Loading...
HomeMy WebLinkAboutGallatin Center AFTER NEW LINE IS TESTED AND ACCEPTED BY CITY, CLOSE VALVE, REMOVE EXISTING WATER LINE, - INSTALL PLUG AFTER REMOVE ABANDONED WATER - INSTALL CAP, AND REMOVE REMOVAL OF EXISTING MAIN AFTER NEW LINE HAS VALVE BOX. ENSURE EXISTING '8" WATER MAIN [BEEN TESTED AND ACCEPTED VALVE IS RESTRAINED TO BY CITY. L _ EXISTING TEE PRIOR TO K --- - -- - - -1-•-_ - - - - - - - -I REMOVAL OF EXTISTING 8" REBAR ANCHOR EXISTING iJ. ! WATER LINE. IF NOT \ THRUST BLOCK DIMENSIONS 30LLaRJS RESTRAIN PER COB STD DWG FIRE HYDRANT o va. T00 PSI 150 PSI 20v PS 250 PS, 300 PSI I N0. 02713-1 AND 02718-1. s,:o s- A B C A B I C A B C Aj-0j2'-m012'-0"2'-0* A B C STA. 0+00 - z-o•x-0 2-o z o'x-o z'-o•r o'r-r z o z-0 '-o•r o'x'-�'/? / POTHOLE AND VERIFY LOCATION 2 z'-o'2-or-o a2-6 2'-0 2 9 x-6-2-6'J o - J'o J'-oAND ELEVATION OF EXISTING WATER t.'^ C 1 2 2-3.2-o z'o 3'0 3-0 2'-6 3 s•3'-o-S-0•.J '-r 3'-o 15+01.53 MAIN PRIOR TO CONSTRUCTION. °" 1 14" 2'-3•2 o s'-o Y-5 3-0 3'0 4 6'J o-s o'4-o '-9 4'o 4-o'CONNECT NEW MAIN TO EXISTING /` 1 8 16 Y-T r-o Y-o 4.4 3'-o r o 4-r4•-o-4'o's 6'-r r o+-o•5+01.53 "POTHOLE AND VERIFY WATER MAIN W/8" DI GATE VALVE. 1/4 1 r-s-3'-o J'-o s'-s 3- 4-0'6-. s-9 s-o s'-o•4+45 ( ) LOCATION AND ELEVATON OF - -� NOTE PRESSURES SHOWNoABOVE ARE MAXIMUM WORKING PRESSURESIN SYSTEM. EXISTING WATER MAIN PRIOR 8"X6"STEE MJ W/MJR TO CONSTRUCTION. CONNECT CONCRETE/ THRUST BLOCKING AND ANCHORS ARE REQUIRED ON ALL 6" VALVES AND NEW MAIN TO EXISTING " _ ANCHORS WATER MAIN W/8" DI GATE 00 0 LARGER UNLESS SPECIFIED BY THE ENGINEER 6" GATE VALVE UG 1Q I 8" "A" AND PLUG VALVE 4+42 r 1 DETAIL STA. 4+H9- A I NOTE: COAT RODS WITH "KOPPERS" BITUMASTIC NO. 50 COATING OR EQUAL. 1.5" WS - TYPE "K" COPPER, 15 LF I EXISTING THRUST BLOCKING FOR WATER MAIN VALVES -W/CURBSTOP AT EASEMENT LINE FIRE HYDRANT C.O.B. STD DETAIL NO. 02718-1 PER COB STANDARDS. [� r UNDISTURBED EARTH (TYP.) 0 0 0 CONCRETE THRUST ' ", r 30' WATER MJ GLAND NEW 8" DI CLASS 51 a MAIN EASEMENT BLOCK (TYP.) �,;,.•". �:", GENERAL NOTES: L - - - . _ . . - .WATER MAIN . _ . . _ . . � _\ MJ GLAND 1. ALL MATERIALS AND WORKMANSHIP SHALL 8" DI TEE, MJ 8" DI TEE, MJ STA. 4+08.67 STA. 0+61.62 •" CONFORM TO MONTANA ADDS PUBLIC WORKS STANDARDS, STA.8" ENDCAP, W/8" ENDCAP, D.I. MJ D.I. ® D.I. 4TH EDITION AND ADDENDUM p2 WITH CITY OF MJ W/ MJR MJ W/MJR PIPE TEE PIPE O PIPE gppROVEDOZEMANMB DITIHE T UNLESS ENG ENGINEER CONSTRUCTIONSHALL --- - BE DONE BETWEEN 8:00 A.M. AND 5:00 P.M., MONDAY THROUGH FRIDAY. MJ VALVE 2. CONTRACTOR SHALL FIELD VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES WHERE NEW WATER MAIN-PLAN D.I. FACILITIES CROSS OR CONNECT. CONTRACTOR NOTE: MJ GLAND PIPE SHALL BE RESPONSIBLE FOR EXPOSING POTENTIAL UTILITY FARAHEAD OF INSTALL JOINT CON RUCOTIONC O TS MAKEENOUGH NECESSARY GRADE MODIFICATIONS WITHOUT DELAYING THE WORK. ALL RESTRAINTS WITHIN 40' 3/4- MIN. CORROSION RESISTANT ALL THREAD UTILITY CROSSINGS SHALL POTHOLED RI NECESSARY PRIOR TO EXCAVATING OR BORING TO RESTRAINING ROD, CONFORMING TO ASTM A242-81, ALLOW THE CONTRACTOR TO PREVENT GRADE OR OF ALL FITTINGS. O INSTALLED IN HALF THE AVAILABLE MECHANICAL JOINT ALIGNMENT CONFLICTS. MJ VALVE BOLT HOLES (TYP.) WHERE NECESSARY, CLAMPING LUGS (ROMAC "DUCTILE LUG" OR EQUAL) DESIGNED 3. CONTRACTOR SHALL ERECT AND MAINTAIN TO FIT DUCTILE IRON (D.I.) PIPE, AND CONFORMING BARRICADES, WARNING SIGNS, AND TRAFFIC CONES TO ASTM 536-80 MAY BE USED IN CONJUNCTION PER CITY AND MDT REQUIREMENTS IN ACCORDANCE MJ GLAND WITH THE RESTRAINING RODS. WITH THE MUTCD (INCLUDING MONTANA D.I. AMENDMENTS). ALL TRAFFIC CONTROL MEASURES PIPE MECHANICAL JOINT RESTRAINT DEVICES (MEGALUGS) SHALL BE APPROVED AND IN PLACE PRIOR TO ANY 3 MAY BE USED IN LIEU OF CONCRETE THRUST BLOCKING. CONSTRUCTION ACTIVITY. z 4. AT LEAST 2 BUT NOT MORE THAN 10 BUSINESS r 2 DETAIL DAYS BEFORE BEGINNING ANY EXCAVATION, THE TYPICAL VALVE/TEE RESTRAINT CONTRACTOR SHALL, ACCORDING TO MCA 69-4-501, < C.O.B. STD DETAIL NO. 02718-8 NOTIFY ALL OWNERS OF UNDERGROUND FACILITIES co a � AND COORDINATE THE WORK WITH THE OWNERS OF o SUBGRADE OR GROUND Ma, ' SURFACE SUCH UNDERGROUND FACILITIES. THE INFORMATION SHOWN OR INDICATED IN THE CONTRACT DOCUMENTS m w WITH RESPECT TO EXISTING UNDERGROUND FACILITIES IS BASED ON INFORMATION AND DATA OBTAINED II w o II w II FROM THE OWNERS OF THE FACILITIES WITHOUT 4695.0 O+ z �+ + + 4695.0 FIELD EXPLORATION, AND AS SUCH, OWNER AND zy 5 < o � wow, ENGINEER ARE NOT RESPONSIBLE FOR THE z Q I N d y" a z z a n y ACCURACY OR COMPLETENESS OF SUCH �- a z m u�i z o~z< 4690.0 INSTALL DETECTABLE 4690.0 r,y? ao y_ y- INFORMATION OR DATA. WARNING TAPE 18" (45CM) STOCKPILES (TO MAX. DEPTH (OPTIONAL) BE REMOVED) 4685.0 TYPE "B", OR "C' 5. PIPE BEDDING AND @gQKF111 ALL PIPES SHALL 4685.0 i. - TRENCH BACKFILL BE BEDDED WITH MINIMUM 4-INCHES OF TYPE 1 FINISH GRADE PIPE BEDDING AND BACKFILLED WITH THE SAME FINISH GRADE \ i \ EXISTING GROUND MATERIAL A MINIMUM OF 6-INCHES OVER THE TOP 4680.0 / �� i \\ 4680.0 SLOPING, BENCHING OR OF THE PIPE PER CITY OF BOZEMAN STANDARD -------- - \-- -------- SUPPORT SYSTEMS IN THIS DETAIL 02221-1. --- --- -- -- - -- 4675.0 -- 6.5' 4675.0 AREA TO CONFORM TO MIN. COVER O.S.H.A. REGULATIONS' 6. CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND FACILITIES REQUIRED FOR TESTING ALL UTILITY PIPING IN ACCORDANCE WITH CITY 4670.0 4670.0 SELECT TYPE I BEDDING 6"(15CM) INITIALO RAND ORETESTINGCSHALLSBE COST BORNEFBY ALL THE MATERIAL PLACED IN 6"(15CM) 4665.0 502 LF OF 8 DI CLASS 51 WATER MAIN LAYERS AND COMPACTED AS- I 4665.0 SPECIFIED IN SECTION 0222E � - CONTRACTOR. TYPE I BEDDING PLACED �i 7. NO TRENCHES IN ROADS OR DRIVEWAYS SHALL < < IN 6" (15CM) MAX. LAYERS ---4"(10CM) BE LEFT IN H OPEN CONDITION OVERNIGHT. ALL AND COMPACTED THOROUGHLY. SUCH TRENCHES SHALL BE CLOSED BEFORE THE i*} -� END OF EACH WORK DAY AND NORMAL TRAFFIC FLOWS RESTORED. 0 0 0 0 0 0 0 0 0 0 o WATE TRENCH WIDTH= 1 TYPE 2 PIPE BEDDING _ 0 voi 0 Ln 0 N 0 9 0 0 0 WHERE REQUIRED FOR �{ O.D. OF PIPE + 2' �-- 8. CITY FORCES TO OPERATE ALL VALVES, v+i a a n n N N - ± o+ o SOFT OR UNSTABLE FOUNDATION MIN. TRENCH WIDTH=3.5' INCLUDING FIRE HYDRANTS, ON EXISTING PUBLIC MAINS. -SEE O.S.H.A. CONSTRUCTION STANDARDS FOR EXCAVATIONS. 9. ALL WATER MAINS 12" DIAMETER AND SMALLER s WATER MAIN-PROFILE SHALL BE CLASS 51 DUCTILE IRON. ALL WATER = 3 DETAIL MAINS AND SERVICES TO BE INSTALLED NTH A MINIMUM 6.5' OF COVER TO FINISH GRADE UNLESS TYPICAL UTILITY TRENCH OTHERWISE NOTED OR DIRECTED. C.O.B. STD DETAIL NO. 02221-1 AS-QUILT NO. REVISIONS DRAWN BY DATE HORIZONTAL SCALE VERTICAL SCALE NTq r LOT PROJECT ': 01-245 SHEET EVISED/ADDED SERVICES CGB 2/6/03 0 30 60 0 10 20 q GALLATIN CENTER T 9.1 32 DISCOVERY DRIVE DATE: FEB., 2003 Wl 1 AS-BUILT cBH s/ze/o3 /pR,9 ,,.. Civil Engineering �/�/ OF WATER MAIN DESIGN LL_ PHONE(40BOZEMAN MT 59721 W1-RELOCATION ',sd6l� Land Surveying SCALE VERIFICATION-BAR EQUALS 1 INCH '� PHONE(406)582-0221 LOT 9.1 °°25 ALLIED Geotechnical En ineerin BOZEMAN MT ENGINEERING g g FAX(406)582-5770 PROJECT ENGINEER: CGB DRAWN BY: GBH WATER MAIN DESIGNED BY: CGB REVIEWED BY: CGB c° 1 cEs,wc. J_ -I,JTURE EXISTING DEVELOPMENT--_,. DEVELOPMENTS m I m I 2+20 SAN. SWR. LINE "1"= - a 4+61 END SAN. SWR, LINE "1" CL EX, 4.0' DIA. SAN. SWR. -. INSTALL: 1-10 PLUG MANHOLE _ v -0+30.D0 LINE "2" o FL 4668.75 FL 4668.89 0+0 SAN. SWR. LINE "1"= - CAP END CL EX. SAN. SWR. MANHOLE - N CONTRACTOR SHALL VERIFY LINE AND GRADE OF EX. 10" SEWER MAIN STUB-OUT N 12918.7531 PRIOR TO CONNECTION. E 337.0287 - N 12687.7338 j 423 Z5416 - - - - - - - - - - - -- - - - - - - - - - - - l I r H n {"~ PROPOSED 10" SS "°° = GRAPHIC . (CALE a v Avenue ]�]y�l l P �_ z,a N 13138.7526 M x L 1 V 1 1 1.1 L 1 N E l E 42336.5402 IN FT r - PROPOSED MAX AVENUE- EXISTING TEMPORARY I EXISTING MAX AVENUE) - _ - _ - I inch 4U It - 4+51 SAN. SWR. LINE `1"= __SEE SHEET C-3— _ CUL-DE-SAC_ — — — — — — — — -- -� — +0__ SAN.�4(R. LINE 2«— - - - k - I _ INSTALL PRECAST 4.0, DIA. SAN. SWR. I a 2+23 2 38-SAN. SWR. LINE "1" - MH. W/ 8" STUB-OUT TO WEST ROW LINE. I SEE SHEET C-9 FOR CONNECT TO EX. 10"{ MANHOLE IN - STUB ON-SITE WATER LINES " Q I li- - - - - - - - - - - - - - - - 0 Qz SEE SHEET C-5 FOR I z Q -- — — — — — — — — -- — — _ ON-SITE WATER LINES , InI I ' ---- - S - Lv Q SEE SHEET C-i FOR IFUTURE - DEVELOPMENT- ON-SITE SAN. I z W I- FUTURE II }--V. DEVELOPMENT H _ LL. Q � - � � 46 w z �46115 a w z iTTIZ e r J a N AT <N-�ooF aw CL OF PI E � z I om +k-" _ - 4 ZZ +X W +z +,o?vwil +i3l I EX. R T " O _�Nw __.+ r.. owcn _. -- - - ---.. - I` 4680 LLI W LL 4680 z LLJ LL] 4675 _ _ - I I �1 —- - _ i - — X Q Q 1 _ - - Q I �46J7O - PROPOSED 10.' AN. SEWER rt- -- #F -_l ... — ' I- _ X. 10" SAN. _SE R i �� - ---- � I 0.6 � 4665 4665I- - - 1 ino * I N N * I t1 o 466 0 _ vi In � ooll o x '0011 I �0' ZZp - _ - S. Z {{ SANITARY SE NER LINE "1" _ . D —_ i t + I j � I � o C) o L tl — - -�- � SEE - - 231 LF 10' SDR-35 PVC C-4 NOTE: EXISTING UTILITIES FROM AS-BUILT DRAWINGS BY ALLIED S+OO 4+00 3+00 Z+OO 1+00 O+OO ENGINEERING SERVICES, INC. DATED 1/2001 AND ;_.F 11 REVISED ON 9/2001. FUTURE BUILDING FUTURE ,��� BUILDING - - = FUTURE 4-4 -- - -I BUILDING SEE MEP PLANS FOR LOCATION OF UTILITIES AT BUILDINGS (TYP.) FUTURE _ SEE SHEET C-4 FOR I BUILDING � N OFFSITE SAN. SWR. FL 4673.23 SEE SITE CIVIL PLANS FL 4674.40 \ m I {�q�g9 FOR CONTINUATION OF N A 5+61.11 END LINE "2" a ND CAP SAN. SEW. SERVICE (TYP.) INSTALL: PRECAST \ o I 4' DIA. S.S. MH. O 0+00 S.S. LINE "2"= ? FL 4677.02 y 4+51 S.S. LINE "1" END CAP INSTALL: PRECAST 0- l I I s jTVF.I 4.0' DIA. S.S. M.H. PROPOSED 8" SS SEE SHEET C-4 1 - I I �� T LINE "2" 1. GRAPHIC SCALE THIS SET - - FL 4676.07 "I I 3(P.U.E. i z i!r ,-__ 'vNi _ I ENDS C P�� Tro - - - -I� J `� la / I - - - T I ( IN FEET) 1 Inch= 40 ftwt i E 423 7 416 PROPOSED 8" SS 1 N 12687.73 8 NI r a N 12687.733 I I LINE "2" E 42637.5416 YI I E 42898.6520 o p 1+59.00 LINE 1 FL 46 .47 � ' I/ INSTALL: 2+78.00 LINE "2" 5+36.00 LINE "2. I N I I 1�7 1-STD. 45'WYE UNtp E CAP 5+56.00 LINE "2" f 4+05 LINE "2" FL 4678.40 I \ INSTALL: 4+34.50 LINE "2" INSTALL' I IN STD. 45' WYES ND CAP INSTALL: N A 2-STD. 45.WYES I CD 2-STD. 45'WYES I 3+00 LINE W C Q INSTALL: PRECAST 4' DIA. S.S. MH. FUTURE FUTURE FUTURE I = �- } I Q C J BUILDING BUILDING BUILDING I --- W c II �I $1I IL- n LL- Lj-- I-- — - -— - — z a Rx o o� l uU NnN. Nu3 ^p�z - - 4690 o l W4690 ugo LLJI LOO pciN ' z n+ zz - . . . Inol ne _ - - -- _. I U- O 11 U N f. 1;1 3. < _ N O _n .- Y_ V N . _- . 4685 4685 - - —_ - ,LL OR Ok' GRADE AT I I i MAN OLE HEIGHT TO BE - _- _ _ - - - VJ / a GL OF PIP - ._ -. - STED WITH FUTURE / n (APPROX.) - - _ _ _ SITE DEVELOPMENT - _ -_ _ - - - + - V J _ - EX. GRADE AT / _ ---- - - Q CL OF PIPE- - _ 4680 rV z W 4680 4675 — - — 4675 6 Q Q L 40% 8., SAN. SEWER ON - T 8" SAN. SEWER0. 4670 4670 ON 0.70% &#gyfr 1.ss' - _ - I , to w P - �� t _ � o a m M m w 4665 0 4665 v� ooc a per II - - m = K II �IJI} II II II _ II II II I� V _ _ - _ O N IN/l N tN/I O 2+' fN/1 V1 i Ut 3 VI(�/1 (A T --m 4 N 4660 - - 4 �_ 660 u a L o 0 --- �- --- SANITARY SEWER LINE „2" AIS U I L T v o o o 1 - -- SHEET w" 'SOP-35 PVC L C-6 0+00 1+00 2+00 3+00 4+00 5+00 6+00 11 i1� o a _ I lz N 0+51 1+82.07 WATERLINE "A" INSTALL: FIRE HYDRANT ARROW BOLT o w B+5B:B6 TO E LINE "A" 1-8"a6" M.J. TEE 3+76.70 WATERLINE "A" \ w CONNECT TOE ITUB- 8" WATERLAN STUB-OUT 1-F.H. ASSEMBLY PER INSTALL ELEV. = 4682.05 COB DATUM GRAPHIC SCALE o TEMP6RAf21�-9 STD. CONST. DETAILS 1-8"x6" M.J. TEE - - o w \ I 'cTP 1-F.H. ASSEMBLY PER STD. CONST. DETAILS - w I z IN FEET _ EX. CONNECTION TO I - - _ - I_ I inch = 40 1t. WATERLAN IN MAX AVE. ., 'oo PROP. 8 WATER - UNE INSTALL 8" WATERLINE E -- WATER AIN STUB-OUT FIRE HYDRANT ARROW BOLT 8" + ELEV. = 4681.63 COB DATUM ` "wq Tfl� 7+23.00 WATERLINE "A" A r_ FIRE HYDRANT ARROW BOLT FUTURE - INSTALL: z ELEV. = 4685.15 COB DATUM .� �'/ a.re, \ -,.E. 1-8"z6" M.J. TEE { w D I lJ•/ BUILDING '+i 1-F.H. ASSEMBLY PER STD. CONST. DETAILS FUTURE - >l �/ BUILDING 'Po tea,,; 7+59.34 WLI 0+00 z INSTALL: A}�= _ 1-12"x8" M.J.''�,TIkE I Q (� o 1-8""GAS-4Y-x9T -Q •tti--� Q w I FUTURE -- W Z � Z �d BUILDING — , ,--4 z 0 FUTURE Q\� � 'II 1 I < O X w BUILDING { �--1 LLB z $ I ; \ J� \' Q O -- -- - - - Q Tj < zL 4690 Z�� _ 5 �o Jm Zm. - -- - Jz 0 0 .oa R a 4690 O SUN Q 41. O V + Vt -h X + 0 _ _ I + LLJ 4685 . . . . . . . - Q Z + -- - - -- - ,4685 cn 4680 _T PROPOSE FINI HED GRADE .� __ - - _ _-_ - - I FUTURE STO M ---._ - _- - -- - ---- - --- ---�-- -. .- 4680 z Q O SEWER'AND HANN - _. __ _. _ ._- _ . . . m �. _ _ _ _ w O i _ .. - --- -— -- --- ZED CULVER _ ___ -- - .g +. - -- _ Q EXISTING CHAN EL BED _ �EXISTNG GRAD O 4675 N TALL: - - 4675 LLJ LLJ _ I \\ 20 LF FORMULA 150 .. a" 0.1. N.+ , _- - W .. _ _ _ _ Q O Q ON OR QUIVALENT.,{T ) - - - Z FL 4672.78t CE TERED ON CULVERT GROSSING 4670 1.97' -- i.7 1r p,l. 0 3.1% - ~a N + 4670' i- — - -- - IN TA L: 150 INSU A ON.0 EQUIVALENT (TYP.) I - - -, - - _ __ - - - 4665 o o x - CULV OS SING b o oo a a F - - IN -- �_-AS-13 4660 466; � ' 1. p III'p z a O U�o °o o � + z EUClff iPO.cPE C.RSS 1 _ _ SHE. 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 C-7 € 11 \ a Ka N i a � NORTH 19TH AVENUE N \ a. � O i 1+74 7+59.34 WL "A"= I f i-34.?e WATERLINE "A" 0+00 WL "A-1" CONNECT TO EXIST. INSTALL: 3 8" WATER MAIN 1-12"x8" M.J. TEE '.� •� I�/ N INSTALL: -"`DueE �- 1-8" GATE VALVE 1-8" GATE VALVE , g 1-12"x8" REDUCER - c w.�1 18 GRAPHIC SCALE i PT 9—BG 00 •� 10 l 1 1 / �'x� � � PROP. 12" WATER aoo PROP. 12" WATER ='cu 10+83.28 WL A"= ( h FEET ) LINE "A-1" - i- -—LINE "A" S 9+69.44 WL "C" 1 inch = 10 r. / _ K INSTALL: 112" BUTTERFLY VALVE Q WJ i 'I INSTALL 12" WATERLINE ; 112"xl2- M.J. TEE {; 1-12"x8" REDUCER L-+— u� z J, INSTALL 12" WATERLINE I U co 1-8" GATE VALVE Li I 0 Q l i� ?' z ) / z w O / 8 PC B 1 .60 / •.• 0 8 < O LL- 77 - t 74 co - I .ia. I I- TIaI� I Wz - z J -- � 95 � W Ol� w 4695 _ -.I 46 _ _ w z 1 oNMbh __ 00. - . 4690 Z I O 4690 - - } QJ F- + I (n i -1 —j r� �- - •— I -= - - �4685] Z w4_ Q 4685 -- I T -- -- + - _ -, _ _. - , -- -. LIJ - T . - _ - PRQP SE F�NI HE � I J - 1 f � _-I N F— LL_ Q I J46�8O — -. - 46LBO 4 3% v +1.55% ; 12" D.I. O<J +8:4�% I — - ocn fi _ EXISTI 1G GRADE-- J 4675 LLJ — D - U l - N I 1 age N = N c — 4670 N s 3 4670 z o < c • j - T ���� �J ��� 4665 2 ' ' 3 Y o m o 1� I LINE ..A.. a r o 4665 - �� T� n o o v o c m ---a 4 111 SHEET C—8 ZM1 i1'-DUCAS I4DN OAK CL31 of 8+00 9+00 10+00 0+00 1+00 2+00 11 Z w �, 1+92.22 WATERLINE '8" a. wN 2+82.96 WATERLINE "B" 3+23.74 WATERLINE "B" 4+64.63 WATERLINE 'B' �' ¢ 0 wrn INSTALL: 4+10.17 WATERLINE "B' 1 i33.34 WATERLINE "B-1" V 1-2" WATER SERVICE PER INSTALL: INSTALL: o PROP. 10" SAN. SEW. r1 FIRE HYDRANT ARROW BOLT CITY STANDARDS 1-8"x6" M.J. TEE W/ PLUG 0+57.19 1-8"x6" M.J. TEE W/PLUG r� �"I 1-8"x6" M.J. TEE W/PLUG 1-2" WATER SERVICE PER 0+49.19 1-2" WATER SERVICES PER FUTURE " w REF. SHEET C-4 ¢u ELEV = 4680.41 COB DATUM REFERENCE MECHANICAL, CITY STANDARDS CITY STANDARDS _ THIS SET x¢W ELECTRICAL, PLUMBING (MEP) REFERENCE SITE CIVIL & REFERENCE SITE CIVIL & BUILDINGS 1 �w PLANS FOR CONTINUATION. MECHANICAL, ELECTRICAL, MECHANICAL, ELECTRICAL, - oN INSTALL " WATERLINE PLUMBING (MEP) PLUMBING (MEP) V o`` FUTURE SEE SITE CIVIL PLANS PLANS FOR CONTINUATION. PLANS FOR CONTINUATION. - gc FOR CONTINUATION OF 1+23.34 WA RLINE "B 1' INSTALL: 0 1 m a BUILDING SERVICE STUBS (TYP.) o FUTURE FUTURE t 1-8"x6" M.J. TEE � � 1 07.36 WL "C* BUILDING 1-F.H. ASSE LY PER a 3 Ir 000.00 WL "C• BUILDING STD. CONST. ETAILS 3-HYDRANT ARRIER w o INSTALL: �'� 4+80.32 WATERLIN B" POSTS PER TY STD. a o 0+00 WATERLINE "B' 1-8"x8" M.J. TEE o�, - \ V o CONNECT TO EXIST. 1-8" GATE VALVE N'' �a ;10 a _ 1- 90'BEN DETAILµ 02 8-5 � GRAPHIC SCALEN � o 12' WATERLINE i• - ' ¢- INSTALL: 1-12"x8` TAPPING SLEEVE - — —I L :.00 POP. 8" WATER a.001 E 1-8" GATE VALVE "o' P OP. 8' WATER i,oa LINE F. LN 8 FIRE HYDRANT ARROW BOLT f ( IN FEET) w - - - I� - - o -- - - ELEV = 4685-46 COB DATUM I j 1 inch= 40 It - °- - -4� (BY OTHERS) • I '!, PROP. 8" SAN.•SEW. o; i 1+3}}.d0 WATERLINE 'B,� �'!, LINE -2", REF. P+3b.00 WATERLINE N SHEET C-6 C4 a C FUTURE 4 ue INSTA' i BLOW 1-8"x ' M.J.EACH STA.• 3 BUILDING 1-8"x6` M. TEE -. 1 F.Ht ASSEMBLY PER�, 1+85.00 WATERLINE B" 3+54.32 ATERLINE 'B' 5+00.32 WL "B" m 5+06.69 WATERLINE "B I 1 -8" (;ATE VALVE I 3+19.00 WATERLINE "B" 4+44.32 ATERLINE 'B' 0+00 WL "B-1" d _ z f 5+16.69 WATERLINE "B" 1+05.00 WATE INE "B-1' ` 1, STD. CONST. DETAILS INSTALL: INSTALL: INSTALL: INSTALL: F l 3-HYDRANT BARRIER 1-2" WATER SERVICE PER 1-2" WA R SERVICE PER 1-8`x8" M.J. TEE a c 1-2" WATER SERVICE PER INSTALL: POSTS PER CITY STD. ! DETAI 111 02718-5 CITY STANDARDS CITY STA ARDS CITY STANDARDS 1-8" 45'BEN 1-8"x6" M.J. TEE W/PLUG REFER" J. TEE W/PLUG FUTURE 1-8"x6" M.J. TEE W/ PLUG w REFERENCE SITE CIVIL & REFEREN SITE CIVIL & h' it o REFERENCE SITE CIVIL & MECHANICAL, ELECTRICAL, MECHANI L, ELECTRICAL, PLUMBING (MEP) PLUMBIN (MEP) BUILDING y s MECHANICAL, ELECTRICAL, cr PLUMBING (MEP) I PLANS FOR CONTINUATION. PLANS F CONTINUATION. s I�_ � 6+09.85 WL "B"= - PLANS FOR CONTINUATION. �-U — — _ (n Z INSTALL:85 WL "C' m G o_ w Q 0+20.00 WATERLINE "C" 1-8`x8" M.J. TEE _ - 0 Q w FUTURE 8" ATERLINE INSTALL: FUTURE 2-8" GATE VALVE Z 2�GAS - Y<_I `o-`' ---�s"0 - io+ao LN)'s�"' Z 1-8" PLUG J -�� _ ? PROP. 12` WATER 1-TEMPORARY BLOW-OFF BUILDING - ws-- _-. - ws- oc1 PRE. 9` WATER Z NE `C" e+a - — L - I PER CITY SPECIFICATIONS a�� � Q 0 I I I ,w ct -- — U z LJ Q FUTURE 8" WATERLINE w C G I z � W �I ~Z Q Dj m - - - - — — -- - - - � O I —I Q z z z m i r� Z o m �o m o z �95 m0 ` � a W � z� z9 m< m J _ wU z w -iu J -�w �Z. _? m _ _ _ i"¢ c� N w w� ___ - w _ _ o �� .._— _ �_ ___ _ W J z o Z N. J oa�w rn N I m d o sJ a m _ Qn� _ 469 m O V w O Vl N WI +i * In Jl O i(1 V ,O h O N + 4690 Q W 4690 Z 4685 -- { - - - —. --- ' —- EXISTING GRADE a- u) O POOP-- . . . . .. -- - - - -- - - - _cam--- -�-- - .-- - - ' _ - - A4685 - w -D _ - - - - 4 POSED I BADE Q Q i 1 _ } - - - --- _. X15TIN - - l H AN r�x - 44, = PROPOSED FINISHED G Li 14680 -- l ----POOP-- +-- -- ------ ---- ,yam - $ _ 468C J Q f ALL INSTALL 701 F.. _ I IIING RADE b _ - - - -- - _- - _ _ Q O } F AMUL R 150 ..-. 2j.3Q'/ L p.1. ON p i 4675 w6T LL 10 L.F. - 5,. E UIVALI NT OR P $„ FOAM LAR 50 FUTURE _ _ - -- - -- - - INSULATION+OR -CHANNEL BEO - - - - 8,1 D.I. ON +0.61% 8„_D.I. _ 4675 A EQUIVALENT;(TVP.� - 8„ D.I. sa 2. 6' —. - ON +0.63% i. - _ _ 1,75' 10.33' 4670 1.7 T ts' — U - - - - 4670 $ o i _ N - h.rn . LINE "Q 466f, N a s n�'n� e e * v LINE „B„ 1 ill ID 65 _.0 LU m J I - m e -- m —_. In o o u o a w —�w �. - w aW '-aw a� -�w- `r f -- _ 4 � SHEEP - _. - _ _ an.i..r e•a,c wor - - �. ----_t_ :� _ - _ ��eu Lr a art-ad �-- -- — - -- !Ra^PE Css C—9 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 0+00 1+00 OF 11 i o = FUTURE °g N BUILDING FUTURE BUILDING 0 FUTURE FUTURE 1+37.36 WL "B"= I BUILDING BUILDING N 0+00.00 WL "C° h INSTALL: > 1-8"z8" M.J. TEE T c rw �`0 --- GATE VALVE '; N — � ''to � A I � fir+. 0 6'A - z OP. 8" WATER �. - LINE - >oo PROP. 8" WATER c� LINE �- `4",SAS - - LINE s o o � - - o 1 I I / a FUTURE BUILDING 10+62.44 a048+6Sf� WATERLINE "C a FIRE HYDRANT ARROW BOLT R I NSTAL�': RT GRAPHIC SCALE 'I ELEV = 4686.58 COB DATUM 1-12" 9 'BEND M.J. w 20 FUTURE $ II BUILDING j' __. /_.�._- ( IN FEET) 6+73.44 WL "B"= 5' 15e I .ry I inch= 40 ft. Q 7+09.85 WL "C" �'1/ � z INSTALL: m v :� _ --z _� �r. _ _ - Q 1-8%8" M.J. TEE n III 0+20.00 WATERLINE "C" 6+49.85 w _ - 'o---- _ _ — — LLJ FUTURE G= 2-B" GAE VALVE Z 2" GAS a _ a,c" NFL Z F— INSTALL: �J-8`J 1-8" PLUG PROP. a PROP. 12" WATER BUILDING - % 6" WATER - - Z 1-TEMPORARY BLOW-OFF B'P 85..WATERLINE "C" LINE " s-�' '- �' Q O PER CITY SPECIFICATIONS INSTALL: _ _ 1-8" PLUG g \ _�_ 1-TEMPORARY BLOW-OFF —\ _ 10+85.44 I I I ^ PER CITY SPECIFICATIONS " _ 1� WATERLINE "C" L — J /i 'I� E ATERLINE "C" L1_) Z _ i 10+83.28 WL "A"= INS PLUG FUTURE 8" WATERLINE w 8+59.96 WATERLINE 'C' 9+69.44 WL "C" _ � / 8+69.96 WATERLINE "C" INSTALL: PER TYYRARY SPECIIF BLOW-OFF z L.LJ 1-12" BUTTERFLY VALVE �44?.56-WAERLINE "C" INSTALL: N (i�F.) — INSTALL: 1-4" WATER SERVICE PER 1-12"xi2" M.J. TEE U O 1-8"x6" M.J. TEE CITY STANDARDS 1-12 GATE VALVE m 1-12"x8" REDUCER STD.HCO SST ASSEMBLY LSR REFERENCE JSI SITE CIVIL &UG Q 3-HYDRANT BARRIER MECHANICAL, ELECTRICAL, I LL _ POSTS PER CITY STD. PLUMBING (MEP) O I DETAIL � 02718-5 PLANS FOR CONTINUATION. Q . 4 --r '4695 Z - —I - 8 0 a - - 4695 0 U N w Z 7 -. U - _ 1 W.a m [ J Z I Z h Z w_1 Q. - - - - __- -__ _� Za - ZN _. _ w Q 4690 1 o II o vi o?wLLI f + N w + —_ - o o+Z. _ n II rn u 4690 Q .- --. ,- _ - ---- P FINISHED.GRADE _ -- . . . _ '--. - I `�`I —_ _ PROP =---- -- _ EX. GRADE -- -- - _J I O r - - cn CD .. - --- £X. GRADE I '-- _ _ _ / i : _ _- Z L1J + D FINISHED GRADE __ _ _RM�SE �-- _ _ APPR XIMCD AT).._ _ ~ � 1 T - : .g.. - _ s __ _ Q ,1680 W F - - —468C Of —i Q - - - : + - -- - 12" ON 0.00%- � .I- ON +0.43% i W S_ (� I— FUTURE 8„ D.I. - - Q O i 4675 ---+ ---- _ - 8" D.I. _ - - ON +0.66� FUTURE 8" D.I. -- _ _ 4675 4670 155' o o -t III''p 4670 o 3 e II v, � 3 & n w � o r * - LINE , - -- I -__._ _- - - 2 m 0 Q O I 4665 -_ _ -- - - _ - - - I I 4665 ? j a o 00 �o_ ; v JO_. ,D tD � aI 1 a E w w SHEET ---I c-10 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 OF 11 GALLATIN CENTER e PHASE IV MAX AVENUE SEVER MAIN AND ROADWAY EXTENSION LOCATED IN THE CITY OF BOZEMAN, OA][ LATIN COUNTY, MONTANA MAY 24TH, 2005 SHEET INDEX _-_ ravelT� •/ Z SHEET NO. DESCRIPTION INN J y C7 COVER SHEET GENERAL NOTES: C2 MAX AVENUE ROAD — PLAN AND PROFILE 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO MONTANA PUBLIC WORKS STANDARDS, LATEST EDITION AND WITH CITY OF BOZEMAN MODIFICATIONS. UNLESS OTHERWISE APPROVED BY THE ENGINEER CONSTRUCTION SHALL BE DONE BETWEEN C3 SEWER — MAX AVENUE — PLAN AND PROFILE 8:00 A.M. AND 5:00 P.M., MONDAY THROUGH FRIDAY. C4 CIVIL DETAILS co r(O" 2. CONTRACTOR SHALL FIELD VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES WHERE NEW FACILITIES CROSS OR CS DETENTION BASIN DESIGN CONNECT. CONTRACTOR SHALL BE RESPONSIBLE FOR EXPOSING POTENTIAL UTILITY CONFLICTS FAR ENOUGH AHEAD OF (7a CONSTRUCTION TO MAKE NECESSARY GRADE MODIFICATIONS WITHOUT DELAYING THE WORK. ALL UTILITY CROSSINGS SHALL BE uT POTHOLED AS NECESSARY PRIOR TO EXCAVATING OR BORING TO ALLOW THE CONTRACTOR TO PREVENT GRADE OR ALIGNMENT CONFLICTS. W _ _ 3. CONTRACTOR SHALL ERECT AND MAINTAIN BARRICADES, WARNING SIGNS, AND TRAFFIC CONES PER CITY AND MDT F'^ 1 REQUIREMENTS IN ACCORDANCE WITH THE MUTCO (INCLUDING MONTANA AMENDMENTS), ALL TRAFFIC CONTROL MEASURES W 04 SHALL BE APPROVED AND IN PLACE PRIOR TO ANY CONSTRUCTION ACTIVITY. �` 4. AT LEAST 2 BUT NOT MORE THAN 10 BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION, THE CONTRACTOR SHALL, U 31 c�� repk, ACCORDING TO MCA 69-4-501, NOTIFY ALL OWNERS OF UNDERGROUND FACILITIES AND COORDINATE THE WORK WITH THE L � \ 86 OWNERS OF SUCH UNDERGROUND FACILITIES. THE INFORMATION SHOWN OR INDICATED IN THE CONTRACT DOCUMENTS WITH RESPECT TO EXISTING UNDERGROUND FACILITIES IS BASED ON INFORMATION AND DATA OBTAINED FROM THE OWNERS OF THE FACILITIES WITHOUT FIELD EXPLORATION, AND AS SUCH, OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE ACCURACY OR a a I437 SITE COMPLETENESS OF SUCH INFORMATION OR DATA. Baxter a • V _ y _ 5. PIPE BEDDING AND BACKFILL ALL PIPES SHALL BE BEDDED WITH MINIMUM 4-INCHES OF TYPE 1 PIPE BEDDING AND BACKFILLED WITH THE SAME MATERIAL A MINIMUM OF 6-INCHES OVER THE TOP OF THE PIPE PER CITY OF BOZEMAN STANDARD DETAIL 02221-1. GALLATIN CENTER -t - --1--- Q • ,1..,, j (0 \ LOT 12 6. CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND FACILITIES REQUIRED FOR TESTING ALL UTILITY PIPING IN x ACCORDANCE WITH CITY CONSTRUCTION SPECIFICATIONS. COST OF ALL INITIAL AND RETESTING SHALL BE BORNE BY THE lit 1458 CONTRACTOR. 7. NO TRENCHES IN ROADS OR DRIVEWAYS SHALL BE LEFT IN AN OPEN CONDITION OVERNIGHT. ALL SUCH TRENCHES SHALL BE BACKFILLED, COMPACTED AND CLOSED BEFORE THE END OF EACH WORK DAY AND NORMAL TRAFFIC FLOWS RESTORED. PC �1_ —� `SHEET C2,C3 - • --- MAX AVENUE 8. SUBGRADE AND BASE COURSE SHALL MEET THE REQUIREMENTS OF SECTIONS 02234 & 02235 OF THE MONTANA PUBLIC WORKS STANDARDS, THE SUBGRADE AND BASE COURSE SHALL BE COMPACTED TO A MINIMUM OF 95 PERCENT OF ASTM TO FOUR CORNRRS r1C'' I(gm 9. ASPHALT PAVEMENT SHALL MEET THE REQUIREMENTS OF SECTIONS 02510 OF THE MONTANA PUBLIC WORKS STANDARDS AND COMPACTED TO A MINIMUM OF 97 PERCENT OF ITS MARSHALL BULK DENSITY. GALLATIN CENTER A 5' J -'- LOT 11 -� S1tat , SI d - 10. PROJECT BENCHMARK. PROJECT BENCHMARK IS THE ARROW BOLT ON A FIRE HYDTANT LOCATED IMMEDIATELY NORTH OF THE ROSS DRESS FOR LESS RETAIL STORE. ELEVATION - 4681.63 o fARMEHy z o a 5 3 it _ NTA A SKEET LOCATION MAP w w tayti t67 3 ®R E NOT TO SCALE V; N W VICINITY MAP ` Z NOT TO SCALE Civil Engineering 32 DISCOVERY DRIVE Land Surveying BOZEMAN, MT 59718 A S e 71-33UI LT PHONE(406) 582-0221 ALLIED Geotechnical Engineering FAX(406) 582-5770 0 ENGINEERING SERVICES, INC_ i i PROJECT ENGINEER: CHRIS G. BUDESKI,PE DESIGN ENGINEER: CHRIS G. BUDESKI, PE DEANNA L. GEBHARD, EI LAND SURVEYOR: KYLE THOMPSON, PLS "s EXISTING 12" DI - 0' OW- BUTTERFLY VALVE - - CATTAIIL STREET MAX AVENUE SIGNAGE INSTALLED PER STANDARDS p' DESIGN STA. 2+09.0 NNNJJJJ 22.5 x 36.25" RCP ARCH CULVERT W/FETS I EXISTING 48" SANITARY IE IN 4682.30 IE OUT 4682.10 L = 58' S = 0.66% CONTRACTOR CONSTRUCTED SWALE SEWER MANHOLE\\ ON DISCHARGE (EAST) END OF CULVERT WITH 3:1 SIDE SLOPES TO THERMOPPLASTIC STRIPING END PAVEMENT 10' NORTH DISCHARGE TO EXISTING STREAM a STOP BAR PER 1 - 6" & 1 - 12"S IA. HDPE \\. OF PROPERTY LINE C.O.B. STD. 2' X 15' UTILITY CONDUITS STA, 1+79. STA. 3+10 . STA. 0+10 R.O.W. BOUNDARY = W 0 - - - - - - - - - - - -15" RCP STS W/FETS- � - - 1- I' ' t - - - - - - - - - - - - - - - - - - - - - 5-0.23%L-44' Y 1 UT I 6`LITY CONDUITS.& 1 - 12" DIA. HDPE EDGE OF PAVEMENT INV IN (E) 4683.80 i L 40'. INV 4680.32 • EXISTING 12 DI WATER MAIN OF EXT'G 60' R.O.W. INV OUT (W) 4683.78 I I II 4- ,END AVEMENT 32' WIDE S J S S ^' N I �" a PROPOSED 8" SDR 3 �' ,MAX AVENUE g PVC SEWER MAINS -SSI EXISTING io I �� 0 0 0� o c �, > - - PAVEMENT EDGE OF PAVEMENT - - - - - THERMOPPLASTIC S�TRIPING ?.'� e - - - - - - - - R.O.W. BOUNDARY - - - - - - - - - - - FUTURE ROAD EXTENSION STOP BAR PER OF MAX AVENUE (NIC) C.O.B. STD. 2' X 15 z < t _ ' DAYLIGHT LINE (TYP.) III z EXISTING 48" _ •N �-s SANITARY SEWER MANHOLE a n z 3 - - - - 24 WIDE 'C,• �(/) I �` 0 0 n w STREAM EASEMENT I I �7loo o F %XT'G EASTo w a X 1 Z CATRON CREEK " 0. O N w• N - - - - . . . . . . - X X. W W LEGEND INDEX CONTOUR • FOUND MONUMENT AS NOTED CONTOUR MINOR (1' INTERVALS) A CONTROL POINT PLAN VIEW 60'R/* PROPERTY LINE 'T1- POWER POLE X X BARB WIRE FENCE STREET SIGN CA S SEWER MAIN • BOLLARD V 16' 16' 1' ss SEWER SERVICE m SEWER MANHOLE n W WATER MAIN w WATER VALVE _ �� � 3 �181WN CHP OVERHEAD POWER FIRE HYDRANT G UNDERGROUND GAS O CURB STOP e �� 16"MIN r ASP«aT OORt >E CONSTRUCT ROADSIDE DITCHES U ENSURE TEL UNDERGROUND PHONE O LIGHT POLE caNPAcreo*o vno a uARs"Au svEcwENs POSITIVE DRAINAGE . INLETS/OUTLETS AND E'ROM BASE CONPACTED SUBGRADE CONNECTION POINTS. ROUGH GRADE DITCH AREA E UNDERGROUND ELECTRIC m ELECTRICAL PEDESTAL axwPAcrtro ro vs:PER Asm-Gw 3" BELOW F.G. TO ALLOW PLACEMENT OF TOPSOIL ROAD CENTERLINE 10 ELECTRIC TRANSFORMER 's•PIT�" BY LANDSCAPER. t01aPMlEO ro 95x PER-- EDGE OF PAVEMENT N TELEPHONE PEDESTAL TYPICAL SECTION - 60' R.O.W. ------------ EDGE OF GRAVEL I8 GAS METER "'• EASEMENT LINE ® WELL CULVERT 4715.0 4715.0 4710.0 4710.0 m o N 4705.0 4705.0 0 �p O < N w < Q w + n d a a 4700.0 4700.0 0 + B + U II I N N N 4695.0 a s II w II w n 4695.0 aril 0. a a x a FINISHED i vri a v1 i N a PAVED ROAD 4690.0 e 4690.0 w s g CL PROFILE 0 STA. 8+08.65 -0.95% - - MATCH EXISTING PAVEMENT - _ 4685.0 4685.0 - - -- 4680.0 __. 4680.0 STA 1+79 r r - o` 12" RCP CULVERT STA. 3+1 EXISTING GROUND 4675.0 ------- -- STA.-2+09.0 a 1 a INSTALL - 6" & 1 - 12" - 4675.0 b 22.5" X +09.036.25" w DIA. HDP UTILITY CONDUITS. STA. 7 80 ARCH CULVERT L = 40'. INV 4680.32 INSTALL 1 - 6" & 1 - 12'�i 4670.0 _ _ ----DIA-HDPE UTILITY CONOU TS. 4670.0 s - - - L = 40'. INV 46 4.5 4665.0 4665.0 i n n w n rn w rn a rn a rn e o �n .vn ars na es ma ow � aao�n oao voice rno m0 d w ww ww w w aoanvi 'nacD s as v s a as a m a 0 o 0 0 o 0 0 0 0 0 0 0 n o 0 0 0 o 0 0 0 0 0 0 0 0 0 o o 0 o 0 0 0 0 0 o O ro o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 oo o - � 0 � p N O � O N O O O O 0 N i(1 O N V) u1 _ + + + + + + ry + + + + + + + + + + + + + n O N aD O n n w w w I PROFILE VIEW 8 NO. REVISIONS DRAWN BY DATE HORIZONTAL SCALE VERTICAL SCALE PROJECT /: 03-242 SHEET J 1 REMOVED LOT 12 ACCESS CGB 5 24 05 0 30 DATE 1: 2/6/2004 � GALLATIN CENTER - PHASE IV 1� Civil Engineering 32DISCOVERYDRIVE C2 of 5 * * Land Surveying BOZEMAN,MT 59718 R-MAX.DWG 1 INCH = 30 FEET 1 INCH = 10 FEET f ' ie; MAX AVENUE PHONE(406)582-0221 GALLATIN CENTER-PHASE IV PROJECT ENGINEER: CGB DRAWN BY: DLG '` ALLIED Geotechnical Engineering FAX(406)582-5770 BOZEMAN MONTANA ENGINEERING MAX AVENUE DESIGNED BY: DLG I REVIEWED BY: CGB se,Rvaces,wc. w`5 STA. 8+01.63 (LT) 30 LF OF 8" SDR 35 PVC SEWER MAIN. STA. 1+98.5 S = 0.82% W TIE INTO EXISTING 8" SDR 35 PVC STUB. ra ENO INVERT = 4669.00 a J m ail r 3 'y EXT'C 12" D.I. WATER MAIN vi W 8" PLUG MH M3 (EXT'G) CROSSING. 2.5' SEPERATION c� FOR FUTURE EXTENSION �1 STA. 2+68.45 > t �a a STA. 0+10.0 R.O.W. I R.O.W. EDGE OF PAVEMENT I 30' EDGE OF PAVEMENT " EXISTING 12""DI CLASS 51 WATER MAIN 8" SDR 35 PVC SEWER MAIN ro cN 16, 8" SDR 35 PVC SEWER MAIN 60' ROW c .S�o.S .S o (n m s S + o S �S s p S, ' EXISTING 10" SAN SWR­ N Z U 30, o o MAX AVENUE o t.---- EDGE OF PAVEMENT MI EDGE OF PAVEMENT (Y z � I R.O.W. 'e < R.O.W. \MH M2 MH M3 (EXT'G) _ -• 3 STA 3+12 STA. 6+04,23 STA. 8+01.63 N 3 I TIE INTO EXISTING 8" SDR 35 PVC STUB. TIE INTO EXT'G MH, W -f OPENING GROUTED TO FIT 8" PIPE. I I }r- - - a RIM ADJUSTED TO NEW F.G. j N � M Q N .. �I I Nj jo N O mm-+ im W X W PLAN VIEW 7A ]ILD3UIL 4715. _ 4715.0 4710.0 ti ;z 4710.0 N ne �rn 4705.0 °p n 0 7 .n nod 4705.0 = N ng 4700.0 a m n �aNa II m ^ �'a II �a� c Nm 'm j x �o Na a F =,r1N II 4700.0 a0 O N�pp �IIr m+II omia <}air ONO o 0 m � 4695.0 r II r+ +a- p a x r+r N Il�m I =m rr +d 4695.0 z^� a3�� z w MOB mIrr 4690.0 z z EXISTING GROUND' FINISHED �� w' x2z "'¢� 642� ! <s 4690.0 i PAVED ROAD FVIz ��,z a &zz �gzz EXISTING GROUND FINISHED - 4685.0 - - -_` -- ._ PAVED ROAD - - - - - _ - 4685.0 4680.0 4680.0 188.5 LF OF 8" SDR 35 PVC SEWER MAIN (EXT'G7 EXIST. WATER MAIN _8"SAN SSWR (EAN FIELD VERIF LOCATION a 4675.0 SLOPE - 0.967E _ - El. SWR 290.23 LF OF 8" SDR 35 PVC SEWER MAIN 4675.0 S 0.96% S 0.969> 4670.0 SLOPE 0.999. - 193.4 LF OF 8" SDR 35 PVC SEWER AIN 4670.0 x i SLOPE 1.287 4665.2 4665.2 o N - m a rn a m o n r iri vi < a ri C5 6 w a a a < e a a a R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 00 0 0 0 0 0 ,5 o voi 0 N O N O O O O O + + { + + + + + + + + + + + + N N h rry d + i+ + b i0 n n m PROFILE VIEW "s NO. REVISIONS DRAWN BY DATE HORIZONTAL SCALE VERTICAL SCALE 1 REVISED SEWER FROM LOT 12 CGB 5,24,05 0 30 0 10GALLATIN CENTER - PHASE IV PROJECT 1)1: 03-242 SHEET o C1V1I Engineering 32 DISCOVERY DRIVE DATE: 2/16/2004 1 INCH = 30 FEET 1 INCH = 10 FEET * we * Land Surveying BOZEMAN,MT59716 S-MAX.DWG C3 of 5 Y PROJECT ENGINEER: CGB DRAWN BY: DLG MAX AVE SEWER ALLIED Engineer Geotechnical EnBin PHONE(406)-5770 1 GALLATIN CENTER-PHASE IV DESIGNED BY: CGB, DLG REVIEWED BY: CGB BOZEMAN,MONTANA ENGINEERING FAA(406)sae-s77o SEWER MAX AVE BERVIGES.INC. FRAME AND COVER TO BE EITHER CAIRO NO. 52441, MCI 305 FRAME, 305A COVER, OR IFCO 772 FRAME, 772-B 7" COVER. COVERS SHALL HAVE 1" PICK HOLES. NOTE: ALL JOINTS BETWEEN MANHOLE SECTIONS, ADJUSTABLE RINGS, MANHOLE RING & TOP SECTION, AND AROUND SEWER 2" MIN., 12' MAX. PIPE INTO MANHOLE SHALL BE WATERTIGHT. JOINTING MATERIAL SHALL BE "RAM-NEK' OR EQUAL FOR ALL GENERAL NOTES: k EXCEPT BETWEEN SEWER PIPE AND MANHOLE NOTE:WHERE TRENCH PASSES THROUGH EXISTING PAVEMENT THE PAVEMENT SHALL BE CUT ALONG A NEAT VERTICAL LINE A MINIMUM 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO MONTANA PUBLIC WORKS STANDARDS, PRECAST REINFORCED CONCRETE OF 12" FROM THE EDGE OF THE TRENCH OPENING. WHERE NEAT LINE LATEST EDITION NTH CITY OF BOZEMAN MODIFICATIONS. UNLESS OTHERWISE APPROVED BY THE 5" IS LESS THAN 3' FROM THE EXISTING PAVEMENT OR CURB AND ENGINEER CONSTRUCTION SHALL BE DONE BETWEEN 8:00 A.M. AND 5:00 P.M., MONDAY THROUGH 4'-0" MANHOLE RISER & ECCENTRIC CONE GUTTER SECTION, REMOVE ANBD REPLACE ENTIRE PAVEMENT SECTION FRIDAY. TOP MANUFACTUREDIN ACCORDANCE BETWEEN TRENCH AND EDGE OF PAVEMENTWITH ASTM DESIGNATION C-478. 2. THE CONTRACTOR SHALL NOTIFY THE CITY 24-HOURS PRIOR TO BEGINNING OF ANY WAORK. MANHOLE EXTG STREESTEPS A FACE 3. ANY EXISTING OR NEW VALVES WHICH CONTROL THE CITY Of BOZEMAN'S WATER SUPPLY SHALL BE 16' CENT CRUSHED ROCK OPERATED BY CITY OF BOZEMAN PERSONNEL ONLY. 12' (T�'P) 4. CONTRACTOR SHALL FIELD VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES WHERE NEW FACILITIES CROSS OR CONNECT. CONTRACTOR SHALL BE RESPONSIBLE FOR EXPOSING POTENTIAL UTILITY CONFLICTS FAR ENOUGH AHEAD OF CONSTRUCTION TO MAKE NECESSARY GRADE 48" DIA. MANHOLE REQUIRED FOR MODIFICATIONS WITHOUT DELAYING THE WORK. ALL UTILITY CROSSINGS SHALL BE POTHOLED AS < INSIDE DROP, SEE COB STD. DWG. NECESSARY PRIOR TO EXCAVATING OR BORING TO ALLOW THE CONTRACTOR TO PREVENT GRADE OR NO. 02722-10. ALIGNMENT CONFLICTS, Z 48" _ STALL DETECTABLE WARNIN ER VARIABLE X i TAPE 18'MAX. DEPTH 5.CITYOANDAMDTR SHALL ERECT R REQUIREMENTS IND MAINTAIN ACCORDANCE NTH THESMUTCD(NG SIGNS, AND(INCLUDING MONTANAFIC CONES AMENDMENTS). a w N SHELF-SLOPE 1" PER FOOT TOWARD TYPE "A N CHANNEL (SEE CHANNEL DETAIL) TRENCH BACKFILL ALL ACTIVITY.TRAFFIC CONTROL MEASURES SHALL 13E APPROVED AND IN PLACE PRIOR TO ANY CONSTRUCTION a m _FLEXIBLE GASKETED JOINT(TYPICAL yf FOR PRECAST BASES - SEE DETAIL) 6. AT LEAST 2 BUT NOT MORE THAN 10 BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION, THE JIL A SLOPING, BENCHING OR SUPPORT SYSTEMS IN THIS CONTRACTOR SHALL, ACCORDING TO MCA 69-4-501, NOTIFY ALL OWNERS OF UNDERGROUND FACILITIES AND COORDINATE THE WORK WITH THE OWNERS OF SUCH UNDERGROUND FACILITIES. THE CHANNEL DIA OF PIPE AREA TO CONFORM TO INFORMATION SHOWN OR INDICATED IN THE CONTRACT DOCUMENTS WITH RESPECT TO EXISTING _ O.S.H.A. REGULATIONS" UNDERGROUND FACILITIES IS BASED ON INFORMATION AND DATA OBTAINED FROM THE OWNERS Of THE A L _ FACILITIES WITHOUT FIELD EXPLORATION, AND AS SUCH, OWNER AND ENGINEER ARE NOT RESPONSIBLE `#4 BARS — 1'—D" c c 6' FOR THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. PRECAST OR POURED—IN—PLACE BASE. TYPE I BEDDING PLACED 5'-4" DIA. POURED—IN—PLACE BASE, MINIMUM CONCRETE IN 6' MAX. LAYERS 7. PIPE BEDDING AND BACKFILL ALL PIPES SHALL BE BEDDED WITH MINIMUM 4—INCHES OF TYPE 1 (MIN.) THICKNESS BELOW PIPE IS 8 INCHES. AND COMPACTED THOROUGHLY. SELECT TYPE 1 BEDDING PIPE BEDDING AND BACKFILLED WITH THE SAME MATERIAL A MINIMUM OF 6—INCHES OVER THE TOP OF ADIUS OF PRECAST BASE, MINIMUM THICKNESS IS 6 MATERIAL PLACED IN 6" THE PIPE PER CITY OF BOZEMAN STANDARD DETAIL 02221-1. MANHOLE INCHES. ALL BASES REINFORCED AS SHOWN, LAYERS AND COMPACTED AS SLOPE AT 1" PER SPECIFIED IN SECTION 02221. 8. CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND FACILITIES REQUIRED FOR TESTING FOOT CHANNEL TO GROUT INVERT TO SPRINGLINE ALL UTILITY PIPING IN ACCORDANCE WITH CITY CONSTRUCTION SPECIFICATIONS. COST OF ALL INITIAL FULL PIPE DEPTH OF PIPE IF GAP BETWEEN PIPE AND RETESTING SHALL BE BORNE BY THE CONTRACTOR. AND CHANNEL IS GREATER THAN 1/8" 4" (10CM) 9. NO TRENCHES IN ROADS OR DRIVEWAYS SHALL BE LEFT IN AN OPEN CONDITION OVERNIGHT. ALL PRE—CAST CHANNEL DIA. OF SEWER PIPE TYPE 2 PIPE BEDDING COMPACTED SUBGRADE SUCH TRENCHES SHALL BE BACKFILLED, COMPACTED AND CLOSED BEFORE THE END OF EACH WORK FLOWLINE TRENCH WIDTH _� L— _ WHERE REQUIRED FOR O.D. OF PIPE + 2� DAY AND NORMAL TRAFFIC FLOWS RESTORED. SOFT OR UNSTABLE FOUNDATION MIN. TRENCH WIDTH=3.5' SANITARY SEWER SECTION A—%, 'SEE O.S.H.A. CONSTRUCTION STANDARDS FOR EXCAVATIONS. 10. UNLESS OTHERWISE SPECIFIED, SANITARY SEWER PIPE SHALL BE PVC IN CONFORMANCE WITH ASTM D-3034, SDR 35, ALL OTHER APPURTENANCES AND INSTALLATION TO CONFORM TO THE CITY OF BOZEMAN SPECIFICATIONS, I DETAIL 2 DETAIL 11. PER DEQ REQUIREMENTS, CONTRACTOR SHALL HAVE SEWER INSTALLATION INSPECTED AND TESTED C4 SANITARY SEWER MANHOLE C4 TYPICAL UTILITY TRENCH PER DEQ PROCEDURES AND CERTIFIED BY A LICENSED ENGINEER. CONTRACTOR TO PROVIDE ENGINEER C.O.B. STD DETAIL NO. 02722-1 C.O.B. STD DETAIL NO. 02221-1 WITH 48 HOURS ADVANCE NOTICE FOR INSPECTION. MANHOLE TESTING SHALL BE PERFORMED PRIOR TO PAVING AND FINAL SURFACE RESTORATION. 12. OPENINGS FOR CONNECTIONS TO EXISTING MANHOLES SHALL BE MADE BY SAWCUTTING OR CORE—DRILLING EXISTING MANHOLE STRUCTURE. USE OF PNEUMATIC JACKHAMMERS SHALL BE PROHIBITED. CONNECTIONS TO BE WATERTIGHT AND SHALL PROVIDE A SMOOTH FLOW INTO AND THROUGH THE MANHOLE. SMALL CHIPPING HAMMERS OR SIMILAR LIGHT TOOLS WHICH WILL NOT DAMAGE OR CRACK THE MANHOLE BASE MAY BE USED TO SHAPE CHANNELS OR ENLARGE EXISTING OPENINGS IF AUTHORIZED BY THE ENGINEER. 13. CLEANING. PRIOR TO TESTING AND TV INSPECTION, CONTRACTOR SHALL FLUSH AND CLEAN ALL SEWER PIPE AND MANHOLES AND REMOVE ALL FOREIGN MATERIAL. 14. LEAKAGE TESTING. SANITARY SEWER PIPE AND APPURTENANCES SHALL BE TESTED FOR LEAKAGE BY CONTRACTOR. LEAKAGE TESTS SHALL BE COMPLETED PER MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS AND CITY OF BOZEMAN MODIFICATIONS. 15. MANDREL TESTING. AT THE DISCRETION OF THE ENGINEER, THE CONTRACTOR SHALL CONDUCT DEFLECTION TEST OF FLEXIBLE SANITARY SEWER PIPES BY PULLING AN APPROVED MANDREL THROUGH THE COMPLETED PIPE LINE FOLLOWING TRENCH COMPACTION. THE DIAMETER OF THE MANDREL SHALL BE 95%OF THE INITIAL PIPE DIAMETER. TEST SHALL BE CONDUCTED NOT MORE THAN 7 DAYS AFTER THE TRENCH BACKFILLING AND COMPACTION HAS BEEN COMPLETED. 16. TV INSPECTION. UPON COMPLETION OF ALL SEWER CONSTRUCTION, TESTING AND REPAIR, THE CONTRACTOR SHALL COORDINATE A COLOR TV ACCEPTANCE INSPECTION OF ALL MAINLINES. THE TV INSPECTION SHALL BE CONDUCTED BY THE CITY OF BOZEMAN. SUFFICIENT WATER TO REVEAL LOW a AREAS OR REVERSE GRADES SHALL BE DISCHARGED INTO THE PIPE IMMEDIATELY PRIOR TO INITIATION OF THE TV INSPECTION. THE VHS TAPE AND WRITTEN REPORT SHALL BE DELIVERED TO THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL COORDINATE AND PAY ALL COSTS FOR TV INSPECTION. AS-IX33UILTI zi s NO. REVISIONS DRAWN BY DATE ti AN9 — PROJECT #: 03-242 SHEET 1 REVISED DETAILS REMOVED WTR CGB 5 24 05 NOT TO SCALE GALLATIN CENTER PHASE IV Civil Engineering 32 DISCOVERY 59718 DATE: 2/1PUBLIC C4 of 5 o. L� Land Surveying B02:EMAN,MT 59718 DETAILS—PUBLIC * * CIVIL DETAILS - PUBLIC ALLIED Geotechnical Engineering PHONE(4%)592-0221 GALLATIN CENTER-PHASE IV PROJECT ENGINEER: CGB DRAWN BY: CGB i BOZEMAN FAX(406)582-5710 MT ENGINEERING Structural Engineering CIVIL DETAILS A DESIGNED BY: CGB REVIEWED BY: JDB Es�a 6ERVICE6.INC. \ - +-- ~ --- LOT 11 _ I LOT 12 � ( ) L O - } - - -_-- CATTAIL BTREEr "- ARCH CULVERT W/FETS .�-,.1 - � _ --- - -- - S INV. IN W 4682.41 � _ �Y_�Fs --;' - INV. OUT E 4682.15 L = 50 S = 0.52% CA AIL STREET L11 LOT 16 I Ia.xl.era. y a LOT 14 LOT 13 I < L I % �I x L65 aan 1.38 acre I Im LOT 15 I 15" RCP STS W/FETS I - �_-T-0.61 aorta C 18" RCP STS PIPE W/FETS �S- 129% L =28' S= 2.21X L =39'- _ INV. IN 4684.11 I LOT 17 INV. IN 4684.25 �� JI INV. OUT 4683.19 LOT 18 376.- I INV. OUT 4683.39 RIP RAP OUTLET WITH WITH I 4.04- I 24" RCP STS PIPE W/FETS 0.5 C.Y. 4"-6" ROUND ROCK S= 0.50%L =30 --� I-t DETENTION POND D I ,!-BASIN BOUNDARY INV. OUT 4682.35 �` // 36" DIA. FLOW CONTROL STRUCTURE r RIM 4684.95 CREST EL = 4682.66 I Ir DETENTION POND C % 15" INV OUT 4682.64 48" DIA. FLOW \\ WEIR WIDTH - 1.0" II CONTROL STRUCTURE RIM 4684.72 24" INV OUT 4682.50 15" RCP STS PIPE W/FETS iI WEIR WIDTH = 3.25" S= 3.5%L -14' \\ INV. OUT 4682.15 II 15" RCP STS W/FETS S= 1.96X L =24' INV. IN (E) 4683.62 BASIN D II INV. OUT (W) 4683.15 - RIP RAP OUTLET MATH ,d - NTH 0.5 C.Y. 4"-6" ROUND ROCK !! 15" RCP STS W/FETS II LOT 19 S= 0.18%L =40' BASIN C INV. IN (E) 4683.75 NV. OUT (W) 4683.68 r/f II � � oil I I II DETENTION BASIN - PLAN VIEW SCALE 1"=30' - PROPOSED I L---- ----- -- FINISH SURFACE OVERALL, BASIN SCALE 1"=120' VARIES SPECIFIED SEE PLAN VIEW SLOT WIDTH SLOPING, BENCHING OR TYPE "A" SUPPORT SYSTEMS IN THIS TRENCH BACKFILL AREA TO CONFORM TO O.S.H.A. REGULATIONS PLI VIEW-OUTLET STRUCTURE L CAST IRON GRATE III 6" %ti \ SELECT TYPE I BEDDING MATERIAL PLACED IFCO #700-71 OR IN 6" LAYERS AND COMPACTED �VARIES� APPROVED EQUAL 4" ---- \ AS SPECIFIED IN GEOTECH REPORTS DETENTION BASIN SUMMARY T- TYPE I PIPE BEDDING PLACED IN 6" BASIN C BASIN D MAX. LAYERS AND COMPACTED AS _ RIPRAP OUTLET 3 4 I VARIES VARIES SPECIFIED IN GEOTECH REPORT ) 1 SEE PLAN VIEW BASIN AREA = 804,650 S.F. 18.47 ACRES BASIN AREA = 202,581 S.F. 4.65 ACRES -WITH 6"-B" COBBLES. TYPE I PIPE BEDDING PLACED PRE-DEVELOPMENT PRE-DEVELOPMENT IM ELEVATION TRENCH WIDTH-O.D. IN 6" MAX. LAYERS AND COMPACTED 8 OF PIPE PLUS 2' AS SPECIFIED IN GEOTECH REPORT RUNOFF COEFFICIENT (C) = 0.2 RUNOFF COEFFICIENT (C) = 0.2 I \ MIN. TRENCH WIDTH=3.5' TIME OF CONCENTRATION = 40 MINUTES TIME OF CONCENTRATION = 41 MINUTES `` VARIES RAINFALL INTENSITY(I) = 0.83 IN/HR RAINFALL INTENSITY(I) = 0.82 IN/HR II CREST PEAK RUN-OFF (0) = 3.08 CFS PEAK RUN-OFF (0) = 0.76 CFS OUTLET PIPE INVERT ELEVATION SLOT\ SEE PLAN VIEW FOR SIZE AND SLOPE OUT ELEV. HEIGHT SECTION POST-DEVELOPMENT POST-DEVELOPMENT 5 TYPICAL SCALE RUNOFF COEFFICIENT C a ( ) = 0.8 RUNOFF COEFFICIENT (C) = 0.8 8 1 9" TIME OF CONCENTRATION = 16 MINUTES TIME OF CONCENTRATION = 14 MINUTES 3 PROVIDE WATER-TIGHT RAINFALL INTENSITY (1) = 1.51 IN/HR RAINFALL INTENSITY(1) = 1.65 IN/HR JOINT I *SEE O.S.H.A. CONSTRUCTION STANDARDS FOR EXCAVATION PEAK RUN-OFF (Q) = 22.33 CFS PEAK RUN-OFF (0) = 6.13 CFS DETENTION REQUIRED: 22,627 CF DETENTION REQUIRED: 5,706 CIF _ DETENTION PROVIDED: 23,307 CIF DETENTION PROVIDED: 5,929 CIF 2' X2' X8" DEEP j INLET ARMOR USE-' 2 DETAIL 6"-8" COBBLES cg TYPICAL TRENCH DETAIL - NTS 1 DETAIL �������� _ � DETENTION POND FLOW CONTROL STRUCTURE NOT TO SCALE N0. REVISIONS DRAWN BY DATE PROJECT #: 03-242 SHEET SCALE AS NOTED GALLATIN CENTER - PHASE IV � Civil Engineering 32 DISCOVERY DRIVE DATE: 2/16/04 C5 of 5 za Land Surveying BOZEMAN,MT 59718 DIET BASIN DETENTION BASIN C & D DESIGN ALLIED Geotechnical Engineering PHONE(406)592-0221 GALLATIN CENTER-PHASE IV FAX(406)582-5770 PROJECT ENGINEER: CGB DRAWN BY: CGBEll BOZEMAN,MT ENGINEERING Structural Engineering DET.BASIN C&D DESIGNED BY: CGB REVIEWED BY: PJS se�xvicEs,i'ac.