Loading...
HomeMy WebLinkAboutCattail Lake Subdivision Phase 1 & 2 O TAB, CATTAIL LAKE SUBDIVISION NTH l# 1 � :P Tom; PHASES 1 AND 2 ¢_< LEGEND RECORD DRAWINGS Qo= U7 NEW EXISTING DESCRIPTION APPROVED G $mo El ,V RISER CITY OF BOZEMAN, MONTANA `- �AM QI CFNTERLINF MONUMFNI NAMF TITLE DATE TD& 70KIIS, DEAN 8-, HOMNS, INC. • m cLLANouI SEPTEMBER, 2006 IId(iIIdPFltING CONSMTANTS �+ CONCRETE P GREAT FILLS—ROZEMgM'lTl tSPELL MONT" .3415-- CONTOUR SVOIc>NE WpSNiNCTON 6 LEW1Si0N I ON Q I CONTROL POINT w • A CURB BOX - CURB& GUTTER f CULVERT J E C DITCH N V ————- EDGE OF ASPHALT z m EDGE OF GRAVEL w c ELECTRICAL BOX >a W m Y 17 FIRE HYDRANT SCHEDULE OF DRAWINGS ww 0 INLET - 0 wiz SHEET NO. SHEET NAME � N T INLET& INLET APRON r''++ 1 COVER SHEET � 8.�+ � f7f/1J A LIGHT POLE 2 NOTES, OVERALL UTILITY PLAN N m 1 MAILBOX 9 CA AIL 3 SITE GRADING PLAN / SURVEY CONTROL w • O MANHOLE B VIS w SU ION / 4 SANITARY SEWER - BLACKBIRD DRIVE, SOUTH ALLEY !/ ~ ~ • PROPERTY PIN O 6 5 TC. 54.60 ITA SANRY SEWER - WARBLER WAY 5 60 yn� SPOT ELEVATIONS 6 SANITARY SEWER - TROUT MEADOWS ROAD, FEN WAY p 54� M TELEPHONE RISER i 1 7 SANITARY SEWER - LAKESIDE DRIVEIIIIIIIIIIIIIIIIIIIIIIIII 0 TEMPORARY BENCHMARK 8 SANITARY SEWER - WEST ALLEY y y TEST PIT 9 SANITARY SEWER - WEST PARKING CORRIDOR co Ill ■ n TRAFFIC SIGN 10 SANITARY SEWER FORCE MAIN - BLACKBIRD DR, TROUT MEADOWS RD DRAWN BY: JLN ———CTV�-—— UNDERGROUND CABLE TV ® C1 11 WATER - FEN WAY, DAVIS LANE DESIGNED BY: JLN QUALITY CHECK: DJC ———E ——— UNDERGROUND ELECTRIC 12 WATER - BLACKBIRD DR, SOUTH ALLEY DATE: 9.15.06 13 WATER - WARBLER WAY JOB No. Boy-057 GAS =Nq FIELDBOOK S S SANITARY SEWER 14 WATER - LAKESIDE DRNE —SD SD STORM DRAIN -� t17E WATER - TROUT MEADOWS, NORTHEAST WATER LOOP T ——— UNDERGROUND TELEPHONE WATER - WEST ALLEY VALVE W W WATERLINE VICINITY MAP WATER - WEST PARKING, SOUTHWEST PARKING ►� ea 18 STORMDRAIN - TROUT MEADOWS RD 19 STORMDRAIN - NORTHEAST PARKING CORRIDOR, EAST POND 20 STORMDRAIN - DETENTION PONDS 21 IRRIGATION DITCH - DAVIS LANE 22 IRRIGATION DITCH, DAVIS LANE - CULVERTS, TROUT MEADOWS RD 23 STREET - FEN WAY Z t27SITREET - BLACKBIRD DR, SOUTH ALLEY 0 SECTION OR DETAIL - WARBLER WAY `cl DESIGNATION SYMBOL - LAKESIDE DR /- TROUT MEADOWS RD WSHEET NUMBER WHERESECTION OR DETAIL _ REAT FALLS - TROUT MEADOWS RD, SEWER LIFT STATION SITE D � W � aIS SHOWN - DAVIS LANE (n HELENA - DAVIS LANE, WEST ALLEY W rL ABBREVIATIONS ' f 31 STREET - NORTHEAST ALLEY Q N ; BUTTE 32 INTERSECTIONS DETAILS J 0 ARCP ARCHED REINFORCED CONCRETE PIPE MANUF. MANUFACTURER O E AN co • AT MH MANHOLE BILLIN 33 INTERSECTIONS DETAILS J () B.F. BUTTERFLY VALVE MIN. MINIMUM 34 STREET AND ALLEY SECTIONS COB CITY OF BOZEMAN NIC NOT IN CONTRACT CONC. CONCRETE N0. NUMBER 35 WETLAND BENCH CONSTRUCTION CONST. CONSTRUCTION PVC POLYVINYLCHLORIDE 36 SIGN AND STRIPING PLAN V CT. COURT RCP REINFORCED CONCRETE PIPE.I. DUCTILE IRON PIPE STA. STATION 37 PEDESTRIAN RAMPS 0 DIAMETER SIM. SIMILAR PROJECT LOCATION 38 DETAILS D DR. DRIVE STD. STANDARD DWG. DRAWING ST. STREET o ELEV. ELEVATION TYP TYPICAL LOCATION MAP p EXIST. EXISTING W/ WITH F.E.T.S. FLARED END TERMINUS SECTION YPC YELLOW PLASTIC CAP DENOTES SHEETS THAT ARE L.F. LINEAR FEET NOT IN CONTRACT. . c o° CAD NO. 557-01_DWG SHEET OF 38 I I r N H I I GENERAL NOTES: 1 A 1 ' - 1. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES IN WRITING AND SHALL BE C JrV�`d I RESPONSIBLE FOR SECURING THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE 1 I BEGINNING EXCAVATION. RECORD DRAWINGS ��� a=o 1 - I 2. ALL POWER, TELEPHONE AND OTHER UTILITY POLES OR GUY WIRES WHICH INTERFERE WITH THE U ¢�a I ASP-P/7ROVED CONSTRUCTION SHALL BE REMOVED OR RELOCATED BY THE UTILITY COMPANY. "o 1 I 3. THE CONTRACTOR SHALL EXCAVATE ALL WATER LINES PRIOR TO BEGINNING TRENCH EXCAVATION I III NAME ITITIF DATE TO ENSURE CROSSING CLEARANCE.THE CONTRACTOR SHALL NOTIFY THE BOZEMAN PUBLIC 3 WORKS DEPARTMENT PRIOR TO EXCAVATION. TIC VJ ' THOMAS,DEAN&HOSKINS,INC. Z I � ENGIN EF.RING CON3ULT 4. EXISTING FITTINGS ARE SHOWN BASED ON DATA FURNISHED THE OWNER. THE CONTRACTOR TT Q 11JJ 'ANTS SHALL BE RESPONSIBLE FOR EXCAVATING FITTINGS AND CONFIRMING REQUIREMENTS PRIOR TO GRUi FALLS-BOZFIANI-%M SPELL 0 100' 200' 300' Ism lygq,� ORDERING NEW FITTINGS. NTy 1E.,�i _ I 5.THE CONTRACTOR SHALL INSTALL MEGA LUG RESTRAINTS OR CONCRETE THRUST BLOCKS AT ALL O I^) S C A L F WATER LINE FITTINGS, VALVES & FIRE HYDRANTS,AS DESCRIBED IN THE SPECIFICATIONS. I I 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY PERMITS. O wJ I I 7.ALL CULVERTS AND DRAINAGE DITCHES AFFECTED BY CONSTRUCTION SHALL BE RESTORED TO V s ORIGINAL CONDITION, UNLESS OTHERWISE NOTED ON PLANS. Z y w 1 I B. ALL STREET& TRAFFIC SIGNS THAT INTERFERE WITH CONSTRUCTION SHALL BE REMOVED & Q Z a WATER MAIN PUN ` RESET BY CONTRACTOR. SEE SHEET 11 9. ALL STORM DRAIN MANHOLES ARE 4'0 UNLESS OTHERWISE NOTED ON PLANS. SEWER MANHOLE A W Y SIZES ARE NOTED ON PUNS. Zm Z47 p 1 I,..h1 w 10. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL SEPARATION BETWEEN OUTSIDE OF In In V N SEWER/STORM DRAINS AND WATER LINES. IQ Q 40 W D: 11. MAINTAIN If A MINIMUM OF 18"VERTICAL SEPARATION BETWEEN OUTSIDE OF SEWER/STORM U G U W 1 Tn O m❑ O LLw� 1 ' \ DRAINS & WATER LINE CROSSINGS. zo T \ ``� STORM DRMN PLAN 12. CONTRACTOR SHALL REMOVE ANY OBSTACLE (FENCES, CONCRETE SUBS, ETC.) THAT INTERFERE I� m\ SEE SHEET 19 rrry...11y 0� WITH CONSTRUCTION UPON APPROVAL OF PROJECT ENGINEER. O L �pW j I DETENTION PONDS \ �'/ \ 13. SEE SPECIFICATIONS FOR CITY OF BOZEMAN AND MONTANA PUBLIC WORKS STANDARD �NJ I 1 SEE SHEET 19 ` o � CONSTRUCTION DRAWINGS. STANDARDS ARE BASED ON 31' WIDE STREET. MODIFY STANDARD O m DRAWINGS ACCORDINGLY TO FIT THE DIFFERENT WIDTHS OF STREETS ON THIS PROJECT. SEE N PUN SHEETS FOR WIDTH CHANGES. I �r 14 ALL CONSTRUCTION WILL CONFORM TO MPWW$S LATEST EDITION) AND COB MODIFICATIONS Q Q FH BEING REPLACE I I I I SEES SHEET 20 TO MPWSS (INCLUDING LATEST ADOPTED ADDENDUMS). O O FALL 200 i 1 - � \ i\ SEE SHEET 15 ' 15. ANY EXISTING OR NEW VALVE WHICH CONTROL THE COB'S WATER SUPPLY SHALL BE OPERATED ! \` BY COB PERSONNEL ONLY. �V SANffARY.S � \ _ � 16. THE CONTRACTOR SHALL NOTIFY THE COB WATER DEPARTMENT A MINIMUM Of 24-HOURS � SEE SHEET 07 \ �I PRIOR TO BEGINNING ANY WORK. J \ m m 1• I j" 7. CONTRACTOR SHALL FIELD VERIFY LINE AND GRADE OF EXISTING CONNECTIONS PRIOR TO ORDERING MATERIALS. IRRIGATION PIPE DRAWN BY: JLN 1 - � � 1 SEE SHEET 21, 22 I I / \\'. �..�. \ \ I DESIGNED BY: JLN QUALJC DATE:ITY CHECK: 81D 06\ SANITARY SEWER NOTES ..' j•\�`� JOB NO. B05-057 FIELD 00K 1. ALL SEWER MAINLINE IS TO BE SDR35 PVC AND MEET ASTM 3034 STANDARDS. 4" & 6" SERVICES SHALL BE SCHEDULE 40 PVC. CULVERTS'XI wnTFRnnIRSF 1 SE SHEET 22 2 EACH SEWER SERVICE CONNECTS TO THE MAIN WITH A SEPARATE WYE. NO TEES OR � E DOUBLE WYES ARE ALLOWED. LT f 71rR PLAN FH ARROW BO WEILANII S WrB 1 +� SHEET 17 EL= 4633.65 'Fa MORPISON 1 Mnitm.l , \ WAS PLAN 3. ALL SERVICE LINES ARE TO BE 4" UNLESS NOTED WITH SIZE IN PARETHESIS. SEE SHEET 15 4. SERVICE CONNECTIONS TO EXISTING MAINS SHALL B P WATER PLAN� E COMPLETED USING SEE SHEET 14 \ \ '`� INSERTA—TEES. MAXIMUM SPACING SHALL BE 2'0" CENTER TO CENTER. PIMA% f STORM DRAIN PLAN SEE SHEET 18 �- IT WATER NOTES z I FH Row BOLT � : _SANRARY SEIYER.-- �'�` -- �', Q EL 4638.01 / SEE SHEET 8 Z__ -- -- J `h 1. ALL WATER LINES TO MAINTAIN A MINIMUM OF 5.5' OF COVER FROM FINISHED GRADE O TO TOP OF PIPE. N d C- - - - -I I FH ARROW BOLT I' � WATER PLAN - - F _ - SEE SHEET 5 2. FIRE HYDRANT ASSEMBLY INCLUDES HYDRANT, AUXILIARY VALVE & BOX, DRAIN > I El= 4636-17 - i SEE SHEET 1B ( I SMUT 11 GRAVEL AND CONCRETE THRUST BLOCK (SEE MPWSS CONST. STD. NO. 02660-4). J SEE SHEII,6 _ Q ' SANITARY I'I'lIL1h 4 FH ARROW BOLT 3. ALL WATER SERVICES TO BE " COPPER UNLESS OTHERWISE NOTED WITH SIZE IN m f- --- ; SEE SHEET.-9. I EL- 4636.73 'BLOC `) `N PARENTHESIS. 3'4 1 1 I II +�_i SANRARY SEWER If J I 1 _ SEE SHEET 4 . I -- --- - - -- ------' I G.O. 1'cM �s �M\. W Z J =__ WATER PLAN ' �`'�WATER PLAN Q Q FH ARROW LT I SEE SHEET 12I i 111 _ - SEE SHEET 13 J w ; ELF 4642.3 a Elf?�4641.ROW 86�r --Y - atio -5 -- I — O O - - -_-----_- FORCE MAIN I n `-I 1 - I SEE SHEET 17 I _ fll IRRIGATION PLAN > RARY SE1R Lu WATER PLAN-� I I SEE SHEET 21&22 I SEE SHEEP 4 SEE SHELT12 V 0 �-----_ —--____ _—__—___________—__.____ Z AMOUNT OVERALL UTILITY PLAN CAD NO. 557-02.DWG SHEET 2 OF 38 I c. r 9)• 91• � � 91• 91• � 91• 9� 91• � 9l� � 91• � 9I• 91• 91• 9� � 91� 9� � � 91• 9!• 9l� � �O N T q iY °; `DAVISPOND \ ' OVAL <zo 11 0.4 NolmCm 0 80' 160• 240• (1) E \ \ S C A L E Z Z I � EAST 1c� _ I REL'UCn7E Fx,lb"fING SOIL PILE __ _ A 1 � �� U w l i a l l�l l � 1 � zm RECORD DRAWINGS I PLACED FlLL MATERIAL TO - ----' - APPROVED crU U W CREATE WETLANDS AND �, —— —_- .�`d.�.,�+—{1tr .+.a T.n�.pcc'Ee� $•Sa-OFr 0 O O p STABILIZE EXISTING BANK _ Tf NAME ITLE DATE iF r--- x AI I n w -6XT THOMAS,DEAN&HOSKINS,INC. v F" '06 TD& ENGINEERING CONSULTANTS ^m GIWATT -BOiE4W-IUUSPEII LEwwoN IAwo ui Q WEST POND D 111e, , O LOT, �I > > b w 3JILIN DESI NED BY: J N QUALITY CHECK: DJC L_ ! DATE 9.1.06 J.BL�0.OOK BOS-057 PE BLOCK `1,, 4 \ a 1 WETLAND SETH!{C✓' 1 .PARK BFF MUAf1"Jo. • �1 Y I Z I i + I 1 PHASE 2 — +, �— I 1 J 113LOCK 6 Z Z ' CONTROL POINTS 0 � REG .LOTS_ 1 CP NORTHING EASTING ELEVATION DESCRIPTION } ` -- 4636.2 o1AT�ED - ' 501 12545.69 4871.57 4647.37 $" RB W/ RPC Z W _ - FOR F ODPLAI ' PROTECTION 530 12592.91 5751.56 4640.45(NOT,COMPLETE CP 0 Q �y li AS OF 1/2008 1 531 12599.42 6256.18 4640.84 RPC = Z 1 1 - $LACK 4 �r \/ '�4 RECRADE LOT TO 3 �II W 3 --1 ' 1636.20 AT EDGE Z Q z -------�-_� I _ FOR FLOODPLAIN 1 I di 1 Q w \ _ LOT 1 L st — PROTECTI* Lu - A - - - - - - Y oTI1', f 1 '; i ; , JN PHASE 1 B t; loll, _ - � / I I,1 Q�♦ �'i^ j� Ein E 5 w -- _�-' 3 4 S-- p�- -6 __7 B A �. .. -- _ _ft5l.' -RSL R51, RSCZ'AIL- - - 1 ---------------" CATAMOUNT ST I m}� F-7 F— T I _ _ _ _ _ _ _ CAD O. 557-03.DWG SH ET $ OF $$ I � N N Z RECORD DRAWINGSJr �� APPROVED ONAL 0 50' 100' 150' I 5 3 D-O I I I I I � I I �-r-+�-titr� �flsPec�nr k NAME ITLE DATE II, ( 1 �a SCALE \/ ZZo THOMAS,DEAN&HOSKINS,INC. 0-0 TD&I� ENGINEERING CONSULTANTS ; + I I / E415-B020AAN-ILLLl5PD1 WASNWQiON V1 II I& LEW/S�ON IUM10 z F II 3 4" INSULATION 0 50' 100' 150' c 11 r 0 (32 LF) I I I I I I Fo F _ { ul SEE DETAIL 2 S C A L E m 0 u 38 `� y u 4625.58' 4620.20' 0 MH #11 xj z I jp - +35 +72 �c MH12 USE WATERTIGHT Q USE WATERTIGHT MANHOL D -- H #13 MnLE LID 4832.97' MH #10 c� S+bO +381(8"� 1+54 a z J 0. 4534.06. 1 a —Sv- - T f — 6'0 WET WELL I II SOUTH ALLEY I I V) W a FN f N V I V I J A w" I i -I ;w +00 N8 5" 9.37' 1 n o +53 (6') 1 1 1 1 1 1 I I 1 I I I I I I I I MH 410 4630.D4' MH #9 c ¢ +90 +40 +90 +40 +90 +70 +20 +70 +20 +94 3 4634.25' 4634.04' 4633.83' 4633.62' 4833.41 4632.87 4632.66 4632.45 4632.24 4631.9.3 I L) o W z w w O LL z zo I LL 1 2 3 4 5 d 6 7 8 9 10 I v o x �0 F a2 O 1 m o I `"3 SOUTH NSTALLI-4" SERVICE LEFT H F INSTALL i - 8" SERVICE LEFT o QO INSTALL 10 - 4" SERVICES RIGHT BLACKBIRD DRIVE INSTALL 43.5 LF OF B" PVC o w INSTALL 2 - 4' SERVICES LEFT INSTALL 253.5 LF OF SCH 40 4' PVC INSTALL 1 - 6" SERVICES RIGHT INSTALL 46.0 LF OF 6" SCH 40 PVC in m m INSTALL 87.0 LF OF 4' SCH 40 PVC DRAWN BY: JLN DESIGNED BY: JLN QUALITY CHECK: DJC DATE: 9.1.06 TYPE 2 EXCAVATION / TYPE A BACKFILLL JOB NO. B05-057 FIELDBOOK �z 3n a N MM m TYPE 2 EXCAVATION / TYPE A BACKFILLL 0 a eaa 3z >>>> N �N�ZZ ui K Z .0 3 W 0. ++n L: o J a mtn0 OAP <0 4640 ROUND '�,�, 3 �^ ma< rc�i S tea» zz _„, ; Ana �Vc Z J --- --- o a zo O Q —� �,'N� � ' ww sv, z =F �1Wi1m EO 10 a640' uj IPROPOSED GROUND _-_-- -- - ---- ---- -- ;PVC -- - -- --- ZWO PROP ED GROUN �4630 -- - - EXI LNG GROUN = co T80 LF. 0.4 Xcnm } W 5 2B0 LF 0 8" R 3 Q ff+ - YZ o - SOQ 4630 J N Zc 0 N54620 6 LF. 0. 0.40% 9 50 5 8 PVC SDR 3 8' PVC m w n �o �+? o v1 m m rn rn m n V Q SDR 35 n n n n n rO1i r°ii - n m w rmi °n° mn J co �o m m m m ro �o io <o m 50 coa < a a a a a e e a a a a 10 < e n °6 n n n n 0+00 1+00 2+00 3+00 4+00 5+00 6+00 a a a < v a a a a 2+00 3+00 4+00 5+00 6+00 BLACKBIRD DRIVE SOUTH ALLEY CAD NO, 557-04.DWG SHEET 4 OF 38 WET ALL SEE SHOT 4 BLACKBI DRIVE m 1 , z0m INSTALL 67 L.F. OF 1 ; V" iuo 7 8" PVC SDR 35 \ SEWER ' _ ;� 3� 1 of ® 0.42% MH �16 STATIO ING _--- _ (SEPER _ SET) 1 1 - _- `�Ly W) 1 0 50' 100' 150' 3 u 2" I S ION S C A L E ra MH 13 0 50' 100' 150' 1 LF MH �5 V�J D AIL p\ \+87 W z W *12 +q? i S C A L E kXVD j-I I _ u_ - t` - 1 - 1 T y MH #14 111 I` I / MH #17 T I MH #15 1 — �— �_ _ — i — W I•ya Ri N SEE SHEET 4 � 3?' I 'I / 1 _ FEN_W_A_Y- _ - --_ r wY C� I END SEWER (PHASE 1) I 12+72 CONNECT TO T - -- - - -- zm A �� 8" CJW I EXISTING SEWER T I �N �j N Q � TROUT MEADOWS CONNECT TO EXISTING 1 w� W m INSTALL 1 - 8-X4" WYES RIGHT 1 (PHASE 3) I rn(nFEN N m L w C)INSTALL 34 LF OF 4" SCH 40 PVC I 1 1 - 8"X4' WYES LEFT x IN Y �wzo rn 1 ■ ■ ■ 1 INSTALL 43.5 LF OF 4" SCH 40 PVC O [. Wr �o N 1 1 RECORD DRAWINGS W W I 1 -T-� ~~~ APPROVED 0 b 0 - Sp'c of 5-30-08 0 NAME TITLE DATE Q TYP 2 EXCAVATION / TYPE A BACKFILLL I THOMAS,DEAN&HOSKINS,INC. ^ i D& ENGINEERING CONSULTANTSCE m m CE 3 I F- W 3 ; I GNGT FALLS-BOZEWW-NAlSPElI YONiANA W �� �`� W SPOKANE WASWNGION W z in n I in N n r� in 3 1 0urlsTON 1 ° DRAWN BY: JLN ri m o in##3 v... ���� m�� '� n N � �� DESIGNED BV: JLN +n O pdTYPE 2 EXCAVATION / TYPE A BACKFILLLOUALITv CHECK: DJC 4640- - ----o +--- — —� - - am - - -F ao�N< DATE: 9.5.06 ?O ^'r Z p •r Z O +M a .. 1 JOB NO. 50"57 +nd >> to 1 r FIELDBOOK � . zz =FaF-y>> .F, >> oir-z 9 I NNM m d 0 4630 EA 1 1 4640 \\ L.F. Z 12 L.F. 0.43% 1 .631:&.iBXr — -- - 9 3 L f' jj1% F PVC SDR 35 O Z 8 PVC SDR 35 1 (/� W 4620 1.4 L.F. 0.42X LL.I 8" PVC SDR 35 -- - 1.22� 1 100 - 8 SDR 35 Q Q W 6FVC5 I 1 1 - - Q 4630 -- Z W O 0 cf) 1 1 Yz 4610 - ----1----- - -. - - - - - - I O Q Z a Q m W 1 1 4620 SC, I5 9<F 1 50 O O op m N OJ N tD 50 M N O 40 n n O n t/J N Mn I N n OD i'l r'1 u1 n Gp I d d d < d d d d h � M � rl M M rdj r7 ral M M �O �O �O tD 10 Ip p O O tD � tD d d d a d d d d d d < d 1 2+00 3+00 4+00 11+00 12+00 3+00 14+00 15+00 16+00 1 1 1 FEN WAY TROY MEADOWS ROAD - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 CAD NO 557-06.DWG SHEET 6 OF 38 I � RECORD DRAWINGS ; SIN HAS APPROVED NAME TITLE DATE J O,YA 1. TDBC THOMAS,DEAN&HOSKINS,INC. ENGINEERING CONSULTANTS I:pFAT cols-802EMNt-NAl15PELL WASMNGfON �(- rrr z0Q CN�60o 1-0 9�`,}_ UZ 0s q I� mLo�In � � 3 I I I I51 1 1 T50' // . MH #9 Z z S C A L E f �� _ / '2d i Ln SEE SHEET 4 �O..II n•7 — 446.65, TROUT MEADOWS KUAD �p - --_ — — jr�a- � � g+34, s ,// \ F� z w ; 4622.78' � �',' \ Om 2 fE0 4623.53' \ \\ \\\\ 9f' �yMH/f1 8 0cl)0 u u w I a'„ R +1 w w w O �Wz �v tv V r' 0 10. 11 z ( 1 \\ \ \ \ ,�i ❑o o x Sao v fiJ'l ,�V hl I =1 z 4623.03' 1 A .0 +07 ft81 f{S1 ,F \ / E,y maw R+pf2, L301 +so +4o R� +sol + R+L� R+so Rs `��� IIo 181 1 \67 \ 5 // / I� I— owl +30 —1+65 'q N i 1 I qHH00 J /I \ MH Ill--,Ill--, S S41'27'38 E 0 0 0 6 v A WEST ALLEY r �\ ,•''�,. +38 MH �J6 +39 INSTALL 4823.26' 482 14 - 8"X4" SERVICES LEFT \ '"`� ' �� 267 \ INSTALL 1 - 8"X4" SERVICE RIGHT \` ` INSTALL 1 - 0 X8" SERVICE RIGHT SEE SHEET 9- Dom CD INSTALL 533.5 LF OF 4" SCH 40 PVC DRAWN BY. JLN INSTALL 34 LF OF 8" SCH 40 PVC DESIGNED BY: JL QUALITY CHECK: OJC DATES 9.8-06 JOB NO. B05-057 FIELOBOOK TYPE 2 EXCAVATION /TYPE A BACKFILLL ro � m �nA o w n Div m� O Nn�prntO _ ,7 z N 11 N O l V�I�d ' N N GD r It 2 m 4640 - - - r ;w - nI N� ay � mrnypZ� m-NCQxi W � �v K E N nr� v O �� I_ �� ^ntp,.j S�F'ZZ NNm E XISTING GR4D 0 PROPOSE GROUND O ao z ��, i r�> rn o!? 4630 -- - _ j > Q z coZ w J cn 0 uj J za .F. o.42x 3 .42 z >- 35 8" 8" PVC SDk I PVC SDR 35 - 0 18B F. ,41 cn cn OBL.F. U. 1% 8_PVC-SDR-35-- -- fifr3-L.f.-i 1% - J W a 4620 --- - - - -� -- 8, PVC SDR 35 8 P SDR 35 J N Z H In can 5 N N N OI O lA m N 50 m rn OI N O lT n O N N r7 N pOj N NrN'r M 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 WEST ALLEY CAD NO. 557-08.DWG SHEET 8 OF 38 RECORD DRAWINGS is APPROVED NAKIE 'irl[I DATEO� ?, QVAlzo L C'�`•`• _ _ _ _ _ THOMAS,DEAN&HOSKINS,INC. (,j a8< - 0 50' 100' 150' F.NCINF.ERING CONSULTANTSoz� FEN WAY I I I I TD&� PRE FALLS -KAIJSPEu w t 'N a S C A L E Ew st0 xw o 3 % Go • �10 I y�y.�.� Z c� \ EE S E 8 ` 1�� 4631.54' ►►�1�VV {`L +30 O II II xz� 1OD 2.+0 � I +00 II I Yy 5+0 6+woA 4091* _yO `C'' S t S I ............ S �15 MH #2A 1 1 I I I I I ~ ^W +49 +031 MH #3 I +lal +42I MH �14 zm A z 41M.03' 4627.65' 1 1 4630.86' 4632.42' 7n Ln z o I I cr U U U W I I w 44W11 w a O wz Dom - o DAVIS LANE -- � otn� aal LidW 1�1 -- --nl Hr� .,. WEST PARKING CORRIDOR INSTALL 1 - 4" SERVICE LEFT (� INSTALL 4 - 4" SERVICES RIGHT m m INSTALL 176.5 LF OF 4" SCH 40 PVC DRAWN BY: JLN DESIGNED BY: JLN QUALITY CHECK: DJC DATE; 9.6.06 TYPE 2 EXCAVATION / TYPE A BACKFILLL v JOB NO. B05-057 m FIEL OK f� n H Z N 1p ,0w OD av+ia0 4640 fvz �z I — J n M L.j m x aa �"t< PRO OSED GROUND au m co _O co > --T-- NOVI OYZO _�� �--- wN\-EXis nNG GROUN �— x 8. S R Z 4630 SDR 35 Q 9 F 1.70 8" Q ZZ LJJ sc m Z W Q �L) 27 � 5 9�F N 0 (1) V Y4620 s0 Q Q Y o rn rn a rn n rn N rn v r Q W O N N M Q Q M M Yt r7 Nt ✓t M `t "t Nt M r�] M M m �o m Lo m �o c0 e m m 10INZ Q coo Q d 0+00 1+00 2+00 3+00 4+00 5+00 6+00 N cl) Q W V WEST PARKING CORRIDOR CAD NO. 557-09.DWG SHEET 9 OF 38 -- z RECORD DRAWINGS APPROVED,1 0 50, 100' 150' lirr C_ B-ZS-og sf AL I I I I NAME TITLE DATE 08 , a zo SCALE TD& N THOMAS,DEAN&HOSKINS,INC. Z zzo _ EGINEERING CONSULTANTS L•I my - tEoI E -BDZEWN-wW5vEi1 3 � zF ; LIFT STATION TO �'f FM MH Q1 b0 BE CONSTRUCTED ^Ify E„I STA: 1+50 LATER AS SEPARATE (�a CONTRACT RIM: :4634 STA 11+78, 33.5' LT 0 z ' I INV IN: : 4634. (� to INSTALL 6" CAP M+I w INV OUT: 4634.24 ( ) c INV: 4625.23 STA 11+15, 11' RT .gyp INSTALL 6" 90' BEND `SI -f '�— - - f- -��— - - —� ��— - INSTALL46' 90' BEND w F TROUT MEADOWS RD S N J W W� Zm A ' u . Zm 5.INSTALL I6"RT STA 2+56, SO 11+78, 11' RT oN (�w 11.0' RT w E >) INSTALL 6" 90' BEND QI Zm 11-f 4' INSTALL 6" B,NO (to r)0 W N C BEND ❑ (jn l C) Ow 0 4 zo x Mcl m ` ONE U O 5 m w w 0 0 mmm TYPE 2 EXCAVATION / TYPE A BACKFILLL TYPE 2 EXCAVATION / TYPE A BACKFILLL DRAWN BY: JLN DESIGNED BY: JLN QUALITY CHECK: DJC in DATE: 9.6.06 �v JOB NO. B05-057 e N 4640 FIELDBOOK va n a'. �N�aa a r x�*zo s \ 4630 _ SEWER rORCE MAIN Q 107 L.F OF 6" C90 C 4640 --- (n `- EXISTING ROUND S FIRST RUN- - Z 0 PIPE FLAT --- --- z - W W PROPOSED > Z V EXISTING 8" 4620 J Q Z SEWER MAIN 4630 - = Z LL O W � W o +_ a w J W N ; �W qb J C �o SEWER FO 7Er4l 4610 - - - ---- 4620 --. �ii --- 391 .F ~ m Q Q O QI 5 9�F — U Z m Nb s o to V 50 5 9 N n O 0 10 tp D 1D D D i0 � t0 50 W Y a a a a a a a < a n N h O u' 1� 2+00 3+00 4+00 5+00 f n 11 n n n n n a a e a a e BLACKBIRD DRIVE 10+DD 11+00 12+00 TROUT MEADOWS RD CAD N0. 557-10.DWG SHEET 1 Q OF 38 °0N T,,n,•, 1 RECORD DRAWINGS - �= APPROVED 8-_28-OT �DA'AL NAME 1TIC DATE 0 50' 100' 150' V azo nI Z THOAS,DEAN&HOSxINS,INC. I ZZ � - ENGINEERING CONSULTANTS S C A L E 1Zr N TD& a 0 50' 100' 150, 3 STA 1+50, 5.5' LT 1 1 1 1 1 1 1 I REMOVE EXISTING SOUTHWEST PARKING BLOWOFF & CAP SEE SHEET 17 S C A L E CONNECT TO EXISTING cn a W/ 12- GATE VALVE I STA 2+74, 5.5' LEFT 10+20.2, 3.3' LT 0 r7 rA +97 !1.5") I 12"X12"TEE O6�S. 45+e p S-� R+ h+w O ._ O 04 U x - - --- -- -- -------------------- FEN WAY ----------------- -- - ------ Za -___..........)RR IPR IRR [RR IRR IRR..............._-_...._.__........._....-............... W innnW _ ..........._..._....._._......._.................._.. W WEST ALLEY —--— -- y - - - zm Z SEE SHEET 16 A � 01 C/Z STA 6+94, 5.5' p\ a y m SOUTH ALLEY / / B'XB'TE A 10+59,5:s'ftF-3.8' LT w WO 0 awz SEE SHEET 12 / III I 8 6'TEE wzo E / / STA 6+99. 5.5' LT \ \\' 3026-L.F. OF 6" PIPE STA 15+99,5:.r 8.0,KLT 1�1 W ;soot ~ / / 8'VALVE STA +00. 5.5' LT 8.5' HYDRANT 8" CAP E* �R / 8'X6" TEE& 8" CAP BURY ELEV: 4629.00 W/ BLOWOFFWEST ALLEY yyy /SEE SHE L 10. "LF. OF 6" PIPE 0 UJ 1V - / / \ 7 HYDRANT rc ELEV:4630.48 ~ W W W W Y dJ�� ED co co FEN DRAWN BY: JLN INSTALL 1 - 1 SERVICE LEFT DESIGNED BY: JLN QUALRY CHECK: DJC DATE: 9.6.06 JOB NO. B05-057 FIELDBOOK TYPE 2 EXCAVATION / TYPE A BACKFILLL TYPE 2 EXCAVATION / TYPE A BACKFlLLL TYFE 2 EXCAVAION / TYPE A BACKFILLL i 4640 -- -- `\ - -- - 4630 ---_ PROPOSED ROUND -------_ ___ E ISTING GROUNDLu - - \ - -___-_ -- Z 4630 - --------- - �--- -- 0 Q J 4620 Z -- -- - - -- u=) 0 w Q wZ a o o ---- - W Y Y A 15+68-T 15+84, m j Q m 3 +W it m +i +rz II STALL-+G-L. 24 L.F. ,++ o J LLJ Q z m m INSULATIO m J N <� _ <� I EE DETAIL 2 ; Q 4620 ; - - - - 4610-- - -- - - -- Q m Z S SC lIJ STA 1+ TO 2+74, Cq q LL INSTALL 24 L.F. 5 ( STA 6+ TO 8+00. 5 C STA 10 11 TO 15+ 9, INSTALL 88 L.F. 12 CLASS 51 DUCTILE IRON 12" CLA S 51 DUCTI E IRON a INSTALL 06 LF. B" LASS 51 D CTILE IRON V 50 50 N 2+00 3+00 4+00 5+00 6+00 7+00 8+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 FEN WAY DAVIS LANE CAD NO. 557-11.DWG SHEET 11 OF 38 Z RECORD DRAWINGS N r APPROVED-1� 0 50' 100' 150' _�cx _ 1 1 I I I I I NAME ITl I DATE QZO 3 m 3 Qoo S C A L E THOMAS,DEAN&HOSKINS,INC. N o o Z ZZo TD& ENGINEERING CONSULTANTS w F- �_ GREAT EAUS-607EM -K ISKa MprtNN 8 8 N LEW ON to Wa In STA 2+79, 5.5' LT ¢ Li. z 8'VALVE 4" FIRE SERVICE a <~ 0 50' 100' 1 50' v1 STA 1+50, 5.5' LT I " I I I I I I I I REMOVE EXISTING STA 4+11, 5.5' LT STA 1+54, 11.0' LT x o o x z +06, 5.5' LT 8"X8"TEE 8"X4" TEE S C A L E BLOWOFF & CAP c 'o m CONNECT TO EXISTING 8"VALVE 32.5 L.F. 4" PIPE n rlr w a W/ 6"VALVE - +25 (1.5) I I +82 (1.5") O ® 0.09 W/ 4" CAP +n n r C)J z I I I I II - {I w STA 1+57, 1 1.0' LT I I I � 0�' („)? -- �p TA 5+57, 5.5' LT 8"X4- TEE +44 1.5" J r 'f' A 0+00, 5.5' LT +57 (4'� 325 L.F. 4" PIPE ( I)I +34, 11' LT f - f � - - �— V - 0' BEND 1 "XS" REDUCER 1 II ® D.09. W/ 4" CAP I I II STA 6+2 8"1VALVE BLACKBIRD DRI E I I I I I O —._ -_ V V V 4 - - V rnN A w z SEEtV l IiT�-+�-1' zw t< L II 8"XB` TEE STA 4+16, 5.5' LTJ I N89" 15 9.3�' +41 4" SEE SHEET 17 -1 _ +90 �1 �-- Fnp V"' 8`X4" TES O STA 2+41, 5.5' LT B" VALVE SOUTHWEST PARKING I I I I l i 1 1 1 i 1 I I 1 j� Z.m 4 Lf. 4` PIP ° £ I 67 +30 +80 +30 + +60 +10 +72 wx ¢8"X4" TEE 0+05. 5.5' LT 77FFCA < VALVE �ST+75 A 2+47, 11.0' L B l��C J I o [r U U m 43.5 L.F. 4" PIPE O / STA 5+14, 5.5' LT ® 0.0% W/ 4" CAP 8"X6' TEE > 8"X6" TEE qa W w a z 10.5 L.F. OF 6" PIPE SEE SHEET 15 i 6.5 LF. OF &'1 PIP 0 0 "zo TROUT MEADOWS RD E"I x CTl 7.5' HYDRAM 1 2 ;3 4 9"" 'DRA Ei 7 f3 9 l0 a o �a3 BURY ELEV: 4634.76 BURY ELEV: -17 N7 SEE SHEET 11 SEE SHEET 12� FEN WAY SOUTH ALLEY BLACKBIRD DR .- - INSTALL 10 - SERVICES RIGHT O O INSTALL 1 - 1 �' SERVICE LEFT !' BLACKBIRD DRIVE INSTALL 1 - 4" SERVICE LEFT �►rXV INSTALL 2 - 1 I" SERVICES LEFT INSTALL 1 - 4" SERVICE RIGHT o}D m DRAWN BY: JLN DESIGNED BY: JLN QUALITY CHECK: DJC DATE: 9.6.06 JOB NO, B05-057 FIELDBOOK TYPE 2 EXCAVATION /TYPE A BACKFILLL 4640 STA-1f50= f• W INSTALL 48 ,�- EXISTING ROUND 2' INSULAT ON - --- -_- - -- r TYPE 2 EXCAVATION / TYPE A 13ACKFILLL _I Z J PROPOSED GROUND Q Z) 4640 _--- - m H 0 4630 — PROP SED GROUN -VEXI NG GROUN 2 H w W Q w J N 0 + +W O Ix o n m 4630 - - Q m m 4620 �u3 - m - �m_ Inm Sc q STA 0+00 TO 6 34, o o V S + + 5 ( n IN 634 LF. +�i n1=i m o m 5 STA 1+50 TO 5 57,o c m > F 8" LASS 51 D TILE IRON � > U Q q a" I < < r a a F INSIALL 407 LF B" CLASS 1 DUCTILE If tON 50 co n co m ,n o v1 �o m m m m n 50 ao m ao m o o rn N N T6 a -1Oe o a To a a + a 0+00 1+00 2+00 3+00 4+00 5+00 6+00 2+00 3+00 4+00 5+00 6+00 BLACKBIRD DRIVE SOUTH ALLEY CAD NO. 557-12.DWG SHEET 12 OF 38 i RECORD DRAWINGS N APPROVED 1 1 = NAME -- — — NmimCm 1 s o�AL TD&� THOMAS,DEAN&HOSKINS,INC. 1 1 azo ENGINEERING CONSUI.TAN7'S GREAT FALLS-801[MW-KA.TSPETl MOM 1 I // Fa-UO POKANN WASH I 1 / I �l O_- I , I _ ze l r r I a� 'n TA 4 27, 5.5' L 8" VALV STA 14+31, 5.5' LT 4Q a 1 F' STA 10+99, 5.5' LT 1 � - 90' BEND 8"X6'TEE 0 50' 100' 150' , 10.5 LF. OF 6" PIPE 3/1/ STA 13+61 6.0' 7.5' HYDRANT I I I III���III F V,qL 4636.27 L� STA 1+26, 5.0' LT S C A L E I O 8"X6" TEE 5.0 L.F. OF 6" PIPE Z �`- ! 0.5 v � HYDRANT ELEY• 4628.99 STA 45' BEND I W � I � U= W \\ '�! Z- 1�wsR r 1 a TROUT 1 1 +83 STA 14+79, 9.2 LT +57 T A 12+09, 5. LT 1 - STA 13+91 T 22.5' BEND zm Z< 225' BEND 1` 8 C E 1 /` STA 16+07, 5.5' IT \ \ STA 5+87 01 '""I w + 3 STA 15+82. 5.5' LT /I 8"XB" TEE 8" VALVE N4 �I o Y 00 8" GATE VALVE STA 1+05 \ 1 4.0 +79 STA 1+ \ 8'VALVE \ 1 U w j STA 12+7.? 7.7' LT I 8"X8"TE 40 > O O O 4wz INSTALL 8" CAP & \.y STA 4+92 Jzo BLOWOFF (PHASE 1) I \ \\ 2.5' BEND sn I o �'T M5 REMOVE CAP & I STA 5+92cc 1 F CONNECT TO EXISTING 8"X8"TEE 3 0 50' 100' 150' (PHASE 3) TROUT MEADOWS ROAD 1 I I ' INSTALL 4 - �" SERVICES RIGHT I ¢ C S C A L E INSTALL 1 - 1" SERVICE RIGHT C] 0 ww I 1 DRAWN BY: JEW 1 1 1 j m m A 1 1 TYPE 2 EXCAVATION / TYPE A BACKFILLL I DESIGNED BY: JLN 1 QUALITY CHECK: DJC 4640 -- -- 1 DATE: 9.6.06 JOB 140. B05-057 1 1 FIELDBOOK TYPE 2 EXCAVATION / TYPE A BACKFILLL I Q" 4630 I O 1 1 0 1 � STk 13+06 TO 13 30, LLJ 8" INSULATION 4630 _-- ----_ --__-- I Li O Q z 1 S DETAIL - - - 4620 1 - 1 Q N Q 1 _ 1 Wo W 4620 - - 1 w a S 1 y„ + , °i +�, m STA 1 00 TO 5+9 S�+ o Y Q O <m INSTAL 492 L.F. 9 i I Q � Z < 1 <j a•amc <N '> <� +��Q + + 8' C S 51 DUC IRON 5 ��„ + Go fno �^ <x a� ao to J W (/� 4610 - -- -- �m � � � mom 1 J O 3 1 N o m a a n o 50 ci 0 au ry 1 m O m o� of o; rn ai o 0 o rn m �A 10+ TO 16+07 INSTALL 50 L.F. B" C S 51 DUCTILE IRON M) O MJ O t0 tp t0 fD 1D t0 M) r Lu a < a a a a a a a a e Sn9 1 1+00 2+00 3+00 4+00 5+00 1 U 5 �� 1 1 1 � 50 ^ 1 7 �q a s NORTHEAST WATER LOOP 1 rNi n a < a a 1 < a a a < a a s 11+00 12+00 1 13+00 14+00 15+00 16+00 1 1 1 TROUT MEADOWS ROAD 1 I� CAD NO. 557-15.DWG SHEET 15 OF 38 RECORD DRAWINGS aNTq" , APPROVED iI F DATE .1 I i rir 8-28l NAME II OVAL THOMAS,DEAN&HOSKINS,INC. ZO TD& ENGQNEERING CONSULTANTS V o SEE SHEET 12y" 0� BLACKBIRD DR 0 SD' 100' 150' �°� Z z < I I I 1 1 I SCALE � / STA 11+30 \ 58- 8" GATE VALVE O 446.65' SEE SHEET 11 04 U= FEN WAY � � d — — TROUT MEADOWS ROAD - ^SJ \ \1 ,dam/ STA /TEE i I- W B j TEE Q W I ST 00 \ / Z'ND / / z m Z< 45' BE STA +41 , \ \\ k66 0\5� / / 00 1 N (N ALK.Yr ST 2+36 12'X " REDU ER A 6+49, 3.3' LT 1 2 1j"X 2" TEE 8"X4" TEE \ ` \ \ // w U U W n '?y�\ 4 5 6 ¢ L.F. OF 4" PIPE 4" ARE SERVICE +T\ `1 5'� \ \ \\ \ // w w O X6t` 03 7 6 9 10 0.0% W/ 4" CAP STA 6+52, 3.3' LT I \ \ / / O ❑ Zo J'\ TA 2+ 0 11 \ STA 9+94, 8.8' Ri SEE SHEET 11 \ o < 8"X4" TEE 1 �� �« DAVIS LANE �\ \ +00 $SNA�20 +50 STA +46 al�j +90 1.5" \\ ,gy�pp\ \\ \ //// 22.5' BEND o Uo 47 L.F. OF 4" PIPE 1 9'f"" ' L' I +� +50 8` V VE+20 RSL RSL 1ttSgl. '� 1 ) ® 0.0% W/ 4" CAP 1 50 / / N END 7 \ \\i S41'27'38 E 379.00' / / ��� o 0 \ � I STA 4 1 8 X8" 1 11 STA 7' RT� ,� w STA 5+04 1 �( 11.2tiS�BEND +28 (1.5") B" VALVE \.... \ STA 6+94, 1.5' LT B"X6" TEE WEST ALL SEE SHEET 17 19 L.F. OF 6" PIPE INSTALL 11 - 3` SERVICES LEFT WEST PARKING 8' HYDRANT DRAWN BY: JLN INSTALL 3 - 1 SERVICES LEFT BURY ELEV: 4634.11 DESIGNED BY: JLN QUALITY CHECK. DJC INSTALL 1 - 1 17" SERVICE RIGHT DATE 9.6.06 INSTALL 1 - 4` SERVICE RIGHT JOB N0, 805-057 FIELDBOOK TYPE 2 EXCAVATION / TYPE A BACKFILLL 4640 - -- - - rEXISTING GRO ND PROPOSE) GROUND -T -- -- - ---- - N 4630 7 _ STA 3+1 TO 8+58- INSTALL L.F.60 L . 0 �. 2" INSU ION m W SEE DETAI 2 38 UJ W cf) 4620 j Lu J N �p19 +> o m + +m a * + Q STA 0+08 TO 2 41, INSTkLL 233 L.F. 5 -7 ST 2+41 TO 11+35, 12" CLASS 51 D CTILE IRON F INS rALL 896 L. . 8" CLASS 51 DUCTILE RON 50 N N N O O T N N Q m N c� " O c� h O N N n m O 6 0 O N N N c� c� n n < C N n N N n n n n n n n n n n n M n n n n n n n n ao t0 � O 10 1D O O N a < a a o a v a a v a o a a a c < a c a a e c v 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 WEST ALLEY CAD NO. 557-16.DWG SHEET 16 OF 38 I N H #'= 0 50' 100' 150, J ONAL o S C A L E N U` aa + 7 0Z- 1� OI 3 STA 1+96, 17.5' LT 0 50 100' 150' 0 O 'J 12"X6" TEE I I I I I I I Z F1.1 a \ d - t 10 LF. OF 6" PIPE µ W z z \a `\ OO I I I 8.5' HYDRANT STA 2+18, 7.7' LT S C A L E a L{7 0 W STA 0+26. 23.7'�T SEE SHEET 17 BURY ELEV: 4640.19 Li w 12'%12"TEE y k, I I 12" VALVE } Z J SOUTHWEST PARKING SEE SHEET 17 ^nJ0 I 36.5 LF a WEST PARKING = a STA 0+30, 19.9 LT I I +40 (1.5") 2+23, 7_T LT W U, v, re J SEE SHEET 16 5 12" VALVE ( I I I 1 1 X12" TEE SEE SHEET 12 W W x WEST ALLEY I I I SOUTH ALLEY U) m A Q 1+00 2+00 33++00_ 1 4}pp 11 5+00 6+00 �40 - FnS_ SOUTH ALLEY V1 U Q o A +29, 7.7' LT w 0 0 0 Q W m 1 " REDUCER w w w 0 1 1 I I STA 3+72 I SEE SHEET II r l 0 0 0 4wz I 1 FEN WAY m I I I I 12"X6" TEE `sZ�A +55 (1.5") +13 1.5 18 L.F. OF 6" PIPE I I tD o L�o3 STA 0+49 40�.F ( +24 (1.5-) +52 (1.5") > 0 E..1 haw 45' BEND 40 LF 9' HYDRANT 1 1 40 LF 40 LF STA 6+22 BURY ELEV: 4635.75 1 1 STA 1+00, 6.7' LT 90' BEND o O N RECORD DRAWINGS a 3 6) 0 0 APPROVED Z 0 Q� WEST PARKING NAME TI E DATE INSTALL 4 - 1J¢' SERVICES RIGHT >> INSTALL 1 - 11¢" SERVICES LEFT THOMAS,DEAN&HOSKMS,INC. m In m TD&I� E.NGINEERINGCONSUI.TANTS 1 crtr T rial5-eo7rwr�-wwsFeu Wo.na,�n DRAWN BY: JLN sp K l w lulcrwl iexisro" loulo DESIGNED BY: JLN QUALITY CHECK: DJC DATE: 9.6.06 JOB NO. 80"57 FIELDBOOK TYPE 2 EXCAVATION / TYPE A BACKFILLI. TYPE 2 EXCAVATION / TYPE A BACKFILLL 4640 -- - PROIOSED GROU ROPOSED MOUND 1 4640 Z`EXIS INC GROUN !` __-- — EXISTIN GROUN Y — + STA 1+00 TO 2+29 a INSTALL 129 L.F. Z 4630 - �- - ---- - --- - 12" CLASS 51 DUCTILE IRON 0 Q a o N f- 0 4630- Q �• aN <b S Q Z w " -- c o 5 9 _"' M Q S - - W F Fab +�+j D Z 2 N STA 0+2f TO 6+22. I STALL 606 F. 12" CLASS 51 DUCTIr IRON 5 F G w ~ 50 w F- � 462D tO rn Z Q 0 50 n n n c6 n o rn ,n rn e m to n m N ro m < n Q N o cJ �v n a a ui In Iri e m a � a a a W I w cD b �O t0 1p tD ,O 10 O 10 10 tO Ip ,O v a a < a a < a a a a < a a a 1+00 2+00 J INO Z 0+00 1+00 2+00 3+00 4 00 5+00 6+00 m Y SOUTHWEST PARKING a a WEST PARKING w CAD NO- 557-17.DWG SHEET 17 OF 38 °�tITA�",, N H INVERT OUT RECORD DRAWINGS APPRGVED G� Ott—ioc" SSzO�B otei.~ WEST POND a ` NAME TITLE DATE / r ` ZOS •/ a08 o� 1a3 A�� TD&� THO ENGINEERING DEAN&HOLTANS INC. 2_ ENGINEERING CONSULTANTS carver rws-0ouuw-xu�sv[u S 3 sonaalE (�In a 'Fwrror+ INLET #4 e SO INLET/MH #2 66 TBC 1S70I (~ ~ 4¢6.65' INSTALL 27 LF. STA 5+71 TBC ELEV: 4634.32 Ir�.i/yr OF 12' PVC TBC 12.0 LT \ INV: 29.82 (W) \ o 'PVG _ f _� O 2.O6X 6 / O D DOUB INLET /1 tN6 nP0(rr \ x A 0 0 ST S F'1DOyys f` ------_ i INSTALL 31 L.F. OF STA 2 5 � V RT D 12" PVC o 2.23$ I 1 T C ]A 2 TB 16.5' L -'"'� RDA �O \ \ POND BC 46 .4� T C 4627.4 NLET MH 513 \ INV 46 2.8 1 4622.7 (N.SE. W) 9 155 5 STA 10+89 Q z N \ SEE D AIL 50' TBC 15.7' RT \ W a 6 Q, SO NLET # TV- i � D —I t ^ rW i RSL RSL o > t8 asao.R r '__ om F_I z N , RSZ 6 91N\ 4625. 0 ( I mQ V o SO INLET/MH y[F3 � Z m \ _( r6 / STA 6+03 XU If Of L) W ur less, 11 TBC 15.7 RT 1 0 INLET/MN $4 \ STA 8+38 to RSL I 1TBC 16.5' RT / i O Q 0 C) \ / V �o \\ '` S412I'38 f _ INSTALL 103 L.F. OF I 1 I 1 1 1 / i E.r wa.b'5 37 12" PYclo 1.79% 1 1 1 1 0 50' 100' 150' 1�2 9.00' 1 I Im scALE w D INLET #2 STA 7+15 NOTES: w TBC ELEV: 631.52 ALL MANHOLE/INLETS A INV: 4627.02 SHALL BE CONSTRUCTED PER COB STD DWG NO. co m coTYPE 2 EXCAVATION / TYPE A 13ACKFILLL 2720-18 W DRAWN BY: JLN v yD DESIGNED BY: JLN Z m QUALITY CHECK: DJC 3 v N DATE: 8.3.06 Z N In = n O 1p JOB NO. BD5-057 vipp o ���.--m ? a FIELDBOOK N ', m O N N J+ b V I N Z f Z 't1 QO ZNa Y Z_Z N� / mac; [nVN <U dU > +a z N d•a PR POSED GRO PVc \' .69R 15" PVC 0.6 /^ 23 L.F. i 321 LiF. �0.54% _—_ PVC EXISTING GROUND Z 6A LF. 0 1,BBR Z Z Q o --- U) 0 o a uj ui 4610 — -- --- Q Q J N O :3 0 H m x F- i I 5 9�F V 50 - d O d ? V d •f < d V d V C < P a a < v a v 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 TROUT MEADOWS ROAD CAD NO. 557-18.DWG SHEET 18 OF 38 N = N H I II ' zZo`z of e r irr 0 20' 40' 60' r I I I I I I 1 ,I \' S C A L E 1 O x RECORD DRAWINGS I z� rcm �� Ow APP OVED i 7 I �M- - - i TITLE/T z' DATE TE I i 1 WEST DETENTION POND VEGETATION PLANTING PER , W 1 I r `VAUGHN ENVIRONMENTAL TD � THOMAS DEAN&HOSKINS,INC. QVEREXCAVATE POND AND U) & IN A w Z ENGEERING CONSULTANTS I I r r r r ' PLACE 1' OF TOPSOIL om < GREAT FN1.5-"EII -KQJSPDL ror+u1�,� BOTTOM: 4621.5 SPd4WE WASHi�GTOl1 � U7 V) -et y p icxma+ uwq K r ; r r, r WATER LEVEL: 462Z.0 > F.m TOR 4623.5 VOLAjME:-,15k33 CIF WE POND ST Jul w �w 1 i ❑}'❑ O. z o 1 irI n x �<l, RIPRAP m co rn� 9 0 20' 40' 60' N S C A L E INS I 4.5'X6' RIP- OF 12" PVC ® 2.17% ��1 ' i Q �Q - ❑ ❑ I I � INV OUT: 4618.00 i �I I . COB OUTLET STRUCTURE , co m SS.OT INV: 4618.5 1 INSTALL 106 L.F. - _ 90 . i LOT: L�_ NV _ OF 12" PVC 0 224.0 ,\ I PIPE INV: 4618.50 1 -�; _ - INV INS 4624.0 � '� '� DRAWN BY: JLN INV OUT: 4621.5 , DESIGNED BY: JLN �PO 1 QUALITY CHECK: DJC I ` /_ DATE: 9.8.06 JOB NO. BOS-05 IP—RAP DAMS LANE POND 1 _ _ 7 S•XS•x FIELDBOOK _ BOTTOM: 4618.5 WATER LEVEL: 4620.0 I _ s \\ � TOP: 4620.5 m \ \ y `INSTALL 44 LF VOLUME: 610 CIF OF 12" PVC 0 1.167, INV OUT• 4618.50. 1 SD INLET N5 I POND 1'3, 1u" STA 15+77, 14' RT C08 OUTLET - I�( u, 1 i SLOT INV: 462 .5 INS7BC: 4623.75 / 6 ' SLOT: I- \ T2 T PVq 10�6.25% Q / - PIPE INV: 4624,0 \ RO :NV`I UT�4622 50 Z DETENTION POND 13 \9p P 1 OTTOM: 4626.5 ATER LEVEL�8.0 8�X8 RIP-RAP DAVIS POND TOP: 4628.5 j \ GOB OUTLET STRUCTURE ' (q r -'VOLUME: 3267 CF - SPOT INV: 4622.25 I j SLOT: 5 , _ Z Q 1 QQ z z --- m ,z Q O �'I 3.00• CONSTRUCT RIPRAB�' m V-DITCH W/ 30 SLOPES ' Q Z 48 LF 0 7.78% NOTES: 1 (4+SY) (26.67 SY) \ I Y IZ O ALL COB OUTLET STRUCTURES 1 ----- ---I- ARE PER FIGURE A-2 OF THE IW 0 Z BOZEMAN DESIGN STANDARDS. ��.' S 3 f'�_, \ i it it it 1 LJJ ALL RIPRAP PLACEMENT 4p W INCLUDES MIRAFI 16ON ORco APPROVED EQUAL GEOTEXTILE I , / \ ' Q MATCH ALLEY INVERT SLOPES \ WEST POND AND POND 13 CAD NO. 557-20.OWG SHEET 20 OF 38 RECORD DRAWINGS N H *` APPROVED - ,' NAME T E DATE 41'A L THOMAS,DEAN&HOSKINS,INC. i Si 100,ENGINEERING CONSULTANTS � a�zo ORF/T ius-DOZEw-KAUSPDl zzo `� 'z "STOW S C A L E _STA 0+72. - CONNECT TO EXISTING 3 W/ 48" RCP CL III A 5+76, 25' LT � REMOVE EXISTING 6' 0 MANHOLE BEND DIVERSION STRUCTURE STA 0+92. 25' LT SEE SHEET 38A 6 P MANHOLE Q -- --(A r a IRR A 'RR —-_— iRR IRR IRR IRR IRR IRR DtR TRR IRR IRR IRR IRR IRR IRR IRR IRE it O 2400 3+00 _ U= 0�00 _ cn 1 � -1 � d�00 --1 _00 � 00 _ _ __40440Q _�__—11�+00_—__�^_ —13+00-- ^� � z W DAVIS LANE — = ►.a rn L REMOVE k REUSE _- F F 4 NCLUDINGFETS RCP REMOVE 27 LF OF i U) m A Z� 21"05" CSPA 0 O� I PltAGEy2 DUI D'-4 'Z m ij fry U W I O OO O &Z z0 Q N 0��O 3 O [11N IL 4650zNaZ J W fD m _ \ M DRAWN BY: JLN DESIGNED BY: JLN + 4640 _ QUALITY CHECK: DJC " ~ _ DATE. 8.3.0E CL III - F ' 7 a JOB NO. B05-057 - T Fe w __--_ ��l 484 L. N n FIELDBOOK PROPOSED GROU D z 48" RCP CL E 25STING GROUND- __ --_-- N --- - 4630 - _ — — __n O _ �\' MINIMUM 394 L.F. - --- — ---- -- ---- _ - J48 0. III RCP ----- - __ ----'---- --- �� r/---- NATIVE CLAY / Z 4620 1' MINUS 12" MINIMUM Q '2 V BEDDING GRAVEL m Q �' LL z Z - No Z Q IRRIGATION BEDDING DETAIL 1 YNO SCALE O 4610 -- --- -5-------- - - - - - 1 w Q 5 q� Q m N N 50 13 Oi OI p0 OI i!I M N d U !� 4T O N D O O N r) m d f` t0 N d N .- N O O O O� O 1O h Op t0 tD V d d M M M h N1 h f7 M M rJ M �1 0 N 0 N N N N N N N d d d d d d a a d d d d d d d d d < d d d < d d 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 DAVIS LANE CAD NO557:'1 DWG SHEET 21 OF 38 I RECORD DRAWINGS PLACE RIPRAP {N H 1 (12'X12') 1 APPROVED�I1 1 tt 1"- �a......+-HoQw P-�= •' NAME �E DATE 1 INV OUT FETS: 4631.23 ' o \ I STA: 13+1865 OVAL . INV OUT FETS: 4629. ♦ " TD&I� THOMAS,DEAN&HOSMS,TNC. 1 STA: 13+ OFFSET: 47.19 L $ 1 ENGINEERING CONSULTANTS OFFSET: 4 � U zoA GREAT FA S-WZEW-KALISVELL MON= =Z� 1 oy INV OUT FETS: 4631.23 INSTALL 96 LF OF / ♦ 1 co� �3 STA: 12+99.33 31 1%" X 51 d' S 11 ♦ 1 1 OFFSET: 47.19 L RCPA PIPE / ♦ a ® 1.04 STA 15+32, 25' LT 6 0 MANHOLE 1 INSTALL 96 LF OF J 1 V O RIM: 4624.60 54" X 88" CLASS - (S,N) RCPA® 1.04%E W/ S / 1 Q C -- o J ♦ // 1 -J �; IPF. IH6 1RR �- 1 ...... ...._ -.- ... / / INSTALL 96 LF 0 / w z w _ 1 \ 31 {" X LASS III 12+00 ___ 13+00 Urwlti LANs 14+00 15A 17+24.96 // RCPA 1P / FETS (� W 4 1 -1 I I I I 1 I EI 3I I zo m STA 16+23, 38.5' RT 1 �" . S C A L 1 Om I OUTLET W/ FET 1 / . 1 >� No ly INV: 4617.50 Q z m t RIPRAP (B'X12') / / / • RoU U U W Jr ZZ 1 1 w w w 1 Jj��,�j , / 1 �m / tRO w w I- Z 1 0 50' 100' 150' I I I I S C A L E 1 INV IN FETS: 4632.23 1 m m 1 00 / STA: 13+36.19 1 OFFSET: 47.19 R DRA BY: JLN DESIGNED 8Y: JLN . I QUALITY CHECK: DJC DAT1 - .06 1 JOB E BOS-057 . INV IN FETS: 4632.23 1 STA: 147.19' 7 NOTE 1 FIELD K / OFFSET: 47.19 R ALL 1 RI PLACEMENT INCLUDES MIRAFI 160N • IN IN FETS: 4630.73 OR APPROVED EQUAL 1 STA 13+26.53 GEOTEXTILE OFF ET: 47.19 R 1 N 1 1 Z 1 �O 1 4630 -- - -- ----'t'+Nim- 1 NolmCm 1 0 i N,O 10 1 z N ---y-- ----- - -- - 1 1 z RCPA PIPE CLASS III y _ 1 INV: 4630.73 558 L.F. 31 X 51 CLASS III RCPA PIPE 1 �" CLASS III 1 > Z J Q v✓/1.32X 48"® -- - - --- ————— {�" d" ---- CL IIf RCP yw - --�--- --- 1 RCPA PIPE INV: 4632.32 INV: 4632.32 1 Q - W � z L II _ 1 1 Q IRP 1 W 0 -- -0 U--------- Q ---- 1 I Y Z Z O -- - 1 + + 1 1 � W O � � . 1 + 1 Qm 1 FILL IN PIPE 9' WITH WASHED 1 ~ � W 5150 9 1 ROCK 2" PLUS AND 6" MINUS J9.50' 9.50'1 1 U CREEK CROSSING PIPE SECTION A 1 N N N N N N N N N N N d d d d d d d d d d d d 1 1 12+00 13+00 14+00 15+00 16+00 17+00 1 1 1 1 DAVIS LANELm 1 1 1 I SH T 22 OF 3$ INSTALL ALLEY APRON ' SEE C.O.B-: 5T0- - DRAWING N0.-02529-7A -�. 1 {4i (40.28 SY) I 0 50' 100' 150' I I I "-ox F W S C A L E a AV C an . INSTALLPEDESTRIAN / Z- PEDE - , 1� - ,. " L �yy x RAMP TYPE G (2) { � / \�� ��,__-' I""I gQ wrrH z• PVC coNoulrs to -- — ' ` RECORD DRAWINGS � SEE DETAIL e - - - -- - -- -- - i H APPROVED 63 LF OF 3• SCH.40 ',I ' ALLEY APRON o N _ ..� ,-- - - .t PVC CONDUIT $EE C.d.B. ST4. �, �- - tier... Ts50ct�FisG B-LS-pB DRA W. 0�529-7A \ \ Q'� _ NAME T DATE �] a 1'i (40',28 SY) �'' ' / \ INSTALL.ALL- A SE c.o:j} srnr THOMAS,DEAN&HOSKINS,INC. `�Z l I CENTERLINE CURVE DATA �- OR IMNG 0 "A TD&� o R " /' ENGWEERING CONSULTANTS R=160.00' i �V / (4p•28 i S) c EIS-BOZV +-KAWPEU U i � �nsi0e wro I A=48'18'30" -0 / / INSTALL ALLEY APRON - i SEE,C.O.¢. STD'' DRAWING No, 29-7A \ s; /� m� A Grp I 0.28 SS') zm rZnf INSTALL/PEDESTRIAN TALL PEDESTRIAN o1%1 N RAMP TYPE "D" P TYPE "D" >a Z m SEE DETAIL 5 SEE DETAIL W U cr W .I r --- 37, w w w LLwp U) I c- ccjn• o �i � 3 INSTALL PEDESTRIANrn RAMP TYPE "F" (2) ' Uy / C' - w w - SEE DETAIL e `,[_ ' I C' / - i ¢ ¢Q 37 CIDNSTRUCT 5' I �' / '�� J�,' ' ' �--- 0 SORA ST i iUSI,1A 2� LEN RE - - - - - - - J L - - - - -I f W A tI SEE INTERSECTION Draw Br: JLN DETAIL, SHEET 33 PVI STA = 2+10 QUALITY EDGY: JLN UAUTV CHECK DJC PVI ELEV = 4642.52 GATE: 9.8.06 A.D. _ -2.57 JOB NO. B05057 K = 50.62 FIELDBOOK 130.00' VC PVI STA = 3+75 PVI ELEV = 4636.63 A.D. = 2.08 K = 48.04 + 100.00' VC a + + a m m N Q N d n a -1 �n m X > w + n Z 4640 `�� --- -- - - --� �--- - _ PROPOSED GROUND >_ - _ E 41STING GROI IND +pLD a - :asr. fn W w a z IIJ _ W 4630 rn cJ- - -- - \` Y W W U) LL � J J — -- Q F- p Q � U 4620 i-- - -- - — - -- o I s H QO 50 U M NO, a0 O MW N 2 N M .�l] Vl 1 ^O .N .� fm .O NJ fm M N� OIN m m� a a `� a a a a a as `ta as as as as 2+00 3+00 4+00 5+00 6+00 7+00 8+00 FEN WAY CAD NO. 557-23.DWG SHEET 23 OF 38 i _ ION HAN#�= RECORD DRAWINGS N , z_ 0 50' 100' 150' �,� 02� S � "01 NAME mu DATE �0 S C A L E THOMAS,b*,AN&HOSKINS,INC. z oio z TD& ENGINEERING CONSULTANTS MW INSTALL ALLEY APRON INSTALL ALLEY APRON O v iaE Ls-9ozEN�N-K&I PELL wnswwHMcron E C.O .B SEE G O . °"M0 ; A25Pg-7A-- DRAWING N0. Q25297A IINSTALL � � z40.28 SY) I ('0.28tYJ o 0 50' 100' 150' PEDESTRIAN 3" SCH. 40 RAY PVC I I RAMP TYPE "D" I SEE DETAIL 5 S C A L E 0 ►� CD ►� I 37 I 1 Iz 25 TRANSITION g 25' TRANSITION o FROM 1% TO -1% ¢ FROM 11% TO -1% D - -1 - - a TI Vx i LY V J 01400 f— ;I g+D CqI K �I I I y J W w� A9 - -1 -I zm A p pp' 3+00 N 4 5'Ft0o579 T 0 1 N 1+00 2 to INSTALL P ESTRIAN I ¢ ¢ o RAMP ttP "ST IAN _ INSTALL PEDESTRIAN - INSTAI,L ALLEY APRON RAMP TYPE "D" 3 0 - �. O SE DETAIL SEE„F.0.8. STD. SEE DETAIL g LL --- --- �� Y o 0 O zo 3 ✓ DRAWING NO[,02529-7A -- - --- - _ _ - - - - - "(40.28 SY) m 37 1 3 4 - --- ----6 7 - - - � � l U — E m �m� ir - - om� NOTE: ¢ Q INVERTED CROWN OF SOUTH O O ww ALLEY IS FULLY CROWNED �] FROM STA 0+30 TO 1+89 M/ AND STA 3+05 TO STA ui 6+09 PVI STA = 2+10 co PVI ELEV = 4642.72 A.D. _ -2.61 DRA BY: JLN K = 50.00 DESIGNED BY: Jlp 130.54' VC QUALITY CHECK: Dic PVI STA = 3+65 DATE: 9.8.06 PVI ELEV = 4637.12 57 rn I+ A.D. = 1.91 JOB NO. BOS-0S7-0 '^ ELD800K K = 36.59 a HIGH POINT ELEV = 4641.63 + m� 70.00' VC HIGH POINT ELEV = 4641.19 N n HIGH POINT STA = 0+90.24 LOW POINT ELEV 4639.35HIGH POINT STA = 5+23.22 6i Livi PVI STA = 1+00 = PVI STA = 5+25 + LOW POINT STA = 2+81.94 PVI ELEV = 4642.11 N a "ml PVI ELEV = 4641.54 PVI STA = 2+79.52 co A.D. _ -2.39 A.D. _ -2.56 + PVI ELEV = 4639.04 K = 58.58 in -L�i - "� K = 50.24 A.D. = 2.64 Z+ + n 120.00' VC K = 35.00 150.00' VC -1• o w a m fii a 92.35' VC U r ", O O O O 4640 ¢ o r m m m N + y + a - 1 EXISTING ROUND o+ + a n ,o a m m m Z U Z J _ U U i.i °+w PROPOSED GROUND 10 - 31% Z ¢z 4640 - -i. 9% COH D _ 4630 kilo - ---- ---- -- --- --PRO SED GROUN -- -�- ---- — N O W cn EXIETING GROUN W W W N O 3 4630 4620 - - s - -- - --------------- O~ 9c �c~i� V P +W¢ 5 9l `Ozm Q Q s 9! aoyzyl1 F ¢05 (� J (" Sp V1UW 'nUm M 50 W 50 m No UO pp ON O Off•- N� U,N aM m mM com6 rD N N < r m 'm m Of M Ma Ma M� Mi, MM MM MM M� M� M� �aa r,1 < t d'y a a a a a < a a a e a v a as ad c� ea <d a� as <a a 0+00 1+00 2+00 3+00 4+00 5+00 6+00 2+00 3+00 4+00 5+00 6+00 BLACKBIRD DRIVE SOUTH ALLEY CAD NO. 557-24.DWG SHEET 24 OF 38 O�y,T C NT R INE CURVEDATA = N H E# -d447' 4S2'44" 2PI ` - � ' T TONAL G INSTALL PEDESTRIAN ---- - o_� `RAMP TYPE "C (2) SEE DETAIL-� _ _-___ / 3 \ r` \ INSTALL PEDESTRIAN V1 t 37 RAMP PIPE C (2)— i 50' 100' 150' 1 ""- SEE DETAIL 4 - I I I I IS E� ��7/ CAL INSTALL PEDESTRIAN\ TRO`/_ ` - __- -__--.----- ------ - --------------------------- RAMP _ TYPE "K"•, ` 4 O _ _ _ -- - CONSTRk/Ci-ice-SIDE IAL�IG - --- - O - - ------ * At SEE DETAIL e`,\`\\` -\ I ----\�` R q0 - ---- - - ------------- INSTALL AEDE TYPE' \ \` , 150 OF 5' DE SEE DETAIL \ - - - - -_" 9 - \ BP to iF 01 w ir CE 350.00'E �VE DATA 0 !Z. d=26'36'07" FI �N J CENTERLINE CURVE DATA co R=300.00' � L=1 13.66' N d=21'42'24' wIjw RECORD DRAWINGS PVI STA = 10+50 w A FM ELEV = 4633.05 APPROVED A.D. = 0.98 co 13 m g-zo-pp K = 101.71 LOW POINT ELEV = 4627.54 NAME IT[E DATE 100.00' VC DRAW1I�BY: JLN LOW POINT STA = 2+50 - - - - DESIG�o6Y: JLN PVI STA = 2+50 THOMAS,DEAN&HOSKINS,INC. QUAI CHECK: DJC PVI ELEV = 4627.45 TD& ENGINEERING CONSUL'1'AN'fS o O1 DATE: 9.8.06 GIIFRI FNLS NGINEERIN MONTNiA O m A.D. = 1.40 i sronL wwsw N o + n JOB NO. 805-057 K = 35.71 o N e EIELDsooK 46401 50.0 ' VC c Li cn m m U 11 V m PRC POSED GRO ND 7 % ' 0.70 - cl--- ---- N EXISTING GROUND ; (Y 4620 V/ -------- - I- - - -- - - m H uj n I =) Z O + m< UJLLJ Q Q W VIO Nli i_ C J LLI V, f J N 4610 - - --- - m o � � m Q Y s U c 50 aN m'n nO in'_n nO LO4 d0 n'' 40 aN NO ,D u)'n nO N,ao,4D a m4 a.N4 a4 4m4 N m 4 `0 07 oN"l N.0 N0Mm .0 O nn ,6 c6 mm co b, 6 7 N N,6 o p M' mN 0cj ✓n1� 0 N NN NN NN NN NN NN N� NN IN N mo IN IN N nem mo m1 0oao ao 4 441 ad a4 mnm 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 TROUT MEADOWS ROAD CAD N . 557-27.OWG SHEET 27 OF 3$ r - - - - - - - - - - - - - - - - - - - - - IATA ,,,,,,, 1 10' SIDEWALK 1 e 1 H (273 SF PH1) RECORD DRAWINGS (1051056 SF PH3) INSTALL ALLEY APRON 1 SEE C.O.B. STD. AP R VED CENTERLINE CURVE DATA INSTAL LIFT STA. APPROACH CENTERLINE CURVE DATA DRAWING NO. 02529 % 1 �,(�DE�£-W�.,O.B. ( `,R=150.00' (40.32 SY) S Zi0 .o,OA'AL \ - N 2524-5 Z ,L=64.40 1 NAME TITLE DATE '"� W/ 6 TRA NSA 26'36'00" V, o� 6 SY) W 3 1 N THOMAS,DEAN&HOSVJNS,INC. ZZe - 1 TD& ,AT ENf FNEERIFNG CONSULTANTS �N JT _ � TI3L5-BOZEL4W-WLSPELL WAS M q VI 3 0-1 _ J as o . 1 a xzz 0� r 1 0 10' 20' 30' v~i Ulz = S C A L E za a INSTALL ALLEY APRON I 1 Z W w Y SEE C.O.B. STD. STA 12+62, END CURB, CONSTRUCT PEDESTRIAN DRAWING NO, 02529-7A GUTTER AND ASPHALT C&STRUCT 6' WIDE RAMP TYPE "B" 1 ZW F�1 z zQ (37.5 SY) FOR PHASE 1' SIDEWALK SEE DETAIL INSTALL DEAD END PER C.O.B. STD. 37 BARRICADE: SEE C.O.B. STD. DRAWING NO. 02529-15 CONSTRUCT PEDESTRIAN 1 >�Lu z m DRAWING NO. 09810-2 I RAMP TYPE " 1 ' �Co�j(o W SEE DETAIL L e 37 1 0 0 0 zo 1 1 — - FI �� Do HI(# POINT ELEV = 4636.95 1 p HIG POINT STA = 13+24.22 ' �'VI STA = 13+06.79 0 100' 200' 300' PVI ELEV = 4637.37 ¢ ¢ I , S C A L E I I A.D. = -2.68 NoloCEl' -----_-_-_ a ofi K = 50.46 1 --- 135.00' VC PAVEMENT SSE�CTION 34.73 1 9 6" BASE COUR3� a N o 1 12" P)F'RUN > > + I M '� 1 i/ INSTALL PRECAST CONCRETE DRA BY: JLN w I Li 1 PARKING BLOCK (2) U SEE DETAIL e QU I ECHECK: 4640 OJC DATE: 9.9.06 '/ JOB NID. 805-057 i 1 34.50' '46' 1 FIELD OOK -0.9 % 1 WET WELL -- ---- - 1 ST 0 VEI_LDW ',TRIPE 4 5. 118 l.T. 46 .07 > l 3 4630 1 34.91 8.98" _ WIDEN 6' DUCTILE IRON BYPASS 1 1 1 1 0 1 Z GC O N w APPROACH APRON U) O N '' -;, SEE6COB STD. DWG 4620 I 1 02529-7B O Q Q O Lu ~ 1 0 LL 4610 Lu 5 c9�F n W W - -- -- — I50 SEWER LIFT STATION SITE v N 1 1 cn 1 Nr r�1 �Co wN uI a �w Co � rn� ��I row ro(np row row ion o� rn"�o� 1 c �� ca ay, ca as va a,a. av Qv a 12+00 1 13+00 14+00 15+00 16+00 1 1 1 TROUT MEADOWS ROAD 1 F N 7.238 E tA '4 RECORD DRAWINGS T AA N H -7— NAME TITLE DATE THOMAS,DEAN&HOSKINS,INC. AA ENGtNEERING CONSULTANTS lzo -W F.�-WZDM-K%j5PEU om ---------- oz mx: OVE ASPHALT.,11 MATCH EXISTING CURB-\ --------------------------—-------- REMOVE -- ---------- CURB & GUTTER� (118 LF) �01--------------------- --T STA 0+04 14' t --------------------------- -------------- --------- C) rA z -4 k -4- 3 C�d u T sAwCuT-AS T REMOVE CO USE CURB & GUTTER REMOVE CMP BARRICADES & REUSE STAB 14' RT (22 LF) STRUCTURE AT NORTH END OF ZED Z< DAVIS 0 1 INSTALL PEDESTRIAN RAMP r5v) TYPE -H z 0 Lux x I SEE DETAIL rB---) X0(1) —— U)III L)U) :�37 Lu U) 0 100' a I)C, C) 50, wo 03: SCALE wl�' w �w PVI STA - 2+15 PIA EUEV = 4643.69 A.D. 1.63 K = 101.14 165.00' VC Qj ' 1- DRAWN BY: ILN PVI STA = 6+00 'L. PVI ELEV DESIGNED BY: QUALMY ILM 4634.72 CHECK DJC 465 DATE: 8.4.06 + aK = 4.65 JOB NO. 805-057 loom, VC FIELDBOOK 0 cq + n k v PROPOSED GROU D 4840 &i u 6i EX STING G OU 4 z 0) 4630 —-----ZU > 6 z LLI N-- z (n z D Z' Z F- 171 o U) 0 2 w w Z. W cl) W > in 4620 N Lu _j am 4610 5 50 w c� 0 C6 10,6 0 CP. m 'qloo n m 0 1 1! 'q I -]l. -��V 'm I w C'� 0 qjc� 0 NM mNdNnNm 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 ,CAD NO, 151,211,I)WG SHEET 29 OF 38 C1N TAN£*= RECORD DRAWINGS AP ROVEDy � o -I���' Z �Lw-f-�- 1 .+.•.c1> O,YAL NAME TITLE TT DATE IZO 0 100' 200' 300' THOMAS,DEAN&HOSKINS,INC. 0 50' 100' 150' lla I i TD&� ENGINEERING CONSULTANT\ I L•1 �N GREAL FALS-BOIEMAN-NAUSPFll MWAMA S C A L E ti "'S1^15 S C A L E ; END LEFT CURB STA 13+89 TBC 4626.39 DAVIS LANE TRANSITION - - - ----------- `- - -- - __- - —�-- - --�� g - ' SEE SHEET 33 - -- ===r-- - - - - - 4 � Q tj 7 B y _ - __iyyyr SL Zw �r -- � � _--- --- �, �iSlio R RSt L � tj , �9- I � "V a 3 -- 3-- ---A-—1 R RSL RSL a In PG N .--- __ J T�' i -- ---- - - PRESERVE AND PROTECT N - WEST ,2 - LL EXISTING NORTHWESTERN � K-- _ - zm ENERGY CATHODIC o - -� -I - LoIn (;J PROTECTION WELL \ \. N INVERTED \\' $4)2�' E 379.00' W m - \ ti CROWN �U) 0) N CMP \ r zo O. (875 SF) SALVAGED BARRICADES END LEFT CURB F-a l IC--, ORIENT AS SHOWN STA 15+89 `* i;<TBC: 4623.37 O ti GO 930}0 DRAW BY: JLN DESIG 4ED BY: JLN OUALI FY CHECK: Bic DATE: 9.8.06 JOB N BOS-057 FIELD LOOK 4640 M m n m .r 4640 -- d n u � N M J + rE XISTING GRO JND w � m d i PROPOSE GROUND 4630 - --- II - 4630 W v \. J 4620 - - p H W }L�� W LLI 4620 - Q K Z Jw Q J � J Q 4610 - - 3,- 0 5 sc9! a Q Q c F s p Z (U 5 ! In 4 F 50 Om O�n co Om 50 N M N N N N M M n M M M M M h Or N ry r N d' r N r N 1� M) c0 c0 c0 M) r0 w r0 rp r0 a d p d a d N NN NN NN NN NN NN NN NN NN NN NINV N d �'d d d d d d d `*d d d `*d d d d d d d `*♦ `* 0+00 1+00 2+00 3+00 4+00 5+00 12+00 13+00 14+00 15+00 16+00 17+00 DAVIS LANE WEST ALLEY CAD N 557.TO.DWG SHE i 1 STA 7+23. 7 1 ' OFFSET: 18.50 L NmimCm 1 ELEV: 4633. 7 STA: 7+10. 3 �QNAL OFFSET: 16.25 L I 1 � STA: 10+50.53 STA: 10+62.B7 ` I I ELEV: 4634. 7 STA: 11+58.2 STA 11+t.57(8 � zoOx STA: 10+ 28 - e�S I __ �. STA: 11+04.37 FFSET: 14.25 LOFFSET: 16.50 L ELEV: 4632.75 00 � ' -- -- ��� (, zoSTA: 6+9838 4632.54 ELEV 4632.97 1 Ems, 0zELEV: 4633.60 STA: 1+45.87 E zZ- OFFSET: 14.0 L _ 42.00 L sQ I 1 ELEV: 4633 46 1 , I I I S A: 1+11.24 STA: 15+68.95 n / (�1A 14.00 R 1 OFFSET: 12.00 L STA: 93.88 1 1�00 E~ EV: 4614.0 ELEV: 4634.33 STA: 15+ OFFSET: I14 00 L - 1�+00 STA: 11+04.37 1Z4� ' S A: 0+18.39 1 STA: 15+56.61 --OEFS�-1 00 L _ EL 'r 3.62 _ w STA 5+50.97 TROUT MEADOWS RD ELEV: 4634.16 7�`` _ 0 FSET: 20.89 L j Ofiiii--14:4S L= - - I STA: 10+50.53 „" 0+77.37 4. STA: 11 1 4628.57 - ELEV: 4634.42 STA. 11+58.22 1 OFFSET: 4633. R ail OFFSET: 34.00 R 1 _ OFFSET: 14.25 R OFFSET: 14.25 R STA: 0+29 STA: 5+91.39 ELEV: 4632.75 ELEV: 4 4634.05 O 41 F ET: 1L 1 OFFSET: 1 39 L 1 ELEV: 4634.43 W STA: 15+44.26 _ _ �� I OFFSET: 16.50 L ELEV B9 1 I W co Q 1 ELEV: 4634.51 TROUT MEADOWS RD ���' 1 T 10+62 7 12 S 1 5.67 _ z 1 5 A: 6+568 1 STA., 10+3 OFFSET: 2. 87- o A: 1 STA: +70.550 ' TROUT MEADOWS RD 1 STA: 15+83.45 OFFSt7:'1fi60--RSV_.�.9� OFFSET: 16.39 R OFFSET: 16. 9F- 4 a OFFSET: 12.00 R ELEV: 4632.53 ELEV: 4 33 61 m 33.8-i I ELEV. _ ELEV: 463 . �' � � STA•I10+79.74 - 1 _ 1 OFFSET:52039L I m cn� F'4 Wz STAJ 0+00 1 1 ELEV: 4634 05 A: 5+23.97 g I zap STA: 15+yyyyyy4.06 Fr I STA: 15+44.26 STA: 15 8. 5 OFF ET: 6.39 R 1 F :: 4634.00 R OW N � N 1 OFFSET: 16.5�A--T`.r+`5 :B1--OFFSET: 2. EL 46 4.11 STA 5+09 47 >a ; Z m --Erw>-- 3431 D R q- I A 5+09.47 w0! ¢ I I OFFSET. 12.0 L W I I ELEV: 4634.42 ¢ F ET: 12.00 R a!U U _ FF4629.13 _ 1 3 1 ELEV: 4634 30 4634.30 w w w O li STA: 6+2 .8 Ir 4wz g -4628.49 _ 1 I STA: 4+97. 3 O O C] zo 0 m OFFSET: 14. 0 m 1 T 4+97.13 zo > ELEV: 46 .1 OFFSET: 14.25 L F ET: 14.25 R r i I39 ¢ ELEV: 4634. 4634.44 [1 maw .89 R 1 STA: 6+1 .3 ; I 1 ��� OFFSET: 14.0 N 1 .49 1 ELEV: 463 .2 I 1 OFFSET: 16.50 8L OF-SET:8 6.50 R 4.78 R STA: 6+03. 4 o I} ELEV: 4634. 8 E 4634.58 W ul 1 OFFSET: 4634. L I 1 o a +90 ELEV: 4634. 8 i 1 STA: 1 OFFSET: 18.50 18.50 ELEV: 4634. INTERSECTION OF DAVIS LANE 1 1 INTERSECTION OF BLACKBIRD DR & TROUT MEADOWS RD A & TROUT MEADOWS RD 1 1 1 DRAWN BY: JRN DESIGNED BY: JL.N 1 INTERSECTION OF WARBLER WAY & TROUT MEADOWS RD QUALITY CHECK: DJC DATE: 9.8.06 L m m m m m m m m m m m m m m JOB NO. BOS-057 \ \ L�STA 5+20.88 r FIELDBOOK OFFSET: 16.50 L 1 T w 1 \ OFFSET: 4628.84 \\ A: 0+66.19 STA: 5+33.23 1 0 S : 16.50 R 1 \ 0 4628.93 14.25 L ■ ' ■ ■ E 634.22 1 S 0+53.85 1 \' �• 0 ET: 14.25 R STA: 14+38.04 STA 5+45.57 1 4634.62 4\ \ OFFSET: 12.00 L 1 i r OFFSET: 12.00 L A: 0+ .19 a OG ELEV: 4629.02 OFFS 16.5 L ELEV: 4635.69 1 STA: 5+F0.8 A. 0+41.50 'OFFSET: 16.519,R\ q1 1 ELE . 4634. : 12.00 R S - +49.°9 ELEV: 4628.84 '•� F.qQ `.� ST7�0+53. \ E 4635.01 OFFS - L TA 0+27 4635.53 STA: 5+33.2, O�is \ 1 OFFSET:.14.25 L, \ 0 S 12.00 R 1 OFFSET: 14.2� �, -per \ 1 ELEV: `\ E 635. Z ELEV: 46 0° � \ S 5+45.57 STA: �41.50 STA: 14+62.6¢ 0 12.00 R \ OFFSET: 12. L TA +23 OT 1 ELEV: 463°O1 \, C ET: .00 L OFFSET: 16.5 ° + ELEV: 4635.32 1 N J ELEV: 4629.15 SEA:: + 7 5+87.07 STA +27 E 635.79 _ -1 - 0 12.00 L 0 20' 40 60� 1 OFFSET: 12. L \ a 1 > Q ELEV: 4 •25. \ ` ELE.V: 629.31 1 1 I I ELEV: 4635. to STA: 16 39 8 \ � S C A L E 1 OFFS. 1+83914 \ STA: 14+12.93� ui 1 m Q OFFSET: 16.39 R �I ELEV: 4629.55 STA: 8+07.0 \ 1 ELEV: 46 OFFSET- T8.39 L 1 OFFSET: 12. L s \ \ E 4635.60 Z ELEV: 4 9.6}Y > \STA 6+28.57 1 STA: 13+ L STA: 14+6.50 R (/� �C ELEV, 16.50 R 0 STA: 7+92STA 5 7. \ FSET: 12.00 L OFFSET• 00 L 13+96.54 Ey _-1 W ., OFFSET: 12 ' STA: 8+J4.07 EL�V: 4629.80 NOTES: 1 4636.27 A 0+00 1 A: 13+42.69 14+ 1 i ELEV: 30,fi� 0 ET: 14.25 STA: 7+80.22 STA: +03.4 STA 6+41.11 r O� STA 13 .54 OF . 14.68 R Q V OFFSET: 14.25 Ii" N/SLPy OFFSEI�16.39 FSET: 14.22 L ALL STATIONING AND OFFSETS ON CURB IS TO 1 y-� EL 4 .35 0 12.00 L 4+ 4 4635.47 1 �J W �1.� ELEV: 4.630 7+7 ��A 4 9.55 EL 4629.69 BACK OF CURB. ALL ELEVATION ON CURB IS TO V STA 13+30. �ELEV: 4636.1 0� �4 2�69 N / STA: 6+14. FLOWLINE OF CURB. OFFSET: t L 5 J STA: 7+67 `�' �' OFFS 12.00 STA: 6+53.49 1 E 4636.44 �Po ' 1 0 OFFSET: 16 0 OT�SE4 16.50 L tM STA: 1 .54 LLJ ELEV: AS30 i S�': 8 \ .07 LEV: 29.49 of 4629.77 CONTRACTOR MUST CONSTRUCT CROWN 1 - jP� 0 1 R 1 / L 46 a R \ STANDARDS. IN ACCORDANCE WITH COB 1 ` / tEV: 5.98 1 Q Z / STA: + 57 - 0 ET-12.00 R ' \ \�. PAINT 556 L.F.(YELLOW)OF CURB IN BULBEO 1 X A: 13 .04 1 (� �4630.06 \ '� OFF 12.00 R STA: 6+ 57 \ AREAS(SEE SHADING) 1 -gr 13 69 4636.27 A: .7+80.22 OFFSET: 12.0° 0 14.25 R \ 1 i 0 ET: 14.25 R ELEV: 4629.6 •\ 1 STA: 13f .35_ 4636.35 1 4630.17 RECORD DRAWINGS /� \ 1 OFF 16.5 STA: 6+40.22 \�-•, �1{,� 7 7.87OFFSET: R APPF�o ED - S2Dm■ 1 \ 1 16.56.5 4629.0 R ELEV: 4629.69 � Q/ ^ E 4630.29 STA: 6+53.16, __ OFFSET: 16.50 R" TITLE ATE /N \ ELEV: 4629.77 �,� , _ TD&>� THOMA$DEAN&HOSKINS,INC. 1 1 INTERSECTION OF FENWAY & TROUT MEADOWS RD F:NGINF.F:RINGCONSULTANTs spoow aws" �Z - �Eu W�"'n 1 INTERSECTION OF LAKESIDE DR & TROUT MEADOWS RD 1 CAD NU. 557-32.DWG � � a� � F>• � � � � � >e� � � � � � � � � � � � � � � � � FSF>• i � SHEET320F 38 i RECORD DRAWINGS 'N H a =./2�- aS�/ZOsB f Gam,, STA: 17t14.59 N I LEV: 4642.81 NAME TITLE DATE ORAOFFSET: 2 .50 L +ELEV: 4 2247 THOMAS,DEAN&HOSMS,INC. V zomSTA: 1+79.42 1+79.42 TD& EN(:[NEERINGCONSLIL'1'ANTSOffSET: 16.50 L aeur vruswNruuo=ET: 16.50 R ELL1/: 464221 : 4642.21 1EM61oN "ASH ioNa ~ �OFFSET: 11425 L T:6 4.25 RTA 1 ELEV: 4642.39 4642.40STA: 1+54.7 54.73 53 LF OFFSET: 12.00 T : 12.00 R ( ) O ASPHALT ST 16#70.33 -EL V° 464 -- - 842.59---EOL S 4124-19 L - STA: 1+39. - u40.23 -- - - (5 .2 CY)z MATCH EXISTING a CURB O MATCH EXISTING OFFSET: 12.00 L : 12.00 RELEV: 4642. I642.81 - w CURB Z U= I I - ----- C7 I I I SET HIGH PT. AT z wa J CATAM UNT ST MIDDLE TO DRAIN N W I I I SAWCUT ASPHALT W I ( CATAMOUNT ST I A A Z Q ................. O nr (n N f i NOTE: DUE TO FLAT GRADES ALONG >a z m S 16�26.21 / ---- ---- ------ ............ CATAMOUNT, CURB WILL NEED TO BE wU U W rI I 0 FSET: 20.27 L HAND-FORMED SO THAT THE FLOWLINE I ELEV: 4 23.64 CAN BE WARPED TO DRAIN. LU O �wz EDGE OF I 0 W rzo ASPHALT o I I u�w L I �m I 1 I STA: m N I 1 OFFSF)T: 0.00.00 L STA: 1 4+88.84 o I ELJ 4623.65 Q a F- F OFFSET: 15 84 L ELEV: �i624.13 - I%; INTERSECTION OF FEN WAY INTERSECTION OF SORA :3 o� 1 /^ & CATAMOUNT ST & CATAMOUNT ST Q I I I ED - I I l DRAWFI BY: JLN I 1 DESIGNED BY: JLN I I QUALITY CHECK: DJC D RR ERS 0 20' 40' 60' ZLo K eos-057 I ( I I I I I I I l i S C A L E I I PT 15 1. 1 EL 24 36 OF E L 1 I 1 I II 1 r STA: 1+79.4 STA: 1+79.42 I � OFFSET: 16.50 I OFFSET: 16.50 R 1 1 I ^ ELEV: 4642.4 ELEV: 4642.40 it I 1 STA: 1+88. 1 STA: 1+67 7 TA: 1+67.07 OFFSET: 18.50 Z OFFSET: 14.2 L FFSET: 14.25 R 1 ELEV: 4641.5 1 O ELEV: 4642 3 LEV: 4642.56 STA: 1+77. 3 N . ■ ■ , J Illy Ilb STA: 1+5 .7 I ST : 1+54.73 NOTES: 1 OFFSET: 16.82 L 1 N I OFFSET: 12. T o OFTSET: 12.00 R ELEV: 4641. 3 Q Q -7y --ELEV- .6 �� ELEV--4642.73--- - ALL STATIONING AND OFFSETS ON CURB IS TO 1 STA: 1+59.6 1 Z m -- -. - Y - -- - - -- - BACK OF CURB. ALL ELEVATION ON CURB IS TO OFFSET: 14.00 Q uJ STA: 4+55.24 I I STA: 1+3 .7 o SdA: 1+40.23 FLOWLINEOFCURB 1 ELEV: 4642.0 > 1 0 OFFS : 124. L- I OFFSET: 12. g I Ofj FSET: 12.00 R Z EL 24.9a I I ELEV: 464 . E4EV: asa2.92 CONTRACTOR MUST CONSTRUCT CROWN 1 °� 1 (� O Z w I I TRANSITIONS IN ACCORDANCE WITH COB - m O I I I STANDARDS. 1 STA: 1+3 .65 < I i 1 W OFFSET: 14.0 L 3 Y Z 1 ELEV: 464 .35 I I m CATAMOUNT ST I PAINT 127 L.F.(YELLOW)OF CURB IN BULBED 3 W I I I AREAS(SEE SHADING) 1 1 J N Izl ppQ1 CATAMOUNT ST 1 R m W 3 II 'T 1 1 a Z 1 .... 1 I 18 I - STA: 13+88.84 1 1 I I I OFFSET: 0.00 L 1 1 I ELEV: 4625.65 I I� INTERSECTION OF BLACKBIRD DR & CATAMOUNT ST 1 INTERSECTION OF WARBLER WAY 1 I I - I DAVIS LANE TRANSITION L . . . . L96JAU19WNT.rST . CAD NO. 557-33.DWG SHEET 33 OF 38 H z •.�v z 30'-0" w w azo Q 0 13' 6" 33' 0" 13.-6. 00 r om 0 13'-6" o, a V zZ0 a MIN. 0'-0' 1'-0" ON 5'-0" 7, 6.. 2.-O�� 14.-6�� 14.-6. 2�_0. 7.-6�� 5. U" 10'-0" (VARIES) I-0" SIDEWALK BOULEVARD TRAVEL WAY TRAVEL WAY BOULEVARD SIDEWALK 3 PROFILE RECOVERY SIDEWALK BOULEVARD FINISHED CONCRETE CURB 9 ZONE 3,7 1/4" PER Fy —% GRADE -� & GUTTER /a" Oz 2-02 PER FT r 4" THICK /•.4 a 4" THICK CONCRETE 3" ASPHALTIC CONCRETE SIDEWALK / SURFACE COURSE CONCRETE Q 6" THICK MIRAFI 50OX EXISTING J SIDEWALK O4 O_ CONCRETE EXISTING GEOTEXTILE OR GROUND 6" CRUSHED GRAVEL BASE SIDEWALK GROUND 4" CRUSHED GRAVEL EQUIVALENT COURSE (1-1/2" MINUS) 4" CRUSHED GRAVEL Z V J SUBBASE LEVELING a 4" CRUSHED GRAVEL COURSE 12" GRAVEL SUBBASE (6" MINUS) COURSE E LEVELING Q1 SUBBASE LEVELING W W Y n COURSE 33' WIDE ROAD SECTION ` m A WZ 10' SIDEWALK SECTION Q z0 0 4' 8' V L)) " W J 4' 8' I I I I I I w ch w z'( S C A L E o o x a� S C A L E F. aw 1 1 < << 1 a o00 Z 46'-6" z 6p-. G G J J 1 NA . Cm 30'-0, 1 0 11'-6" 26' 0" 8 a I W 20' 0" > Y> 1 a 5'-0" 5'-6' 2'-0" 16'-6" T 6" n I m m m 1 SIDEWALK BOULEVARD TRAVEL WAY TRAVEL WAY PROFILE 19: q:7 DRAWN BY: JLN 1 FINISHED A:1 DESIGNED BY: 2 09 GRADE I o 0 0—_� QUALITY CHECK: DJC 1 _ 114 PER FT 0% 3-OZ. FUTURE t DATE: 9.&06 4.1 1 /� 3" ASPHALTIC CONCRETE s 1 EXPANSION TO J/ JOB NO. B05-057 1 _ _ CREATE 26' SURFACE COURSE FIELOSOOK 4" THICK _ BLADE BACK TO I PARKING MIRAFI 50OX EXISTING LE OR 6" CRUSHED GRAVEL BASE 1 CONCRETE Y FINISH GRADE 1 CORRIDOR GEOEO�EQUIVALENT GROUND COURSE (1-1/2" MINUS) SIDEWALK 3" ASPHALTIC CONCRETE \\\ SURFACE COURSE `EXISTING 12" GRAVEL SUBBASE (6" MINUS) 1 MIRAFI7OR -6" 4" CRUSHED GRAVEL - GEOEQUIV CRUSHED GRAVEL BASE GROUND SUBBASE LEVELING EQUIVCOURSE (1-1/2' MINUS) TYPICAL SOUTH ALLEY SECTION COURSE 2" GRAVEL SUBBASE (6" MINUS) 1 1 NO SCALE 1 HALF SECTION (WARBLER) 1 NOTES: 1 SOUTH ALLEY INVERTED CROWN AS SHOWN TO 0 4' 8• I 1 ACCOMODATE FUTURE 26' PARKING CORRIDOR- Z cn I I / I WEST AND NORTHEAST ALLEY SHALL HAVE THE INVERTED O_ Z 1 S C A L E CROWN 3' RIGHT OF PLAT CENTERLINE (MIRROR SECTION O ABOVE). �_ 0 U ti 11' DRIVING LANE 11' DRIVING.LANE__. _..� 5' BIKE _ W LANE m RECORD DRAWINGS 50'-°" J Y a APPROVE LT1f z 21 6' 28'-6" Q W Q ok J o 0 NAME ElIlL g DATE w 7'-6" 2'-0.. 12'-0" 12'-0" 2'-0" 8'-6. co Z THOMAS, DIAN TRAVEL WAY TRAVEL WAY BOULEVARD SIDEWALK W Q ,hD& DEAN&HOLTANS INC.�iVC. PROFILE ENGINEERING CONSULTANTS J.7 FINISHED CONCRETE,CURB I cxta�nus_wnuunN_xwsr[u u0ntwxt 2 07" GRADE & GUTTER W i[POwxrstoN wsstxricaue 4.1 3.0 9 2-0% 2.09 W —� W Y 4" THICK U CONCRETE CURB 5" ASPHALTIC CONCRETE CONCRETE & GUTTER (SPILL) MIRA 50OX SURFACE COURSE (2 LIFTS) SIDEWALK GEOTEXTILE OR 1 6" CRUSHED GRAVEL EQUIVALENT EXISTING BASE COURSE (1-1/2" MINUS) 4" CRUSHED GRAVEL GROUND SUBBASE LEVELING 12" GRAVEL SUBBASE (6" MINUS) COURSE TYPICAL SECTION EAST 1/2 DAVIS LANE 0 Y 8' 12' I I I I S C A L E CAD NO. 557-34 DWG SHEET 3Q OF 3$ RECORD DRAWINGS N J' 6 on Ai TD&I� THOMAS,DEAN&HOSKINS,INC. " ENGIN'EEWNGCOP(MIL U 'TS zo� 9 GRvr Euis-eoz[uu�-wwsReu MonrNw U ago sPORAr+e wrsuacroa z z o CUT LINE MAW 0-4ON (DASH) 3 BOTTOM OF ___ J.� �� 0 100, 1 i0' {rt-SLOPE .� l% I I I --- ELEV: 4620.5 \�� S C A L E �j a tj ' TOP OF SATURATION {_ Cos A W z - " \ ` zm Z w 1 WETLAND-BENCH --- _ - -=' '�?. \- ---- ��� oV) V o ELEV. 4620.0 •���---- _ ' _ - - 1 w Z m ' VEGETATION EA \ ♦,-� 1 � w w �.. PLACE 1' OF TO OIL ONCRETE CURB AND ��� GUTTER PIECES USED FOR - _ (43560 $F) BANK STABILAZATION \ 'i FILL LINE ` =�: _ - ¢ Q (DOTTED) - 0 tic 11 I r _\�I p(�LQ P\Y I� DRAWN BY: JLN Q DESIGNED BY: JLN OJC !t N V \ QUALITY CHECK: p �Q t3P - / % DATE: a_4_06 JOB NO. 605-057 ---------- _ Ir I FIELDBooK Z O Z O U N NOTES o p VEGETATION DESIGN SHALL BE PER VAUGHN ENVIRONMENTAL W VEGETATION SHALL BE TRANSPLANTED FROM AROUND THE SOUTHERN BOUNDARY OF THE LAKE Q Z TOP OF SATURATION INTO THE WETLAND BENCHES AND THE WETLAND DETENTION POND. J LL, W WATER ELEV: VEGETATION DESIGNED ZONE N 4621.5 BY OTHERS ELEV: 4622.5 3:1 WORK SHALL BE MONITORED BY VAUGHN ENVIRONMENTAL TO ASSURE PROPER PLANTING _J m (V TOPSOIL) 6:1 PREFER 6:1 TECHNIQUES ARE APPLIED. Q WETLAND BENCH SLOPE VARIES \ �- �� Z ELEV: 4620.0 - .� �` Q a / VARIES 12.00' U W TO BOTTOM SECTION A 35 CAD NO. 557-35.DWG SHEET 35 OF 38 ® *% N H RECORD DRAWINGS a A`•. ., APPROVEDLiz y w NAME Tnt E IAw aZo THOMAS,DEAN&HOSKINS,INC. i` W% V zoo pp�� �Z z z� T�OC ENGINEERING CONSULTANTS / /� - — - W m -_ _ -- - 0_ GWAISPO [E-80ZEMW-MAMPELL WASNINCfOw ~ a Le ON pAElO - - - - __ - _ - WARBLER WAYun m x zwoz W w Wm J O '/ V Q W o / � �L a o v c� 0 1- Frl W y F&I RID V) CID > co ; W0� ir zm W LiW O awz w _ L) /�i / / - - • WC7 `` • ix w lw O UNW Q _ KFV W_ wm wz /// / / � �SZ 3z W U W o 1 0 ui m` w BLACKBIRD DRIVE o DRAWN BY: JLN / / 0 3°- I DESIGNED BY: JLN QUALITY CHECK' DJC DATE: 8.4.06 JOB NO. B05-057 FIELD800K m U) _ Z- / II I O P rn o a o I m / a I -- .a a Pdso /, • i 0 Z az J Z a 0 / I - � o Z N co) a W fn LL j - ---------------------------- -- - - J J N od k \ Z / fFEN WAY — — C_7 0 ------ ---------------------I------- -- -- a N I - < Z II I W N I PAINT DOUBLE STRIPE (YELLOW) t 1595 LF d / CAD NO. 557-36.DWG - ---- ----- --- - -------- - -- - --- SHEET 36 OF 38 • '' — . i y .. .. ,--SIDEWRI-K 01'AL ... +a SIDEWALK d SIDEWALK " - ------ - • SIDEWALK r j boo r° N o z MAXIMUM SLOPE MAXIMUM SLOPE -°- 0 - MAXIMUM SLOPE ^ > 0-4 �quo_ u=i 0 24"x60" TRUNCATED 0 24"x60" TRUNCATED ?-� 24"x60" TRUNCATED I° DOME PANEL m DOME PANEL Z DOME PANEL BACK OF CURB m" BACK OF CURB N � BACK OF CURB � 0 y f y a zw F GUTTER F GUTTER 24x60" TRUNCATED w FRONT OF CURB FRONT OF CURB FRONT OF CURB F GUTTER DOME PANEL ca V x BACK OF CURB F+ z J w a f v77 FBI Z zm z s FRONT OF CURB F GUTTER OQ QI z m TYPE "A" PEDESTRIAN RAMP DETAIL 1 TYPE "B" PEDESTRIAN RAMP DETAIL 2 TYPE "C" PEDESTRIAN RAMP DETAIL 3 Irc) 0 w� NO SCALE 3 7 No SCALE C Q 7 lu> 6CALE 3 7 w w w o Qzo 5'"SIOEWRLK 12' BOULEVARD m NOTE: SEE C.O.B. STD. '•' 4 N 6) DRAWING NO. 02529-8 NOTES: TYPE "F" PEDESTRIAN RAMP DETAIL FOR ADDITIONAL DETAILS 24"x60" TRUNCATED DOME PANEL NO SCALE r�7 TYPE "J" RAMP J BOO _ COB STD DWG NO. 2529-8 W/ . 7.5' BOULEVARD AND 8.5' BOULEVARD TYPE "K" RAMP • N . ' COB STD DWG NO. 2529-BA W/ RECORD DRAWINGS " 8.0' BOULEVARD AND 3.5' BOULEVARD APPROVED G}0 m L RAMPS SHALL HAVE 1:12 MAX SLOPE / E r� r DAT ASP PER ADA REQUIREMENTS. w.rae�trY ��71TLE r 8^ZS o$ DRAWN BY: JLN DESIGNED BY: JLN o SIDEWALK SHALL HAVE 1:20 MAX SLOPE QUALITv CHECK: DJC p�ii���� THOMAS KI DEAN&HOSNS,INC. DATE 8. PER ADA REQUIREMENTS. TDOG tj��) ENGINEERING CONSULTANTS JOB NO. Boy-057 Ga T r,•us-eozoaw-wwsvEu uoutuu O 9SvOxINE� n � FIELDBOOK m N 8.5' BOULEVARD 15'.SIDEWALK BACK OF CURB 24"x60" TRU 4'WD'-- 6' SIDEWALK 9.5- BOULEVARD - 5'•S EWALK 12' BOULEVARD DOME PANEL 24"x60" TRUNCATED �• ___ _ DOME PANEL -�-� Y„ m 21-1:1 .15 •. cn TYPE "D" PEDESTRIAN RAMP DETAIL 5 MAX R N NO SCALE 37 - 4 x 0" TRUNCATED 24"x60" TRUNCATED DOME PANEL N a 10' SIDEhALK~ 7' BOULEVARD DOME PANEL NOTE: SEE C.O.B. STD. DRAWING NO. 02529-8 '• '^•' FOR ADDITIONAL DETAILS BACK OF CURB Q 24%60" S UNCATED BACK OF CURB o -DO E PANEL a •') < m m Z I 'A • K N R'S, m s• VI Q a m c • - 24"x6O" TRUNCATED > N W • f m DOME PANEL BACK OF CURB • 7SR O FLOWLINE OF GUTTER In FLOWLINE OF GUTTER 0000;o° FLOWLINE OF GUTTER f/) ui uj a FRONT OF CURB�' � _._ _ _- _ _ •__-._. _ FRONT OF CURB � FRONT OF CURB U m p _ •24'x6O" TRUNCATED c TRU DDOOM60PANELNCATED TYPE "H" PEDESTRIAN RAMP DETAIL $ DOME PANEL 35 NO SCALE 37 TYPE "I" PEDESTRIAN RAMP DETAIL 9 10 TYPE G" PEDESTRIAN RAMP DETAIL 7 NO SCALE " BACK OF CURB NO SLAI.L 3 7 7 24"x6O" TRUNCATED DOME PANEL TYPE "E" PEDESTRIAN RAMP DETAIL 6 NO SCALE 37 CAD NO. 55737.DWG SHEET 37 OF 38 �N NEENAH FOUNDRY NO. R-3295A HEAVY DUTY CAST IRON GUTTER INLET FRAME, TYPE DL GRATES o RECORD DRAWINGS _ REMOVABLE EXPANSION & CURB BOXES OR EQUAL. ad GRATES JOINT APPRQVED f /�7 /� 01 A 10 3/4"t o 3RAD W6X12 10 3 4"t -j NamA ME `TITLE Jo'1`•y DATE co F 3 THOMAS,DEAN&HOSKINS,INC. z 38 a N ��\ d - - #4's AT 12" Q.C. TD&ipe�J ENGINEER►NGCONSlT1,TANTS F W6X12 EACH WAY �`�1✓✓ Gwspo �-90MAW-KAusrai w�vmow wco r.7 (VERT. AND HORIZ.) �nsTaN roano O .'7 W C7 m x z z 0� PIPE PIPE I 8" C O e �� NOTES: SJ U i 1.SET IN PLACE WITH 5/8"x24" STEEL PIN. z u GROUT SPACE AROUND PIN. o m 2.REINFORCE WITH 4-#4 LONGITUDINAL BARS 1- W W r EACH WAY - - m 10" AND WRAP WITH W1.5 OR LARGER WIRE AT �-1 Q W z )f4's AT 12" O.C. •• 4 1/2' PITCH. TIE W1.5 OR LARGER WIRE zm < TO EVERY REINFORCING BAR AT 2' CENTERS. p I I••i w (VERT. AND HORIZ.) 6' 3 0" 6" (114.)HOLE w4 Wm 0 U) V) n DOUBLE INLET DETAIL 1 CURB INLET SECTION B CURB INLET SECTION C 'Zo NO SCALE 38 ^ h••I �YN v NO '.CALF 38 NO SCALE 38 °a � � W� vOaiw 7'-0' PRECAST CONCRETE PARKING BLOCK 5 NOT TO SCALE 38 w co ca 1-4 LAYERS (SEE NOTES) DRAWN BY: JLN OF 2" THICK, HIGH DENSITY ED BY: JLN 8'-0"INSULATION LENGTHS TYP RIGID BOARD INSULATION OUAL�ITY CHECK: DJC (OFFSET JOINTS) I n. CENTERED ABOVE PIPE 4' P I DATE: 9.8.06 THICK LAYERS (SEE NOTES) OF 2"HICK, HIGH DENSITY RIGID BOARD JOB NO. 805-057 INSULATION CENTERED ABOVE PIPE FIELDBOOK NEW UTILITY MAIN NEW UTILITY MAIN - (OFFSET JOINTS) ,,I`• ',. !�BACKFILL MATERIAL -- PIPE BEDDING MATERIAL TRENCH INSULATION DETAIL 2 SECTION D J5 �S.q Nu AI_E 38 NO SCALE U 1h (rs 24' (IYP.) Z o O INSTALL FLEXIBLE INSTALL FLEXIBLE `DELINEATOR POST ; IF�i z DELINEATOR POST :! Q �Q h _ 50'-0" w 35 �DIbS RPO\US = —� u 35 Q 23'-0" 2'-0" 19'-0" _ 5'-0" a 0" BOULEVARD SIDEWALK 1 W CONCRETE CURB r _W Q & GUTTER CURB PAINTED YELLOW W CURB PAINTED YELLOW 3.0% 4.0% 2.OX _ RADIUS 35•RADIUS W 4"THICK CONCRETE GEOTEXTILE SIDEWALK U NOTE:SIDEWALK SHALL BE 6' WIDE, AND 6" INSTALL FLEXIBLE \\`-INSTALL FLEXIBLE DEEP IN PARK AREAS AS SHOWN IN 4" CRUSHED GRAVEL DELINEATOR POST DELINEATOR POST COB STD DWG NO. 02529-15 SUBBASE LEVELING 33' (TYP.) COURSE CATAMOUNT - NORTH EDGE 3Q 0 4' B' 1 38 I I I I i CURB BULB DETAIL 4 S C A L E Ho 38 CAD N0. 557.38.DWG SHEET 38 OF 38 RECORD DRAWINGS A 346PEZ_ APPROVED Zu 8 18 0j� iotieL �•,... Z �t— NAMF — Y LE DAIC i�nrr rill ii NEW PIPE INSTALLED-1/23/07 _ V tom TD&I� F.NTHOMAS,DEAN&HOSxtNS,INC. Z 0 GINF.ERING CONSULTANTS l.y �_ +yP STEEL WELDED GRATING W/ GREAT 0 5 �� ti Gee s� m " BAR SIZE AT 1 SPACING Z SPACING AND CROSS BARS AT 2" SPACING (A36 STEEL). o_ Q APPROXIMATE WEIGHT OF 18" m a WIDE PANEL = 1501b. r7 .n_._ - ----------- Q x O U A J V J a4ll" RCP m 1 48" RCP a ^N 2" N> A z a SLOT -7 �.•rr w O __ _- LJ _ -- Ow Q Zm ae �cUil to ai � W N W 2. Z:..___ 1.5' --L5• O I O O FO O �p3 SEE DETAIL 2 N H F r 8'-4" BLOCKOUT DETAIL 2 — Z� NV SCALE 1 Ji L DIVERSION STRUCTURE. PLAN 1 m Go co N DRAWN BY: JLN 0 2 4* f� 1 DESIGNED BY: JFP I II I DUALITY CHECK: JFP DATE: 9.28.06 S C A L E JOB NO, B05-057 FIELDBOOK ELEV=4631.45 TOP OF WALL GRATE ELEV=4631.45 STEEL GRATE ELEV=4630.95 J FINISHED GRADE) / II 4'-1" I `FINISHED GRADE Z II r Q -------- II I BLOCKOUT SLOT N4 ® 12` O.C. -- (/ II rELEV= - SEE DETAIL 2 _ QEACH WAY \ II " .C. a >_RCP Y WRIP NEW %; ; \IRR C 3 I48" RCP Z 21"x15" CSPA II IRR CL3INV=4628.35 ( 4 ® 12" O.C. EACH WAYBLOCKOUT II WSLOTI8" CONC.---_--- ___ WALL (TYP) W k4 0 P3 �4825.12 J Z 12" O.G. o B" CONCRETE 2'-0" ;o1'-0. INVERT 4625.11 WALLSWALLS (�� " I� - � (� 12 O.C.N N4 0 12" O.C. 1•_0.• �/4 ® 12` O.C. #4 ® tO Q EACH WAY EACH WAY 12' O.C. iv W 1-0" V SECTION A SECTION yt 1 1 0 2' 4' 6' 0 2 4 b I IIIII I I IIIII I S C A L E S C A L E CAD NO. 551-38A.DWG SHEET38AOF 38