HomeMy WebLinkAboutCommunity Food Coop L
I rtr_flite tl-lrr Inc
- ' FIRE DEPARTMENT CONNECTION,
IF CONSTRUCTED,SHALL BE %I SpUth Gr e`,-ono Avnue
Q "- - -' - INSTALLED DOWNSTREAM OF THE 'Studic 221a
DOUBLE CHECK VALVE AND ROW
DETECTION DEVICE. Pt�2PrT16 `i89 :J�171`
!41]6} 511t2
fax SR°,�G18
w • ., DOUBLE CHEC, VALVE ASSEMBL, SHALL MEET
e Inal
3 c Q THE FOLLOWING SPECIFICATIONS- cone PpIs@rrornm OG.•^_nm
Existing Building A UL OR FM USTED FLOW DETECTION DEVICE PEP.
3 APPROVED B'THE UNIVERSITY OF SOUTHERN CALIFORNIA /CLTV OF BOZEMAN STANDARDS
• - -I. -- __ �I` FOUNDATION FDR CROSS CONNECTION CONTROL AND
Y HYDRAULIC
Y A DR R UUC AR ESE CH US FC R F.s'r ( E CCt1 CW OPERATION
{ ON IN
Z Community
THE VERTICAL POSITION
I W STA. 0+18 Food Co-op 1c °Fa +rGtir
YI installed 6-x: 908 West Main '2
I -, i _W r Reducer, � � . v
- - - coMiu o"
ARCNRECTURE `
41 / NCB
1 I"+._. _ -_4'w_ „� A- � � ProDoasd 1%"copper I ti "• a,
water service(to cote s w
Q 1 S1A. 0+03- Remorea I Aspen 6r atop by cit). In 9tau• / fOAAC�x
J I Stop, Plug,Bell end o1 4'stub and - - y
on east side of fire 1,�-
MIS twAww.,5"Or 1-1,10m
solid sleeve STA 0+27.4 - Ins fire ver DCa1 line
at 0 NOR sN l'It sE ij E roe
3 New Curb pop, T It thurst black Ended(re serwce line at O.S.&t' cON4Rucn0',Pureow
1 2-MIN CLEARANCE w E5a W%AeD
- [ + e Fe ductile iron pipe fir Nlne- Installed u..,w"eas behind sidewalk vdve (Set tleloll this sheet.) FROM OUTSIDE WALL e"Orzss'..sTAMe or A
W I FCamWar 260 InaW anon, 6"above flee line Beaded INSTALL 4"D.I. PIPE ANO AH,t51ERED MCMrECT
in 4" JS&', VALVE- THIS PROJECT Ew•I0tt 0+COMMA-G
minimum of 3'Of 3/4'minus crushed gravel T' _J _�__ The lire Rne shall be placed exactly 2.0 feet inside the north ,Aal,ccnaE rs.rnxm Asovr U) I (See detoil, this sheet) I - and west walls of the addition to allow Ine maximum amount ~_
v, rnt� �'^ ; � of room possible for the new tjTj" eater aerrtce. U
LL STA- 0+ns- Installed 6"%6" Tee with thrust
r ri) J $
block. Installed 2'slu0 to the west with cop I/ 1
and thrust block. Installed I" water service b ,F� \ o 0.
wrp. slop ad reernTnected Aspen Motors wnter / w-•VJ-� _ - NOTE. Contractor will restore oil surloces. FLANGE TO BE THREADED ON STANDPIPE W g
service One, ashalt concrete. d I /�' \Sla 0+23 -Installed p , ee,an Iondseapinq.
f 4r M.J. TO FLANGE ADAPTERS NOT ACCEPTABLE
4'•Gale Valve 1 C N o
4"ductile Iron pipe hreline. Inst Oiled?" thlcMness M /� .• .fig .
Foamul II, Iedde ton 6'above f I line and lIF I s C
serVlce Ili a BMdea inlm 1 }" at 3/4•' *,W J s
nIn I< W $
1'MIN 2'MAX I
ABOVE FINISHED
Saw cut existing t dewall. Replace all concrete FLOOR "-
Ir'with Tim Xar construct- withexpansion pint 3/4'MIN REDI ROD,INSTALLED IN • -
�5
• malerVN at each edge. HALF OF THE AVAILABLE M.J.FLANGE o f
^ Q
' B T H " N r O
OL HOLES TYPtCAi. -
Ty d ' ' Note The contractor ahall coardmote with
_ the city of Bozeman Water Deportment -Y
personnel to Install a new 1� C cLAss 51 D.1 PIPE'domestic Aspen .-- U
CID
water service in the some trench with the MOtOfS_ V 3 new d" fire line The Cty Watm Department MECHANICAL JE11N7 L
f' uq, will Only be instoll'ng the domestic service to —
I the curb stop The domestic sxvice from REVISION GATE
U) _ the curb stop into ilia building t to be
(Q • installed Dy the owner as per City o1
n t 1 1 QT Bozeman Standard Drowing 02719-6.
�c
I
90'BE IM _-
0 .. 10 20 THRUST BL,OCk
—_ - SCALE t'= to' FIRE LINE DETAIL — CLASS I SYSTEM — — -
4'�"r)O GENERAL NO $ Nor TO SCAiE -
1. ALL CONSTRUCTION SHALL CONFORM Tr) THE ACCOMPANYNG PLANS AND ^
THE MONTANA PUBLIC WORKS STANDAFD SPECIFICATIONS, FOURTH L.i.
- EDITION, DATED JANUARY. 1996. INCLUDING ADDENDUM No. 2 (8/08/00), O
i4798 AND THE CITY OF BOZEMAN MODIFICATIONS, MAY 1997, INCLUDING
ADDENDUM No 1 (2/19/98) AND ADENDUM No. 2 (3/15/00). 1
2. A PRECONSTRUCTION MEETING SHALL BE HELD PRIOR TO COMMENCEMENT OF 0
WORK. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER WORKING DRAWINGS, NATIVE sun.
r SPECIFICATION SHEETS, ETC_ FOR ALL EQUIPMENT AND MATERIALS TO BE USED
ON THE PROJECT AT LEAST ONE WEEK PRIOR TO THE PRECONSTRUCTION TRENCH BACRnLL I-
EX:SONG ASr'HALI - y MEETING. INSTALLATION SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN TZ
S,RFar E,MAIN STREL! APPROVAL OF ALL EQUIPMENT AND MATERIALS BY THE ENGINEER IIII I-I V
'• 13 3. NO CHANGE OR MODIFlCATION OF THE APPROVED PLANS AND lI- O
SPECIFICATIONS SHALL BE MADE WITHOUT THE PRIOR WRITTEN y O
APPROVAL OF THE
�'4 ENGINEERINGDEPARTME
ENGINEER
NT,ER AND THE CITY OF BOZEMAN 11
I - - - 4, THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL BURIED UTILITIES 6'Min c_ --
PRIOR TO THE BEGINNING OF CONSTRUCTION. OTHER UTILITIES MAY EXIST z'
TRAFFIC SIGNAL caNOLnT THAT ARE NOT SHOWN.
0
5. THE ENGINEER AND THE CIY OF BOZEMAN ENGINEERING DEPARTMENT SHALL
NOTE T
EXACT OF ORAWAG PIPES& -" -- '-- - BE NOTIFIED AT LEAST 24 HOURS PRIOR TO BEGINNING CONSTRUCTION.
G�E Installed 2" t ckoass of FoomWor 6 Mn
CONTRACTOR
TONALVERIFY CONDUIT uNK/(ONN. �' 6 MINIMUM COVER OVER THE WATER MAIN SHALL BE 6.5 FEET OR THE PIPE / 2" 1naLness rt
CONTRACTOR TO vEPoFY THEIR,LOCA RONS \) �250 inulotaN 6" above firt,6ne SHALL BE INSULATED A MINIMUM VERTICAL SEPARATION OF 15 FEET 6 Mn ( 2' Th,lor:5U Oror,d
RELAtIvESTALLA TO C�NSIRUCTION P�iIDR TD Orin service Imes Bedded SHALL BE MAINTAINED BETWEEN THE WATER MAIN AND ALL SEWER MAINS I lawlntwn. Bedded
INSTALLATION OF FIi.E ONE. minimum,o �I or(See
d minus 7. TYPE 1 OR TYPE 2 TRENCH EXCAVATION MAY BE USED AT THE New IK'water o mnimvm of 3" I�, - $,
•) �-i crushed grovel (See detoX ,
sernce b City) moo.4'D.1 P water
t Toast.) DISCRETION OF THE CONTRACTOR. ( Y y this contact 13/4"minus - _
8 TRENCH BACKFILL SHALL BE TYPE A crushed graver
1 3 5'Minimum
LxtSING E.' NkTTR MAIN Iz'a%IPjSTtIA'M DRAIN/f, / _ 9 BENCHMARK:TOP CAP BOLT FIRE H'rDRANT WEST SIDE OF NORTH 9th AVE .
AT WEST MAIN STREET. ELEVATION - 4794,57 ( CITY B.M.# 216) O
_ - 10. IF CONSTRUCTION OCCURS WITHIN THE RIGHT-OF-WAY OF A DEDICATED ' S,
e'suB-DRUM CITr STREET, A STREET CUT PERMIT SMALL BE OBTAINED FROM THE CITY PIPELINE INSULATION U _I 3,i
_ §TREE? DEPARTMENT,
17.0 i TOTAL'LF.6"CLASS 51 D.1,PIPE 11. FIRE LINE INSTALLATION SHALL CONFORM WITH THE REQUIREMENTS OF NOT to SCALE
[NOTE THE)EPTH OF THE X1S11NG 8'wA1�R LINE16-4 f TOTAL LF 4'CLASS S1 p.l.P1FE THE CITY OF BOZEMAN FIRE SERVICE LINE STANDARD THE 4" FlRE SEP,VICE LINE OBTAINING THE CONTRA ND E RE OF ALL INCLUDING THE OS&Y VALVE ARE TO BE INSTALLED AS PART OF THIS PROJECT.
OBTAIES THE LI f C N AND TIOIN pF µl 12. ONLr FLANGED FITTINGS CAN BE USED UN THE RkE SERVICE LINE INSIDE
UAL1T1E5 YATHIN i/fE CPNSiRUCTON AREA PRIOR $EXCAVATION. OF THE BUILDING. �O
- - --- - --'a'j a .478F, 13. APPLICATIONS FOR THE FIRE SERVICE LIVE MUST BE COMPLETED PRIOR TO z
.6$0 Cp ...o INITIATION OF CONSTRUCTION.
EXISTING 6'EXISTI WATER MAIN AND TEE o v m'-2 a n ITV
. r:l wa� Como c�3 . v �Q
P9 a w a = ' O
^ I't comae-i 1 >'I 8 - - d784 a4' IJT 1jb DESIGN By. DATE:
or € M 5P•a ai`�w - F� ,9•, DRAWN BY: DATE; DRAWING SCALE`; Q�i
%> > m T3 s c � RHC ou+ 0 c +,r 2°u a +o. +� r•Ilo` 04/20/2001 DAJ 04/20/2001 PLAN VIEW HORIZONTAL: I" = to'o«o o �$ ojii£^c^ o o= a;u t^ ! YH. ENTER TE
Flu^ o o x wt 50.53 ES City euer0-N2 ay20D1 o5/OB/tool CHECk:ED BY: DATE: CONTOUR INTERVAL. 1'
- m uE lot<m In;P-T.o s.3•v,is vi'v vr,mwrj A� - As-Bus1 Dr.=q 10/04/2001 '-HORIZONTAL'. I = 10 4762 PROFILE VIEW DATE:
-0+7G -O+tiO -0+50 -0+40 -0+30 -0+20 -0+10 0+00 0+10 0+20 0+30 0+40 'r f P��" DRAWING FILENAME: 886Co-a T.dw 10/04 2001 VERTICAL: 1" _ 05/08/01
gRAlN� P- 9 / _ -
t u�ua•`•"��
PROJECT u:
0/ 99-21
As-Built Drawing October 2001 °RAWN
RMEY
MAIN STREET
FIRE LINE