ~
0 W W
Z. FQWN ZNQ 7FQU FQW
FN �UajN Q W�W�OQW �IajJN UZ
ln3 �3 O U JQ W n> e3 1- 01
2
W Z �p Q4 iU _�O IX W V^ �~QO d� 0 25 50 -
yyJJH. JQNO: J tt¢ >¢ LL .JQU, J�
? �Y W J WW H W 1-OW JAY
OwU a�ci- aY ,}z It,- Q�cJw
- W WN ~ O Z
<
SCALE: 1'=50'
mZ 2' STYROcOAM—
UlmOw NO Y ZO= rna
�CZQ Z mQ Z OU3 4WIDE
Z m,
m m x x - L I Q w
IUD I�NM Ir IOW 4H.JZp _g"NITo I�z- IZ
OO'j F a 0 0: p 0 p W n 0= N Q a 6 WATER MAIN _ I_O D=O N I`
+JUI +Z1=-J +'� +Q ~NZ�O 3/4"MINUS }Z�J +O
Q N Q � Q
O a x a Q N F W �� GRANULAR BEDDING m. G 4 N 2 A S-BUILT
W Z r .2 Z 2 U 0 W_
�ia� vra = Nz aQQQaoa10 �a�N aw
a Nfffa J;m PIPE INSULATION DETAIL Na�.a 0<
a I
I
I
I
I
\ / I
I
GENERAL NOTES
I
1. ALL CONSTRUCTION SHALL CONFORM TO THE ACCOMPANYING PLAN:
I I 1 I AND SPECIFICATIONS.
2. NO CHANGE OR MODIFICATION OF THE APPROVED PLANS AND
------ - t ? I SPECIFICATIONS SHALL BE MADE WITHOUT THE PRIOR WRITTEN
G - G
_ APPROVAL OF THE ENGINEER AND THE CITY OF BOZEMANENGINEERING DEPARTMENT.
I �_
______
��) G - - 3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO THE
�--- G -- - ------ OR F,u
-� G G Ss SS S Ss �T_____
ENGINEER, WORKING DRAWING, SPECIFICATION SHEETS, ETC., F
G ----- --------- ____I
EQUIPMENT AND MATERIALS TO BE USED ON THE PROJECT.
ss -- 8 s 8 _
--- __ -------- INSTALLATION SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN
I ` G SS �.____ ----____SS__-- SS �_____ w 5+00 7 s _._�____
55 ----- APPROVAL OF ALL EQUIPMENT AND MATERIALS BY THE ENGINEER.
DRIVE � 4 '" ® 4. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL BURIED
II 0+00 1 INDUSTRIAL i t I tl I UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION.
w I 0—0-0-0—
0—0—0--E 1 5. THE ENGINEER AND THE CITY OF BOZEMAN SHALL BE NOTIFIED AT
� LEAST 24 HOURS PRIOR TO BEGINNING CONSTRUCTION.
I 0 0-0— 6. MINIMUM COVER OVER THE WATER MAIN SHALL BE 6.5 FEET.
I A MINIMUM SEPARATION OF 1.5 FEET SHALL BE MAINTAINED BETWEEN
0 THE WATER MAIN AND ALL SEWER MAINS.
7. BENCHMARK: NORTH RIM OF SANITARY SEWER MANHOLE, 25' LEFT
I /yh 0 OF STA. 2+20, ELEVATION = 4693.10
I I I
I I I
I I �I I
P� 0
I I IrP'` n
1 � Rocky Mountain Engineers
P.O. Bo:BHS, E3oxem an,Montona 59771
(406)566-4659
I 1
1 PROJECT: WATER MAIN EXTENTION - INDUSTRIAL
1 INSTALL WATER SERVICES AT DRIVE, NORTH OF GRIFFIN DRIVE
1
STA. 4+27(LT), 5+85(RT),
6113(LT), 7 18(LT), DESIGN BY: DATE: DRAWN BY: DATE:
a 7+88(RT). R.N.C. 4-2-92 R.H.C- 4-9-92
REVISIONS: DATE: CHECKED BY: DATE:
r:
� ss
W b d6
UU
S�J�
1 k iL0
Iga�
of 3
Sw< +
Sc� r
FUTURE AND �� -A
` EXISTING GROUND PROFILE a i a i kl
4695
li
EXISTING 6-WATER MAIN - y
EXISTING SEW'E9 SERVICES(TYI♦ICAL)
f LOCATION SHALL BE VERIFIED ARIOR TO _ _ _-------`_-_
CONSTRUCTION Q
a e
------. - -f- MIN_1.5'SEPARATION(T7P.) INSULATION a -----
4 E%IS7BJGIII20 NSAWTARY SEWER -.0 --
a �/ 1�ANSUA5510 MAINS 4 __________
�S
I., MIN
EPARATION �. .
466U
4675
p Ip pp y4�� pp ,p p OppI $ p IY�'
0+00 7+01 2+00 3+DO 4400 5+00 6+00 7+00 84 9+00 1G+00