Loading...
HomeMy WebLinkAbout1450 West Kagy Boulevard Ia � o I 14 5 a II I I �0 1`w•o`' I ,� I'f 60 R.D.w+_ ,cSl IIP\cil' Ii „.,,,,, Acass �. p l I'-- LI - - - - - - - - - - - - - - - - - - - - — E%l—OG30.12•RCP - - - - - - ----— — J � �`'�`— ----- APPRDXIIAATE NQRTH EDGE Dr ASPHALT WEST-KAGY BOULEVARD_ _ _ _ ___ ___- _---—-- 16 F110M CENTERUNE ----_----__-----_----_-------- -_ _ -- __-- �t _WATEfi_.�INJr-w---_ __._. r - - r- _ = r r ---- --._ _ -_ - EXISTING 8• (' r + � —• _ J _ ----- _ —_ - OaIIING ~ _. T - -- yH ---- --_PItOP05E0 21•STORM DRAIN-- = .1 05 REBAR -_ EXISTING 12• ATER LINE '`-FSET FRGL1 r.'A TIC NATURAL GAS LINE NE N17H - -w`v:a�Nm-ai _ _- - i••D,R:�=!'il r ���A� r _ A 1%*U.S.WEST CONDUIT WS SS (r i - I ` I ' 1 I , I 1 (l 30'WATER AND SEWE10 R I \ EASEMENT(TIP.) \ `11 I u � I I I MHI 2,57A WATER AN9 NV.OUT-4903.82(E) EASE (TYP.)M a 0,00 � I W RIM -4912,00 WV. IN 4902.002 (f( __ INV. N 4902.92(5) E'•' `M T Rf_$S -- 1 INV.OUT-4902.68(NE) L 1 I a (zip CONNECTE _4y,D TO EXISTING SANITARY- �-— --- I 1Yr SEWER TIED PLUGGED AND 1Yr _—_—_—_=yti,,__—. _ _ _ _ __ ABANDONED IN PLACE EXISTING —S9 DRAIN FILED LINE AND SEPTIC I / I -— - ---- I ; xi J \•(�pP D 29 50 100 SYSTEM. SCALE: 1'=50' INSTALLED 4•THICKNESS OF 2//FTe_/SNO- A90VFOAM INSL1LSWE as EOUAL,6• ` I A$-BUILT DRAWING ABOVE SANITARY SEWER SERVICE UNE, BED IN MINIMUM OF 3.OF 3�4•MINUS CRUSHED GRAVEL(SEE DETAIL THIS SHEET) t .• I I i -—- I • — L SEPTEMBER 1999 SAN�TARY SEWO MAI GENERAL NOTES ' -- 1. UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE AND ARE NOT TO BE CONSIDERED COMPLETE. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL BURIED UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION. - N THE CONSTRUCTION. SHALL PROTECT ALL EXISTING UTILITY LINES DURING 11I CONSTRUCTION. ALL UTILITY LINES DAMAGED DURING CONSTRUCTION ACTIVITIES SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. NOTE: + "a 2. ALL CONSTRUCTION SHALL CONFORM TO THE ACCOMPANYING PLANS AND THE .$$a MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, FOURTH EDInON, DATED MAN HOLE RIM ELEVATIONS WILL CHANGE WHEN a a JANUARY. 1996. ADDENDUM No. 1, DATED JUNE, 1998, AND THE CITY OF BOZEMAN ADJUSTED TO FINISHED PARKING LOT GRADE. $�, �i.- MODIFICATIONS, DATED MAY, 1997, ADDENDUM No. 1, DATED FEBRUARY 28, 1998. rlws+m mAOE - 4 _ EXISTING GROUND PROFILE __ _ - �� 3. NO CHANGE OR MODIFICATION OF THE APPROVED PLANS AND SPECIFICATIONS �$ PROPOSED FINISHED GRADE ��� i SHALL BE MADE WITHOUT THE PRIOR WRITTEN APPROVAL OF THE ENGINEER AND THE CITY OF BOZEMAN ENGINEERING DEPARTMENT. 24' 4. A PRECONSTRUCTION MEETING SHALL BE HELD PRIOR TO COMMENCEMENT OF WORK. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER x sY 3/4•MINUS CRUSHED GRAVEL,OR SAND BUM OF -- ----- 4 INCHES PIPE AND INSULATION,To A MINIMUM OF WORKING DRAWINGS, SPECIFICATION P SHEETS, ETC., FOR ALL EQUIPMENT AND 4 INaEs ABOVE INSULATION. MATERIALS TO BE USED ON THE PROJECT AT LEAST ONE WEEK PRIOR TO THE PRECONSTRUCTION MEETING. INSTALLATION SHALL NOT BE 4•THICKNESS OF SNO-FOAM,HEAVY DENSITY MADE WITHOUT THE PRIOR WRITTEN APPROVAL OF ALL EQUIPMENT AND u - _ (2.0//CU.FT.)EXPANDED POLYSTYRENE(EPS) MATERIALS BY THE ENGINEER. u - RIGID INSULATION(OR EOUAL). " 5. THE ENGINEER AND THE CITY OF BOZEMAN ENGINEERING DEPARTMENT SHALL _ 4•PVC SANITARY SEWER SERVICE UNE BE NOTIFIED AT LEAST 24 HOURS PRIOR TO BEGINNING CONSTRUCTION. - = 6. TYPE 1 OR TYPE 2 TRENCH EXCAVATION MAY BE USED AT THE DISCRETION F.e•Acne 3034$OR 3$P OF THE CONTRACTOR. VC O 0.60X 790 7. PROJECT BENCHMARK: NORTHWEST BONNET BOLT, FIRE HYDRANT 605 AT -� - - - 49m SERVICE PIPE INSULATION THE SOUTHWEST CORNER OF WEST KAGY BLVD. AND SOUTH 11th AVE. ELEVATION = 4914.13 (PROJECT DATUM) 4•IeANNSTITALLARY_CLEAN-UUT$AS_YET_ ST'SS"AU$LEREOUI LOCAjjQNS-REn FFoig € 8. ALL CONSTRUCTION SHALL MEET APPLICABLE OSHA SAFETY STANDARDS. STA. 1+49 INSTALLED 95' (LT) N�p�'g jw xo, wwo8� 9. THE CONTRACTOR SHALL OBTAIN STREET CUT PERMITS FOR ALL WORK DONE €3.gggy WITHIN PUBLIC RIGHT-OF-WAY. 4899 10. THE CONTRACTOR SHALL REPAVE ALL AREAS OF EXISRNG ASPHALT REMOVED DURING CONSTRUCTION ACTIVITIES. MATCH EXISTING PAVEMENT THICKNESS. PiOPOSED GWND ELEV. SEWER LINE INVERT ELEV, ��+�s g 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY AND SAFELY FENCING FF STING GRWND I,ELEv. ALL OPEN EXCAVATIONS. THE FENCING SHALL BE MAINTAINED BY THE CONTRACTOR. 48W AS-BUILT DRAWING 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE CITY OF BOZEMAN FOR INSPECTION OF ALL SERVICE CONNECTIONS BEFORE BACK FILLING THE TRENCH. d o� ^�' September 1999 `o �oo v,7 F. 13 ALL BACKFILL SHALL BE TYPE 'A'. v as 7 tea' 2+00 1+00 D+OO Ro c k Mountain u n t a i n Engineers i n e e r s DESIGN BY: DATE: DRAWN BY: DATE: DRAWING SCALES- Y 9 RHC/AOR 04/20/99 AOR 04/21/99 PLAN VIEW: HORIZONTAL: = 50' SANITARY SEWER MAIN EXTENSION ����� - - -- REVISIONS: DATE: CHECKED BY: DATE: CONTOUR INTERVAL- 1' Civil Engineering & Land Surveying AS-BUILT 09/20/99 PROFILE VIEW: HORIZONTAL: 1' = 50' FOR q ®2 �I 1700 West Koch Street, Suite 7, Bozeman, Montana 59715 (406)-586-4859 DRAWING FILENAME: /787-KZLO-ASBLT.dwg 09/20/99 VERTICAL: 1' = 5' 9�50 WESY ICAC�Y BOIJLEVAR® a If- u