Commission Memorandum
REPORT TO: Honorable Mayor and City Commission
FROM: Chris Kukulski, City Manager
Anna Rosenberry, Administrative Services Director
SUBJECT: Adoption of the Street Impact Fee Fund Capital Improvement Plan
(CIP) for FY15-19.
AGENDA ITEM TYPE: Action
MEETING DATE: December 16, 2013
RECOMMENDATION: Adopt the Street Impact Fee Fund Capital Improvement Plan
(CIP) for FY15-19.
***This item is meant to work in conjunction with the Intersection Funding Discussion and
Resolution, previous on this Agenda.***
BACKGROUND: Each year, the City Manager is required to prepare a 5 Year Capital
Improvements Plan and submit it to the Commission by December 15th. The City’s Impact Fee
Advisory Committee (IFAC) met on November 14th to review and make recommendations for
the planned expenditures of Street Impact Fees. There was not a quorum of the committee,
however, those present made suggestions and asked that the schedules move forward to the
Commission.
1. Revenue estimates for Impact Fee collections should be updated from the amount
budgeted in FY14. The attached schedule revenue estimates for FY15 show the 5-year
average of collections (FY09-13), with a modest amount of annual growth projected in
years 2016-2019.
187
2. The Committee recommended that we prepare to schedule Intersection Improvements as
needing a 40% Other Source (local share) to be combined with 60% Impact Fee money.
As a result, we are showing the full project cost on the expenditure tables, with a “Local
Share” item listed with Revenues on the Financial Summary sheet.
3. They recommended to remove from the previous plan:
a. SIF22 – Intersection Control, College & 8th
b. SIF26 – Intersection Control, Church & Kagy
4. They discussed removing, be elected to keep:
a. SIF32 - Intersection Control, Manley Road & Griffin Drive
b. SIF33 – Intersection Control, N 7th and Griffin Drive
5. They recommended scheduling of construction projects for:
a. SIF08 – Durston Road, Fowler to Ferguson in FY17.
b. SIF36 – Cottonwood, Babcock to Oak
c. SIF38 – Ferguson, Baxter to Oak
d. SIF43 – South 11th Ave, Opportunity to Arnold
6. Staff has discussed the following projects as potential Impact Fee projects, and
recommends their inclusion in the Schedule. These are missing segments of important
streets. The amount of the project that would be eligible is undetermined at this point.
a. SIF46 – Oak Street, New Holland to Ferguson
b. SIF47 – N 27th Ave, Tschache to Oak Street
UNRESOLVED ISSUES: The primary unresolved issue for this CIP schedule remains to
identify the “Other Source (local share)” needed for construction of the Intersection
Improvements. Although we show a number of intersections scheduled for construction in
FY15, we expect that we’ll likely need to spread those projects to future years in order to fit with
local share funding, once that is known.
Also unresolved is the amount of “other source” money that will be available for street projects
on collectors and arterials, and when it will be available for the scheduled projects such as:
• SIF08 – Durston, Fowler to Ferguson
• SIF36 – Cottonwood, Babcock to Fowler
188
• SIF38 – Ferguson, Baxter to Oak
ALTERNATIVES: As suggested by the City Commission. If the Commission is does
not wish to adopt this schedule tonight, it can be scheduled for approval on a later agenda.
FISCAL EFFECTS: This step in the process has no fiscal effect. Once adopted, the
Capital Improvements Plan becomes the basis of the City Manager’s Recommended Budget for
FY15.
Report compiled on: December 9, 2013
Attached: Draft Street Impact Fee Fund CIP
189
Street Impact Fee Capital Improvement PlanFinancial Summary Current YearFY14 FY15 FY16 FY17 FY18 FY19UnscheduledProjected Beginning Reserve Balance Dedicated to CIP 10,216,098$ 7,741,098$ 5,751,167$ 6,125,937$ 3,071,003$ 4,546,970$ Plus: Impact Fee Revenues Dedicated to CIP 981,000$ 1,485,069$ 1,514,770$ 1,545,066$ 1,575,967$ 1,607,486$ ‐$ Plus: Urban Funds: SIF09, Kagy (Willson to 19th)260,000$ 2,400,000$ Plus: Local Share of Intersections (40% of Total)1,800,000$ 1,530,000$ Plus: SID or other sources 950,000$ 600,000$ Less: City Share of SIF06, College (Main to 19th) (3,106,000)$ Less: Scheduled CIP Project Costs (350,000)$ (5,275,000)$ (2,350,000)$ (7,600,000)$ (100,000)$ (100,000)$ (27,575,000)$ Projected Year‐End Cash Dedicated to CIP 7,741,098$ 5,751,167$ 6,125,937$ 3,071,003$ 4,546,970$ 6,054,457$ (26,045,000)$ Assumptions Made for Revenue Estimates: Current YearFY14 FY15 FY16 FY17 FY18 FY19Estimated Annual Street Impact Fee Revenues 981,000$ 1,455,950$ 1,485,069$ 1,514,770$ 1,545,066$ 1,575,967$ Estimated Annual Increase 0.0% 2% 2% 2% 2% 2%Total Estimated Revenues 981,000$ 1,485,069$ 1,514,770$ 1,545,066$ 1,575,967$ 1,607,486$ Current Revenues Dedicated to CIP % 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% Plus: Increase Dedicated to Street Capacity Expansion CIP 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%Total%DedicatedtoCIP100 0%100 0%100 0%100 0%100 0%100 0%ProjectedProjected Total % Dedicated to CIP100.0%100.0%100.0%100.0%100.0%100.0%Total Estimated Revenues Dedicated to CIP 981,000$ 1,485,069$ 1,514,770$ 1,545,066$ 1,575,967$ 1,607,486$ 26,000,00021,000,00016,000,00011,000,0006,000,0001,000,000FY15 FY16 FY17 FY18 FY19 UnscheduledStreet Impact Fee Projects 190
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15FY17FY18FY19Impact Fees StreetsSIF01STREET IFRIGHT OF WAY ACQUISITION$100,000$100,000$100,000$100,000$100,000SIF02STREET IFBAXTER LANE, 19TH TO COTTONWOOD$3,350,000SIF05STREET IFCOLLEGE STREET 8TH AVENUE TO 19TH AVENUE)$3,300,000SIF08STREET IFDURSTON ROAD, FOWLER AVE. TO FERGUSON AVE.$1,500,000SIF09STREET IFKAGY BOULEVARD, WILLSON AVENUE TO 19TH AVENUE$650,000$6,000,000SIF21STREET IFGRAF STREET CONNECTION$1,000,000SIF23STREET IFHIGHLAND BOULEVARD, MAIN ST. TO KAGY BLVD.$7,600,000SIF34STREET IFFOWLER CONNECTION$1,500,000SIF36STREET IFCOTTONWOOD ‐ BABCOCK TO OAK$200,000$1,100,000SIF37STREET IFTRANSPORTATION PLAN UPDATE$125,000SIF38STREET IFFERGUSON ‐ BAXTER TO OAK$100,000$500,000SIF43STREET IFSOUTH 11TH AVE, OPPORTUNITY TO ARNOLD$250,000SIF46STREET IFOAK STREET, NEW HOLLAND TO FERGUSON$4,800,000SIF47STREET IFN 27TH AVE, TSCHACHE TO OAK STREET$2,200,000$775,000$2,350,000$7,600,000$100,000$100,000$23,750,000Impact Fees StreetsSIF20STREET INTINTERSECTION CONTROL 7TH AVE. & KAGY BLVD.$650,000SIF24STREET INTINTERSECTION CONTROL, HIGHLAND BLVD. AND ELLIS ST.$500,000SIF25STREET INTINTERSECTION CONTROL, HIGHLAND BOULEVARD AND KAGY BOULEVARD$750,000191
CIP PROJECT FUPROJ.DEPARTMENTPROJECT NAMEFY16UnscheduledFY15FY17FY18FY19SIF27STREET INTINTERSECTION CONTROL, COTTONWOOD ROAD & DURSTON AVENUE$500,000SIF32STREET INTINTERSECTION IMPROVEMENTS, MANLEY ROAD & GRIFFIN DRIVE$925,000SIF33STREET INTINTERSECTION CONTROL, N. 7TH AVENUE AND GRIFFIN DRIVE$500,000SIF39STREET INTINTERSECTION CONTROL ‐ FERGUSON & DURSTON$750,000SIF40STREET INTINTERSECTION CONTROL ‐ MAIN & BROADWAY$750,000SIF41STREET INTINTERSECTION CONTROL ‐ FERGUSON & BABCOCK$750,000SIF42STREET INTINTERSECTION CONTROL ‐ BAXTER & DAVIS$750,000SIF44STREET INTINTERSECTION CONTROL, FERGUSON & OAK STREETS$750,000SIF45STREET INTINTERSECTION CONTROL, OAK AND 27TH AVENUE$750,000$4,500,000$3,825,000Summary for Impact Fees Streets (26 items)Totals by year:$5,275,000 $2,350,000 $7,600,000$27,575,000FY15FY16FY17UnscheduledFY19$100,000$100,000FY18192
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF01
DEPARTMENT
STREET IF
PROJECT NAME
RIGHT OF WAY ACQUISITION
FY15
$100,000
FY16
$100,000
Unscheduled
DESCRIPTION OF PROJECT
Annual allocation available for right-of-way purchases as they become available. Purchasing additional right-of-way is critical to
expanding the capacity of streets in the city. This is deemed to be 100% impact fee eligible – as additional right-of-way is not
required if we are not expanding the capacity of the street.
ALTERNATIVES CONSIDERED
Condemn property for right-of-way; pay court costs as well as appraised value of property. Time consuming for city staff and a
relatively expensive process.
ADVANTAGES OF APPROVAL
Provides dollars for the purchase of necessary right-of-way as it becomes available on the market. Avoids the expensive,
antagonistic condemnation process where possible.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Street Impact Fees can not be spent on operating and maintaining facilities. There is
expected to be a very minimal, incremental cost to the Street Maintenance District from this expenditure.
FUNDING SOURCES
100% Street Impact Fees
New
Replacement
Equipment
Project
FY17
$100,000
FY18
$100,000
FY19
$100,000
193
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF02
DEPARTMENT
STREET IF
PROJECT NAME
Baxter Lane, 19th to Cottonwood
FY15 FY16 Unscheduled
$3,350,000
DESCRIPTION OF PROJECT
Reconstruct Baxter Lane from 19th Avenue to Cottonwood to a Minor Arterial standard as shown in the Transportation Plan.
Continued development in the northwest quadrant of the city will be sustained by having this important east-west arterial
improved to a complete street standard.
ALTERNATIVES CONSIDERED
Full payment by SID, or developer constructed.
ADVANTAGES OF APPROVAL
Improved capacity and safety in this corridor;
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost
estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
60% - Street Impact Fees = $2,000,000 40% - Special Improvement District (SID) or Other = $1,350,000
New
Replacement
Equipment
Project
FY17 FY18 FY19
194
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF05
DEPARTMENT
STREET IF
PROJECT NAME
College Street 8th Avenue to 19th Avenue)
FY15 FY16 Unscheduled
$3,300,000
DESCRIPTION OF PROJECT
Reconstruct West College Street from 8th Avenue to 19th Avenue to a minor arterial standard as shown in the Transportation
Plan. This section of West College has already exceeded the volume of traffic it was projected to carry in 2020 according to the
Transportation Plan. Improvements to South 19th and increased development in the South 19th corridor will only further
increase traffic demand on this facility. Additionally this facility lacks pedestrian and bicycle facilities.
ALTERNATIVES CONSIDERED
Use of Urban funds for full financing, CTEP grants if available.
ADVANTAGES OF APPROVAL
Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians. The use of street impact fee funds
enables the community to leverage the available State Urban transportation funds to complete other projects and address more of
the city’s pressing transportation needs.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians. The use of street impact fee funds
enables the community to leverage the available State Urban transportation funds to complete other projects and address more of
the city’s pressing transportation needs.
FUNDING SOURCES
60% - Street Impact Fees = $2,000,000, 40% Urban, CTEP or other Funds - $1,300,000
New
Replacement
Equipment
Project
FY17 FY18 FY19
195
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF08
DEPARTMENT
STREET IF
PROJECT NAME
Durston Road, Fowler Ave. to Ferguson Ave.
FY15 FY16 Unscheduled
DESCRIPTION OF PROJECT
Over recent years, Durston Road has been significantly improved, except for this small portion of the road. This ~ 1/4 mile length
of road needs to be improved with completed sidewalk, bike lanes, and additional driving/turning lanes. Incremental improvement
of Durston Road with development projects may be possible, thus preventing a severe drop in service level similar to that
experienced on West Babcock Street.
ALTERNATIVES CONSIDERED
SID for full financing, or incremental construction by developers.
ADVANTAGES OF APPROVAL
Improved safety and capacity, both for motorized vehicles as well as bicycles and pedestrians. The use of street impact fee funds
enables the community to leverage the available State Urban transportation funds to complete other projects and address more of
the city’s pressing transportation needs.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost
estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
60% - Street Impact Fees; 40% SID or other funding.
New
Replacement
Equipment
Project
FY17
$1,500,000
FY18 FY19
196
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF09
DEPARTMENT
STREET IF
PROJECT NAME
Kagy Boulevard, Willson Avenue to 19th Avenue
FY15 FY16
$650,000
Unscheduled
DESCRIPTION OF PROJECT
This project consists of widening Kagy Boulevard from the intersection of S. 19th Avenue to Willson Avenue to a three lane
urban arterial standard. This includes one travel lane in each direction, bike lanes on each side, curb and gutter throughout,
boulevard, sidewalks and a raised median. Kagy serves as an important element of Bozeman's perimeter street system connecting
Highland Blvd., Willson Ave. and S.19th. It also serves as the primary access to Montana State University and the University's
major athletic facilities.
ALTERNATIVES CONSIDERED
SID for full financing, Urban funds or incremental construction by developers.
ADVANTAGES OF APPROVAL
Kagy is a State Urban Route and is eligible for expenditure of State urban funds designated annually for the City of Bozeman;
however, the availability of urban funds cannot match the pace of the City's transportation improvement needs. The need for this
project comes from increased traffic due to growth in the Bozeman area and the project is eligible for Impact Fee Funds. Use of
Street Impact Funds enables the community to leverage the available State Urban transportation funds to complete projects and
address more of its pressing transportation needs.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost
estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
Total Project: $6,650,000. 60% - Street Impact Fees = $3,990,000; 40% - Urban Funds = $2,660,000
New
Replacement
Equipment
Project
FY17
$6,000,000
FY18 FY19
197
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF20
DEPARTMENT
STREET INT
PROJECT NAME
Intersection Control 7th Ave. & Kagy Blvd.
FY15 FY16 Unscheduled
$650,000
DESCRIPTION OF PROJECT
Control of the intersection of 7th Avenue and Kagy Boulevard, a collector and an arterial. Includes the installation of a traffic
signal or roundabout. 7th Avenue is a two lane collector north of this intersection and a two lane local street south of the
intersection. Kagy Boulevard is a two lane arterial. This intersection currently has stop control on 7th Avenue. Recent
development and increased traffic indicate that a signal or roundabout will soon be not only warranted but justified. This
intersection is a major access point for the MSU campus.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by the Montana Department of Transportation. Attempt to create an SID
or identify and apply for other potential sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Proposed 60% Impact Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
198
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF21
DEPARTMENT
STREET IF
PROJECT NAME
Graf Street Connection
FY15 FY16 Unscheduled
$1,000,000
DESCRIPTION OF PROJECT
This project consists of extending Graf Street approximately ¼ mile in order to connect the street with South 19th Avenue to
allow through traffic to flow east and west to and from 19th Avenue. This is an important connection for public safety purposes –
allowing fire and emergency services to meet their response time requirements in areas where they currently cannot.
ALTERNATIVES CONSIDERED
Do nothing and wait for development to connect the street.
ADVANTAGES OF APPROVAL
Improved traffic flow and better emergency response to the local area.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current cost
estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
100% Street Impact Fees.
New
Replacement
Equipment
Project
FY17 FY18 FY19
199
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF23
DEPARTMENT
STREET IF
PROJECT NAME
Highland Boulevard, Main St. to Kagy Blvd.
FY15 FY16 Unscheduled
$7,600,000
DESCRIPTION OF PROJECT
This project consists of widening Highland Boulevard from the intersection with Main Street to the intersection with Ellis Street
to a five-lane urban arterial standard, and from the intersection with Ellis Street south to the intersection with Kagy Boulevard to
a three-lane urban arterial standard. This roadway is currently a minor arterial roadway with one travel lane in each direction.
This project serves as a long-term need that will be necessary to accommodate future development patterns in the region and
serve north-south traffic flow. It is expected that a minimum of two travel lanes in each direction from Main Street to Ellis Street,
one travel lane in each direction from Ellis Street to Kagy Boulevard, bike lanes on each side, curb and gutter, boulevard, sidewalk,
and a raised median will be required.
ALTERNATIVES CONSIDERED
Use of Urban Funds, developer contributions and/or creation of an SID for full financing.
ADVANTAGES OF APPROVAL
Increased capacity and safety in this corridor, both for motorized vehicles as well as bicycles and pedestrians. The use of street
impact fees enables the community to leverage the available State Urban Funds to complete other needed projects.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: Incremental increases in sweeping, plowing and general maintenance costs. Current
cost estimate of $8,725 per street mile maintained annually.
FUNDING SOURCES
Estimated: 50% Street Impact fees ($3,600,000.00), and 50% Urban Funds, Special Improvement District (SID) or Other,
$3,600,000.00.
New
Replacement
Equipment
Project
FY17 FY18 FY19
200
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF24
DEPARTMENT
STREET INT
PROJECT NAME
Intersection Control, Highland Blvd. and Ellis St.
FY15 FY16 Unscheduled
$500,000
DESCRIPTION OF PROJECT
Identified as TSM -20 in the 2007 Transportation Plan Update. Includes installation of a traffic signal, roundabout or other
adequate traffic control device when warrants are met. Highland Boulevard is currently a two-lane minor arterial roadway and
Ellis Street is a two-lane local street. This intersection currently has stop control on Ellis Street.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by MDT. Create an SID or identify other and apply for other potential
sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: None
FUNDING SOURCES
Proposed 60% Impact Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
201
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF25
DEPARTMENT
STREET INT
PROJECT NAME
Intersection Control, Highland Boulevard and Kagy Boulevard
FY15 FY16 Unscheduled
$750,000
DESCRIPTION OF PROJECT
Identified as TSM -9 in the 2007 Transportation Plan Update. Includes installation of a traffic signal, roundabout or other adequate
traffic control device when warrants are met. Highland Boulevard is currently a two-lane minor arterial roadway and Kagy
Boulevard is a two-lane principal arterial.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by MDT. Create an SID or identify other and apply for other potential
sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: None.
FUNDING SOURCES
Proposed 60% Impact Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
202
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF27
DEPARTMENT
STREET INT
PROJECT NAME
Intersection Control, Cottonwood Road & Durston Avenue
FY15 FY16 Unscheduled
$500,000
DESCRIPTION OF PROJECT
Includes installation of a traffic signal, roundabout or other adequate traffic control device when warrants are met. Cottonwood
Road is currently a two-lane principal arterial roadway and Durston Road is a three-lane minor arterial.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by MDT. Create an SID or identify other and apply for other potential
sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Increased capacity and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating and Maintenance Costs: None
FUNDING SOURCES
Proposed 60% Impact Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
203
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF32
DEPARTMENT
STREET INT
PROJECT NAME
Intersection Improvements, Manley Road & Griffin Drive
FY15 FY16 Unscheduled
$925,000
DESCRIPTION OF PROJECT
This project consists of the installation of a Traffic Signal or roundabout at the intersection of Manley Road & Griffin Drive,
installation of a Turn Lane on Griffin Drive and the Relocation of associated railroad crossing equipment on Griffin Drive.
ALTERNATIVES CONSIDERED
ADVANTAGES OF APPROVAL
Facilitates development of property in the immediate area.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal
FUNDING SOURCES
Project Estimates - Traffic Signal $575,000, Turn Lane $175,000, Railroad Equipment Relocate $175,000. Proposed 60% Impact
Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
204
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF33
DEPARTMENT
STREET INT
PROJECT NAME
Intersection Control, N. 7th Avenue and Griffin Drive
FY15 FY16 Unscheduled
$500,000
DESCRIPTION OF PROJECT
Control of the intersection of 7th Avenue and Griffin Drive. Includes the installation of a traffic signal or roundabout. Future
development and the resulting increased traffic indicate that intersection improvements will be needed.
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by the Montana Department of Transportation. Create an SID or identify
and apply for other potential sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal
FUNDING SOURCES
Proposed 60% Impact Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
205
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF34
DEPARTMENT
STREET IF
PROJECT NAME
FOWLER CONNECTION
FY15 FY16 Unscheduled
$1,500,000
DESCRIPTION OF PROJECT
Fowler Avenue is classified as a minor arterial and is an important north-south corridor in the west part of the City. This project
would fill in the quarter mile gap in the roadway that exists between West Babcock and Durston Road. This project would
involve the purchase of the necessary right-of-way and construction of a two lane minor arterial between West Babcock Street
and Durston Road.
ALTERNATIVES CONSIDERED
Do nothing.
ADVANTAGES OF APPROVAL
Traffic on Fowler Avenue between Garfield and West Babcock Street has increased dramatically since the connection to Garfield
and hence South 19th was made. Once north-bound traffic reaches West Babcock travelers are forced to drive on local streets
such as Hunter’s Way or Michael Grove. Construction of this section of Fowler will both allow motorists to stay on the arterial
system and reduce traffic on local streets.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Routine O & M will be required once constructed.
FUNDING SOURCES
Impact Fees, Special Improvement District, developer contribution.
New
Replacement
Equipment
Project
FY17 FY18 FY19
206
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF36
DEPARTMENT
Street IF
PROJECT NAME
Cottonwood - Babcock to Oak
FY15
$200,000
FY16
$1,100,000
Unscheduled
DESCRIPTION OF PROJECT
This project consists of widening Cottonwood Road from West Babcock Street to Oak Street to a three lane urban arterial
standard. This includes one travel lane in each direction, bike lanes on each side, curb and gutter throughout, boulevard, sidewalks
and a raised median. Cottonwood Road serves as an important element in Bozeman's west side street system and serves as a
primary north-south corridor on the west side of the city.
ALTERNATIVES CONSIDERED
SID for full financing, Urban funds or incremental construction by developers.
ADVANTAGES OF APPROVAL
Improved traffic flow and safety in this corridor.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
FUNDING SOURCES
Street Impact Fees, SID for upgrade of existing roadway portion, Urban funds or incremental construction by developers.
Current estimate is 50% SID/50% Impact Fees.
New
Replacement
Equipment
Project
FY17 FY18 FY19
207
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF37
DEPARTMENT
Street IF
PROJECT NAME
Transportation Plan Update
FY15
$125,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
Update Transportation Plan. Last plan was completed in 2007.
ALTERNATIVES CONSIDERED
Do not update plan. Continue improving infrastructure based on 2007 plan.
ADVANTAGES OF APPROVAL
Improving Infrastructure is costly and as Bozeman grows, our needs change. Updating our plan will allow us to make better
decisions on what areas need to improve.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
None
FUNDING SOURCES
Street Impact Fees
New
Replacement
Equipment
Project
FY17 FY18 FY19
208
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF38
DEPARTMENT
Street IF
PROJECT NAME
Ferguson - Baxter to Oak
FY15
$100,000
FY16
$500,000
Unscheduled
DESCRIPTION OF PROJECT
This project consists of constructing Ferguson Boulevard from Oak Street to Baxter Lane to a three lane collector standard. This
includes one travel lane in each direction, bike lanes on each side, curb and gutter throughout, boulevard, sidewalks and a raised
median. Ferguson is an important collector on the west side of the City and ultimately leads north to Chief Joseph Middle School.
ALTERNATIVES CONSIDERED
SID for full financing, or incremental construction by developers.
ADVANTAGES OF APPROVAL
Improved traffic flow and safety in this corridor, as well as improved access to Chief Joseph Middle School.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal.
FUNDING SOURCES
Street Impact Fees, SID, or incremental construction by developers. Current estimate is 50% SID/50% Impact Fees.
New
Replacement
Equipment
Project
FY17 FY18 FY19
209
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF39
DEPARTMENT
STREET INT
PROJECT NAME
Intersection Control - Ferguson & Durston
FY15
$750,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
Intersection Control
ALTERNATIVES CONSIDERED
Accept the current level of service (do nothing). Alternative financing could be provided by creating an SID or Payback District.
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal
FUNDING SOURCES
Proposed 60% Impact Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
210
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF40
DEPARTMENT
STREET INT
PROJECT NAME
Intersection Control - Main & Broadway
FY15
$750,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
Intersection Control
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by the Montana Department of Transportation. Create an SID, Payback or
identify and apply for other potential sources of funding (CMAQ…). Developer Contribution.
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal
FUNDING SOURCES
Proposed 60% Impact Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
211
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF41
DEPARTMENT
STREET INT
PROJECT NAME
Intersection Control - Ferguson & Babcock
FY15
$750,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
Intersection Control
ALTERNATIVES CONSIDERED
Accept the current level of service (do nothing). Alternative financing could be provided by creating an SID or Payback District.
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal
FUNDING SOURCES
Proposed 60% Impact Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
212
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF42
DEPARTMENT
STREET INT
PROJECT NAME
Intersection Control - Baxter & Davis
FY15
$750,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
Intersection Control
ALTERNATIVES CONSIDERED
Accept the current level of service (do nothing). Alternative financing could be provided by creating an SID or Payback District.
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal
FUNDING SOURCES
Proposed 60% Impact Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
213
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF43
DEPARTMENT
STREET IF
PROJECT NAME
South 11th Ave, Opportunity to Arnold
FY15
$250,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
This project is for the capacity expanding share of South 11th Avenue, Opportunity to Arnold Street
ALTERNATIVES CONSIDERED
Full payment by SID, or developer constructed.
ADVANTAGES OF APPROVAL
Improved capacity and safety in this corridor;
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Annual Operating & Maintenance Costs: Street Impact Fees can not be spent on operating and maintaining facilities. There is
expected to be a very minimal, incremental cost to the Street Maintenance District from this expenditure.
FUNDING SOURCES
100% Street Impact Fees for the capacity expanding share.
New
Replacement
Equipment
Project
FY17 FY18 FY19
214
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF44
DEPARTMENT
STREET INT
PROJECT NAME
Intersection Control, Ferguson & Oak Streets
FY15
$750,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
Intersection control at Ferguson and Oak Streets.
ALTERNATIVES CONSIDERED
Accept the current level of service (do nothing). Alternative financing could be provided by creating an SID or Payback District.
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal
FUNDING SOURCES
Proposed 60% Impact Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
215
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF45
DEPARTMENT
STREET INT
PROJECT NAME
INTERSECTION CONTROL, OAK AND 27TH AVENUE
FY15
$750,000
FY16 Unscheduled
DESCRIPTION OF PROJECT
<div>Intersection control at Oak and 27th Avenues</div>
ALTERNATIVES CONSIDERED
Do nothing or consider other alternatives as suggested by the Montana Department of Transportation. Create an SID or identify
and apply for other potential sources of funding (CMAQ…)
ADVANTAGES OF APPROVAL
Improved traffic flow and safety at this intersection.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal
FUNDING SOURCES
Proposed 60% Impact Fees and 40% Local Share (other).
New
Replacement
Equipment
Project
FY17 FY18 FY19
216
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF46
DEPARTMENT
STREET IF
PROJECT NAME
OAK STREET, NEW HOLLAND TO FERGUSON
FY15 FY16 Unscheduled
$4,800,000
DESCRIPTION OF PROJECT
This Project is the completion of the street segment of Oak Street, from New Holland to Ferguson. Currently, the south half of
the street is missing, creating a bottleneck in the street network.
ALTERNATIVES CONSIDERED
Leave as-is. Wait for the developer to build the street.
ADVANTAGES OF APPROVAL
This project will expand the capacity of our street network and improve safety for drivers and pedestrians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
minimal
FUNDING SOURCES
Street Impact Fees, Developer Contribution for local share, other. Total cost estimates are shown. Design $800,000.
Construction $4,000,000.
New
Replacement
Equipment
Project
FY17 FY18 FY19
217
CIP Project Fund
Impact Fees Streets
PROJECT NUMBER
SIF47
DEPARTMENT
STREET IF
PROJECT NAME
N 27TH AVE, TSCHACHE TO OAK STREET
FY15 FY16 Unscheduled
$2,200,000
DESCRIPTION OF PROJECT
This Project is the completion of the street segment of N 27th Avenue, between Oak Street and Tschache Road. Currently, the
east half of the street is missing, creating a bottleneck in the street network.
ALTERNATIVES CONSIDERED
Leave as-is. Wait for the developer to build the street
ADVANTAGES OF APPROVAL
This project will expand the capacity of our street network and improve safety for drivers and pedestrians.
ADDITIONAL OPERATING COSTS IN THE FUTURE, IF FUNDED
Minimal
FUNDING SOURCES
Street Impact Fees, Developer Contribution for local share, other. Total cost estimates are shown. Design $360,000.
Construction $1,800,000.
New
Replacement
Equipment
Project
FY17 FY18 FY19
218