Loading...
HomeMy WebLinkAboutExcellence Theaters 4900 4901 4902 4903 4904 4 4906 49074908 4909 F j�J Iw_ I MAIN N N 4899 IRE EE 4910 FOR: EXCELLENCE THEATER it BY : GASTON ENGINEERING AND SURVEYING ARCHITECT: SPRINGER GROUP 4900 4911 9 4912 �Tn ru 4901 EXIST.AR TIEA�� 4913 e•CL 5119P� GENERAL NOTES: CONSTRUCTION NOTES: CLASS I SYSTEM r 4914 AS PER CITY OF BOZEMAN , FIRELINE POLICY OCT. 1, 1993 V- I u1 1. THE LOCATION &OR ELEVATION OF EXISTING UTILITIES 000NSTRUCT 4" DI 90'M.J. BEND AND THRUST BLOCK. 4902 _- 4915 < SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES OR CITY OF BOZEMAN 490- _ . /_ F> ; RECORD. THE INFORMATION IS NOT TO BE RELIED ON 2 4' DI CLASS 51 RISER PIPE W/ THREADED FLANGE i AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST O ALL ONE PIECE �Z7 THEi ADDIT CALL FOR UTILITY LOCATION AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION AND REQUEST EXACT 3/4- MIN REDI ROD, INSTALLED IN HALF OF THE FIELD LOCATION OF ALL UTILITIES. IT SHALL O AVAILABLE M.J. FLANGE BOLT HOLES (TYP.) I.E. EVERY BE THE RESPONSIBILITY THE CONTRACTOR TO OTHER HOLE. U RELOCATE ALL EXISTING UTILITIES WHICH FIRE LINE 4916 CONFLICT WITH PROPOSED IMPROVEMENTS SHOWN 4904_ ( ON PLANS OR SPECIFIED IN SPECIFICATIONS. 0 4" FLANGED MUELLER OR KENNEDY OS&Y VALVE 2. FIRE LINE CONSTRUCTION SHALL BE IN COMPLETE 4" DIA UL/FM LISTED DOUBLE CHECK VALVE ASSEMBLY ACCORDANCE WITH CITY OF BOZEMAN INTERIM FIRE O AS APPROVED BY THE UNIVERSITY OF SOUTHERN LINE POLICY OCTOBER 1993. INCLUDING STD DETAIL CALIFORNIA FOUNDATION FOR CROSS CONNECTION 4917 NO. 2718-6A. &HYDRAULIC RESEARCH. 4905 � 3 HLD WITH THERCONTRACTOR,OENGNEEIR, AND CITY NG SHALL E OFEBOZEMAN O 4° DIA FLOW ALARM DEVICE PRIOR TO CONSTRUCTION. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF ASPHALT, GRAVEL BASE, AND O 4" M.J. GATE VALVE CONCRETE SIDEWALK AS PER CITY OF BOZEMAN STD 4918 SPECIFICATIONS. 4906 • 5. TRAFFIC CONTROL FOR WORK CONDUCTED IN THE PARKING - - LOT WILL BE REQUIRED, AND CONDUCTED AS PER MPW , STANDARD SPECIFICATIONS AND CITY OF BOZEMAN REGULATIONS. 4907 6. THE DOUBLE CHECK VALVE ASSEMBLY MUST BE APPROVED F657,41' 4909 4910 4911 4912 4913 t9N t915 4916 49i7 4918 BY THE MANUFACTURER AND THE FOUNDATION FOR CROSS- CONNECTION CONTROL &HYDRAULIC RESEARCH UNIVERSITY OF ERN CALIFORNIA, FOR OPERATION IN THE VERTICAL WATER MAIN EXTENSION POSITION. AND FIRE _INE PLAN SCALE' PLAN: 1'-30' 4810 - _-- -- - I 5 llI AM -- s WALL I ! 6 4= &3 �4. ai'vIPE 4 2 FLANGE TO BE THREADED MIN ON THE STANDPIPE EXISTING GRADE CONTRACTOR TO PROVIDE FLOOR A FLEXIBLE SEAL THROUGH FLOOR �pNT4 � I'MINIMUM `•GERM ...9 0�0 N SD4E 4WD FOUNDATION 8 �•� . - 3 6.5'MIN. 2 AS CONSTRUCTED: 12/93 4M - GASTON ENGINEERING & SURVEYING BOZEMAN & BUTTE, MONTANA EXCELLENCE THEATERS 72'lF4'DICLSIPIPE BOZEMAN, MONTANA AUM FIRE LINE PROFILE DRAWN BY:CTD PROPOSED FIRE LINE DATE:10-1-93 WATER MAIN EXTENSION SCALE; AND DETAILS CHECKED BY: STA. 0+20 TO 1+01.62 � MG "SED•' 14 94 _ PROFILE HORIZ: 1'=30' APPROVED BY: GC DWG. & 89533FIR STA 0+20 TO 1+01.E2 VERT: 1"=5 SCALE: As SHOWN PROJECT: 89-533 SHEET 1 OF ,