Loading...
HomeMy WebLinkAboutHighland Boulevard - 1987 i E'M u //t PROJECT 4N ST, / LOCATION / SAWCUT 8 REMOVE EXISTING ' EXIST. DRAIN INLET \ ASPHALT SURFACE 8 BASE COURSES TO BE RELOCATED Q�vQ. �/ TO PROVIDE A MINIMUM 10 WIDTH AS SHOWN n^\ V /•\ OF NEW PAVING ADJACENT TO / ,.-r`V� I j PROPOSED CURB 8 GUTTER'o I EXIST. CURB 8 GUTTER EXIST. 12"RCPnv G VICINITY MAP No Scale 10*50 S TA. II+62.73 = P.T. STA. 10+00 = P.C. / 3 END CONSTRUCTION 11,50 ` _ — ! �� _ _ ` BEGIN CONSTRUCTION q POWER POLE �• "—_ T.5' / / / i•^. l To be relocated(by others) 10*00 \ SAWCUT a REMOVE TEL CLOSURE))) `•_ _•_ ` ` EXISTING CURB MIN.WIDTH PRIOR 15 i PROPOSED CURB a GUTTER TO BE REMOVED VARIES TO PAVING A EX. GRATE ELEV. = 02.96 i sllcu7 2-+ VARIESUO MIN a EX. 12" INV. = 00.30 A,p -2%-� VARIES I�%MIN.) _--- ' PROP. GRATE ELEV. = 02.90 R.p\ `F\`1 EXTEND EXIST. 12 RCP PROP. 12" INV. = 00.30 a 31 WITH NEW 12 RCP 8 RECONNECT WITH NOTES: CONTRACTOR SHALL OBLITERATE 3"ASPHALT CONCRETE SURFACE DRAIN INLET EXISTING DOUBLE YELLOW CENTERLINE 3"ASPHALT CONCRETE BASE B.M. 4814.53 STRIPING 8 RESTRIPE WITH NEW 8"-11/2"MINUS GRAVEL BASE DOUBLE YELLOW LINES CENTERED SPIKE IN POWER POLE 14' FROM THE PROPOSED EAST BACK PROPOSED BACK OF CURB DATA OF CURB. TYPICAL SECTION R = 286.00 CONTRACTOR TO FIELD VERIFY ALL 4 32°36'00" UTILITIES PRIOR TO EXCAVATION. NO SCALE L = 162.73 T = 83.63 —'—-—• A.P. =AERIAL POWER ———— T.U.G.= TELEPHONE UNDERGROUND SCALE: I" = 10' HOR. I" = I' VERT. Imo- 65' V.C. I I� - 100' V.C. 4805 4805 00�_ EXIST T.O.C.�_ _ — — _ - — — 4804 _ — _ 4804 PROPOSED TOP OF CURB 4803 _' 4803 m v o m o 0 1� I,, H1 !V N ISO rV (i _ O M Q O O O V N +I O In II,,��yy n`n`TT `o o� N a o L' o 0 C) v iI's CO{W 1�TO 0 +U IO W H: u V F O ♦ m +3 a:q n o0 0 C,U Q a + H a R N lo � o w~ on w a y 1987 STREET IMPROVEMENTS N HIGHLAND BLVD. a:aa DESIGN CD TTATTT O CDDRAWNED ASK— SCHEDULE M RE VET DATE Ir�i a N v CHECKED PJF STREET RADIUS GRANGE N O A < 2 DATE 6/22/8T Z O U O O O O � II II II II U 2 F O O O O O w CITY OF BOZEMAN w IIF � � m 11+50 11+00 10+50 10+00 ENGINEERING DEPARTMENT