Loading...
HomeMy WebLinkAboutAdoption of General Fund Capital Improvement Plan FY 2015-2019 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Chris Kukulski, City Manager Anna Rosenberry, Administrative Services Director SUBJECT: Adoption of the General Fund Capital Improvement Plan (CIP) for FY15- 19 AGENDA ITEM TYPE: Action MEETING DATE: December 19, 2013 RECOMMENDATION: Adopt the General Fund Capital Improvement Plan (CIP) for FY15-19, with amendments as necessary. BACKGROUND: On December 2, 2013, the attached draft General Fund Capital Improvement Plan was presented to the Commission during a public meeting. There was an opportunity for public comment. During Commission discussion it was requested that staff provide more information on a number of items and that the Plan be brought back and advertised for Adoption at the December 19th meeting. Commissioners requested information regarding: 1. Need for GF219 – Addition to City Hall, Consolidation of Services. This item was developed based on very general concepts and cost estimates. If the Commission is not comfortable including it in the plan at this time, please remove it from the schedule. We could come back at a later date when we can be prepared with a more detailed plan. 2. GF083 – Cemetery Backhoe. Backhoe hours of use = 2,405 hours. While this is a critical piece of equipment for Cemetery Operations, it is in good working order. We would like to advise pushing this replacement to the Unscheduled column (out beyond this current five year CIP.) 365 3. GF191 – Upgrade Softball Complex Lighting. The original Softball Complex lights are not Dark Sky Compliant, nor are they a common sports lighting system. However they do work and we continue to attempt retro-fits to alleviate bleeding and light pollution. An eventual replacement is the proper long term solution to provide dark sky compliance and energy efficiency. 4. Timing of Pool Bond (GF056) and Police Station Bond (GF050). The Police/Municipal Court needs have been a priority for the city staff and Commission since the first needs assessment was produced in 2004. The requirement of a municipality to provide for public safety is a priority of government. The inefficiencies and risks associated with the current police/courts location is costly in both operational requirements that are not being met and in staff and public safety shortfalls. The Chief of Police and the Director of Parks and Recreation both agree and recommend that the appropriate timing for the two facility initiatives remain as the Police/Municipal Courts facility followed by the Aquatics facility. 5. Explain the current process of snow removal on parks sidewalks? Why the need to replace 5 ft walks with 6 ft walks? (GF144 - Mansion Park Sidewalks, GF108 – Park Sidewalk Replacements.) The Bozeman Transportation Plan standard calls for six foot sidewalks along arterials and fronting parks; the ease of maintenance is an ancillary benefit. These are areas where either there are higher volumes of pedestrian traffic from the kinds of business and services which commonly locate in proximity to arterial streets, and from park users going in and out of the park or travelling to it. 1) Supporting ADA accessibility in areas of high volume pedestrian activity. The selections from the most recent ADA Standards for Accessible Design, published in 2010, are excerpted below. The minimum 36 inch clear width is for single direction travel. This dimension carried forward from the prior edition of the standard. The City's sidewalks see two way travel, especially in areas like parks where there are often multiple pedestrians in a small area. A six foot width of sidewalk allows for two persons in wheelchairs, or a wheelchair and a stroller to pass without conflict or having to leave a stable surface. Unlike residential areas where a driveway or residential walk may provide a convenient widened area for additional maneuvering room, the park frontages are generally bare of 'wide spots' and need some additional room to accommodate travel. This is especially true in the winter when snow encroachment can significantly narrow the available travel path. 403.5.1 Clear Width. Except as provided in 403.5.2 and 403.5.3, the clear width of walking surfaces shall be 36 inches (915 mm) minimum. 403.5.3 Passing Spaces. An accessible route with a clear width less than 60 inches (1525 mm) shall provide passing spaces at intervals of 200 feet (61 m) maximum. Passing spaces shall be either: a space 60 inches (1525 mm) minimum by 60 inches (1525 mm) minimum; or, an intersection of two walking surfaces providing a T-shaped space complying with 304.3.2 where the base and 366 arms of the T-shaped space extend 48 inches (1220 mm) minimum beyond the intersection. 2) Support for adequate multi-modal transportation in high pedestrian volume areas; The City has placed high priority on multi-modal transportation through its long range transportation plan, PROST plan, and Complete Streets policy, as well as supporting documents such as the climate action plan and sustainability initiatives. Multi-modal transportation is an integrated system linking the City's hardscape areas like sidewalks to our trail network. Often these intersections occur at parks. Due to the long term financial and policy investment represented by these facilities the City includes multi-modal facilities as part of our transportation planning and implementing regulations. The first except below is from the UDC and requires that new street construction comply with various design standards, including the cross sections established in the transportation plan. Following are two excerpts from the cross sections in the transportation plan. The first, Figure 9-13, is from the local street description and the second, Figure 9-16 , is from the principal arterial cross sections. You will note that both address six foot sidewalks and in the case of local streets specifically address the proximity to parks. As noted above, parks and arterial streets are expected to see greater numbers of pedestrians than other areas. We therefore provide an increased amount of facility to accommodate those users. Width of sidewalk makes it easier for wheelchairs, strollers, people walking dogs, or just walking side by side to avoid conflict with other users. Safe and accessible multi-modal travel is also part of the City's obligations under the ADA. Sec. 38.24.050. Street and road right-of-way width and construction standards. A. All streets and roads providing access to, and within, the proposed development shall meet the following standards: 1. Right-of-way width and construction standards contained in this chapter, the most recently adopted long range transportation plan, the City of Bozeman Design Standards and Specifications Policy, and the City of Bozeman Modifications to Montana Public Works Standard Specifications shall apply. 2. Access streets and roads which are not on the city's or county's road maintenance system shall be dedicated to the public or shall have a public easement which meets the criteria of this article. 367 Figure 9-13, Greater Bozeman Area Transportation Plan Figure 9-16, Greater Bozeman Area Transportation Plan 3) Cost effective provision of services and maintenance of public facilities. The six foot sidewalk width also coincidentally is a better fit for some of the municipal snow removal equipment. This helps the City remove snow effectively, thereby preserving our level of service to multi-modal travelers, as well as avoiding costs due to damaged irrigation and other adjacent equipment. It is a convergence of the benefits of 368 better facilities and also less costly maintenance, something we don't experience all that often. The City has not always required sidewalks. New or replacement sidewalks are required to comply with the current standards. UNRESOLVED ISSUES: Listed in the attached memo. ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for FY15. Report compiled on: December 12, 2013 Attached: General Fund CIP Memo and attachments, dated December 2, 2013 369 Commission Memorandum REPORT TO: Honorable Mayor and City Commission FROM: Chris Kukulski, City Manager Anna Rosenberry, Administrative Services Director SUBJECT: Adoption of the General Fund Capital Improvement Plan (CIP) for FY15- 19 AGENDA ITEM TYPE: Action MEETING DATE: December 2, 2013 RECOMMENDATION: Adopt the General Fund Capital Improvement Plan (CIP) for FY15-19. BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital Improvements Plan and submit it to the Commission by December 15th. This item has been advertised for adoption tonight. However, it is not unusual for Commissioner to provide direction on changes to this draft, which can be brought back for adoption on a following meeting date (consent or action item.) During October & November, city staff members met to submit and discuss items to be included on in the General Fund’s capital plan. This is the largest, most diverse section of the CIP. Significant changes for this year’s schedule: 1. Included in the General Fund’s CIP is item GF218 – Landfill Gas Remediation System ($1,700,000). It is anticipated that we will be able to borrow the money for the system 8370 from the State’s Revolving Loan fund, to be paid from the General Fund each year for 20 years. 2. GF056 – Design & Construct Indoor/Outdoor Family Aquatics Center ($12,000,000) has been re-written to take into consideration the Aquatics Feasibility Study results. The cost has been changed to most-recent estimates and the timing has been moved up to FY16 for a voter-approved bond sale. 3. GF219 – Addition to City Hall, Consolidation of Services ($5,500,000) is a new item in a concept-stage. Estimates of costs are very preliminary. 4. GF209 – Lindley Center Full Upgrade is the compilation of multiple projects presented by the Recreation Department. They have been combined into one item for a lump sum, to be completed in the same general time-frame. They could be broken back into separate projects, if needed. UNRESOLVED ISSUES: 1. GF206 – Bronken Park Sidewalks, does not have a cost estimate listed. We anticipate having that estimate available by meeting night. 2. GF220 - Bozeman Pond Infrastructure & Improvements (TOP Project), and GF221 - Sports Complex Infrastructure & Improvements (TOP Project) are both very preliminary projects, with unknown rating or costs. Because these applications are coming forward at the same time as the CIP is being developed, we do not have much information about funding needs that will be required of the General Fund or other city sources. ALTERNATIVES: As suggested by the City Commission. FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for FY15. Report compiled on: November 21, 2013 Attached: Draft - General Fund CIP General Fund CIP Criteria sheet 9371 General Fund Capital Improvement PlanFinancial Summary Current YearFY14 FY15 FY16 FY17 FY18 FY19UnscheduledProjected Beginning Balance Dedicated to CIP 1,022,544$          ‐$                         19,449,395$      20,005,173$       20,666,124$       21,900,939$          Plus:  General Fund Revenues Dedicated to CIP 1,896,913$         1,898,295$             1,917,278$        1,936,451$         1,955,815$         1,975,373$           ‐$                 Plus:  Bond Issue:  Police & Municipal Court Facility Bond 17,992,000$           Plus:  Bond Issue:  Indoor/Outdoor Aquatics Facility 12,000,000$      Plus:  Loan for Landfill Gas Remediation System 1,700,000$             Less:  Carry‐over Capital Projects from FY13 (1,022,544)$        Less:  Scheduled CIP Project Costs (1,896,913)$        (2,140,900)$            (13,361,500)$     (1,275,500)$        (721,000)$           (1,152,000)$        (8,851,800)$          Projected Year‐End Cash Dedicated to CIP‐$                     19,449,395$           20,005,173$      20,666,124$       21,900,939$       22,724,312$           Assumptions Made for Revenue Estimates:FY15 FY16 FY17 FY18 FY19Estimated Annual General Fund Revenues 26,850,000$          27,118,500$     27,389,685$      27,663,582$      27,940,218$         Estimated Growth in General Fund Revenues 1% 1% 1% 1% 1%Total Estimated General Fund Revenues 27,118,500$          27,389,685$     27,663,582$      27,940,218$      28,219,620$       Current Revenues Dedicated to CIP % 6.0% 7.0% 7.0% 7.0% 7.0%  Plus:  Increase Dedicated to Capital Improvements % 1.0% 0.0% 0.0% 0.0% 0.0%  Total % Dedicated to CIP 7.0% 7.0% 7.0% 7.0% 7.0%ProjectedProjectedTotal Estimated Revenues Dedicated to CIP 1,898,295$            1,917,278$       1,936,451$        1,955,815$        1,975,373$         16,000,00014,000,00012,000,00010,000,0008,000,0006,000,0004,000,0002,000,0000FY15 FY16 FY17 FY18 FY19 UnscheduledGeneral Fund  Projects & Equipment10372 PROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15RATINGFY17FY18FY19CIP PROJECT FUND:General FundSorted by Department and RatingGF083CEMETERYBACKHOE$110,00042GF116CEMETERYCEMETERY VEHICLE REPLACEMENTS$42,50034GF010CEMETERYCEMETERY MOWER REPLACEMENTS$16,000$16,00025$16,000$17,000$18,000GF064COMM. DEV.VEHICLE REPLACEMENT35$25,000GF218ENGINEERINGLANDFILL GAS REMEDIATION SYSTEM$1,700,00037GF170FACILITY MGMT.BOILER REPLACEMENT AT FIRE STATION #162$260,500GF104FACILITY MGMT.ENERGY UPGRADES$30,000$30,00047$30,000$30,000$30,000GF139FACILITY MGMT.CITY HALL PHASE 3 SITE IMPROVEMENTS$47,25045GF171FACILITY MGMT.CITY HALL SITE DRAINAGE ON WEST SIDE OF BUILDING$11,50043GF103FACILITY MGMT.AMERICAN'S WITH DISABILTIES ACT (ADA) COMPLIANCE IMPROVEMENTS$20,000$20,00042$20,000$20,000$20,000GF188FACILITY MGMT.REPLACE BOILER AT BOZEMAN SENIOR CENTER$18,50042GF187FACILITY MGMT.REPLACE WORN SIDING ON THE BOZEMAN SENIOR SOCIAL CENTER$26,25039GF130FACILITY MGMT.CITY HALL SITE IMPROVEMENTS ‐ PHASE 238$42,000GF157FACILITY MGMT.SENIOR CENTER ELEVATOR$68,00037GF198FACILITY MGMT.SENIOR SOCIAL CENTER FIRE SPRINKLER UPGRADES$17,00037GF200FACILITY MGMT.BOZEMAN SENIOR CENTER RESTROOM VENTALATION$14,00037GF001FACILITY MGMT.PROFESSIONAL BUILDING ELEVATOR REPLACEMENT$66,60033GF203FACILITY MGMT.BOZEMAN SENIOR SOCIAL CENTER EXTERIOR ENVELOPE IMPROVEMENTS.$38,50032GF189FACILITY MGMT.REFINISH THE ROOF ON THE GREEN STORAGE BUILDING AT THE SHOP COMPLEX$39,90030GF201FACILITY MGMT.FIRE STATION #2 SIDING REPLACEMENT$24,00029GF219FACILITY MGMT.ADDITION TO CITY HALL, CONSOLIDATION OF SERVICES.$5,500,00028GF186FACILITY MGMT.REPLACE ENTRANCE LOCKS AT THE PROFESSIONAL BUILDING WITH FOB UNITS.$12,0002711373 PROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15RATINGFY17FY18FY19GF199FACILITY MGMT.CARPET REPLACEMENT MAIN FLOOR PROFESSIONAL BUILDING$14,00027GF202FACILITY MGMT.INSTALL IRRIGATION SYSTEM AND COMPLETE SITE LANDSCAPING FOR THE LOWER YARD$15,50027GF162FIRELIVE‐FIRE TRAINING PROP$10,000$10,00045$10,000$10,000$10,000GF079I.T.NETWORK CORE SWITCHES$50,00050GF080I.T.REMOTE CLOSET SWITCHES, ROUTER AND WIRELESS AP REPLACEMENT$40,000$40,00050$40,000$40,000$40,000GF196I.T.NEW COOLING UNIT FOR PROFESSIONAL BUILDING DATA CENTER$35,50047GF062I.T.SERVER & PERSONAL COMPUTER (PC) REPLACEMENT$70,000$75,00045$100,000$100,000$75,000GF197I.T.MICROSOFT OFFICE VERSION UPGRADE TO OFFICE 2013$88,00037GF115PARKSPARK VEHICLE REPLACEMENTS$28,000$90,00063$30,000$30,000GF207PARKSCITYWORKS HARDWARE$45,00045GF034PARKSLARGE DECK MOWER$54,00043$80,000GF144PARKSSTORY MANSION & MANSION PARK SIDEWALKS$69,20038GF031PARKSPARK IMPROVEMENT GRANTS$100,00037$150,000$150,000GF084PARKSPARKS RESTROOM UPGRADES$390,00037$300,000GF092PARKSPLAYGROUND EQUIPMENT$60,000$50,00037$70,000GF190PARKS4‐WHEELER ATV REPLACEMENT$14,00037GF194PARKSPARK ENTRANCE SIGNS$10,000$10,00037$10,000$10,000$10,000GF030PARKSARTICULATING TRACTOR$110,00035GF205PARKSPROST PLAN UPDATE35$100,000GF100PARKSTRACTOR WITH BUCKET$45,00033GF111PARKSEAST GALLATIN REC AREA IRRIGATION REPAIRS$25,00028GF146PARKSLINDLEY PARK IRRIGATION SYSTEM$100,00028GF147PARKSSOFTBALL COMPLEX IRRAGATION SYSTEM$110,00028GF108PARKSPARK SIDEWALK REPLACEMENTS$182,00027GF206PARKSBRONKEN PARK SIDEWALK2712374 PROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15RATINGFY17FY18FY19GF148PARKSBMX PARKING LOT$85,00025GF149PARKSEAST GALLATIN REC AREA PARKING LOT$60,00025GF151PARKSBEALL PARK BASKETBALL COURTS$18,00023GF191PARKSUPGRADE OF SOFTBALL COMPLEX LIGHTING$825,00022GF195PARKSAERATOR$17,00019GF220PARKSBOZEMAN POND INFRASTRUCTURE & IMPROVEMENTS (TOP PROJECT)GF221PARKSSPORTS COMPLEX INFRASTRUCTURE & IMPROVEMENTS (TOP PROJECT)PW01PARKS/FAC. MGSHOPS FACILITY EXPANSION PLAN$12,000GF165POLICEPATROL MOTORCYCLE REPLACEMENTS$60,00066GF052POLICEUNMARKED VEHICLE REPLACEMENT PROGRAM$21,00063$23,000GF053POLICEPOLICE CARS & VEHICLE EQUIPMENT REPLACEMENT$156,000$208,00063$156,000$208,000$156,000GF051POLICEANIMAL CONTROL VEHICLE$33,00060GF166POLICEPORTABLE RADIO REPLACEMENTS$48,000$50,00057$49,500$51,000$52,500GF050POLICE/COURTSPOLICE & MUNICIPAL COURT FACILITY$17,992,00065GF208PUBLIC SERVICES ASSET MANAGEMENT SOFTWARE42$50,000GF065PUBLIC SERVICES AERIAL PHOTOGRAPHY$60,00039$60,000GF140RECREATIONLINDLEY CENTER PARKING LOT RENOVATION47$47,000GF142RECREATIONSWIM CENTER POOL GUTTER & EDGE TILES, POOL RESURFACING, AND UNDERWATER LIGHTING REPLACEMENT$400,00047GF182RECREATIONSWIM CENTER EXPANSION$1,200,00046GF137RECREATIONSWIM CENTER POOL FILTRATION SYSTEM$135,00045GF056RECREATIONDESIGN & CONSTRUCT INDOOR/OUTDOOR FAMILY AQUATICS CENTER$12,000,00044GF181RECREATIONSWIM CENTER DECK TILE REPLACEMENT43$198,000GF217RECREATIONBEALL FURNACE REPLACEMENT$23,0004313375 PROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15RATINGFY17FY18FY19GF209RECREATIONLINDLEY CENTER FULL UPGRADE:  RESTROOMS, WINDOWS, SIDING, BASEMENT, KITCHEN, ROOF38$192,000GF192RECREATIONBOZEMAN SWIM CENTER CEILING TILE REPLACEMENT$40,00030GF216RECREATION12 PASSENGER VAN$15,00025Summary for  General Fund (73 items)Totals by year:$21,040,900 $13,361,500 $1,275,500$721,000$8,851,800FY15FY16FY17FY18UnscheduledFY19$1,152,00014376 PROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15RATINGFY17FY18FY19CIP PROJECT FUND:General FundSorted by Funding Year and RatingGF053POLICEPOLICE CARS & VEHICLE EQUIPMENT REPLACEMENT$156,000$208,00063$156,000$208,000$156,000GF080I.T.REMOTE CLOSET SWITCHES, ROUTER AND WIRELESS AP REPLACEMENT$40,000$40,00050$40,000$40,000$40,000GF104FACILITY MGMENERGY UPGRADES$30,000$30,00047$30,000$30,000$30,000GF062I.T.SERVER & PERSONAL COMPUTER (PC) REPLACEMENT$70,000$75,00045$100,000$100,000$75,000GF162FIRELIVE‐FIRE TRAINING PROP$10,000$10,00045$10,000$10,000$10,000GF103FACILITY MGMT.AMERICAN'S WITH DISABILTIES ACT (ADA) COMPLIANCE IMPROVEMENTS$20,000$20,00042$20,000$20,000$20,000GF194PARKSPARK ENTRANCE SIGNS$10,000$10,00037$10,000$10,000$10,000GF010CEMETERYCEMETERY MOWER REPLACEMENTS$16,000$16,00025$16,000$17,000$18,000GF115PARKSPARK VEHICLE REPLACEMENTS$28,000$90,00063$30,000$30,000GF031PARKSPARK IMPROVEMENT GRANTS$100,00037$150,000$150,000GF052POLICEUNMARKED VEHICLE REPLACEMENT PROGRAM$21,00063$23,000GF065PUBLIC SERVICEAERIAL PHOTOGRAPHY$60,00039$60,000GF165POLICEPATROL MOTORCYCLE REPLACEMENTS$60,00066GF050POLICE/COURTPOLICE & MUNICIPAL COURT FACILITY$17,992,00065GF079I.T.NETWORK CORE SWITCHES$50,00050GF196I.T.NEW COOLING UNIT FOR PROFESSIONAL BUILDING DATA CENTER$35,50047GF137RECREATIONSWIM CENTER POOL FILTRATION SYSTEM$135,00045GF139FACILITY MGMCITY HALL PHASE 3 SITE IMPROVEMENTS$47,25045GF207PARKSCITYWORKS HARDWARE$45,00045GF171FACILITY MGMCITY HALL SITE DRAINAGE ON WEST SIDE OF BUILDING$11,50043GF217RECREATIONBEALL FURNACE REPLACEMENT$23,00043GF188FACILITY MGMREPLACE BOILER AT BOZEMAN SENIOR CENTER$18,50042GF187FACILITY MGMT.REPLACE WORN SIDING ON THE BOZEMAN SENIOR SOCIAL CENTER$26,25039GF197I.T.MICROSOFT OFFICE VERSION UPGRADE TO OFFICE 2013$88,00037GF198FACILITY MGMSENIOR SOCIAL CENTER FIRE SPRINKLER UPGRADES$17,0003715377 PROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15RATINGFY17FY18FY19GF200FACILITY MGMBOZEMAN SENIOR CENTER RESTROOM VENTALATION$14,00037GF218ENGINEERINGLANDFILL GAS REMEDIATION SYSTEM$1,700,00037GF100PARKSTRACTOR WITH BUCKET$45,00033GF203FACILITY MGMT.BOZEMAN SENIOR SOCIAL CENTER EXTERIOR ENVELOPE IMPROVEMENTS.$38,50032GF189FACILITY MGMT.REFINISH THE ROOF ON THE GREEN STORAGE BUILDING AT THE SHOP COMPLEX$39,90030GF192RECREATIONBOZEMAN SWIM CENTER CEILING TILE REPLACEMENT$40,00030GF201FACILITY MGMFIRE STATION #2 SIDING REPLACEMENT$24,00029GF199FACILITY MGMT.CARPET REPLACEMENT MAIN FLOOR PROFESSIONAL BUILDING$14,00027GF202FACILITY MGMT.INSTALL IRRIGATION SYSTEM AND COMPLETE SITE LANDSCAPING FOR THE LOWER YARD$15,50027GF166POLICEPORTABLE RADIO REPLACEMENTS$48,000$50,00057$49,500$51,000$52,500GF034PARKSLARGE DECK MOWER$54,00043$80,000GF092PARKSPLAYGROUND EQUIPMENT$60,000$50,00037$70,000GF051POLICEANIMAL CONTROL VEHICLE$33,00060GF142RECREATIONSWIM CENTER POOL GUTTER & EDGE TILES, POOL RESURFACING, AND UNDERWATER LIGHTING REPLACEMENT$400,00047GF056RECREATIONDESIGN & CONSTRUCT INDOOR/OUTDOOR FAMILY AQUATICS CENTER$12,000,00044GF083CEMETERYBACKHOE$110,00042GF157FACILITY MGMSENIOR CENTER ELEVATOR$68,00037GF030PARKSARTICULATING TRACTOR$110,00035GF116CEMETERYCEMETERY VEHICLE REPLACEMENTS$42,50034GF186FACILITY MGMT.REPLACE ENTRANCE LOCKS AT THE PROFESSIONAL BUILDING WITH FOB UNITS.$12,00027GF216RECREATION12 PASSENGER VAN$15,00025GF140RECREATIONLINDLEY CENTER PARKING LOT RENOVATION47$47,000GF181RECREATIONSWIM CENTER DECK TILE REPLACEMENT43$198,000GF208PUBLIC SERVICEASSET MANAGEMENT SOFTWARE42$50,000GF130FACILITY MGMCITY HALL SITE IMPROVEMENTS ‐ PHASE 238$42,00016378 PROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15RATINGFY17FY18FY19GF209RECREATIONLINDLEY CENTER FULL UPGRADE:  RESTROOMS, WINDOWS, SIDING, BASEMENT, KITCHEN, ROOF38$192,000GF205PARKSPROST PLAN UPDATE35$100,000PW01PARKS/FAC. MSHOPS FACILITY EXPANSION PLAN$12,000GF064COMM. DEV.VEHICLE REPLACEMENT35$25,000GF170FACILITY MGMBOILER REPLACEMENT AT FIRE STATION #162$260,500GF084PARKSPARKS RESTROOM UPGRADES$390,00037$300,000GF182RECREATIONSWIM CENTER EXPANSION$1,200,00046GF144PARKSSTORY MANSION & MANSION PARK SIDEWALKS$69,20038GF190PARKS4‐WHEELER ATV REPLACEMENT$14,00037GF001FACILITY MGMPROFESSIONAL BUILDING ELEVATOR REPLACEMENT$66,60033GF111PARKSEAST GALLATIN REC AREA IRRIGATION REPAIRS$25,00028GF146PARKSLINDLEY PARK IRRIGATION SYSTEM$100,00028GF147PARKSSOFTBALL COMPLEX IRRAGATION SYSTEM$110,00028GF219FACILITY MGMADDITION TO CITY HALL, CONSOLIDATION OF SERVICES.$5,500,00028GF108PARKSPARK SIDEWALK REPLACEMENTS$182,00027GF206PARKSBRONKEN PARK SIDEWALK27GF148PARKSBMX PARKING LOT$85,00025GF149PARKSEAST GALLATIN REC AREA PARKING LOT$60,00025GF151PARKSBEALL PARK BASKETBALL COURTS$18,00023GF191PARKSUPGRADE OF SOFTBALL COMPLEX LIGHTING$825,00022GF195PARKSAERATOR$17,00019GF220PARKSBOZEMAN POND INFRASTRUCTURE & IMPROVEMENTS (TOP PROJECT)GF221PARKSSPORTS COMPLEX INFRASTRUCTURE & IMPROVEMENTS (TOP PROJECT)17379 PROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15RATINGFY17FY18FY19Summary for  General Fund (73 items)Totals by year:$21,040,900 $13,361,500 $1,275,500$721,000$8,851,800FY15FY16FY17FY18UnscheduledFY19$1,152,00018380 CIP Project Fund General Fund PROJECT NUMBER GF001 DEPARTMENT FACILITY MGMT. PROJECT NAME PROFESSIONAL BUILDING ELEVATOR REPLACEMENT FY15 FY16 Unscheduled $66,600 DESCRIPTION OF PROJECT The elevator in the Professional Building is a three stop Otis elevator. The elevator was installed when the second floor was added in 1972. Since the City purchased the building re-modeling has occurred on both the main floor and second floor. The elevator is to the point where many technological improvements have been made in elevator technology and a change out would yield both improved service and some reductions in energy savings. While the elevator is still a safe system, there are some inherent problems with the operation of the elevator. Of the four elevators owned by the City, this system experiences the most downtime. One big problem is the leveling systems and the way the rails and tracks are mounted in the building. If someone loads the elevator heavy to one side or another the balance alarm will engage and the elevator has to be reset. A new car and track system would solve the nuisance trips associated with this elevator. ALTERNATIVES CONSIDERED Continue to maintain and adjust the elevator operating systems throughout the year. The current electronics for the building are also a source of increased vigilance on the system and the electrical components on the system had to be traced back this year on two occasions to determine the problems of uneven voltages associated with the system. ADVANTAGES OF APPROVAL A new car, rail system and control package would add to the reliability of the elevator operation and the address the accessibility requirements for a municipal building. Building energy demands would also benefit as the newer elevator systems have more energy saving features built into them. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: A new system would reduce some of the maintenance costs currently associated with this elevator. A new system would also include a number of technological improvements such as a solid state slow start motor yielding reduced energy costs associated with the high demand motors used in elevator systems. FUNDING SOURCES General Fund and Building Inspection Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:33 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 19381 CIP Project Fund General Fund PROJECT NUMBER GF010 DEPARTMENT CEMETERY PROJECT NAME CEMETERY MOWER REPLACEMENTS FY15 $16,000 FY16 $16,000 Unscheduled DESCRIPTION OF PROJECT Ongoing mower replacement program developed to keep the cemetery mowers operating as needed. These mowers are the equipment used to complete the mowing of 53 Formal Turf Acres, and support the Cemetery Divisions performance measures - Mowing the cemetery and adjacent trails. ALTERNATIVES CONSIDERED Keep older mowers for extended periods of time. ADVANTAGES OF APPROVAL Less down time, Decreased repair /maintenance costs, High trade –in value, Increased productivity, Less emissions. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Routine maintenance, oil changes, fuel. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:25 LEVEL OF SERVICE (Up to 20):5 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):3 FY17 $16,000 FY18 $17,000 $18,000 FY19 20382 CIP Project Fund General Fund PROJECT NUMBER GF030 DEPARTMENT PARKS PROJECT NAME ARTICULATING TRACTOR FY15 FY16 $110,000 Unscheduled DESCRIPTION OF PROJECT The replacement of the 1992 MT articulating tractor, which does the bulk of the sidewalk snow removal for the Parks Division, encompassing over 12 miles of sidewalks and two routes to plow. ALTERNATIVES CONSIDERED Repair and maintain the 1992 MT as needed or explore the potential of sharing the costs of new Wacker/Neuson or Maclean MV2 wheel loader machines with the Street Division. These machines are a fairly new development in regards to sidewalk snow removal and can handle numerous implements as well. Depending on the machine of choice prices range from $60,000 to $110 000ADVANTAGES OF APPROVAL Less down time and maintenance/repair costs, A new MT tractor will be able to support more implements, Less emissions and better fuel economy, Faster more efficient use of time. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Better fuel economy and less emissions= less maintenance costs and operating costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:35 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):3 FY17 FY18 FY19 21383 CIP Project Fund General Fund PROJECT NUMBER GF031 DEPARTMENT PARKS PROJECT NAME PARK IMPROVEMENT GRANTS FY15 $100,000 FY16 Unscheduled DESCRIPTION OF PROJECT Contribute every other year from the General Fund towards improving park infrastructure through implementation of park master plans. This grant program is a matching funds program in which the City receives a minimum 1 to 1 match from the recipient. The Commission has established a formal grant policy by resolution. By switching to every other year, and also increasing the allocation, bigger projects can be accomplished, though these projects will take more time to complete. ALTERNATIVES CONSIDERED Handle park equipment and improvement requests on an adhoc basis, as various donors or service groups bring them forward. Allocate more or fewer dollars to the program. ADVANTAGES OF APPROVAL This matching funds program provides critical infrastructure to the park system by utilizing the talents of our community members through matching funds, donations, labor in lieu of and numerous specialized services. All of the above can be used as a match in this program ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: New infrastructure and facilities bring on increased maintenance and labor costs. The nature of each project funded will determine the continued costs. Some projects have very low ongoing costs, others have relatively higer costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):7 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 $150,000 FY18 $150,000 FY19 22384 CIP Project Fund General Fund PROJECT NUMBER GF034 DEPARTMENT PARKS PROJECT NAME LARGE DECK MOWER FY15 FY16 $54,000 Unscheduled DESCRIPTION OF PROJECT Eventual replacement of the 1999 (in FY16) Toro 455 series mowers, which are difficult to repair due to lack of parts (these mowers are not manufactured anymore) and are currently used as back-up mowers and/or are used sparingly in un-developed and smaller park areas. The mower request in FY18 would be an addition of a large-deck sports turf mower, anticipated to be needed for additional land purchases from Park and Trail Bond and future annexations. The city currently maintains over 125 acres of Formal Turf in the parks system. ALTERNATIVES CONSIDERED Continue to repair as break downs occur, Replace mowers as they breakdown, Lease mowers on a 3 - year program. ADVANTAGES OF APPROVAL Proper mowing of sports fields is imperative to safety. Regular replacement will reduce maintenance costs and decrease the number of breakdowns we have been experiencing. Well mowed parks are an important reflection on our City and how it is perceived by visitors and citizens. Having the right mower to do the job will ensure well mowed parks. New mowers will be more reliable, safer, productive, and will reduce the workload on the vehicle maintenance shop personnel. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Improve scheduling of mowing and increase crew efficiency because of reliable equipment. FUNDING SOURCES 100% General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:43 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):3 FY17 FY18 $80,000 FY19 23385 CIP Project Fund General Fund PROJECT NUMBER GF050 DEPARTMENT POLICE/COURTS PROJECT NAME POLICE & MUNICIPAL COURT FACILITY FY15 $17,992,000 FY16 Unscheduled DESCRIPTION OF PROJECT The Bozeman Police Department has outgrown the leased space at the Law and Justice Center. The existing building does not meet current building and life-safety codes for critical public safety facilities and is not suitable for remodel, alteration or expansion. To address these deficiencies, the City has been working with Gallatin County on a collaborative approach to addressing facility needs for the City and County’s criminal justice systems. Our particular focus has been on a combined facility for the Sheriff and Police Department. In December of 2012 the County decided it was not going to participate with the City in a joint facility and encouraged the City to proceed alone. Once the County withdrew from a joint facility, the benefits of the existing Law and Justice Center as a site for the City’s Police and Municipal Courts rapidly diminished to a point where we believe building on the site would compromise the ability of the Police Department to effectively and efficiently operate in the long term. Building location and site restrictions placed on the City by the County combined to cause us to look elsewhere for a more suitable building location. ALTERNATIVES CONSIDERED We have all but exhausted options to cooperate with the County in a joint facility. Once the County determined they would not participate in the design and construction of a joint law enforcement builing, and with the restrictions placed on our design by the County, we have determined that the L&J site is inadequate to accommodate the criminal justice facility needs of a growing community. We have evaluated 3 potential sites to construct a Police/Municipal Courts building and are focusing our efforts on a land exchange with the Montana Department of Transportation that will allow us to redevelop an industrial site on North Rouse. Should that option not be acceptable to the City Commission or fail to happen for other reasons, we have alternate sites identified on, or near Oak Street. ADVANTAGES OF APPROVAL The Police Department would have adequate room for existing staff – and projected staff for 15-20 years. Sufficient Municipal Court space would also be available. This facility would be programmed and built with the PD, Court, and Prosecution needs in mind from the beginning. The new site and building would provide secure parking for the City’s police vehicle inventory. Public areas, secured areas, office locations, and space adjacencies could be maximized for the best and safest utilization (as opposed to a retro-fit of an existing building). ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Not estimated at this time. Currently, the City pays approximately $170,000 a year to Gallatin County for the Police Department and two court rooms at the L& J. We anticipate asking voters to approve an operating levy, if necessary, when approving the construction levy. FUNDING SOURCES General Fund: Final design costs and construction would be funded by a voter-approved levy. 20 year General Obligation Bonds would be issued. $750,000 for design was allocated to the project in FY’s 12 & 13: $1,000,000 was budgeted in FY14 for land purchase and site improvements. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:65 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):5 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 24386 CIP Project Fund General Fund PROJECT NUMBER GF051 DEPARTMENT POLICE PROJECT NAME ANIMAL CONTROL VEHICLE FY15 FY16 $33,000 Unscheduled DESCRIPTION OF PROJECT FY16 - $33,000 to replace vehicle Asset 3230, 2004 Dodge 4-wheel drive with an expected mileage of 130,000. This vehicle will be replaced with a new extended cab, 4wd truck. Replacement includes new radio, with remaining equipment reused. The department responds to nearly 2,000 Animal Complaints each year. During the winter months it is very difficult to navigate the city streets and transport animals to the Heart of the Valley Animal Shelter with a 2 wheel drive pickup and need to continue use of a 4wd vehicle. It is anticipated that this vehicle will begin accumulating repairs and increasing maintenance costs. Purchase of a new truck would ensure many years of service without incurring high maintenance costs. The current truck could be used by another city department, be sold at auction, or used as a trade in. Hybrid fuel vehicles will be examined for suitability to assignment. ALTERNATIVES CONSIDERED The purchase of a newer lease return vehicle is a viable option and one that should be looked at before a final decision to purchase is made. ADVANTAGES OF APPROVAL 4-wheel drive is important for 12-month access in difficult weather. 4-wheel drive vehicles are often used for evidence retrieval and transport. A flex-fuel vehicle would provide better gas mileage. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Reduction in costs expected. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:60 LEVEL OF SERVICE (Up to 20):17 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):1 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 25387 CIP Project Fund General Fund PROJECT NUMBER GF052 DEPARTMENT POLICE PROJECT NAME UNMARKED VEHICLE REPLACEMENT PROGRAM FY15 $21,000 FY16 Unscheduled DESCRIPTION OF PROJECT FY15 - Replace Detective Vehicle Asset 3274 2001Dodge Durango which has 97,124 miles on it (Sept 13), but has started to become high maintenance and unsafe for continued use. This vehicle was originally forfeited as part of a criminal drug arrest. FY17 - Replace Detective Vehicle Asset 3138 2002 Chevrolet Impala which has 102,200 miles (Sept 13) on it currently. This amount includes all necessary vehicle equipment, with most current equipment being reused. Hybrid fuel vehicles will be examined for suitability to assignment. Unmarked vehicles are an essential item in the operation of the Bozeman Police Department, being the primary tool used by Detectives, School Resource Officers and command officers to assist and manage calls in support of marked police cars. Uses include response at all hours to violent and sexual crimes, assignment at area schools and enforcement purposes where an unmarked vehicle is more appropriate or tactically sound. While these vehicles are not over 20 years old, they are primary reponse vehicles for the department. ALTERNATIVES CONSIDERED Replacement will include trade in options and looking at lower mileage vehicle. Some equipment may be able to be reused. ADVANTAGES OF APPROVAL Would drastically reduce maintenance costs, mechanical concerns and provide many years of reliable service. Increased public safety and officer safety in providing mechanically sound emergency response vehicles, reduced risk and liability related to use of unreliable cars. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Reduction in maintenance costs and possible reduction in fuel costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:63 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 $23,000 FY18 FY19 26388 CIP Project Fund General Fund PROJECT NUMBER GF053 DEPARTMENT POLICE PROJECT NAME POLICE CARS & VEHICLE EQUIPMENT REPLACEMENT FY15 $156,000 FY16 $208,000 Unscheduled DESCRIPTION OF PROJECT This plan allows for a number of patrol cars to be replaced each year, including all of the necessary vehicle equipment (top lights, sirens, radio, mobile data terminals, video cameras, electronic reporting / ticketing systems, etc.) Marked patrol vehicles are an essential item in the operation of the Bozeman Police Department, being the primary tool used for over 41,000 Response to Calls each year. Police vehicles must be available for police patrol and emergency call response 24 hours a day, 365 days a year. These vehicles are used to respond to both emergency and non-emergency calls for service, investigate vehicle crashes, conduct traffic enforcement and for general patrol duties. These patrol vehicles average approximately 20,000 miles annually. The table on the following page is an outline of the replacement schedule. ALTERNATIVES CONSIDERED None. ADVANTAGES OF APPROVAL This helps us plan for safe and reliable emergency response vehicles for patrol use, as well as projected lower annual maintenance costs due to lower annual miles driven per vehicle per year. This program would allow for the replacement of older, higher mileage patrol cars that become less reliable and more costly to repair. Equipment components mounted inside the car can sometimes be transferred from the old car to the new car, depending on the condition. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED These are replacement vehicles. Recurring costs frequently decline as newer cars replace older ones. Maintenance costs have stabilized due to regularly scheduled service, even though calls for service have increased and additional officers have been hired. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:63 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 $156,000 FY18 $208,000 $156,000 FY19 27389 Police Vehicle DetailsProject NumberCurrent MileageAsset #MakeFY15FY16UnscheduledNotesFY17FY18FY19GF053101,644336907 Chevy Impala$52,000Mileage Sept 1393,011344008 Chevy Impala$52,000Mileage Sept 13134,614335006 Chevy Impala$52,000Mileage Sept 1368,155337007 Chevy Impala$52,000Mileage Sept 1345,040358911 Chevy Impala$52,000Mileage Sept 1342,335349809 Chevy Impala$52,000Mileage Sept 1342,103359011 Chevy Impala$52,000Mileage Sept 1321,784359511 Chevy ImpalaMileage Sept 13$52,00024,420362712 Chevy ImpalaMileage Sept 13$52,00040,099349909 Chevy ImpalaMileage Sept 13$52,00016,177363012 Chevy ImpalaMileage Sept 13$52,00015,629362812 Chevy ImpalaMileage Sept 13$52,000200366113 Chevy ImpalaMileage Sept 13$52,000200365913 Chevy ImpalaMileage Sept 13$52,0000363114 Ford InterceptNew vehicle$52,000200366013 Chevy TahoeMileage Sept 13$52,00011,143363112 Chevy TahoeMileage Sept 13$52,000$156,000 $208,000 $156,000 $208,000Totals$156,00028390 CIP Project Fund General Fund PROJECT NUMBER GF056 DEPARTMENT RECREATION PROJECT NAME DESIGN & CONSTRUCT INDOOR/OUTDOOR FAMILY AQUATICS CENTER FY15 FY16 $12,000,000 Unscheduled DESCRIPTION OF PROJECT Indoor Aquatic Elements: Therapy pool, water slides, zero entry teaching area, river run, deep diving well, 25 yd lap pool. Outdoor Aquatic Elements: Lazy river, zero entry teaching area, zero entry pool, water slides. This item was identified as a “Top Ten Capital Facility Recommendation” in the PROST plan, adopted October 2007. This project will need to be approved by the voters. ;It is estimated that an election would be offered in Spring 2015. Construction would begin in the Summer/Fall 2015 (FY16). Opening would occur in Summer 2016. ALTERNATIVES CONSIDERED Implement plan in phases. ADVANTAGES OF APPROVAL Community Benefits of an Aquatics Center: Safe and healthy place for families to play; Connected families; Strong, vital, involved community; Support for youth at risk; and, Increased community programs. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual operating and maintenance costs to include additional aquatic staff: Cost undetermined at this time. We would recommend asking voters to approve a levy increase for operations, at the time of capital improvement funding. FUNDING SOURCES General Fund, Bond Issue, Grants, etc. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:44 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):0 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):8 COMMISSION WORKPLAN (Up to 10):8 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 29391 CIP Project Fund General Fund PROJECT NUMBER GF062 DEPARTMENT I.T. PROJECT NAME SERVER & PERSONAL COMPUTER (PC) REPLACEMENT FY15 $70,000 FY16 $75,000 Unscheduled DESCRIPTION OF PROJECT This is a general item for replacement of personal computers and Servers for General Fund related jobs and services. (Enterprise and Special Revenue fund services pay for their own pc’s and servers.) As of FY10, Personal Computers’s moved to a 4 year rotation and servers continued to be minimal of a 5 year asset before replacement. PC Replacements are one of the primary drivers of Help Desk Calls (PM01 & WL01) - aging computers can have more software and technical conflicts, and replaced PC's often require user support for newer versions of software, etc. ALTERNATIVES CONSIDERED Not replace computer/server hardware as frequently. ADVANTAGES OF APPROVAL City technology needs will be better met and the IT department will be able to more efficiently support employees and citizens. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:45 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):7 SERVICE AREA (Up to 10):8 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $100,000 FY18 $100,000 $75,000 FY19 30392 CIP Project Fund General Fund PROJECT NUMBER GF064 DEPARTMENT COMM. DEV. PROJECT NAME VEHICLE REPLACEMENT FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Replacement of the current vehicle, a 1998 Nissan Sentra with 55,000 miles. This is a small car which works well for single or two person activities but does not have much cargo or personnel capacity. The vehicle is used by Planning Staff for site visits to projects, posting notices on-site, in-town meetings and other department activities (WL01-WL32) . Replacement would be with a fuel efficient small vehicle, possibly a hybrid. ALTERNATIVES CONSIDERED Continue to operate the existing vehicles with increasing maintenance costs. ADVANTAGES OF APPROVAL Provide functional transportation with reduced maintenance costs. Because of the age of the existing vehicle, maintenance costs are likely to increase to keep it functional. Recent repairs include power windows and routine maintenance. The vehicle needs numerous minor repairs, including dashboard lights, that continue to be deferred. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: No new costs are expected as maintenance is already performed on the existing vehicle. However, maintenance and repair costs are anticipated to increase due to the age of the vehicle. FUNDING SOURCES General Fund and/or Planning Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:35 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 $25,000 FY19 31393 CIP Project Fund General Fund PROJECT NUMBER GF065 DEPARTMENT PUBLIC SERVICES (GIS) PROJECT NAME AERIAL PHOTOGRAPHY FY15 $60,000 FY16 Unscheduled DESCRIPTION OF PROJECT Acquire aerial photography for the Bozeman planning area. Aerial photography benefits both the organization and the community by supplying a clear and accurate representation of current conditions. This information is used on a daily basis in all levels of our operations. We continue to experience unprecedented demand for digital imagery (i.e., staff reports, Commission presentations, water/sewer utilities, public requests, etc.). ALTERNATIVES CONSIDERED Use of lower resolution satellite imagery. Partnerships with other agencies. ADVANTAGES OF APPROVAL Contributes to on-going acquisition of photos at regular intervals for historical archives. Since 1987 we have not gone more than five years without an update. Measurements and land use determinations are made on a local or regional basis without requiring extensive field time. Aerial photographs are used extensively in several on-line and in-house mapping applications. Background information for existing and future GIS & CAD datasets and Facility Plans. Meets public demand for current and accurate aerial photography. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED There are no annual operating or maintenance costs associated with this project. FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:39 LEVEL OF SERVICE (Up to 20):13 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):7 DEPARTMENT PRIORITY (Up to 10):8 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):1 FREQUENCY OF USE (Up to 5):5 FY17 FY18 $60,000 FY19 32394 CIP Project Fund General Fund PROJECT NUMBER GF079 DEPARTMENT I.T. PROJECT NAME NETWORK CORE SWITCHES FY15 $50,000 FY16 Unscheduled DESCRIPTION OF PROJECT This is a scheduled replacement of switches that provide the backbone of the entire network. These provide the technology platform for the entire organization. The switches at the Professional Building will be replaced in FY15. This equipment is critical to the City's technology network, suporting all of the department's performance measures related to system "uptime" (PM02- PM06) and workload measures related to number of hours the network and various software is "in service" (WL02-W06). ALTERNATIVES CONSIDERED Maintain current switches without critical support or maintenance. ADVANTAGES OF APPROVAL Continued maintaining network stability and ensure phone services and data without interruption. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: FUNDING SOURCES General Fund – with costs shared with Enterprise, as location warrants. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:50 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 33395 CIP Project Fund General Fund PROJECT NUMBER GF080 DEPARTMENT I.T. PROJECT NAME REMOTE CLOSET SWITCHES, ROUTER AND WIRELESS AP REPLACEMENT FY15 $40,000 FY16 $40,000 Unscheduled DESCRIPTION OF PROJECT Wan Site end of life replacements for switches and router throughout City to include City Hall, Professional Building, City Shops, Landfill, L&J, Library, WWTP, WTP, Swim Center, Beall Park, Cemetery. Smaller sites will be consolidated in one year. FY 15 - Prof-Building, Vehicle Maint. This equipment is critical to the City's technology network, suporting all of the department's performance measures related to system "uptime" (PM02-PM06) and workload measures related to number of hours the network and various software is "in service" (WL02-W06). ALTERNATIVES CONSIDERED Maintain current switches without critical support or maintenance. ADVANTAGES OF APPROVAL Maintain uptime for all WAN locations throughout the City to include phone services as well as data. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund – with costs shared with Enterprise, as location warrants. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:50 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $40,000 FY18 $40,000 $40,000 FY19 34396 CIP Project Fund General Fund PROJECT NUMBER GF083 DEPARTMENT CEMETERY PROJECT NAME BACKHOE FY15 FY16 $110,000 Unscheduled DESCRIPTION OF PROJECT This piece of equipment replaces the current cemetery backhoe (2001) that is used for burials an average of 2 times per week.. This is the main piece of equipment utilized for cemetery burials. ALTERNATIVES CONSIDERED Continue to use older vehicle which is becoming unreliable and costly to maintain. Borrow from another department. ADVANTAGES OF APPROVAL Increased reliability and safety for staff and the families relying on cemetery services, and the old cemetery backhoe would be handed down to the Parks Division, which is in dire need of a “road-worthy” backhoe. Cost of economy with both divisions receiving “new” pieces of equipment. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing vehicle. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:42 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 35397 CIP Project Fund General Fund PROJECT NUMBER GF084 DEPARTMENT PARKS PROJECT NAME PARKS RESTROOM UPGRADES FY15 FY16 Unscheduled $390,000 DESCRIPTION OF PROJECT This project is the general replacement and upgrading of the City Park’s public restroom facilities. Other restrooms that need to be replaced- and/or built are: Rose Park ($175,000), Westlake BMX ($175,000) , Beall ($40,000) and a new addition that rises to the top, is the Softball Complex ($300,000 - Large Facility plus Concession Stand). Currently, Rose and BMX Parks are unscheduled, due to evaluating Impact fee costs and implications of the landfill clean-up. ;The Lindley Park restroom, funded in FY13, has been replaced and will be fully functional in the spring of 2014. ALTERNATIVES CONSIDERED Continue to try to maintain existing facilities. The Rose and BMX Park projects will provide restroom facilities in areas where currently none exist. ADVANTAGES OF APPROVAL Ease of maintaining new restrooms, increased cleanliness of public facilities. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Operating and repair costs are expected to be lower than the existing facilities. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 $300,000 FY19 36398 CIP Project Fund General Fund PROJECT NUMBER GF092 DEPARTMENT PARKS PROJECT NAME PLAYGROUND EQUIPMENT FY15 FY16 $60,000 Unscheduled $50,000 DESCRIPTION OF PROJECT The following playground equipment will eventually ;need to be replaced due to its age and condition: Replacement will bring equipment up to today’s standards and reduce safety and liability concerns. Jarrett Park (FY16), Christie Park (FY18), and Beall Park, are identified as the playgrounds that need replacement, in that priority. In general, safety recommendations for playgrounds address: playground site elements, sight lines, equipment features and materials, surfacing materials, hardware, paints and finishes, and any other hazards that might be present. Playground repairs require same-day; response given their critical safety implication. We currently maintain 24 playgrounds city-wide. ALTERNATIVES CONSIDERED Keep existing equipment in place, maintain as we go ADVANTAGES OF APPROVAL Increased safety for community members. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Minimal. FUNDING SOURCES 100% General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 FY18 $70,000 FY19 37399 CIP Project Fund General Fund PROJECT NUMBER GF100 DEPARTMENT PARKS PROJECT NAME TRACTOR WITH BUCKET FY15 $45,000 FY16 Unscheduled DESCRIPTION OF PROJECT Replace the aging 1986 Ford tractor with a new tractor. This tractor will be used to broom the 4 ice rinks, move material, assist in fertilization and will be used extensively with all three city-owned aerators. New price information is much less expensive than previously quoted. ALTERNATIVES CONSIDERED Continue to repair and patch up the Ford tractor as breakdowns occur. Explore the possibility of using the Street Division’s Massy in the winter. ADVANTAGES OF APPROVAL Less down time and maintenance/repair costs, A new tractor will be able to support more implements, Less emissions and better fuel economy, Faster more efficient use of time. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Better fuel economy and less emissions= less maintenance costs and operating costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:33 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 38400 CIP Project Fund General Fund PROJECT NUMBER GF103 DEPARTMENT FACILITY MGMT. PROJECT NAME American's with Disabilties Act (ADA) COMPLIANCE IMPROVEMENTS FY15 $20,000 FY16 $20,000 Unscheduled DESCRIPTION OF PROJECT Replace or install ADA upgrades in various city-owned buildings. Work examples include: door hardware, handrails, parking signage and stalls, building access, etc. The newly formed ADA advisory committee is anticipated to provide recommendations to the city on priority order for any upgrades or improvements that we might make in order to make our facilities or programs more accessible. Having this money available to begin improvements will show our priorities have already been in place to address special needs concerns for the City of Bozeman. Based on the initial review of the work to be done the dollar amount should be increased in order to complete the improvements within the needed timeframe. ALTERNATIVES CONSIDERED When remodels are initiated on buildings they are brought up to current ADA requirements as per regulations. There are changes to the ADA that took effect in March 2011. We will continue to make upgrades as changes are made to buildings but this budget item would accelerate the compliance for city buildings. ADVANTAGES OF APPROVAL It has been the policy of the city to meet the full spirit of the law as outlined in the ADA regulations. By taking the initiative to bring all our buildings up to current standards we can provide a positive example to the community in meeting the needs of people with restricted or limited mobility. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: No real costs foreseen with these improvements. Future costs could be reduced if the upgrades are made prior to any remodeling of the building FUNDING SOURCES 100% General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:42 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $20,000 FY18 $20,000 $20,000 FY19 39401 CIP Project Fund General Fund PROJECT NUMBER GF104 DEPARTMENT FACILITY MGMT. PROJECT NAME ENERGY UPGRADES FY15 $30,000 FY16 $30,000 Unscheduled DESCRIPTION OF PROJECT Install occupancy sensors in areas that are occupied at irregular times; install programmable thermostats; replace plumbing fixtures with low-water fixtures; replace single glaze windows with double glazed units. Work would occur on all city owned buildings after an analysis of the work that would have the best payback and energy savings. Some consultation with an electrical engineer would be needed to develop some energy modeling to determine which improvements would have the best payback. This funding is expected to become available just as our federal Energy Efficiency & Conservation Block Grant money has been fully utilized. This project may change if the City decides to move forward on the Performance Contracting Energy Improvement work that has been bid. The Performance Contracting will address the major energy improvements identified by the city and the contractor. ALTERNATIVES CONSIDERED Currently upgrades are made as equipment reaches its useful life. This approach would be more proactive, replacing Items that have a reasonable pay-back on energy savings. ADVANTAGES OF APPROVAL This work would be in line with the Mayor’s energy initiative. Some rebates are currently available through NorthWestern Energy which would help offset the cost of the change-outs. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Improvements that would result in the shortest payback would receive priority. Changes that would improve the work environment for employees and the public would also be given a priority. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:47 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 $30,000 FY18 $30,000 $30,000 FY19 40402 CIP Project Fund General Fund PROJECT NUMBER GF108 DEPARTMENT PARKS PROJECT NAME PARK SIDEWALK REPLACEMENTS FY15 FY16 Unscheduled $182,000 DESCRIPTION OF PROJECT Identified for replacement due to deteriorating cement, missing sections and heaving from weather and roots from trees. Approx $7/ square foot for rip and replace. New sidewalks must meet or exceed city code. Replacing the old sidewalk will result in a safer sidewalk year round and enable the sidewalks plows to better meet the snow removal municipal code. Project 1: $100,000 - Southside Park - replace 730' of sidewalk along South 5th Avenue and along West Alderson Street with new 6' (six foot) wide concrete sidewalk, and the related retaining wall. Project 2: $82,000 - Cooper Park - replace the sidewalk around the entire block. This sidewalk serves as a main route to and from the University. Approximately 1875' total. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Increased safety for community members. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: no estimate at this time FUNDING SOURCES General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:27 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):0 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 41403 CIP Project Fund General Fund PROJECT NUMBER GF111 DEPARTMENT PARKS PROJECT NAME EAST GALLATIN REC AREA IRRIGATION REPAIRS FY15 FY16 Unscheduled $25,000 DESCRIPTION OF PROJECT Update and repair the irrigation and pump system that has been repeatedly damaged by construction of the restrooms and park expansion. A damaged system requires more repairs. Wait until the Sunrise Rotary park development is completed. ALTERNATIVES CONSIDERED Not irrigate until construction and master plan implementation is complete. Patch together what we can of the existing system and irrigate some of the park. Potentially, this could be a PIG project as described earlier in the CIP. (Bigger projects) ADVANTAGES OF APPROVAL Efficiently irrigate the entire park. Minimize labor due to potentially hauling hoses around. Shorten the time it takes to irrigate the park Irrigate at night-minimize evaporation, transpiration and vandalism to irrigation heads. Healthier turf ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Annual operating and maintenance costs would rise slightly, due to the upgrades of valves, rotor heads and electrical wire in the ground. These identified costs potentially could be offset by fuel, vehicle and manpower savings attributed to continual manual watering. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:28 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 FY18 FY19 42404 CIP Project Fund General Fund PROJECT NUMBER GF115 DEPARTMENT PARKS PROJECT NAME PARK VEHICLE REPLACEMENTS FY15 $28,000 FY16 Unscheduled $90,000 DESCRIPTION OF PROJECT Parks Department utilizes trucks for mowing, fertilization, irrigation, inspections, and repairs of the city parks, comprising over 125 acres of formal turf and 220 acres of natural parkland. Because these are not emergency response vehicles, they are replaced as funding becomes available. All trucks are utilized well beyond 130,000 miles, and until service related down-time for equipment and staff become problematic or safety is compromised. A detailed listing of the replacement plan is shown on the following page, with vehicle mileage updated October 2013. FY 15 replacement is for the Blue 1988 GMC ½ ton – 1495- 210,000+mi. ALTERNATIVES CONSIDERED None. ADVANTAGES OF APPROVAL This insures safe and reliable vehicles for park use. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: These are replacements; recurring costs frequently decline as newer cars replace older ones. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:63 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 $30,000 FY18 $30,000 FY19 43405 Parks Vehicle Replacements - DetailsProject NumberAsset #MakeModel YrCurrent MileageFY15FY16UnscheduledNotesFY17FY18FY19GF1151495GMC1988209,739$28,00010/2013 MILEAGE2691FORD1990190,92810/2013 MILEAGE$30,0001608FORD1986186,141$30,00010/2013 MILEAGE5561FORD1997182,58510/2013 MILEAGE$30,0003251DODGE2001180,911$30,00010/2013 MILEAGE1691DODGE1985164,482$30,00010/2013 MILEAGE$28,000$30,000$30,000$90,000Totals44406 CIP Project Fund General Fund PROJECT NUMBER GF116 DEPARTMENT CEMETERY PROJECT NAME CEMETERY VEHICLE REPLACEMENTS FY15 FY16 $42,500 Unscheduled DESCRIPTION OF PROJECT Cemetery Vehicle Replacement Plan. The Cemetery Department utilizes 1-Ton trucks for operations and maintenance of the Sunset Hills Cemetery. Asset# 1213, 1989 1Ton 4x4, Estimated 45,000 miles, replace in FY16. This 1-Ton is critical to providing prompt burial services (loading and unloading dirt) roughly twice a week, and sanding/plowing cemetery roads. While it has relatively low mileage, the cost of repairs and its extremely low fuel economy (460 engine) drive our recommendation to replace this 25 year old vehicle. *Mileage as of 10/2012 ALTERNATIVES CONSIDERED None. ADVANTAGES OF APPROVAL This insures safe and reliable vehicles for cemetery use. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: These are replacements; recurring costs frequently decline as newer cars replace older ones FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:34 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):5 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 45407 CIP Project Fund General Fund PROJECT NUMBER GF130 DEPARTMENT FACILITY MGMT. PROJECT NAME CITY HALL SITE IMPROVEMENTS - PHASE 2 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT A general landscape plan was prepared for the building remodel. It included planting beds, irrigation upgrades for a dated system and modifications to provide water coverage for the revised site and better use of treated city water. Improvement items include: Irrigation upgrade and new irrigation lines to all parts of the site, Reclamation of the abandoned alley to the south of the City Commission meeting room, Trees to provide screening and shading on the south facing elevation, A storm water detention area on the north east end of the alley to protect the creek from site run-off and any added siltation, Planting beds and screening from the parking lot to the south of City Hall, Benches and or picnic tables for staff and citizen use, Better amenities for bike racks will also be included. If approved the landscaping plan will be presented to the Commission for final review and approval. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL The site improvements will add to the overall character of the building as an important municipal facility. Commitments were made in the LEED application for future site development that will address lower maintenance needs, less water use, and other green practices. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: The replacement of the irrigation system with a properly zoned system will make better use of treated city water. The landscape plan that has been initially developed for the site includes both native plantings and other vegetation requiring less water. FUNDING SOURCES 100% General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:38 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):3 FY17 $42,000 FY18 FY19 46408 CIP Project Fund General Fund PROJECT NUMBER GF137 DEPARTMENT RECREATION PROJECT NAME SWIM CENTER POOL FILTRATION SYSTEM FY15 $135,000 FY16 Unscheduled DESCRIPTION OF PROJECT The current filtration at the Swim Center is a hazard to work in. Staff must climb into the filtration pit onto slick wood rails to scrub the filter grids on weekly bases. Once per month staff must climb to the bottom of the pit to clean out all old filter media, there is not a ladder the bottom of the pit so staff must swing from pipes to get to the bottom. The filter pit holds approximately 60,000 gallons of water, which gets flushed down the drain. A regenerative media system is a new media system that uses the same media that the Swim Center currently uses, which provides the cleanest water. The system is contained in a pressurized tank that will hold 400 gallons of water. To clean the staff will only be required to press a button, reducing the potential hazard. This project would assist in making sure Aquatics classes aren't cancelled (PM08), reduce some of the current maintenance burdens (PM01), and mitigate some of the items contained in Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED Continue to use current system ADVANTAGES OF APPROVAL This project will decrease the work place hazards for staff, reduce staff time needed to clean filters, and replace media. The regenerative media system will also save approximately 700,000 gallons of water per year in cleaning. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Maintenance and Operating cost will be equal or less then current system. FUNDING SOURCES 100% General fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:45 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):7 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):7 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 47409 CIP Project Fund General Fund PROJECT NUMBER GF139 DEPARTMENT FACILITY MGMT. PROJECT NAME CITY HALL PHASE 3 SITE IMPROVEMENTS FY15 $47,250 FY16 Unscheduled DESCRIPTION OF PROJECT Phase III will address some of the longer term site needs. Work proposed in this phase of improvements includes: an established path of travel through the parking lot from the parking area along Rouse to the entry sidewalk, resurfacing the parking lot and restriping will reduce annual maintenance costs, sections of sidewalk along Lamme are starting to deteriorate. Work on these sidewalk sections will be combined with the establishment of tree pits and drip irrigation. Current code calls for street trees approximately every 50 feet. The curb area around the creek crossing bridge on Lamme is an odd configuration that leads to water retention and freezing during the winter. Site security and pedestrian lighting will also be evaluated once a site plan and project costs are further refined. ALTERNATIVES CONSIDERED Certain components of Phase III will require coordination so that improvements do not get damaged with future work on the site. ADVANTAGES OF APPROVAL The site improvements will add to the overall character of the building as an important municipal focal point. The work proposed in Phase III will improve general pedestrian safety by getting people across the parking lot and address some of the deterioration sidewalk on the East Lamme side of the building. This area gets a good deal of pedestrian traffic for both City Hall and Hawthorn school. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Some additional costs will be incurred during the first few years as the plantings are starting to establish themselves on-site. The upgraded sidewalk areas will still need to be maintained, but a new walk will require less work to clear because the surface will be uniform and have the proper drainage slopes. Improvements to the parking lot will also reduce some of the overall annual maintenance costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:45 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 48410 CIP Project Fund General Fund PROJECT NUMBER GF140 DEPARTMENT RECREATION PROJECT NAME LINDLEY CENTER PARKING LOT RENOVATION FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Curb and overlay the parking lot at the Lindley Center and include ADA parking stalls. Install parking lot lights and bases, a dumpster pad and dumpster enclosure fence. This project aligns with section 10.10.1 of the PROST plan (adopted October 2007) that recommends that City parks, recreation facilities and trails are accessible to the greatest extent possible. It would reduce some of the current maintenance burdens (PM07), and mitigate some of the items contained in Risk Management reports - Recreation Facilities (PM06). Includes permit fees. ALTERNATIVES CONSIDERED Sealing and striping lot and not installing lights ADVANTAGES OF APPROVAL Comply with city codes, allow for more cars to be parked in the lot at a time, more organized parking which will make the lot safer and reduced liability, lights will help with public safety and parking lot/facility security, ADA spots will be designated which will make the lot accessible, the dumpster would be enclosed. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual operating and maintenance costs to include stripping and periodic overlays. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:47 LEVEL OF SERVICE (Up to 20):13 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):9 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $47,000 FY18 FY19 49411 CIP Project Fund General Fund PROJECT NUMBER GF142 DEPARTMENT RECREATION PROJECT NAME SWIM CENTER POOL GUTTER & EDGE TILES, POOL RESURFACING, AND UNDERWATER LIGH FY15 FY16 $400,000 Unscheduled DESCRIPTION OF PROJECT The current Pool gutter tiles are from the original build in 1974. They are made of concrete and over the years have been eroded away and are becoming dangerously thin. The tiles are no longer made; the gutter will be replaced with a high impact plastic gutter system. The edge tiles around the pool will be damaged during the process, and they are also no longer available. A modern tile that will fit into the color scheme of the pool will replace them. $210,000 The pools current shell surface will be 10 years old in 2017. The average life span of pool surfaces is 10 years. Resurfacing of the pool is the best time to replace light fixtures. In the last resurfacing the crew was not monitored and the fixtures were installed incorrectly, therefore we have disconnected the lights from the electricity source for safety. Resurfacing of the pool will be with Diamond-brite, and the lights will be LED fixtures producing better light at higher efficiency then the 500W fixtures currently in place. Light and shell resurfacing combined price: $190,000 This project would assist in making sure Aquatics classes aren't cancelled (PM08), reduce some of the current maintenance burdens (PM01), and mitigate some of the items contained in Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED Replace with stainless steel gutters ADVANTAGES OF APPROVAL Replace with stainless steel gutters ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:47 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 50412 CIP Project Fund General Fund PROJECT NUMBER GF144 DEPARTMENT PARKS PROJECT NAME STORY MANSION & MANSION PARK SIDEWALKS FY15 FY16 Unscheduled $69,200 DESCRIPTION OF PROJECT Replace the damaged areas of sidewalk around the perimeter lot of the Story Mansion. Replacing the old sidewalk will result in a safer sidewalk year round and enable the sidewalks plows to better meet the snow removal municipal code in 12.24.020 (PM23). ALTERNATIVES CONSIDERED The current sidewalks are the standard 5 foot walkways. Areas of the sidewalk are showing signs of wear making it difficult to maintain in the winter. The turf areas on either side of the sidewalk are higher that the sidewalk which leads to snow and snow melt-off accumulation on the walk. The Parks Department has moved to 6 foot wide sidewalks so it can be cleared properly with the equipment we currently use for winter snow removal. ADVANTAGES OF APPROVAL Annual Operating and Maintenance Costs: Replacement of the walks will facilitate more efficient snow removal on the block. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:38 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 51413 CIP Project Fund General Fund PROJECT NUMBER GF146 DEPARTMENT PARKS PROJECT NAME LINDLEY PARK IRRIGATION SYSTEM FY15 FY16 Unscheduled $100,000 DESCRIPTION OF PROJECT Completely replace the irrigation system at Lindley Park. The system is one of the oldest in the city. It is becoming common that the pipe and electrical wire are starting to fail on a regular basis. A damaged system requires more repairs. It is important to keep this system working because Lindley is one of our most used parks, keeping the grass green before and after the Sweet Pea Festival, and it also a part of the cemetery irrigation system. ALTERNATIVES CONSIDERED Repair existing system as needed ADVANTAGES OF APPROVAL Healthier turf, grass will be green, not dormant in the summer Efficient use of the water (water conservation) Irrigate at night- minimize evaporation and transpiration Public safety, un-irrigated ground is hard and attracts gophers. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Annual operating and maintenance costs would rise slightly, due to the nature of valves, rotor heads and electrical wire in the ground. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:28 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 FY18 FY19 52414 CIP Project Fund General Fund PROJECT NUMBER GF147 DEPARTMENT PARKS PROJECT NAME SOFTBALL COMPLEX IRRAGATION SYSTEM FY15 FY16 Unscheduled $110,000 DESCRIPTION OF PROJECT Replace the existing irrigation system at the softball complex. The system is 40 years old and starting to fail regularly. This is not only due to its age but because many of the lines were cut through and patched when the lighting system was installed. Work has been done to fix the curb stops from leaking by. A damaged system requires more repairs. ALTERNATIVES CONSIDERED Continue to repair existing system ADVANTAGES OF APPROVAL Healthier turf, grass will be green, not dormant in the summer Efficient use of the water (water conservation) Irrigate at night- minimize evaporation and transpiration Public safety, un-irrigated ground is hard. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Annual operating and maintenance costs would rise slightly, due to the nature of valves, rotor heads and electrical wire in the ground. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:28 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 FY18 FY19 53415 CIP Project Fund General Fund PROJECT NUMBER GF148 DEPARTMENT PARKS PROJECT NAME BMX PARKING LOT FY15 FY16 Unscheduled $85,000 DESCRIPTION OF PROJECT Installation of parking lot at Westlake BMX park. ALTERNATIVES CONSIDERED Do not install a parking lot ADVANTAGES OF APPROVAL Also access for Childrens Memorial Park Accessible area to park Christmas tree dumping ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Minimal. Clean-up, possible snow plowing, painting lines every few years FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:25 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 54416 CIP Project Fund General Fund PROJECT NUMBER GF149 DEPARTMENT PARKS PROJECT NAME EAST GALLATIN REC AREA PARKING LOT FY15 FY16 Unscheduled $60,000 DESCRIPTION OF PROJECT Paving parking lot at the East Gallatin Recreation Area. ALTERNATIVES CONSIDERED Keep the parking lot gravel until master plan is completed in coordination with the Rotary Club. ADVANTAGES OF APPROVAL Reduced maintenance on the road. We would be able to plow the parking lot after all snow events. We now have to make sure the ground is frozen before we plow so the parking lot does not come up with the snow. No washboards and holes to trap water. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Minimal. Clean-up, possible snow plowing, painting lines every few years FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:25 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 55417 CIP Project Fund General Fund PROJECT NUMBER GF151 DEPARTMENT PARKS PROJECT NAME BEALL PARK BASKETBALL COURTS FY15 FY16 Unscheduled $18,000 DESCRIPTION OF PROJECT Resurface or tile the existing court. ALTERNATIVES CONSIDERED Leave it the way it is. Utilize Cash-in-Lieu or PIG $$ ADVANTAGES OF APPROVAL Improved basketball courts that are level, safe and are an asset to the park and could be used for a multitude of City Recreation programs, ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:23 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):3 FY17 FY18 FY19 56418 CIP Project Fund General Fund PROJECT NUMBER GF157 DEPARTMENT FACILITY MGMT. PROJECT NAME SENIOR CENTER ELEVATOR FY15 FY16 $68,000 Unscheduled DESCRIPTION OF PROJECT The elevator at the Bozeman Senior Social Center is a three stop Otis elevator. The elevator was installed in early 1980. The elevator is to the point where many technological improvements have been made in elevator technology and a change out would yield both improved service and some reductions in energy savings. While the elevator is still a safe system, the elevator is used often due to the special needs of the members of the Senior Center. Planning ahead for the replacement of the elevator will be more cost effective and avoid unnecessary down time during the replacement process. I requested a detailed analysis of the elevator by the maintenance contractor we have for the elevator and they agreed that the Senior Center elevator is the one that is most in need of replacement amongst all the city elevators. ALTERNATIVES CONSIDERED Continue to maintain and adjust the elevator operating systems throughout the year. Wait to replace the elevator until it physically breaks down or continue to monitor the operation and hold off on the replacement until the routine repair and maintenance costs exceed acceptable limits ADVANTAGES OF APPROVAL A new car, rail system and control package would add to the reliability of the elevator operation and the address the accessibility requirements for a municipal building. Building energy demands would also benefit as the newer elevator systems have more energy saving features built into them. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: A new system would reduce some of the maintenance costs currently associated with this elevator. A new system would also include a number of technological improvements. FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):7 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 57419 CIP Project Fund General Fund PROJECT NUMBER GF162 DEPARTMENT FIRE PROJECT NAME LIVE-FIRE TRAINING PROP FY15 $10,000 FY16 $10,000 Unscheduled DESCRIPTION OF PROJECT This will continue building the Fire training facility at the lower yards. It will be constructed of modular container units that will be configured and replaced when needed. This facility will be used year round. The following types of training would occur: Live Fire, Flashover, Ventilation, Forcible Entry, Confined Space, Hazardous Materials Response, and Trench Rescue. The facility will be available to the City Police Department for their training needs (Special Response Team, etc.) and to the Water and Sewer Department for continued Trench Rescue training. In recent budgets we have purchased the containers and have them stacked at the training site. The ongoing request is to begin and complete the passage doorways, roof props, burn rooms and eventually a standalone flash over prop. This project trains firefighters to respond to Fires, Rupture/Explosion , and Hazardous Conditions and various other call types. ALTERNATIVES CONSIDERED Continue with utilizing the existing site and Central Valley Fire training center out of the city and limited trips to Missoula to use their prop. We also have a stronger relationship with Sourdough Fire and potentially will be training with them. ADVANTAGES OF APPROVAL Firefighters can train when on-duty, reducing overtime costs. Required for ISO compliance.. Located within the City Limits, firefighters would be close for call-outs. Available when needed (unlike Central Valley Fire site.) Shared facility with City Police and Water/Sewer Operations ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Operating and Maintenance Costs: Operating costs are minimal and are within our existing operational budgets. FUNDING SOURCES 100% General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:45 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $10,000 FY18 $10,000 $10,000 FY19 58420 CIP Project Fund General Fund PROJECT NUMBER GF164 DEPARTMENT FACILITY MGMT. PROJECT NAME REPLACEMENT OF IT AIR CONDITION UNIT AT PROFESSIONAL BUILDING FY15 $23,500 FY16 Unscheduled DESCRIPTION OF PROJECT Upgrade the aging air conditioner in the professional building's server room. Due to the migration to virtual servers, this piece of equipment is over-sized for today's uses. It is also out of warranty, so future repairs could be troublesome or difficult to accomplish. When in need of repair, this equipment is an "emergency" (PM01), due to its temperature control of critical IT equipment. ALTERNATIVES CONSIDERED Don't replace. ADVANTAGES OF APPROVAL The replacement will be significantly smaller and have reduced energy costs. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Assists in reducing the professional building's reoccurring energy costs. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:49 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):8 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):4 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 59421 CIP Project Fund General Fund PROJECT NUMBER GF165 DEPARTMENT POLICE PROJECT NAME PATROL MOTORCYCLE REPLACEMENTS FY15 $60,000 FY16 Unscheduled DESCRIPTION OF PROJECT FY15 - $60,000 will replace asset # 3112 and asset # 3154. This plan allows for our 2 primary patrol motorcycles to be replaced, including most of the necessary vehicle equipment (emergency lights, sirens, radio) This program would replace older, higher mileage patrol motorcycles that become less reliable and more costly to repair, but more importantly can become a safety issue for Officers. Some of the equipment from the motorcycle will be transferred from the old motorcycle to the new motorcycle depending on the equipment’s condition. Patrol motorcycles are an essential item in the traffic enforcement division, used for a portion of the over 13,000 traffic stops, crashes, and citations each year. ;These vehicles are used to respond to both emergency and non-emergency calls for service, investigate accidents, conduct traffic enforcement and for general patrol duties. ALTERNATIVES CONSIDERED None. This will include trading in 2 primary motorcycles and a third older motorcycle to help minimize costs. ADVANTAGES OF APPROVAL This ensures safe and reliable emergency response vehicles for patrol use, as well as lower annual maintenance costs. For the traffic division to be effective, this equipment must be kept in top operating condition. Police motorcycles must be available for police patrol use during the day and when the city streets are clear enough to ride. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Maintenance costs are stable due to regularly scheduled service. Officers assigned to the motorcycle division are also assigned to their own motorcycle. This seems to reduce the wear on this equipment. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:66 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):3 FY17 FY18 FY19 60422 CIP Project Fund General Fund PROJECT NUMBER GF166 DEPARTMENT POLICE PROJECT NAME PORTABLE RADIO REPLACEMENTS FY15 FY16 $48,000 Unscheduled $50,000 DESCRIPTION OF PROJECT This plan allows for 9 police portable radios to be replaced each year, including all of the software, programming and peripheral accessories. This is planned replacement of radios at the end of their predicted usable life, estimated between six and ten years. This will provide forseamless communication and response capabilities as the radios become less reliable and repair is no longer a financially prudent option. Portable (or hand-held) radios are an essential item in the operation of the Bozeman Police Department, being a critical communication tool used for over 41,000 Response to Calls (workload measures WL02-WL34) each year. Police radios must be available for police use 24 hours a day, 365 days a year. These radios are individually assigned, allowing for greater longevity, and department-wide communication in the event of a need for major response. ALTERNATIVES CONSIDERED None. Previously had this rotation beginning in FY15. Radios are working to a degree that this entire planned purchase moved back beginning FY16 ADVANTAGES OF APPROVAL This insures safe and reliable emergency communication and response. Program allows for a planned and predictable need for equipment replacement. Clear and dependable communication allows for quick and efficient deployment and the required level of officer safety. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:57 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $49,500 FY18 $51,000 $52,500 FY19 61423 CIP Project Fund General Fund PROJECT NUMBER GF170 DEPARTMENT FACILITY MGMT. PROJECT NAME BOILER REPLACEMENT AT FIRE STATION #1 FY15 FY16 Unscheduled DESCRIPTION OF PROJECT **This project is most ideally timed with the Station #1 Remodel in the Fire Equipment & Capital Replacement Fund.** The old steam boiler at Fire Station #1 has reached the end of its useful cycle. The fact that the unit is no longer serving the old City Hall means that is working even less efficient because it is now oversized. The current plan was to replace the existing boiler with another steam boiler. When the steam lines were disconnected from old City Hall the condition of the pipes could be assessed. The pipes were found to be severely corroded and in poor condition. An engineer was hired to size the boiler for servicing only Fire Station #1 and to assess other features of the 1964 vintage system. Three options were proposed to upgrade the system for both building comfort and energy efficiency. The third option proposed in the study is the most efficient and has the best payback. This project significantly effects building occupant comfort/quality (PM05) and potentially generates emergency and non- emergency repairs (PM01-3). Staff has been working to keep the boiler running properly, and monitoring the chemical condition of the boiler water to try to increase the useful life of the boiler. ALTERNATIVES CONSIDERED Replacement of the current boiler with another steam boiler is no longer an option after assessing the condition of the steam distribution lines and other components of the older system. Three options were reviewed and a summary report for each option was included in the analysis done by the engineer. The least expensive solution is to stay with a stem system. The project will now include boiler replacement, distribution line replacement, and changing out the old pneumatic controls with a digital control system. The structural assessment and architectural design for the upstairs expansion of Station #1 is complete. This information will now allow proper sizing the boiler. It would be better to replace the boiler as part of the planned improvements for the building provided that the renovation work is going to be done in the near future. It the building improvements are out more than a couple of years then the replacement should go ahead in the next two to three years. ADVANTAGES OF APPROVAL The proposed option will better address the variable heating needs of the building – work areas, living areas, and fire bays. The proposed system is designed for the current configuration of the building and could be supplemented to handle the additional square footage proposed when the dorm area of the station is increased. The proposed system is in line with the Municipal Climate Action Plan. Planning for the replacement of the current boiler prior to failure of the unit will be most cost effective. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED The recommended system would result in an approximate $9,000 per year in energy savings at current utility rates. The payback would be about 28 years. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:62 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):10 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):9 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 $260,500 FY19 62424 CIP Project Fund General Fund PROJECT NUMBER GF171 DEPARTMENT FACILITY MGMT. PROJECT NAME CITY HALL SITE DRAINAGE ON WEST SIDE OF BUILDING FY15 $11,500 FY16 Unscheduled DESCRIPTION OF PROJECT The drainage on the west side of the building at City Hall needs some re-grading to properly drain the lot. The roof drain and melting snow is ponding in the lot and accumulates in the ADA parking spot. Water needs to be diverted from the area from the public building entrance to the south. The work will involve removal of pavement, regrading, and repaving in order to drain properly. So concrete aprons may need to be added along the edge of the building to aid drainage. The water build up is starting to impact the use of the lot with large pools of water and ice problems in the winter. ALTERNATIVES CONSIDERED Phase II and Phase III improvements for City Hall are already listed in the Capital Improvements Budget. This work could be added into one of those phases. ADVANTAGES OF APPROVAL Proper drainage of the lot will reduce water ponding and during the winter icing in the lot. It will make the building access safer and improve the layout of the ADA parking space on the west side of the building. It will also improve employee access to the building so they don’t have to wade through the water accumulation. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Proper drainage will reduce the amount of time needed to make sure there is safe building access from the staff parking lot and reduce the risk of slip and falls. Proper drainage will also mean less hand shoveling and less sand and salting of the lot. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:43 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):8 SERVICE AREA (Up to 10):8 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 63425 CIP Project Fund General Fund PROJECT NUMBER GF181 DEPARTMENT RECREATION PROJECT NAME Swim Center deck tile replacement FY15 FY16 Unscheduled DESCRIPTION OF PROJECT The tile on the Bozeman Swim Center’s deck is the original tile. The grout has worn away in many places and the tile is cracked in many places. The tile pattern was a special order tile when the pool was constructed and we have none left. Replacement with a current, non-skid tile will not only increase the visual appeal of the facility, but will help reduce the number of slips that occur at the facility. This project would reduce some of the current maintenance burdens (PM01) and mitigate some of the items contained in Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED Replace the deck in four sections, north($23,500), south($23,500), east($81,000) and west($70,000) deck. With the first deck being the east deck. ADVANTAGES OF APPROVAL Increase safety by installing non-skid tile ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:43 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $198,000 FY18 FY19 64426 CIP Project Fund General Fund PROJECT NUMBER GF182 DEPARTMENT RECREATION PROJECT NAME Swim Center Expansion FY15 FY16 Unscheduled $1,200,000 DESCRIPTION OF PROJECT The Swim Center expansion will increase the size of the lobby, create a secure front desk space, provide for private(Family) ADA changing rooms, bring all entrances up to current federal ADA codes, add a teaching/birthday party room, and provide office space for staff. This project would reduce some of the current maintenance burdens (PM01) and mitigate some of the items contained in Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL This project will provide space to meet the current needs and use of the Swim Center ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:46 LEVEL OF SERVICE (Up to 20):13 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):10 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 65427 CIP Project Fund General Fund PROJECT NUMBER GF186 DEPARTMENT FACILITY MGMT. PROJECT NAME Replace Entrance Locks at the Professional Building with Fob Units. FY15 FY16 $12,000 Unscheduled DESCRIPTION OF PROJECT There are 6 main entrance doors at the Professional Building on the south, north, and west sides of the building. The current door locks would be replaced with the radio frequency fob locks that are being used for other city buildings. It might be good to move this installation up to FY 15. There is more activity and this would help with some of the concerns that have come up with the doors getting locked in the evening with the activities related to the MSU Computer Training Lab in the basement of the building. ALTERNATIVES CONSIDERED Stay with the existing key locks. ADVANTAGES OF APPROVAL Replacement of the key locks with fobs would be consistent with the other locks that have been installed on all new city projects. This is one of the last primary city buildings that is not equipped with the fob units. These locks would allow for easier access for the various employees and multiple departments that occupy the building. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% general fund unless the building department fund would be charged separately for a portion of the cost. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:27 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):0 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 66428 CIP Project Fund General Fund PROJECT NUMBER GF187 DEPARTMENT FACILITY MGMT. PROJECT NAME Replace Worn Siding on the Bozeman Senior Social Center FY15 $26,250 FY16 Unscheduled DESCRIPTION OF PROJECT The original siding on the Senior Center is wide flat boards installed in a clap board pattern. The board are showing signs of wear and many are split and exposing the underlayment. Areas of the building that were damaged in the 2010 hail storm were resided with a cement based siding that is more durable. While the current siding does add character to the building it will be difficult to replace or refinish and the proposed material will be more durable. Addition work is being included in the CIP requests for exterior work on the building. Other areas of the building are in need of repair due to the age and condition of the materials. ALTERNATIVES CONSIDERED Repair, replace, and repaint the existing wide board siding. ADVANTAGES OF APPROVAL Install a more durable type of siding that will seal the building envelope and provide for a material that will have a longer life. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Long term maintenance costs will be reduced. FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:39 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 67429 CIP Project Fund General Fund PROJECT NUMBER GF188 DEPARTMENT FACILITY MGMT. PROJECT NAME Replace Boiler at Bozeman Senior Center FY15 $18,500 FY16 Unscheduled DESCRIPTION OF PROJECT There are two hot water boilers at the Bozeman Senior Social Center. One boiler was replaced about 3 years ago. The other boiler from about 1989 is now assigned as a back-up boiler. The older unit is having problems firing and will often not come on. The boiler would be replaced with a high efficiency combustion boiler and the other unit would then be used as the back-up unit. In checking with some heating contractors there is a benefit to replacing both boilers with more efficient and properly sized boilers. There have been some other additions to the building and it would be good to upgrade the entire heating system especially since the mechanical control systems have been recently upgraded. Replacing both boilers would increase the cost to $32,000.00. ALTERNATIVES CONSIDERED Work is being done right now on the old unit to get the venting and firing to function property so that we can continue to use the unit for awhile. Another option would be to put in three multiphase boilers similar to the system that we have at the Bozeman Public Library. This thee unit system is highly efficient and provides better heating back-up should one of the boilers fail to operate for some reason. Cost for a three unit system would be $36,000.00. ADVANTAGES OF APPROVAL Replacing the older unit will give us a reliable more cost effective boiler which will help with both comfort levels (PM04) and efficiency. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Reduced maintenance and operating costs from less energy use. FUNDING SOURCES 100% general fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:42 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):5 FREQUENCY OF USE (Up to 5):3 FY17 FY18 FY19 68430 CIP Project Fund General Fund PROJECT NUMBER GF189 DEPARTMENT FACILITY MGMT. PROJECT NAME Refinish the Roof on the Green Storage Building at the Shop Complex FY15 $39,900 FY16 Unscheduled DESCRIPTION OF PROJECT The Green Building used for vehicle and equipment storage has a metal roof that is has been leaking at the seams of the metal panels. The interior ceiling shows lots of areas where leaks are occurring. There is a new technique where a plasticized material is sprayed on the roof which will seal all the seams and cover the existing metal roof material. The roof is power washed, seams are sealed and the spray material is applied. ALTERNATIVES CONSIDERED Remove and replace all the existing metal roof panels. There is also an option of spraying on a layer of insulation and then spraying on the roof finish. Rather than applying the insulation on the roof, once the roof is sealed the insulation on the ceiling and some ventilation for condensation will need to be installed. ADVANTAGES OF APPROVAL The spray on material will cost less than removing all the panels which are showing no signs of rusting. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED As mentioned after the roof is sealed, he ceiling of the building will need to be removed and new insulation and sheet rock will need to be installed. FUNDING SOURCES General Fund and other departments that occupy the shop complex and store equipment in the building could be charged for the cost of the repairs. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:30 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 69431 CIP Project Fund General Fund PROJECT NUMBER GF190 DEPARTMENT PARKS PROJECT NAME 4-Wheeler ATV Replacement FY15 FY16 Unscheduled $14,000 DESCRIPTION OF PROJECT Replace the ATV (2000 Yamaha Grizzley) used for sidewalk snow removal and is the main piece of equipment that is used to spray approx 300 acres with herbicides and biostimulants for the Parks Division. ALTERNATIVES CONSIDERED Continue to use the 2000 Yamaha Grizzley and repair as needed. ADVANTAGES OF APPROVAL Maximize efficiency, minimize down time, proactive replacement of aging equipment. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Routine maintenance FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 70432 CIP Project Fund General Fund PROJECT NUMBER GF191 DEPARTMENT PARKS PROJECT NAME Upgrade of Softball Complex Lighting FY15 FY16 Unscheduled $825,000 DESCRIPTION OF PROJECT Replace the current lights at the Softball Complex with appropriate stadium lights. Estimate provided by MUSCO, would be bid at the time of construction. Existing lights have light spillage and this is the only way to make the lights Dark Skies Compliant. ALTERNATIVES CONSIDERED Keep existing lights ADVANTAGES OF APPROVAL The new lights can offer 50% less light spillage and glare and reduce energy costs by up to 50%. Additionally, upgraded lights could help to reduce or eliminate complaints regarding light pollution. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Reduction in electrical use. FUNDING SOURCES 100% General Fund, or fundraising by user groups - Cost estimates range from $750,000 to $825,000 in August 2012. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:22 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):6 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):0 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):1 FY17 FY18 FY19 71433 CIP Project Fund General Fund PROJECT NUMBER GF192 DEPARTMENT RECREATION PROJECT NAME Bozeman Swim Center Ceiling Tile Replacement FY15 $40,000 FY16 Unscheduled DESCRIPTION OF PROJECT This Project will replace all of the ceiling tiles above the pool at the Bozeman swim Center. Most of the tiles are from the original construction. They have lost their reflective ability, limiting the amount of light reflected down into the pool. Replacement of the tiles will increase the visibility on the bottom of the pool and increase public safety thereby mitigating an element of Risk Management reports - Aquatics Facilities (PM06). ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Increase safety of swimmers by reflecting more light off the ceiling tiles. This will also increase the aesthetics of the facility. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:30 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 72434 CIP Project Fund General Fund PROJECT NUMBER GF194 DEPARTMENT PARKS PROJECT NAME Park Entrance Signs FY15 $10,000 FY16 $10,000 Unscheduled DESCRIPTION OF PROJECT Project to replace existing park signs and add park entrance signs where none currently exist with an updated, identifiable, uniform, maintenance-free park sign. This project would provide for approximately 5 double-sided signs per year. ALTERNATIVES CONSIDERED Continue to make our own wooden routered park signs. ADVANTAGES OF APPROVAL A uniform signing system creating easily identifiable park properties, continuity, and reduction in labor costs due to constant upkeep of our wooden signs. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED None FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):10 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $10,000 FY18 $10,000 $10,000 FY19 73435 CIP Project Fund General Fund PROJECT NUMBER GF195 DEPARTMENT PARKS PROJECT NAME Aerator FY15 FY16 Unscheduled $17,000 DESCRIPTION OF PROJECT An additional aerator into Parks and Recreation inventory of turf equipment. This would be used to maintain the 125 acres of turf in the park inventory. ALTERNATIVES CONSIDERED Continue to operate with one aerator. ADVANTAGES OF APPROVAL Proactively and aggressively aerate parks and sports fields within the City to create a finer and healthier product. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:19 LEVEL OF SERVICE (Up to 20):5 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):1 FY17 FY18 FY19 74436 CIP Project Fund General Fund PROJECT NUMBER GF196 DEPARTMENT I.T. PROJECT NAME New Cooling Unit for Professional Building Data Center FY15 $35,500 FY16 Unscheduled DESCRIPTION OF PROJECT Replace the current APC cooling system in the professional building Data Center. > ALTERNATIVES CONSIDERED Keep using the current 10 year old system and spend $6,000 to replace bearings. ADVANTAGES OF APPROVAL We would have a system that is properly sized for the room and heat load. It would be a redundant system that would allow failover in the event that one of the unit fails. The new system would be more energy efficient. We have had to put money into the unit multiple times over the last year and we are looking at a sizable expenditure now to keep using this unit going forward. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED 1 Year warranty out of the gate with roughly $100 per year for Freon replacement and maintenance. Repairs and issues beyond basic maintenance after the first year would have to be paid at that time. FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:47 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):7 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 75437 CIP Project Fund General Fund PROJECT NUMBER GF197 DEPARTMENT I.T. PROJECT NAME Microsoft Office Version Upgrade to Office 2013 FY15 $88,000 FY16 Unscheduled DESCRIPTION OF PROJECT Licenses with Software Assurance program. ;Certain vendors are asking us to upgrade our software version. ;We are currently using Microsoft Office 2007. ;This needs to be accomplished in FY15 or FY16. ALTERNATIVES CONSIDERED Microsoft Cloud System Office 365. $8,000 ongoing/year; We haven't fully investigated this option and have concerns about meeting our discovery and records retention requirements. ADVANTAGES OF APPROVAL A coordinated migration to Office 2013 that can be occur during planned roll-out. Less disruption to the organization. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 76438 CIP Project Fund General Fund PROJECT NUMBER GF198 DEPARTMENT FACILITY MGMT. PROJECT NAME SENIOR SOCIAL CENTER FIRE SPRINKLER UPGRADES FY15 $17,000 FY16 Unscheduled DESCRIPTION OF PROJECT Replace the existing ½ inch sprinkler lines with the current code requirement of 1 inch lines. An annual inspection and testing of fire sprinkler systems is required. The person that conducted the inspections the last time pointed out the some of the individual sprinkler heads did not have the right size of pipe. Code requires that the piping for the sprinkler heads be 1 inch diameter. The individual heads were put in with only ½ inch lines. This work will change out the smaller diameter sprinkler head supply lines with the code compliant size lines. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL The replacement of the current lines with larger diameter lines will bring the system up to current code standards. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED No additional costs for the proper size lines. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):0 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 77439 CIP Project Fund General Fund PROJECT NUMBER GF199 DEPARTMENT FACILITY MGMT. PROJECT NAME CARPET REPLACEMENT MAIN FLOOR PROFESSIONAL BUILDING FY15 $14,000 FY16 Unscheduled DESCRIPTION OF PROJECT Hallway carpet on the main floor of the Professional Building is starting to show wear. Also there have been problems with static build up causing problems with computer use. New carpet will be static free. Most of the carpet areas are the hallways by the offices for Planning and Engineering. ALTERNATIVES CONSIDERED Replace small sections of carpet a little at a time over multiple years to work from standard budget verses CIP money. ADVANTAGES OF APPROVAL Replace worn carpet with static free carpet. Maintain the character of the building and offices and avoid trip hazards from worn carpet areas. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Standard costs for annual carpet cleaning, but no added costs for static guard application. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:27 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):0 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 78440 CIP Project Fund General Fund PROJECT NUMBER GF200 DEPARTMENT FACILITY MGMT. PROJECT NAME BOZEMAN SENIOR CENTER RESTROOM VENTALATION FY15 $14,000 FY16 Unscheduled DESCRIPTION OF PROJECT Install a ventilation system for the four restrooms located at the Bozeman Senior Social Center. The work will include the needed ducting, fan systems, and occupancy sensors to turn the fans on and off at the appropriated times for both operation and energy efficiency. ALTERNATIVES CONSIDERED Individual fan system verses the proposed unit system that will accommodate all 4 restrooms. ADVANTAGES OF APPROVAL Ventilation will improve the condition and comfort of the restrooms and move closer to current code requirements. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Some additional electrical costs and maintenance costs for the equipment and system. The work will include installation of occupancy sensors to limit the time the equipment will be running when the restrooms are not in use or the building is closed. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):18 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 79441 CIP Project Fund General Fund PROJECT NUMBER GF201 DEPARTMENT FACILITY MGMT. PROJECT NAME FIRE STATION #2 SIDING REPLACEMENT FY15 $24,000 FY16 Unscheduled DESCRIPTION OF PROJECT The exterior of Fire Station #2 is showing signs of aging. Improvements have already been done on parts of the building – re-roof due to hail damage, and replacement of windows and doors due to age and for improved energy efficiency. Now that the windows are replaced it will be a good time to replace the building siding. ALTERNATIVES CONSIDERED None identified at this time. ADVANTAGES OF APPROVAL Replacement of the siding will improve the appearance of the building and stabilize the rest of the building envelope. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED The proposed siding is a cement based material that is pre-colored. This will be a durable materials and reduce the amount of repainting that will need to be done to maintain the condition of the material. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:29 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):0 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 80442 CIP Project Fund General Fund PROJECT NUMBER GF203 DEPARTMENT FACILITY MGMT. PROJECT NAME BOZEMAN SENIOR SOCIAL CENTER EXTERIOR ENVELOPE IMPROVEMENTS. FY15 $38,500 FY16 Unscheduled DESCRIPTION OF PROJECT Due to the age and condition of the Bozeman Senior Social Center building a number of exterior materials will be replaced. Work will include the replacement of the rough board siding with cement based clapboard siding. The soffit area of the building is open in many areas and lots of birds have been getting into the attic areas. New fascia boards and soffit boards will be installed. The gutter sections are leaking and torn on many areas of the building. The entrance columns on the northeast entrance of the building are also starting to rot out and will be replaced. There is foam material on the foundation area of the building that is broken and not providing the needed moisture protection. This will also be replaced. ALTERNATIVES CONSIDERED Phasing the various repairs over time will increase the cost as some things need to be done before other work is done. For example replacing the fascia boards before the gutter system is installed. Replacing the soffits before the fascia boards are installed. One other consideration would be upgrading some of the single glazed windows with more energy efficient windows before the siding is installed. ADVANTAGES OF APPROVAL Now that the building is over 30 years old, the repairs will address the deterioration of the building exterior envelope. The roofing was all replace due to the 2010 hail damage. The west side of the building was also resided due to hail damage and the proposed replacement materials will match what has already been upgraded on the building. In addition to improving the overall appearance of the building, the new materials will have a longer life expectancy and protect the condition of the building. There has been some water leaking in through the windows in the basement. The gutters will be set up so that the water from the roof does not drain into the window wells keeping the water from getting into the building. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED The new materials will have a longer projected life expectancy. We will step up the ongoing maintenance and requirements for painting when needed. FUNDING SOURCES 100% General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:32 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 81443 CIP Project Fund General Fund PROJECT NUMBER GF205 DEPARTMENT PARKS PROJECT NAME PROST Plan update FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Update the 2007 Parks Recreation Open Space Trail (PROST) Plan. The current plan is nearing 10 years old. Since adoption, the city has grown in size, new park properties have come into the system, and local demographics may have changed. This project anticipates hiring an outside party to update the Plan. If funded in FY17, the Community Plan update will have occurred, and much of the Parks Trails bond will likely be allocated. ALTERNATIVES CONSIDERED Do not update the plan. ADVANTAGES OF APPROVAL The update would record and reference new and accurate information that has been developing over the last 10 years. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:35 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):0 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $100,000 FY18 FY19 82444 CIP Project Fund General Fund PROJECT NUMBER GF206 DEPARTMENT PARKS PROJECT NAME BRONKEN PARK SIDEWALK FY15 FY16 Unscheduled DESCRIPTION OF PROJECT INSTALLATION OF NEW SIDEWALK FOR PEDESTRIAN TRAFFIC BETWEEN DURSTON AND CLASSICAL WAY, ALONG COTTONWOOD ROAD. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL Safe pedestrian travel for park users and vehicle traffic. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Minimal. FUNDING SOURCES General Fund. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:27 LEVEL OF SERVICE (Up to 20):10 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 83445 CIP Project Fund General Fund PROJECT NUMBER GF207 DEPARTMENT PARKS PROJECT NAME CityWorks Hardware FY15 $45,000 FY16 Unscheduled DESCRIPTION OF PROJECT Implementation of the CityWorks program for Parks work-orders and infrastructure tracking. In FY 14 Parks paid the licensing fee and now is ready to integrate into the system. ;This project includes ruggedized tablets, staff training, and other related costs. If approved, tentatively scheduled for the fall of 15. ALTERNATIVES CONSIDERED Continue with not using CityWorks ADVANTAGES OF APPROVAL Integrate the Parks Division into the program that is being used by a vast majority of other divisions. Precise tracking of work orders and asset management. Better, more efficient deployment of parks workers and crews. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Hardware upgrades. FUNDING SOURCES General fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:45 LEVEL OF SERVICE (Up to 20):12 OPERATING BUDGET IMPACT (Up to10):8 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 84446 CIP Project Fund General Fund PROJECT NUMBER GF208 DEPARTMENT PUBLIC SERVICES (GIS) PROJECT NAME ASSET MANAGEMENT SOFTWARE FY15 FY16 Unscheduled DESCRIPTION OF PROJECT Managing infrastructure efficiently continues to be one of the top priorities and goals of the Bozeman City Commission. Asset management software will build upon existing datasets and systems to assist in delivering the desired level of service for the lowest life cycle cost. Advanced applications are necessary to analyze condition information and criticality to identify and coordinate overlaps and gaps among various assets. ALTERNATIVES CONSIDERED Continue managing data and workflow using manual processes with limited potential for effective analysis. ADVANTAGES OF APPROVAL Using technology to support long term capital planning will aid in rehabilitation/repair/replacement decisions and ultimately result in a prolonged asset lifespan. A fully developed asset management program will assist the organization in continuing to deliver a high level of service in the most sustainable way possible. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Annual Maintenance (first year included) = $8,000 FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:42 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):7 COMMISSION WORKPLAN (Up to 10):5 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 $50,000 FY18 FY19 85447 CIP Project Fund General Fund PROJECT NUMBER GF209 DEPARTMENT RECREATION PROJECT NAME Lindley Center Full Upgrade: Restrooms, Windows, Siding, Basement, Kitchen, Roof FY15 FY16 Unscheduled DESCRIPTION OF PROJECT This project is the combination of requests for upgrade fo the Restrooms ($50,000), Building Envelope ($22,000), Window Replacement ($22,000), Siding Replacement ($24,000), Kitchen Upgrade ($50,000), and East Roof Insulation ($24,000). This is a heavily used community center that could benefit from substantial improvements. ALTERNATIVES CONSIDERED As suggested by the Commission ADVANTAGES OF APPROVAL 1. Brings restroom up to current ADA requirements; 2. Brings restroom up to current City of Bozeman building codes; 3. Improves sanitation in the restooms and kitchen facilities; 4. Rehabs and secures the building envelope for years to come; 5. Reduced energy consumption from improved windows and insulation. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Minimal. FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:38 LEVEL OF SERVICE (Up to 20):15 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 $192,000 FY18 FY19 86448 CIP Project Fund General Fund PROJECT NUMBER GF216 DEPARTMENT RECREATION PROJECT NAME 12 Passenger Van FY15 FY16 $15,000 Unscheduled DESCRIPTION OF PROJECT The Parks and Recreation Department has no participant transportation options between our facilities and to offsite program areas. ;The Recreation Division continues to expand programs that will utilize offsite locations and needs to be able to transport participants and supplies. Currently, the YMCA trades the Recreation Department transportion services of program participants in exchange for pool use. ALTERNATIVES CONSIDERED Rent vans. Contract for other transportation option. Continue with the YMCA, if they are available. ADVANTAGES OF APPROVAL Expanded program options and potential revenue, participant safety when offsite i.e. if a storm rolls in, we could transport kids to indoor locations. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Routine maintenance FUNDING SOURCES General Fund, potential sponsorship with local service organization. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:25 LEVEL OF SERVICE (Up to 20):5 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 87449 CIP Project Fund General Fund PROJECT NUMBER GF217 DEPARTMENT RECREATION PROJECT NAME Beall Furnace Replacement FY15 $23,000 FY16 Unscheduled DESCRIPTION OF PROJECT Replace two furnaces with one high efficiency condensing furnace that will provide combustion air from outside. It was discovered during the 2012 Facility Condition Inventory that there is currently no combustion air coming into the furnace space and addressing this concern was identified as a high priority. Project includes engineering plans. ALTERNATIVES CONSIDERED Keep existing furnace and try to address ventilation issue. ADVANTAGES OF APPROVAL Increase public and staff safety and energy efficiency ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Routine Maintenance FUNDING SOURCES General Fund New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:43 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):5 SERVICE AREA (Up to 10):5 DEPARTMENT PRIORITY (Up to 10):5 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 88450 CIP Project Fund General Fund PROJECT NUMBER GF218 DEPARTMENT ENGINEERING PROJECT NAME Landfill Gas Remediation System FY15 $1,700,000 FY16 Unscheduled DESCRIPTION OF PROJECT Installation of a new gas remediation system at the old Story Mill landfill. ALTERNATIVES CONSIDERED ADVANTAGES OF APPROVAL ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES Loan, paid back by the City's General Fund. The sale of North Park Property could also provide some of the funds to repay the loan. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:37 LEVEL OF SERVICE (Up to 20):20 OPERATING BUDGET IMPACT (Up to10):0 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):10 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):0 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 89451 CIP Project Fund General Fund PROJECT NUMBER GF219 DEPARTMENT FACILITY MGMT. PROJECT NAME Addition to City Hall, consolidation of services. FY15 FY16 Unscheduled $5,500,000 DESCRIPTION OF PROJECT This project would relocate the functions currently housed in the Stiff Building (Community Development/Engineering/IT/Building Inspection) into an expansion of City Hall on Lamme Street. > ALTERNATIVES CONSIDERED Keep operations at the Stiff Building. ADVANTAGES OF APPROVAL Centralizing more services in one location at City Hall. Staff and citizens spend time migrating between the buildings. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED The new facility should have lower operating costs than the Stiff Building. FUNDING SOURCES Potential Funding Sources include: General Fund, Enterprise Fund (for public works), Building Inspection Fund (Building Inspection Division), sale of the Stiff Building. This is a very rough estimate, based on building square footage and current construction costs. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING:28 LEVEL OF SERVICE (Up to 20):12 OPERATING BUDGET IMPACT (Up to10):3 SERVICE AREA (Up to 10):2 DEPARTMENT PRIORITY (Up to 10):3 COMMISSION WORKPLAN (Up to 10):0 ADOPTED CLIMATE PLAN (Up to 5):3 FREQUENCY OF USE (Up to 5):5 FY17 FY18 FY19 90452 CIP Project Fund General Fund PROJECT NUMBER GF220 DEPARTMENT PARKS PROJECT NAME Bozeman Pond Infrastructure & Improvements (TOP Project) FY15 FY16 Unscheduled DESCRIPTION OF PROJECT This item is a place holder, with UNKNOWN costs. Because of the timing of the CIP and the TOP application (coming forward at the same time), we do not have details. Should the original application, and/or amount approved from the TOP Bond Fund not be enough to complete the project, the General Fund could be relied upon. ALTERNATIVES CONSIDERED Unknown at this time. ADVANTAGES OF APPROVAL Completion/better functioning park land. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Unknown FUNDING SOURCES Portion of the TOP Bond Fund, general fund, in-kind and cash donation, other. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING: LEVEL OF SERVICE (Up to 20): OPERATING BUDGET IMPACT (Up to10): SERVICE AREA (Up to 10): DEPARTMENT PRIORITY (Up to 10): COMMISSION WORKPLAN (Up to 10): ADOPTED CLIMATE PLAN (Up to 5): FREQUENCY OF USE (Up to 5): FY17 FY18 FY19 91453 CIP Project Fund General Fund PROJECT NUMBER GF221 DEPARTMENT PARKS PROJECT NAME Sports Complex Infrastructure & Improvements (TOP Project) FY15 FY16 Unscheduled DESCRIPTION OF PROJECT This item is a place holder, with UNKNOWN costs. Because of the timing of the CIP and the TOP application (coming forward at the same time), we do not have details. Should the original application, and/or amount approved from the TOP Bond Fund not be enough to complete the project, the General Fund could be relied upon. ALTERNATIVES CONSIDERED Unknown at this time. ADVANTAGES OF APPROVAL Completion/better functioning park land. ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED Unknown. FUNDING SOURCES Portion of the TOP Bond Fund, general fund, in-kind and cash donations, other. New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING: LEVEL OF SERVICE (Up to 20): OPERATING BUDGET IMPACT (Up to10): SERVICE AREA (Up to 10): DEPARTMENT PRIORITY (Up to 10): COMMISSION WORKPLAN (Up to 10): ADOPTED CLIMATE PLAN (Up to 5): FREQUENCY OF USE (Up to 5): FY17 FY18 FY19 92454 CIP Project Fund General Fund PROJECT NUMBER PW01 DEPARTMENT PARKS/FAC. MGMT. PROJECT NAME SHOPS FACILITY EXPANSION PLAN FY15 FY16 Unscheduled DESCRIPTION OF PROJECT The construction of the new Vehicle Maintenance Shop at the Lower Yards on Rouse Avenue in FY10/FY11 was Phase I in expanding and improving our ability to service equipment, store vehicles, and provide work space for Public Works, Parks, and Facilitiy services. Questions remain about the long-term plan for construction, location, and expansion for: Streets, Sign & Signal, Forestry, Water/Sewer Operations, Solid Waste Collection & Recycling, Facilities, and Parks & Cemetery departments. This project would develop a master plan. In scheduling this project, we are recommending waiting until after the Vehicle Maintenance Division is relocated to its new shop and the interior improvements are made to the Shop at Rouse and Tamarack Street for the remaining divisions. ALTERNATIVES CONSIDERED Most of the reconfiguration for the existing buildings is now complete. Also the improvements for the Laurel Glen building are complete. This work would access future needs for the departments at the current Shop location at 814 N. Bozeman. We could also determine whether there is space for additions at both the 814 N. Bozeman location and the new Vehicle Maintenance building site at 1812 N. Rouse. ADVANTAGES OF APPROVAL ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED FUNDING SOURCES From related divisions: General Fund 20% ($10,000), Water Fund 20% ($10,000), Wastewater Fund 20% ($10,000), Street Maintenance Fund 20% ($10,000), Solid Waste Fund 20% ($10,000). New Replacement Equipment Project General Fund Project and Equipment Scoring TOTAL RATING: LEVEL OF SERVICE (Up to 20): OPERATING BUDGET IMPACT (Up to10): SERVICE AREA (Up to 10): DEPARTMENT PRIORITY (Up to 10): COMMISSION WORKPLAN (Up to 10): ADOPTED CLIMATE PLAN (Up to 5): FREQUENCY OF USE (Up to 5): FY17 $12,000 FY18 FY19 93455 General Fund Criteria Criteria Rating Notes Project Score 1. Level of Service Up to 20 pts 20 - Corrects a health or safety hazard or prevents a critical breakdown of an existing city facility or equipment. 15 - Repairs, rehabilitates, or replaces physically deteriorated or functionally obsolete existing city facility or equipment. 10 - Brings an area up to the basic level of service as identified in an adopted city wide plan. 5 – Expands an approved City service. 0 – Other. 2. Operating Budget Impact Up to 10 pts 10 - Provides a significant decrease in city operating and/or maintenance expenses. 5 – Has a neutral or small impact on operating and/or maintenance expenses. 0 – Provides a significant increase in city operating requirements. 3. Service Area Up to 10 pts 10 – Direct Benefit to entire city. 5 – Direct benefit to roughly half city or indirect benefit to entire city. 2 – Direct benefit to small area of the city or indirect benefit to several areas. 4. Departmental Priority Up to 10 pts 10 – Critical to Department’s Mission 7 – High 3 – Moderate 0 – Questionable/Very Difficult to Complete 5. Commission Work Plan Up to 10 pts 10 – Identified project in Adopted Commission Work Plan 5 – Contributes to an indentified project in the Adopted Commission Work Plan. 0 – Not identified in Adopted Commission Work Plan. 6. Municipal Climate Protection (Municipal Climate Action Plan – MCAP) Up to 5 pts 5 – Is recommended by MCAP and will accomplish a stated MCAP goal. 3 – Will assist in meeting MCAP goal. 0 – No relation to MCAP. 7. Seasonal Use Up to 5 pts 5 – Year Round. 3 – Six to Eleven months per year. 1 – Five or fewer months per year. TOTAL Up to 70 pts. 94456