Loading...
HomeMy WebLinkAboutEllis Street and Old Highland Blvd Road Improvements ELLIS STREET AND OLD HIGHLAND BLVD. ROAD IMPROVEMENTS I 1 I� OLD HIGHLAND BLVD. PATHS ROAD SHEET INDEX SHEET NO DESCRIPTION R1 ROAD IMPROVEMENTS — ELLIS STREET AND OLD HIGHLAND BLVD. i R2 ELLIS STREET — STA 0+00 TO 8+50 PLAN AND PROFILE R3 ELLIS STREET — STA 8+50 TO 11+35 PLAN AND PROFILE I R4 OLD HIGHLAND BLVD. — PLAN AND PROFILE R5 OLD HIGHLAND BLVD. — PATHS AND DETAILS — SHEET R4 OLD HIGHLAND BLVD. GENERAL NOTES _\SHEET RS 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO MONTANA PUBLIC WORKS STANDARDS, 4TH EDITION AND ADDENDUM N2 NTH CITY OF BOZEMAN MODIFICATIONS. UNLESS OTHERWISE APPROVED BY THE ENGINEER -� - ------ -•�--�.-�-___ --_I CONSTRUCTION SHALL BE DONE BETWEEN 8:00 A.M. AND 5:00 P.M., MONDAY THROUGH FRIDAY. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MANAGING CONSTRUCTION ACTIVITIES TO INSURE THAT PUBUC i STREETS AND RIGHT-OF-WAYS ARE KEPT CLEAN OF MUD, DUST OR DEBRIS, DUST ABATEMENT SHALL BE MAINTAINED BY ADEQUATE WATERING OF THE SITE BY THE CONTRACTOR. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR ALLOW CONSTRUCTION DEBRIS, MUD OR GRAVELS TO BE LEFT WITHIN THE RIGHT OF WAY I f. OVERNIGHT. M 3. CONTRACTOR SHALL NOTIFY ENGINEER 72 HOURS PRIOR REQUIRED PRE-CONSTRUCTION CONFERENCE AND PROVIDE ALL NECESSARY MATERIAL AS REWIRED BY THE CITY OF BOZEMAN. 4.CONTRACTOR SHALL FIELD VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES WHERE NEW FACILITIES CROSS OR CONNECT. CONTRACTOR SHALL BE RESPONSIBLE FOR EXPOSING POTENTIAL UTILITY CONFLICTS FAR I Ca ENOUGH AHEAD OF CONSTRUCTION TO MAKE NECESSARY GRADE MODIFICATIONS WITHOUT DELAYING THE WORK. ALL UTILITY CROSSINGS SHALL BE POTHOLED AS NECESSARY PRIOR TO EXCAVATING OR BORING TO ALLOW THE CONTRACTOR TO PREVENT GRADE OR ALIGNMENT CONFLICTS, 5. CONTRACTOR SHALL ERECT AND MAINTAIN BARRICADES, WARNING SIGNS, AND TRAFFIC CONES PER CITY AND MDT REQUIREMENTS IN ACCORDANCE WITH THE MUTCD(INCLUDING MONTANA AMENDMENTS). ALL TRAFFIC CONTROL MEASURES SHALL BE APPROVED BY THE CITY AND IN PLACE PRIOR TO ANY CONSTRUCTION ACTIVITY. 6. AT LEAST 2 BUT NOT MORE THAN 10 BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION, THE CONTRACTOR SHALL, ACCORDING TO MCA 69-4-501.NOTIFY ALL OWNERS OF UNDERGROUND FACILITIES AND COORDINATE THE WORK WITH THE OWNERS OF SUCH UNDERGROUND FACILITIES. THE INFORMATION SHOWN OR INDICATED IN THE CONTRACT DOCUMENTS WITH RESPECT TO EXISTING UNDERGROUND FACILITIES IS BASED ON INFORMATION AND DATA OBTAINED FROM THE OWNERS OF THE FACIUTES WITHOUT FIELD EXPLORATION, AND AS SUCH, OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. 7, STRIP WORK LIMITS, REMOVING ALL ORGANIC MATTER WHICH CANNOT BE COMPACTED INTO A STABLE MASS. ALL ABANDONED ROADWAY MATERIALS, TREES.BRUSH AND DEBRIS ASSOCIATED WITH CLEARING, STRIPPING OR GRADING SHALL BE REMOVED AND DISPOSED OF OFF-SITE. REGRADE SHOULDER TO CREATE SMOOTH TRANSITION BETWEEN NEW AND EXISTING GROUND, 3:1 MAX. SLOPE. BOZEMAN DEACONESS E._. s•fzEf 8. IMMEDIATELY FOLLOWING STRIPPING OPERATIONS, COMPACT SUBGRADE TO 95X OF THE MAXIMUM DRY HOSPITAL DENSITY PER ASTM D-698 TEST METHOD(STANDARD PROCTOR). SUBGRADE MUST BE INSPECTED AND APPROVED BY THE OWNER'S REPRESENTATIVE PRIOR TO PLACING EMBANKMENTS, ENGINEERED FILLS OR FINE GRADING FOR BASE ROCK. , ! 9. ALL FILLS SHALL BE ENGINEERED. ENGINEERED FILLS SHALL BE CONSTRUCTED IN 6" LIFTS OVER APPROVED SUBGRADE. EACH LIFT SHALL BE COMPACTED TO 959E OF THE MAXIMUM DRY DENSITY PER AASHTO T-180 TEST METHOD (MODIFIED PROCTOR). `\ \ 10. CONCRETE CURB & GUTTERS AND VALLEY GUTTERS SHALL BE M-4,000 PSI CONCRETE O 28 DAYS AND SHALL CONFORM TO MONTANA PUBLIC WORKS STANDARDS, 4TH EDITION, ADDENDUM p2 WITH CITY OF BOZEMAN MODIFICATIONS. �\ i 10. SIX—INCHES NOMINAL CURB EXPOSURE SHALL BE USED FOR ALL STREETS. CONTRACTOR SHALL CONSTRUCT HANDICAP ACCESS RAMPS AT ALL LOCATIONS SHOWN IN ACCORDANCE WITH CURRENT �\ j ADA REQUIREMENTS, 11. A.C. PAVEMENT SHALL CONFORM TO MONTANA PUBLIC WORKS STANDARDS, COMPACTED �� ����T ADDENDUM �12 WITH CITY OF BOZEMAN MODIFICATIONS. A.C. PAVEMENT SHALL BE BE COMPACTED EQUAL TO OR GREATER THAN 95%OF MARSHALL LABORATORY DENSITY. e 12. ALL EXISTING OR CONSTRUCTED MANHOLES, CLEANOUTS, MONUMENTS, GAS VALVES, WATER VALVES AND SIMILAR STRUCTURES SHALL BE ADJUSTED TO MATCH FINISH GRADE OF THE PAVEMENT, SIDEWALK, LANDSCAPED AREA OR MEDIAN STRIP WHEREIN THEY LIE. 13. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, STRAIGHT GRADES SHALL BE RUN BETWEEN ALL ,� `�.\` �•, ' FINISH GRADE ELEVATIONS AND/OR FINISH CONTOUR LINES SHOWN. UNLESS OTHERWISE SHOWN, NO �r --- CUT OR FILL SLOPES SHALL BE CONSTRUCTED STEEPER THAN 2H:iV. 14. PRE—PAVING INSPFCTIQbL PRIOR TO PAVING OF STREETS A PRE—PAVEMENT INSPECTION SHALL �\ BE CONDUCTED. THE CONTRACTOR, A REPRESENTATIVE OF THE CITY AND THE ENGINEER SHALL ------ __ ATTEND THE INSPECTION. CONTRACTOR SHALL GIVE A 48 HOUR (2 BUSINESS DAYS) NOTICE TO THE \�\ CITY AND ENGINEER PRIOR TO CONDUCTING THE PRE—PAVING INSPECTION. \_`— 1 REVISIONS DRAWN BY DATE �pNTgh,4 PROJECT#: 02-039 SHEET J 1 _REVISED PER CITY REVIEW GBH 4 i6 03 2 REVISE TO CENTERLINE DESIGN GBH 5 16 03 NOT TO SCALE HRIS G ROAD IMPROVEMENTS Civil Engineering 32 DISCOVERY DRIVE DATE: 10/2002 R�OF 5 3 AS—BUILTS 3 15 05 eU 21 ELLIS STREET AND OLD HIGHLAND BLVD. y� g BOZEMAN,MT 59718 OVERALL $ �,,,,� . . Land Surve in PHONE(406)582-0221 OVERALL SHEET 1 OF 5 PROJECT ENGINEER: CGB DRAWN BY: GBH 'F, ALLIED Geotechnical Engineering FAX(406)582-5770 DESIGNED BY: CGB REVIEWED BY: CGB �avAL BOZEMAN, MONTANA ENGINEERING BOZEMAN DEACONESS SERVICES.INC. OVERALL 15 LF 18" RCP STORM SEWER W/FET. 10 LF 12" RCP STORM SEWER SLOPE - O.5X. RIPRAP OUTLET. W FET. SLOPE = 0.59. INVERT OUT 4868.E / RIPRAP OUTLET. CURB INLET STA. 7+88.16, 13.00 RT CURB INLET STA. 0+80, 25.00 RT Z TBC - 4874.91, INV. OUT = 4868.7 TBC - 4863.65 EXISTING COMBINATION SIGN. Q SEE DETAIL® SEE DETAIL UCT CONCRETE VALLEY GUTTER SEE DETAIL 4859.55 RELOCATE 10' NORTH. a�y , 1 REMOVE EXSITING 24" CMP CULVERT s� PT-STA. 0+54.97 W TYPICAL PAVEMENT MARKINGS STA. 0+49 TO 2+57, 4" DSYL W/8" SPACE STA. 0+49 TO 1+28. 8" SWL 25.00 RT h FOR PEDESTRIAN CROSSINGS TBC-4863.48 �•/ SEE DETAIL[i� PC=STA. 1+27.91 ASPHALT°SECTIONT NEW C SAWCUTR, AND �'l 486 RT -- REMOVE EXISTING CURB AND ASPHALT TBC=4863.89 R=27 5' d PATH. TRANSITION PATH TO MATCH PC-STA. 2+27.06 i 14.82 RT �i EXISTING CURB AND ASPHALT PATH. 26 LF 18" RCP STORM TBC-4865.42 TBC=4861.95t PT-STA. 1+57.67 - - SEWER. SLOPE - 0.77X. - 60 PEDESTRIAN RAMP (TYP) PT-STA. 2+57.30 23.21 RT - 4 - 13.00 RT TBC=4864.10- i SEE DETAIL e - - - Z - -48 TC-4866.34 -48657 - 13, ' a row g g g g $ 13, g - 12' II g - - { - - ELLIS STREET- + I - I - -I - - i - - -1 - I - - + + - \ }ID n 15, ro R=250' 13 ADJUST WATER VALVES TO NEW OjS FINISHED GRADE (TYP) PT-STA. 6+14.69, 13.00 FEE LT 10' - -- --- - -- TBC=4873.81 - - - �_-. ROW --- _ - -- -----_ CURB INLET STA. 7+88.16, 13.00 LT 37 LF 12" RCP STORM $ -.= TBC - 4874.91, INV. OUT= 4868.9 R=29'S R=29.5' PC-STA. 5+28.85, 13.00 LT ------- STOP SIGN (R1-1) TBC-4873.38 SEWER. SLOPE - 0.5X. STA, 0+59.5 13't (LT), TYPICAL PAVEMENT MARKINGS SEE DETAIL 1 TBC=4863.9 MATCH EXISTING7, r FOR PEDESTRIAN CROSSINGS PEDESTRIAN RAMP (T 3 SEE SIGNS CURB INLET STA. 0+80. 13.D0' LT CURTRANSITION CREATE TO ENSUE Ua I SEE DETAIL � SEE DETAIL®i F; SEE DETAIL � TBC = 4864. 1. INV. OUT= 4859.74 POSITIVE DRAINAGE 10' WIDE ASPHALT PATH SEE DETAIL 1 x a FUEL a SEE DETAIL e w a TURN LANE PAVEMENT MARKINGS >� RELOCATE EXISTING STOP SIGN. a p ALIGN W/STOP BAR. EXISTING COMBINATION SIGN NOT PLAN VIEW 1. AALLLL DIMENSIONS AND CURB INFORMATION ARE MEASURED AT THE TOP BACK OF CURB. 2. ANY PUBLICLY OWNED/MAINTAINED MARKINGS NEED TO BE INLAID THERMOPLASTIC OR PREFORMED PLASTIC TAPE (PREMARK 2020 FLEX, OR APPROVED EQUAL. 3. SAWCUT EXISTING PAVEMENT& CONSTRUCT NEW PAVEMENT SECTION AS DETAILED. 4. POTHOLE AND VERIFY DEPTH AND LOCATION OF UTILITIES PRIOR TO CONSTRUCTION. IF DISCREPENCY EXISTS CONTACT ENGINEER PRIOR TO ORDERING MATERIAL, 5. PRIOR TO PLACEMENT OF SUBBASE MATERIAL THE SUBGRADE SHOULD BE SCARIFIED AND COMPACTED TO 95%OF ASTM D-698. AREAS WHERE COMPACTION CANNOT MEET REQUIREMENTS SHALL BE EXCAVATED TO SUITABLE MATERIAL. AMOCO 2002 WOVEN SEPARATOR GEOTEXTILE SHALL BE UTILIZED. PVI STA - 9+02.85 4+00 4900.0 PVI ELEV - 4875.80 PVI STA A71 PVI Ft FV KQ 4900.0 K - 5 21 A.D. - -2.17 PVI STA 2+ 2.01 4895.0 K 9.10 PVI ELEV - 4854.56 4895.0 150 VC K - 38.3 4890.0 N n o6 7 4890.0 n + 1 V N fN 4885.0 + n B II II II + n 4885.0 Gi N FINISH CL 00 PAVED d > N + O n 4880.0 °1 ROAD SURFACE w > "' �o p w + 4880.0 a a a c� r' ,o m 4875.0 m m + II II 4875.0 -------- ------ 1.4 w w v� --------------- --------- -------- 4870.0 ---- --- - m m 5 w 4870.0 EXISTING GROUND 3.83% o. 4865.0 4865.0 4860.0 ----- -------------- --- 4860.0 g 4855.0 4855.0 J, 4850.0 4850.0 O O ��pp M2 m n m N n w n w p O N O n W <O rn 0 a 0 4 p n O co O M O a0 O O O o p m N n♦ 8 ip a0 N N n O M co Y N N <h M M rj Yj ni M N N (V(V O pj pj n n 8 It)0 W� d�rj O pO O O O 0p O p 8 O O 8 N h N O OO N O 8 QO m PROFILE VIEW ��e�� T��� N0, REVISIONS DRAWN BY DATE HORIZONTAL SCALE VERTICAL A ONTA jr. 02-039 J AS-BUILTS 05 3Q 6D '° 20 "q ROAD IMPROVEMENTS - ELLIS STREET PROJECT SHEET Civil Engineering 32 DISCOVERY DRIVE DATE: 10/2002 r * �a: : (� (� OF SCALE VERIFICATIONS BAR EQUALS 1 INCH ... PLAN AND PROFILE - STA. 0+00 TO 8+50 Land Surveying BOZEMAN,MT 3971E R-ELLIS R2 J ALLIED PHONE(406)562-0221 OVERALL SHEET 2 OF 5 PROJECT ENGINEER:CGB DRAWN BY: GBH Geotechnical Engineering FAX(406)mz-3770 `/ON,E� BOZEMAN, MONTANA ENGINEERING BOZEMAN DEACONESS DESIGNED BY: CGB REVIEWED BY: CGB sERV��Ee.���. R-ELLIS CROSSING SEE SHEET R4 FOR 2'I- 1-0" rm INTEGRAL EXPANSION JOINT OLD HIGHLAND BLVD. TRANSITION r CURB 7-1 )) PEDESTRIAN RAMP (TYP) L 2 0 N SEE DETAIL - - ' i CONTRACTION REMOGRATE __ JOINT � 4'-0" n u EXISTING GATE . •---�2°�- STOP SIGN (R7-1), STOP BAR & STREET SIGN END CURB (TYP) 4' MIN I To' I i PIPE.' .I R-24.5' TYPICAL PAVEMENT MARKINGS - I 1 i O.D. CONCRETE INLET APRON WITH 24" WHITE W.W.F. 6x6 - W4.0 x W4.0 o FOR PEDESTRIAAN CROSSINGS STOP BAR � CONCRETE SHALL BE M-4000, 6- THICK SEE DETAIL(') n v - I WITH 8' COMPACTED SUBBASE COURSE. $13 $ INLET APRON EI NOTES: NOT TO SCALE ��. - 4 -} ELLIS STREET -+ - 1. THE LOCATION OF THE CROSSWALK LINES PC=STA. 10+"' LT 0 13' rn ARE DEPENDENT UPON LOCATION OF THE 4' - 0" 13.00 RT & LT SEE STD. DWG. ELEV. 4882.71 SIDEWALKS. EXPANSION JOINT NO. 02721-2 FOR 6" x 6" 2' - 0" 5 2. PAVEMENT MARKINGS PER COB STANDARDS. AND 5' - 0" INLET CASTINGS. 4/4 WWF NORMAL CURB COM NA-PION I =5 � , - 15' 5' -- - --II TRANSITION ON ADJUST TO GRADE. SECTION SEED TAIL y4�`'(� _ I DETAIL I BOTH SIDES OF 5/8" DIA. SMOOTH ROD - -- INLET (THREAD EACH END) - _ p 24_.5' _ __-_---ROW-____�_-� __ _______�______-_ R3 PAVEMENT MARKINGS s' A I PEDESTRIAN RAMP (TYP) BENCH AREA FOR TYPE "B" CROSSING (COB STD. DWG NO. 02581-2) VARIABLE SEE DETAIL 9" U 10' WIDE ASPHALT PATH e ® GUTTER DEPRESSION ADJUST TELPHONE SEE DETAIL PEDESTAL TO FINISH GRADE < TO TOP OF GRATE - (3 1/2") BASE COURSE Q (� > , STOP SIGN (R1-1) wl 7 6' MIN SECTION A-A 2 DETAIL SECTION B B � 04 I AND STOP BAR I I ;o SLOPE ►4 m 1:12 MAX R3 CURB INLET A I I \ NO LIP NTS Q - MIN VARIES 6MI' EXISTING 10 GROUND MAXIMUM CROSS SLOPE PARALLEL RAMP ON TANGENT SECTION THROUGH RAMP 2" ASPHALT (ALL VIEWS) CONCRETE ADJACENT TO TRAIL 3:1 LLDIMENSIONS AR NOTES: AND CURB INFORMATION ARE MEASURED AT 1. TEXTURE ON RAMPS TO MEET LOCAL CODE THE TOP BACK OF CURB. 2. ALL RAMPS AND ACCESSWAYS SHALL CONFORM TO THE 1 AMERICANS WITH DISABILITIES ACT (ADA). \ `2% EXISTING ��DETAIL 1 GROUND < R3 PEDESTRIAN RAMP II n NTS i e6 24" J + \ \ o DEPRESS CURB TO THIS 2. 9'S" LINE FOR CURB DROP 6" THICK, 1" MINUS CRUSHED GRAVEL +N PVI STA 9+02.85 R3" (1/2" SLOPE) COMPACTED TO 95%ASTM D-698 F I COMPACT SUBGRADE TO 95% ASTM D-698 4900.0 PVI ELEV = 4875.80 4900.0 4 DETAIL 0: 1m K ==57.21 4" TOPS(TYP) + SMATCH LOPE PAVEMENT R7 ASPHALT CONCRETE PATH 4895.0 z 4895.0 w 150' VC � \ \\ 1.5" T z g U0 a 12"DEPRESSED CURB ° 4890.0 � 4890.0 FOR HANDICAP ° 6" x' _ + RAMP (NO UP) 4 a ° ° 7.5" 4885.0 w .. .. 4885.0 9" ° '� 4 ,� FINISH CL PAVED D;O o 0 0 o I CURB AND GUTTER ROAD SURFACE o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c� w w 3 o 0 0 0 0�0 0„0„0�0„0„0 0„0°0„0�0 0 0 0 0 4880.0 4880.0 0 0 0 0 0 0 0 0 0 o 5=37 S=3% �o°o° ° o`CRUSHED GRAVEL BASE - 3" MIN?o°o°o°o°o° _ o 00000 0 � o 0 0 0 0 --- ---- -_ -- __ D°0°°°0°0°0°�°o°O°O°O°O°°°O°O°O°o°O°O°o°o°O°0 1 I 4875.0 -_ -- -- 4875.0 1 EXISTING GROUND SUB-BASE COURSE (AS REWIRED) I l `3" PLANT MIX SURFACING 4870.0 4870.0 L 3" OF 3/4" MINUS CRUSHED GRAVEL BASE COMPACTED SUBGRADE SEE COB STD. DWG NO. 24" OF 6' MINUS PIT RUN GRAVEL SUB-BASE NOTES 02528-1 (REV) THIS SHEET 4865.0 4865.0 �6�DETAIL 1. SUBGRADE AND CRUSHED GRAVEL BASE COURSE COMPACTION SHALL R3 ROAD SECTION,CURB&GUTTER g 4860.0 4860.0 CONFORM TO SECTION 02230 (M.P.W. SPECS., 1996 ED.) NTS 4855.0 4855.0 2. CONTRACTION JOINTS SHALL BE PLACED AT 10' INTERVALS AND SHALL HAVE EP EP A MINIMUM DEPTH OF 3/4" AND MINIMUM WIDTH OF 1/8". SLOPE e• a• e• ASPHALT 4850.0 4850.0 3. 1/2" EXPANSION JOINT MATERIAL SHALL BE PLACED AT ALL PC'S, PT'S, VARIES ie• �' vLArzPes CONCRETE CURB RETURNS AND AT NOT MORE THAN 300' INTERVALS. THE EXPANSION 4 MATERIAL SHALL EXTEND THROUGH THE FULL DEPTH OF THE CURB AND n o n o a n g o GUTTER. COMPACTED IShp m m n o rn N a inn �v o BASE ROCK m ro m ,. I. m,. 4. NO CURB AND GUTTER SHALL BE PLACED WITHOUT A FINAL FORM ✓a'/ a a a m a a a°� INSPECTION BY THE ENGINEER OR THEIR REPRESENTATIVE. 0 0 0 0 0 0 8 5. CONCRETE SHALL BE CLASS M-4000. + o+ + o+ + o+ $+ 6. CRUSHED GRAVEL BASE SHALL MEET THE REQUIREMENTS OF SECTION 02235 COMPACTED 0 0 rn m ao (MPW SPECS, 1996 ED.) 8"CONCRETE PSISUBGRADE CONCRETE PROFILE VIEW 5 DETAIL e� �� �1 DETAIL RJ CONCRETE CURB&GUTTER R3 CONCRETE VALLEY GUTTER COB STD. DWG. 02528-1 (REV) NTS NO. REVISIONS DRAWN BY DATE HORIZONTAL SCALE VERTICAL SCALE PROJECT M: 02-039 1 AS-BUILTS 3 15 05 30 60 ° Civil Engineering 32 DISCOVERY DRIVE DATE: 1o/zooz 10 20 °N1q"� ROAD IMPROVEMENTS - ELLIS STREET SHEET °ma s �30F 5 * . * BOZEMAN,MT 59718 R-ELLIS 8 SCALE VERIFICATIONS BAR EQUALS 1 INCH PLAN AND PROFILE - STA. 8+50 TO 11+35.08 Land Surveying oe:e ALLIED PHONE(406)582-0221 OVERALL SHEET 3 OF 5 PROJECT ENGINEER:CGB DRAWN BY: GBH . „ e E, Geotechnical Engineering FAX(406)582.5770 BOZEMAN, MONTANA ENGINEERING BOZEMAN DEACONESS DESIGNED BY: CGB REVIEWED BY: CGB secnvioes.�N�. R-ELLIS i PEDESTRIAN CROSSING SIGN (W11-2) U ------ _ MATCH EXISTING CURB (TYP) AND STOP BAR �_. SEE PC=STA 6+25, 13' RT&LT TYPICAL PAVEMENT MARKINGS FOR SHEET R3 -- '� FOR PEDESTRIAN CROSSINGS STREET TBC=4908.41 SEE DETAIL PC STA 6+723 13Fo RT, TBC=4910.1t ASPHALTSAWCUT EXISTING PAST GATE. REGRADE AND REPAVE CENTERLINE RADIUS=150' PEDESTRIAN RAMP (TYP) W/3- AC. MATCH TO ENSURE SMOOTH TRANSISTION. ADJUST J SEE DETAIL EXISTING GATE AS NECESSARY TO STA. 7+75. SAWCUT EXISTING / I +� COMBINATION SIGNS NEW FINISH GRADE. ASPHALT. REMOVE EXISTING $ as J/ �O SEE DETAIL ASPHALT BETWEEN STA. 6+72 TO { R=1_4.5�+ _ 7+75. REGRADE AND COMPACT AS I _ CENTERLINE RADIUS=150' END OF CURB (TYP) REQUIRED. PROTECT EXISTING CURB, I71 I - _ STA. 0+00, 13.00' RT & LT GUTTER, APRON AND VALLEY I I� - o TBC=4883.65 GUTTER. REPAVE AREA W/ 3" AC AND PROVIDE SMOOTH TRANSITION OLD H GHLAN g 13 TO EXISTING PAVED SURFACE. D_ _ `� ,,, - U - END OF ASPHALT PC=STA 6+72.69 13' 13.00 LT, TBC-4909.8t 9.5' PC-STA 5+60.09 R-29.5' ----- 5 13.00 LT, TBC-4906.45 PC-STA a+7a.09 -------_-_---- ------- _-- ---- ----- 10 F---------_____ EXISTIN COMBINATION SIGNS 13.00 LT, TBC=4902.60 I I I I R=24.5' GATE SEE DETAIL Q ROW PT=STA, 0+75 S REMOVE EXISTING CURB, GUTTER & APRON AND TOP SIGN (R1-1) 13.00' LT, TBC=4884.41 CONSTRUCT NEW CURB, GUTTER & APRON AND COMBINATION SIGNS 10' WIDE ASPHALT PATH (TYP) STOP BAR PEDESTRIAN RAMP. MATCH EXISTING CURB (EAST), SEE DETAIL SEE DETAIL@ STOP SIGN (R1-1) I W Rs STOP (R1-1) & STREET SIGN = � ti 2 TYPICAL PAVEMENT MARKINGS FOR PEDESTaLAN CROSSLICS- As t DETAIL(6) DETAIL(6) � � w PLAN VIEW Z PVI STA = 5+40.14 z PM ELEV = 4907.18 A.D. _ -4.56 + K = 54.86 250' VC N a Y N � W + � PIA STA 1+93.61 O 4920.0 < PV ELEV- 4885.00 II M 4920.0 A.0 = j op M II a915.D W W CO K 34.00 + j JJ w 0 4915.0 + 200, VC I < w r 4910.0 1g2x +rn = 4910.0 W 4905.0 - ! m m rn z 4905.0 z I 4900.0 w < -1 4900.0 w EXISTING GROUND + _� 0+ 4895.0 k' = 4895.0 PROPOSED CENTERLINE u o 4890.0 FINISH GRADE m 4890.0 4885.0 4885.0 4880.0 4880.0 7a� 4875.0 4875.0 a 4870.0 4870.0 yyd O� d 001m �h or,P� N� o 01 O a N V1 rn w 7 pp OD rn O 8 O O rn Oi I� b n r7 YI CI 06 N V) c6 < O M $ O O O 00 00 O 01 0 m p,� pp pp pp p0 pp � m v a a a♦ a a w a$ °� pp a a Fo 0 0 0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 g o 1O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 + N O iA O N O N O 0 O N 0 N O + + + + + + + + + + N + + + + 0 �D iA N O f M M N PROFILE VIEW A S-BUI LT J NO. REVISIONS DRAWN BY DATE HORIZONTAL SCALE VERTICAL SCALE 1 AS-BUILTS 3 SOS 0 30 60 0 10 20 40NT,4Nj PROJECT �: 02-039 ROAD IMPROVEMENTS - OLD HIGHLAND BLVD. SHEET * * Q y Civil Engineering 32 DISCOVERY DRIVE DATE: 10/2002 T�F o SCALE VERIFICATIONS BAR EQUALS 1 INCH a°o`er" PLAN AND PROFILE - STA. 0+00 TO 6+96.81 Land Surveying BOZEMAN,Mi59718 R-oLDHIGHLAND K � -1 PE � PHONE(406)582-0221 OVERALL SHEET 4 OF 5 PROJECT ENGINEER:CGB DRAWN BY: GBH ", f.-ssa ALLIED Geotechnical Engineering FAX(406)582-5770 ENGINEERING BOZEMAN DEACONESS DESIGNED BY: CGB REVIEWED BY: CGB ` 'CNA��`� BOZEMAN,MONTANA sER��Es. Nam. R-OLDHIGHLAND D 1 2 D I Z m mm r Z mm m ADJUST WATER VALVE SAWCUT A.C. AND BLEND (TYP) cAi�Aa NEW PAVEMENT INTO PEDESTRIAN RAMP (TYP) EXISTING PATH STOP SIGN (R1-1) SEE DETAIL ADJUST WATER VALVE (TYP) ADJUST WATER VALVE REMOVE EXISTING CONC. SIDEWALK AND (TYP) RELOCATE TREES (TYP), 10' WIDE ASPHALT PATH CONSTRUCT NEW SIDEWALK CENTERED IN 10' WIDE ASPHALT PATH SEE DETAIL e TYPICAL PAVEMENT MARKINGS LANDSCAPED ISLAND. RELOCATE SPRINKLER SEE DETAIL --�-_--��-, FOR PEDESTIj�AN CROSSINGS HEADS. RE-SOD ALL DISTURBED AREAS. L`�J , �! TYPICAL PAVEMENT MARKINGS SEE DETAIL FOR PEDESlNj N CROSSINGS SEE DETAIL ' 10'WIDE ASPHALT T IL 10'WIDE ASPHALT TRAIL III' q 10'1i'IDF,ASPHALT T AIL � EDGE OF PAVEMENT 18' (TYP) J 1 1 I COMBINATION SIGNS OLD HIGHLAND / EDGE OF PAVEMENT SEE DETAIL a STOP SIGN (R1-1) BLVD. ROAD CENTERLINE I , STOP BAR 1 PEDESTRIAN PEDESTRIAN CROSSING CROSSING SIGN -- SIGN (W11-2) REMOVE AND REPLACE EXISTING (W11 A-2)-, PEDESTRIAN RAMP (TYP) RESURFACE EXT'G RAMP J STOP SIGN (R1-1) SEE DETAILe TO MEET C.O.B. STDS, PLAN VIEW -NORTH SAWCUT AND REMOVE EXISTING A.C. AND D CONSTRUCT NEW CONIC. CURB AND GUTTER. SEE DETAILe ? O z COMBINATION SIGNS SEE DETAIL e s 10' WIDE ASPHALT PATH SEE DETAIL 10'WIDI; 24" e 10"X18" (APPROX) MATCH EXISTING CURB RELOCATE EXISTING STOP & STREET SIGN BIKE SYMBOL (BLACK) ADJACENT TO ALIGN W/ STOP BAR g,al1. � WHITE BACKGROUND VD 18' (TYP) �S�IG �AivD UL 36 BIKE PATH STOP SIGN I11 . R EDGE OF PAVEMENT 1 OLDj O� (R1-1 - 18"X 18") CENTERLINE c�J U STU° SIGN ROAD PAVEMENT , (R1-i - 30"X 30") ADD 6" TOPSOIL AND EDGE OF - BIKE PATH HYDROSEED DISTURBED BOARD P SIGN AREAS. TYPICAL PAVEMENT MARKINGS PEDESTRIAN RAMP (TYP)SEE DETAILe FOR PEDESTRIAN CROSSINGS -_ - MOTOR PEDESTRIAN CROSSING SEE DETAILe �I„'I`+�s (W11-2 - 30"X 30") COMBINATION SIGNS NO MOTOR VEHICLES SIGN TYPICAL SIGNS SEE DETAIL e (R5-3 - 24"X 24") -1 5' (THIS PATH ONLY) NOTE: SIGN SHOWN IN PHOTO IS AN EXT'G SIGN TO SHOW PROPER LOCATION OF SIGNAGE. SIGNAGE SHOWN IS NOT 10' WIDE ASPHALT PATH g SEE DETAIL e WHAT IS REQUIRED. SEE SIGN DETAIL ABOVE FOR ACTUAL SIGNAGE TO BE INSTALLED. MATCH NEW PAVEMENT INTO EXISTING PATH COMBINATION SIGN IS COMPRISED OF A BIKE PATH STOP SIGN BOARD (SEE DETAIL) ON ONE SIDE AND A NO MOTOR VEHICLES SIGN (R5-3) MOUNTED BACK TO BACK ON SIGN POLE. THE PEDESTRIAN STOP SIGN IS ORIENTED FROM THE PATHWAY 5a TOWARD THE INTERSECTION, SIGN POLES ARE MOUNTED PER COB 8 STANDARDS. 5 g I DETAIL xs COMBINATION SIGNS NO SCALE PLAN VIEW - SOUTH AS-ILBUILT s J PROJECT 111: 02-039 SHEET N0. REVISIONS _ DRAWN BY DATE 0 30 6 11 0 90 4ONTgNq 32 DISCOVERY DRIVE DATE: 10/2002 1 AS-BUILTS a ,s Ds ROAD IMPROVEMENTS - OLD HIGHLAND I� BLVD. Civil Engineering R5oF 5 Land Surveying BOZEMAN,MT 59716 R-OHIGH-PATHS G PATHS AND DETAILS PHONE(406)582-0221 OVERALL SHEET 5 OF 5 SCALE: 1 INCH - 30 FEET eaoEsxi ALLIED Gemechnical Engineering FAX(406)582-5770 BOZEMAN DEACONESS Na.'121 PE PROJECT ENGINEER:CGB DRAWN BY: GBH ,� < BOZEMAN MONTANA ENGINEERING ���� ; ' sER��Es. �� R-OHIGH-PATHS DESIGNED BY: CGB REVIEWED BY: CGB