Loading...
HomeMy WebLinkAboutEast Side Office Building UNDERGROUND LEGEND SYMBOL DESCRIPTION EIISTWO 6'CIRCULATING OS3Y VALVE RISER WATER MAN 6'-6'MIN --- NEW UNDERGROUND FIRE LINE COVER -— -'- D]STNG UNDERGROUND FIRE SERVICE ATER MAIN 00 TAPPING SLEEVE ♦ THRUST BLOCKING -- CIE CUT IN FIELD LION UNLESS OTHERWISE NOTED EXISTING 6'CIRCULATING TOE THREAD ONE END WATER MAIN 6'-6'MIN - TBE THREAD BOTH ENDS _ COVER DOE GROOVE ONE END GBE GROOVE BOTH ENDS TAG THREAD B GRDOV£ OSRY OUTSIDE STEM A YOKE /U W WITH ON DOWN FG FNAL GRADE OSRY GATE VALVE-MUELLER MODEL P-2360-20 //lll 9Y 4 ARE ABOVE FINISHED FLOOR 8•HOLE THRU WALL,FILL TAMPER SWITCH-POTTER OSYSU-2 U! 9CTgq Cl W/SILICONE MASTIC �(BY 9"WLER CONTRACTOR) ll/ • BY h (2)36'MINIMUM REO ROD.(2 TOTAL) UNDERGROUND NOTES i TO NEW CUSS 1 SPRINKLER SYSTEM ') ANA PUBLIC WORKS UNDERGROUND STANDARD SPECIFICATIONS, IN ACCORDANCE NTH T FIFTH EDITION MARCH 2003);CITY =: 4• IRON FINE SERVICE BOZEMAN MODIFICATIONS TO MPW FIFTH EDITION;AND THE CITY OF j) UTILITY f/Clll BY UNUtt CONTRACTOR s �� /// BOZEMAN FIRE SERVICE LINE STANDARD(REVISED FEBRUARY 2,2004) CALL I-80�424-5555 COATED STEEL WALL PLATE, •i /// /// 2) 'CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR UNDERGROUND BffORE gGGING 5/16'MIN.THICKNESS BY U1L11Y BY FIRE SPRINKLER /// /// PIPING'IS TO BE COMPLETED AND SUBMITTED TO THE CITY OF BOZEMAN CONTRACTOR CONTRACTOR /// PRIOR TO THE FINAL ACTIVATION OF THE FINE SERVICE UNE. 3) NO CONNECTION IS TO BE MADE BETWEEN ME INTERIOR FIRE SPRINKLER Sff 1/CI NEW 1 BLOCKINGBLOCKINGPIPING AND THE 4'OSdY VALVE,UNTIL THE UNDERGROUND h/ � `-�- PORTION OF THE SYSTEM HAS BEEN ACCEPTED BY THE CITY 6 BOZEMAN. 11Y MJ ELBOW AND HEW SECTION p1 AEI 4) INTERIOR ARE SPRINKLER SYSTEM SHALL BE FRONDED. 1HRUSi SLOG( TAP IN WATER MAN BY CITY OF BOZEMAN.(AT OWNER'S �I p�p� Ar W LIYIM . 5) NEW 4'FINE SERVICE LINE SHALL BE CHLORINATED,PRESSURE TESTED EXPENSE 6-X4-TAPPING TAPPINGG)VALVE ARE TO BE FURNISHED AND AND INSTALLEDLBY C 1 NEW�FISM MIL REQUIREMENTS.NEW 4''AND PASS IFIRE SERVICE UNE SHALLCAL TESTING AS PER W AND CITY OF BE INSTALLED WITH NO CONTRACTOR TWIN CITY OF BOZEMAN MAKING TAP C1 NO SCALE LESSATTE COVER THAN SHOULD 6E AT OVERE To THEOBT EXIIN STING HE MWATER MAIN AND MY NEW 4'DOCTIE RON NT OF FIRE SERVICE BY 6'-6'OF COVER. UNDERGROUND CONTRACTOR SEE 2/CI 6) APPLICATIONS FOR THE NEW WATER SERVICE SHALL BE MADE AT CITY OFFICES(35 N.ROUSE)PRIOR TO START OF CONSTRUCTION. 7) NO WORK IS TO BEGIN PRIOR TO RECEIVING WRITTEN APPROVAL BY THE -- CITY OF BOZEMAN AND THE COMPLETION OF A PRE CONSTRUCTION MEETING CONDUCTED BY THE ENGINEER. CONTRAC OR SHALL /�p�\ PLAN � A,' �p�p� /� �- 6) ENGNEERTSFALL PROVIDE VAS BOLT TO CITY OF BOZEMAN.OF NEW ARE UNE TO ENGINEER. I L�rLM -UNDERGROUND / z 9) ALL FlTNNGS SULL HAVE A MINIMUM PRESSURE RATING OF III PS. C1 1•=30'-0• O 10) ARE SERVICE LINE WILL NOT BE TURNED ON UNTIL INSTALLATION OF DOUBLE CHECK VALVE ASSEMBLY IS COMPLETE 11) MATERIAL SUBMITTALS SHALL BE SUBMITTED TO CITY OF BOZEMAN TWO DAYS PRIOR TO PRE CONSTRUCTION MEETING(MINIMUM). 12) PRO.ECT REQUIRES ADEQUATE ENGINEERING INSPECTION. 104 22%*M.J. RECORD DOCUMENTS 102 4•TAPPING VALVE 4•UNDERGROUND PRE CLAMP 9 T � ���eEEH � WITH T5''DOC EAR'WASHERS FINISHED WAX REDUCER DE9fi1.INC W 5 WT mh)tlFiD M AIXaR�CY 100 Illl Ipl �I IasP°X�r Fa wir[meow ax no�os ww�unr a N�BDwA1FDIXpiE)M/AS�A REART. 198 �IIVi' M.J. GRAVEL Tj 8-L -W 9— 96 ISER TO BE I FOUNDATION(WALL ) (2)4V'MINIMUM RED RODS AT EACH CONNECTION 4'OIIC1lF ROM 94 RISER TO BE 1'-9' TEE TEE(PLUGGED) BEND ABOVE BASEMENT FLOOR 92 /�\ pC L w�1C A■ OF BASEMENT ROOR ( 0 \FiFE DETAL AREAS(SQFT)FOR MUST BLOCKING I y CI NO SCALE i FITTNG TEES k PLUGS 90'BEND W BEND h WYES ��S� MIN 6'-6'OF • a L1' Y SIZES AREA H x B AREA H x B AREA H x B AREA H x B COMPACT TO 95% COVER ABOVE UYBACK TRENCH AS 90 i 4 27 38 21 1.1 RELATIVE DENSITY TOP OF PIPE REOIRED 6 5.6 7.9 4.3 2.2 ~ 8• 9.6. 13.6 7.4 3.8 88 10' 14.5 20.5 11.1 5.7 0 10 20 30 40 50 80 70 80 12' 20.5 29.0 15.7 0.8 0° 14 27.6 21 39.0 21.1 108 NOTE:BE ADVISED THAT IF LESS THAN 6%FEET OF COVER OVER THE SERVICE LINE IS OBTAINABLE,THE UNE WILL HAVE TO BE INSULATED. NOTES; 8oBFP oO4p DOMESTIC(SHOWN FOR 1)THIS TABLE BASED ON 200 PS MAN PRESSURE BACKFILL A CONSOl1DAlE °o�pOQ�°d0$°°°040�oo,;oy ° REFERANCE ONLY) AND 2000 PS-SOIL BEARING PRESSURE: TO I?OF PIPE WITH SURD. °o"°'b o °ogo °bq°o 2)WRAP ALL FITTINGS WITH POLYETHYLENE. UNDISTURBED NATIVE SOIL FIRE LINE SZE AS NOTED� 3)THE BEARING SURFACE SHOULD BE PLACED AGAINST UNDISTURBED SOIL PLANS SAND % S I ' 1 ARE UNE PROFILE UNDERRLAYMEENT. C1 NO SCALE THRUST BLOCKING DETAIL r2-'�NEW FIRE UNE SECTION CT NO SCALE NOTICE ENGINEER APPROVALS & COORDINATION Cl NO SCALE REVISIONS O4 ""` NA : , 8'=1'-0• `VON 6 Sprinkler EAST SIDE UFFlCE BUILDING e is TXE owXCRs RESPWSIBxItt rnY or'eOznNX AXED xoeR Aoe)xt-2YAD C' Xa wTc oEvwerTeoX 1050 EAST MAIN STREET ro PROWE ADEQUATE I T To 7 Technology BOZEMAN.MONTANA DRAWN er. P.MANION rwrweT T EBW nNDunrouT y ,a GEC®en M.000\0A ��p�Q �yW^ 07-15-05 vAT arc SPwNxeen meEw d ,CI ♦� YW iLLW caxmACT ane wTe ARCMs AXD w owosuR<5 d't `� 607 PROFESSIONAL OPoYE.SUITE 3 00NiXA°T TORS,ING Xa: FOR DRY PPE AHD 011lR IWrS a vAEscs caXmaxec xam+ SYSTEM TYPE 1 orth 22n Avenue Suite 4 sNwx Tccx Xa:05436 M BOZEMAN,595-065 59718 Bozeman, MT 59718 406-585-0OR se¢T Xo.: sorwEs rD sPRxAacx snores Phone 406-582-1938 Fax 408-585--8332 KE11Y 7AriOR �-� XE' Email info®sprinklertechnologydesign.com IINDERCRWND FIRE SERVICE DX